Thanks, Crystalyn, and I appreciate all of you being here for Babcock & Wilcox Enterprises' call covering our second quarter 2026 earnings. This is Sharyn Brooks speaking, and I serve as Director of Communications. With us on today's call are Kenny Young, who is B&W's Chairman and Chief Executive Officer, along with Cameron Frymyer, our Chief Financial Officer, and they'll walk through what we delivered in the second quarter. Some of what we say today will be forward-looking in nature, and those remarks carry risks and uncertainties, among them the ones described in our safe harbor provision covering forward-looking statements, which appears at the conclusion of our earnings press release and in the quarterly report on Form 10-Q we submitted to the SEC earlier today. Beyond that, unless the law demands it, we assume no duty to revise any forward-looking statement. We're also sharing non-GAAP information tied to particular historical and targeted results as a supplement to what we report under GAAP. That information, which covers a discussion of adjusted EBITDA and adjusted net income, shouldn't be viewed as better than or as a replacement for the matching GAAP measures. You can locate a reconciliation of historical non-GAAP measures in the second quarter 2026 earnings release we published earlier today, as well as in the company overview presentation submitted on Form 8-K, which sits in the investor relations portion of our website at babcock.com. Also, please refer to the second quarter 2026 earnings release we published on August 10, 2026 for additional details about our bookings and backlog. At this point I'll hand things over to Kenny.

