Good morning, and thanks to all of you for joining our Capital Market Day. We've got a couple of busy hours ahead of us. To begin, Luca Moroni, our CFO, will walk through the results for nine months. After that, Renato Mazzoncini, our CEO, will take you through the update on our capital and the strategic plan at 2035. With no further delay, we're ready to get started, and I'll hand things over to Luca.
Thanks a lot, Marco. As usual, I'll walk through the presentation of the results for our nine months. Good. We're showing solid resilience in economic and financial results, even with the exceptional hydroelectric production seen the year before. Margin contributions from the electricity network's growing performance, the higher Capacity Market premium, and rising urban waste treatment prices offset the negative effect of lower hydroelectric output, which came back to historical average levels, along with the exit from the safeguard market. Strong economic and financial performance was confirmed. Reported EBITDA posted a modest decline, coming in at EUR 1,729 million. Excluding the hydroelectric production impact — one of the few exceptional effects seen in 2024 — EBITDA rose by 3%. Ordinary net income, stripping out special items booked in both 2024 and 2025, was down 16% versus the nine months of 2024, at EUR 559 million. If 2024 results are adjusted for last year's hydroelectric production effect, ordinary net income fell by 3%. We reaffirmed the strength of our financial ratios. Net financial position comes to EUR 5.3 billion, with a ratio of net financial position to EBITDA of 2.4x, down from 2.5x a year earlier.
Even with hydro volumes returning to normal levels, EBITDA held up well. In generation and trading, ordering EBITDA came in at EUR 623 million, down 20%, which is EUR 160 million lower than the first nine months of 2024. That shift is mostly due to our hydro production normalizing, -26%, -1 TWh, which cut margin by roughly EUR 130 million. Also at play: less opportunity from energy commodity hedging, a bigger contribution from thermoelectric production, and a higher premium awarded on the Capacity Market. Supply ordering EBITDA reached EUR 328 million, a decline of 9%, EUR -34 million versus the nine months of 2024. We saw the same marginality level as the comparable period last year, net of the safeguard market effect, which comes to EUR 33 million. The result reflects the positive impact of commercial development in the free-market electricity segment, 109,000 more customers than last year, +7%, lower retention costs, and higher operating costs stemming from sales channel mix. Circular Economy ordering EBITDA was EUR 423 million, up EUR 20 million, +5% against the first nine months of 2024.
In this case as well, the rise is mostly due to a favorable effect from waste-to-energy treatment prices, partly counterbalanced by reduced margin on the new Campania region contract covering management of the Acerra plant. There was also a favorable effect from district heating, driven by greater volumes sold — +96 GW thermic gigawatt-per-hour, +5% — along with higher volumes from white certificate sales. Marginality was slightly impacted by the decline in the Collection segment, chiefly as a result of the new contract signed with Milan following the tender. Regulated network EBITDA came to EUR 359 million, down 29% year-on-year. The margin contraction stems mainly from how the new electricity network perimeter performed, +68 million, together with growth in low revenues from a historical perimeter, EUR +23 million, and reduced marginality coming from the sale of gas distribution assets. Now let's look at our income statement, beginning with EBITDA of EUR 1,729 million. We posted EUR 704 million in depreciation, amortization, and write-off, higher than last year by EUR 45 million, 23%, reflecting the delta perimeter of the new electricity company, Duereti, and the new CapEx plan executed during the period. Net provisions were EUR 69 million, and net financial expenses were EUR 128 million, reflecting the new debt volume effect.
I just think back to the new issuance we completed in January — the EU Green Bond in the new format — along with the bridge loan tied to buying the new asset from Enel Distribuzione. Taxes came in at EUR 244 million, which is a reduction of EUR 42 million versus the first nine months of 2024, giving a tax rate of 29%, in line with the prior year. Minor interest was EUR 28 million, producing a net income of EUR 559 million, which includes EUR 22 million of special items, chiefly the plus value from the gas network asset deal. Group net income stands at EUR 581 million. We keep investing, growing, and supporting the ecological transition. CapEx for the first nine months totaled EUR 1,037 million, up 15% versus the same nine months a year earlier, backing the ecological transition. Development CapEx reached EUR 6,018 million, focused mainly on raising grid efficiency, increasing the flexibility of generation plants, and developing photovoltaic and wind power plants. 70% of CapEx is eligible for taxonomy, and 51% is aligned. Net free cash flow — over the period, the change in our net financial position was positive, at EUR 518 million.
Operating cash flow covered the CapEx plan and dividend payments in full, and that's very good news. As of September 30, the company reported a net financial position of EUR 5,317 million, consistent with the first alpha, reflecting an improvement of net financial position to EBITDA ratio to 2.4x compared to 2.5x as of the end of December 2024. In light of the solid result we have just commented, our guidance for EBITDA is confirmed in the upper end of the range, EUR 2,170 million-EUR 2,200 million, and the group net profit, net of non-recurring items, between the range of EUR 680 million-EUR 700 million. Thank you very much.
Thank you, Moroni. All right, thanks, Luca. Good morning, everybody. We appreciate your presence here or joining us online for our Capital Markets Day. From the time Luca walked through last quarter's results, you've come to know the name of the plan introduced a year ago, Lifeyards, and that name conveyed the tale of an organization dedicated to constructing tomorrow daily through investments in infrastructure and renewable energy, as Marguerite noted. Today we require additional electricity, greater efficiency, and enhanced sustainability. Data sits at the core of this transformation, and data centers are proliferating throughout our region and expanding at a very rapid pace. At this point, we stand prepared to capture our momentum in order to propel the digital and ecological transition, bringing both competencies and responsibility. Bear with me for a second, folks, since I began speaking before advancing the slide. No, apologies, I've returned. No enterprise is immune to the future, yet certain enterprises are prepared for it. A2A belongs among those, prepared to confront what lies ahead and prepared to supply power. Later today, we'll demonstrate how A2A is crafting one of Europe's most impressive energy-sector success narratives, a narrative rooted in financial discipline, industrial strengths, and strategic foresight, guided by a long-term vision centered on the dual possibilities offered by Energy Transition and Circular Economy, and further sped up through the advancement of artificial intelligence.
To kick things off, I'll give you a quick rundown. We began with a short look at the energy landscape that I believe you'll find quite interesting, and after that we'll walk through the main strategic highlights. Then I'll turn things over to Luca, who will walk you through our key financials and explain how long-term financial stability supports our growth and provides the foundation for accelerating going forward. Let's start with the landscape. Electrification is being driven by fast growth in data centers, which we'll discuss at length in the presentation, but that's not the only factor, since e-mobility and heat pumps keep coming down in cost and entering the market, which creates entirely additional electrical demand. This graph shows how electrical demand will grow over the next year. It makes clear that electricity demand is rising while, at the same time, demand for fossil energy is falling. On the whole, total final consumption is declining, because electrical equipment is also far more efficient than its fossil fuel counterparts, so there is an overall reduction. That's why electrification is also the only path to decarbonization. Decarbonization is further supported by more niche but essential technologies in complex urban settings, like waste-to-energy or district heating.
