Home / Transcripts / Black Hills Corporation (BKH) · February 5, 2026

Black Hills Corporation (BKH) Earnings Call Transcript

February 5, 2026

New York Stock Exchange US Utilities Multi-Utilities earnings 41 min

Earnings Call Speaker Segments

Sal Diaz executive
#1

Thanks, operator. Good morning, everyone, and thanks for joining us for Black Hills Corporation's call covering results for the fourth quarter and the full year 2025. Our earnings release and the materials for this morning's call can be accessed on our website, blackhillscorp.com. Linn Evans, our President and Chief Executive Officer, Kimberly Nooney, our Senior Vice President and Chief Financial Officer, and Marne Jones, our Senior Vice President and Chief Utility Officer, are the ones guiding today's earnings call. As part of today's earnings discussion, remarks we deliver might include forward-looking statements, as the Securities and Exchange Commission defines them, and such remarks carry a number of inherent uncertainties. While we think our expectations rest on reasonable assumptions, actual results could differ materially. For a list of some factors that might cause future results to differ materially from what we expect, please see our earnings release, slide 2 of the investor presentation on our website, and our most recent Form 10-K and Form 10-Q filed with the Securities and Exchange Commission. Having said that, I'll hand the call over to Linn Evans. Linn?

Linn Evans executive
#2

Thank you, Sal. Good morning, everyone, and I appreciate you all being here today. On slide 3, I want to open with a recap of what we accomplished during 2025 along with our strategy looking forward, and I'll also give you an update regarding the merger we announced with NorthWestern Energy. Kimberly is going to walk you through the financial picture, and Marne will cover how we performed operationally plus where things stand on a handful of important initiatives. Let me first offer my genuine gratitude to the whole Black Hills team. The things our team got done in 2025 make me extraordinarily proud. The commitments we laid out at the start of the year were all met, which positions us well for continued success going forward. Once again we delivered on the financial side, hitting the midpoint of the guidance we gave for earnings as well as our long-term growth objective. Our financing approach was carried out successfully, and our strong investment-grade credit ratings stayed intact. Solid earnings came from steady implementation of our long-term strategy, and that generated new base rates, recovery through riders, and made customer growth possible. In particular, we saw demand rising among our large load customers, including data centers, and healthy economic development across the areas we serve; on top of that, we raised our dividend in 2025 for a 55th straight year and have since pushed that industry-leading streak to 56 years. Considerable regulatory headway was made by our team, with 3 rate reviews finished and approvals moved forward on multiple strategic projects. We also moved ahead on plans to meet data center demand, and during the year our data center pipeline grew threefold to over 3 GW; in a span of just 3 years, our team designed, permitted, built, and energized the 260-mile Ready Wyoming transmission project, bringing it in on schedule. That project, which is truly transformative, exemplifies how we invest with innovation and customers in mind. By linking our electric systems in South Dakota and Wyoming in a strategic way, the value we deliver will serve customers dependably and affordably for generations ahead. Additionally, we have the Lange II, 99-MW generation project under construction in Rapid City. Aging resources will be replaced by this project using state-of-the-art generation technology, which strengthens our capability to deliver resilient, reliable service to our customers and communities. Excellent operational performance has long been our foundation, and it underpins everything we do. We routinely post safety results better than the industry average, reliability in the top quartile, and a positive customer experience. To keep our customers and communities safe, we put in place an emergency public safety power shutoff program; it gives us one more tool in our toolbox for reducing wildfire risk. Beyond what we achieved as a standalone company, in August we announced the strategic merger with NorthWestern Energy. Slide 4 lays out how firmly we are committed to these critical areas in 