Home / Transcripts / Ajmera Realty & Infra India Limited (513349) · August 4, 2026

Ajmera Realty & Infra India Limited (513349) Earnings Call Transcript

August 4, 2026

BSE Limited IN Real Estate Real Estate Management and Development earnings 32 min

Earnings Call Speaker Segments

Operator operator
#1

Ladies and gentlemen, hello, and welcome to the Ajmera Realty & Infra India Ltd Q1 FY’27 Earnings Conference Call. <<operator_script>> Kindly be aware that this call is being recorded. At this point I would like to pass the conference to Mr. Gaurang Chotalia, Lead Investor Relations. Thanks, and the floor is yours, sir.

Gaurang Chotalia executive
#2

Good evening, everyone, and a very warm welcome to all of you. On behalf of the company, I want to thank each of you for joining Ajmera Realty & Infra India Ltd's earnings call covering the quarter that ended 30 June 2026. Our Director of Corporate Affairs, Mr. Dhaval, will begin with opening remarks, and after that our CFO, Mr. Nitin Bavisi, will walk you through the business performance discussion. We shared the operational updates for the quarter during the second week of July 2026. Both the investor presentation and the press release, which are based on the financials adopted by the Board, have been posted on the stock exchange website, and you can download them from our company website too. Kindly note that certain statements made in today's discussion could be forward-looking in nature, reflecting the company's outlook, and they may carry some risks and uncertainties that the company could encounter. I would now like to turn the call over to our Director of Corporate Affairs, Mr. Dhaval Ajmera. Thank you, and the floor is yours, sir.

Dhaval Ajmera executive
#3

Good evening, everyone, and thank you very much. I hope all of you are doing fine. I'd like to start the whole conference by sharing sector updates with you, and after that our CFO will take everyone through the company update and the numbers. In Q1 of FY'27, as we are all aware, geopolitical tensions, new trade policies, and ongoing macroeconomic uncertainty kept shaping the global economic environment. Even with these outside challenges, India stayed comparatively resilient, helped by robust domestic demand, steady macroeconomic fundamentals, inflation that held stable, and a policy backdrop that was supportive. Given this setting, Indian real estate went on showing solid structural fundamentals. The industry did see a quarter that was seasonally softer — one I would describe as more cautious — with pre-sales and collections moderating sequentially after a strong Q4 FY'26, yet the demand environment underneath is still healthy. Momentum continued to be supported by infrastructure-led development, better connectivity, fast urbanization, and a lasting preference for owning a home. Meanwhile, the sector keeps maturing and becoming more organized, as homebuyers place growing priority on quality, transparency, timely delivery, and the credibility of the developer. Turning to the residential market, we saw a structural shift take place. Though across this whole quarter we have observed lifestyle and premium development, with healthy demand coming in from all sectors, customers increasingly look for projects that deliver superior amenities, stronger connectivity, and long-term value creation, together with the competitive advantage held by established developers who have proven capabilities.

Dhaval Ajmera executive
#4

When it comes to the commercial side, healthy office leasing activity has also been fueled by the GCCs and the flexible workspace operators, and an expanding enterprise keeps making the Indian real estate ecosystem stronger, while also supporting residential demand in key employment corridors. We're happy to report that during this quarter, we received INR89 crores as our share of investment and profit from a property sale, out of the INR330 crores that we had referenced in the potential cash flows we expect to come in. Going forward, we stay optimistic about the sector's long-term perspective. Continued policy support, infrastructure investments, and a stable interest rate environment, along with the ongoing consolidation in the industry, are expected to strengthen the position of the organized developers. In our view, the moderation witnessed across the quarter reflects normal industry seasonality rather than a structural slowdown. As India continues its journey toward becoming a developed economy, we remain confident that disciplined execution, prudent capital allocation, and customer trust will continue to be the key drivers of sustainable growth and long-term valuation — value creation. Turning to our company and the projects of — our ongoing projects, our flagship luxury development, Ajmera Manhattan 1, has achieved around 93% sales, with progress in finishing and MEP works.

Dhaval Ajmera executive
#5

Manhattan — Ajmera Manhattan 2, our other Wadala project, has drawn a heartening response from buyers too, with roughly over 50% of its inventory already sold even as excavation is underway. The next phase of Ajmera Greenfinity A & B has clocked 94% sales and is likewise moving quickly — steadily advancing toward completion, with the occupation certificate expected soon. At Ajmera Vihara in Bhandup, sales have reached 81%, with RCC work in progress. The rehab wings are almost finished already, and the sales wing has made solid headway as well in Wing D and Wing E — that is, the 4th floor and the 1st floor, respectively. Ajmera Solis, our standout for the last quarter, has enjoyed strong demand, letting us reach 86% of its inventory absorbed while excavation has only just begun and is moving forward steadily. Our commercial project at Bandra, 33 Fifteen, has likewise seen a steady shift in its inventory, with 19, one-nine, percent of it sold while piling and shoring work — shoring progress is ongoing, and we are aiming at quicker execution across these projects. And our luxury collection launch from last quarter, Ajmera — Vann By Ajmera in Versova, is showing good progress on the work front, and inventory is also moving gradually and steadily, with 3% of it sold as of today.

