Aris Mining Corporation (ARIS) Earnings Call Transcript

May 7, 2026

Toronto Stock Exchange CA Materials Metals and Mining earnings 19 min

Earnings Call Speaker Segments

Operator operator
#1

Good morning, everyone, and welcome to the call covering Aris Mining's results for the first quarter of 2026. Management will start us off with an overview, and after that we'll open things up for questions and answers. If you'd like to join the question queue, just press star followed by one on your phone's keypad. A tone will confirm that your request has gone through. As a reminder, everyone is in listen-only mode and this conference is being recorded. If you require assistance at any point during the call, pressing star then zero will connect you with an operator. Please be aware that the presentation management will refer to today can be found on the Aris Mining website, aris-mining.com, under the Events and Presentations section. The first quarter 2026 financial reports for Aris Mining have been filed on SEDAR+ and EDGAR, and they're also available on the company's website. I'd now like to hand the conference over to Mr. Neil Woodyer, Chief Executive Officer. Please go ahead.

Neil Woodyer executive
#2

Thank you, operator, and welcome everyone to the Q1 2026 earnings call. With me today are Doug, Oliver, Cam, Dustin, Corné, and Alejandro. Before we get started, I'd ask you to review the disclaimer on slide two. Now let's turn to slide three. Aris Mining had a solid start to 2026, driven by strong production, a higher realized gold price, and ongoing advancement across our growth portfolio. We produced 74,000 ounces of gold and generated gold revenue of $364 million, which is up 20% from Q4. Adjusted EBITDA came in at $212 million, up 25%. Adjusted net earnings were $124 million, or $0.60 per share, compared with $0.46 per share in Q4. Our operations produced cash flow that supported our growth and expansion projects during the quarter, while also generating $42 million of free cash flow. Across our portfolio, we're continuing to move each of our four assets forward. At Segovia, the expanded mill's ramp-up is going well. Our focus stays on raising owner mining rates and growing our CMP business to support the new 3,000 ton per day processing facility. At Marmato, construction of the new 5,000 ton per day CIP plant is still on schedule for first gold production in Q4 of this year. In April, we connected the decline to the crosscut, an important milestone that gives us direct underground access between the mining, the bulk mining zone, and the new CIP plant infrastructure.

Neil Woodyer executive
#3

At Toroparu, the pre-feasibility study is moving forward nicely and stays on track to wrap up in the second half of 2026, which would let us make a construction decision in early 2027. Work is underway on updated mineral resource and reserve estimates to underpin the mine schedule optimizations. During the quarter, select pre-construction activities carried on, such as building the bridge at the Puruni River crossing, ramping up key personnel, expanding the camp, and continuing roadworks. Over at Soto Norte, the environmental license application is close to being finished. Submission remains on track for the second quarter. We keep engaging actively with Colombian regulators to foster a collaborative approach throughout the submission and review process. With our producing assets turning in strong results and our growth projects moving ahead, Aris Mining is well-positioned to reach its longer-term objective of roughly a million ounces of annual gold production from the assets we currently own. With that, I'll turn things over to Cam to go through our financial performance.

Cam Paterson executive
#4

Thanks, Neil. Moving now to slide four. What we want you to take away from this quarter's financial results is that our business keeps getting stronger. Higher production volumes, robust realized gold prices, and tight cost discipline are all showing up in the income statement and carrying through to the balance sheet. The charts on this slide illustrate how things have progressed across the last five quarters. Gold ounces sold, revenue, adjusted EBITDA, and adjusted earnings per share have each risen substantially, and just as importantly, that improvement has come consistently across all of our financial metrics. Now please turn to slide five, where we discuss the main cash flow drivers. We came into the first quarter with a cash balance of $472 million, which is $80 million above the $392 million we had at the end of 2025. That reflects $103 million of operating free cash flow after sustaining capital and taxes paid. Even with an additional $44 million from higher cash mine operating earnings, that figure came in $22 million below Q4, owing to working capital movements and share-based incentive settlements. The $61 million put into growth and expansion capital consisted mainly of the $47 million spent at Marmato, along with a $40 million installment received under Marmato's precious metal stream after we hit the 50% construction capital expenditures milestone.

Cam Paterson executive
#5

During Q1 2026, as was the case throughout full year 2025, we produced free cash flow even while making substantial investments in organic growth, and that helped our cash balance grow steadily across the year. The sole exception was the temporary drop in our cash balance during Q4 of last year, which mirrored the $60 million in cash consideration that we paid to acquire the remaining 49% interest in Soto Norte. It is also worth noting that our net debt fell to $1.6 million, down from $86 million at year-end, thanks to our rising cash balance. At this point I would like to turn the call over to Dustin so he can walk us through our operational results.

