Good day, everyone, and thanks for joining us on the Q2 FY '26 post-results conference call for Ajmera Realty and Infra India Limited. <<operator_script>> Kindly be aware that this call is being recorded. At this point, I'll pass the floor to Mr. Abhishek Dakoria of Churchgate Partners. Thank you, and the floor is yours.
Absolutely. Thank you, and good evening to everyone — a very warm welcome to all of you. On behalf of the company, I'd like to express our thanks to each of you for joining the Ajmera Realty and Infra India Limited Earnings Conference Call covering the quarter that ended on 30th September 2025. We'll begin with opening remarks from our Director, Corporate Affairs, Mr. Dhaval Ajmera, and after that our CFO, Mr. Nitin Bavisi, will walk you through the business performance discussion. The operational updates for this quarter were already shared by us during the second week of October 2025. Both the investor presentation and the press release, which are based on the financial results adopted by the Board, have been uploaded on the stock exchange website, and you can download them from our company's website as well. Kindly note that certain statements made during today's discussion may be forward-looking in nature, reflecting the company's outlook, and may carry certain risks and uncertainties that the company could face. With that, I'd now like to hand things over to our Director, Corporate Affairs, Mr. Dhaval Ajmera. Thank you, and over to you, sir.
Thanks a lot. Good evening, everybody. I hope all of you are doing well. I’d like to start our discussion by going over the broader sector developments, how the market is performing, how the real estate market looks, and then move on to how the company has performed and what we see as the outlook going forward. So just to give you the big picture. From our perspective and in our terms, the Indian real estate market is evolving into a very mature market and is heading into steady growth in FY '26 after record sales achieved in FY '24 and '25 as well. So I mean, the outlook remains balanced, with momentum always favorable with credible developers. Obviously, what we observe and personally see is that luxury housing, primarily in Mumbai per se, is performing really well. But the mid-income and the premium segment have also strengthened. That is what we have been seeing, supported by — all of this has been possible because of the cumulative impact of the lower interest rates. The industry's ongoing consolidation reflects a more strategic approach. Developers are aligning new launches with market demand to safeguard margins. With approval processes and regulatory bottlenecks easing out, project execution time lines are also improving, reinforcing overall market stability.
Investment activity is still strong as well, and with the capital — we've stepped up capital deployment into office space and retail assets, alongside ongoing momentum in land and development set acquisitions. So we're seeing healthy demand arrive not just in the residential segment but in commercial and retail assets too. Thanks to the current festive season and government backing for GST reductions across many sectors, a solid amount of liquidity has flowed into the market, which has helped produce an overall positive effect during the festive period. And the RBI's monetary easing from earlier this year was likewise anticipated to give a significant lift to demand in the affordable and the bid segments. So on the whole, sentiment appears positive, and customers are showing up in the right way for the right launches. Turning to how Ajmera Realty performed, I'm very happy and proud to report that this quarter's bookings were our highest ever, with great collections as well. In late September, only a few weeks before the month ended, we held 2 landmark launches. One is Ajmera Manhattan 2 at Wadala, and the other is Thirty3.15 in Bandra, which was a commercial project.
Combined, these two launches come to roughly INR 2,100-plus crores, and we're very pleased that they've been completed successfully. The market's reaction has been excellent. That gave us our best quarterly bookings ever, posted at INR 828 crores in advanced sales, which shows more than 50% of our full-year guidance arriving in just these 2 quarters. So the market's overall response, from buyers and from the team as well, came together nicely to deliver great -- 2 great launches in the last -- in September itself. Ajmera Manhattan has seen exceptional traction. We've done -- roughly 38% of our inventory is already sold within under a month from launch. That plainly demonstrates that community living and openness, and when you offer a great product with an absolute -- has perfect demand, and it also creates a great platform for faster development of the remaining Wadala land parcel. Because we've seen that if 38% of our inventory from the launch sells within just a month or under a month, then certainly our future parcel launches will also arrive at an accelerated pace. Our commercial launch of Thirty3.15 in Bandra has likewise drawn good traction.
