Home / Transcripts / Aspen Aerogels, Inc. (ASPN) · August 6, 2026

Aspen Aerogels, Inc. (ASPN) Earnings Call Transcript

August 6, 2026

New York Stock Exchange US Materials Chemicals earnings 44 min

Earnings Call Speaker Segments

Neal Baranosky executive
#1

Thanks, Holly. Morning, everyone, and we appreciate you being with us for Aspen Aerogels’ Second Quarter Financial Results Conference Call; joining us are Don Young, our President and CEO, along with Grant Thoele, our Chief Financial Officer and Treasurer. Aspen’s press release covering the financial results and business developments, plus the slide deck that goes with what we discuss today, can be found in the Investors section on Aspen’s website, www.aerogel.com. On this call, we’ll mention non-GAAP financial measures, such as adjusted EBITDA and adjusted net income. Reconciliations comparing GAAP and non-GAAP measures appear at the back of the slide presentation and earnings release; during today’s call, management will provide forward-looking statements regarding our expectations. Such statements carry risks and uncertainties that may lead actual results to differ materially. Those risks and uncertainties include the factors described in our filings with the SEC. Kindly look over the disclaimer statements on Page 1 of the slide deck, since the content of our call will be governed by that language. I also want to point out that, from time to time, in connection with divesting of restricted stock units and/or stock options issued under our long-term equity incentive program, we expect our Section 16 officers will file to report the sale and/or withholding of shares in order to cover the payment of taxes and/or the excess price of options. I’ll now hand the call over to Don. Don?

