Good afternoon, everyone, and welcome to A2A's consolidated results for the first half of 2026. Right now, everyone is in listen-only mode. That said, if you'd like to pose a question, just press the pound key followed by 5 on your phone's keypad to join the queue. Please note that this conference today is being recorded. I'll now turn things over to our host, Marco Porro, Head of Investor Relations. Over to you.

Marco Porro executive
#2

Good afternoon, everyone, and thanks for being with us. On today's call, our CEO, Renato Mazzoncini, along with our CFO, Luca Moroni, will walk you through the results for the first half of 2026, and those numbers confirm both the operational and financial strength of the group as well as the headway we're making on our strategic investments. We'll be glad to take your questions once the presentation wraps up. Renato, over to you.

Renato Mazzoncini executive
#3

Alright. Thanks, Marco, and good afternoon to all of you. I'd also like to thank you for being with us. Responding well to change produces outcomes now. Taking on change over the long haul is what creates results that last into tomorrow. That's the difference between quick fixes and lasting value creation. I believe this captures exactly what the first half of '26 has meant for A2A — still delivering today while laying the groundwork for growth to come. To show this, I'll begin with several of the main accomplishments from the first half of '26 in both of our pillars: energy transition and the circular economy. In renewables, we kept expanding our RES platform, adding 35 MW of wind capacity and lifting installed wind capacity from resources to more than 300 MW. We also kept building out our PPA platform. For me this is truly essential, with agreements signed with Sosteneo and Politecnico of Milano, a large customer, plus the launch of our first A2A open PPA, aimed at supporting small business enterprises through long-term contracts. Via these efforts, A2A fosters renewable development by making green energy more widespread, more accessible, and less exposed to market dynamics. This also stands as a concrete example of how PPAs make it possible to integrate renewable sources into industrial consumption, encouraging long-term procurement models that deliver greater stability and sustainability.

Renato Mazzoncini executive
#4

Today, really, A2A is the only energy company that has attempted to shift this renewable paradigm with offerings for every type of customer over the long term. The PPA mass market — 120,000 contracts signed, roughly 260 GWh sold through these kinds of PPAs. Of course, classical B2B PPAs, and now also this small business enterprise segment, which is a really interesting kind of customer that, absent standard PPAs, genuinely cannot reach the renewable paradigm shift. In this case too, the contract duration is 10 years or 20 years, depending on the negotiation. We are truly very pleased to have in our market, let's say, a PPA product for every type of customer. At the same time, we have expanded our role as a strategic infrastructure operator. Some examples from the 250 construction sites currently active. For instance, the Monfalcone construction site — a CCGT that is super large, 870 MW of thermo capacity — is running at full capacity, backed by an extended shift partner, with commercial operation confirmed for next year. Power network capacity rose by 5%, reaching 9,300 MVA, and two new water and wastewater treatment plants added treatment capacity equivalent to 30,000 inhabitants.

Renato Mazzoncini executive
#5

When we talk about grid capacity here, it isn't merely a technical measure. It's the thing that allows the transition to actually be carried out. Strengthening our networks gives us the conditions needed to hook up additional renewable generation, to enable new uses of electricity and the demand that comes with them, and to guarantee that the service we provide to the community stays continuous and of good quality. With water resources facing growing strain — including in Italy during this very month — wastewater treatment is essential both for safeguarding water quality and for boosting the resilience of the integrated water cycle. The results we're delivering today are only one piece of the picture. Simultaneously, we're pushing forward several strategic initiatives that support value creation over the long term. Starting on slide number 3, let's discuss our data center platform. I'll now move to one of the fields where our industrial approach can release considerable potential going forward — precisely the data center. Right now, this sector is gaining a great deal from several favorable structural trends. Heightened focus on data sovereignty and on the resilience of digital infrastructure is fueling demand for capacity located domestically and across Europe, which makes digital infrastructure a progressively strategic asset. Meanwhile, Lombardy — our core territory, where A2A holds the incumbent position in both generation and network — provides an especially supportive setting for development, encouraging brownfield redevelopment and heat recovery solutions, district heating, let's say, two fields that line up completely with A2A's industrial footprint and its long-term strategy.

Renato Mazzoncini executive
#6

Given all of that, we think A2A is uniquely placed to seize this opportunity. Our strategy rests on an energy-efficient power shell solution built on A2A-owned land close to our electricity generation. These facilities will be hooked up behind-the-meter, drawing on our generation assets. That lets us deliver quicker time-to-market, cheaper energy, and a smaller environmental footprint. Consider, too, the NIMBY syndrome — this matters a great deal. On our data center platform, our strategic roadmap is progressing well. You'll recall the 12th of November, when we updated the industrial plan and launched our platform. So where do we stand now? Two sites: Lamarmora in Brescia is designed for roughly 20 MW of IT capacity, 30 MW electrical megawatt, serving AI workloads and colocation services, connected behind-the-meter to our waste-to-energy plants. Our waste-to-energy plants in Brescia run at around 70 to 80 MW, and they are ready to supply this new data center, plus the closeness to our district heating network — which means a data center with a super-low PUE and a WUE of approximately zero. Cassano d'Adda, in the province of Milano, is advancing as well, with preliminary design already finished. That site — our site, again a property of ours — for at least 80 MW IT, at minimum, is designed to support AI workloads, with room for modular densification.

