Black Hills Corporation (BKH) Earnings Call Transcript
November 5, 2026
Earnings Call Speaker Segments
Thank you, operator. Good morning, everyone, and welcome to the third quarter 2026 earnings conference call for Black Hills Corporation. Our earnings release and the materials for this morning's call are available on our website, blackhillscorp.com. Linn Evans, President and Chief Executive Officer, leads today's call, along with Kimberly Nooney, Senior Vice President and Chief Financial Officer, and Marne Jones, Senior Vice President and Chief Utility Officer. In the course of today's earnings discussion, the comments we make may include forward-looking statements as defined by the Securities and Exchange Commission, and such comments carry a number of inherent uncertainties. While we believe our expectations rest on reasonable assumptions, actual results could differ materially. For a list of some factors that could cause future results to differ materially from our expectations, we point you to our earnings release, slide 2 of the investor presentation on our website, and our most recent Form 10-K and Form 10-Q filed with the Securities and Exchange Commission. With that, I'll now hand the call over to Linn Evans. Linn?
Thank you, Sal. Good morning, everyone, and thanks for being with us today. I'll give you an overview of where we stand strategically — including how we've done with large load customers and the merger with NorthWestern Energy that's still pending. Kimberly will cover the financials, and Marne will take you through the business update. My remarks begin on slide 3. I remain very encouraged that both our team and our business are performing at full strength. We turned in outstanding operational and financial results while moving our strategic initiatives forward through the third quarter. Our focus stays squarely on our core purpose: serving customers safely and reliably, and carrying out our mission of improving life with energy. In pursuit of that, we posted strong earnings and stayed on track toward our 2026 earnings guidance. We kept our financial position and credit ratings solid as we carried out the capital plan meant to meet our customers' energy needs. That plan includes the 99-megawatt Lange 2 generation project in South Dakota, which is on schedule to enter service successfully, right on time, during the fourth quarter. Our team keeps pushing our regulatory work ahead. We finished the rate review for Arkansas Gas, and we secured constructive settlements on two rate reviews for our South Dakota electric utility — one in South Dakota and one in Wyoming. We made unmistakable headway in meeting customer needs, large load customers among them. Following more than a year of active, constructive negotiations, we're delighted to have executed definitive agreements to serve Google's planned data center in Wyoming, which slide 4 describes in some detail. Service under the project is slated to start by late 2027, with peak load arriving in 2030. Drawing on our innovative Wyoming Large Power Contract Service, or LPCS, tariff, the agreements we signed with Google cover our generation investment as well as our part in coordinating energy delivery from a total resource mix of 2.7 gigawatts to serve the project. Hitting this key milestone reflects a decade of strategic execution and innovation — and a major growth opportunity that will benefit our customers, the state of Wyoming, the Cheyenne region, and our shareholders. I take real pride in how hard our team worked for more than a year to make sure the executed agreements carry critical protections and opportunities for our customers and shareholders. Turning to slide 5, we're working to serve substantial further large load growth. Once again, thanks to our unique large load LPCS tariff in Wyoming, our retail customers and shareholders gain from our flexibility to serve large load customers using resources beyond traditional rate base capital investments. On market energy or contracted resources, we earn a negotiated microgrid management fee. Connecting these resources to serve our large load customers brings important advantages — speed to market for growth, plus resource optionality and diversity — all while we keep our right and obligation to serve our customers as the franchised utility provider. This distinctive tariff underpins robust demand from big loads in Wyoming; our present plan incorporates 600 megawatts of data center load, mostly because of Microsoft's continuing buildout and Meta's new AI data center, which we now anticipate will start taking service in early 2027. On top of our existing plan, the planned Google data center offers meaningful upside to be added into our 2027 to 2031 plan. Furthermore, we are in active negotiations on 600 megawatts of additional opportunities, which would add to our plan once definitive agreements are reached. Beyond those, a range of other emerging opportunities across our Wyoming footprint could amount to 2.5 gigawatts or more of future large load expansion. For instance, we are evaluating further opportunities, such as Microsoft's recently announced acquisition of over 3,200 acres in Wyoming for future expansion, along with other prospective customer projects we are seeing that sit in exploratory stages inside our service territory. We are likewise putting nearly $700 million into transmission to back current and future large load growth, opening up further opportunities. Marne will share more specifics on our large load progress during her update. Turning to slide 6 for an update on our merger with NorthWestern Energy. We await a decision in Montana, the final approval needed to close. We secured constructive settlements with numerous key intervenors in Montana and finished a four-day hearing before the Montana Commission in May. I'd note that the Montana Commission recently used its option to extend its decision by 30 days, which sets a deadline for a written decision of November 12. With that, I'll hand the call to Kimberly for our financial update.