Don Young executive
#2

Appreciate that, Neil. Morning to all of you. We're glad you could be with us on this Q2 2026 earnings call. In my remarks I'll walk through what we expect for Q3, what's happening commercially — among those, the growth we're projecting for energy industrial, how demand is shifting within our electric vehicle business, and where things stand as we work to build out battery energy storage systems as a possible third growth segment for Aspen. I'll also discuss what we've done to stage the restart of the aerial manufacturing plant in East Providence — correction, in these Providence — and the steps taken so customers don't see supply disruptions. There are a couple of developments that have us feeling good: we've picked up yet another design win from a European automaker, and this one comes courtesy of Jaguar Land Rover, and on top of that our Q3 outlook looks healthy. Grant is going to go into more detail on both of those points during his remarks. Turning now to the third quarter, our guidance points to revenue in the range of $65 million to $80 million, with adjusted EBITDA landing somewhere between $7 million and $15 million. The underlying momentum is broad-based: we're seeing steady deliveries tied to energy industrial projects, growing demand in North America for PyroThin thermal barriers as GM ramps up production to align with EV sales and its targeted inventory levels, and larger production ramps across several European EV OEMs as we head into anticipated growth in 2027. Let me add a bit more color on each of those drivers. Within Energy Industrial, we're still aiming at roughly 20% growth in 2026, even with the East Providence disruption and fairly soft refining and petrochemical activity. Healthy project demand is fueling our second half results and plays a major role in the strong Q3 outlook. In Energy & Industrial, what we offer the segment's tough applications is proven technology, extensive experience and a stellar customer service track record. Conditions in the market stay favorable, and our customers have built up sizable project backlogs. There's a healthy flow of prospects our team continues to build out that span the whole decade, and that gives us a stable foundation to keep growing. On the LNG side, we're collaborating tightly with clients, EPC contractors, and the crews doing the construction. Across multiple projects, we see openings to expand what we take on, which would make our 2026 opportunity bigger and push our line of sight further into 2027. These days LNG ranks among the clearest and most energetic growth areas for us — particularly in the U.S., the Middle East, and Africa — where substantial infrastructure spending is advancing toward turning into commercial work we can actually execute. Compared with 2025, we expect activity tied to LNG to more than double in 2026 and to keep up steady momentum throughout the decade. As mentioned before, refining and petrochemical activity hasn't matched what we expected. Our read is that customers are putting priority on uptime and high utilization rates, which squeezes some maintenance windows. Eventually, reliability needs ought to pull that work back within scope, and we stay well positioned to help customers once turnaround activity returns to normal. All told, these market forces back our expectation of roughly 20% growth for Energy Industrial in 2026, with even stronger growth expected the following year. On a wider level, the rising requirement for Energy Security, for diversified supply, and for dependable power that can back electrification is fueling a multiyear investment cycle across global energy infrastructure. We believe these core market forces are going to create substantial room to grow for Aspen over the remainder of the decade. Our attention remains fixed on expanding Energy Industrial into a business worth $200 million with high margins, and doing so without any additional capital outlay. Turning to PyroThin Thermal Barrier, we saw 81% growth from one quarter to the next in Q2. Lately, U.S. EV demand has leveled off at around 6% of new vehicle sales — roughly half of what we saw in 2025, a period when incentives and regulatory backing were stronger. Within that market, GM LTM accounted for about 13% of U.S. EV sales in the first half of 2026, which works out to more than 120,000 vehicles sold on an annual basis. In the first six months, GM's EV output ran under what it was selling, which caused a sizable decline in finished vehicle stock. GM now appears ready to increase production to match today's sales pace while carefully adding back inventory, consistent with the demand-driven strategy it has described. The extra need for PyroThin that follows is already visible in Q3 and stands as one more key factor supporting our robust third-quarter guidance. In Europe, momentum keeps building, thanks to powerful structural tailwinds for battery electric vehicles, pushing new vehicle registrations to nearly 25%. Just recently, Jaguar Land Rover became our seventh European OEM customer. JLR has chosen our PyroThin Thermal Barriers for certain vehicle architectures, and those architectures will underpin several models throughout its lineup of iconic brands. This win gives us further proof of how valuable our technology is, and it serves as one more significant piece of our European business. During the last two earnings calls, we gave guidance of $10 million to $15 million in 2026 revenue coming from European OEMs. That figure is being lifted now to $20 million to $30 million, reflecting roughly $11 million in first half revenue along with the widening scope of business we've been awarded, which now covers 7 OEMs and 9 vehicle platforms. This growing European opportunity stands as a third major factor behind our strong Q3 outlook. Taking a step back, the forward motion we're seeing throughout our European portfolio gives us confidence, and our view remains that this region is set to play a bigger and bigger role in driving our revenue starting in 2027 and continuing after that. If we look past the segments we operate in today, we're putting investment behind building up Battery Energy Storage Systems, or BESS, as an adjacent growth opportunity that looks promising. The thermal demands these systems involve are complicated and look a great deal like the ones we've already cracked on tough EV platforms, which puts Aspen in position to bring its demonstrated technology, know-how in applications, and U.S.-based manufacturing strength to this expanding market. Right now we're deep into technical qualification work and business talks with top-tier utility scale and critical power developers. Although it will take a while before this is fully commercialized, we still anticipate some initial BESS revenue before long, and we think this could turn into a significant source of both growth and profitability for us. At our aerogel manufacturing facility in East Providence, we began a phased restart on May 14 — roughly a month and a little more after the explosion in the high-temperature oven, which caused harm only to a single area of the site. We're continuing to make progress toward restoring production to its maximum capacity, and we expect to complete that effort within the first six months of 2027. So far, we have prevented any major interruption in supply for our customers by drawing on several levers: inventory we already held, output from the outside manufacturing site we use, and, more recently, the phased restart at East Providence. Plenty of work remains ahead, yet we think the steps taken so far are widening our flexibility on both a near-term and a longer-term basis, bolstering our operational resilience along with our capacity to serve customers as dependably as possible. Throughout this stretch, we are absorbing certain unusual operating and capital costs while we keep customers supplied and work toward full production capacity. Our property damage and business interruption coverage remains in force, we are participating fully in the claims process, and we anticipate that a significant share of these losses will be recoverable. Grant will share further specifics when he speaks. Above all, we feel tremendous gratitude that no employee suffered serious injury in this event. I'd also like to acknowledge the Aspen team for its relentless work to bring the plant back safely and with discipline, and for its steadfast dedication to our customers and to Aspen's success. Grant, the floor is yours.