Renato Mazzoncini executive
#7

You get an advantage from a behind-the-meter link to the neighboring CCGT facility — again, roughly 80 to 800 MW of CCGT capacity — and also from having existing gas peaker units available as backup, 110 MW of peaker able to serve as backup power, which offers possible benefits when it comes to permitting schedules, meaning no environmental impact assessment is needed. Here the time-to-market for this plant is truly remarkable, since we have a high-voltage connection, we have the generation to supply baseload to the plant, and we have the backup, and no environmental impact assessment is required. Okay. On slide 4, we highlight our strategic partnership with Equinix, because as our data center platform keeps moving forward, we are, naturally, also growing our role as an energy partner. Our partnership with Equinix is a clear illustration of that. We are close to Milano — again, Settimo Milanese — and we will convert the heat produced by servers hosted at the Equinix campus in Settimo Milanese into energy resources for local communities. The model is simple and effective: heat created as a byproduct of data center workloads is captured by Equinix and delivered to the A2A energy center, where A2A raises the heat's temperature using 72 MW of large-scale heat pumps, because the temperature coming out of the data center is not sufficient, supported by storage — water storage, 6,000 m³ of thermal storage.

Renato Mazzoncini executive
#8

That heat then gets fed into Milan's district heating systems. To grasp the scale of just one data center of this kind — the contribution we expect is remarkable, reaching as much as 225 GWh of recovered thermal energy annually, which allows the network to expand further and lifts the share of decarbonized heat delivered across Milan by roughly 20%, an additional 20% of district heating in Milan, which is also, let's say, really the sole route to decarbonizing Milan, since given the building typology we have in Milan it isn't easy to swap the thermo plant for heat pumps in every kind of building. It's a pioneering partnership with Equinix that shows how strategic collaboration can open the door to future opportunity. Turning to slide number 5, let me now move to our first half results. These results, despite differing trends across our businesses, underline the value of A2A's diversified industrial platform, which lets us mitigate external pressure while seizing opportunities throughout our portfolio. EBITDA stayed broadly flat at €1.2 billion, despite higher concession fees for hydro and a less favorable energy price environment. Setting aside this effect, group EBITDA would have grown by around 2% year-on-year. This was underpinned by the natural hedge in hydro generation, particularly in this case between Northern and Southern Italy, and by continued EBITDA growth in electricity distribution driven by ongoing investments, because in this half, the relative production in Southern Italy hydro was much, much higher than last year's average level.

Renato Mazzoncini executive
#9

Up in the north, we saw a decrease because there was less snow over the winter in the mountains. With solid financial discipline — our ratio of net financial position to EBITDA came in at 2.6, matching our targets — we delivered resilient results and kept evolving strategically. Have a look at slide number 6. During the first half, through our investment program, we kept carrying out our strategic roadmap, and CapEx for the half reached €718 million, which is up to 5% year-on-year. The main drivers were the ramp-up of investment at the Monfalcone CCGT, which should be finished next year and will contribute €120 million of EBITDA once fully operational — think the second half of '27; the building of the new Corteolona waste-to-energy plant, in the province of Pavia, Lombardy, which should be commissioned in '28 with a full run-rate EBITDA of €40 million; and sustained investment in electricity distribution and regulated assets. Let me stress that we hit €4 billion of RAB, counting the RAB that comes from the power grid — the biggest piece — the gas grid, and the water cycle. Development CapEx rose by 17%, which confirms the projects are progressing and will power our future growth. Notably, 59% of our future-fit investments are aligned with the EU taxonomy, which confirms the strong sustainability profile of our growth plan.

Renato Mazzoncini executive
#10

So with that, I'll hand things over to Luca, who will walk us through our results in more detail. Luca, go ahead.

Luca Moroni executive
#11

Thanks, Renato. Good afternoon, everyone. As Renato just pointed out, the results for our first half once again show what A2A's diversified and integrated business model is worth. The slide illustrates how the strength of our portfolio lets us balance different market dynamics, seize opportunities, and mitigate headwinds. As a result, we delivered an EBITDA of €1 billion — €1,181 million, broadly in line with the last year. This reflects three main factors: higher solar and wind energy production, the ability to capture trading opportunities and strong energy management performances, solid contribution from our regulated business, mainly electricity distribution, and resilience in the market business, despite the challenged competitive scenario, albeit mitigated by the impact from higher hydroelectric concession fees and lower hydro production, the lower waste contribution, and the non-organic reduction in gas distribution. Now, I will unpack our results in more detail, starting with generation and trading, where I walk you through the main driver and our performances. In slide 8, generation and trading, increased wind and solar production and a strong performance in energy management helped offset the impact of higher concession fees. EBITDA was €394 million, a decrease of €26 million compared the first half of '25.

