Home / Transcripts / Aspen Aerogels, Inc. (ASPN) · November 5, 2026

Aspen Aerogels, Inc. (ASPN) Earnings Call Transcript

November 5, 2026

New York Stock Exchange US Materials Chemicals earnings 41 min

Earnings Call Speaker Segments

Neal Baranosky executive
#1

Thank you, Kathleen. Good morning, and thanks for being with us on the Aspen Aerogels Third Quarter 2026 Financial Results Conference Call; joining us today are Don Young, President and CEO, along with Grant Thoele, Chief Financial Officer and Treasurer. The press release that announces Aspen's financial results and business developments, plus the slide deck that accompanies today's conversation, can be found in the Investors section of Aspen's website, www.aerogel.com. On this call, we'll reference non-GAAP financial measures, which include adjusted EBITDA, adjusted gross profit, adjusted gross margin and adjusted net income. Reconciliations between GAAP and non-GAAP measures appear at the back of the slide presentation and earnings release. During today's call, management will make forward-looking statements regarding our expectations. Remarks of this kind involve hazards and unknowns that might make what we actually achieve materially different; these hazards and unknowns encompass the elements spelled out in the documents we file with the SEC. Kindly examine the disclaimer language shown on Page 1 of the slide deck, as the material of our call will be controlled by that wording. I would also like to mention that occasionally, related to the vesting of restricted stock units and/or stock options granted under our long-term incentive equity program, we anticipate that our Section 16 officers will submit Form 4 to disclose the sale and/or withholding of shares so as to cover tax payments and/or the exercise price of options. Now I'll hand things over to Don. Don?

Donald Young executive
#2

Thanks, Neal. Morning, everyone — appreciate you joining us today. Our third quarter was a strong one, finishing above the high end of guidance on revenue and adjusted EBITDA alike. The improvement was widespread: solid energy industrial shipments, stronger demand from GM, and growing input from our EV customers in Europe. In addition, we reached early commercial milestones in data center infrastructure and battery energy storage systems. Those results reflect movement toward our goal of expanding and diversifying revenue while establishing lasting profitability. I'll take you through the drivers of our performance, the opportunities in front of us, and the current situation at our East Providence manufacturing facility. For the third quarter, our guidance was revenue between $65 million and $80 million, with adjusted EBITDA of $7 million to $15 million. We ended up posting about $85 million in revenue and $20 million in adjusted EBITDA. Those results came from robust customer demand in a number of areas of our business, along with gross margins that moved back up. Starting with Energy Industrial — we're still aiming for roughly — we're still aiming for roughly 20% growth in 2026, even with the disruption at the East Providence facility. Healthy project demand is driving our Energy Industrial results in the second half. During Q3, we completed the subsea projects we had planned, which shows the team executed well. Q3 saw solid LNG deliveries, and the pace has stayed robust into Q4. On a number of projects currently set for delivery in 2026 and 2027, we're expanding our scope. In LNG we see a sizable multiyear opportunity, especially across the United States, the Middle East, Asia and Africa. Looking ahead to 2027, we think our Energy Industrial business is positioned well for another year of solid growth. We carry momentum from a strong second half of 2026, a subsea project for 2027 already secured, and market dynamics fueled by a multiyear investment cycle in energy infrastructure that underpins the world's need for energy security, supply diversification and reliable power. When it comes to new and adjacent markets, rising investment in energy storage and data center infrastructure is opening up new opportunities for Aspen. Within BSS, during the third quarter we brought in our first revenue from supplying parts to several leading market participants for advanced design and evaluation work. With safety requirements changing, manufacturers and developers want thermal protection solutions that are Made in America, higher performing, and cost-effective, and our proven PyroThin technology puts us in a strong position to meet those needs. We're glad to have captured that initial revenue and expect this opportunity to grow and add to our 2027 growth and profitability; in another new adjacent market, we're happy to have booked our first data center infrastructure order, scheduled for delivery in Q4 2026. At one large data center campus, our products are being used in its technical strategy for handling the severe resource demands of these mega sites and for lessening the effect on the nearby community. In our view, resource efficiency is going to be a key factor in data center growth. This opportunity is a logical outgrowth of our thermal management knowledge, drawing on our aerogel technology, our manufacturing strength, and our technical know-how; we believe we are strongly positioned to meet the growing power generation and resource efficiency demands of AI data centers; after we complete our first installations and gain a better definition of the opportunity, we will share more specifics on upcoming calls. We think this market could play a major part in growing Energy Industrial into a lasting, high-margin business without requiring additional capital investment. Moving to our PyroThin thermal barrier business. Revenue climbed 81% quarter over quarter in Q2 and then another 54% in Q3. In North America, U.S. EV demand has leveled off at roughly 6% to 7% of new vehicle sales. We observe GM production moving closer in line with current sales rates while modestly rebuilding inventory, in keeping with its stated demand-driven approach. In Europe, battery electric vehicles are nearing 30% of new vehicle registrations. In Q3, our European thermal barrier business posted record revenue, supplying 7 OEMs across 8 programs. During the last earnings call, we forecast 2026 revenue from European OEMs at $20 million to $30 million, an increase over the $10 million to $15 million projected earlier in the year. With momentum continuing into Q4, we are confident that we will reach the top of that range. This expanding opportunity across a diverse set of European OEMs is a major driver of our strong Q4 outlook, and we think European Thermal Barrier revenue can double in 2027. At East Providence, we are progressing toward completion of our staged restart, which should finish in the first half of 2027. I'd like to recognize the Aspen team for their relentless efforts toward a safe and disciplined plant restart, and for their steadfast commitment to our customers. These actions strengthen our flexibility in supply for both the near and longer term, our operational resilience, and our ability to serve customers dependably. Grant, over to you.