Now let's take a deeper look at what's happening with data centers in Italy. On this map, you can see that 55 GW of connection capacity has already been requested from Terna. The way it's distributed geographically doesn't just favor Lombardy — which isn't a surprise — but also two southern regions, specifically Puglia and Sicily, which sit on some of the world's most important underwater data networks. So we'll be in a position to capture opportunities. Think about our plants in the north, but also sites like San Filippo del Mela in Sicily or Brindisi in Puglia. Our estimate, which we presented, as you recall, in September in Cernobbio with Tea, is among the most conservative on the market right now. The base scenario is 2.3 GW, and full potential is 4.6 GW. The heat recovery potential for district heating is interesting because it can double the thermal energy available. That's a particularly interesting opportunity in Milan, which has 50% of Italian data centers in its territory, and the district heating network there currently covers only less than 20% of buildings. On one hand, a great opportunity to grow district heating; on the other, heat recovery from data centers.
Spending on Italy's electricity distribution grid exceeds EUR 10 billion annually, at least across the span of our industrial plan through 2035, with the main push coming from new demand but also from the requirement to hook up fresh renewable generation and renewable grid. Another point worth noting is that the PNIEC — our National Integrated Plan, Energy and Climate, revised by the Meloni government in 2024 — has raised the renewable energy goal to a level never seen before, 63% by 2030, which in my view is the obvious reaction after the wars of a country that ranks third in Europe for renewable potential after Norway and France, yet Italy has neither Norway's fossil fuel nor France's nuclear power. Alongside renewables, storage is expanding too. It is interesting, the outcome of the first MACSE tender, that outcome stems from very low battery prices, from competition between Chinese players, and therefore from a very low price of time shift. We have calculated roughly EUR 30-EUR 35 per megawatt hour as the cost of time shift, which makes renewable even more competitive during the day. Lastly, I would like to point out that the Capacity Market programs launched by Terna in recent years to avoid the risk of blackouts, such as what is seen in Spain, are leading to the construction of a powerful fleet of new high-efficiency gas-fired CCGT plants.
Efficiency comes in at 62%-63%, versus 40%-50% for the old plants. That means less CO2 and a lower energy price, and it replaces the Italian generation fleet with a power of 5 GW — more or less equal to all the Spanish nuclear power. The key point is that the load factor of CCGTs right now sits around 20%, and that also holds in the horizon of the plan without data centers. So that means it is more than able to cope with the increase in demand coming from data centers. You only need to look at the following graph to understand how our strategic decision in recent years has allowed A2A to pave the way toward electrification in Italy. We invested EUR 10 billion over the last 10 years — EUR 10 billion — 60% of which focused on electrification. Our investment in electrification includes the swap between part of A2A gas network and Enel's power grid in the province of Milan-Brescia. The result is the swap in the value of the RAB in our asset gas and power grid. Focused investment in renewable with a good mix of Wind and Solar to build increasingly competitive PPAs for our B2B customer, and an electricity customer base that has grown by 61% between 2020 and today — 61% the customer base electrical.
Right now A2A stands out for three things that are unique to it. First is its presence in both the Energy Transition and Circular Economy arenas. Second is its base in Lombardy, the heart of the development zone, and third is its readiness, which comes from investment decisions made earlier. The first of these — the one that truly sets A2A apart on the Italian scene — is that no other player is vertically integrated both in Energy Transition networks, generation, and customer base and in Circular Economy, with strong crossover elements like waste-to-energy and district heating. We have been making this case for a while, but a phenomenon has now emerged that has everyone's attention: the data center. It is a key competitive tool at the very center of the digital revolution, yet it demands a systemic approach to sustainability questions. Connection to the electricity grid, supply of base-load energy with low CO2 impact, an efficient cooling system and heat recovery, and efficient water management. Lombardy, once again, is at the heart of the action. We are ready. A2A is plainly a single development partner able to tackle all of these matters in an integrated and efficient manner. This is our momentum, driven by growth, new businesses, and new geographies, raising our productivity.
Here are the figures Luca will walk you through in greater depth shortly. We're staying on the course set back in January 2021, when, as you'll recall, we unveiled the initial 10-year plan. Back then, those targets looked extremely ambitious. Now we're beating the majority of them, even with the holdups caused by COVID and wars. Right now, momentum is on our side. EUR 23 billion of investment, still rising versus the Lifeyards plan, with EUR 16 billion of that going to the Energy Transition. The key thing, though, is this graph, which shows where our investment stands. Out of the EUR 23 billion of CapEx that will take A2A to EUR 3.6 billion of EBITDA, 35% is already done or being built, and 35% is already approved and ready to go. That's exactly what Europe needs, as Mr. Draghi points out in his well-known report, to create infrastructure that keeps Italy and Europe competitive and sustainable over time. As of today, the 12th of November, we currently have more than 250 large-scale construction sites across all our sectors. May I ask whether we can show a video, a very brief video about this. In past years, we didn't sit around waiting for the future.
We have built it. Yard by yard, year by year, we've grown renewable generation, reinforced strategic infrastructure, made grids increasingly smart, and brought together innovation and circularity. Now we're entering the age of artificial intelligence. Data centers — the engines behind this revolution — sit on our territories, and energy demand is rising exponentially. At A2A, we are ready, ready to supply efficient, sustainable power, ready to lead the digital and ecological transition. That's our momentum, the force carrying us into the future: A2A Momentum, ready to power. All right, let's begin with the strategy's highlights. Spending on the electricity grid continues to rise, hitting EUR 4.9 billion, which will lift the electricity RAB to EUR 4 billion by 2035. This acceleration, as we'll see, comes mainly from efficiently integrating the former Enel network. Two points I'd like to stress. First, EBITDA per pod is climbing strongly, thanks to rising investment, naturally, and to economies of scale created by doubling the number of pods A2A manages. As of today, we've reached 2 million pods managed. Second, rolling out the electricity network is projected to triple our present pace in kilometers of electricity grid lead, strengthening our dedication to electrification.
You can imagine I'm genuinely pleased that the dual rate deal has at last been properly understood. The good news for everyone is that, in year one, compared with the dual rate acquisition plan — and you'll recall we began managing this network in January 2025 — we've developed 23% more CapEx than expected. As you know, the worth of this network lies in the quantity of CapEx you're able to invest, which was not at all obvious in a network we didn't know, and with an absolute value more than double the investment made at the same pre-acquisition network in 2024. The EBITDA produced is 7% more than we estimated we had in the plan, in the acquisition plan. We're very satisfied, both from a strategic point of view with the performance we're achieving on the new network. The strategic value is clearly represented by the 280 MW of connection requested for data centers received only from January to date alone. Main connection for data centers up to 10 MW. If the data center arrives to 10 MW, it is the main connection. Backup connection for larger ones, because even the larger data centers start with a 10 MW medium voltage connection, because dual rate is faster than Terna in delivery and guarantees a faster time to market for developers.