Luca Moroni executive
#12

Turning to renewables, we achieved strong output from wind and solar. That said, two things partly counteracted this: increased hydroelectric concession fees — a €37 million effect, with roughly €25 million tied to earlier years — and reduced hydroelectric generation. Regarding hydro output, there's also a favorable element to point out. Scarcer water in Northern Italy, especially during May and June, was partly balanced by improved hydrological conditions in Calabria. This again demonstrates how much our diversified generation portfolio is worth and how it can lessen local volatility. Shifting to flexibility, solid results in trading and energy management affirmed our capacity to seize market opportunities. In summary, operational performance stays solid, with greater production volumes and effective trading execution, even though steeper concession fees and weaker hydro conditions acted as a headwind over the semester. I'll now turn to market. Within the market segment, the first semester confirms that our commercial performance persists. EBITDA came in at €232 million, up €3 million versus the first half of 2025. The result was chiefly fueled by greater electricity volumes, above all in the free market segment. Meanwhile, unit margins stood below last year's level, mirroring a market environment that is more competitive.

Luca Moroni executive
#13

Although competition stayed elevated, we’ve observed a steady decline in churn over recent months—especially in July, and also in June and July. All in all, the business turned in a solid set of results, as volume growth helped counterbalance margin pressures. Now I’ll move on to how the circular economy performed. Adjusted EBITDA came to €293 million, down €29 million versus the first half of 2025. That drop was primarily due to temporary factors in waste: reduced availability of Parona waste-to-energy and other treatment plants because of maintenance activities, the new ASSA service contract signed in February 2025, and higher fuel cost in collection. On a brighter note, treatment prices edged up slightly, and the integrated water cycle gained from higher allowed revenues. In district heating, results were weaker year-on-year, largely because of lower volumes and a smaller contribution from white certificates. Taken together, the softer result mirrors temporary operational factors, chiefly tied to plant maintenance in waste. If you set those effects aside, the business’s underlying performance stayed broadly robust, with support from the integrated water cycle partly offsetting pressure on waste. Next, let me discuss smart infrastructure. Within smart infrastructure, overall performance shows growth in allowed revenues that more than offset the negative perimeter effect in gas distribution.

Luca Moroni executive
#14

For this business unit, EBITDA came in at €285 million, which is 3% higher than what we recorded in the first half of 2025. Within electricity network, EBITDA gained from increased allowed revenues, and that was driven by the new ROSS tariff methodology, the alignment of regulatory lag, and RAB growth that kept expanding through CapEx deployment. Over in gas network, the contribution was negative versus a year earlier, largely because of the gas distribution asset disposal that closed in July 2025, along with the absence of the non-recurring non-OpEx recognition that had helped the first half of 2025. Okay. With each business unit's results now unpacked, I'd like to wrap up by showing how these pieces combine in our EBITDA mix, group net profit, and cash flow. On Slide 12, beginning with EBITDA of €1,181 million, D&A came to almost €500 million, which is €21 million above last year, primarily a reflection of continued CapEx deployment. Provisions were €41 million, a touch above last year, mostly because of how our market business performed. Net financial expenses were €87 million, essentially flat versus last year. Even with market volatility persisting, the cost of debt held steady at 2.7%. Adjusted taxes come to €165 million, down €18 million year-on-year. The tax rate was 29.5%, and that excludes the effect of the IRAP increase brought in by the energy decree, which we have treated as a special item.

Luca Moroni executive
#15

So adjusted group net profit ended up at €374 million, versus €419 million during the first half of '25. Through the first half, we kept delivering solid returns — return on investment and return on equity of roughly 9% and 11%, respectively — nicely in line with our targets. Now let me turn to cash flows. During the first half of 2025, the group posted a negative change in net financial position of €312 million. At June 30, net financial position was €5.8 billion, with leverage at 2.6 times, which confirmed the overall stability of our financial profile and stayed fully aligned with our capital structure target. On cash generation, operating cash flows reached €749 million, fully covering the financing of our organic growth over the period. Let me briefly go through the main drivers. Beginning with net working capital, the -€287 million variation was chiefly driven by two one-off events. The first was the cut in payment terms to CSEA that followed the 2026 energy decree, the Decreto Bollette. The second was payment of past due state concession fees on hydroelectric concessions. Below operating cash flows, we paid €145 million of taxes, €76 million, and net financial expenses, €69 million.