Thanks, Linn, and good morning, everyone. I'm happy to share that we had a strong third quarter, which reflects our team's ongoing dedication to carrying out our strategic initiatives as we meet our financial commitments. Slide 8 shows a bridge for EPS from Q3 2025 to Q3 2026. Our GAAP EPS came in at $0.54, and that figure included $0.03 of merger-related transaction costs in Q3 2026. Once we adjust for those costs, adjusted EPS for the quarter was $0.57, versus $0.45 in Q3 2025. We booked $0.28 per share of increased margins, largely from new rates and rider recovery along with favorable weather relative to Q3 2025, and that more than offset higher O&M, financing, and depreciation costs. On slide 9 you'll find our year-to-date bridge. GAAP EPS was $2.76 through September 2026, which included $0.13 of merger-related transaction costs. After adjusting for these costs, adjusted EPS came to $2.89, compared with $2.68 during the same period in 2025. Looking at EPS as adjusted, we posted strong margins from new rates and rider recovery plus customer growth, and those more than offset higher financing and depreciation costs and unfavorable weather versus last year. We also gained from cost management and tax planning relative to last year. We're still on track to hit our earnings guidance for the year. More detail on the year-over-year changes is available in our earnings release and in our 10-Q, which will be filed with the SEC later today. Slide 10 lays out our solid financial position through credit quality, capital structure, and liquidity. We continue to concentrate on keeping a healthy balance sheet and hitting our stated credit metric targets of 14% to 15% FFO-to-debt and at or better than 55% net debt-to-total capitalization. So far this year, we've issued roughly $70 million of equity through our ATM program to support our capital investment plan of over $900 million for the year, excluding recently announced generation and transmission to support growing data center load in Wyoming. Liquidity remains strong, with $685 million of availability under our revolving credit facility at quarter end. Our next debt maturity comes in January 2027, when $400 million of 3.15% notes will be refinanced. We're looking at both the public and bank markets as refinancing options. Slide 11 shows our financial outlook. We reaffirmed our earnings guidance range of $4.25 to $4.40 of adjusted EPS for 2026, representing 6% growth at the midpoint over 2025. Strong execution, planned large load growth, and our solid financial position give us confidence that we'll deliver in the upper half of our 4% to 6% long-term EPS growth rate. Slide 12 highlights the substantial upside potential to our current five-year financial plan from large load growth opportunities, driven by new capital investment and contracted microgrid management fees; we recently announced approximately $2.5 billion of new generation and transmission investment to serve data center growth in Wyoming. That figure covers $1.8 billion in new generation investment made through Black Hills' non-regulated affiliate, which is contracted to our utility in order to serve Google's planned data center. Under our agreements with Google, contracted cost pass-through mechanisms are included — debt costs among them — and they let us start earning a cash return on our generation investment while construction is underway, with that construction expected to begin in mid-2027. Once construction finishes and the assets enter service between 2028 and 2029, we will keep earning a return on this investment, with book value declining until it is fully depreciated by 2048. Beyond the returns from generation investments our company owns, we will manage output from roughly 2.1 gigawatts of added resources serving Google, and we anticipate earning a microgrid management fee starting in late 2027; that fee will rise according to a contractually defined load ramp schedule that peaks in 2030, with fees running through 2048, when the contracted term ends. All together, these earning streams will ramp up and produce about $150 million of net income in 2030. We also expect the planned Google data center to generate an estimated $2.4 billion of unlevered free cash flows through 2048, after netting out our $1.8 billion of generation investment; in addition, we expect roughly $700 million in transmission expansion by 2029 to serve large load opportunities, Google's planned data center included. Recovery of this investment is expected to come directly from large load customers via our proposed large load transmission tariff. Returns on these investments and contracted cash flows will meaningfully strengthen our financial profile, letting us fund these investments through a combination of strong cash flows and a mix of debt and equity instruments, while keeping our focus on earnings accretion and solid investment-grade credit ratings. In February, we look forward to sharing our updated financial plan and capital forecast for 2027 through 2031, incorporating our large load growth opportunities and other growth across our business. Slide 13 illustrates our industry-leading dividend track record. In January, we raised our dividend, extending our record of increases to 56 consecutive years in 2026, based on our current annualized dividend. A dependable and increasing dividend is an important component of our strategy to deliver long-term value for our shareholders. I will now turn the call over to Marne for a business update.