2026 as we push our customer-centric strategy forward and take advantage of new opportunities that arise. Our dedication to consistency remains unwavering as we build on what was accomplished last year and welcome the exciting possibilities that lie ahead. We are already working hard to meet our financial commitments, among them delivering earnings growth in the upper half of our long-term growth target, which our 2026 earnings guidance reflects, anticipating 6% year-over-year growth. We expect to produce outstanding outcomes for our investors by carrying out our capital strategy centered on customers, advancing through several rate cases on the regulatory front, satisfying rising customer demand, keeping up our positive trajectory via our upside data center pipeline, and closing our combination with NorthWestern Energy. Slide 5 lays out our data center pipeline exceeding 3 GW. That pipeline contains solely top-tier data center firms bound by nondisclosure agreements, with whom we are in active talks to provide service... Meta is bringing its new data center up to speed, and Microsoft keeps needing more. Together, their load comes to roughly 600 MW that we would serve by 2030 under our minimal capital investment model. From a financial standpoint, starting in 2028, we anticipate this data center demand adding over 10% to our rising consolidated EPS; we are likewise advancing talks with our other top-tier partners about potentially serving what remains of our data center pipeline. To meet demand at this scale, we depend on a blend of energy resources, among them purchasing market energy, contracted generation, and investments we would undertake in generation and transmission. Every one of those energy resources carries its own particular risks and factors, and each will add to earnings in its own way, determined by the negotiated contracts with each customer. Our distinctive tariff gives us flexibility in how we serve data centers, delivers speed to market, and is having a favorable effect on affordability for our Wyoming customer base. Marne will go into further detail during her business update. Slide 6 lays out our $4.7 billion capital plan. We put money into our natural gas and electric customers' core needs for safety, reliability, and growth. As I described earlier regarding our data center pipeline, our present capital plan contains only minimal investments meant to support 600 MW of data center demand, which we expect to serve via market energy procurement and contracted generation. We are cultivating investment opportunities that are not yet part of our plan. As I noted before, that would encompass generation and transmission builds as one element of a resource mix to serve additional data center demand. Turning to slides 7 and 8 for an update on our combination with NorthWestern Energy. We remain strongly dedicated to the merger, since bringing these two companies together makes excellent sense for our stakeholders. The merger will yield a stronger, more competitive utility company, delivering long-term value for stakeholders through greater scale and better customer diversity inside our current eight-state footprint, an enhanced financial profile with a bigger balance sheet that widens opportunities for strategic investments, giving employees more chances to grow, boosting employee attraction and retention, and through the industrial logic of efficiencies tied to procurement and the adoption of best practices, to name a couple of examples. Crucially, the merger will strengthen our ability and capacity to grow, particularly when set against our standalone business. In brief, we remain dedicated to this strategic merger, one we have chased for over two decades. At this point, perhaps more than at any previous time, bringing these two businesses together is going to let us open up further chances to create value for the people we serve and for those who hold our stock, and that's something we're enthusiastic about. As of now, every joint submission has been made to the regulators in Montana, Nebraska, and South Dakota, asking them to sign off on our combination, and in each of those states we are now taking part in the discovery stage. In addition, our Form S-4 went to the SEC last week, and special shareholder meetings are set for early April; we plan to obtain all the approvals required so the merger can be completed during the second half of this year. With that said, I'll hand things over to Kimberly, who will walk us through the financial update. Kimberly?