Grant Thoele executive
#3

Thank you, Don, and hello everybody on this morning's call. My remarks will address the Q2 2026 results we posted, our outlook for Q3, and the main factors shaping the rest of the year. Revenue for the second quarter came in at $49.8 million, consisting of $20.4 million from Energy Industrial plus $29.5 million from Thermal Barrier; within that Thermal Barrier figure, $4.9 million represented deferred revenue from earlier periods that we recognized tied to the GM settlement we received during Q1 of this year. On a quarter-over-quarter basis, total revenues rose 32%. Energy Industrial revenues fell 6% compared with the prior quarter, landing under our expectations, since customer demand stayed limited by logistics and inventory difficulties connected to the conflict in Iran, and because some demand shifted out of Q2 into Q3. We anticipate a substantial Q3 rebound as Subsea project revenue lands for the year. Thermal Barrier revenues beat our forecast thanks to two things: First, GM vehicle production climbed back to levels matching underlying sales rates following a weak Q1. I'll say more about this shortly, though we think production and sales rates will move more closely in tandem than they did in earlier cycles. Second, European Thermal Barrier revenue rose 14% quarter-over-quarter, going from $5.1 million to $5.8 million. Volumes could be uneven while these customers work through preproduction inventory, yet it's becoming ever clearer that these programs will ramp. Gross profit reached $3.3 million, a 7% gross margin, which mirrors lower production volumes that weren't enough to fully absorb fixed manufacturing costs. That figure includes $5.3 million of incremental costs stemming from the April incident at East Providence, and those costs don't reflect normal operations. If you set aside these incident-related costs, adjusted gross profit would have been $8.6 million, or 17% margin. Adjusted operating expenses, which exclude impairments or similar losses, restructuring charges and other onetime items, totaled $23.1 million in Q2. On the expense side, the $32 million we reported included an $8.9 million hit from property damage related to the April incident. We recorded an offsetting $8.9 million insurance receivable in other income, since we concluded collection of those proceeds was probable, and we expect the money to come in during Q3. For Q2, GAAP net loss was negative $23.3 million, versus negative $23.7 million in Q1. Adjusted EBITDA was negative $6.6 million in Q2, compared with negative $12.7 million in Q1. That amounts to close to a 50% improvement in earnings alongside 32% revenue growth. Typically, our EBITDA add backs barely budge quarter to quarter. But then April's event introduced a fresh, short-term set of costs that aren't tied to how we normally operate. When those incident-linked costs hit in a given quarter, we add them back, and we classify them under our business interruption insurance policy. On the cash side, the insurance money is expected to come in about a quarter behind the charges themselves. Broadly speaking, there are three buckets for these incident-related charges: first, expedited freight to finish roles in parts over at our Thermal Barrier business; second, professional fees, largely for services in East Providence focused on bringing production capacity back; and third, starting in Q3, the extra expense of temporarily getting certain Energy Industrial products from our external manufacturing facility. For the second quarter, the expenses fell into the first two buckets and totaled $5.3 million, and we excluded that amount from adjusted EBITDA. Under both our property damage coverage and our business interruption coverage, the claims process has now begun, and we expect that what we file will largely match up with those incurred costs. At East Providence, a stage restart in May got production going again, and the site continues to deliver high-quality products across both business lines, though we are still not back to running at full production capacity. As a result, we expect incident-related charges to keep accumulating until the facility returns to full production capacity in the first half of 2027. Now let's talk about liquidity. We ended Q2 with $153.4 million in cash, cash equivalents, and restricted cash. That's a decrease of $22.2 million compared to $175.6 million in Q1. Three things drove that. First, investing and financing activities used $9.4 million, which is in line with our expectations of roughly $10 million per quarter, thanks to reduced capital spending and quarterly debt amortization. We partly offset that with a $3.5 million draw on our revolver, leaving a net outflow of $5.9 million. Second, we incurred $5.3 million in incident related charges and increased purchase orders with our external manufacturing partner by about $3 million. This figure is likely to move around based on the volumes we expect and the supply mitigation work we're continuing, up until East Providence is fully back up to its production capacity. Moving to the third point: operating activities consumed $8 million in cash once you strip out incident-related charges, and that represents our underlying quarterly burn. Since our Q3 outlook has us returning to positive adjusted EBITDA, we anticipate the cash trend improving in the near term. In Q2, debt payments were mostly made up of $6.5 million in principal amortization on the term loan, which left that term loan at $79.5 million when the quarter closed. We pulled $3.5 million on the revolver, which pushed the balance to $10.9 million, and there's plenty of availability remaining under that facility. Just to remind everyone, the MidCap facility's main financial covenant requires that we hold cash amounting to no less than 100% of the term loan balance. Since we have $153.4 million in cash versus the $79.5 million term loan, our covenant headroom remains considerable. Let's turn to Slide 6. Rather than jumping straight into quarterly guidance, we should first review how our earlier assumptions are holding up. We anticipated revenue growth throughout 2026, supported by three main drivers. The first was our expectation that GM production would continue bouncing back as inventory levels returned to normal and destocking wound down. That remains on track, with production rates gradually rising. Also, our European Thermal Barrier initiatives are coming online faster than planned. Originally, we told you to expect somewhere around $10 million to $15 million in revenue from those programs during 2026. Based on how the first half has gone, we're doing better than that, so we're lifting that guidance to between $20 million and $30 million. Next, in Energy Industrial, we're anticipating roughly 20% growth, and a bigger share of the project work lands in the back half of the year. Our Q3 project schedule remains intact, setting us up for two consecutive strong quarters. Looking at Q3 of 2026, we project both revenue and profitability will rise compared with Q2, with total revenue landing somewhere in the range of $65 million to $80 million. This range works out to growth of 30% to 60% from one quarter to the next. What makes that range so wide is principally our assumption about GM's vehicle output. Now let's take apart our revenue guidance. For Energy Industrial, we expect revenues of about $40 million in the quarter, which is roughly twice what Q2 delivered, with LNG and subsea projects leading the way. Two main factors shape our Q3 guidance for the Thermal Barrier business. For the quarter, we've assumed GM builds at an annualized pace of about 90,000 to 125,000 vehicles, which is a clear increase compared with the first half of the year. In light of recent sales rates and activity levels, our internal plan is to satisfy demand at the upper end, while accounting for historical volatility and therefore guiding cautiously across a wide span of possible outcomes. In Q1, GM sourced roughly 40,000 vehicles on an annualized basis, and in Q2, 100,000 vehicles annualized. According to the current IHS forecast, GM will produce about 112,000 vehicles annualized in Q3. Volumes from our European Thermal Barrier customer have held steady in 2026, with revenues of $5.1 million in Q1 and $5.8 million in Q2. In fact, having generated $10.9 million of revenue this year, we've already exceeded the $8.6 million in European Thermal Barrier revenues recorded for all of 2025.

