Good day, everyone, and welcome to the Balaji Amines Limited Quarter 2 First Year 2027 Earnings Conference Call, brought to you by Elara Securities Private Limited. <<operator_script>> At this point, I'll turn the conference over to Mr. Akshat Vijay of Elara Securities Private Limited. Thank you, and the floor is yours, sir.
Good day, everyone, and ladies and gentlemen, welcome to Balaji Amines' 2Q FY '27 conference call, which Elara Securities Private Limited is hosting. At this point I hand the conference over to Mr. Ram Reddy of Balaji Amines. Thank you, and over to you, sir.
Thank you, Akshat. Good evening, everyone, and a warm welcome to Balaji Amines Limited Earnings Conference Call for the second quarter and half year ended September 30, 2026. I hope all of you have had an opportunity to go through our financial results, press release and investor presentation, which have been uploaded on the stock exchange and on our company website. Let me begin by putting the first half performance into perspective. H1 FY '27 has been a strong period for Balaji Amines from a profitability standpoint. While the overall operating environment and sales volumes remained somewhat challenging, we have delivered meaningful improvement in revenue, EBITDA and profitability. This reflects our continued focus on product mix, operating efficiencies, cost management and strengthening the contribution from our diversified business portfolio. More importantly, we have continued to advance our expansion program with the commencement of commercial production at our expanded Acetonitrile facility and the commissioning of our DME plant. These developments mark an important transition in our growth journey as our focus increasingly shifts towards commercialization and utilization of the capacities created. The financial performance. Coming to our consolidated financial performance for Q2 FY '27, revenue stood at INR 472 crores compared to INR 348 crores in Q2 FY '26, registering year-on-year growth of approximately 36%.
For the quarter, consolidated EBITDA came in at INR 106 crores, versus INR 67 crore during the same quarter a year earlier — a rise of roughly 58%. The EBITDA margin was 22%, against 19% in Q2 FY '26. Profit after tax for the quarter was INR 67 crore, compared with INR 37 crore in Q2 FY '26, which works out to about 82% growth. Diluted EPS for the quarter was INR 20.76 per equity share, versus INR 10.67 in the same period last year. Sequentially, revenue climbed to INR 472 crore from INR 461 crore in Q1 FY '27. Sales volumes likewise rose, reaching 24,491 metric tons against 21,587 metric tons in the prior quarter, which points to better overall offtake. EBITDA, though, eased to INR 106 crores from INR 121 crores in Q1 FY '27, with margins slipping from 26% to 22%. Although profitability softened on a sequential basis, the year-on-year picture still shows a substantial gain in our earnings profile. Turning to how the first half of FY '26 and FY '27 performed: consolidated revenue for H1 FY '27 was INR 933 crore, versus INR 715 crore in H1 FY '26, a growth of approximately 31%.
Consolidated EBITDA rose to INR 227 crore, up from INR 131 crore — a gain of roughly 74%. EBITDA margins came in at 24%, better than the 18% recorded in the same period a year earlier. For H1 FY '27, consolidated PAT was INR 146 crore, versus INR 74 crore in H1 FY '26, which works out to about 98% growth. What stands out as especially heartening is that profitability strengthened even though overall sales volumes were lower. That shows we can keep earnings resilient by managing the product portfolio, running operations efficiently, and staying focused on adding value. At the stand-alone level, Q2 FY '27 revenue was INR 434 crores, EBITDA was INR 103 crores and PAT was INR 69 crores. Balaji Amines Limited held its stand-alone debt position at 0. Turning to how operations performed: consolidated sales volumes in Q2 FY '27 were 24,491 metric tons, against 26,165 metric tons in Q2 FY '26 — a moderation of about 6%. Sequentially, though, volumes rose roughly 13.5% over Q1 FY '27. That gain is encouraging and points to stronger uptake in the quarter. By segment, Q2 volumes were made up of 6,525 metric tons from Amines, 8,974 metric tons from Amines Derivatives and 8,992 metric tons from Specialty Chemicals.