Kimberly Nooney executive
#3

Appreciating that introduction, Linn, and hello everyone on the call. The team performed exceptionally well in carrying out our strategy and delivering on the financial targets we set for 2025. As a group, we're pleased to share that we've completed another year reinforcing our standing as a trusted energy provider — we landed at the middle of our earnings guidance range and maintained our strong investment-grade credit rating, while also financing our $900 million capital investment plan efficiently throughout the year. And to echo what Linn said regarding the merger with NorthWestern Energy, we're working toward an even more robust future, supported by a larger balance sheet that will allow us to serve our customers' needs with confidence from a sound financial foundation. Turning to slide 10, you'll see a bridge laying out how 2025 stacks up against the year before. Our GAAP EPS came in at $3.98, and that figure carried $0.12 in transaction costs tied to the merger. Strip those out, and adjusted EPS landed at $4.10 for 2025 — a 5% gain over the $3.91 per share we recorded in 2024. Our regulatory plan paid off, delivering $0.95 per share from new rates and rider recovery margin, and we kept adding customers too, which was more than enough to absorb higher operating, financing, and depreciation expenses. Weather gave us a $0.09 lift compared with an unusually mild 2024. Still, when you stack it against normal conditions, weather turned into an $0.11 drag — something we nonetheless succeeded in overcoming during 2025. O&M expenses finished $0.36 per share above last year, and that includes $0.12 of merger-related transaction costs. Excluding merger-related charges, our operations and maintenance spending was up $0.24 per share compared with a year ago. That increase came primarily from three areas: employee and outside service costs that were $0.13 higher, insurance expenses that added $0.08 per share, and $0.05 attributable to generation outages we hadn't planned for. On the financing side, costs climbed $0.33 per share. Within that figure, interest expense was $0.25 higher, shared dilution contributed $0.19, and AFUDC associated with major construction projects provided a $0.12 per share benefit. Depreciation also came in higher by $0.15 per share, driven by newly placed assets entering service. Additional information about these year-over-year variances is available in our earnings release and in our 10-K, which we will file with the SEC on February eleventh. On slide 11, you can see we're in a strong financial spot when it comes to credit quality, our capital structure, and liquidity. We maintain a solid balance sheet by hitting credit metrics that stay within our targets — 55% net debt to total capitalization and 14%-15% FFO to debt, which sits 100 basis points above the 13% threshold where a downgrade would be triggered. During 2025, we brought in $220 million of equity in total. Thanks to better forecasted cash flows driven by our successful execution of strategic capital investments, regulatory plans, and rising data center load growth, we're looking at a much smaller equity need for 2026 — somewhere in the range of $50 million-$70 million. At the start of October, we wrapped up the debt offering we had planned, issuing $450 million in 4.55% notes. Part of that money went toward retiring our $300 million of 3.95% notes when they came due in January 2026. Looking at what's next, our January 2027 maturity involves $400 million of 3.15% notes. On top of that, our liquidity position is still strong — as of year-end, we had access to more than $700 million through the revolving credit facility. Moving forward now, our financial outlook is laid out on Slide 12. For 2026, we introduced adjusted earnings guidance of $4.25-$4.45 per share, which at the midpoint represents 6% growth compared with 2025. Thanks to our capital plan, a solid financial position, and organic customer growth, we have strong confidence in our capacity to land in the upper half of the current 4%-6% plan, all while keeping 2023 as the base year. What fuels that confidence is continued customer growth across our jurisdictions, rising data center demand, and new rates plus rider recovery tied to strategic investments such as Ready Wyoming and Lange II, which will deliver long-term benefits to customers; we keep actively chasing further data center pipeline demand that would be additive to the five-year plan and bring upside to earnings over time via a mix of market energy purchases, contracted generation, and utility-owned capital investments in generation and transmission. If you look at Slide 13, you'll see how we've consistently hit our earnings guidance. We set a 4%-6% growth target back in early 2023 because we wanted to hold ourselves accountable for meeting our financial commitments every time. Given that track record, we left our long-term EPS growth target unchanged, 2023 base year included, but we gave more clarity and confidence about the upper half of that range. On Slide 14, you can see our dividend history, which leads the industry. We boosted the dividend this January, which brings our streak of consecutive increases to 56 years in 2026. We're still aiming for a payout ratio of 55%-65%. A dividend that's dependable and keeps growing is central to how we create long-term value for shareholders. Right now, I'd like to pass things along to Marne so she can walk us through what's happening on the business side.