Thanks, Kimberly, and good morning, everyone. I'll bring you up to date on our regulatory position and the capital projects currently in progress, and then wrap up with a look at how we're performing when it comes to capturing our large load opportunities. Before I turn to those topics, I want to recognize the commitment that makes possible something our customers count on daily: energy that is safe and dependable. That commitment is put into practice by our team each and every day. Nicely done, team. As the foundation for that commitment, our industry-leading reliability is shown on slide 15. We delivered another year of outstanding reliability, and our combined electric utility finished in the top quartile of the 2025 EEI SAIDI results, which came out not long ago. Delivering that level of service to our customers is no coincidence. It takes a committed team working together and a well-coordinated schedule of capital projects, which is how we reliably satisfy our customers' energy requirements. We're also making solid progress on the regulatory front, as laid out on slide 16; we continue carrying out our pattern of three to four rate reviews annually throughout the eight states where we operate; this past October, the Arkansas Public Service Commission signed off on $17.9 million in new annual revenues, calculated using a 9.8% ROE. Those updated rates went into force on October 12th. In addition, we were glad to obtain approval of settlements for new rates at South Dakota Electric, which provides service to customers in South Dakota as well as northeastern Wyoming. South Dakota's settlement gives us $27.4 million in new yearly revenue, calculated using a 7.58% WACC, and includes a four-year moratorium on base rates. The final rates go into effect on December 1st. In Wyoming, the commission-approved settlement delivers $4 million in new annual revenues, built on a 9.6% return on equity and a 53% equity structure, and new customer rates there also start December 1st. In Colorado, our electric rate review is still moving through the regulatory process; we're asking to recover $184 million in investments we've made since the 2024 rate review. You can see on this slide that the team has achieved quite a lot this year across several important regulatory efforts—wildfire liability safeguards, long-term plans for electric resources, and ongoing work on large load opportunities, which I'll get into later. On slide 17, the Lange 2 generation project, at 99 megawatts, is nearing completion of construction and should enter service in the fourth quarter; it will serve customers in western South Dakota and northeastern Wyoming. For the South Dakota share, we've filed for cost recovery via a generation rider, while the Wyoming share was part of the Wyoming rate review settlement that was approved recently. Now looking at the big load prospects shown on slide 18. Cheyenne remains an excellent spot for sizable load customers because of its weather, fiber connections, rail lines, and highway access. The distinctive large load rate we offer additionally provides room to meet each customer's specific requirements and get them to market quickly. We're glad to have executed contracts to supply the data center Google intends to build in southern Wyoming—achieving our goals of backing this major customer while protecting our remaining customers and shareholders. Since Kim already went through the key financial details of this project, I'll provide background regarding the opportunity itself, the timeline, and safeguards for customers; the slide before you illustrates the private microgrid configuration that will power the planned facility. We anticipate building and owning 564 megawatts of new natural gas generation at our existing Cheyenne Prairie Generating Station through our non-regulated affiliate, in order to provide as much as 590 megawatts of grid service. Under a rate-base model, that investment is expected to generate a risk-adjusted, utility-like return, kept separate from our base retail customers and billed directly to Google. The remaining 26 megawatts we are contracted to serve via our industrial service tariff and market energy purchases; beyond investment returns beginning in 2027, we expect to earn microgrid management fees tied to 2.1 gigawatts of third-party collocated resources. That power is secured through PPAs and will be operated through a private microgrid; overall charges will be tied to the minimum peak load contracted, anticipated to commence with first service in 2027 and increase during the project's ramp period. I should mention that the 2.7 gigawatts of total resources slated to serve the planned Google data center encompass reserve margins, and both the contracted peak load and the load ramp