Grant Thoele executive
#4

Given this momentum, we feel good about lifting our 2026 guidance to between $20 million and $30 million in European Thermal Barrier revenue. Keep in mind that none of these European programs have entered serial production yet, though the majority are set to SOP during 2027. Turning to 2027, bringing Jaguar Land Rover on board as an additional design win is truly exciting, with volumes expected to ramp that year. Our awarded Thermal Barrier pipeline totaling $135 million in revenue is built on customer-supplied full production volume assumptions along with typical platform ramp curves; we take a conservative approach in modeling these programs, and even assuming moderated volumes, we aim for significant growth by doubling our 2026 outlook to $40 million to $60 million in revenue for 2027. Because of the product mix within our revenue range, we anticipate Q3 adjusted EBITDA landing somewhere between $7 million and $15 million, and that figure includes adding back roughly $5 million to $10 million in incident-related charges. Once more, those costs consist of expedited freight, professional fees, and the added expense of temporarily sourcing certain Energy Industrial products from the company's external manufacturing partner until East Providence is back at full production capacity. Now to our liquidity outlook. Let's begin with the items within our control. CapEx plus scheduled debt payments ought to come to approximately $10 million in Q3, once East Providence restoration CapEx is excluded. Working capital will fluctuate more, shaped by where we produce and sell finished goods, safety stock builds connected to EP's recovery pace and supply chain — and a supply chain that grew longer over this period. Insurance proceeds arriving in arrears relative to the costs they offset may also generate timing differences from period to period. Setting that timing aside, we're confident that by year-end we will at minimum hold and probably increase our net cash position of roughly $63 million. Regarding the sale of Plant 2 assets, the nonbinding letter of intent we disclosed earlier lapsed with no definitive agreement reached. We had a handful of buyers when this agreement came together, have reengaged them, and are also still actively marketing the assets. Consequently, proceeds from any potential sale of Plant 2 assets will most likely occur in 2027, and would go directly toward reducing our term debt on a dollar-for-dollar basis. With liquidity at all levels today, we continue to see room to further delever the business, and we're assessing a range of options while remaining nimble enough to invest opportunistically in strategic growth initiatives. As we keep steering through 2026, generating incremental profitability through new commercial activity and preserving balance sheet strength stay at the top of our priorities. Don, back to you.