Luca Moroni executive
#16

Once you factor in €718 million of CapEx, operating cash flow before dividend came to €31 million. After dividend payments, net free cash flows were €295 million — negative €295 million. The change in consolidation perimeter had a negative effect of €2 million, mainly from €27 million tied to M&A, partly offset by the €25 million price adjustment on the partial disposal of our gas asset to Ascopiave, which closed in 2025. Then, after also factoring in €15 million spent on our share buyback program, the total change in net financial position for the period came to -€312 million. Going forward, we remain confident that the strength and diversification of our integrated business will keep serving as a key competitive advantage. That gives us the flexibility we need to navigate shifting market conditions. It lowers our exposure to market volatility. It reinforces the stability of our cash flows and net financial position. Now, I'll hand things back to Renato for the final section of the presentation.

Renato Mazzoncini executive
#17

All right. Thanks, Luca. Our guidance stands confirmed. I feel genuinely confident in reaffirming our guidance for '26, with adjusted EBITDA in the range of €2.210 billion to €2.250 billion and adjusted net profit of between €0.63 billion and €0.66 billion, which reflects how robust and visible our business mix is. Our diversified business portfolio's resilience, together with our capacity to seize opportunities, leaves us genuinely fully confident that we will hit these targets — our targets. Let me wrap up by pulling together all the elements we've discussed. What our strategy seeks is to deliver today while continuously building the growth of tomorrow. That strategy rests on disciplined execution, industrial excellence, and future-fit growth. Disciplined execution is what underpins our ability to meet our commitments, through clear priorities and rigorous capital allocation. We are on target. Industrial excellence is rooted in the strength of our integrated portfolio across energy, environment, and infrastructure, and we are on track. Future-fit growth stems from putting investment into platforms that answer long-term structural trends, ranging from decarbonization and electrification through to digitalization, and we are on trend. In short, this is an architecture built to last: resilient, integrated, and designed to turn opportunities into sustainable growth. Many thanks for your attention. Now, let's open the Q&A session.

Operator operator
#18

Should you want to pose a question, hit the pound key followed by 5 on your phone's keypad to join the queue. To pull your question, hit pound then 6 on your keypad. Our first question is from Javier Suarez Hernandez with Mediobanca. You may proceed.

Javier Suárez Hernández analyst
#19

Hi, everyone, and thanks for the presentation. I have a few questions. The first concerns the generation business. There are likely two separate dynamics at play. One is higher power prices, and probably a larger contribution from ancillary service activity giving your results a lift. I just wanted the most recent data on forward selling for electricity in 2026 and '27, and is this upward pressure on electricity prices perhaps affecting your business? Conversely, hydro conditions in the second quarter were probably lower than a year earlier — what is your expectation for company production from hydroelectric facilities by year-end, and how do those assumptions compare with what you assumed in the business plan you presented recently? That would be the first question. The second question is more strategic, and it's about interest in renewable energy. Can you help us understand your current views on developing new renewable energies in Italy, the value for the group, and the relative preference for brownfield assets versus greenfield assets, and also your latest views on new battery systems? The third question is whether you have any comment on the consultation document opened by ARERA on ROSS implementation for gas distribution in Italy from 2028? Thank you.

Renato Mazzoncini executive
#20

Javier. Good afternoon. Regarding generation, bear in mind — as you're well aware — that we hedge our output. For '26, it's more or less fully hedged — not entirely, because, given the flexibility we have precisely in hydro production, we keep some headroom so we don't end up over-hedged. Those prices were locked in months ago. Same for '27: given that the current scenario looks high, yet volatility is extremely elevated, it takes only — as I imagine all of us hope — Trump and Iran finding a solution tomorrow, and prices return to normal, so to speak. We have 70% of '27 production covered at a price above €100 per MWh, which is fine, but it's on budget, let's say. On the hydro situation right now for A2A: in this first half, the south performed extremely well. Keep in mind that in March, as I likely mentioned on the previous call, we generated the entire output of '25, and that's why our current forecast sits at around 3.9 TWh versus an average of 4.1 — yes, a slight decrease, but nothing really material at all. On renewables: I believe we absolutely must, in Italy and across Europe, raise renewable output, since that is the sole route out of this extraordinary condition of reliance on outsiders — especially gas, oil, and the like.

Renato Mazzoncini executive
#21

For a company such as A2A, it performs strongly in both brownfield and greenfield settings. Across Italy as a whole, naturally, additional renewable capacity is required, since that also encompasses repowering. Take wind, for instance: repowering is certainly the crucial factor for raising overall output. We are fully dedicated to this. Within our plan sits €3.7 billion of investment aimed at a further 3 GW of renewable generation over the coming year. Our pipeline is robust, is appealing, and is nicely balanced across solar and wind. On the subject of batteries, that's a fair question. My view is that the battery business can succeed within the MACSE tender, since imagining this business developing on a merchant basis is genuinely too hard. The upcoming tender takes place in November, as you're aware. We are working toward taking part in it. You'll see how, and in what configuration. A2A, in common with other big energy firms, holds some plants and some sites that are already hooked up to the high voltage power grid — which is essential for building large-scale storage plants and battery plants — and so we believe we can join the next tender with an appealing proposition. Okay.