Grant Thoele executive
#3

Thanks, Don, and good morning, everyone. I'll go through the results for Q3 2026 and what we expect for Q4. Before getting into the specifics, I want to put this quarter in context. Q3 showed how much earning power this business has at higher volumes, which demonstrates that the financial framework we've been building since early 2025 is paying off. The last quarter with revenue similar to this one was Q4 of 2023. Back then, the regulatory environment was set up for widespread EV adoption. We were preparing for GM's ramp as our main OEM and adding Aerogel capacity in Georgia. During that quarter, we generated $9.1 million in adjusted EBITDA on $85 million in revenue and spent $28 million on CapEx. In the time since, over $75 million has been taken out of our fixed costs, we've spread supply across both segments, started generating revenue from 7 European Thermal Barrier customers, and moved toward a manufacturing model that is more sustainable, capital-light and flexible. With revenue essentially flat at $85 million, adjusted EBITDA rose to $19.8 million — more than double — while CapEx came in at just $4.7 million. Aspen today is fundamentally different: more profitable, less capital-intensive, and backed by a healthy balance sheet. That gives us the foundation to grow share in our core markets, move into adjacent markets and chase new opportunities. With that, let's dive into the quarter. Revenue for the third quarter came in at $85.2 million. That topped the upper bound of the $65 million to $80 million range we had guided to, representing a 71% rise sequentially and 17% growth versus a year earlier. Of that total, $39.9 million was contributed by Energy Industrial and $45.3 million by Thermal Barrier; the latter figure includes $4.9 million of deferred revenue that was recognized as a result of the GM settlement we received in Q1. Energy Industrial revenue was up 96% from the prior quarter, matching our roughly $40 million expectation, driven by Subsea project revenue that landed during the quarter. Relative to last year's third quarter, Energy Industrial revenue grew 64%. Thermal Barrier sales rose 54% versus the prior quarter, and two things drove that. First, GM-related revenue climbed to $37.3 million from $23.7 million in Q2, since output levels are now tracking closer to actual sales. Second, our European Thermal Barrier business posted 38% quarter-over-quarter growth, going from $5.8 million to $8 million — the biggest single-quarter figure we've ever recorded from European customers. Gross profit came in at $20.6 million, a 24% gross margin, compared with $3.3 million, or 7% gross margin, in Q2, because the added volume lets us spread fixed manufacturing costs further. That figure includes $14.7 million in extra costs tied to the April incident at East Providence, which don't reflect how the business normally runs. Although those expenses get added back when calculating adjusted EBITDA, they still weigh on gross margin. If you set aside the costs tied to the incident, non-GAAP adjusted gross profit stood at $35.3 million, equal to a 41% gross margin. Q3 operating expenses totaled $27.7 million, and that figure includes a $4.6 million loss on disposal of PPE connected to Plant 2. We also recorded roughly $400,000 in incident-related charges within OpEx. Excluding those items, adjusted non-GAAP operating expenses were $22.7 million, compared with $23.1 million in Q2. Net loss on a GAAP basis narrowed to $10.4 million in Q3 from $23.3 million in Q2. Adjusted EBITDA reached $19.8 million, exceeding the guidance range of $7 million to $15 million. To give some perspective on that profitability, we produced $26 million of incremental EBITDA on $35 million of additional revenues between Q2 and Q3. That works out to roughly 75% of the added revenue dropping to the bottom line — impressive, but well above typical levels, mainly because of product mix and cost absorption. When planning, we still anticipate that 50% to 60% of