Good day, everyone, and welcome to the Q3 FY '26 earnings conference call for Arihant Superstructure Limited. <<operator_script>> Kindly be aware that this call is being recorded. At this point, I'll turn the conference over to Ms. Kunjal Agarwal. Thank you, and the floor is yours, ma'am.
Good afternoon, everyone, and hello. I want to thank all of you, on behalf of Arihant Capital Markets Limited, for being on this Q3 FY '26 Earnings Conference Call of Arihant Superstructure Limited. Joining us today from the management side are Mr. Ashok Chhajer, Chairman and Managing Director; Mr. Parth Chhajer, Whole-time Director; and Mr. Udit Kasera, CFO. So, with no further delay, I'll turn the call over to the management for their opening remarks.
Thank you. Good afternoon, everyone, and thanks for making the time to be on this Arihant Superstructures Limited conference call for Q3 FY '26, where we'll discuss the results and business updates. I trust you've had a chance to go through our presentation, which has been filed with the stock exchanges. At this point I'd like to hand over to our CFO, Mr. Udit Kasera, who will walk you through the financial highlights for the quarter, and after that I'll cover the key operational highlights and business updates.
Good afternoon, everyone. To begin, I'd like to walk you through the financial highlights for the quarter we're reviewing. Consolidated operating revenue for Q3 FY '26 came in at INR 126 crores, which is a drop of roughly 16% year-on-year, though it grew about 3% sequentially versus Q2 FY '26. EBITDA was INR 29 crores, down approximately 32% year-on-year and about 3% quarter-on-quarter, and the EBITDA margin came in at 22.94%. PAT for the quarter was INR 8 crores, with a PAT margin of 6.59%. Over the 9-month period, operational revenue reached INR 370 crores, a rise of about 7% year-on-year, while EBITDA was INR 96 crores, up 17%, and the EBITDA margin improved to 25.92%. PAT stands at INR 34 crores, with a PAT margin of 9.23%. With that, I'll hand the call over to Mr. Parth Chhajer, who will cover the operational highlights.
Yes. Thank you, Udit. Turning now to the main operational highlights for the quarter. Sales bookings for the company during this quarter came to 288 units, equivalent to 370,000 square feet of area, with a booking value of INR 278 crores. For the quarter, the average price achieved per square foot was INR 7,505, versus INR 5,594 in Q3 FY '25, which reflects a 38% rise year-on-year. The average price per unit sold came in at INR 96.4 lakh. Collections during the quarter totaled INR 132.5 crores. On the business development side, we signed roughly an additional 3.5 acres of land at Chowk Manivali for our town Villas project, and this deal is structured on an area sharing basis. With that addition, the total township size now stands at 96.5 acres. We also received OC during the quarter for Arihant Aloki at Karjat, where we delivered 127 units, equivalent to 79,000 square feet of area. Our development pipeline stays robust, supported by a strong land bank, and we expect value unlocking as projects move through construction and launch cycles. At the same time, our inventory position remains comfortable, with unsold ready inventory at just 81 units, having a total value of INR 17 crores.
Navi Mumbai is right now at the edge of a major transformation, backed by a number of landmark infrastructure projects and developments that are going to shape the whole real estate picture over the coming 10 years. As the Navi Mumbai International Airport begins operations at the end of 2025, connectivity is getting meaningfully better. On top of that, the government has also announced the Gold Line for Metro 8 — that is Line 8 — linking the existing Mumbai International Airport with the Navi Mumbai International Airport. So this is going to cut travel time substantially and potentially carry more passengers year-on-year as well. With Atal Setu now operational for over 2 years, these developments are bringing large parts of Navi Mumbai considerably nearer to Southern Mumbai, the Eastern suburbs and the Western suburbs than was the case before. It is also encouraging to share with you that in recent months and weeks, price increases in Navi Mumbai have been rising faster than in Mumbai, according to several knowledge partner reports. That said, a strong affordability advantage still exists in certain areas of Navi Mumbai, which really will draw in more people and make it — make it the first choice for migrants arriving from other parts of the country.
With the leadership position we hold and our extensive footprint throughout several micro markets in Navi Mumbai, we stay optimistic regarding the opportunities that lie ahead. We likewise have confidence in the medium- to long-term outlook for the MMR region, which is now entering a fresh growth phase backed by infrastructure development that keeps accelerating across the whole geography. This is also where we're going to enhance social infrastructure, and we anticipate improved end user demand going forward in the majority of the micro markets we are focused on. So with our robust land bank and a diversified portfolio spanning affordable, mid-income, and premium categories, and with numerous projects located in and around the significant large infra developments, I think we sit in the right place to seize the advantage of what is -- one of the best periods to come for real estate in this part of the city going forward. With that, I now open the floor for questions and answers.