The subject we're covering for them is this one. These days, data centers come up in every conversation, yet we shouldn't overlook mobility, since car costs have declined over recent years. That's noteworthy. City cars cost 24% less, small cars 12% less. And as you're aware, during that same stretch, the price of endothermic vehicles went up. Consistent with ordinary market dynamics, it will respond in kind, hitting a 20% share for electrical vehicles by 2035. Our estimate is that, at the national level, electricity consumption tied to electric transportation will get to 40 TWh. Without question, Lombardy and Milan will be front runners in e-mobility too. We keep investing selectively in charging infrastructure, focusing on the two segments we think will succeed, which are solely the slow charging city plugs, meaning low CapEx for widespread urban mobility, or high-power charging apps in extra-urban areas with heavy traffic. As for our renewable energy investment, we reaffirm the commitment to reach 3.7 GW with balanced development across Wind and Solar. Interestingly, we project a rise in production per megawatt installed thanks to the effect of repowering and greater productivity from new plants. Growth will be 54% in Wind and 28% in Solar.
Our pipeline has expanded as well, and it now stands at more than 2 GW of Wind and Solar capacity. The matter of how the Generation portfolio is risked is especially significant. As you're aware, that's a concern for you—extremely important. Diversification of generation sources remains the first level of that risking, in technology as well as geography. Relative to the usual description, we've introduced a meaningful distinction—a new one between traditional CCGTs and high-efficiency CCGTs. You know, it's the blue and color. The latter, clearly, will enjoy more market space—you recall 62%-63% of efficiency—and forms one of the strategic components of the risking. Furthermore, incentivize renewable, a Capacity Market, but also the expanding market for PPAs, which is growing. We estimated that we'll cover 65% of our renewable production, and 70% of our energy mix will be renewable. Finally, and importantly, the natural edging between generation and customer base stays crucial. As this graph shows, A2A remains long on sales, with generation well covered by final customers' consumption across the whole plan. On the customer side—so let's talk a little about customers—competition in the retail sector has increased. You know, this is the data per ARERA data, which shows rates have risen by 1.8x in recent years.
The curve is shifting in 2025 — that's what's happening. This comes from ARERA data as of today. Our electricity customer base is going to keep expanding relative to gas. You've seen how our mix of gas customers versus electricity customers is transforming entirely. When it comes to acquisition strategy, the aim is to pick geographies and sales channels with care, concentrating on bringing in high-value customers. The 5 million customer target stays confirmed, consistent with the earlier plan, and that holds for this year too, even with the customers lost under safeguard. Margins are still very healthy. Over in B2B, it's interesting — the dynamic runs the other way. Churn is going down, at a rate now even below retail. That's likely a first for our country's history. It's interesting because B2B is a segment where A2A is highly active, holding over 10% of market share. That's precisely thanks to the vertical integration strategy with generation which, hello, lets us offer corporate PPAs. Corporate PPAs stay key, and B2B customers are key for getting PPA agreements closed. Turning to the Circular Economy, let's begin with the waste cycle. On the European stage, Italy isn't a bad performer when it comes to the 2035 goals.
You recall that 10% — no more than 10% — goes to landfill, but much work remains. To be candid, in Lombardy, where A2A is the incumbent operator for urban waste, landfill usage is, you know, near zero. The plan calls for increases in the amount of waste processed as well as in the thermal and electrical energy recovered. It's worth noting that in 2024, the third waste-to-energy line at Parona came online, with a treatment capacity of roughly 250,000 tons, and a further plant of another 250,000 tons is already being built in Corteolona. You saw that in the video. As things stand today, A2A is the only company in Italy constructing a waste-to-energy facility at a time when the gap we must close to meet the European target stands at 4 million tons. A new feature of this plan is the combining of the waste management, water cycle, district heating, and data center operations into the new Circular Economy business unit. We have set up a new business unit called Circular Economy that brings all of this business together. The Circular Economy business unit, with a CapEx plan of EUR 6.5 billion, will achieve EUR 1.3 billion of EBITDA.
A key lever here is going to be a proactive integration across the B2B supply chain. Data center growth will have a major effect on the Circular Economy business unit. Take water management, for instance — it becomes essential when you're dealing with data centers. Let's dig a bit deeper into how A2A intends to tackle the data center business. We'll begin with the piece that's easiest to forecast. As an energy partner, A2A is a standard presence at a data center that's running or being built. Our estimate is that electricity demand growth stemming from data centers could hit 42 TWh when the scenario laid out in Chernobyl reaches its full potential. That's interesting, though our own scenario is considerably more cautious than the one Terna released a few days ago. In the Terna scenario, electricity demand was put at nearly 600 TWh — 508 TWh by 2050 — with data centers making a substantial contribution. What's more, Mr. Picchietto says each time that we get to 600 TWh of energy consumption. Once again, working from our most conservative scenario, we've calculated that electricity connection demand on the medium voltage grid in the province of Milan comes to 1,400 MW. In the same way, under our assumptions, we've estimated the energy that data centers could yield for district heating — 3 thermal terawatt-hours at full potential, enough to heat roughly 300,000 apartments in Milan.
When it comes to CapEx and EBITDA, the effect of A2A's energy partner activity sits inside the individual businesses. That covers generation, market, networks, and district heating, with upside still available to capture. If a party is involved, we don't want to show up merely to play the DJ. So, because our value proposition is very attractive, we've set aside EUR 1.6 billion of CapEx to develop a portion of the ambitious national data center plan. Let's examine that value proposition more closely. A key requirement for data centers is clearly a low-cost, high-resilience baseload energy supply. The optimal setup ensuring both of these elements simultaneously is connecting generation plants directly to the data center, which simply means the data center must sit near the generation plants. It's interesting to look at the map and see how many generation plants A2A operates in Lombardy and how tightly clustered they are around Milan. Baseload production—baseload production provided by our waste-to-energy plant as well as our thermal electrical plants, together with the growing renewable mix—is drawing considerable interest from operators regarding final energy supply cost and time to market.
At this point it's hard to judge whether energy cost or speed to market matters more, since the situation is genuinely unusual. Our projected EBITDA for 2035, including the addition tied to the energy partners' activities, comes to EUR 0.4 billion by 2035. We have already pinpointed the initial projects with care, and the earliest analyses are now in progress. I'm able to share the name today, though the graph makes it fairly clear. It's quite compelling to observe on the graph how much a partner such as A2A can shape the economics of developing a data center. As the chart shows, 65% of OpEx ties to energy consumption. The remainder covers personnel and maintenance. That 65% breaks down, again, as 65% for the server room, 25% for the cooling system, and 10% for other components. Owing to A2A's competitive edge, we are able to target that 65% of energy-linked consumption and bring the total cost below 50%. Trust me, that figure is extremely conservative. Through a direct link between the data center and generation plants — in Italy this is called SSPC, meaning a direct connection, a cable running from generation to the end user — we cut network charges, since in that setup you avoid paying TSO and DSO plus the associated tax.