Kenny Young executive
#2

Thanks, Sharyn. Good afternoon, everyone, and I appreciate you being with us for our earnings call covering the second quarter of 2026. We're happy to share that we've delivered yet another robust quarter, one marked by solid financial performance, busy project development work, sustained operational momentum across our core business, additional strategic reductions in debt, and buybacks of stock. Throughout Q2, Babcock & Wilcox kept gaining from rising demand for dependable electricity generation across every power consumption source, which includes utility, industrial, and data center customers. Those favorable conditions produced strong operating results for the quarter and prompted us to lift our target range for full year 2026 adjusted EBITDA from $80 million to $105 million. While we're enthusiastic about the expanding opportunities in new utility, industrial, AI, and data center power generation projects, we feel just as enthusiastic about the impressive performance of our core projects along with our parts and services businesses. For the company, these businesses have been and remain powerful generators of cash, and they keep delivering meaningful growth quarter after quarter thanks to greater demand from coal and natural gas utilization, particularly within the U.S. Revenue, net income, and adjusted EBITDA stood out in our quarterly financial results, with each one surpassing what both the company and consensus had anticipated; during the second quarter of 2026, our pipeline, bookings, and backlog also experienced considerable development. Our overall pipeline now exceeds $14 billion, and that figure includes 4 to 6 gigawatts of power generation opportunities. Both bookings and backlog climbed sharply year-over-year, driven by growth in our core business and the ongoing advancement of our Base Electron project located in North Dakota; across the first half of 2026, we recorded bookings of $2.7 billion, representing a rise of more than 1,058% versus the first half of 2025. Backlog, meanwhile, reached $2.6 billion in the second quarter of 2026, marking a 533% gain relative to the second quarter of 2025. Robust worldwide appetite for B&W's technologies, combined with growing investment in power generation, keeps strengthening our optimistic view. Our attention is on carrying out our strategic priorities, fulfilling our existing pipeline, and preserving the operational and financial flexibility required to seize future growth opportunities. Shifting to our core business, our parts and services keep performing exceptionally well, as demand for dependable baseload power expands throughout North America and in global markets too. This quickening demand is motivating utilities to put money into refurbishment, recommissioning, and ongoing operation of coal fire generation assets that already exist, so they can uphold grid reliability and satisfy load growths in the future. Such a development acts as a catalyst for B&W's ongoing growth, putting us in position to serve a vital role in enabling AI data center expansion and fulfilling greater baseload generation requirements in the years to come. Our first data center project with Base Electron is moving forward on budget and ahead of what we expected. Work on the boilers, steam turbines, and other components with long lead times is still moving ahead at a rapid and efficient pace, which supports delivering dependable, high capacity power generation on the accelerated schedule that AI data center customers require. Base Electron has filed its conditional use permit application, and our plan is for the bulk of on-site construction, civil and mechanical work included, to begin in the early portion of 2027, with turbines and boiler components arriving once construction is underway. AI-driven data centers keep expanding, which is opening up meaningful opportunities for B&W, with over 4 to 6 gigawatts of fresh opportunities from hyperscalers, developers, and utility customers added to our pipeline. We are still in active talks with several AI data center customers that use coal and natural gas, and we anticipate a second data center project reaching full notice to proceed during this year. In preparation for that next data center project, B&W has obtained the manufacturing reservation rights for another one gigawatt of steam turbines from Siemens Energy. Altogether, 20 50-megawatt steam turbines are going to be built, with the initial generator sets handed over within 12 to 14 months after that, and further deliveries arriving on a regular cadence; this will assist in speeding up deployments for upcoming B&W data center projects. As B&W keeps growing, we are adding to our workforce to back the expansion in our hiring, in our engineering project, and business development organizations, while also boosting the supply of qualified, skilled welders and electricians. With worldwide power demand still rising, the supply of highly skilled labor, particularly in the U.S., remains tight. In particular, this hurt efficiencies and drove up direct costs on one specific construction project for B&W in the second quarter. We acted right away, cooperating with the unions to quickly expand qualified labor availability via incentives, rehires, and delayed retirements so that qualified, skilled labor will be on hand moving forward. Even with these problems across the U.S. industry, we managed to work through the labor effects while still posting robust top-line results and strong EBITDA growth too. We do not anticipate labor shortages lingering as ongoing problems, since our near-term emphasis within our construction business has moved toward variable price construction projects, and we are also stepping up recruiting and training efforts across numerous disciplines. Our BrightLoop initiatives keep progressing as we push commercialization of our technologies to make cost-effective energy production possible. The commercial-scale demonstration of BrightLoop at our Massillon, Ohio, project site stays a strategic priority; we are continuing to fabricate major components for the facility while getting the site ready so major construction activities can start before this year is out. We have put a few photos of the different BrightLoop reactors during fabrication into our company overview presentation on our website. Once Massillon begins operating toward the end of 2027, BrightLoop will be positioned as a commercially available choice for producing energy, given that demand keeps rising for new generation assets; our view is that these efforts will reinforce B&W's leadership position in low-carbon energy solutions while supporting growth over the long term. At this point I'll hand the call to Cameron so he can walk through the financial specifics for the second quarter of 2026. Cameron?

Cameron Frymyer executive
#3

Thanks, Kenny. I'm happy to walk through our financial results for the second quarter of 2026, and you can find more detail in the Form 10-Q we filed with the SEC this afternoon. Consolidated revenues for the second quarter of 2026 came in at $319.7 million, up 130% versus the second quarter of 2025. Net income for the second quarter reached $14.3 million, which is $72.8 million higher than the second quarter of 2025. And adjusted EBITDA for the second quarter was $21.8 million, an improvement of $7.9 million over the second quarter of 2025. These top-line figures really show the growth we've recently delivered across our businesses and demonstrate the positive trajectory B&W is on going forward. Turning to the first half of 2026, revenues hit $534.1 million, a substantial rise from the $287.5 million we recorded in the first half of 2025; the main driver here is higher large project volume, including $131.7 million from Base Electron, along with rising demand for electricity generated from fossil fuels, fueled by AI, data centers, and growing economies. Our core parts and services kept performing strongly through the first half of the year. Net loss for the first half of 2026 was $62.7 million, versus a net loss of $80.5 million in the first half of 2025. That net loss in the first half of 2026 stems from $77.4 million in non-cash warrants and other stock-related costs recorded this year because of the rise in our stock performance. If you set aside the effect of those particular warrants and other stock-related costs, B&W posted adjusted net income of $14.7 million in the first half of 2026. Adjusted EBITDA for the first half of 2026 was $37.8 million, compared with $17.9 million in the first half of 2025. Now I'll move on to the balance sheet, cash flow, and liquidity. Total debt as of June 30, 2026, stood at $276.8 million, including unamortized fees and unamortized gains tied to our bond swap in 2025. The company's cash equivalents and restricted cash balance was $382.8 million. During the second quarter of 2026, we announced the repurchase of the remaining $61.8 million of outstanding December 2026 bonds. Also, in July of 2026, B&W's board of directors approved a share repurchase program of up to $50 million. Together, our bond payments and the start of the share repurchase program show B&W's disciplined approach to paying down debt, while also reflecting confidence in our balance sheet and our strategic approach to building shareholder value. With that, I'll hand the call back to Kenny.