<<operator_script>> Our initial question comes from Juhi, who is an investor.
Is there anything else from management...
My question is about the World Villas township, which includes a 221-key hotel and a Gymkhana for annuity income. Since villa sales are stagnant, first, what's the investment outlay, the expected IRR, and the payback period for the hotel or the Gymkhana? Second, when does construction start? If villa sales don't pick up, would you delay or cancel these components? Third, have you finalized the brand partner for the hotel operator? And what gives you confidence in hospitality — a completely new vertical — when core real estate sales are struggling?
Yes. On the Gymkhana and hotel question you asked about: total investment envisaged for the Gymkhana is around INR 125 crores. And the hotel will be INR 225 crores. So the overall investment outlay comes to INR 350 crores across both projects. To bring you up to date on where things stand, work has begun on the Gymkhana. The plinth for the whole Gymkhana is finished. We've started on the first slab, and after that one more slab remains. We're confident the project will be ready within the next 2 to 2.5 years from now, so members can come and take part in the club's daily activities. As for funding, we've already tied up with the State Bank of India for construction finance. So even if Villa sales are a little slower or not so great, we'll still be able to finish this, because financial closure for the Gymkhana is already in place. The hotel is a similar situation. As of today, excavation work on the hotel is complete. We expect the hotel to be ready in the next 4 years from now. We're in the final stages of finalizing the operator.
So as soon as that gets signed, we'll gladly come back and give investors an update on it. For both of those assets, the expected time to breakeven is roughly 8 years. That's the timeframe in which we expect to reach breakeven.
<<operator_script>> Our following question comes from Amit Agicha with HG Hawan & Company.
My question relates to the debt-equity ratio. What's the target range for debt to equity, and what's the average blended cost of borrowing? Because I believe that figure has doubled relative to the prior quarter.
So the debt hasn’t doubled in 1 quarter...
The interest on debt came to INR 9 crores, compared with INR 18 crores year-on-year.
Yes, that relates to how revenue was recognized this quarter versus the same period last year. That is in line with the NDA standards. On debt, we will raise it by, let's say, roughly another INR 150-odd crores, since that funds development of the annuity assets at the Gymkhana and the hotel. At the same time, we are also paying down some debt that came from Tata Capital. So both an increase in borrowing and repayment are taking place concurrently across various projects. At the consolidated level, though, we expect an additional rise of about INR 150-odd crores going forward. We feel quite comfortable about it, because these are long-term borrowings, particularly for the annuity assets. They also carry a late payback period. So managing that is comfortable.
There was also another question, sort of a macro-level one. It was asking whether, given the geopolitical situations along with AI and all these developments that are happening, the IT sector might get affected. You can see it today as well in the stock market — all the IT stocks are down. As for the bookings that are happening, will those bookings continue, since most of the real estate is being booked by IT employees? So a slowdown in this sector will affect our sector as well. What is your view on this?
No, I think in Mumbai and Navi Mumbai, real estate sales aren't dominated by the IT sector alone. Many other industries matter too—particularly around Navi Mumbai, where the MIDCs are located and where large corporate houses sit within the industrial belts. We also have tech companies along Thane-Belapur Road, but I don't see demand for real estate being heavily impacted by the downturn in IT.
And sir, could you also tell us what the marketing cost is as a percentage of revenue?
On marketing cost — the direct marketing cost ends up averaging roughly 1.5%.
<<operator_script>> Our next question comes from Shivani, who is an investor.
As I mentioned, projects such as Advika — the one we did in Vashi — are 72% complete, yet just 35% has been sold. So why is absorption slow even with the excellent connectivity?
I mean, back when we launched this project in 2022, we managed to sell roughly 10% of the inventory. However, from the plinth stage through to RCC completion, sales weren't strong. During the last few months and weeks, though, this project has performed quite well. Sales have picked up now. We're averaging around 8 to 10 units each month. And with the product ready at this point, the building visible, and painting work underway, people gain greater clarity and greater confidence. Vashi is more of a ready-to-move-in market, since people don't like paying rent. Most owners already possess their own property, and their chief aim in buying is to upgrade — from a 1 bed to 2 bed, 2 bed to 3 bed, 3 to 4. As a result, their decisions come a bit later than in other projects we're doing. Up to today, that has been slower. But looking ahead, I think we rise in for the next 1, 1.5...