are confidential, as stated in the agreements. This strategy is designed to provide large load customers with a flexible energy solution while safeguarding our franchise and our current customers, and while keeping a utility-like risk profile for the company. The setup pairs 564 megawatts of generation owned by the company and provided by our non-regulated affiliate to our regulated utility under a PPA, together with 2.1 gigawatts from third parties delivered under long-term PPAs with our regulated utility and Google. A private microgrid that we manage interconnects those resources to serve the customer. Combined with our innovative LPCS tariff, this arrangement allows us to shape the resource mix around the customer's specific energy needs, and it is built to produce predictable, risk-adjusted, utility-like returns along with strong cash flows. We see this flexible, disciplined model as a distinctive advantage as we go after and deliver additional large load opportunities in Wyoming. The planned timeline for the project appears on Slide 19. The Google data center we have planned should start serving customers in late 2027, with a full ramp targeted for late 2030. So far, we've made solid headway on many of the requirements behind this project, and our team along with our project partners is working diligently to secure the necessary permits, regulatory approvals, and further contracts. As we've mentioned before, we have set aside long-lead-time equipment for the 564 megawatts of planned generation additions; construction on those is targeted to start in 2027, and they're slated to come online in multiple phases through the second half of 2029. On top of that, long-term third-party PPAs supply capacity and energy to underpin the data center's ramp and continued operations, working alongside our company-owned generation and grid service. Under these agreements, delivery happens in phases and ongoing availability standards apply. Beyond capacity and energy requirements, we also intend to put investment into growing our transmission system to serve this project as well as our other large load demand in Cheyenne. Those transmission projects should likewise enter service across 2028 and 2029, covering several new lines, substations, and other equipment upgrades. An update on our large load customer opportunities appears on Slide 20. Considering where these opportunities stand in development, roughly 600 megawatts sit within our current financial plans through 2030, mainly from Microsoft and Meta, and both of them still need only minimal capital investment, as we have disclosed before. Stacked on top of that 600 megawatts is the Google data center I just mentioned, which represents upside to the current plan and will go into our financial plan when we present our 2027 through 2031 plan in February. Once again, though, the peak load for the Google data center is confidential. Alongside our current plan and the planned Google project, we remain in negotiations to serve another 600 megawatts of load. During this quarter, we're also highlighting additional opportunities — projects at an early or exploratory stage involving current and prospective new customers. These are still being evaluated and aren't yet in active negotiations. One illustration is a possible data center expansion by Microsoft, connected to their recent land acquisition in the Cheyenne area. Right now, we put these exploratory-stage opportunities at a minimum of 2.5 gigawatts, and that figure is growing. As progress occurs, we'll continue to share updates. Slide 21 lays out the transmission side of serving large-load opportunities. To recover our transmission investment, we pursued a Large Customer Transmission Cost Adjustment mechanism, or LCT-CAM. The design of this tariff is such that transmission-related investments and expenses get recovered directly and exclusively from those large load customers who benefit from those facilities. We have recently submitted CPCN requests for two new projects. As recently as this week, we filed for the Aeolus transmission project, a $606 million undertaking that is expected to introduce two additional 230 kV lines covering roughly 125 miles. It's important to note that these lines are going to be engineered with the capability to be upgraded to 345 kV in order to accommodate future growth. Back in September, we sought a CPCN for the South Cheyenne transmission project, an $80 million initiative adding about 15 miles of lines across two new segments, plus other upgrades to substations and equipment. As I wrap up, I want to highlight the main protections in our Google agreements that safeguard customers and shareholders, which appear on slide 22. These safeguards include passing through costs, strong collateral plus financial assurances, protection from stranded asset risk, and favorable early termination terms; from our perspective, these represent industry-leading protections, which are crucial for securing future growth of large loads in Wyoming; the quarter was once again busy and successful, and I am pleased with our progress. With that, I'll return the call to Linn.