Luca Moroni executive
#22

Possibly the final question here is that

Javier Suárez Hernández analyst
#23

was

Luca Moroni executive
#24

Regarding the ARERA consultation document on gas distribution — I believe you mean bringing the ROSS mechanism into gas as well. Honestly, we don't expect that to have much effect on our network. As I recall, the only network we run at present is Milan's, and we've already completed the tender. This is something that will hit larger players than us — those with more than 300,000 points of delivery. For us, there would be no real impact at all.

Operator operator
#25

Our following question is from Emanuele Oggioni at Kepler. Emanuele, you're up — please go ahead with your question.

Emanuele Oggioni analyst
#26

Hi there, am I coming through okay?

Luca Moroni executive
#27

Yeah.

Emanuele Oggioni analyst
#28

Thank you for the questions. First, on guidance: beyond the numbers and figures, what moving parts do you expect in H2? We know that, aside from the usual flexibility in hedging volumes depending on weather, water availability and the next weather, you have not included a potential positive effect for power prices, correct? What are the moving parts generally by business unit — in waste, is a recovery expected, or higher pressure in energy supply, I don't know, in another business unit? That's the first, more qualitative question on the H2 outlook. The second concerns the ETS reform, the EU ETS reform, which came out better than expected, or not as bad as investors feared. What is your comment and opinion on this? The third is on market supply. In Q1, you were able to increase by 1%, but in any case it was still an increase, a small increase, but an increase in the free market customer base, while according to the H1 data there is a minus — you lost three free customer base in Q2. What are the current dynamics for you and this turn down compared with Q1 in Q2?

Emanuele Oggioni analyst
#29

I appreciate that.

Renato Mazzoncini executive
#30

All right. Luca, you’ll begin, covering the guidance’s moving pieces. Yes.

Luca Moroni executive
#31

On guidance, I'll give you an answer, and perhaps a bit on market supply as well. Regarding guidance, we feel fairly comfortable with it and we confirm it, with some positive expectation for the generation and trading business unit, having also taken into account the negative impact tied to hydro concession fees, which affects the full year by more than €50 million — over 50 million. We can offset that and remain in line with last year's result. On the market, you've seen it performing very well, with strong resiliency in marginality, even if slightly below last year, but with an increase in volume sold. The churn rate should improve next month, and we expect it to stay below where it ended last year, at the close of 2026, and consequently there's an opportunity to somewhat revert the number of acquisitions and the total customer count, particularly in the electricity market in the free market. We also have positive expectations in terms of marginality, to stay slightly below or near the 2025 level. Smart infrastructure, very good, very positive. The fact that the ROSS mechanism of the tariff has delivered quite good results and opportunities for the first semester, and for the second one too, offsetting the negative effect on gas distribution.

Luca Moroni executive
#32

Overall, there's a chance we finish the year above the prior one. On circular economy, that's the unit feeling more pressure from maintenance work during the first part of the year, with a pattern of improvement in the second half and a finish in line with 2025. Taken together, that's what leaves us at ease about how the 2026 results will land.

Renato Mazzoncini executive
#33

Alright. Regarding ETS, the reform the Commission has put forward right now exceeds what we had expected, for a couple of reasons. First, on the proposed change to the merit order of plants operating under ETS, the Commission's response was crystal clear: don't touch ETS, and what we truly need is to give renewables the strength to beat the other sources. Second, on the flip side, one of the discussions concerned applying ETS to waste-to-energy plants, which was under debate, and at this point the decision was to move that hypothesis from '28 to '31 or later, because, frankly speaking, at present there is no technology anywhere in the world better than a waste-to-energy plant for handling the portion of waste not recovered into new material. What we see is an ETS attempting to be more useful for Europe, but not altering the strategy or rationale that led ETS to be created some years ago. On supply, our strong commitment is to free-market electricity. Also in the second quarter, in this first half, A2A Energia — pay attention, A2A Energia — grew 0.2 to 0.3%.

Renato Mazzoncini executive
#34

Those minor variations in the figure tie back to our second brand — specifically the multi-utility operations, AEB in Brianza, ASVT, and ACSV up in northern Lombardy, which include certain brands that genuinely can't keep pace with the tough competition when it comes to marketing, advertising, and so forth. Pushing the second brand isn't something we intend to do, since it's absolutely inefficient. Honestly, we're pleased that despite a churn rate as high as it was during the first half, A2A Energia's ability to acquire customers has stayed strong. Come June, July, and August, the churn rate dropped, so we expect that this year we'll be able to grow our electrical customer base as well.

