Home / Transcripts / Babcock & Wilcox Enterprises, Inc. (BW) · November 10, 2025

Babcock & Wilcox Enterprises, Inc. (BW) Earnings Call Transcript

November 10, 2025

New York Stock Exchange US Industrials Electrical Equipment earnings 29 min

Earnings Call Speaker Segments

Sharyn Brooks executive
#1

I appreciate it, Victoria, and I want to thank all of you for being with us on the Babcock & Wilcox Enterprises call covering our third quarter 2025 earnings. With us on this call are Kenny Young, who serves as B&W's Chairman and Chief Executive Officer, along with Cameron Frymyer, our Chief Financial Officer, and they're here to walk through the results for our third quarter. Before we go further, I should note that some of what we say on this call will consist of forward-looking statements. Such statements carry risks and uncertainties, among them the ones described in the safe harbor provision covering forward-looking statements, which appears at the conclusion of our earnings press release, as well as in the Form 10-Q we filed this afternoon and the Form 10-K currently on file with the SEC, all of which offer additional specifics concerning the risks our business faces. Also, unless the law demands otherwise, we assume no duty to revise any forward-looking statements. In addition, we offer non-GAAP information touching on particular historical and targeted results as a supplement to what we present under GAAP. That information ought not to be treated as better than, or as a replacement for, the corresponding GAAP measures. You can locate a reconciliation of historical non-GAAP measures in the third quarter earnings release we published last week, and also in the company overview presentation filed today on Form 8-K and made available in the investor relations portion of our website, babcock.com.