There's one more thing I'd like to ask about. My question concerns the 19% of ongoing development that falls under the asset-light model, JV or JD — you recently signed a 3.5 acer JD...
What did you ask? Your voice is...
To start off, I'd like to ask about the details of this new joint venture — specifically, what's the area sharing ratio, how much capital are you committing, and how will profits be split?
It's a joint venture structured around area sharing. A set number of units has to be handed over to the landowner. There's no commitment of capital, and no commitment on profit.
Then for my follow-up, do you intend to raise the proportion of asset-light projects in order to bring down capital intensity and debt?
Yes, we are open to it, though it won't make a big difference, since most of the projects we undertake involve us buying the land. That said, we are looking at a few redevelopment opportunities. So the share of the asset-light model could rise from 19% to upwards of around 25% or so.
Then the final thing I'd ask is: for joint venture projects, how do the margins stack up against those of fully owned projects?
Margins look about the same when you measure them on a revenue P&L basis. The only thing that differs between a JV and an outright purchase project is the capital infusion. But margins are...
Amish from Knowise Investments has the next question.
Sir, if my notes are right, we recorded presales of INR 890 crores last year. Could you remind us of the presales figure for the 9 months of this year? And what do you expect for this year, say, year one? Second, sir, our EBITDA margins are running around 25%. If you could give us a sense, based on our pipeline, the GDP pipeline, you mentioned our land cost is under INR 500 per square feet. I'm assuming margins on the land bank we own could be higher. So if you can give us a sense of the blended EBITDA margin for the pipeline we have. And the third question, sir, is whether you can update us on the villa projects, both World villa and the other one. I think for one of the projects we've received approval and we've launched. The other one we're waiting on. So if you can give us a sense of when we're launching that and whether -- what kind of blended margins we should assume in those projects?
So over 9 months, we hit total sales of INR 664 crores in value, which came to 890,000 square feet by area, and that was roughly 760 units...
Sir, you mean presales, correct? The presales figure, right — or is it sales, or are we talking revenue? What I wanted was the presales number.
This is presales.
Yes, sir.
Yes. Regarding your margin question, we anticipate margins will rise since the mix of higher-margin projects is beginning to feed into revenue and the P&L. So EBITDA margins, currently at roughly 23% to 25%, ought to climb to 28% to 29% over the coming quarters. Our upcoming pipeline consists of a combination of villa projects and phases of the existing projects. In villa projects, then, we're expecting higher EBITDA margins of approximately 45%, while for the apartment projects we'll be targeting EBITDAs in the range of 30% to 33%.
Of course, sir. That's really encouraging to hear. And sir, I wanted to — if you could give us an update on both of the project launches...
World Villas has now launched. In Phase 1, we're developing 180 villas. As of today, work is progressing at full pace on over 100 villas, where construction and RCC work are already taking shape. As for the town villas, we're currently in the approval stage. That launch should therefore happen in the next financial year.
All right. And sir, since these villas are essentially standalone units, how would we go about recognizing the sales here, I'm assuming? Because my guess is, first, as you mentioned, the entire project could stretch out for as much as 7, 8 years, like you said. But could we recognize revenue as we move forward, sort of carve out phases inside the project and book the revenue that way? Any thoughts on the accounting side of the villa, sir?
Right, so we're only doing the phase-wise model when it comes to recognizing the villas. So, I mean, we haven't started — we haven't hit the threshold yet for World Villas either. But yes, that's the framework we've put together for apartment projects as well. So we'll need to follow a similar pattern for these villa developments.
Sure. To sort of go back to the figures that were given in the presentation, we're looking at World Villa Phase 1, which is called Chowk at that location, with 176 units, and we booked 51, and you're saying roughly 100 units would be a completion. So when this project is finished, we can recognize that revenue, which is likely somewhere around INR 600 crores, INR 700 crores, right?
Sorry, we don’t use a project completion method. What we use is the percentage completion method. So as soon as a given project gets past the 10% completion threshold, we begin recognizing revenue on that project. That applies to every development we’re carrying out. So perhaps within a quarter or 2, World Villas will begin contributing to revenues as well.
<<operator_script>> Our following question is another one from Amit Agicha, who is calling in from H.G. Hawa.
Sir, my question touched on margin, selling price, and cost — those 3 things. For instance, what average selling price trend are you observing? And costs are rising too, I believe. Could you please share your view on that?
Cost has gone up slightly, by INR 200 per square foot. Selling price differs from one micro market to another. That said, in this quarter we sold a larger number of units in the premium luxury segment, and that played a part in helping us reach an average selling price of INR 7,500, whereas in earlier quarters the usual average was roughly INR 6,200 to INR 6,500. So the average selling price always reflects which inventory is sold during that particular quarter, and it gets divided accordingly.