incremental revenue will fall to the bottom line. Just to remind everyone, incident-related charges get added back to adjusted EBITDA during the quarter in which they occur, and we submit claims for those costs through our insurance policies. In Q3, those charges totaled $15.1 million, consisting of expedited freight, professional fees, and the added expense of temporarily sourcing certain products from our external manufacturing facility. Since volumes are higher, much like in Q3, these charges grow along with the greater activity. We're actively pursuing the claims process through our insurance policies and anticipate continuing to incur incident-related charges until the facility is back up and running, which we expect to complete in the first half of 2027. Turning to liquidity: we ended Q3 with $146.5 million in cash, cash equivalents and restricted cash. That's down $6.9 million from $153.4 million in Q2. Net cash stood at just over $60 million, in line with the previous quarter. Let me take you through the main cash flow items for Q3. In the quarter, we collected $15 million in insurance proceeds related to property damage from the EP incident. After receipt, $8.9 million moved through investing activities, clearing the property damage receivable we had recorded in Q2. The other $6.1 million landed in accrued expenses and ran through operating activities. Cash used in operating activities was $3.8 million. Keep in mind that $15.1 million in incident-related charges, which we will file claims for under our insurance policies, weighs on that number. So with normalized operations, cash generation would be stronger. Investing and financing activities consumed $3.2 million, primarily from $4.7 million of CapEx, $8.9 million of insurance proceeds and $6.5 million of scheduled term loan amortization, leaving our term loan balance at $73 million at quarter end. Two final liquidity points. First, I want to point out that our $146.5 million of cash excludes any potential insurance reimbursement for roughly $20 million of incident-related charges incurred year-to-date. Additionally, if you set aside the charges tied to the incident, the insurance money received, and the debt repayments, we would have produced roughly $10 million in cash from $85 million in revenue. There is still additional effort required on our part to generate greater incremental cash flow, yet these figures are encouraging. Turning to Slide 7. Put simply, Q4 might resemble Q3 once subsea project activity is excluded. As a reminder, our subsea revenue normally falls in the $10 million to $20 million range each year. We are bringing momentum from both of our businesses into the last quarter of the year. It's exciting to see fresh opportunities coming our way — robust European Thermal Barrier activity, a rise in LNG orders, and the execution of our inaugural data center infrastructure project. . Watching the business grow more sustainable is exciting, since our assumptions for the full year on both demand and supply have held up. As inventory levels have normalized, we've watched GM production recover. Revenues from our European Thermal Barrier programs keep climbing, and the Energy Industrial business has solid underlying drivers, with roughly 20% year-over-year growth in our crosshairs. For Q4 of 2026, our expectation is total revenue ranging from $60 million to $75 million. That lower end reflects a prudent posture, since it bakes in GM output estimates that are lower than what IHS currently projects. Continued momentum in European Thermal Barrier and Energy Industrial, carrying over from Q3, puts us squarely on track for the upper end of the range. Looking at the components of the guidance, we anticipate Energy Industrial revenue of approximately $35 million for the quarter. Our Q4 outlook for the Thermal Barrier segment rests on two primary factors. We have built in an assumption that GM production will run at an annualized pace of roughly 70,000 to 90,000 vehicles over the quarter.