Heat recovery—that's the second one—plus heat recovery for district heating and an efficient cooling supply. I keep energy and they lower the cost for the data center. On top of that, PPAs and energy management could reduce the volatility risk a business faces. Think about it: a data center is the ideal PPA customer, since its energy consumption baseload is super predictable across the entire life of a data center. I'd like to wrap up this section by discussing our geographical footprint, our backyard. It's worth recalling that when we presented the first 10-year plan in January 2021—some of you will surely remember—we had planned to develop A2A in Europe as well, along with some of the company's most core businesses, especially waste-to-energy and renewable energy. In 2022, after the Russia-Ukraine war, we updated the business plan by bringing all CapEx back to Italy, so we could contribute more quickly to our country's energy autonomy. Today, we believe it's necessary to return to a more European footprint—to a geographical diversification that lets us identify opportunities with higher returns and faster execution. The tender, let's say, between countries is about being more attractive for investment. So, a portion of the CapEx envisaged in the plan and not yet definitively allocated—there is a part of the CapEx that is not definitively allocated, meaning not additional, to be clear—can serve as an opportunity for international expansion, which will happen gradually and typically through the first inorganic moves.
Our attention is still on the core businesses, especially within the waste value chain, beginning with waste-to-energy and possible integration with Collection. You know, there's a natural advantage between connection and treatment that we need to preserve, along with district heating, and in the power value chain area by bringing together renewable generation, energy management, and the customer base. Our growth strategy will rest on country commitment, pinpointing potential targets for an initial external growth as an anchoring platform model for further development. That work is already in progress, and we have identified priorities across different countries in line with the targets. You can see the picture in the graph. For instance, the Iberian Peninsula and the U.K. are the most interesting for waste-to-energy, whereas Germany and Poland are of interest in the power supply chain. Okay, I'll close this part here, and now I hand the floor to Luca so I can drink some water. Please, Luca.
Thank you. Thank you, Renato. Now I'll take you through the plan's financials. Being an infrastructure company, we're putting forward EUR 23 billion of investments — a further step up from what we showed last year. That spending will deliver profitable growth across the plan horizon and let the company seize new opportunities coming from the changing needs of the utility sector. Deploying CapEx is set to drive structural industrial EBITDA, taking the place of the temporary boost from improved hydro conditions and the favorable hedging window we captured in the recent period. The EUR 23 billion of investment rests on our two familiar pillars, Energy Transition and Circular Economy. What's new for you is the EUR 1.6 billion of direct investment in data centers — the data center platform — which I'll go into later. Expectations around electrification and the potential for rapid, strong demand dynamics, also driven by data centers, have led us to be more selective about our project pipeline. We've chosen to raise investment in the electricity grid by close to EUR 800 million and to refocus our treatment investment mainly on energy recovery. This plan will produce a solid EBITDA CAGR of +5% from 2025 to 2035, and a CAGR of +6% if we move our base to 2028, when data center development begins to play its part.
The data center platform is our first structural move to anchor this opportunity within our targets, pushing a rising contribution toward EUR 300 million in EBITDA by 2035. And lastly, splitting EBITDA between merchant and low volatility activities shows the right mix of risk and stability, which underlines our confidence. From 2025 to 2035, with a solid 8% of growth during the 2028 to 2035 span. That growth excludes the full potential stemming from data centers, specifically greater electricity supply, medium voltage connection, and expansion of the district heating network. Our pledge of at least 4% year-over-year dividend growth stands confirmed, strengthening the company's emphasis on rewarding shareholders while keeping financial discipline. We think the fruit of our financial management will keep making A2A a highly attractive proposition for our shareholder, with a forecast return on investment of +9%, a 12% of return of equity, and a payout ratio between 45% and 55%. Our guidance anticipates EBITDA between EUR 2.21 billion-EUR 2.25 billion and ordinary net income ranging from EUR 630 million to EUR 660 million. These figures mirror the company's confidence in delivering steady operational performance and short-term profitability, while establishing the groundwork for stronger future growth via a remarkable CapEx plan.
Thanks. I’ll hand the floor back over to Renato now.
Thanks, Luca. I’ll take a few minutes for closing remarks, and after that we’ll begin the Q&A. Also, since this has been a long presentation—though I hope an interesting one—there are many opportunities. As in the presentation of a Lifeyards plan, let me leave you with this thought: A2A’s growth today no longer has the industrial machine as its bottleneck. On the contrary, it is full of human capital that wants to do, wants to grow, and to create long-lasting value. If anything, the bottleneck is our solid and rigorous approach to financial policies, which could also open up to partnership to seize further opportunities in the future. On this slide, you can see another EUR 300 million of potential EBITDA that can be generated by other projects that we already have in the pipeline. Talking about new utilities, battery, reforms of electricity grid, district heating growth, and so on. We have many things in the toolbox, but not everything. This is why we have decided to set up the new Life Ventures company to increase our commitment to innovation, venture capital, and collaboration with startups, universities, and research centers. Today, A2A is the largest Italian corporate venture capital in climate tech.
We've just launched the LIFE II fund, and it has already brought in EUR 150 million of a EUR 200 million final target. We're very pleased. Lots of activities are already underway with startups, and plenty of investments have been made in the past. Energy Dome, I think, is a really good example. All of them are proving to be a great vision and foresight. A2A has already put several use cases into practice with startups, including, for instance, digital twin for predictive maintenance on the electricity network, and artificial intelligence-powered plastic sorting. Really, believe me, digital twins on the networks, a lot of applications. At this moment, we have more than 100 projects with artificial intelligence ongoing in the company. Finally, our commitment to a competitive but sustainable transition, our net zero commitment to 2050, and the decarbonization curve that you know of to 2030 remain solid. It remains solid because our decarbonization path will reconcile sustainability targets with improvement in our performance along our business lines. Just a few examples in the water cycle, district heating, supply, and so on. In this last slide, we summarize the main data, which I think need no further comment before we open the floor to your question. Let me recap some of today's key points.
Being in the right spot at the right moment is always beneficial, yet that alone won't suffice if you aren't also built for the future and prepared to capture near-term and long-term openings. As of today, A2A is prepared. Prepared to supply power and, above all, prepared to capture the possibilities that come from data centers expanding across Italy and Europe. Our integrated industrial foundation — backed by EUR 23 billion in strategical investment, regulated assets that keep growing, and an expanding presence in electrification, renewable, and Circular Economy — provides the scale and solidity needed to prosper amid change. Our distinct vision, consistent with the Europe Energy Transition, has let us get ahead of structural shifts and turn them into opportunities. Our financial steadiness has given us the base for speeding up. That is what makes us the company now generating fresh confidence and recognition in the market. Many thanks, and the floor is open for your question.
Thanks, Renato. Thanks, Luca. To begin with, we'll take questions from the floor. We'll also bring in the phone lines. Let's begin with the room. Our first question comes from Javier Suarez at Mediobanca.
Thank you, Marco, and good morning everyone. I have two questions; the first one concerns the near term and the second the medium term. Regarding the near-term assumption that the company altered for 2026, 2027, and 2028: could you walk us through the underlying assumptions for 2026 and the changes you have implemented? I noticed that the prior net income target stood at EUR 700 million, and unless I am mistaken, the company now aims for EUR 650 million of net income in 2026. My question is: what are the moving pieces behind that? I also noticed that the target for 2027 has remained the same for 2028. In that stretch running from 2026 to 2028, what does the company perceive through different lenses that causes its profitability, or its net income, to come out lower? On the medium term, it is fair to say that for the first time the company has incorporated the data center opportunity from 2028 to 2035 into its business plan. If that is so, why does the EUR 400 million of increase you are forecasting not fully carry over into your previous target?