Don Young executive
#5

Appreciate that, Grant. In wrapping up, we're convinced the growth plan we're pursuing right now — scaling Energy Industrial, fueling expansion and diversification for PyroThin Thermal Barriers, moving into appealing nearby markets, and going after breakthrough R&D possibilities — is the strongest route for putting our financial strength to work and generating long-term shareholder value. We anticipate that how we perform in Q3 will serve as a solid signal of durable growth and profitability in 2027 and afterward; so with that, let's begin the Q&A portion of the call.

Eric Stine analyst
#6

Let's begin with Energy Industrial, if that works. Those two big subsea projects were supposed to land in 3Q, I realize. From what I'm hearing, it may be more of a 3Q, 4Q situation, yet your guidance still points to a very strong quarter. So I'm just wondering — obviously there are other favorable things happening there. Could you walk through how that splits across subsea, LNG, and the softer maintenance business right now? And then perhaps share what you expect on a sequential basis for Q4?

Don Young executive
#7

Thank you, Eric. Most of our subsea work is landing in Q3. LNG activity is robust in both quarters. That is genuinely what underpins the growth outlook, or the strong Q3 outlook, that we gave, and we believe an active Energy business will carry into Q4 as well. Our Q3 guide doesn't really assume any rebound or strong refinery or petrochemical work, even though we do think that — as I mentioned in my comments — over any stretch of time, that work will return to scope as those facilities concentrate on reliability and keep those facilities maintained, which I know they will.

Eric Stine analyst
#8

Understood. For my next question, perhaps regarding Thermal Barrier—in the past, you've outlined what your OEM partners are saying about the potential value of your Thermal Barrier awards, and I realize you've reduced that in your guidance. I'm just wondering, though, are you seeing any hesitation around that figure? You mentioned $135 million. Is this still just a case of being cautious, given how you've handled guidance previously?

Grant Thoele executive
#9

Yes. Eric, I believe that $135 million represents full customer volumes at—essentially just the per-part price. So $135 million is, of course—we're prepared to deliver that as demand arrives; but that's exactly why we've—we have consistently adopted this cautious stance, since these programs do ramp. There are other supply chain factors. Therefore, for our $20 million to $30 million '26 outlook, we believe and have strong confidence in expanding that into 2027.

Don Young executive
#10

Apologies, Eric — I only wanted to tack on a single point. What stands out to me regarding our Q3 guidance and what we said earlier today is this: over the last 2 years or so, those design wins have kept coming in. The encouraging part is that those wins are converting into sales, and that's showing up — we already saw it during the first 6 months of this year. It's also appearing across the back half of this year. You can see a clear ramp. The OEMs involved are a varied set, and in my view this genuinely strengthens our PyroThin business in a way that's productive and more durable over the long term.

Grant Thoele executive
#11

Eric, one more thing worth mentioning on this topic. What matters most, in my view, is that our manufacturing capability to serve every one of those European Thermal Barrier customers is already established. From here forward, only a minimal CapEx is needed. So as that demand arrives, we are prepared to supply it.