Grant Thoele executive
#4

During Q3, GM was sourcing about 170,000 vehicles on an annualized basis, and IHS's current forecast has GM producing roughly 110,000 vehicles annualized in Q4. We understand that Q4 has a seasonality component, so our guidance is set conservatively below IHS. Through the third quarter, our European Thermal Barrier customers generated $18.9 million in revenue. This is the ramp we've been waiting for. With one quarter left, we've already generated more European Thermal Barrier revenue than in any year since we entered the EV business; for the full year of 2026, we expect European programs to reach approximately $30 million in revenue. Just to remind everyone, serial production has not yet been reached for these European programs, though the majority are set to SOP in 2027; indeed, one of the most promising drivers here is customer diversification, since growth in 2027 comes from 7 different OEMs across 8 different programs. Our target remains meaningful growth over our 2026 outlook, to approximately $50 million to $60 million of European Thermal Barrier revenues in 2027. With the product mix factored into our revenue range, Q4 adjusted EBITDA is expected to land between $5 million and $13 million, and that figure includes adding back incident-related costs of roughly $5 million to $10 million. Now to our liquidity outlook. Excluding East Providence restoration CapEx, CapEx and scheduled debt payments should come to about $10 million in Q4. Variability in working capital is going to stay elevated. What drives that is where finished goods get produced and sold, safety stock we build in line with how quickly East Providence recovers, and when insurance money arrives, since those payments trail the expenses they reimburse. Even with that timing, we're confident we'll keep a net cash position at minimum through year-end. As for selling Plant 2's assets, we're still actively marketing the building and the equipment. There's buyer interest in the building, and we keep pushing toward liquidity as we weigh every option. For the equipment, we intend to launch a structured sale process to move the remaining assets over the next several months. Most of the money from selling the Plant 2 assets will probably come in during 2027, and keep in mind that it would go straight toward paying down our term debt on a dollar-for-dollar basis. With plenty of liquidity on hand right now, we still have room to bring down leverage further while remaining nimble enough to invest opportunistically in strategic growth initiatives. Taking all of this together, three things capture where Aspen stands today: an operating model that is more profitable and less capital-intensive; commercial traction in both segments, with new market opportunities and best and data center infrastructure projects; and a strong balance sheet with net cash a little above $60 million. For fiscal 2026, we're projecting revenue between $233 million and $248 million, with adjusted EBITDA landing somewhere in the $5.5 million to $13.5 million range. At $85 million in quarterly revenue and $19.8 million in adjusted EBITDA, we've shown just how strong our financial framework can be, and we intend to keep building on that momentum. Don, I'll turn it over to you.

Donald Young executive
#5

Thanks, Grant. Before we get to Q&A, I want to restate the outlook we have for Q4. Revenue is expected to land between $60 million and $75 million, with adjusted EBITDA in the range of $5 million to $13 million. There's a real chance we finish at the top end of both ranges. Our priorities are straightforward: scale, Energy Industrial, expand the PyroThin customer base, and push forward on adjacent opportunities where our technology can deliver value. We're putting money into innovation and into our customer-facing commercial teams to back that effort; in our view, this strategy is the best route to deploy our financial strength and build long-term shareholder value. Our Q3 results and Q4 outlook give us considerable momentum as we head into 2027 focused on growth and durable profitability; with that, we'll open the line for questions.

Colin Rusch analyst
#6

Congratulations on the results too. When you consider the European opportunity and how much upside it could bring, I'd like to understand where the manufacturing footprint is going, along with the finishing lines. Is this the kind of situation where it could make sense to consider ramping up a finishing line in Europe to serve some of that demand?

Donald Young executive
#7

Well, at present we have no plan to build fabrication capability in Europe; we're very happy with what we can do in Mexico, and our efforts, our expertise, and our costs will stay focused on that single facility. There's a possibility we'll shorten the supply chain by having warehouse capability close to our European customers. We are discussing that idea right now; but as of today, we have no plan to spend capital on building fabrication capability in Europe.

Colin Rusch analyst
#8

Great. Now turning to the data center opportunity, could you discuss the variety of prospective customers you're engaged with right now? And how might we begin to see some of that activity show up in the P&L over the coming couple of years?