Since the prior target was raised by EUR 300 million. The data center opportunities are quantified at EUR 400 million, and that is the element that moves within the EBITDA target. One related question is more philosophical, about the data center opportunity. How does A2A view itself? Will it become a builder of data centers, or will it be a company that serves data centers? The final question, leaving room for other colleagues, is how does A2A view this business? I have observed that this business was not placed within the Generation business; it was placed within the district Circular Economy unit. That signals the company perceives different pricing, different dynamics, and a different opportunity for this business, one that will be decorrelated from the Generation activity. What I am attempting to capture is that the pricing of this electricity sold to data centers will follow an entirely different logic. Thank you.
Is there one for each individual?
No, it's one for one. A single one for a single one.
Alright, let me address the medium term first, and then I'll hand things over to Luca for 2026 and 2027. Picking up right where your last question left off, Javier: yes, I'd say the difference — the whole difference — between this plan and the one before it comes down to our decision to put money directly into developing data centers. Being an energy partner, and one that can also unlock plenty of opportunities around PPAs, grid, and district heating, is only natural for a company like ours. We're glad to be fully integrated and to offer our customers a great many opportunities. What isn't so obvious is committing EUR 1.6 billion directly to develop and build the data center itself. That's because the data center business differs when you look at the size of the facilities. The really massive ones, 200 MW or more, will probably be built directly by the over-the-top players — Amazon, Google, and so forth. The typical size we expect to see in Italy next year is somewhere between, let's say, 5 and 100, probably. Under a co-location business model, the key point, the real issue, is having a facility for data centers that is super efficient so it can host the racks of the customers who will come.
What our business model chose to do was commit EUR 1.6 billion precisely so that we could become the owner of the data center. That explains why there is EUR 400 million of EBITDA on top of the guidance we gave before. The reason is that our EUR 400 million is entirely tied to the CapEx — to EUR 1.6 billion of CapEx. We expect that by 2030 we will already have more than EUR 100 million of EBITDA, and the curve climbs to EUR 400 million with this CapEx. I think it is very interesting to grasp that these opportunities connect to the graph where you saw how many generation plants we have in Lombardy. Opportunities for data centers to be built near, close to our generation plant are not easy, but they are absolutely not impossible. There are really a lot of opportunities. The direct connection is the killer application. The true killer application is being able to lower the charges for distribution and transmission. We have many waste-to-energy plants in Lombardy. Not only the well-known ones such as Brescia and Milan, but also in Como and Cremona. We have plenty of other plants in Bergamo. And many thermal plants.
A large thermal plant is capable of drawing in really big data centers. Since a thermal facility generating between 700 MW and 800 MW can definitely also supply a data center needing 200 MW or more. For a mid-sized data center, 20 MW to 30 MW for instance, a waste-to-energy plant makes an excellent partner. But big — because right now, I recall that in Lombardy, the largest data center belongs to a team in Rozzano, close to Milan, at 30 MW. That's where things stand at present in Italy. So speaking in short-term terms.
Sure. Let me begin with EBITDA. A year ago, when we laid out the plan at this event, we were explicit that we were starting from a result inflated by certain exceptional circumstances — namely the effects of hydro volumes and prices. Those effects we put at EUR 300 million. So 2024 needs to be viewed through that normalization lens. That said, 2025 carries a series of price effects, since the normalization of prices will take us to a level of between EUR 100 million and EUR 110 million, which reflects the normalized scenario we had always assumed. If you run the numbers, we still have EUR 80 million to EUR 90 million remaining in 2026 as a carryover of the scenario effect. We did a fairly solid job on recovery, standing at the same EBITDA level as under the prior plan. Looking ahead, the impact of data center opportunities begins to come through. And here too, we have factored them in — I would say, as is very typical for A2A, in a highly prudent manner. You have seen it. The potential could in fact be very large. We keep our feet on the ground, step by step, counting only on a handful of opportunities through which to leverage our growth over the midterm.
On EBITDA, a few factors bring the figure down somewhat versus the prior one. The first is how we allocate prices for the Enel network acquisition. That purchase price allocation is an accounting step we are required to follow. It will mean EUR 20 million of depreciation and amortization, beginning at the close of this year and continuing from 2026 onward. We have also shifted our CapEx mix a little. As you have seen, we raised the CapEx plan in electrical distribution by nearly EUR 800 million of additional CapEx. That leaves us, in the calculation, with depreciation higher than last year. So those are the three items: energy, the energy scenario queue, and depreciation and amortization.
When we talk about a larger construction site, what's going to make the difference next year is Monfalcone. At Monfalcone, the first parallel — so the first grid connection — will come in October 2026. We expect to have operational activity, meaning EBITDA, of EUR 10 million per month starting January 2027. The second one is roughly mid-2028: the new waste-to-energy plant in Corteolona. Naturally, there are plenty of other CapEx investments, but together these two items come to around EUR 200 million. That's why starting in 2028 you see the full potential of these two plants and EBITDA, but then resume growing fast. I think the key thing to grasp — and I'm sure it's clear to you — is that the scenario effect was decisive last year. We managed to offset the bulk of the scenario effect thanks to the CapEx we carried out last year.
Alright, let's begin. Emanuele Oggioni from Kepler here.
Emanuele Oggioni from Kepler Cheuvreux. Thanks for the presentation. My first question concerns the revenue model for data centers. You said earlier that there's over EUR 100 million of EBITDA contribution in 2030 and EUR 400 million in 2035. What would the revenue model look like, and how would it break down across generation, district heating, networks, and also other fees or services tied to the direct connection to your plants? That's the first question. The second one is about the RAB. You raised the — no, sorry. My second question is about renewables. Essentially, you trimmed the CapEx plan by EUR 1 billion versus the prior one, EUR 3.7 billion down from EUR 4.7 billion, for an extra 1 GW of additional capacity in 2030. I think this might be one of the reasons as well for some postponement or, as I mentioned earlier, the delay of the EBITDA from 2027 to 2028. How much visibility do you have on this, given that the track record in Italy — not just at A2A, but at A2A, yet across the system as a whole — is not excellent. In Italy, every year we see delays. We endure delays in the permitting process, and so on. The third question is on RAB.
Apologies. On the Generation side, regarding CapEx—and the follow-up question was whether you've looked at, or how much you've looked at, or possibly not, judging from your slides, the potential extension, renewal, or the regulatory concession. To what degree might this matter, or this factor, represent further upside, perhaps to the plan? Coming back to the RAB, the RAB went up, if I have that right, from EUR 3.4 billion to EUR 4 billion in 2035. So in that case, how far has the electricity distribution concession, or renewal extension running from 10 up to 20 years and so on, already been factored in or not, or would it mean additional incremental CapEx and development? Thank you.