Roughly 5% to 6% of our inventory has been sold, and that happened only in the last week or the final few days of September. So on the whole, the project — both of these projects have performed extremely well. Within our ongoing projects, Ajmera Manhattan Phase 1, that is the first tower, has reached 89% of its sales. Construction there is moving along nicely. We're at roughly 80% to 90% of progress where construction is concerned. The next phase, Ajmera Greenfinity, has posted 74% sales, and even its construction — the structural work is nearly finished, and we're now getting ready for the finishing stage. Ajmera Eden has finished its structure and hit 98% sales. Ajmera Vihara Bhandup has reached 81% sales, and it stands on the 9th floor for the rehab slab, while we are at the plinth level of the sale building. In Bangalore, our mid-market housing portfolio likewise keeps up strong momentum. Lugaano & Florenza is nearly sold out, with 97% of its inventory having been sold, and we received OC in 2025 — September 2025 for these 2 buildings. Ajmera Iris launched recently and has seen around 70% sales, while Ajmera Marina, launched in Q4 of FY '25, has drawn robust demand with 68% sales, and foundation work is underway — sorry, that's Q2 of FY '25.
So all of this has stayed on track, and we're seeing strong momentum both in work and in sales across our launch projects and our existing ones too. We're very much on track, and we still expect the launch pipeline to deliver an estimated GDV of INR 6,400 crores in FY '26 — that's what we're going to do — and of that, 2 projects have already been launched, worth INR 2,100 crores. So looking ahead, we have 7 upcoming projects with a combined GDV of INR 4,300 crores spanning 1.6 million square feet of carpet area. We're very confident this will have a great run, both in bookings and in construction. On the delivery side, we're gearing up for almost about 1,000 possessions this financial year, and of those, 533 homes have already been handed over — I'm very happy to say we delivered 533 homes in the first half of FY '26. And we'll continue to hand over the remaining balance over the next 6 months. This is also being supported by accelerated progress across all our projects, whether in Mumbai or Bangalore.
Reaffirming our commitment to delivering on time and creating lasting value for every stakeholder. On that note, I’d like to mention that the company is preparing for aggressive launches as well as aggressive construction on the projects already underway. Roughly 9 projects are currently in progress, and somewhere between 6 and 7 launches are on the way. Altogether, that comes to 15 to 16 projects, with total GDV of approximately INR 8,000-odd crores — that’s what the company intends to deliver, build and sell over the coming 3 to 4 years. I’ll now hand the call over to our CFO, Mr. Nitin Bavisi, who will walk you through the financial and operational highlights. Thank you.
Good evening, everyone, and thank you for being with us. Before we open the floor for Q&A, let me walk you through the steady operational and financial results we posted for quarter 2 and H1 of financial year '26. Starting with operations: the company recorded its highest quarterly sales ever, with sales value tripling Y-o-Y, reaching INR 720 crores, while sales totaled INR 828 crores, a 48% Y-o-Y increase. For H1 '26, volume came in at 2,93,000 square feet of carpet area sold, which is likewise a 20% Y-o-Y rise, and collections grew 52% to INR 454 crores. Turning to the financials: revenue stood at INR 481 crores in the first half of FY '26, up 20% Y-o-Y, backed by highly consistent execution across our projects. EBITDA grew 6% to INR 139 crores, and PAT came in at INR 71 crores, a 2% increase on a Y-o-Y basis. The company kept a strong financial position, with total debt of INR 690 crores as of the quarter ended September 30, 2025, and a healthy debt equity ratio of 0.55x net worth, leaving us well positioned to lever our strong growth pipeline.
Also, a 24 basis point decrease in the weighted average cost of debt, bringing it to 11.51%, underscores our stronger credit profile and disciplined approach to financial management. Our revenue visibility has improved considerably, thanks to, of course, the outstanding sales we saw during these launches — a couple of launches — along with steady progress on our Ongoing and OC Received projects. Total visibility from this comes to roughly INR 3,599 crores, made up of INR 1,582 crores from committed sales and about INR 2,000-plus crores from the available inventory to sell and revenue to recognize over the life cycle. In addition, our upcoming launch pipeline is expected to add INR 4,357 crores, which is the GDV of the remaining 7 projects. That is why overall revenue visibility sits at a robust figure of sub INR 8,000 crores, with strong growth momentum ahead. On cash flow, net cash flow pretax post debt from OC Received as well as the Ongoing projects is estimated to generate approximately INR 1,526 crores. With that brief summary of our business highlights and financial performance, I will now open the floor to your questions and look forward to further discussion. Thank you.