Donald Young executive
#9

Sure. As I mentioned, Collin, we've secured our first order in this space, and it centers on resource efficiency for these facilities. We'll take this initial order — the installation is a deliverable here in Q4, with immediate installation — and use it as a case study showing the value our product brings in these areas, and you'll see us leverage that case study as we expand our commercial team to win more orders of this kind. The opportunities are substantial and broad based. And we think resource efficiency will be paramount for both existing and new facilities as the data center push spreads out. Clearly, given community consternation, we believe resource efficiency helps address that, at least in part. So we're in the early days of this. That said, the opportunity is here in Q4. We're delivering and installing, so we're moving at a pretty fast pace. We're very excited about the opportunity. It's a very natural extension of the work we've done in Energy Industrial for a long time — so while it's new, it's not entirely new. It's very much a first cousin of the work we've done for more than 10 years.

Colin Rusch analyst
#10

Alright, and I just have one quick clarifying question. Is this mainly about thermal management, or are you also tackling any of the sound problems with some of these systems?

Donald Young executive
#11

What we've secured so far centers on energy efficiency and the thermal management side of things; we do offer features that address acoustical opportunities too, but that isn't what this particular order focuses on.

Eric Stine analyst
#12

Let me begin by confirming that I've got this right — the two subsea projects were completed during Q3, it sounds like. I'd like that verified, and beyond that, I'd really value additional detail, first about the major project award you referenced in your remarks, and second about the substantial project activity you're seeing in Energy Industrial for 2027.

Donald Young executive
#13

Absolutely, and there are at least two parts to address there. Yes, we delivered exactly as planned and as expected — our two projects in Q3 of this year. That explains why Q3 revenue came in strong and Q4 shows somewhat of a tail off, even as the rest of our business keeps growing. As everyone is aware, the subsea segment is inherently uneven. For context, Grant noted in his remarks that looking at our track record, a typical year would see us generate subsea revenue somewhere in the range of $10 million to $20 million. Back in 2024, we came in at a figure nearer to $30 million, which was not a typical year; during 2025, we saw roughly 0, and that also was not a typical year. For 2026, we're landing in the usual $10 million to $20 million band; looking to 2027, with a project secured, we expect once more to sit within that same $10 million to $20 million span for the year on our subsea work. On the second half of your question about activity levels — we're seeing substantial opportunity, particularly when it comes to LNG. We're busy here and across — really, across all of 2026, and that carries straight into 2027 too. Again, having the subsea project secured is great. We're confident we'll land in that $10 million to $20 million range. There's no shortage of opportunities for us to keep pushing that forward as well.

Eric Stine analyst
#14

All right. So perhaps a brief follow-up question. I'd really appreciate additional information about the storage revenue—I understand there was initial revenue here in 3Q. What I mean is, does this seem—or does it sound—like this could be a fairly comparable product to what you're already delivering, one that hasn't really needed much tuning for that particular application? I'd still like more detail.

Donald Young executive
#15

Yes, thank you. We have been working toward and stating a target that we would reach initial revenue in 2026, and that is precisely what we accomplished here in Q3. And you are right. These thermal barriers are quite close relatives of the thermal barriers that we provide for mobility and for automotive OEMs. We think we will be able to turn these prototype materials—these evaluation materials, which I would describe as advanced evaluation materials at this stage—into specific projects, and that they will contribute to our revenue in 2027.

Ryan Pfingst analyst
#16

Perhaps I'll begin with a follow-up question about Energy Industrial growth for '27. You cited a Subsea revenue outlook that's comparable. But how ought we to think about LNG and maintenance growth in the coming year, maybe measured against the growth we witnessed in 2026?

Donald Young executive
#17

Well, we aren't really ready yet to give guidance for 2027, but we do; it's great to have confidence that our Subsea business will return to its typical range of, as we mentioned again, $10 million to $20 million. Our LNG revenue and efforts are accelerating, so we view that as a growth opportunity for us from '26 to '27. Look, generally speaking, the energy infrastructure space is expanding, and we intend to take part in that expansion; we're striving — right now we're keeping our heads down, working to hit that 20% growth in 2026 as we've targeted; and we'll address 2027 on our next earnings call. But we're entering '27 with considerable momentum. Let me just say that.