Alright, Emanuele. Let's begin with generation, since that's simpler to address in this presentation — we chose not to restate everything contained in the plan. Hydro doesn't appear in the presentation, though it is part of the plan. What that means is that the EUR 4.7 billion of CapEx shown in the Lifeyards plan contained EUR 1 billion allocated to hydro. Total CapEx for Solar and Wind stayed unchanged at EUR 3.7 billion. That EUR 1 billion sits within the plan precisely for extending the concession. Our confidence in the concession extension is absolute. That's why we opted not to concentrate on this subject during the presentation, but these very weeks are particularly delicate. We want to close — the numbers are in the plan. We envision being able to proceed in full continuity. The revenue model, as we stated, encompassed our natural activities in supply distribution and district heating within our businesses. There is probably some upside, because at this moment we anticipate that, given rising electrical demand, energy prices will stay roughly at the current level. And probably, being located in Lombardy and thanks, for instance, to the chance to develop district heating or water management activity that could prove very interesting alongside data centers, our historical activity can grow.
The EUR 400 million relate to where the data center is situated. As for the business model, that EUR 400 million sits entirely outside our traditional business line. It's CapEx plus the siting of space within a data center. On the grid, Luca, RAB, would you like to take that?
I didn't catch the question about the RAB — could you repeat it for a moment?
That related to the grid distribution extension.
All right, on distribution — yes, we're still waiting on the decree.
We're still waiting on ARERA — on the new ARERA.
So when does it become official?
That depends on the situation.
The 20, etc.
Emanuele.
Is CapEx already accounted for in that?
No, no—the CapEx are definitely part of it, since right now what we're investing in the grid is roughly three times the national average. A2A certainly isn't going to put the other one on the table. As for knowing when we begin, the issue is there's an activity coming from ARERA. At this moment, we're waiting for ARERA's new board. Once we get there, I think the situation will be resolved quickly. What we expected as an extension is 20 years, 30, 50.
We didn't include any upfront installed payments for the renewal or the concession. And keep in mind there's a discussion going on about whether this amount of money should be paid, given the customer's bill. In any case, it doesn't change the picture.
Roberto Letizia from Equita.
Much appreciated for the presentation and for taking my question. Naturally, I have to stay on the data center since that is the most interesting part. I was just wondering, you are including the EUR 400 million as the return on the investment. Is the whole upside of serving the energy, providing the heating, in there, or is that included within the EUR 400 million? If so, how much of that EUR 400 million would be purely the return on direct investment rather than service? Maybe 30% is direct investment, 70% is servicing for heating and so on. Just a clarification, is that referring to the baseline scenario and not to the full upside potential? Just to clarify that. I am wondering if in that EUR 400 million, there is any inclusion of connection fees or the connection fees would potentially come on top of that because that changes the overall return assumption. I would like to recall Javier's question on the 2035 because actually the old target was EUR 3.3 billion. If I add up the EUR 400 million, I would be on EUR 3.7 billion, but the target is EUR 3.6 billion. Basically, there is a difference of EUR 100 million.
Is that partly since a portion of the data center was already counted in the prior plan’s renewables contribution, for example? I’m just curious whether some of that was already in the old targets. If you could share a little, one element of your assumption that relates to the CCGT. A lot of the energy will probably be supplied by CCGT. I suppose you’re assuming an improvement in the underlying spark spread, which is negative today. Could you tell us just how much improvement in spark spread goes into the assumption for the data center contribution? One last one. If you could highlight once more where the significant client addition under the plan comes from. Since market conditions are changing substantially and you have several times reported greater competition, shrinking margins, and so on, but you’re still sticking with the significant growth in market share on the client. Maybe we can touch base a little on that topic. Thanks a lot.
Alright, thank you, Alberto. To begin again with the data center: that EUR 4 million of EBITDA is entirely tied to the direct investment in the data center. It sits fully outside all EBITDA coming from connection, district heating, generation, supply, and so forth, which fall within the other businesses. The EUR 1.6 billion is part of the EUR 23 billion. That is chiefly why we move from EUR 22 billion to EUR 23 billion of CapEx. There is EUR 1.6 billion of CapEx above the prior plan, and EUR 400 million of EBITDA more in 2035. That's right. The total is EUR 3.7 billion. There's an approximation issue, since the previous figure was slightly under EUR 3.3 billion. This one is slightly above EUR 3.6 bilion. All in all, that is the target. What's interesting — and I grasp your question, your concern — is that we haven't altered our target in, say, grid connection or totally energy supply B2B. Yes, there is growth, but not so enormous. Nor in margin for Generation, CCGT, spark spread, for instance. Even if you assume the load factor of CCGTs will shift entirely, because to be able to source the data center, we likely need to go from 20% to 50%, more or less.
There's clearly some upside in this business. At this moment, we think staying conservative in how we value our structural business isn't a bad idea, given that we're dealing with the new business of developing and siting data centers, where our target is material — EUR 400 million is material. We intend to tackle this plan by looking at the data center 360 from every angle. Jokingly, I said I don't want to be the DJ at the party, because if I show up, I just plug in the power and the developers will handle all the business. I think then I'm not doing my job so well. I believe there are opportunities, particular opportunities, because some locations close to our plants could be super interesting for developing this data center. To give a few examples, staying near Sila in Milan, near the waste-to-energy plant in Brescia, near Cassano. Cassano is 30 km-40 km from Milan. All situations where you can have huge direct generation with redundancy. In Cassano, for instance, right now, we have two plants because we have the old CCGTs and the new pickers, 108 MW installed two years ago, that can provide two direct sources of energy redundancy completely disconnected from the network, the grid, so without paying charges.
I believe this activity has the potential to be really effective. I certainly think there is upside within our historical businesses for development. Take one simple example: there is upside in developing district heating in Milan tied to the heat recovery that district heating can bring. Just from this example, you can understand. This is very much why, in the closing remarks, I said, "Okay, there is another EUR 300 million of EBITDA linked to potential upside where our bottleneck may be financial discipline, and where it is also possible to find partners in order to develop more." We'll see. On spark spread.
So the spark spread — like Renato mentioned — the assumptions there are really up to date with the earlier scenario. We haven't factored in any upside to the spark spread that might come from new opportunities developing on the data center platform. Perhaps we're being conservative, since it's too early to grasp what concrete effect this type of opportunity could have on prices and on demand levels. We're fairly confident they could potentially lift both volumes and prices, if the situation plays out the way it appears to be, given that the request to Terna for the connection seems to point to a genuinely potential new opportunity. In the plan we've only accounted for what we're doing with our own projects. The direct investments as well rest on a handful of opportunities we've already identified. We're already in discussions with the developer about how much length we can have available for the connection to the grid, or not to the grid — directly to our plants — and about having the chance to exploit it directly, extracting the most marginality we can. Again, it's, let's say, a few projects, very concrete. As we presented last year, a concrete approach with the Lifeyards.
At this point, our approach is in a position to deliver real, tangible power.
When we look at the customer base, two factors need to be taken into account. A highly competitive market is certainly a given. You've observed how our electricity customer count has grown by 61% from 2020 through today. Our focus is squarely on premium acquisition. We're working to steer clear of the risk of, shall we say, doing the washing machine with a customer who brings no value. The real challenge is determining precisely which channels and which customer types are the interesting ones. In this situation, and also given that we have a customer base in this region as well, with a market share that is very attractive and very strong, alongside very low churn, we envision being able to grow and reach a target that is big yet not a monster, since at this moment we stand at 3.6 million customers. We envision getting to 5 million within 10 years. You can appreciate that the growth we envision for the coming year differs from the 60%, 12% year by year we've seen over the last five years. Precisely because competition has increased and because this is the market as it stands. It isn't a market that grows.