Kenny Young executive
#4

Thank you, Cameron. So to wrap things up, what we've witnessed through the opening six months of 2026 gives us confidence, and when you pair that with the clear line of sight we have to robust demand continuing in the back half, it contributed to pushing up our revised target range for full year 2026 adjusted EBITDA. Within our primary operations, we keep finding lasting chances to grow, powered by rising appetite for dependable baseload electricity along with an ongoing emphasis on energy security. It's our view that B&W holds a distinctive position to benefit from these developments. Work on the Base Electron project keeps advancing, we're seeing more data center possibilities come up, and our pipeline has now grown to more than $14 billion worth of project opportunities. The pace at which our bookings and backlog turn into results remains solid. The momentum we're witnessing throughout our main markets is heartening, as are the chances to both serve the expanding requirement for dependable baseload generation and take a meaningful part in furthering energy security while assisting the worldwide energy transition. To finish, I want to acknowledge our skilled and committed team members everywhere, whose dedication and know-how keep propelling B&W's achievements. We appreciate everything they keep contributing, along with the backing they keep giving to our customers, suppliers, and partners across the globe; the possibilities in front of us make us hopeful, and we're eager to keep showing how B&W leads and innovates in providing sophisticated power generation and environmental solutions that underpin dependable power, reinforce energy security, and help determine what the global energy landscape looks like going forward. So with that, I'll hand things back to Crystalyn, and we've got room for only one or two questions. Crystalyn, over to you.

Rob Brown analyst
#5

Hey there, Kenny. Hey, Cameron. Nice work on everything you've gotten done.

Kenny Young executive
#6

Hi, Rob.

Cameron Frymyer executive
#7

Thanks.

Rob Brown analyst
#8

Let's begin with the Base Electron project. You recognized a sizable amount of revenue this quarter. Could you describe where that project stands, how it's flowing through the income statement, and how it will roll forward over the next several quarters?

Kenny Young executive
#9

Sure. We ended up recognizing a bit more revenue in the first period than we'd anticipated. On the production and manufacturing fronts, several milestones have clearly been reached, which is encouraging for us, because right now we're running ahead of plan on that project and staying within budget. Looking at it that way, the biggest chunk of revenue should come once we get into the construction phase and begin delivering materials to the site, and that phase comes with some pretty major milestones attached. Naturally, that gets underway at the start of next year at that specific location. Like I said, Base has already submitted its first permit application for the site, they're sorting through all the specifics, and we're giving them a lot of support on that front. We can't wait to reach the construction phase, which, again, kicks off next year. We're going to monitor how things look on the top line, and should we determine that additional revenue could be brought in for EBIT, then clearly we'll review that over the next few quarters and tweak things as needed from that angle. Among other factors, that's a reason we chose to raise the EBITDA range too. How the milestones end up unfolding remains to be seen, but my expectation is that a good deal more revenue will arrive as we move into the start of next year.