Ryan Pfingst analyst
#18

Understood. Turning now to Thermal Barrier: as you ship more product to the European OEMs, how do you view possible upside relative to the current 2027 outlook? And could there be wins out there that arrive quickly enough to appear as early as late next year?

Donald Young executive
#19

Let me take the second part of that question first. We're in the running for further European OEM design awards. Based on history, those typically take — you don't normally bring in revenue during the same year you win the award. I mean, at least not meaningful revenue, just prototype-type revenue; so I wouldn't want you counting on that. But these companies are further along in their development, and from a thermal protection standpoint, what we're seeing is that the gap between design award and first revenue is getting shorter. On upside, look, I said in my script that we'd land at the high end of that $20 million to $30 million for 2026, and that we were positioned to double that revenue in 2027. I think that's a solid way to think about it as we head into 2027. Again, if you simply take price times volume of our '27 agreements with these companies, the number is considerably greater than $60 million. But again, I think our history tells us to be careful and conservative, and that's what we're doing. We still think doubling the business year-over-year is impressive; so we're excited about that.

Grant Thoele executive
#20

There's one more thing I'd add to that, Ryan: with the European OEMs, we're clearly in active discussions on programs we already have, and we're also quoting on new ones. So whether it ends up being a fresh award with a new OEM or a fresh award with an existing OEM — that, I think, is another way to look at it for '27.

Chip Moore analyst
#21

I'd like to dig a little deeper into the energy storage opportunity. So, how should we frame the way that evaluation process works? Is it — how does it stack up against automotive? My assumption is that getting spec-ed in takes less effort, but what about the testing requirements or the timeline? Any perspective on that?

Donald Young executive
#22

The order of things is, once more, with several leading partners in this space, we're supplying materials — what I call advanced evaluation materials. After that, the next complete stage is, I'd say, full qualification; and then our customer has to go out and win their business on the strength of our product and their modules. So those are the stages involved, and we think qualifications will come here in the near term, with revenue starting in 2027. Once again, this is a broad opportunity for us. And once again, we view hitting initial revenue as a great milestone that we had pledged to reach earlier this year. We got there, and now the task is turning it into steady, profitable revenue on an ongoing basis for us.

Analyst analyst
#23

Great. As a follow-up, could you give us a brief update on the East Providence restart? It sounds like things are on schedule, and what does that mean for margins — really in the back half of next year?

Grant Thoele executive
#24

Thanks, Chip. What I'd say about East Providence at this point is that aerogel blanket production is running at full capacity, and we're actively bringing back the oven where the incident happened. So we remain on schedule to have that restoration finished in the first half of next year. The team is working around the clock, essentially, to make sure all the proper safety protocols are in place and that everything is buttoned up the way it should be. What's interesting about our margins so far this year — and this is why I've been pointing to the adjusted gross margin — is that there are just so many incident-related charges that, from a GAAP standpoint, are clearly weighing on gross margin, but we add those back to adjusted EBITDA. That will likely continue through the first 2 to 3 quarters of next year, as we're building inventory with EMF as well; so we're making sure that when we do flip back to having that oven capability at East Providence, we have the inventory in place to do that, and we can do it in a very efficient way. So everything is on track, and we're just proud of the team for all the work they're doing down there at the plant.

Donald Young executive
#25

Chip, one thing I found interesting in what Grant laid out in his script earlier today had to do with cash, and specifically the business interruption charges we've taken — I think you put the figure at roughly $20 million. From a cash standpoint again, those insurance proceeds haven't come in yet; we're in the process of filing claims for them. So we'll work through that. But purely on the cash side, it's worth noting that we've spent that cash and have yet to be reimbursed. Once more, we feel good about how the claims process will go, let me say, and about capturing that during the coming quarter.

Donald Young executive
#26

Thanks, Kathleen — we’re grateful for your interest in Aspen Aerogels, and we look forward to sharing our fourth-quarter results with you in early February. Take care, and have a good day. Thank you.

Operator operator
#27

This concludes today's call. Thank you for attending. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Aspen Aerogels, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Aspen Aerogels, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.