Kenny Young executive
#2

Thanks, Sharyn. Good afternoon, everyone — I appreciate you joining us on today's call. Our plan remains on track: expand the worldwide parts and services business, chase significant opportunities right here in North America, and pay down the bulk of what we owe. Growing electricity demand across North America is driving our expansion, and that aligns well with our strategy of divesting chosen non-core assets to cut debt substantially, all while positioning B&W to be a major participant in the buildout of AI data centers and the broader need for baseload power generation. We're glad to share a number of encouraging updates from this quarter at Babcock & Wilcox, spanning our quarterly financial results as well as the projects and partnerships we've recently completed. Adjusted EBITDA and operating income landed well above what both the company and consensus had expected this quarter. Versus the third quarter of 2024, adjusted EBITDA increased 58%, while operating income was up 315% compared with that same period in 2024. Those improved margins stem directly from the record quarter delivered by our parts and services business. During the third quarter, our global parts and services unit recorded its strongest quarterly and year-to-date bookings, revenue, and gross profit in the company's recent history. Our growing backlog continues to benefit from rising demand across projects, upgrades, and construction, as power generation needs for North American industrials and utilities keep accelerating. In total, our backlog rose 56% quarter over quarter, reaching a figure above 393 million. Through a combination of non-core asset sales and equity raises, we have repaid — or will repay — the February 2026 notes ahead of the end of 2025; we also have sufficient liquidity to retire the December 2026 bonds, which we plan to begin doing by year's end. Over the past several months, and with the significant equity raises finished last week, our balance sheet has strengthened substantially. With that improvement, along with the favorable momentum from baseload generation demand in the market, we have positioned B&W for meaningful growth in 2026. Currently, we expect our core business to produce EBITDA in a range of 70 million to 85 million in 2026, which equals 80% growth year over year from 2025. That number excludes any revenue or margin from the AI data center projects we announced recently. We've been holding discussions about a number of opportunities in the AI data center space, and we see agentic AI as a new catalyst fueling greater power needs in the U.S. and around the world. We're pleased to announce that we've signed a limited notice to proceed with Applied Digital to begin work on delivering and installing natural gas technology that will provide one gigawatt of efficient energy for an AI factory and data center project. Once everything is finalized, the full project — measured at full notice to proceed — will exceed 1.5 billion. Separately, we see potential in the range of $10 billion to $12 billion, alongside $309.3 million and $393 million, as relevant reference points. We anticipate receiving the complete notice to proceed sometime over the next few months. As part of this plan, B&W plans to design and construct 4 natural gas-fired power plants, each with a capacity of 300 megawatts, consisting of proven boilers along with the accompanying steam turbines, in order to support Applied Digital's AI factory. The target for starting up the plant is 2028; the efficiency this technology provides is on par with simple cycle turbines, and it can be brought online much faster than either combined or simple cycle power plant options. This agreement is hugely important for B&W, bringing 3 to 5 billion of AI data center opportunities into our pipeline. In addition, we are pursuing further projects and opportunities, which raises our total global pipeline to 10 to 12 billion in all, ClimateBright and BrightLoop included. Moving to our BrightLoop technologies, our effort to advance BrightLoop continues to progress as we push commercial development of the projects we already have and continue working to improve how efficiently these technologies perform overall in producing low-cost hydrogen or steam. Interest in BrightLoop technology is expanding, for steam generation as well as hydrogen production, able to deliver energy at lower costs and expenses; in fact, discussions are taking place with several oil and gas companies and large utilities about using BrightLoop on specific steam or hydrogen generation projects. On the ClimateBright side, demand continues to grow for accessing carbon credits — in waste to energy as well as coal to energy — as optional offtake revenues for our customers; we are also in talks about multiple opportunities and believe we can announce a major carbon capture project based on our SolveBright technology very soon. At this point I'll pass the call to Cameron for the financial details of the third quarter of 2025. Cameron? Yeah, thanks, Kenny. I'm glad to walk through our third quarter results, and additional detail is available in the 10Q filed with the SEC. Consolidated revenues for our third quarter totaled 149 million, roughly flat compared with the third quarter of 2024. Global parts and service remained strong in the third quarter of 2025, reporting revenues of 68.4 million versus revenues of 61.7 million in the third quarter of 2024. That increase is mainly due to rising electricity demand from fossil fuels, driven by demand from artificial intelligence, data centers, and growing economies. Net operating income for the third quarter of 2025 was 6.5 million, compared with operating income of 1.6 million in the third quarter of 2025. Loss from continuing operations in the third quarter of 2025 was 2.3 million, compared with a loss of 7.9 million in the third quarter of 2024, and Adjusted EBITDA was 12.6 million versus 8 million in the third quarter of 2024, beating street expectations. As Kenny said earlier, we've set our 2026 full-year Adjusted EBITDA target range at 70 to 85 million, coming from our core operations, and that number excludes any expansion tied to data centers. Moving along now to the balance sheet, cash flow, and liquidity picture. As of September 30th, 2025, our total debt was 379.3 million. That figure breaks down as 98.4 million of February 2026 bonds, 90.9 million of December 2026 bonds, and 121 million of bonds coming due in 2030, with the remaining debt tied to our letters of credit. As of September 30th, we had not drawn anything on our asset-based loan. Cash, cash equivalents, and restricted cash totaled 201.1 million, leaving net debt of 178.2 million as of September 30th, 2025. On October 2nd, B&W repaid 70 million of bonds maturing in February of 2026, and we said recently that the remaining February 2026 bonds outstanding will be repaid in full in December of 2025. Another notable item came last week, when the company raised an additional 65 million in equity, further strengthening the balance sheet and showing our ability to pay off what's left of the 2026 bonds due in December of 2026. After factoring in that recent equity raise, pro forma net debt comes to 113.2 million, which lands between 0.8 and 1.6 times targeted 2026 EBITDA. And last, while on Friday we said sales under the ATM program would be paused, we've decided to restart ATM sales and intend to sell shares under the ATM program opportunistically, based on market conditions and our share price. I'll turn the call back over to Kenny now. Cameron, thank you. Well, to close, as always, I want to recognize the work of our dedicated and talented employees around the world who commit themselves each day to meeting challenges and serving our customers while delivering today's energy needs. I'll now hand the call back to Victoria, who will, and I think we have room for about three questions. So, Victoria, I'll pass it back to you. Thanks.