Dustin Van Doorselaere executive
#6

Thanks, Cam. Moving on to slide six. Aris Mining posted consolidated gold production of 74,300 ounces for the first quarter, which is a 6% rise compared with Q4 2025, with Segovia adding 66,600 ounces and Marmato 7,800 ounces. What's worth pointing out is the robust gold grades we achieved at both operations. At Segovia, mill feed during Q1 averaged a gold grade of 12.41 grams per ton, well above the reserve grade of 10.7. Over at Marmato, the mill feed grade for the first quarter came in at 3.53, which is likewise above the reserve grade of 3.16 grams per ton. At Segovia, our AISC margin rose to $2,935 per ounce, an increase of 128% versus Q1 2025 and 25% versus Q4 2025, reflecting stronger realized gold prices along with higher gold sales volumes. That translates into an AISC margin of $199 million, 31% higher than Q4 2025. Owner operated mining accounted for 64% of the mill feed, with an AISC of $1,492 per ounce, lower than the $1,662 per ounce recorded last quarter and beating the full year 2026 guidance range of $1,700-$1,800 per ounce. This gain came mainly from more gold ounces sold on the back of better average gold grades. Our CMP business delivered an AISC sales margin of 40%, hitting the top end of the full year 2026 guidance range of 35%-40%.

Dustin Van Doorselaere executive
#7

Now if we look at the chart in the bottom right corner, what it shows is that margins at Segovia have kept on expanding, and that comes from realized gold prices going up along with tight cost discipline. During Q1 2026, the AISC margin kept widening versus earlier quarters. Going forward, since our production profile is weighted toward the second half of the year and gold prices are supportive, we are well-positioned to continue producing strong cash flow that funds our growth. Let's move to slide seven. As we discussed before, we installed a second ball mill at Segovia in June of last year, and that lifted our processing capacity by 50%, taking it up to 3,000 tons per day. To operate our expanded processing plant consistently at 3,000 tons a day, we need to raise both our owner mining rates and our CMP mill feed. To make the first of those happen, we are boosting haulage capacity by building an interconnected underground haulage circuit, which will link three of our four principal underground mines at Segovia — El Silencio, Providencia, and Sandra K. We are driving new ramps to surface at both our El Silencio and Providencia mines. Besides increasing the mill feed, these development projects carry a few other positive attributes, such as enhanced productivity by enabling more efficient transport of workers or in waste, shortened cycle times, eliminating long routes and multiple shafts.

Dustin Van Doorselaere executive
#8

We also remove a great deal of our haulage by way of Marmato's main town. Our expectation is to hand over the El Silencio ramp in Q4 2026, the link joining El Silencio and Sandra K in Q1 2027, and the Providencia ramp tied into El Silencio in Q1 2028, which allows steady state production starting next year. On that note, I'll hand things to Corné for an update on how construction at Marmato is progressing.

Corné Lourens executive
#9

Thanks, Dustin. Now on slide eight. At Marmato, work on the CIP plant and the bulk mining zone development keeps moving forward, with substantial progress both below ground and at the surface. We hit a key milestone last month when the new underground decline broke through into the Los Indios crosscut. That link gives us direct access from the bulk mining zone to the new 5,000 tons per day CIP plant. It also creates another access and ventilation route, which helps move ore and waste between the existing and new infrastructure and supports the early ramp-up of mine production. Underground workshops, the main pump station, and field offices will start construction in Q2 2026. The main decline toward the bulk mining zone has advanced over 1,200 meters, which works out to a completion rate above 70%. Turning to slide nine. At surface, bulk earthworks for the process plant platform are finished, as are the key foundations for the mills, tailings thickener, and the leach and CIP tanks. Civil, mechanical, and electrical work all continue to progress well. On equipment, every long lead item needed for first gold has been ordered. Major equipment — including the primary crusher, SAG and ball mill, and filter presses — is ready to ship from storage in Cartagena and Medellín to our Marmato construction site, with deliveries starting this month.

Corné Lourens executive
#10

During Q1, we signed a leasing deal with Sandvik for an underground mining and development fleet. Deliveries of that equipment are set to begin in Q3. Construction work is moving forward according to plan, and we're still on track for first gold in Q4 2026. We anticipate a staged production ramp-up that progresses toward steady state operations over the course of 2027. If you turn to slide 10, the photos there show work carrying on around the clock, which highlights the pace and the scale of the development now underway. Roughly 850 people are on site during daytime hours, while 250 are working the night shift, concentrating on the work streams we consider safe to perform at night. Last month, the project team reached 365 days lost time, injury-free. I want to thank everyone involved for their ongoing commitment to safe, safely advancing the project. A new video showing how the project is progressing is also up on our website. You'll find the link at the bottom of this slide. With that, I'll hand things over to Neil for his closing remarks.