Marne Jones executive
#4

I appreciate that, Kimberly, and hello everyone on this call. Linn and Kim have already described how we delivered an outstanding year, keeping service safe and dependable for the people we serve. Our operations performed at a very high level — we kept delivering reliability in the top quartile while putting money into an energy future that is resilient and reliable, moving forward electric transmission and generation projects along with work focused on safety and integrity for our gas utilities; we pushed ahead on regulatory and growth efforts and kept working to tackle wildfire risk. It's a pleasure to share our achievements from this year, which required plenty of effort and commitment. One illustration of how resilient our team and system are came in December, when we responded to an extreme wind event. Winds hit 100 miles per hour in Rapid City, South Dakota, and our crews together with mutual aid partners worked across our communities to bring power back safely and as efficiently as possible, swapping out damaged poles and lines. I want to thank our devoted team members and our community for how they responded during restoration. I'll begin on slide 16 with what we accomplished in 2025. During December, we finished building the Ready Wyoming transmission project, which spans 260 miles, and brought the last segments into service right on schedule. That marks a milestone in our company's history, and I feel tremendous pride in our team and partners, because this project transforms how well we can serve customers reliably and cost effectively; it lowers how much we depend on third-party transmission, boosts resiliency, and widens access to market energy. Our interconnected transmission network will help keep prices stable for customers over the long term and allow continued growth throughout our service territory. Keep in mind that we're recovering most of this investment via our Wyoming Transmission Rider. Now to slide 17. During 2025, we started construction on Lange II, a 99-MW natural gas-fired generation resource that we own, situated in Rapid City, South Dakota; this new resource will take the place of aging generation facilities using modern Wärtsilä engines and satisfy updated reserve margin requirements. We've already purchased major components and they're on site, among them six reciprocating internal combustion engines, and we remain on track for the facility to enter service in Q4 of 2026. Our intention is to recover this investment through the South Dakota Generation Rider. Slide 18 covers our Colorado Clean Energy Plan; we secured approval for the plan in 2024 and spent 2025 working to finalize our project contracts. In November, we won approval for our 50-MW utility-owned battery storage project, slated to be placed in service in 2027, and it's already part of our capital plan; we're in negotiations over the 200-MW solar PPA and anticipate signing an agreement in the first quarter. Slide 19 sums up where we stand on regulation. Through decades of strategic acquisition and investment, we've expanded our scale and the diversity of our large electric and gas systems, building long-term value for the benefit of our customers and stakeholders. When it comes to regulation, we handle this valuable diversity by carrying out 3 to 4 rate reviews each year as part of normal business. We had another strong year in 2025, wrapping up three rate reviews that brought in more than $52 million of additional yearly revenue. Through those cases, we also secured approval for deferred accounting insurance trackers in Kansas and Nebraska, plus a new weather normalization pilot in Nebraska. Those two mechanisms should help cut down on earnings swings going forward. In December, we filed another rate review for Arkansas Gas, asking to recover $147 million of investments made since our prior case in 2023. Our request is for $29.4 million in new annual revenue, based on a 10.5% return on equity and a capital structure of roughly 50/50, and we expect new rates in the back half of this year. We also intend to file a abbreviated rate review in Kansas during the first quarter, consistent with what we laid out in our last case, and it should recover capital invested through 2025 at the weighted average cost of capital we previously agreed to. Looking forward, we're getting ready for a rate review in South Dakota in the coming weeks. Since base rates there have stayed flat for over a decade, this request will recover the investments we've made for customers and the higher costs of serving them since our last case in 2014. Because this utility operates in both South Dakota and Wyoming, we'll file separately in each state. We also recently won approval for a new tariff for interruptible large load service in South Dakota, aimed at capturing blockchain growth opportunities. Finally, in Wyoming, wildfire liability legislation was enacted in early 2025. Under that law, we submitted our wildfire mitigation plan in November, with commission approval expected in March. As a result, we anticipate meaningful liability protections as long as we stay compliant with the approved plan. We're backing similar legislation that has been introduced in South Dakota. Slide 20 gives an update on our progress toward serving over 3 GW of data center demand. We've reliably met growing demand from Microsoft's hyperscale data centers for over a decade via market energy procurement, which has benefited other customers in the region; we're also serving Meta's new AI data center now under construction in Cheyenne, and we expect it to move from construction power to permanent service this quarter; we've incorporated into our plan the expectation of serving 600 MW of demand from existing data center customers by 2030. Under today's market conditions, roughly 600 MW of demand will call for investment in generation and transmission infrastructure. If large load requests come in faster than we anticipate, the need for that generation and transmission could arrive sooner. Beyond our five-year plan, our pipeline offers substantial and attractive upside; we're making headway in negotiations with high-quality customers on a mix of resources to meet this demand under our flexible Wyoming tariff. Meeting demand on this scale is going to take a combination of energy resources. That includes procuring energy, depending on what the market can offer, contracted generation via PPAs — both third-party and customer co-located generation — plus utility-owned generation and transmission investments. For every project, we have a chance to earn on the total demand from customers. That said, no two customers need the same thing, so the resources required to serve them will differ, and that affects margins in different ways as we negotiate inside the framework of our LPCS tariff. When investment opportunities exist, we look for risk-adjusted returns similar to what a utility would earn. When outlays for investment aren't needed, pricing gets negotiated project by project, reflecting speed to market value along with operational and financial risks, and it's deliberately built to incentivize the utility as a substitute for traditional utility investment. As we go about contracting this new load, we're carefully analyzing and negotiating the possible resource mix so we land on a long-term solution that benefits everyone and safeguards customers, communities, and shareholders. On the Crusoe and Tallgrass project specifically, several agreements are being worked through that would ultimately back 1.8 GW of demand. To show our incremental progress, we recently submitted a CPCN to the Wyoming Public Service Commission supporting a substation for this project, and we're engaging with all the partners involved in finding the resource mix to serve this demand, fuel cells included. A project this size, as you'd expect, is complex and has many components with multiple parties involved. Because of that, the contracts must be structured and negotiated with care to manage operational and financial risk. Following our usual practice, more details will come once binding service agreements are signed. With that, I'll hand the call back to Linn.