So for H1 FY '27, consolidated sales volume came in at 46,078 metric tons, versus 53,735 metric tons during the same period a year earlier. Having a diversified footprint across Amines, derivatives and specialty chemicals keeps giving the business stability. We serve a number of end user industries — pharmaceuticals, agrochemicals, paints, resins, solvents, rubber chemicals and other industrial applications. Looking ahead, lifting volumes while holding on to the improved profitability profile is going to stay a key priority. Now let me walk you through a few important developments at our manufacturing facilities. In the quarter, we hit a significant milestone as commercial production began at our process improved Acetonitrile plant. Thanks to this improved process, the expanded capacity now stands at 1,440 tons per month. The upgraded facility brings in better technology and greater process efficiencies. This expansion bolsters our ability to meet customer requirements and strengthens our position in the Acetonitrile market. Our focus from here will be on stabilizing operations, building up the customer base and steadily raising utilization of this expanded capacity. It gives me great pleasure to share the news that Dimethyl Ether Road Tanker valves have been approved by the PESO Nagpur office following a thorough testing process. We are actively working on developing the customer ecosystem and exploring opportunities in both domestic and international markets.
For DME, the Aerosol segment is a significant opportunity, and our efforts are aimed at building a sustainable network of customers and distribution. We think DME could become a meaningful addition to our product portfolio as the market grows and commercial volumes in the Aerosol space scale up gradually, since this directly serves the health care and personal care sectors. N-Methyl Morpholine, or NMM, is our next product in the pipeline, and it will further strengthen our specialty chemicals portfolio. The project is moving forward, and we remain focused on commercializing it during FY '27. Alongside expanding capacity, we keep investing in process improvements and indigenous manufacturing capabilities. Our work on improving the manufacturing process for Diisopropylamine has also produced positive results, reinforcing our emphasis on process optimization and operational efficiencies. Turning to Balaji Specialty Chemicals Limited, the company continues to advance its expansion program, which is being implemented in phases. The goal is to broaden our specialty chemicals portfolio and increase our participation in products that offer import substitution opportunities and higher value addition. In Unit-1, the brownfield expansion project involving EDA-based derivatives, including DETA, TETA, Piperazine, AEEA, and AEP, is progressing and is expected to be commissioned towards the end of FY '27.
Over at Unit-2 — that's the greenfield expansion at MIDC, Chincholi, where we'll produce hydrogen cyanide, sodium cyanide, EDTA and EDTA-2Na — equipment erection and installation work is moving forward. We're aiming to commission that project in Q4 FY '27. These projects matter strategically: they'll bolster our product portfolio, deepen integration, and widen our footprint in specialty chemicals serving a range of industrial applications. Our view is that these investments will give Balaji Specialty Chemicals a stronger platform and open up further growth opportunities in the years ahead. Turning to the balance sheet, our financial position remains comfortable. Consolidated net worth as of September 30, 2026 was INR 2,023.02 crores, against INR 1,976.46 crores on March 31, 2026. Consolidated debt came in at INR 161.15 crores, and cash and cash equivalents were INR 52.62 crores. In H1 FY '27, operating activities generated cash flow of INR 54.46 crores. Spending on ongoing expansion projects and capital expenditure produced a cash outflow of INR 99.38 crores. Balaji Amines, on a stand-alone basis, still carries 0 debt. Our approach to capital allocation stays centered on funding strategic growth initiatives, keeping financial discipline, and making sure we have adequate financial flexibility.
As we enter the second half of FY '27, we feel Balaji Amines is positioned well to go after its next growth phase. The first half showed that we can deliver sustained earnings growth even though aggregate volumes moderated. Our focus now is to build on that performance by improving capacity utilization, commercializing new products, and growing our customer base for the new expanded facilities along with the new DME and ACN lines in our expansion program. We see 3 important growth drivers converging. First, our core amines and derivative business will keep providing the operating foundation. Our focus will be on improving values, strengthening customer relationships, and enhancing manufacturing efficiencies. Second, commissioning our expanded Acetonitrile facility and the DME plant gives us further opportunities to grow our presence in value-added and import substitution products. Our immediate priority is to establish the customer base, stabilize operations, and progressively scale up commercial volumes. Third, the expansion program at Balaji Specialty Chemicals will substantially broaden our specialty chemicals portfolio. As these projects are commissioned, they will give us access to additional products and end user industries, strengthening our long-term growth platform. Importantly, our strategy is not limited to increasing manufacturing capacities.