Rob Brown analyst
#10

All right, that's helpful. Regarding the pipeline, I believe you mentioned somewhere between 4 and 6 gigawatts of possible projects. Can you say more about how you expect those to move forward, and perhaps how they stack up against the Base Electron project when it comes to how many projects you're pursuing?

Kenny Young executive
#11

Yes. Absolutely, glad to do that. We're currently engaged in a number of them through discussions and, clearly, negotiations on a few. My sense is these will develop, as we've said publicly before, these will develop with some kind of initial LNTP of varying sizes at the front end. Following that, we will move into complete NTP — that is, the full notice to proceed — for those initiatives. We are plainly confident and enthusiastic regarding a couple that are advancing, the ones for which we already obtained reservation rights covering the Siemens turbines connected to them. Here, instead of the larger boilers, 50-megawatt boilers plus steam turbines are being employed in an enhanced combined cycle setup, which lets us put in the boiler and turbine before the combustion turbine, and enables adding a combustion turbine afterward. Even so, the customer is able to get the entire output from those 50-megawatt units, delivering at first one gigawatt of power — 50 times 20. Once that combustion turbine is up and running, it will essentially let us produce twice as much power on that very same piece of property — going from one gigawatt up to two gigawatts. That gives a couple of our customers a genuinely attractive benefit, and talks with them are still ongoing. Beyond that — and I believe this part is unusual — we're also talking about possible additional big project chances. A number of those opportunities involve coal, and I understand that's going to be hard for a lot of folks to accept. Even setting aside the TerraSpark project we've already announced — where we're handling the FEED study tied to it — we're currently talking with people about additional coal projects that could happen. These would clearly have backing from the administration now in office, and the idea is that the power would either feed into a grid connection for a data center or run straight to a data center located at a specific site. We're also engaged in a number of bigger initiatives beyond the coal-related ones. I'm bringing those up because we see them as distinctive, and because B&W is in a rare spot—very few firms currently provide backing for efforts like these.

Rob Brown analyst
#12

All right, excellent. For the final question, it's about how customers are reacting to — I believe your product gets to market faster, and your system's overall cost structure is comparable to what others offer. How much does the marketplace need speed to market, and how is that landing with your customer base?

Kenny Young executive
#13

Customers, of course, are constantly pushing for more speed; that pressure is something we recognize, and we're trying to address it. That's partly why we're accelerating our work on these Siemens turbines so they'll be set within a 12 to 14-month window for the first shipments, aligning with the boiler opportunity that exists broadly. On the capital side, our attention has consistently been on the total levelized cost — or the levelized cost of electricity — meaning we consider total cost of ownership. The levelized cost of electricity, within that category, or if you prefer to examine heat rate, once you take advantage of the enhanced combined cycle plant design we're implementing — pairing the boiler and turbine and later adding a combustion turbine — all three together deliver a heat rate that isn't significantly inferior, so to speak, to that of a combined cycle plant. Thus, regarding overall efficiency for those, we're quite aligned or quite near. At those sites, we deliver power three to five years sooner than a combustion turbine by itself. Another crucial element, which we don't discuss often enough, is that a plain combustion turbine paired with a HRSG and a steam turbine in a combined cycle setup has somewhat lower reliability. First, it's widely understood that combustion turbines aren't as dependable as steam. Second, should the combustion turbine stop working, all of that electricity vanishes. In our situation, we take a regular steam boiler and turn it into a mix of a HRSG and boiler, capable of taking waste heat from a combustion turbine down the road, so we can produce power from the combustion turbine and from the boiler/steam turbine as well. Therefore, if either one fails, the other unit remains in operation. Together, they'd generate, say for this example, 100 megawatts. A 50-megawatt combustion turbine plus a 50-megawatt steam and boiler/HRSG would yield 100 megawatts. If one stops, you still have 50 running; in a typical combined cycle scenario, when that combustion turbine shuts down for maintenance, the whole amount of electricity generated is lost. You get far greater reliability. From a speed perspective, from a power perspective, you get to market three to five years sooner. Like I mentioned, when you look at levelized cost of electricity, efficiency and heat rate come out fairly similar, so that gives us quite a few benefits. That said, the people we serve keep pushing us to move quicker and quicker, and we're always looking at methods, technologies, and possibilities to pull that off, and that work will carry on. We feel great about our current position, and clearly, pushing a handful of these projects over the finish line matters a lot to us, and we're still grinding away on them.