Linn Evans executive
#5

Thanks, Marne. I feel great about everything our Black Hills team has achieved during the last 12 months, along with plenty of additional victories we didn't have enough time to cover today. As you've already heard, we keep delivering on our financial commitments time and again, while making strong headway on our regulatory plan, our growth initiatives, and our strategic goals. In 2026 we're already moving forward, maintaining a steady focus, with innovation centered on customers as we chase our mission of improving life with energy — both in how we operate and in becoming the energy partner of choice. Looking ahead, Black Hills presents an attractive long-term value proposition, given our customer-focused growth, competitive yield, and meaningful upside opportunities that go beyond our five-year plan. On top of that, our planned merger with NorthWestern Energy will bring us the benefits of greater scale and fresh opportunities as a bigger, premier regional electric and natural gas utility company. We appreciate your interest and the trust you place in the Black Hills team as we work together to grow long-term value for our customers and stakeholders. That wraps up our prepared remarks, and we're glad to take your questions.

Chris Ellinghaus analyst
#6

Hey, everybody. How are you?

Marne Jones executive
#7

Morning.

Linn Evans executive
#8

Hi, Chris.

Chris Ellinghaus analyst
#9

Linn, regarding that 3 GW pipeline, could you help us understand how much of it might land inside your five-year window, and what share sits past the five-year plan? Any details you can share on the timing, or perhaps on geography?

Linn Evans executive
#10

Morning, Chris, and thanks for asking that. I really appreciate it. Sure, I’m glad to give whatever detail I can here. Microsoft and Meta are our 2 current clients. They remain part of our pipeline. During our opening remarks, we said we’d reach 600 MW by 2030. That figure comes from our projections along with discussions and similar inputs. Past that point, we also have the 3 GW+. The way I’d put it is that among those we’re in talks with, the ones moving fastest—or maybe the ones most active right now, or eager to begin service around 2027—fit that description best. And keep in mind, once they begin taking service, it will build gradually. It won’t happen all at once, since they’ll be building and growing their data centers and so on. So I hope that gives you a sense of how we’re looking at it, Chris.

Chris Ellinghaus analyst
#11

All right, that's useful. So clearly you've got a far clearer read on, well, what the probabilities look like and, and how the timelines shape up, and, you know, there's a real squeeze on the equipment queue. Is it possible to submit CPCNs ahead of, you know, knowing precisely which resources you'd require, just to, sort of, set that process in motion and, you know, perhaps lock down a bit more certainty for yourselves when it comes to securing spots in equipment queues and that kind of thing?

Marne Jones executive
#12

Morning, Chris. It's Marne here. Let me share a bit with you regarding the CPCN process. Usually, when you're examining a CPCN, having the greatest number of facts on hand is what you want. As we proceed through this, as you noted, there's tightness in the equipment queue. Those queues include us. We're beginning to receive some of those particular specifics regarding a CPCN, yet it truly matters as well to acknowledge how we'll recoup on any of those CPCNs. So everything here genuinely connects. We're still finding our way. This territory is new. Clearly, CPCNs aren't unfamiliar to us, but it's new territory as we pursue that speed to market we'll be working through — how do we deliver those CPCNs as fast as we're able?

Linn Evans executive
#13

As Marne pointed out — and I want to underscore this — we hold a place in line, and equally significant, our customers likewise occupy spots in the equipment queues, which has worked to our advantage.

Chris Ellinghaus analyst
#14

All right, that's useful. Now regarding the NorthWestern merger, you've submitted filings, but has there been any meaningful engagement with the Montana Commission yet to get a sense of where they stand right now?

Linn Evans executive
#15

Chris, the way I would put it is that we're currently in the discovery stage, which means we need to be extremely cautious about ex parte matters and that sort of thing. But the discovery phase is where we are. The questions coming our way are exactly the type we'd expect, and things are proceeding, I'd say, pretty much as planned, so to speak. They certainly match what we anticipated regarding the questions that would come up and the information required for a sound decision.