Our focus is on shifting toward products with greater value, reinforcing backward integration, creating our own manufacturing processes, and enhancing the overall quality of what we earn. We stay attentive to outside factors, such as raw material costs, demand conditions around the world, and geopolitical events. Even so, the advances achieved across our projects, along with the strength of our current businesses, give us confidence as we head into H2 FY '27. Our priority will continue to be disciplined execution, better capacity utilization, and making sure the investments we have made turn into sustainable business growth and shareholder value. Given our established position in the amines industry, a diversified product portfolio, integrated manufacturing capabilities, and a visible expansion pipeline, we remain confident about the long-term prospects of Balaji Amines. Thank you all. I now hand the floor over for the question-and-answer session.
<<operator_script>> For our first question, we have Akshay Satija from Alpha Invesco.
My understanding is that China used to dump DMF into India, and because of that, running our plants wasn't viable when compared with their cost. So now that DMF prices have shot up, I'd like to understand what the status of this plant running is.
It's operating at better capacity levels. Previously, we were at roughly 30%, 40%. Now I believe capacity utilization is running at over 50%. Yes, you're correct. Pricing has improved. Current prices for the DMF are above INR 110, INR 115 on the basic.
All right, so that would also suggest that with Unit-3 for methylamine, which you ran for only about a month within a quarter, utilization there could get better as well.
No — Unit-3 was running at nearly 80% capacity. I think you're referring to Unit-4's capacity, right?
Yes, sir. Yes.
Yes. Utilization at Unit 4 has gotten better. And our view is that it plays out this way: Unit 4 will definitely operate at full capacity at a minimum of 70% to 80%.
How is Unit-4's utilization looking at present?
Its utilization sits at 15%, 20%.
Right. And sir, regarding DMC, we actually signed a contract with a battery electrolyte manufacturer, and we said volumes should begin in Q3, and in Q4 as well, if the client takes up additional volumes, we could expand our capacity in FY '28. So could you shed some light on how that is progressing for DMC?
Right. This quarter, they're requesting amounts in the 100s. Previously, the discussion would be about 20 tonnes, 40 tonnes, 60 tonnes. And in this quarter, what they're asking for is almost 500 to 1,000 tonnes of both carbonates, meaning dimethyl carbonate and propylene carbonate. Likely starting next month, we should be able to deliver those 500 to 1,000 tonnes.
And do you have anything to say about the additional capacity that will be brought on next year for that same client?
Not at this point. This year there's discussion about it. A lot of folks are talking. Plenty of people are approaching us wanting investment and asking that we also take on the other carbonates, though we're somewhat optimistic on that front. We simply want to see those parties actually come onto the stream — only after that would we look to build out our facilities for additional capacities. With the capacity we already have, we were trailing at 30%, 20% versus the 80%, 90% projected.
Understood, sir. The last question concerns the antidumping duties that were recently imposed on EDA. So we still aren't seeing any meaningful rise in pickup volumes for EDA. Could you shed some light on that?
Let me give you the picture. On EDA, pricing has actually gotten better. We're running at close to 50% to 60% of capacity. As for the antidumping duty, it never went into effect, since the Commerce Ministry recommended it but the Finance Ministry didn't implement it. At this point we've gotten a writ petition ready to push for enforcement against the Finance Department. When one government department makes a recommendation and another government department blocks it, that's not a good situation. So, like other companies have done, we're going to the court — we're also approaching the High Court. We'll likely file this writ petition within the coming 1 month.
All right. Even so, I think that could keep pulling the whole case along.