Some competitors are certainly aggressive, no question. We refined how we approach acquisitions, reaching every segment, and within an electricity market that's highly concentrated and expanding nicely. Another factor is that customers can tell the difference between businesses that actually generate power versus those that merely trade it. Take our PPA Mass Market, for instance — whenever we present it, uptake keeps rising. It now serves over 100,000 customers. A ten-year contract, which appeals to us greatly, since it lets this retail customer base hedge our renewable output. What's appealing is that we cut the price just in recent weeks — a scenario exists that allows for such a reduction — bringing it to EUR 105 per megawatt hour. That's extremely appealing, locked in for ten years. Highly competitive. A company whose business is only trading energy would find it very hard to put products of this kind on the market. In my view, our ability to compete is enormous in the electrical market, and weaker in gas. That's precisely why our approach is succeeding in fully shifting the market share between the two customer groups.
We'll take one final question from the room, then go to the phones and afterward return to the room. All right. Francesco Sala with Banca Akros.
Thanks for taking my questions. First, regarding hedging activity for 2026, if you could share an update on quantity and prices. Second, if you could give us a sense of how efficient new CCGT plants are relative to the so-called traditional ones. Lastly, what assumptions do you have on electricity prices over the planned horizon, and on WACCs for the regulated businesses and CPI? Thank you.
Regarding the hedging level we've now reached, we aren't at year-end yet. So, 60% of the fixed price sits at EUR 111. That matches what we expected and aligns with the price in our scenario. As I mentioned, the scenario factors in energy priced between EUR 105 and EUR 108. That is exactly where things stand right now. A year ago, it was above EUR 120.
On CCGT efficiency, let me give you an illustration. When the decision was made to revamp Monfalcone, that site was a coal plant. The efficiency of a coal plant sits at 30%, but bear in mind that an older CCGT facility — our plant on the River Mincio, for instance — comes in below 50%. At the time we ran a beauty contest to select the machine for Monfalcone, a tender took place among the three typical players: Siemens, GE, and Ansaldo Energia. Efficiency stood as one of the most important elements in that tender. The gap was this: we ultimately closed the agreement with Siemens at 63% efficiency. The other player came in at 62.0%. That 0.1, 0.2 difference determines whether Terna calls you or does not call you. The reason is that when Terna requests energy, the elements used to dispatch the plants — the generation plants — are tied to CO2 production, so to speak. Being efficient matters enormously, not just because you are more sustainable and the price of energy is lower, but because the plants work more. Right now, the difference is incredible. The old fleet we have in Italy has an efficiency below 50%, somewhere between 40%-50%, depending on the plant.
The new fleet being built by HOA AD Zone NL8P has an efficiency of roughly 62%-63%. That's where things stand. That's fantastic news for Italy, since the only two options available right now to bridge the gap between renewables and consumption are nuclear or CCGTs. At the moment, it's hard to find another route. As you can imagine, seeing nuclear in Italy over the coming years is a difficult thing to picture. Italy has a very high-performing CCGT fleet, especially given the CapEx we carried out over the last year. That investment was made to avert blackout risk and to keep our grid and network resilient. Today it can supply the data center, because the data center certainly grows with demand, but it doesn't double demand. There is growth that is entirely manageable with the fleet we currently have. Also because over this year, renewables will grow, since the target is 63% in 2030. I believe that is crucial to hit. In the mix of renewables and battery storage, you've seen EUR 30-EUR 35 for time shift is very low, guys, because when we looked at the base price for the MACSE tenders, it was EUR 37 per megawatt and was awarded to 13.
The gap in time shift is between EUR 60 per megawatt hour and 30. Those are the differences between having renewables that stay competitive throughout the day or not. I think the situation in Italy, where we have renewables performing well, battery storage, a low price, and CCGTs with high efficiency, can work. When carbon capture and storage arrives in the future, we'll see. Maybe another piece of good news. For now, that is absolutely enough to handle the situation today.
Just to clarify, Francesco, I was of course talking about 2026, where it edges up to 60. As for 2025, at this point it stands above 80. On the CPI index, the figure is 1.8.
Regarding energy prices, our assumption is that they stay steady at roughly EUR 110 per megawatt hour. EUR 100 to EUR 110, though conditions in this one involve a bit of volatility, yet at present that volatility is very low, very low relative to the other period for investors, which is very high, but relative to recent years, it is very low. Every scenario indicates that because of demand and because in Italy there is no elasticity. No, sorry, there is plenty of elasticity since we are short of generation. The situation is that the price, the poor price, will stay more or less at today's level.
Let's turn now to the folks on the line, please.
Sarah Lester from Morgan Stanley has the next question — go ahead, please.
Thank you so much. I hope my voice is coming through clearly. Apologies for zeroing in on the data center side of things, but I'd like to dig into this a bit further, please, so we're all completely clear. First of all, at a basic level, when we look at the 2028 to 2035 EBITDA guidance that was provided today, some data center uplift is indeed baked into it. I think it would really help to grasp how resilient that guidance is if the pace of data center build-out were to change for the worse. Naturally, A2A's business mix is quite robust, and you referred to plenty of tools in the toolbox. My assumption, then, is that this gives you very solid optionality when it comes to other growth opportunities. I just want to genuinely pin down how resilient your guide is, please, in a downside data center scenario. And turning to the upside case, you said that data centers' full potential isn't captured in the plan, and that the opportunity might be considerably bigger. I think that's a really crucial point. To be clear, please, is it reasonable to infer from all you've said so far that meaningful upside could exist across a range of your classical businesses such as Generation, grid, district heating, and water — upside that goes above and beyond today's plan?
Thanks.
All right. So from 2028 through 2035, our historical plan already incorporates growth. It mirrors the Lifeyard plans, since only a handful of components shift. Take, for instance, slightly less mobility, slightly less biogas, or a bit less in certain other businesses. Every bit of CapEx came back through expansion of the power grid. Keep in mind where we stand: the power grid can soak up, shall we say, an unlimited amount of CapEx. Whatever CapEx A2A is capable of committing can be taken on by the power grid. To give you a sense of what took place inside our company, upon arriving in June we carried out a mid-review of CapEx. I gathered all my people. I asked, "So, can you deliver all the CapEx? If any CapEx is uncertain, send it to the power grid." The reason being that the power grid requires no permitting, operates within its existing assets, and can deliver any volume whatsoever. Even with the EUR 400 million and EUR 1.6 billion for the data center, our plan strikes me as extremely robust, given the business mix, which is certainly capable of delivering the figures we have observed.