Aaron Spychalla analyst
#3

Yeah, yeah, hi Kenny and Cameron, and thanks for taking my questions. Maybe starting with that $1.5 billion project — could you talk a bit about what the next steps look like and how you see the potential contribution from a timing and margin standpoint going forward? And then your thoughts on the supply chain and working capital needs as it ramps.

Kenny Young executive
#4

Sure, appreciate that, Aaron, and thanks for joining the call today. To start, we're currently collaborating with Applied to nail down the exact location for construction, which will let us then wrap up the complete notice to proceed. As you pointed out in your remarks, we anticipate having that done inside the coming two months. In parallel, we're quietly engaged with a handful of steam turbine generator suppliers right now, and we've secured verbal agreements that let us hit those deadlines. So we'll aim to lock in those specifics, plus handle our own production of these specific boilers. What's really encouraging here is that these boilers — 300 MW units — are what I'd call off-the-shelf items. We've already put this same design in place at multiple sites prior to this situation, which means the technology and architecture are both proven. As a result, hardly any engineering work, if any at all, is required before they're ready for manufacturing. We've got the construction drawings for each one, along with the fabrication diagrams, layouts, header layouts, tubing — the complete set of documents for a boiler of this kind that satisfies U.S. specifications and standards. That makes it straightforward for us to shift this directly into production. This is the part that gets us excited. We seldom get the chance to apply a design that we've already rolled out at numerous other sites. Since we know these boilers inside and out — their specs and how they perform — it's a smooth transition into production. On top of that, because steam turbines are already within reach, we can reach the market far more quickly than we could by going the route of a combined cycle or simple cycle turbine facility right now. That's what makes this advantageous. Meanwhile, we're handling all of this alongside Applied, and as I mentioned, we expect the complete notice to proceed to be signed within the coming 2 months. We're putting in a lot of effort behind the scenes to push this project fully ahead. On the working capital side of things, we'll coordinate with Applied regarding the timing and how we proceed; that will fall under the complete notice to proceed process during the coming 2 months. Typically, for us, we aim to keep working capital on projects like this at a neutral to positive level; as a result, the down payment obligations we owe to manufacturers or subcontractors are generally collected upfront for these projects, and there's no reason to expect anything different here. That's the direction we're taking, and Applied knows about it as well. So our thinking is that this will help bring things down a bit on the whole, including whatever working capital effects the company sees. And we should remain positive on cash flow here, the same way we typically are at this point on efforts of this kind; that's the broad approach. On recognizing revenue and margin, it's obvious that we function as a POC operation in that respect. What matters is when we can put the cost against the project as we move into next year. Part of that hinges on the schedule and on getting the final notice to proceed. To be honest, it's not entirely clear right now, and in 2026 I wouldn't expect it to be a massive figure. I really can't say for certain. I'm just throwing a number out there. Maybe somewhere around 10% to 15% of the value gets recognized by then. Under the accounting rules, the bulk of it would land in 2027 and, of course, 2028. Since we're still working through that NTP and our guidance for the coming year, this project — along with any other data center projects — hasn't been factored into that 70 million to 85 million range. What that means is this represents pure upside, and probably meaningful upside, on top of whatever number we put out at this point. Cameron, I don't know whether there's anything you'd like to add to that, but if not, I don't know. I'll hand it back to you.

Cameron Frymyer executive
#5

No, no. I think you hit all the points, Kenny.

Aaron Spychalla analyst
#6

That's really useful, thank you. Then perhaps just a follow-up regarding the extra pipeline — it sounds like a week ago it stood at 1.5 billion. As of today, it sounds like perhaps 3 billion to 5 billion. So there may be some expansion there. Could you discuss how developed a few of those chances are, and the possible timing for when some of them might advance too?