Yes, that will be included. We’re coordinating with the government, correct? On one hand, the government talks about Make in India and Atmanirbhar Bharat, but on the other hand, they aren’t backing it—specifically, the Finance Department isn’t backing it. I’m not sure what went wrong there, because this is a clear case: the government, the Ministry of Commerce, has clearly stated that dumping is taking place in the country. But for now, for a brief period, there’s an opportunity from price improvements. So there’s a chance that starting in the next 1 or 2 quarters, we could run at full capacity. And because of the brownfield expansions, we’re on and off—we’re carrying out these modifications. We run for 20 days and do the modifications for 10 days. That’s how we’re handling it, because we don’t want to lose the market. We want to stay present in the market, and we want to do the modifications as well. So both things are happening. By the end of this financial year, we will see the new products. We’ll be finishing the brownfield modifications. And the old plant will also be running according to market conditions—both plants will be running.
Let's take the next question. It's from Aditya at HDFC Securities.
Can everyone hear me?
Yes, that’s perfectly fine.
All right. Sir, given where LPG prices sit right now, could you shed some light on which approvals are still outstanding before our DME can be supplied for blending into LPG?
This is just PESO — it covers part of the valves that were already approved this quarter, along with part of the Road Tankers, which are at an advanced stage. Following that, the only thing left was approval for the valves. That valve approval has now been completed. We're expecting the Road Tankers approval to come through in the next 3, 4 weeks. Once it arrives, bulk supplies can begin in the country. And the second point I'd like to mention here is that we've begun exporting this in bulk tanks, in bulk ISO tanks. On the international side there's no issue, since the international market already uses it and holds all the approvals. So roughly 7 to 8 tanks have been exported. And on a repeated basis, we're receiving orders for exports in the ISO tank for the Aerosol application.
So at this point we're supplying commercially for aerosol-based applications. Do I have that right?
Correct, that's accurate.
So when could commercial supply for LPG blending actually begin? And have we gotten approval from our customers — is that approval...
Right now, we're actually working with BPCL, Bharat Petroleum Corporation, and they in turn apply to their government department to secure the approval. As soon as they receive that approval, then we will be — the two plants sit in the same industrial area, within a kilometer or 1.5 kilometer area. So we will be — the moment the approval comes from the Government of India for BPCL for the blending, then we'll be supplying bulk supplies for LPG blending. Apart from that, we're working with a few local commercial users who've already started using it, like in hotels for cooking purposes, and in heating areas in industrial, that too we've given the sample. Even for aerosol, we've given the sample in cylinders, since we hold the approvals in cylinders. Some of the major aerosol manufacturers have taken it in cylinders. They're running their trials. So once the trial is done, probably we'll give it in cylinders, maybe 10, 10 cylinders to each customer, which is 540 kg of each cylinder.
Okay, sir. When we last spoke about DME, we had given guidance of INR 100 per kg for pricing. So does that price still hold, or ought we to use another price for H2 FY 2027?
Right now, methanol prices are elevated due to the current geopolitical situation. So the reason it sits somewhere between INR 90 and INR 100 is today's price. We expect it should come down the moment methanol drops below the INR 80 level, which will be far more competitive when compared with LPG.
And, sir, regarding Acetonitrile, how have prices moved over the past few months, and what pricing level should we assume for H2 FY '27?
Look, everything here hinges on what raw material prices do. As I mentioned, you know that given the war and the geopolitical situation, prices for the key raw materials are highly volatile rather than stable. So the whole price of Acetonitrile is driven by those raw material costs. Right now it's running at roughly the INR 230 to INR 240 level. And since our technology and capacities are new, we're focused on ramping up toward full capacity. Perhaps within the next 2 or 3 weeks, it will be running at full swing with the full capacity of 1,440 metric tons per month of Acetonitrile.
Is it fair to assume INR 240 per kg across the whole capacity?
My apologies — we'll move on to the next question now. If you have further questions, please join the queue.
Alright.
Our following question is from Kumar Saurabh, who is with Scientific Investing.
Great numbers—congratulations, sir. My question is about the aspiration: I believe you said on ET Now, and it's also in the latest annual report, that we're aiming at INR 3,000 crores to INR 4,000 crores of growth over the medium term. What I'd like to know is whether that aspiration rests on current prices, or whether it already accounts for them—because results have been excellent, yet volumes still haven't picked up. Most of the contribution, then, is coming from value. So if you could elaborate a bit more on our aspiration.