Turning to the data center topic — first off, I believe Italy will definitely get data centers. As things stand right now, globally there are 10,000 data centers; 5,000 sit in the U.S.; Europe has just 2,000; and Italy accounts for a mere 168. By installed data centers, Italy ranks 13th worldwide. Clearly, we require a great many data centers just to reach the benchmark. Bear in mind there's a question of Europe's strategic autonomy in areas such as intelligence, artificial intelligence. Certain countries definitely need data centers. At present, Milan is regarded alongside Madrid and Zurich as one of the three European cities set to grow the most in data centers over the coming years. That's also because right now, measured against the target, against the benchmark, Milan sits far lower. As I mentioned, the sole medium-sized data center in Milan at the moment belongs to Telecom and is 30 MW near Milan. We certainly have plenty of work ahead. In my view, it's impossible that new data centers won't appear in the years to come. The real question is whether A2A will manage to attract and develop data centers or not.
The real game-changer here is that a data center with A2A inside can hook up to our generation plant and be extremely competitive with others on energy cost. Energy accounts for 65% of a data center's total OpEx. I believe that's achievable. Under the business model, EUR 1.6 billion of CapEx is allocated to building data centers, naturally with the partner able to execute. Plus EUR 400 million for location, meaning EBITDA that comes from location revenues. My sense is the plan can hold up. Naturally, should zero data centers materialize in Italy relative to this industrial plan, that would be a downside. On the other hand, I see plenty of upside, precisely because the impact of an HOA-like energy partner will surely come through, since in a world where electrical consumption keeps growing, national and regional law over the coming months will state that proper water management is key, that recovering it into district heating is key, that being well connected to the grid is key, and that using brownfield sites is key. In my view, that unlocks the door to opportunities — incredible opportunities — for a company like A2A in Lombardy.
The potential upside, without a doubt, sits within our historical business plan — and honestly, we haven't altered our historical target there. Growth room exists in the other business.
Yes. If I could just add something there — you've already seen the roster of possible projects that we haven't factored into the CapEx plan. That roster is laid out plainly. Naturally, it gives us a cushion: should we face a downsizing in any scenario, we can recalibrate the CapEx plan using that separate list, and we keep working on those items internally. This isn't a wish list. It's a genuine set of projects that we'll be advancing daily. Swapping one project for another is straightforward if a given project ultimately doesn't move forward or can be wrapped up the way we intend.
Over the past 5 years, we managed to invest EUR 10 billion in CapEx, combining organic and inorganic spending, and to raise EBITDA from EUR 1.2 billion to EUR 2.2 billion. Our track record, I believe, demonstrates that we can set targets — real targets — and even exceed them. Financially speaking, if I may add, the strength of our position is very clear when you look at the cash generation our projects deliver. That is what allows us to keep up a certain pace without slowing down, and to have the chance to keep growing organically and to examine opportunities, because we have the solidity of a very affordable leverage ratio and a nice FFO to net debt. We are truly in a position to view the upside potential in a very positive way.
And now we’ll return to the floor, where Davide Candela from Intesa is up.
Thank you, Marco. I appreciate the presentation and for taking my questions. First one, again, I won't repeat what's been said on data centers, just a clarification. I'm simply wondering how you intend to supply this data center, because as I went through your figures, it seemed the CCGTs by 2035 have load factors below 20%. Is that about seeing a shift in the mix? Would the CCGTs serve only as peaker solutions, or is it because you aren't including, as you mentioned, those possibilities of being just a supplier? To me this is key for assessing the value of the CCGT fleet you have and whether that value is maintained going forward or not. Second question also on energy supply. This is a high-level question, just your view on the competition. My question is, do you see a scenario where competition increases further when you're required to put in retention costs, as you did previously, to keep those high-value customers you're seeing today? Everyone is focusing on their value-added customer base. I was wondering whether you see a scenario like that or not.
One last question regarding your European sites and opportunities: what amount are you factoring into the plan on the CapEx side, or are you leaving it out, and could you go into more detail about your strategic approach there? Thank you.
Alright, thank you for asking that. So, on the CCGT and data center topic, maybe an example would be useful to you here. Either this year or last year — I can't recall which — we got the authorization for a new high-efficiency CCGT in Cassano. Right now, we hold authorization to construct a new CCGT plant at 63% efficiency in Cassano d'Adda. A lot of discussion is out there online, if you search, about the chance to build a pipeline bringing not just electricity but also heat recovery from that plant into Milano district heating. To actually build the CCGTs, we're waiting on the Capacity Market tenders, likely in February from what we see. If we get there — and we will get there — we're pretty much certain we'll reach the Capacity Market tenders, and naturally we'll submit the application so we can build the new CCGTs, and the question would be, "Fine, but will we also build the infrastructure to deliver 1 TWh of heat recovery to Milan for district heating, or not?" That hinges purely on the assumption of whether part of the plant runs base load or not. Since, naturally, if it operates only as a peaker, there's no way to imagine it could supply a district heating.
Picture building a large data center near Cassano — 200 MW. That implies CCGTs running base load for part of that capacity, which probably opens the chance to recover heat from the data center and from the plant. This could be a huge opportunity for Milan, since we have to tackle decarbonization there, and doing it with heat pumps in individual buildings is not easy. It is interesting to see how a data center and a CCGT can form a mutually beneficial symbiosis, because a data center requires base load energy, and a CCGT is ideal for base load operation. I believe the chance right now to have room in CCGT generation is great news for really being able to develop data centers in Lombardy and in Italy. Speaking of Europe, the CapEx are included. Keep in mind that at this moment we have EUR 23 billion for DAN, because it is the 2024 to 2035 plan. Four are under construction, roughly eight still to be assigned. We have authorization, we can start, but we can also change. Seven remain to be found. Right now, the opportunity from Europe is that where we see a better time to market and a better return, we can choose to swap some projects we have in Italy for projects in other countries.
Our aim, from one perspective, is to turn into a European company. Honestly, I believe having the mindset of a European company matters a great deal for every large business in Europe. From the other perspective, it's about lowering risk, because if you can do cherry picking in other nations within businesses we understand very well, where our leadership is recognized, where better return opportunities exist, then why not? That's the strategy. Naturally, arriving through the first move in organic fashion is probably easier, but that's typical. If you go to Calabria, usually we begin with an inorganic move. You can view this strategy once more as a means of de-risking the plan — the risk of being surely able to do it, of truly putting the EUR 23 billion of CapEx on the table. Regarding supply retention, we paid close attention, because amid the foolish situation we faced during the war, you remember we had a customer totally out of position at a price of EUR 300 per megawatt hour, and we decided to put on the table how much money? EUR 100 million, EUR 100 million.
That final EUR 20 million this year — right, and the point isn't to penalize our customer, since we really believe in the strong relationship between HOA and our customer. I think that's also a B2B customer. At this moment, there's no need for retention cost. What's needed is being able to find a quality customer. I get that you're saying, "Okay, but every player wants quality customers, of course." Probably the difference is that, once again, our position in the north of Italy isn't bad either. Another element I think is very important is that our awareness right now stands at 60%-65%. Our market share is under 10 — it's 7 to 8. That huge gap between market share and awareness is the funnel that helps us grow. Not to get to 20 million customers, but to 5, yes.
Thanks, everybody. That brings us to the end of our time. Should you require any kind of follow-up, please reach out to the IR department. Thank you, Renato. And thank you, Luca, for the presentation.
I appreciate it, everyone.
Thanks to all of you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete A2A S.p.A. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to A2A S.p.A. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.