Emanuele Oggioni analyst
#35

Thanks.

Operator operator
#36

Roberto Letizia from Equita has the next question. Go ahead, Roberto, please ask.

Roberto Letizia analyst
#37

Thank you for taking my questions. I'd like to briefly return to a couple of questions that have already been answered, but if you can tell us exactly how much coverage there is on your production in '27 and eventually in '28, if you did any, for even the following year. An additional clarification, because I had the same question, but actually from Javier, but partially you skip it, I want to recover it. I got the sense of you being interested in the RES and the amount of gigawatt you want to do and the pipeline which supports both solar and wind. Just wondering how much of that can be looked into brownfield deals rather than greenfield, considering that the market is very open. This morning Enel announced another acquisition of 85 MW in the country. We saw additional M&A deal for power generator trying to increase as rapid as possible their RES present. Wondering if any change in the strategy may occur from you by leading you in having a higher exposure of the growth through brownfield acquisition, as there is a market and an opportunity. If you can give us the most recent trend in retail long-term PPA, just wondering if you're keep going to growth on those kind of contracts.

Roberto Letizia analyst
#38

I just wanted to ask whether there could be any potential impact from the heat waves we saw a month ago and also today. A distribution connection net center in Milan failed just this morning, and there were a lot of accidents during the heat wave. I'm just wondering whether we should consider any potential negative impact from extraordinary maintenance on the distribution plants that follow the heat waves. Thanks a lot. Okay.

Renato Mazzoncini executive
#39

Beginning with the hedging, the coverage stands at '27, 70%, the price exceeds €100, it's good, it's in line with our budget and our scenario. As for '28, no, at this moment it's peanuts, but looking 18 months ahead is typical, let's say. On renewables, bear in mind that from the very start our strategy has been a blend of brownfield — if brownfield means M&A for you, let's say — and greenfield. You recall clearly that we acquired the pipeline from Octopus solar and from Ardian wind. We're engaged in repowering part of the Ardian wind portfolio, and on the other side, pipeline and fresh greenfield projects, for instance in Friuli-Venezia Giulia in the north, a 160 MW solar plant, extremely appealing given its location and the robust demand we see in northern Italy. If you examine our 700 MW today, it reflects that mix of strategy. I believe this is a sound approach for the future as well. We'll likely keep a setup like this, since where opportunity exists, it makes sense to look, and to buy something if the chance arises too. On the other hand, having a pipeline is essential. Right now, our pipeline is strong, because to deliver our industrial plan, naturally, we leave M&A out of the count.

Renato Mazzoncini executive
#40

We have to have a pipeline big enough to carry out our industrial plan. After that, M&A may present a chance to raise the return on investment, provided opportunities exist relative to that pipeline and our greenfield development. That, I believe, is where things stand. Turning to Italy, to repeat, we must expand how many solar panels and how much wind capacity we have. It is obvious that M&A alone, in which you move an asset from one set of hands to another, will not suffice. On retail, yes, we are 100% on track with the PPA mass market. Bear in mind something interesting, because on price — I recall that at this moment a PPA price, let us say with a standard profile, for B2B can be roughly €80-€85 per MWh, while the mass market sits at about €105. It is normal for B2C to carry more margin than B2B. The count of contracts right now exceeds 120,000, and the gigawatt hours we have allocated through PPAs in the mass market are slightly above the gigawatt hours allocated through B2B. Specifically, if my memory serves, it is 263 GWh of total energy allocation for PPAs in the mass market. The reason we chose to bring to market a PPA for small businesses as well is that I firmly believe the paradigm shift in renewables is precisely the ability to lock in a price over the long term.

Renato Mazzoncini executive
#41

We definitely need to create offerings for every type of customer. We fully recognize that for a big company — picture a steel plant and the like — it's standard to work with our energy management team to secure the right PPA, the right profile, the right price. For a retailer, for households, and also for a company, a small business, lacking expertise or know-how in energy management, unless you can bring to market standard PPAs, signing a contract for 10 years, 20 years, 15 years, and so on is impossible. I believe we will truly get to 1 million customers with PPAs in mass market or small business. Speaking of heat, yes, right now the heat is crucial. If you look at how our power grid performed in Milano versus the last year, it's much better. The count of blackouts is absolutely minimal, and all the indicators, the KPI, that highlight performance are good. Absolutely there's no extraordinary maintenance we need to carry out. We simply have to keep investing in new secondary cabins, new primary substations, new cable, and so on, but in line with our planned plan. We are absolutely glad to report that even in conditions with 40,000°, which is incredible, we can handle the situation with a good level of customer satisfaction.