<<operator_script>> Our first question comes from Dhaval Jain at Sequent Investments, who is on the line.
Sir, I just have one question from my end. I looked through our annual report, and it mentions that we hold an investment in Bahrain and the U.K. So I wanted to get a sense of whether there's any outcome from those investments we've made in those countries?
Yes, so we've begun receiving — it's been some time now that we started getting the repatriation from the U.K. — and the mix of the funding structure, both the loan and the equity investment, is coming down sequentially. And on the Bahrain project, we exited and we got the down payment, and we do hold the inventory entitlement there. And with this project at an advanced stage of completion, we expect that inventory to be monetized. And then repatriation of the Bahrain funds as well is expected in about a couple of quarters from here on.
Our following question comes from Dixit Doshi, who is on the line with Whitestone Financial Advisors.
Congrats on getting Wadala and Bandra off the ground successfully. Now, given that both of those launches happened right at the very tail end of Q2, could you just shed some light on how momentum is looking in October as well, if you're able to give some guidance?
So, as we mentioned, Manhattan had only been launched a few days before—right at the very tail end, but clearly around a week before the quarter closed—and the response has been tremendous, with really strong numbers coming in. We've now shifted into the sustenance phase at Manhattan, and we expect those sustenance sales to keep going across the coming few quarters, since the launch pipeline will—I mean, the sales pipeline will carry on there. Bandra is still seeing momentum, and we're expecting solid numbers from that region. But yes, of course, as we said, these are commercial sales. So that will follow its own timeline. Still, overall, both projects are heading toward a positive outcome, and it isn't that we intend to go into pause mode, but sustenance sales will continue.
All right, moving to my second question, which concerns the project pipeline. So if you could give us a broad update on, say, Vikhroli and Versova, the ones we plan for this quarter — where do we stand regarding regulatory approval? And clearly, on Q4 with Kanjurmarg, have we filed for the EC, since a lot of competitors have already begun holding their EC hearings? So if you could also update us on our project.
Regarding Vikhroli, I'll break it down by project. Vikhroli comes first. At Vikhroli, we're at an advanced stage of securing approvals. Hopefully within the coming days — or I'd say the coming weeks — all approvals should be in place and we should be in a position to launch the project. Versova: we remain on track to obtain approval there as well. But naturally, since this is a society redevelopment, approvals arrive in stages — once you secure one principal approval, you then break the society, after which you obtain the CC, and following that you obtain the RERA. That's the process we're following. We have received that NIC approval. Hopefully, demolition of the building ought to begin within the next 20-odd days, by this month end, or possibly during this month. After that, we should be able to secure the CC and RERA as quickly as possible.
And what about Kanjurmarg?
As for Kanjurmarg, approvals are being pursued — various separate sign-offs from the collector plus the other permissions that are needed. That work is underway, and since it is an ongoing process, challenges keep arising on the approval side, because multiple departments are involved — the collector, BMC, and the environment authorities. So all of that has to be mitigated, and we are working through it. Still, we have strong confidence that the core approvals will be secured very soon.
All right. And we've already filed for the EC — or perhaps it'll be sooner; we will apply.
We haven't applied yet, but we're fully prepared — we've already begun obtaining EC. ECs are now arriving on a regular schedule. Prior to EC, we need to apply for the Fire NOCs and all of that, and those we have obtained. And I think this month, we should be submitting our application for EC.
And regarding the timeline, I mean, where do things stand for what we're planning, like going from leasehold to pre-hold of the property?
So that ties into the government side, where we've already submitted our application and are actively working on it. There isn't a set timeline for it, but we're pushing to get that approval through.
Alright, and here's my final question. With a BMC election coming up next month, do you expect the approval process might get held up because of it?
Absolutely, 100%, there will be. That's exactly where we're driving to secure every one of our approvals — whatever is needed for the project launches — and we need those in place, since once the BMC elections get announced and people begin getting busy, delays will start coming in over there. But for all our launches, everything we have planned, I think we should be through that, and it shouldn't prove too much of a challenge.