I want to clarify the volumes, since raw materials are in such a volatile situation, and our approach is very cautious. For instance, if I purchase something at a particular price, I have no idea what that same raw material will cost tomorrow — whether it will drop sharply or rise. That is why we are working off order bookings. So for that reason, you will notice volumes running somewhat below what we had anticipated. And regarding 2028, '29, what I mentioned in my earlier interview: look, we have these expansions — Acetonitrile must be in full swing, DME must be in full swing. DMF also goes, and N-Methyl Morpholine comes in alongside, the greenfield and brownfield expansion of the subsidiary. All of the capacities, basically, will arrive by 2028, '29. As I said, by the end of this current financial year, every one of these plants will begin commercial production. So assuming all these calculations and some of the — as you rightly said, perhaps some calculations based on current prices, even if they fall in the years ahead, no new products are coming up. A little here and there, definitely between INR 3,500 crores and INR 4,000 crores, we ought to hit for the top line at '28, '29.
Thank you, sir. And sir, for my second and final question: you've spent many decades in this industry. Following 2020, we witnessed a massive surge in prices in the post-COVID period. Then, over the next 2 to 3 years, prices dropped considerably. Now we're seeing another surge. Is this a new pattern that emerged after 2020, or is this simply how the industry operates? And if we look at a reasonable long horizon — say a 5- or 6-year tenure — what sort of value realization growth should we anticipate from our blended portfolio?
If you're asking me, Kumar — if I were to say this holds up in the volatile conditions we have right now — look, prior to 2020, we had never witnessed these kinds of events: war, possibly sanctions, none of that was on our radar. Since 2020, though, we've begun to witness a number of separate episodes, such as the pandemic we went through, and we've witnessed the war between Ukraine and Russia. Now we've witnessed the Iran and USA war. So should things return to normal, I definitely feel prices ought to decline, with the marginal increases that are natural — the kind you'd see year-on-year — there should be a 7% to 8% increase. That's the earlier graphic I was referring to. So today, owing to these unexpected situations, this volatile situation, prices have been — some of them have doubled, even tripled. I've seen it with methanol: when I started my business, I bought methanol at INR 6. Today, we're discussing INR 61, INR 62. So if things return to normal, definitely it will come to somewhere — methanol ought to come to somewhere around INR 26, INR 27 is normal, INR 30 at the maximum should be the normal price.
Ammonia is the same story — it began at INR 25 to INR 30 and has climbed to roughly INR 85 to INR 90 as the rule today. Under ordinary circumstances, that price ought to sit somewhere around INR 45 to INR 50, which is what places outside the country, China and other nations, are seeing — only INR 45 to INR 50. Yet here we are paying INR 80 to INR 90 today, and that's because of the current situation. And the situation is one side. On the other side, the mediators are cashing in on the advantage. Prices — they simply take — even though they hold the stocks, they bought at certain lower prices. Simply today, if somebody says there's a bomb blast, right away, they will raise the prices without looking into their cost price, they will double the prices. That is the situation currently. And at times we are worried whether this type of attitude will return to normal for the mediators in the coming months — we do not know.
Let's go to the following question, which is from Rajiv Rupani, a private investor.
My question, sir, concerned the expansions at Unit 1 and Unit 2. When I came on 5th of June this year along with the other analysts, you told us that the Unit 1 expansion would be finished by the end of July. Then, on the August 21 PhillipCapital con call, you let us know it would be done by the end of October, and now the press release gives a year-end date. Sir, is the brownfield running late?