Chris Ellinghaus analyst
#16

All right. Perhaps a final question regarding data centers, given that it's such a hot topic right now. Could you offer any indication of the size or the figures involved for data centers sitting in your pipeline? Or does that exist? I suppose, you know, this depends on perspective — what counts as big in your view — but are there a lot of sizable ones, or are they, you know, more of a middling size? Could you provide any hint about how many prospects are waiting in line?

Marne Jones executive
#17

Hi, Chris. As Linn said at the start, Microsoft and Meta are our 2 customers on this call. Each of them is exploring possible ways to grow. We've discussed Tallgrass Crusoe some already. Broadly speaking, that one makes up a major portion of what we count as our pipeline. Sure, there are additional prospects as well, but that represents the bulk of it.

Linn Evans executive
#18

Also, one thing I'd mention is that Wyoming — and Cheyenne especially, where we're watching so many of these data centers take off and flourish — has an edge in that land there tends to be fairly easy to come by and fairly cheap. So as we see it, a good amount of acreage is getting bought up for these projects, which leads me to believe that by and large, they'll end up being big hyperscale data centers.

Chris Ellinghaus analyst
#19

Okay, great. Thanks for the call. I appreciate it.

Linn Evans executive
#20

Thank you, Chris.

Marne Jones executive
#21

Thanks, Chris.

Andrew Weisel analyst
#22

Hey, good morning, everybody.

Linn Evans executive
#23

Good morning, Andrew.

Andrew Weisel analyst
#24

Naturally, there are a few additional inquiries regarding Crusoe Tallgrass. To start, judging from the regulatory filings — and Marne, you touched on part of this during your remarks — you're suggesting we construct certain transmission infrastructure, which includes the Robinson Substation along with some transmission lines, in order to link it up with your grid. You're also suggesting a rather distinctive arrangement in which the customer covers construction costs, which helps reduce both risk and expense for Cheyenne Light customers. In my view, that's an excellent arrangement. What I want to ask is this: with that interconnection in place, do you foresee... Do these assets basically guarantee that the whole data center project will be, as people say, “grid connected,” and as a result, would every bit of associated spending be eligible under the LPCS tariff? Is that what you expect? Essentially, I'm just trying to grasp how this would get applied. You mentioned that particular fees are being negotiated. How, how should we approach distinguishing what's objective from what's subjective, perhaps?

Marne Jones executive
#25

Alright, Andrew — let me make sure I understand what you're asking, and I'll take a crack at it. When it comes to the microgrid management fee, what we actually do is charge it against peak demand. As I believe everyone here has pointed out, there are 3 categories of resources available to us for meeting that kind of load, and every category carries its own kind of microgrid management fee — or what you'd call a standard utility return, or a risk-adjusted one. Those fees, in essence, get levied according to peak demand.

Andrew Weisel analyst
#26

Okay.

Linn Evans executive
#27

Andrew — apologies for cutting you off — but I think there's more to add here. Those networks up to now, as you know, are still in discussion; nothing has been finalized, clearly, otherwise we'd be putting out different sorts of announcements. Still, a large share of it — these megawatts, this power — is, so to speak, connected to our system as things stand.

Andrew Weisel analyst
#28

All right, that clears things up somewhat. Perhaps I could drill down a bit further regarding the supply side. Up to this point, you've not discussed power generation requirements, since it isn't your own development, and naturally no agreements have been made public. Yet Tallgrass has stated openly that it plans to put $7 billion into energy infrastructure within the area you serve. You made reference to fuel cells, and naturally, a major utility filed an SEC document concerning roughly $3 billion of fuel cells located in Cheyenne. A number of investors find themselves uncertain as to whether such projects would be eligible for utility charges and the LPCS tariff. So perhaps you might simply say more — is there anything regarding fuel cells or other things? In what way, in what way ought we to consider all those billions of dollars and, and whether that would be subject to the way your fees are structured?

Marne Jones executive
#29

Right, Andrew. Well, as I said, we're still assessing the resource mix and the way we'd ultimately meet that demand. Like I mentioned — and you know this well, since we rely on market purchases rather than constructing assets — when we consider contracted or co-located generation, the pricing structure differs.

Andrew Weisel analyst
#30

Mm-hmm.

Marne Jones executive
#31

Of course, when a chance to construct something arises, we'd evaluate it by considering the return in terms of utility adjusted for risk, much like how we currently approach things from the standpoint of a regulated rate base. So every bit of that factors into setting the price. That price is subsequently what gets essentially used for the peak demand.