Rob Brown analyst
#14

OK, thanks. I'll hand it off now.

Aaron Spychalla analyst
#15

Hey there, Kenny and Cameron. Appreciate you both fielding our questions. To start things off on our end, regarding the supply chain, could you share how confident you feel about your capacity to support the expansion coming from this initial project as well as the ones that follow? You touched on labor a bit, and clearly there's the matter of placing orders for these turbines. Could you discuss whether any investments are required on that front, and just how confident you are in that growth?

Kenny Young executive
#16

Sure. As we've said before, we keep working through the different opportunities, and we have various manufacturing operations. Let me mention the boiler side briefly. We work with a range of producers and production methods — certain ones belong to us in-house, while others come from outside partners — and that setup lets us move various boiler sizes between different plants. As a result, we're able to handle a growing volume of project work. B&W has operated this way for a long while, and nothing changes on that front when it comes to these particular opportunities. We believe we've got the versatility and the bandwidth for these things, and we're going to keep collaborating with those producers to boost how much they turn out—and not just the quantity, but how quickly as well, since clearly getting this onto the site fast matters a great deal. As for Base Electron, like we said, we're further along than we'd expected, and every one of our long lead time, large components is coming off the line right on time, so that project with them is generally where it should be. Like we said, the largest piece involves securing not just the boiler but the steam turbine too — particularly for those first projects, since the combustion turbine gets tacked on afterward. Naturally, our ties with Siemens remain strong and ongoing. We chose to go forward and put money into the upcoming gigawatt of steam turbines, so that reservation is now locked in, with those turbine units set to ship within the coming 12 to 14 months. That relationship serves us well both on the supply chain side and when it comes to payment terms on the financial end. The relationship there is really constructive. We keep collaborating with them on how the turbine develops, plus other areas where we could boost efficiency—both in terms of what it produces and in how quickly it gets to market. Those are the two things we're concentrating on. That covers those two big areas. As for the other point you brought up—labor—we constantly monitor how available highly skilled workers are. Having a workforce is one thing. Second, the people doing this work need advanced capabilities, particularly when it comes to those welds subjected to high pressure and the specific spots involved. We are collaborating very closely with the different unions on this matter, and with our customers too, to ensure alignment and that we've got the people available whenever required. On Base specifically, with construction beginning next year, we've been engaging very closely with the unions so welders will be ready when those projects kick off, plus a ramp rate—so to speak—to boost the pipeline of qualified welders, guiding them through our safety and other training courses so they can hit the ground running on those projects; that will remain a priority, and we'll keep putting money into recruiting and training efforts together with the various unions. I'd also add that the unions have been incredibly collaborative and supportive on this as well. They recognize how important it is, and they understand the demand exists. It's a strong period for the industry, but whenever you see this enormous level of expansion in the market, particularly in the U.S., it creates pressure to make sure we're planning for those resources just as much as we are on the manufacturing side. So we're keeping on top of it, and I believe we've achieved a great deal during the last quarter and have set us in a good direction as we head into next year.

Aaron Spychalla analyst
#17

Understood. I appreciate the additional context. You mentioned a FEED study tied to an announcement about a coal plant during the quarter that just passed. Could you share a bit more about that pipeline — what the opportunity looks like and what the pipeline itself looks like? Do you have any views on the schedule and what comes next?