Let me explain. I believe you aren't quite getting the whole picture from what I said. The cause of the hold-up is that we want to stay in the market — that's exactly why we aren't shutting the entire plant. Look at the results: if I shut the plant, that Unit 1 for this brownfield expansion, you won't see any sales at all. Just so you know, with any chemical plant you simply cannot carry out manufacturing and expansions at the same time within the same facility. In fact, this is where the modifications are taking place. So we operate the plant for 10 to 15 days, and for 10 to 15 days we work on the expansion. Given all this, there is demand, there's an opportunity. You've seen a lower figure as well, and you've seen some profit. This quarter too, Balaji Specialty Chemicals has posted some profit in the quarter. So if I hadn't done all of this, then I would have finished by July, August — we would have completed it. But what's the point if you aren't seizing the advantage the market offers? We have to watch the market, and based on what it's asking, we'll have to act accordingly. So this time, what I'm doing is that only small equipment erections remain, and those will be completed in 1 or 2 cycles.
We've stopped the first cycle at this point. Now, once more, we're restarting production at the plant on the 15th of this month. Between the 15th and the 10th, the plant will be running. Then, from the 10th of December until perhaps the end of the month, we'll be carrying out all of the modifications and completing them. Starting in January, should all go well, the product ought to reach the market from the brownfield beginning in January.
Also on BSE Unit 2, you mentioned that a handful of products would come out by the end of December. So is there any news on that front?
Yeah, that’s exactly what we’re saying, to be on the safer side, because with logistics — as you know, some of the equipment, given those obstructions in logistics, we do expect a bit of delay. If everything arrives normally, though, you’ll see that product from January as well, and you’ll see the first and second plant in the commercial phase. Should 1 or 2 pieces of equipment in the pipeline be delayed, then that could push to February, or the 1st week of March.
Sir, my next question was about DME and ACN. So you've given us an update on DME — that in 3, 4 weeks, PESO, whatever approvals are pending from PESO, will come through. So what kind of capacity utilization do you see next year for DME and ACN?
Look, with DME, if that BPCL LPG blending approval does come through, then it ought to operate at above 90% capacity.
Is that for next year?
Yes. If that doesn't materialize, then we should still hit at least 50% to 55%, because of the aerosol business we have abroad — as I mentioned in my earlier response, we've already supplied 7 to 8 ISO tanks that were exported for the aerosol market outside the country. And we're currently in discussions with multiple customers abroad. Should that come through, and even within India, the aerosol application alone accounts for consumption of more than 50,000 tonnes. Even if we capture 70% to 80%, taking exports and domestic together, we ought to run at a minimum of 50% to 60% capacity next year.
ACN, sir? For the coming year?
Right, ACN — this quarter, so another month, this month, and then roughly the next 2 to 3 weeks, that may be needed before we're into the full stream. Starting in December, I see it — assuming the market accepts it, not from a quality or quantity standpoint. So we should be able to turn out at least 1,000 to 1,200 tonnes per month, at a minimum.
Our following question is from Diya Jain at Sapphire Capital.
The DME plant was commissioned in the last quarter, so how much revenue would be recognized in Q2?
I was just addressing your previous questions — the same one. You see, the PESO is the reason things aren't running at full swing. As I mentioned, exports only — over 7 — 6 to 7 ISO tanks have gone out. On the domestic side, roughly 20, 25 cylinders were sold to domestic customers for the aerosol market, plus a few commercial applications as well.
Thanks for the question, Diya. We're closing the Q&A session at this point. And since there are — I'll now pass the conference to Mr. Akshat Vijay for his closing remarks. Akshat, over to you.
Yes. So, since participants have no more questions, I'll now give the conference over to Mr. Ram Reddy for closing comments.
Thank you. Thanks, Akshat. And I want to thank every shareholder, investor, and stakeholder who has placed their trust in our company. We will certainly not disappoint you. As I mentioned, every expansion is now at the finishing stage. In any event, before this financial year ends, all of the expansions — and the capital investment as well — will be wrapped up by the close of this financial year. So starting in the first quarter of the next financial year, you will see only, only, only utilization — capacity utilization, where a plant can reach as much as 80%, 90%. We expect every plant to run at a maximum of 80%, 90% capacity utilization, whether for one product or another. So thank you all. Thanks once more for joining us on this conference call.
Appreciate it. That brings our conference to a close on behalf of Elara Securities Private Limited. Thanks for being with us, and you're welcome to disconnect your lines at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Balaji Amines Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Balaji Amines Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.