Dhaval Ajmera executive
#6

Over in Bangalore, our mid-micro market housing portfolio is still delivering strong results as well. At Ajmera Iris, 90% of sales have already taken place, and it's steadily moving toward the occupation certificate, with finishing work currently underway. Ajmera Marina has likewise reached 69% sales across its entire portfolio, where construction has progressed up to the second slab — the basements are complete and slab work on the second floor is ongoing. Looking toward our near-term growth path, the driving force will be unlocking the vast remaining potential of our strategic Wadala land bank, which carries an estimated GDV of roughly INR18,000 crores, including Boutique Office Phase 1, together with an FY'27 launch pipeline in the range of around INR3,000 crores — this gives us a huge GDV opportunity of nearly INR21,000 crores across the whole pipeline. In the quarter, we added an asset-light project in Bengaluru with an estimated GDV of approximately INR400 crores, which further strengthens our development pipeline as we stay committed to a disciplined growth strategy. With that, I'd now like to turn things over to our CFO, Mr. Nitin Bavisi, who will walk you through the financial and operational highlights. Thank you very much.

Nitin Bavisi executive
#7

Good evening, everyone, and thank you for being with us on this conference call for Q1 of FY’27. Before we move into the Q&A session, let me walk you through the consistent operational and financial performance that we have delivered. Starting with operations, Ajmera Realty has had a steady beginning to FY’27, reporting a sales value of INR146 crores, with a sales carpet area of roughly 43,000-plus square feet sold and collections of approximately INR173 crores during the quarter. Turning to the financials, total revenue for the first quarter of FY’27 came in at about INR320 crores, up 23% Y-o-Y from INR260 crores in Q1 FY’26, supported by continued project execution. EBITDA rose 18% Y-o-Y to INR94 crores from INR79 crores in Q1 FY’26, with an EBITDA margin of around 29%. PAT stood at INR45 crores, which is also a 14% YOY increase over INR39 crores in Q1 FY’26, with margins at 14%. In addition, Ajmera Solis became eligible for revenue recognition for the first time during this quarter, thanks to its fast-track execution as well as the exceptional customer response since its launch. Backed by strong collections and asset monetization, we brought our debt down by INR57 crores in this quarter, from INR737 crores as of 31st March 2026 to INR680 crores as on 30th June 2026.

Nitin Bavisi executive
#8

So because of that, we got to a debt-to-equity ratio of 0.47x as of 30th June 2026. On top of that, the weighted average cost of our debt declined as well — it's sitting at 11.01% in Q1 FY'26, which really underscores the stronger credit profile we now have and how carefully we manage our finances. Visibility on revenue continues to look very healthy, backed by robust sales from launches we've done recently and consistent progress on projects that are ongoing as well as those that have received OC. From these projects, revenue visibility comes to INR3,846 crores — INR1,661 crores of that from committed sales and INR2,185 crores from inventory still available to sell — and once sold, that revenue is recognized and recorded in the income statement. Beyond that, the pipeline of launches we have coming up should add roughly INR6,500-plus crores, which pushes our total revenue visibility to INR10,000-plus crores, giving us a very solid base for sustained growth as we keep moving ahead on our ongoing and launched portfolios. The estimated cash flow potential, both pre-tax and post-tax, across ongoing projects, upcoming projects, and other revenues, is estimated at about INR3,380 crores across the life cycle of those projects. That's a concise summary of the business highlights and financial performance — I'll now open the floor to your questions and look forward to further interaction. Thank you.

Operator operator
#9

Thank you very much, sir. We're going to start the question-and-answer session at this point. <<operator_script>> Our first question comes from Dixit Doshi, who is on the line from Whitestone Financial Advisors. Go right ahead.

Dixit Doshi analyst
#10

Yes, thanks for the chance to speak. Are you able to hear me?

Operator operator
#11

Yes, sir, we can hear you. Please go ahead with the question.