Renato Mazzoncini executive
#42

Honestly, the sole issue we ran into was at Duareti — the business we set up last year — coming from the company, which company, and at Duareti we don't have the CapEx track record that we built at Unareti over the past years.

Roberto Letizia analyst
#43

Much appreciated.

Operator operator
#44

Francesco Sala from Banca Akros has the next question. Please go ahead and ask.

Francesco Sala analyst
#45

Good afternoon, and thanks for taking my questions. My first one concerns the treatment business. At what point should we expect that business to return to normal — will that already happen in the fourth quarter, or would it be, say, toward the end of 2026? My second question is about the single national price regarding the —

Renato Mazzoncini executive
#46

Francesco, my apologies. Could you repeat that? I didn’t catch the question — the quality of —

Francesco Sala analyst
#47

Apologies. The initial question concerns the treatment business.

Renato Mazzoncini executive
#48

There have been

Francesco Sala analyst
#49

There seem to be a few problems in the first half. I was just wondering, when do you expect the business to get back to normal — is that a third quarter thing, or more, let's say, toward the end of the year? The second question concerns the single national price. There have been discussions for a while about the end of the single national price, on the demand side as well. I wonder whether you could share your initial thoughts with us on what consequences you think they will have for you and for the market. The third one: are there any updates on the extension of the hydro concession, and also on the electricity distribution concessions? Thank you.

Renato Mazzoncini executive
#50

Alright, beginning with electricity and hydro. On electricity, the final step now rests with the minister, who has to issue the final decree. A few weeks back I spoke with the manager at the ministry who is handling production — let's call it the decree. The tender's historical date was 2030, and the law simply states that the government needed to begin work on the tender 5 years ahead of time. That's why in December '25 — '24, '25 — within the balance law, they inserted the provision to change the tender requirements. Just to note, Francesco, that probably isn't priority number one at this moment, given we're talking about 2030. We're confident that in September the decree text will come up for discussion and be closed this year. On the hydro concession, it's interesting, because the main reason we haven't resolved the hydro concession issue until now is the PNRR — since, as you recall, within the PNRR agreement, the competition law contained the government's commitment to hold tenders on hydro. My personal view is that we'll see something different after August, simply because in August we finally and completely land the PNRR, with the tenth portion of the money arriving from Europe.

Renato Mazzoncini executive
#51

On the tender question — honestly, at this point, no. The only truly tiny, peanuts-level homeopathic tender in Lombardy, at one of our Valcamonica plants, got halted by the court — the civil court of Brescia — since Region Lombardy botched the procedure for bringing that concession to market. My sense is that this dossier, too, can return to the proper table after August. As for your question on the single national price: what you're asking is whether we believe it's possible for a customer to have a PUN price that differs? What exactly is your question?

Francesco Sala analyst
#52

Yes, precisely.

Renato Mazzoncini executive
#53

Since the price right now is set zone by zone for the producer. If you’re asking whether I believe a different national price for end customers is feasible, my view is that it can’t be done, because honestly, in a country such as Italy, where the debate over electricity pricing is going on, if you split the country’s price into seven separate areas, and the variation is mostly tied to the power grid — the national grid run by Terna, let’s say — that isn’t robust enough to create one single market, then just picture what could happen, because, no, this isn’t a structural issue, since it’s only natural to have more sun in the south or wind in Sicily or in Southern Italy and more hydro output in Lombardy, Piemonte, or the Dolomites. We’re a country where this differing energy capacity of each individual region can certainly stay within one single market provided the grid is strong enough to connect the whole country fully, exactly as laid out in the plan, the CapEx plan, of Terna. I genuinely believe it is politically impossible to have anything other than the single PUN. Treatment business, the question is performance, eh? During the first half in particular, we ran into a problem with a waste-to-energy plant in Pavia, Parona.

Renato Mazzoncini executive
#54

It's not really an economic issue, since insurance covers it well. Of course, during the first half we ran into some production problems at a few plants, which we expect to make up for in the second half. In particular, bear in mind that one reason we reaffirmed the guidance with confidence is that we're also seeing the treatment business return to normal in the second half.

Francesco Sala analyst
#55

Thanks.

Operator operator
#56

Davide Candela from Intesa Sanpaolo has the next question. Go right ahead and ask.

Davide Candela analyst
#57

Good afternoon, gentlemen. I appreciate you taking my question and walking us through the presentation. I have a few questions about the present energy situation — specifically the curves and how energy prices are behaving. You touched on generation only briefly, so I was hoping you could give us a somewhat wider picture covering other businesses as well, energy supply for instance: is this current situation shifting how you approach things commercially, and are any new risks emerging around what you might pay for sourcing next year and so on? If you could paint that picture, that would help. Second, on waste, I wanted to ask whether you might run into somewhat higher costs, mainly tied to oil prices going up, that your numbers would have to absorb and that you'd recover later — just a little on that. The last one is still on renewables: could you give us more visibility on your pipeline, and what the breakdown looks like in terms of how many projects are ready to build or nearer to a final investment decision, and on the return environment — aside from the higher power prices we're seeing, are higher interest rates or equipment costs making the return environment challenging for you too, or is that not an issue at all?