Kenny Young executive
#7

Clearly, we're in discussions with multiple parties about this, and we have been. I'd like to stress that before this announcement, we were already in discussions with several regarding this specific solution at varying sizes, correct? That means a few would be smaller, perhaps around a half-gigawatt, while others are maybe somewhat bigger, in the 1.5 to 2-gigawatt range. So there are quite a few of these prospects where this solution is most logical, both from a cost perspective and from a delivery and schedule perspective. A portion of that would depend on full availability on the manufacturing side and the steam turbine side. And once more, early signals show we have some genuinely strong capacities available to satisfy this whole demand. And so with a few of those, it'll involve collaborating with them to advance, ideally, on a couple of the other prospects. If we can secure their commitment, I'd say announcements on that front would come within next year's timeframe. But clearly we're engaged with these other prospects that exist and fully plan to push them across the goal line. That concerns this solution. The others we're working on intensively relate to our Denham partnership. And right now we're collaborating very closely with Denham Capital on numerous sites to convert some coal plants to natural gas. That is likewise in progress too. So I believe those prospects sit within that prospect and pipeline, and the other natural gas plus steam turbine combination that were proposed for Applied would also fall within that prospect too; so given the mix of all that and the sizes involved, we chose to raise the pipeline even a bit more than a week ago.

Aaron Spychalla analyst
#8

That's excellent. I appreciate the detail, and good luck to you. I'll hand things over.

Kenny Young executive
#9

Thank you.

Rob Brown analyst
#10

Hello there, good afternoon.

Rob Brown analyst
#11

Afternoon. Regarding the capability, or what you can handle for that pipeline — what kind of capacity do you have in this power gen segment, and how are you thinking about the constraints on capacity there?

Kenny Young executive
#12

Rob, that capacity question breaks into two primary pieces. And by the way, thanks for joining us. There are two sides to it. First comes building the boiler, or fabricating it. For our part, that's routine, correct? It's what we do. We've been reviewing and assessing the internal capability we possess at present, along with the outside partners we rely on in different locations globally to build these types of systems. So every one of those firms is aligned on this. And honestly, it comes down to volume. A lot of these fabrication and manufacturing organizations are at ease and accustomed to handling projects on this scale. So the only question is how much we're able to place at each site for that. We're currently working through it. So I'd say with the pipeline we currently have, once again, it hinges on precisely when some of this happens, we're fairly confident we can finish the manufacturing and possess the capacity to handle the boiler fabrication and manufacturing. Turning to the steam turbine side, the encouraging part is that steam turbine suppliers are far more numerous than those doing combined cycle and simple cycle. We're unable to share names at this point, yet we're talking with a number of them and are moving quickly to establish a relationship so that this capacity is locked in. And we think, simply given many of the initial talks we're having with these specific groups, that such capacity is out there, perhaps spread across a few different manufacturers. We'll sort that out. But looking at it from the steam turbine angle, we believe these opportunities are real. They're clearly quite enthusiastic since this lets them participate in a high-growth area for themselves too. Thus far, it's been all hands on deck, so to speak, on the manufacturing side and the steam turbine side alike.

Rob Brown analyst
#13

Alright, I appreciate you fielding that. When it comes to the pivot toward climate-focused initiatives, I think you mentioned the emerging chance in CO2 capture. Might you give us some additional detail on when that could materialize and what size it could reach?

Kenny Young executive
#14

Of course. At the moment we're involved in conversations and discussions regarding several projects. Quite a few of these are what we typically call feed studies — meaning front-end engineering design studies. As things stand, we have several of those efforts in progress. So we're presently hashing out talks to finalize a single opportunity, and it seems like that one could come together fairly fast — hopefully within weeks rather than days, at the latest — on something we can make public. The approximate size would fall somewhere in the 70 million to 100 million-ish neighborhood, sitting inside that band. I'll frame it as a range for now while we get it closed out. That figure applies to the initial project on its own, and there are probably more opportunities and added upside past that. What we're seeing across the U.S., from some operators along with hyperscalers and other participants, is that in a few cases they'd rather have the CDRs, or the carbon offtake, and the groups building those power plants are looking at ways to capture CDRs or carbon so it can be sold as additional revenue for the plant owners, connected to rolling out the infrastructure required to serve the hyperscalers. We've seen this happen with a few developers. And I think we've got a route here that will hopefully allow us to announce one or two projects, with a specific one arriving in the coming days, or if not, weeks. In one instance, a project involves 0.5 gigawatt.