Colin Rusch analyst
#12

When we look at the guidance for Q3 and the rest of the year, getting ready for that EU ramp in 2027, how much selling do you figure is actually needed before you can begin satisfying the requirements of those production ramps, and when do you anticipate that starting?

Don Young executive
#13

On our side, Colin, when it comes to selling, I mean, look, these are.

Colin Rusch analyst
#14

Yeah, you'd be selling stock meant for manufacturing since they're going to require some stock on hand...

Don Young executive
#15

Understood, my apologies. Absolutely, without a doubt, when they get to SOP, a spike is going to happen; plus we anticipate things being somewhat uneven across these quarters, likely even the quarters during 2027, yet the direction is unquestionably upward and improving; structurally, we have quite a strong EV market throughout Europe. Like I mentioned during my remarks, approaching 25% EV penetration within the EU strikes me as achievable, and our design award OEMs are gaining from that and will keep gaining; therefore we're certain about expanding that business over the rest of this year while operating largely in served launch mode, setting up a strong 2027, as we presented on Slide 6.

Colin Rusch analyst
#16

All right. Then when it comes to costs, we're noticing several inflationary pressures tied to raw materials across different sections of the supply chain. I'd simply like to understand what direction that's heading for you folks, plus whatever mitigation approaches you've put in place that we ought to keep in mind when thinking about managing costs?

Grant Thoele executive
#17

Yeah, Colin, I suppose this may sound like a standard answer, though the reality is that our supply chain is a strong one. And our supply chain additionally stretches out — by way of our external manufacturing partner; so picture it this way: we've got a varied group of vendors that we're able to turn to, both on a regional basis with our China partner and then likewise here for the East Providence facility; so we're proactively planning ahead, especially regarding all those BAM items tied to the European programs and their ramp. We're taking advantage of opportunities there by doing more bulk ordering, which brings the price per part down, and truly staying ready on the inventory side. So from a few of my remarks, I think what you could gather is that working capital, as we expand into this ramp, we anticipate it being a use of cash. And clearly, that's going to be, in a sense, safety stock and additionally just accumulating that inventory for all these ramps.

Itay Michaeli analyst
#18

Justin here, filling in for Itay. To start, let's revisit the European Thermal business. What would it take for you to feel more assured about closing more of that $135 million gap you're highlighting on awards, compared with the implied $40 million to $60 million you expect to roll on? Is it purely market dynamics? What would boost your confidence enough to narrow that gap? Then Grant, perhaps something more mechanical tied to this for Q3. How are you factoring in the $25 million to $40 million in Thermal revenue for the GM deferred piece during the quarter? Just attempting to reconcile a few things here.

Don Young executive
#19

I'll handle the first part, and Grant, you can take the second. The distinction between the $135 million on Slide 6 and the implied $40 million to $60 million comes simply from experience, honestly. We've spent 5 years on this, and we've learned to be cautious with these figures. We entered this year believing we'd hit $10 million to $15 million, and we raised that to $20 million to $30 million. We simply view 2x from 2026 numbers for 2027 as conservative figures, and we sense we're on that path. Nothing prevents us from going bigger — we're ready to do so and capable of it, which would be upside as we move through 2027.

Grant Thoele executive
#20

Right. And regarding that GM deferred item specifically — what I mentioned in my comments amounts to essentially $4.9 million in deferred revenue being recognized, and Justin, that happens on a quarterly basis, continuing right up until 2027 comes to a close. So each quarter, you're able to add that 4.9% as deferred revenue; you simply have to ensure that when looking at things on a cash basis, you're removing it.

Analyst analyst
#21

Yes, that's completely clear. I simply want to confirm it was level throughout — since my understanding is that Q1 was around 3.5%, clearly, while Q2 came in at 4.9%; so that's really useful; and then perhaps a question about U.S. LNG capacity and perhaps how we should interpret the remark you made about 2027, regarding building into '27 for the EI growth. Of course, the expectation for LNG capacity is 35% year-over-year that you have in '27. So how ought we to think about the EI growth opportunity following the 20% you've guided to for 2026 given those circumstances — is it another 20% year? Is it 20% plus? What's the proper way to frame that EI opportunity in 2027 as you move toward that $200 million annual run rate you're aiming at for that business?