Kenny Young executive
#18

Sure. On the FEED study, we're collaborating closely. Naturally, the FEED covers the entire front-end engineering design side of things — the plant flows, the power flows, and all the other elements tied to that standard scope for this specific piece. The DOE is heavily involved in this project, and we're coordinating very closely with them as well. It's moving through its process, and TerraSpark is advancing its own approach to the process, evaluating various options for how to configure the boiler and other components to serve their long-term objectives on that piece. Being part of this has us excited. From the standpoint of our employees, I can say we have many who never imagined they'd witness the construction of a coal plant here in the U.S. A great number of our engineers who have worked around these subcritical or supercritical plants are thrilled to take part, and so are we. We're backing their efforts, and clearly TerraSpark holds the lead on this, but there are plenty of discussions with them and collaboration to get it finished. Anticipating how we'd project revenues related to this project, and the timing beyond the FEED study, is still premature, but we're actively involved and engaged, and we'll simply have to watch how things develop from here.

Aaron Spychalla analyst
#19

Okay, thanks for that. Perhaps one final question from me, and it's about ClimateBright. I believe you said 2027. Could you discuss what comes next and what that pipeline might look like when we consider growth and bringing that project online?

Kenny Young executive
#20

Sure. Starting with the Massillon project — I haven't had, I'm assuming our presentation is available now — but regarding Massillon, you'll find images showing fabrication of the fuel reactors for BrightLoop that are headed to that site. On the business side, we've received considerable interest from hyperscalers and other parties, including oil companies, when it comes to BrightLoop and that commercial demonstration at that specific project. We have, I believe, largely secured all the funding required to get it into the ground, so construction on-site will start later this fall. That will get underway, and our expectation remains that the fuel reactor and the hydrogen reactor in the initial phase will be operational at some point in the latter portion of 2027 at that location. BrightLoop, as we've discussed, is capable of producing hydrogen, but it can also produce just steam. We're seeing substantial interest right now in the idea of that commercial demonstration, proving that the fuel reactor at that scale-up matters for advancing it to a larger scale. Looking at both the West Virginia project and the Wyoming project, there's a great deal of interest at present, given today's environment, in generating steam from coal while the CO2 is isolated and then used for enhanced methane recovery or enhanced oil recovery at those two sites. So getting this commercially into the ground represents important progress when it comes to those two projects, and we are, of course, in close conversations with both of those customers regarding the Massillon project itself. As for the concept behind it, in our view it still carries strong growth potential, and if we had — honestly, let me just say this — if we had Massillon in the ground 2, 3 years ago, 4 years ago, which wasn't practical, but if that commercial project were finished and we were moving on to bigger projects, I think many hyperscalers today would be discussing the use of BrightLoop for power generation because of what it can do with CO2, whether that means captured CO2 that's sequestered or CO2 used for other enhanced purposes. Over the long term, though, hyperscalers still want a pathway and a box checked showing that at some future point there could be some form of carbon capture tied to these data centers and AI infrastructure; we're clearly still well positioned. We don't foresee an end to the power generation demands coming from AI and data centers, regardless of what the public markets have been saying. That demand keeps growing, not just here, but across the globe. My sense is that, with any luck, we're positioned as a business to take advantage of that once this is up and running by the end of 2027; then we'll be eyeing bookings across 2028, 2029, and 2030, as we've talked about before, for BrightLoop, plus additional ClimateBright uses, like our oxy combustion and post-combustion technologies too.

Aaron Spychalla analyst
#21

Alright, that does appear to be the case. I appreciate you fielding these. I'll hand things back over.

Kenny Young executive
#22

Thanks.

Sharyn Brooks executive
#23

We appreciate you being with us. That brings our conference call to a close. Later today, a replay can be accessed on our website, though only for a limited period.

Operator operator
#24

This concludes today's call. Thank you for attending. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Babcock & Wilcox Enterprises, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Babcock & Wilcox Enterprises, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.