Our next question comes from Manas Agrawal at SANFORD C. BERNSTEIN.
I have a couple of questions. First, on the completion side or from a revenue recognition standpoint for Manhattan, when do we expect those milestones to be reached in terms of completion? That's the first one. Second, I was looking at MMRDA announcements — they've begun auctioning plots near your plot for Wadala CBD. So I wanted to get a sense of how the rates are shaping up. I believe there's some discussion about you guys also doing a commercial in that area down the road. So those are my 2 questions.
On your first question about revenue recognition: it's based on the 25% completion threshold measured on a cost basis against the total project budget. That's the benchmark and the threshold. Once we pass that point, revenue eligibility begins. And naturally, there are other conditions as well — the critical permissions for construction to start on the project must be obtained. And within project recognition, whatever sales are achieved, 10% of collection also has to be achieved, and those are the criteria and the eligibility for recognizing revenue. That's why we follow the erstwhile guidance note as well as the percentage of completion method under Ind AS. Turning to the MMRDA part: I'm very happy that, looking today at the way MMRDA has conducted the auction, and if you look at the reserve price they've set, right, they are looking at, I believe, a minimum of at least INR 10,000 to INR 15,000 a square feet on the land, plus there will be construction cost, plus there will be a premium cost. And therefore, the end product, as we see it coming out, will be not below a minimum of INR 50,000.
So other than that, I don’t really see it becoming too viable for a developer. That said, we need to dig into the specifics, and we ourselves are watching for some tenders there so we can understand all the nitty-gritties. But on the whole, for us as a project, if we simply use this as a benchmark, we’re looking at an FSI cost of at least INR 10,000 to INR 15,000 per square foot.
Got it. I believe the first question you answered came from Manhattan 2. Mine was about Manhattan 1. For instance, when should we expect it to be completed?
For Manhattan 1, as a project, our goal is to have it finished by December of next year. RERA timelines, of course, run longer than that, but what we're aiming for is completion somewhere between December '26 and March '27.
Our next question comes from Saurabh Sadhwani, who is on the line from Sahasrar Capital.
Great job on the 2 launches. I’d like to hear how you’re thinking about those 2 metrics — sales volume and realization. During the first half of this year, both have added to growth in roughly equal measure. Looking ahead, how do you expect those metrics to trend? And for your sales value growth, what are you counting on?
Regarding sales volume, as you’re aware, we’re seeing strong momentum from the launches, and we feel very confident about the lineup we have for launches in the second half of this financial year. That momentum will carry forward, and it will also be reinforced by our existing projects, which are ongoing and provide sustainable sales. On realization, I think if you look at the first half of last year, we were at roughly INR 22,800 per square foot. This time, we’re at INR 28,000 per square foot. The main reason is that it varies from project to project and depends on the value or price of the project we’re selling in. This time, Manhattan was the hero. So naturally, pricing was INR 30,000 to INR 32,000 per square foot. Next quarter, we expect Vikhroli to be the hero, where we’ll see a larger volume of sales coming through. Naturally, the sales price will be somewhat lower. But that is entirely variable depending on volume and the velocity of sales.
So all in all, we're going to keep growing with this momentum and stay on the sales trajectory that stems from every project we've envisaged. And I think how that realization plays out will differ from quarter to quarter depending on the launches.
All right, and how far along would you be with the project additions for this year?
Regarding project additions, we currently have active work underway on 3 to 4 projects. We're attempting to secure some regulatory clearances at the basic ones. Once those are in hand, we can then sign on the dotted line and bring those projects into our books. So hopefully, we're looking at revenue targets of roughly INR 3000-odd plus crores coming from the 2, 3 land parcels we're in discussions about.
Our next question comes from Vijayraj Solanki, an individual investor. Could you please use your handset? We can't hear your voice clearly.
It's helpful to know this: from our Wadala project, the Manhattan project, at a distance of 1.5 kilometers, there's a Lodha project, and they offer 70% open area while we offer 50% open area. So, are we running into any challenges when it comes to selling our Wadala project, Manhattan?