Aaron Spychalla analyst
#15

All right. Thanks a lot. Nice work on the advances.

Kenny Young executive
#16

Yes. Appreciate it.

Brent Thielman analyst
#17

Hi there. Thanks. So Kenny, regarding that Applied Digital deal — the $1.5 billion — does all of that fall under B&W's responsibilities? I realize everything is still being finalized, but clearly this could be a huge addition to the backlog you're carrying right now. I just wanted to get a sense of what's included in it.

Kenny Young executive
#18

Yes. That $1.5 billion is meant to cover and reflect B&W's portion of work tied to this project, correct? B&W would supply every piece and component involving boiler and steam systems, along with the building side of things, right? We operate our own construction firm based here in the U.S. So it would combine construction, the steam turbines, and the boiler portion. After that, we'll handle the remaining pieces so the plant gets finished on time and on schedule. We'll coordinate with Applied on that; we've listed it as more than $1.5 billion at that location. Depending on the final scope, the overall figure might be greater. We'll simply need to sort through that. But I wanted to offer a sense and signal of how it appears from B&W's standpoint; so our intent was for that to be our scope. Under that scenario, the project's scope would be somewhat bigger; but once the NTP is settled, we'll collaborate with them to finish it.

Brent Thielman analyst
#19

Alright, thanks for that, Kenny. So as a quick follow-up, is there anything you can tell us about how risk sharing works with this? On the execution side, is it all fixed price? And I noticed Applied Digital gets an equity component in BW. Maybe you could talk about that, and whether that's something you'd keep doing as you look at other opportunities that may come up.

Kenny Young executive
#20

Whether that same model would carry over to other situations, it's too soon to tell. I won't rule it out, but right now it's hard to say. We saw it as a very favorable step. Those warrants being in place, in our view, obviously align Applied's incentive toward finishing the NTP earlier and getting it done, plainly; and on top of that, there's also a form of buy-in, if you will, or support for BW more broadly—not only as a potential customer and client, but also as an investor. From where we sit, that's all quite favorable. And we've plainly seen that play out across certain data center and other segments as well. So overall, our take is that it's extremely, extremely favorable. As far as the risk share goes, we're in the middle of figuring out what that structure will be. Naturally, the risk wouldn't sit wholly with us—outside manufacturers and steam turbine providers would carry a portion too, and our usual practice is to keep that division even. What matters most, from my perspective, is that we've carried out these sorts of projects and put these technologies into service many times in the past, which cuts our overall exposure substantially. Nothing here calls for engineering, building, or rolling out technology that's completely new. Everything is fully proven—B&W has erected it at tens, perhaps even dozens, of locations. And beyond that, we plainly hold what I'd describe as the advantage here in the U.S. We're leveraging our construction arm and making use of the boilermakers, who deliver solid welding and fabrication capabilities at the job site. Even so, all of these boilers have been built previously, meaning we already know how they operate, what level of complexity they carry, how much time they require, and we've also addressed every risk tied to overseeing how they're produced and know how to manage that work effectively. Beyond that, we've captured every lesson and best practice from those prior efforts and put them to use in earlier cycles. So measured against any large project in B&W's history, this one stands apart. From my perspective, this specific item stands out as an uncommon and well-timed opportunity, largely because comparable work has been done on many earlier occasions, and no novel technology is being introduced. As we see it, that amounts to a significant reduction in the risk tied to this instance—worth somewhere between $70 million and $100 million. Regarding the precise terms and conditions, every one of them is going to be spelled out in full in the final notice to proceed, and that notice will also set out the $70 million to $100 million involved.

Brent Thielman analyst
#21

All right, understood. Appreciate it, Kenny.

Sharyn Brooks executive
#22

We appreciate everyone tuning in; that wraps up today's conference call. A recorded playback will be accessible on our site for a short period starting later today.

Operator operator
#23

Today's call ends here. Thanks for joining us, and have a great remainder of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Babcock & Wilcox Enterprises, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Babcock & Wilcox Enterprises, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.