Neil Woodyer executive
#11

Moving on to slide 11. Following our solid performance in the first quarter, we are still fully dedicated and on track to meet the 2026 full-year guidance of 300,000 to 350,000 ounces. As we look forward, our attention stays on moving all four core assets ahead. Ramping up Segovia over the course of the year, with a target of 265,000 to 300,000 ounces of gold production for the year. Completing a first pour at the Marmato CIP plant in Q4, with a progressive ramp-up to follow during 2027. Releasing the Toroparu PFS in the second half of the year, along with doing additional work to enable construction readiness and a construction decision for early 2027. Filing the environmental license application for Soto Norte in Q2. With our producing assets turning in strong results, our financial position and growth projects continuing to move forward, Aris Mining is well-positioned to reach its longer-term goals of roughly 1 million ounces of annual gold production from the assets we currently own. Thank you for joining us today. Operator, please open the line for questions.

Operator operator
#12

Absolutely. If you'd like to get into the queue for questions, just hit star followed by one on your phone's keypad. A tone will confirm that your request has gone through. Should you be on a speakerphone, lift the handset first before you press any keys. And if you want to take your question back out, press star then two. We'll start with Carey MacRury of Canaccord Genuity. Your line is open.

Carey MacRury analyst
#13

Hello there, and good morning. Congratulations on the impressive results. Perhaps starting with Segovia, I was hoping you could share a bit more detail on how that development is progressing. Given that certain of these ramp-ups won't wrap up until you're reporting 2028, when do you expect to reach 3,000 tons a day? And will that arrive gradually across the coming four or five quarters, or does it come in step functions? Just a little additional color on how we ought to think about the underground mines' tonnage ramp-up.

Dustin Van Doorselaere executive
#14

Hi, Carey. I’ll handle that question. Yeah, clearly a portion of the development work runs into 2028, mostly at Providencia. As you know from your visit, Silencio is our largest production area, and all of the development there is wrapping up at the end of this year. We expect to reach the 3,000 ton a day level near the end of this year or in early 2027, and to sustain it. With Providencia coming online through the ramp and the access, our logistics become considerably simpler. The connections at Silencio and San Jorge are really what unlock our 3,000 ton a day production.

Carey MacRury analyst
#15

All right, that's great. Should we expect an acceleration in Q2, or does it look more like an H2 acceleration?

Dustin Van Doorselaere executive
#16

Not really — it leans more toward the back half. We likely won't truly begin seeing it until late Q3 or Q4. Again, it's a matter of finishing all that development work, opening up those extra areas, and removing the bottlenecks at our Silencio mine.

Carey MacRury analyst
#17

Alright, regarding the grade at Segovia — clearly it came in high this quarter at 12.4 grams per ton. Was that purely favorable grade reconciliation? Should we be looking for that to carry on through Q2, or is there any guidance you can give us on grade?

Dustin Van Doorselaere executive
#18

No. Our guidance for grade is still sitting in that 9 to 10 grams per ton range. We had some luck in one of the newer veins we've got. We sort of ran into a high-grade pocket, and given some of the logistical challenges, we really wanted to push and get that out. Through Q1, we basically concentrated on mining that area out and getting it up into our mill.

Carey MacRury analyst
#19

All right, great. Perhaps just one final question. I mean, your cash balance keeps rising. You're producing free cash flow. Based on my figures, it appears that will carry on at these prices. At this point, are you considering share buybacks or anything along those lines, or simply how are you viewing the balance sheet?

Cam Paterson executive
#20

If you consider our cash position, you'll see that Segovia is producing substantial cash. I get the concern you're expressing. That said, right now we're carrying out the expansion at the two mines. There are two additional projects in the pipeline, and one of them we'd certainly hope to begin building next year. As we grow the business, we have a cash need over the long term. In the end, once we're producing cash without expansion, naturally we'll move to a dividend.

Carey MacRury analyst
#21

All right, excellent. I'm finished with my part. Thank you.

Neil Woodyer executive
#22

Thanks, Carey.

Operator operator
#23

If anyone still has a question, just press star and then one again. It looks like we have no more questions at this point. Mr. Woodyer, I'll hand the conference back to you now for your closing remarks.

Neil Woodyer executive
#24

Thanks, operator. And thanks to all of you for making the time to join us and hear the presentation. We're really pleased with how these results turned out, and trust me, we'll keep delivering going forward just as we have done before. Thanks so much, everyone.

Operator operator
#25

That wraps up the conference call for today. You’re welcome to disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Aris Mining Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Aris Mining Corporation earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.