I believe there may be an error in a few of those figures. I'm not certain what the open spaces at Lodha amount to, but in our case it's certainly above 50%. So if I look purely at openness — to give just one example, Manhattan, where we've launched currently — we have a podium of 7 acres that is entirely open and car-free, which is what we're launching, and only 4 buildings will come up there. So technically it isn't 50%, but it will fall in the range of about 80% or so. I don't know the exact numbers, but openness there will be around 80%. So because of the 7-acre podium with full openness, with 4 buildings standing on it. So I don't think it's 50%; it will be even higher. That's the point I'm trying to make.
Our next question comes from Avi Shah, who is an individual investor.
Yes. So I just have one question. It’s about the 3 projects, Manhattan 1, Greenfinity AB and Vihara. The sales figure shows the same amount in the previous quarter and the current quarter. So could you shed some light on why that is?
So for Greenfinity, Manhattan, and Vihara — all 3 projects — if you look at Manhattan, roughly 90% of its velocity, or total sales, has been achieved; 90-odd percent has happened. At Greenfinity, we're sitting at around 74%, 75%. And with Vihara too, we're at about 70-odd percent. Typically, what happens is once you've hit that sort of level, picking a flat becomes somewhat difficult for a customer. And that's where you'll see somewhat lower sales coming through, because fewer flats are left available and people want a particular choice of flat. So that's where you'll see the numbers working out to be more or less the same, or perhaps some customers who probably haven't been paying and we want to cancel their flats and then rebook with a new one. So we don't — our system is that we don't — we do net booking. So even if someone has canceled, we don't — we cancel the number of flats and then probably add it right now itself rather than doing that at the end of the project.
So those are the 2 options, and that’s basically the way we’ve been handling things here.
Could you just tell us when you'll be in a position to sell off the rest of those flats that are still remaining?
So in Manhattan, we’ve ended up with very few flats left—roughly 40, 50-odd flats that are still there. I think within the next 6, 8 months, we should be done. And for Greenfinity, it’s around the same timing as well. As for Vihara, we’re probably looking at a year or so.
Our next question comes from Dr. Taruna Maheshwari, who is with Prosperion Consulting.
On the overseas investment side, both in Bahrain and in London, the first thing we'd ask is that you include this as part of a presentation, so we're able to follow it and track the cash flow. Then, specifically, I'd like to get a sense of how much money has come in from Bahrain so far, and in which area in particular we'll be receiving it?
Regarding Bahrain, we've gotten roughly INR 35-odd crores, and that came even though we'd exited that project a few years earlier, back in FY '22. There's also a remaining inventory entitlement of more than 10,000 square meters, and the project is still going, at an advanced stage of completion. We expect to monetize that inventory, since our intention isn't to hold it in that specific geography — that was the main reason we exited the project. And yes, we will be receiving the repatriation, and it will be appropriated against the loan as well as the equity funding that sits on the balance sheet. On the U.K. side, the funding structure is similar, and we've been receiving the funds and appropriating them on the balance sheet, both on the loan side and on the equity side.
I'd also ask that you show it in the presentation as a cash flow line item, so investors can track it clearly.
That falls under the cash flow line — within the INR 330 crores of expected cash flow from other avenues, which belong to this one and two assets we plan to monetize. So it sits squarely inside the cash flow estimate within the overall INR 2,800-plus crores that we have projected. And yes, we have disclosed that one too.
Next up, we have a question from Nilesh Sharma, calling in from Anantnath Skycon Private Limited. Apologies, sir — his line has dropped. So we'll go on to the following question, which comes from Karan Bhatelia at MAIQ Capital.
Nice work on those results — really strong. I just want to ask about one thing: what's behind the decline in the EBITDA margin this quarter, if you could walk us through it?
Okay, so the main reason is really the mix of projects that are feeding into top-line revenue recognition. And as you're aware, we recognize revenue based on percentage of completion, along with continuing sales from the ongoing projects we've had. Most of those projects are in Bangalore, and they're relatively low-margin ones — Vihara and other projects like that. So that's essentially how we end up with a couple of basis points of decline in EBITDA.