Dixit Doshi analyst
#12

Thanks for the chance to ask. My first question concerns Kanjurmarg. Could you bring us up to date on where things stand at the moment? During the previous quarter, you said a strategic partnership was being considered, or that you were even willing to sell the seven-acre plot outright, in order to produce cash flows and unlock value as well. So where do we stand on that? Has anything been finalized, or is there something we might expect in the near term? And what is the status of the land conversion? I believe the deadline is December. So when can we expect something on that front?

Dhaval Ajmera executive
#13

We're pushing really hard on the land conversion process, and yes, it involves a regulatory procedure in which we've brought in the government, along with the other steps that have to be completed. So that's what we're working on. Our hope is that we can get it done very soon — ideally within the next two to three months. We're quite confident it will come through — it will certainly come through ahead of the December deadline, as we understand it. As for the strategic tie-up, yes, we're in active talks with a few parties and discussions are already underway. Site visits are taking place. Preliminary discussions are ongoing, but we and they have principally agreed that we'll only finalize things once the conversion is taking place. That's how we're proceeding with regard to all the strategic requirements. So both matters are progressing in parallel.

Dixit Doshi analyst
#14

So, you're saying that the land conversion needs to take place before we finalize any tie-up?

Dhaval Ajmera executive
#15

Yeah, since that's the way we assign value.

Dixit Doshi analyst
#16

Alright. And that would be whatever you're describing about site visits taking place and so on — so is that for an outright purchase, or are we doing some kind of joint JDA arrangement?

Dhaval Ajmera executive
#17

Both. Once — some are outright, some are JV.

Dixit Doshi analyst
#18

Just for seven-acre?

Dhaval Ajmera executive
#19

Yeah.

Dixit Doshi analyst
#20

Okay. So Seven Acre won't come as just one single deal — it might be a couple, maybe two deals or something along those lines?

Dhaval Ajmera executive
#21

This is going to be just one single deal. A few of those parties want a complete exit, while others are looking for a JV. So that evaluation is currently underway.

Dixit Doshi analyst
#22

Right, right, I hear you. Still, you're fairly confident that the conversion issue ought to be sorted out within two or three months at least? Because it's been dragging on for quite a while now, ever since we shifted something in Kanjurmarg. So I'd just like your view on that.

Dhaval Ajmera executive
#23

Right, right. No, no, no — we are, and behind the scenes we're fully focused on making progress in terms of — while the approval processes are underway, but regarding the other items needed to speed up execution, once conversion happens, we've already been getting things prepared as far as certain tax-related matters go, or land transfer or other legal steps, whatever has to be sorted out — all of that is being handled in parallel so we don't lose time afterward and can get things done faster.

Dixit Doshi analyst
#24

And on the same note, is there any news regarding those 55 acres? Since we're also aiming to launch that in FY'28.

Dhaval Ajmera executive
#25

So yes, that master planning effort has been put on hold. At this point we've shifted into Phase 2, which covers the full technical evaluation and all of that. As for the infrastructure side too, that work is likewise being planned out, and we ought to get it started quite soon. So next year, FY’28, when we launch, all of it will be ready.

Dixit Doshi analyst
#26

Alright. So turning to the launches planned for this year, our target is INR6,500 crore worth of launches, and let's say 50% of that is Boutique Office. Now, my question on that is, first, are we confident about launching it in the third quarter? And how confident do you feel — given the demand environment right now — that it might not get pushed back? The related question is that a year ago, we were planning an INR1,800 crore launch for Boutique Office. Now we're doing it in a single phase at around INR3,600 crores. I think this will be Ajmera's largest project. Not just in commercial — even counting residential, we've never done a single launch this big. So how confident are you on current demand, and also on the Q3 launch?

Operator operator
#27

Apologies for cutting in, Dixit — your voice is breaking up.

Dhaval Ajmera executive
#28

We understand the question. So, Mr. Dixit, we—first, we had already told you last time that some approval changes had taken place, and that is where we picked up an additional million-odd square feet of FSI, which has been loaded into our Wadala project, and because of that we have gained another INR3,000-odd crores in GDV increase. And what we are seeing over the last so many years, with India's growth story, is that GCC growth has also been significantly higher. And now, with data centers evolving on a much larger scale outside the city and other GCCs also emerging in a bigger and larger way, demand for commercial premises has been good all across Mumbai because of its strategic connectivity throughout Mumbai. And with Wadala enjoying this strategic connectivity, we are seeing great demand coming for commercial spaces in this particular micro market because of its connectivity to the new airport and BKC. So therefore, we are confident, and that is why we are launching. Earlier we used to do about 4 to 5 lakh square feet of office space launch; now we are going to do about 8 to 8.5 lakh square feet of office space launch.