Don Young executive
#22

Yes. Thank you. Look, I believe we have a chance to keep growing the EI business at this fairly rapid pace, roughly 20%, here in 2026. And so we think we can do that once more in 2027. And just to give some context, that essentially brings us to our AI revenue in the year 2024; and so again, we have the ability to achieve those sorts of figures and honestly, reach that $200 million figure with no capital requirements or any meaningful capital requirements. And so we are able to do that, and we also believe we've got the foundation for that sort of growth. It will be a combination of both routine day-in and day-out maintenance work and turnaround work, with some project work layered on top. As I mentioned in my comments, when I look at our customer base, whether they are LNG customers or subsea customers or engineering firms handling some of the bigger turnarounds, they have built up quite substantial backlogs through 2027 and really past that. And it's our job to ensure we obtain our fair share of participation in that work; we're very close to those companies. We've been outstanding at delivering customer service and high-quality product to them really since — for the past 15 years.

Ryan Pfingst analyst
#23

Can you provide some idea of what the volumes might look like, or the timing? I realize you mentioned it starts modestly in the coming year, but what would the pace of those volumes be for those programs?

Don Young executive
#24

Regarding JLR, I'd put it this way: it could become significant by 2027, though I won't put a figure on it, and it's a solid program spanning multiple vehicles that we believe has the potential to play a substantial role in our European operations as we move through '27, '28, and '29.

Ryan Pfingst analyst
#25

Thanks for that, Don. Turning to the Battery Storage segment, could you share what your most recent discussions with customers have looked like, and perhaps any validation milestones we might anticipate down the road?

Don Young executive
#26

Sure, we've discussed near-term revenue in this area throughout the last quarter, and we restated that point today. That's likely the strongest milestone we can offer you, I'd say. We aren't factoring in any substantial revenue for the 2026 year. That said, I believe having a bit of initial revenue in the near term is the finest valuation we can give investors and the market, honestly. This market is quite compelling for us, since it clearly shares traits with our thermal barrier business. That's essentially what's happening here; though it generally occurs in a more industrial context. As a result, we operate in both of these markets, and we have a part to play. I don't — what we're aiming for is to finish qualification processes alongside a couple of the large developers, after which they proceed to win projects and apply our product within those projects. So that's how the sequence of events unfolds. And my hope is that we can deliver a solid update to you on our next earnings call.

Chip Moore analyst
#27

I'd like to build on what was said about Energy Industrial, Don. Perhaps if we imagine a timeframe around 2030, could you just describe the project pipeline as you see it, recognizing that it will be uneven and that on certain of these projects you'll likely arrive somewhat later; yet how might that stack up against earlier cycles you've experienced?

Don Young executive
#28

The level of intensity feels greater than at any point I can recall — in terms of an investment cycle and energy infrastructure, especially considering how geographically varied our work is, and when I — like I mentioned during my remarks, much of our LNG activity is powered by demand here in the United States, yet additionally in the Middle East, and in Africa too; thus we're witnessing truly wide-ranging programs underway. And I believe this stems, naturally, from the wish for supply diversification, and certain current global events have generated an enormous degree of attention on this once more, from the standpoint of global tensions, yet also when we consider the necessity for diversification or rather, electrification related to data centers and a few of these other high reliability initiatives. We are, in my view, positioned well. Yet I believe on a macro level, we find ourselves in quite an extraordinary period right now across the coming several years. And once more, I think we're positioned really well given substantial experience, a first-class name in this space and the capacity to satisfy any needs ahead, certainly throughout that stretch through 2030, as you mentioned.

Don Young executive
#29

Thanks, Holly. We’re grateful for the attention you’ve shown toward Aspen Aerogels, and we’re eager to share our third quarter results with you in early November. Take care, and enjoy the rest of your day. Thank you.

Operator operator
#30

This concludes today's call. Thank you for attending. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Aspen Aerogels, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Aspen Aerogels, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.