Understood, sir. And sir, for the second question — this is a fairly generic one I was hoping to get clarity on. I realize we hold a pretty solid land parcel in our own right. However, given that Mumbai has such a large amount of redevelopment taking place, what's your perspective? And as a company, are you seeking to take on additional projects of that redevelopment kind?
Yes, yes, absolutely, 100%. If you look at it, our whole business model rests on 3, 4 buckets. The first is our greenfield projects, where we hold our own land banks — that's where we're obtaining approvals, handling the planning, and selling. The second is joint venture and joint development projects, which we're mainly doing a great deal of in Bangalore. The third is on an outright basis, if a greater opportunity comes along like the Vikhroli one, the Ghatkopar one, the Eden project, which we launched — all of those are outright bought projects. And the fourth is redevelopment of slum, society, MHADA, et cetera. So our business model rests on all 4 of these buckets, and it isn't that we focus on one or another, but we — I mean, we have a dedicated team making sure that all these projects work independently to move it forward. So we are absolutely on track to — in fact, as we speak today, we are at minimum bidding for 30 to 40 societies, or perhaps we've given our offers or are in discussions, or perhaps just evaluating. So that's how we're working on it.
Next up, we have a question from Raaj at Arjav Partners.
I wanted to get some clarity on Slide #31, where you've laid out the cash flow projections. So the ongoing projects are expected to generate INR 1,526 crores, is that correct? And the upcoming projects account for INR 2,872 crores.
Right. The project we have underway sits at INR 1,526 crores, and then there are the projects coming up — our pipeline — 7 projects with a GDV of roughly INR 4,300 crores, and their estimated cash flow comes to around INR 1,000 crores. On top of that, INR 330 crores is what we expect from asset monetization and repatriation. So when you put those together, that's how we arrive at a total cumulative cash flow of about INR 2,800-plus crores.
Sir, that INR 2,872 crores is the sum of those 3 numbers, correct — INR 1,526 crores, INR 1,016 crores, and INR 330 crores?
Yes, sir.
Sir, when will the cash flows start coming into the books?
So INR 1,526 crores sits with the project already underway, and the completion timelines for that one run from roughly 2 to 3 quarters all the way out to 4 years, sort of thing, since it's a project we only recently launched and once it's finished, the cash flow gets unlocked. Then for the projects still to be launched where cash flow will be unlocked, that figure is INR 1,016 crores, and those will take around 4.5 to 5 years. So taken together, overall, that's 4.5 to 5 years.
Broadly speaking, it's a 4 to 5 year period, and that will be recorded in the books, correct? It's going to be realized.
Right. Still, it's happening steadily and step by step, since the easy wins — the projects such as Prive, Eden and Nucleus that are already finished, with inventory ready, plus those nearing completion — will begin to free up cash flow starting a couple of quarters from now.
We have a question coming from Nilesh Sharma at Anantnath Skycon on the line.
Regarding Slide #21, how much revenue will we record across the next 2 quarters from the INR 3,508 crores that represents the ongoing project, and from the INR 91 crores for which we have obtained OC?
So, as we've provided that guidance, INR 91 crores — with completion and OC receipt expected over roughly the next couple of quarters — we should be, and as we speak right now, we've had the inventory sale after the quarter, and that will definitely flow into the income statement. And regarding revenue of INR 3,500 crores from the ongoing project, a significant portion coming from the presales we recorded last quarter, that's going to be — once the project qualifies, which we anticipate a couple of quarters out from now — after that, revenues will begin entering the income statement. And as I explained, the INR 4,300 crores of launches, those over a span of roughly 4.5 to 5 years.
I completely agree with you. But to be very precise, we just want to know about the — where we are going to close this financial year. How much will be...
For this fiscal year?
Yes, you're asking about this financial year, sir?
Regarding this financial year — and I'm referring to the one we just closed, with a top line of INR 750 crores — there should be meaningful growth compared with the prior year's figure.
And what should we expect on the margin side?
It's going to be......
Regarding margin, as I mentioned, it's really the lower-margin projects that are flowing through into revenue. That's the reason the EBITDA and PAT margins have held steady. However, looking ahead, since we already have such a strong book of high-margin presales — in Manhattan and other projects, you know — there should be upward movement on margin as we move through the coming quarters.