And sir, are you also seeing a slight deceleration in growth, given that this was occurring previously?
No, no — we aren't seeing any kind of market slowdown. I think particularly once the airport opened, the markets have responded pretty well across the last 45 days. And we're also launching one project this quarter at Panvel Arihant Aspire, which sits very close to the airport. We expect a good response in that project as well. It's the fourth phase, the fifth tower, being opened now after the 4 towers — the 5 towers — 4 towers before have gotten a great response, and we expect that to keep going ahead as well.
What's the average blended interest cost we're paying?
The average interest cost that we will be paying comes to roughly 12.5%.
Would the company be adopting some policy or making decisions aimed at bringing that down even more?
Yeah, we do have plans. Beyond that, our aim is to bring in low-cost debt at the highest level we can, and that is the approach we're pursuing too. So we're pushing on that very hard and working closely to figure out how we can lower the cost of debt, which will also help us shift gears.
Do you have any plans to dilute some of that stake?
Not right now. When the timing in the markets is right, we'll consider it then. But as of now, there aren't any immediate plans to dilute.
<<operator_script>> Our following question comes from Raman, who is an investor.
<<inaudible>> a fresh land purchase, the annuity assets, or reducing leverage on the balance sheet.
Could you say that again, please?
So what I'm really asking is this: during the next 2 years, where will capital be directed first — toward buying new land, toward building out annuity assets, or toward paying down the balance sheet?
We’ll do this at both the entity level and the project level. For certain subsidiary projects, the plan is to lower the debt. And with all of this, our target is for every subsidiary to become debt-free within the next 2 years. At the main listed entity, the priority is to develop the annuity assets first. Second, we want to grow the business by adding more lands. Third would be debt, but reducing it will take place in due course according to the milestones and the milestones set by the bankers. So I mean, it looks very aligned. Everything is set with respect to that. Udit also would like to add more on that.
Now, regarding the annuity assets — we'd like to mention that the entire World Villa project will be cash-neutral for the company. When I refer to the World Villa project, that covers both the Gymkhana and the 5-star hotel. So as time goes on, what will really happen is that excess cash flow from World Villa sales will be reinvested into the Gymkhana and the hotel. So at present, in order to speed up construction and finish these projects on schedule, we're essentially taking a construction finance loan from State Bank. The land value we acquired for these projects has already risen by roughly 3x, which isn't reflected in the books of accounts since it's a notional gain, but it would help us raise the sale price of the villas. So as things stand, construction finance is funding the project. But once it's complete and ready, the project overall would be cash neutral. And when the project wraps up, we would have 2 annuity assets with us — the Gymkhana as well as the hotel.
What's the total count of Gymkhana memberships sold so far?
To date, we've moved roughly 750-something memberships.
Sir, can you tell me what the membership fee structure currently looks like? Last quarter, you mentioned INR 11 lakhs for 75 years. Has there been any price increase or revision to the membership pricing recently?
Yes, as of today, the price is INR 21 lakhs.
Our next question comes from Shah, who is an investor.
I apologize if this was already asked — I joined the call late. My first question concerns the 3 projects — 7 Anaika, Arshiya ph 4, and World Villas Ph1 — which reported zero areas sold in Q3 and required significant <<inaudible>>...
Look, at Arshiya we've seen a sluggish response over these past few months. We're actively working on that project, and our effort to revamp it involves bringing in furnished homes. That's an area, I believe, we haven't explored until now. And I think we should be able to gain traction there. For World Villas, we expect a solid response starting this quarter, since the show villa was finished at the close of last quarter. Visits over the last 45 days have been strong, and traction on that front has been good. On Anaika 7, we've just finished the plinth for one building, and now we're looking to build it out at a fast pace. So that will help us drive more sales, and in parallel at the same time, it's not a worry. We'll be able to manage this comfortably.
The next thing I want to ask about is World Villas — what's the <<inaudible>> and the timeline for turning sales around, and if that situation hasn't gotten better by Q4, would you look at repricing, halting construction, or bringing in JV partners?
No, we don't intend to add a JV partner at all. This project is being developed by us alone, and we're confident about both sales and execution. So for this project, we aren't even inclined toward having any JV partner.
All right, sir. For my final question, given the 19 ongoing <<inaudible>> and the increase in leverage, how are you thinking about prioritizing where your capital goes?
So, most of our capital goes toward land and approvals. For working capital, we mostly rely on presales to help fund construction. That means the company's entire net worth is already deployed.