Davide Candela analyst
#58

Much appreciated.

Renato Mazzoncini executive
#59

All right. On the energy scenario, what's happened over the last month is a bit hard to believe, because on one hand, every one of us sees gas prices and, naturally, electricity prices that are extremely high. On the other hand, when you look at forward '27 and '28, prices come down. Why is that? Because the narrative out there is that the war in the Persian Gulf has to end. The impact of the decree for Bollette will bring the PUN price down somewhat — not through ETS, but through the gas distribution cost, a few euros per megawatt hour, and so forth. We're still inside a movie where real prices are extremely high and forecasts are considerably higher. Keep in mind that for a company such as A2A, which operates with robust hedging, what I can tell you, Davide, is that we manage to stay on budget every single time. Our industrial plan and the target we presented in that industrial plan are fully confirmed. A year ago, the debate was whether the scenario built into our industrial plan — roughly €100 per MWh — was right or too high, remember? You'll recall I said it's right in my view, purely because we're tied to LNG. Right now LNG carries OpEx — liquefaction, transport, regasification — that lifts the base cost of LNG to €30 per MWh, which means 60 when you factor in 50% efficiency of a thermo plant, plus ETS, and you get to about 100.

Renato Mazzoncini executive
#60

Right now, the price is staying elevated, likely because of speculation and the situation you’re aware of in the Persian Gulf. Put simply, if I look ahead 2 to 3 years, our budget is definitely sound, and we can hedge the PUN price at the level set out in our industrial plan. On waste, I imagine you mean collection, given what oil and gasoline cost. Think about it this way: compared with public transport, for instance, our fleet covers a super-peanut number of kilometers. A collection truck is stopped every time, so the kilometers really aren’t material. Also, total oil consumption, set against the other costs, isn’t enough to alter our economics. Labor cost matters far more, for example, and what’s interesting is that the latest labor-cost negotiation produced a total cost slightly below what we expected. We aren’t on our own here, since there’s a national negotiation. We’re probably the biggest company, so the average cost for the other players stays lower, and that benefits us too.

Renato Mazzoncini executive
#61

On waste collection too, we're basically right at budget. As for the pipeline, keep in mind our target is to build 300 MW of new solar and wind renewable capacity each year. The pipeline is 10 times that, and naturally, as with any pipeline, some of it is ready to build, some is advanced, and some is, let's say, ongoing. What matters right now is to choose carefully what can genuinely be merchant and what has too high an LCOE to be merchant, since it's obvious that pressure on the electricity price pushes all of us to build plants with low LCOE so we can stay well positioned in the market and truly help bring down the PUN price without reducing our marginality. The best approach is to be able to build plants with low LCOE. That means cutting the cost of land, of authorization, permitting, EPC, and so on — the whole supply chain that produces the final cost of energy, because the solar plant, or also the competition in the eolic pole between some Chinese players and the historical EU, is working, and it's also reducing inflation in this case.

Renato Mazzoncini executive
#62

To wrap up, we are certainly fully capable of delivering our 300 MW each year, beginning under the regime, I believe, from '28 and '29. Right now, for instance, we have 100 MW of solar plant under construction in northern Friuli-Venezia Giulia. As we've seen, we delivered the 35 new megawatts of wind capacity, and also in this half '26 the new amount of renewable is more than 100 MW.

Luca Moroni executive
#63

On your final question about what debt costs us, I'll give you an answer. We ended the first half at the same cost of debt we had when fiscal year '25 closed, which is 2.7%. We expect to keep that level through all of year '26, given that our funding carries an average cost consistent with our quantities, as the cash flows analysis you've seen shows, but at a cost slightly below, or equal to, what we already saw in the first half of the year. We're also managing the cost of debt proactively, taking some market position through swap activities, and that has likewise helped us reduce the cost's impact. We feel comfortable about how resilient the cost will be going forward. I should also mention that, broadly speaking, the weighted average cost of capital has come down in such a way that it lets us remain consistent with the 200 basis point spread between the WACC and the return — the average return — on our capital allocation, our projects.

Davide Candela analyst
#64

I appreciate that.

Operator operator
#65

That brings us to the end of the question period. So I'll return the call to the speakers for any closing remarks.

Marco Porro executive
#66

Thanks to all of you for joining us for the first-half results. Should you require any further follow-up, please reach out to the IR department, and enjoy the summer break, everyone. Bye-bye. Thank you.

Luca Moroni executive
#67

Bye. Thanks a lot.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete A2A S.p.A. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to A2A S.p.A. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.