And, sir, what exactly caused the margin to fall in the September quarter?
That comes down to the mix of projects currently bringing in revenue—which, as I mentioned, are Vihara, Eden, and the ongoing sustained sales activity. Those factors account for the few basis points of margin decline.
Typically, if you look at our original land—like our greenfield projects, where our land mines are acquired at a historical rate—the margins there run somewhat higher. When we consider a redevelopment project or a slum redevelopment project, margins tend to be a bit lower compared with what our greenfield projects deliver. So, while we keep doing both types of projects, what we observe is that at times, when a redevelopment or slum redevelopment project enters the income statement, we might see a dip at that point. But if, say, in the coming few quarters Manhattan enters the income statement, margins will climb again. So that is how variability comes about.
And sir, regarding those launches potentially worth about INR 4,000 crores, is there any land acquisition or any progress we can note?
As shown in the slides, regarding the launches we've outlined, Vikhroli, as mentioned, will be launched quite soon. Versova is also going to be launched. Bangalore is being launched. The boutique office at Wadala is being launched. For Kanjurmarg, we are in the process of obtaining approvals. And Shastri Nagar along with Ghatkopar are also on track, with the kind of designing and planning that is happening. So that too will come into income -- I mean, launches as desired.
Our next question comes from Saurabh Sadhwani, who is calling in from Sahasrar Capital.
Regarding the approvals for Kanjurmarg, are you expecting those to come through before the BMC election gets announced?
Pardon me — which one was that?
Kanjurmarg.
No, no, no. That won't come about that quickly, since approvals have to be obtained first, and after that it gets applied in BMC. So my view is it won't take place before the BMC election. It'll take place after the BMC election.
Right. Right. And regarding those new Wadala plots that are going to auction, I just want to make sure I've got this straight — you mentioned that the realization could reach as high as INR 50,000 per square feet?
Right. Since the minimum set price that's been put in place today comes to roughly about INR 10,000-odd per square foot on the FSI area. Now, if premiums get added to that, along with construction costs and other items, then overall what we're seeing, I think, is that nobody is going to manage selling below INR 45,000, INR 50,000.
Right. And that would also boost what you're getting out of the plots you already have, correct, in that vicinity?
Definitely.
Alright. Regarding the sales value guidance, we've stayed on track through the first half, and those projects have launched as well. So yes, we do expect to hit that guidance this year, correct?
Yes. 100%.
Our following question comes from Avi Shah, who is an individual investor.
I've got just one question. As you mentioned, you're planning to build a 7-acre podium in Manhattan that has 4 buildings on it. So could you give me the apportioned podium cost across all the projects, or for the project? Could you just walk me through the details?
It varies quite a bit, sir. I think if you're able to come down, we can walk you through the full costing in detail, because podium isn't only about structure and cement — it also carries a great deal of amenities, in terms of mechanical engineering and waterproofing and interiors and parking. So it isn't just one portion, but if I have to give you a rough thumb number, it will be anywhere between INR 2,500 and INR 3,000 a square feet on the construction area.
So is that regarding just 1 project, or does it cover all 4 of them?
No, no—that figure relates to construction area per square foot. The reason is that building that portion costs about the same as, or nearly as much as, putting up the building I intend to sell. To illustrate, for every 1 square foot of carpet area I sell, I actually build 2.1 or 2.2 square feet of total construction area, and that covers the podium, the entrance lobby, services, the building itself—everything. That's the angle I'm coming from.
So the cost will be spread across all 4 projects, is that right?
Yeah, absolutely — that will be spread across all 4 projects.
That wraps up the questions for today, ladies and gentlemen. At this point I'll pass the conference back to management for some closing remarks. Over to you.
Thanks to everyone for joining this earnings call and for engaging with your questions, which help us draw more insight from them. Until we speak again next time, stay safe. Thank you, all.
Thanks. Have a good day.
Appreciate it, sir. That brings us to the close of this conference on behalf of Ajmera Realty & Infra India Limited. Thanks for being with us — you can go ahead and disconnect your lines at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ajmera Realty & Infra India Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Ajmera Realty & Infra India Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.