<<operator_script>> Our next question comes from an investor, Natasha Singh.
Sir, I just wanted to ask, could you please share the sales background by project for Q3?
Absolutely — feel free to reach out to us outside of this call, and we’ll be glad to pass that along to you.
Right, got it. As a follow-up, could you tell me which 3 or 4 projects are really behind those sales? And from that base, what share of total sales do you account for?
At this moment, <<inaudible>> Aspire at Panvel <<inaudible>> those are the 3 leading projects pushing up both sales and revenue recognition. However, additional projects will soon reach that same stage — World Villas, Arihant Avanti Palace at Shilpata, and others. So we have 7 or 8 major projects that will let us move ahead comfortably in the future.
<<operator_script>> Our following question comes from Rushi Joy, who is an investor.
I’ve got just one question—recent margin shifts have been tied to product mix. So could you share your top 3 revenue-contributing projects so we can get a clearer picture of the actual margin dispersion?
I can list the projects that have added more during these 9 months. There's Arihant Aalishan, which is in Arihant at Kharghar, and there's Arihant Aspire. So those have made a big contribution to revenue recognition in this financial year.
All right, so my final question would be this: suppose residential demand were to slow for a period of 12 to 8 months — in that case, what's the lowest sustainable sales velocity needed so that we can comfortably handle that <<inaudible>>?
Looking at our projects, they're each at different phases. So for those that are well along toward completion, we aren't really observing any deceleration. Projects like Arihant Aalishan, Arihant Aspire, and Advika now are sustaining themselves. They've crossed a point where even if the whole market slows down, they won't be significantly impacted, since they're already at a very advanced stage of completion.
We now move to a question from Naman, who is an investor.
I'd just like to get a clearer picture — for the country as a whole, could you break out current inventories and the completed-but-unsold units? Because, as you noted earlier, World Villa currently has zero sold. So across the entire portfolio, where does that stand on the inventory side?
At Arihant Arshiya we hold inventory, along with a few units in Jodhpur, 3 to 4 units at Arihant Aalishan, and some units in Arihant Anmol, Badlapur. Those, then, make up the ready unsold inventory. The total book value of this inventory comes to roughly INR 17 crores.
Alright, understood. So in what way are you handling the risks that accompany all of this — for instance, regulatory matters, labor availability, and, shall we say, funding constraints?
So that’s something we have to manage. If labor can be obtained at cost — meaning if you need to spend a bit more on the cost side — that’s the right approach, because you can’t let the project stall because there aren’t enough workers. So paying the contractor a little more helps us keep moving forward quickly.
And then regarding the unsold inventory, there are 81 units valued at approximately INR 17 crores. So given the overall scale the company operates at today, and factoring in the company's total GDV sitting at around the 12,000 to 12,500 mark, that unsold inventory portion is really quite tiny at present levels.
Our following question comes from Moksh, who is an investor.
Could you tell me what the cost is on the debt secured borrowings <<inaudible>>?
Apologies for cutting in, Mr. Moksh, but your line is breaking up.
And what rate are we paying on the secured borrowings, and what rate on the unsecured borrowings?
Yeah, both come out to 12.5% on a blended basis. So a portion of our debt is secured, and that piece actually sits at 10%, though it spans 10% up to 16%, while unsecured borrowing averages 13.5%. That puts the blended cost at 12.5%.
Could you give us a sense of how much of FY '26 and FY <<inaudible>> revenue has already been locked in via book entry? And what timeline do you expect for the revenue that these will add?
So look, regarding the projects we currently have underway that are shown in the presentation, our expectation is that most of them will wrap up within the coming 2 years.
<<operator_script>> Since no more questions have come in from the participants, at this point I'd like to pass the conference to Ms. Kunjal Agarwal for her closing remarks.
We appreciate the management and everyone who has joined the Q3 FY '26 conference call of Arihant Superstructures Limited. At this point, I will pass the call over to the management team for their opening remarks.
Appreciate all of you being here on this earnings call. I trust that every question you had got answered to your satisfaction. Should anything else come up, don't hesitate to get in touch with our Investor Relations team at Valorem Advisors. You're also welcome to contact our finance department, and from that point we'll gladly carry things forward. Our thanks as well go to Arihant Capital for hosting today's call on our behalf. Thank you so much.
Thanks, everybody.
Thank you. That brings us to the end of this conference on behalf of Arihant Superstructures. We appreciate your participation, and you’re welcome to disconnect your lines now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Arihant Superstructures Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Arihant Superstructures Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.