Andrew Weisel analyst
#32

All right. All right, so I suppose if we return to the T and D side, or the transmission side, are there any additional assets you're aiming to speed up in order to serve this or other large data center clients? Should we anticipate additional filings similar to that one, the Robinson Substation filing?

Marne Jones executive
#33

As we've discussed before, that 500 MW to 600 MW, in our view, is going to call for some extra investment past that timeframe. So be it this project or other projects, we definitely see chances for further investment beyond what our current plan covers, given this pipeline.

Andrew Weisel analyst
#34

Alright, great. Perhaps just one more, and, well, give this your best shot, I suppose. It's clear you still haven't inked an energy service agreement with the hyperscaler for the Crusoe project. We'll hold out as long as we can. What I want to know is, they're aiming to move quite fast, and based on the schedule in your CPCN filing, in-service is expected by March of next year, which is really quick. What's the latest date by which you'd have to sign and make an announcement so that nothing slips? Should we be keeping an eye on some specific window on the calendar?

Marne Jones executive
#35

Well, we actually have that information. The customer intends, as far as I understand, to start receiving the service during the first quarter of 2027. So clearly, we're coordinating with them, and with everyone else involved, because our aim is for both sides to achieve what they're targeting.

Andrew Weisel analyst
#36

All right, that's a good place to stop. I really appreciate all the specifics. Thanks a lot.

Marne Jones executive
#37

Thanks, Andrew.

Ross Fowler analyst
#38

Morning. I realize this may be a topic we've already covered thoroughly, but I'd like to return to what we can state with certainty right now, work through a few figures, and confirm that I've got the picture right. So, the plan currently includes 600 MW, and we understand 200 MW of that comes from Microsoft. Does the Meta site account for the remaining 400 MW, or does something else fill that gap?

Linn Evans executive
#39

Good morning, Ross. Let me take a step back and set the record straight on that. The quantity of megawatts Microsoft takes from us hasn't been made public by us, and Microsoft hasn't revealed it either. What we can say is that taken together — both Microsoft and Meta — we expect the figure to reach 600 MW by 2030. I hope that clears things up.

Ross Fowler analyst
#40

All right, that's useful. We're aware Meta's data center sits in Laramie County, so a portion of that 600 is located there, and interconnection queue filings for Laramie County show roughly 1,150 MW of generation. Beyond whatever slice of the 600 I'd guess Meta accounts for, where does the remainder originate? Is it the Tallgrass site? Another location? I'm simply attempting to size things using what public filings tell us.

Marne Jones executive
#41

Right, Ross, as I suppose we've already indicated, we've disclosed what we're able to disclose. Negotiations remain ongoing, and we're still figuring out the resource mix. Like any queue, plenty of participants will be in queues, so those are matters we'll keep working through while we finalize our mixes.

Linn Evans executive
#42

Also, Ross, one more point on that. Please keep in mind that Meta and Microsoft are both drawing market energy, so the interconnection megawatts don’t necessarily link up, so to speak, or reconcile.

Ross Fowler analyst
#43

Got it. So it doesn't stack, since they're capturing share and—

Linn Evans executive
#44

Exactly.

Ross Fowler analyst
#45

A few of those are me, actually. Alright, so—

Linn Evans executive
#46

Exactly. Exactly.

Ross Fowler analyst
#47

Thanks. So about that 4% to 6% EPS CAGR through 2028 — that sits inside, or rather, the 4%-6% EPS CAGR takes in that 10% EPS contribution; it isn't added on top of the 4 to 6, correct? It falls within the 4 to 6.

Marne Jones executive
#48

That's right.

Ross Fowler analyst
#49

Alright, that works. Thanks a lot.

Linn Evans executive
#50

Thanks, Ross. Glad you're following along.

Linn Evans executive
#51

Alright, I truly appreciate the questions you’ve raised. Many thanks for the interest you’ve shown in Black Hills Energy and Black Hills Corporation. Once more, I’d like to express gratitude to our team for an outstanding 2025, and thanks for committing yourselves to 2026, and we value everyone joining us today, and may you have a Black Hills Energy safe day. Thank you.

Operator operator
#52

Thanks a lot. That brings the call to a close. We appreciate everyone for joining in. At this point, please go ahead and end your connection.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Black Hills Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Black Hills Corporation earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.