Dhaval Ajmera executive
#29

And that's the reason we're seeing this bigger figure show up. And then, when we talk internally with our customers, our brokers, and other folks, they're quite confident that a solid turnaround is on the way in this space.

Dixit Doshi analyst
#30

Alright, and for the final question — regarding the other projects we have lined up for this year, do you think most of them will actually get launched? Because my sense is some timelines have shifted: Borivali went from Q3 to Q4, and even Pune went from Q1 to Q4. So is that down to a regulatory matter, or is it simply the demand situation?

Dhaval Ajmera executive
#31

No, a number of them are regulatory matters, and some are — well, the majority are regulatory matters that have arisen, and we've actually started work at Pune. In fact, we even obtained the RERA number as well, but we'll only launch this once we get to — we made a strategic decision not to launch at what you'd call the execution or ground level stage, or at the excavation stage. Instead, we'll launch at a point where we can generate better demand and pricing, which will arrive at the plinth level. So because of that, we've shifted it from the first quarter to the last quarter.

Dixit Doshi analyst
#32

Alright, alright. I’ve got a few additional questions. I’ll come back on then.

Dhaval Ajmera executive
#33

Sure.

Operator operator
#34

Thanks. <<operator_script>> Our next follow-up question comes from Dixit Doshi, who is on the line from Whitestone Financial Advisors. Dixit, please go ahead.

Dixit Doshi analyst
#35

Thanks again for the chance to follow up. My next question concerns the Vann project — Ajmera Vann. In this quarter, we weren't able to sell even one flat there. So how do you view it — since it seems demand for that project just isn't there. If you could share some thoughts on that.

Dhaval Ajmera executive
#36

No, that’s not how it works. We’re extremely careful when it comes to sales. We’ve positioned this as a luxury collective. Actually, if you look at it, demand is stronger for bigger units than for smaller ones, and we’re assessing all of that. We’re in talks with the brokers we need. And this micro market does see demand for larger apartments like these. Only once they’ve probably reached an RCC level, where the buildings can actually be seen rising, will that change. Right now we’re at the excavation stage. So we’re mindful of that, and we’re aware of it. So we’re not pushing what you’d call a desperate sale to bring buyers in. We’re very confident, and even the channel partners and our investors, everyone involved, are all very confident about getting good numbers as the building progresses. So obviously, building progress has begun. It will take — because there are two basements plus a plinth and a podium to come, so roughly a year or so will pass. We’ll see subdued sales this financial year for this project, but over time, and next year when the superstructure progress is happening, we’ll begin to see traction coming in more quickly.

Dixit Doshi analyst
#37

All right, next question from me. We’ve brought down our consolidated debt, but looking at this quarter’s results, interest expense on a quarter-on-quarter consolidated basis has climbed from INR21 crores to nearly INR30 crores. Is there a specific reason behind that?

Nitin Bavisi executive
#38

Sure, absolutely. So take the Solis project — it's the one that qualified for revenue recognition for the first time. That means the whole accumulated cost pool gets charged to the P&L, and a significant portion of that cost is interest cost tied to this specific project. That's why, on the consolidated numbers, you're seeing what shows up in finance cost. Happy to clarify the actual driver here: it comes from the high-cost debt on this particular project, which came through a private equity deal that supported the acquisition, and we've fast-tracked and repaid a significant amount of it from our cash — from sales collections, essentially. So that's the reason that particular IRR servicing is the finance cost that got pulled in when the project qualified for revenue recognition this quarter.

Dixit Doshi analyst
#39

Starting next quarter, that INR30 crores will return to a normalized level of around INR20 crores <<inaudible>>.

Nitin Bavisi executive
#40

Sure. As you can see, my weighted average cost is also declining quite slowly, so to speak. And the marginal loans, which sit at a far, far lower level than the weighted average cost — once that component begins flowing into the outstanding loan, the weighted average cost and therefore the overall cost, meaning the finance cost figure as well, will also decrease gradually.

Dixit Doshi analyst
#41

All right. So on that INR89 crore asset monetization, did it generate any profit or anything like that in the P&L?

Nitin Bavisi executive
#42

That's actually the financial asset that got classified onto the balance sheet. So it's a balance sheet transaction between the cost we incurred and also the financial advances we've made for this particular project. So it's entirely a cash flow transaction — INR89 crores, which we've realized out of the INR330 crores guidance we've been giving on asset monetization. So INR89 crores, which we've unlocked out of that.

Dixit Doshi analyst
#43

Okay. So nothing at all has flowed through to P&L on this?

Nitin Bavisi executive
#44

No—like I said, that's a financial asset, which means it's a balance sheet transaction.

Dixit Doshi analyst
#45

Alright, alright. And for my final question: in the prior quarter's presentation, the South SV Concrete Bengaluru project was taken off our list of upcoming launches. Is there a specific reason for that?

Nitin Bavisi executive
#46

That one has been exchanged for Whitefield — project line item 6 in my launch pipeline — and that's the business development we completed this quarter, against the INR1,800 crores BD guidance, coming to INR389 crores, which is Whitefield, and which we're also aiming to bring in during the last quarter of FY'27. So that's the swap between SV Concrete and the Whitefield project.

Dixit Doshi analyst
#47

But will SV Concrete arrive next year, or is that project no longer with us?

Nitin Bavisi executive
#48

No, it won't be there anymore.

Dixit Doshi analyst
#49

Okay. Is there a specific reason for that? I mean, we included it in the launch plan we had, and now the project isn’t with us anymore?

Operator operator
#50

Pardon me for cutting in, Dixit — your audio cut out there for a moment.

Dixit Doshi analyst
#51

Sorry about that. So my question was, is there a specific reason the project was included in our planned launch, and now it isn't with us?

Nitin Bavisi executive
#52

So generally speaking, Bengaluru has always been a fairly asset-light type of setup. We’ve been assessing the proposal and moving it to the point where we can look at it with confidence. This is a standalone situation — this specific project is not currently shaping up as one to come in and launch, along with the new project that we have our eye on and have ring-fenced that particular transaction for, and which is now among the launches.

Dixit Doshi analyst
#53

Alright, thank you. That's all I have.

Operator operator
#54

Thanks. Our following question comes from Devang, an individual investor, who is on the line. Please proceed.

Devang analyst
#55

Good evening, everyone. I just want to verify something: right now the debt-equity ratio stands at roughly — the net figure is 0.7 to 0.47, and by year-end we expect 1x. So on a realistic basis, what should we anticipate by financial year-end? That's my first question. My second one is this: given today's uncertain economic conditions, how do you see the real estate sector shaping up over the short term and the medium term?

Nitin Bavisi executive
#56

Okay, on your first question about the debt equity ratio of 0.47 — yes, we've done quite well when it comes to managing debt and bringing that debt equity down. But as you can appreciate, we have a deep launch pipeline, and a few projects need a pre-RERA type of capital, which will create some requirement for debt. Still, as we get closer to launch and see sales velocity on those launches, we're confident those working capital loans will begin coming in, and we can start returning to leveraging. That said, there would be about a quarter or two where this kind of situation persists. And that's why we gave the guidance of FY'27 to 1x. But with this asset monetization and another deal absolutely sealed out, we now see a much lower levered position as we move forward.

Devang analyst
#57

Alright.

Nitin Bavisi executive
#58

Turning to the real estate outlook, I'd like to hand things over to Mr. Dhaval-bhai.

Dhaval Ajmera executive
#59

If we’re speaking in broad terms, the real estate picture is at minimum favorable. Even when you examine the figures for other developers and their firms, we haven’t observed anything troubling—those numbers have held up fine. Wherever launches have taken place, sales have performed well. My view is that demand for real estate remains solid. Buyers have grown more careful. I wouldn’t claim they haven’t become more careful. Yet despite that carefulness, we continue to see a healthy pickup in the luxury segment and in the middle and luxury segment. So in the segments where we operate, even if I look at our own sales figures—though they may be somewhat muted since we didn’t have bigger launches coming through—at least for the ongoing projects we still have, we are seeing sales occur at every site.

Devang analyst
#60

All right, great. And then just one more question: in the presentation, we see some cash flow still coming from asset monetization. So is there any expectation for this financial year regarding that cash flow?

Nitin Bavisi executive
#61

Yeah. Actually, of that INR330 crores, INR 89 crores has already come through. And we put out another disclosure about selling our stake in one of our joint venture companies, and that's what we'll report in quarter two, since we only closed the deal in the first week of July 2026. So it will show up in quarter two as far as cash flow goes. But yeah, that should speed up even more the cash flow realization from this INR330 crores.

Devang analyst
#62

Alright, that's great. Thanks a lot.

Nitin Bavisi executive
#63

Appreciate it.

Operator operator
#64

Thanks. <<operator_script>> Since nobody else has anything to ask, at this point I’d like to pass the conference back to management so they can offer their closing remarks.

Nitin Bavisi executive
#65

Thanks to all of you for joining the call. Regarding our company credentials and how the project portfolio is progressing, keep up your interactions and stay safe until we speak again next time. Thank you.

Dhaval Ajmera executive
#66

Thanks.

Operator operator
#67

<<operator_signoff>>

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ajmera Realty & Infra India Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Ajmera Realty & Infra India Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.