Thank you, Marne. I think our comments make it clear that during the first three quarters of 2026 we achieved outstanding strategic progress on the strategy centered on our customers. We posted strong earnings, kept moving forward with our regulatory plan and growth initiatives, and hit an important milestone involving our large load customer opportunities. Black Hills provides an attractive long-term value proposition, powered by growth focused on our customers, a competitive yield, and the substantial upside opportunities we laid out this morning. On top of that, we now hold six of the seven approvals needed to close our planned merger with NorthWestern Energy. We're eager to bring an even brighter energy future to all our stakeholders, along with the potential benefits and opportunities that come with being a larger regional electric and natural gas utility company. Thank you for your interest and for your trust in the Black Hills team as we work together to grow long-term value for our customers and for you, our shareholders; that wraps up our prepared remarks, and we're glad to take your questions.
Morning to you. Paul Zimbardo here, stepping in for Julien. Appreciate you making the time.
Morning, Paul.
Morning, and thanks. I realize you'd prefer not to share much about the Google arrangement, but could you walk us through the terms, the rates, and the economics? On a per-unit basis, is that a reasonable benchmark investors ought to apply when thinking about future data center transactions?
Hello, Paul. This is Kimberly. In approaching this project, our emphasis was squarely on the contractual protections as well as the recovery mechanism. Naturally, one topic that comes up frequently is load. Looking at how we've framed this, the material elements of the agreement are based — they don't hinge on load. What matters is that we've contracted many of the economic components of this agreement with Google. Perhaps I could encourage the investors to begin viewing this opportunity in a different light than some other opportunities we've talked about previously, given that a great many of these factors rest on the contract.
All right. The next thing I wanted to ask about — just so I've got it straight — is that the opportunities pipeline appears more or less the same even after you landed Google, since you're folding in what sounds like that new Microsoft opportunity. I just want to be clear on that. It looks as though you've essentially refilled that pipeline at the same time as you converted Google, if I'm reading it correctly. Thanks.
Hello, Paul. Good morning; Marne here. Let me spend a moment on that. Our focus remains on that 3-gigawatt pipeline, as we've said before. That pipeline has always included Google, and I believe we're still making meaningful headway in delivering that 3-gigawatt pipeline and converting it into active load on our system. That has definitely been our priority. On top of that, we're examining what lies past the pipeline and evaluating wider opportunities, given what we see emerging in the Cheyenne area. From our high-level view, we believe there are certainly some credible opportunities amounting to at least another 2.5 gigawatts, with demand potentially growing. We approach this by asking how we keep advancing and progressing that 3 gigawatts, while also considering other up-and-coming opportunities that we might eventually bring into that pipeline.
All right, great. Then, if I may slip in just one quick question about that $150 million net income disclosure — is that figure net of financing costs, or is it more at the project level for Google?
Consider financing costs to be a pass-through; it would be net of financing costs.
All right. Excellent. Thanks so much. Talk to you shortly.
Thank you, Paul. Paul.
Morning, and I appreciate you taking my questions. To build on what Paul mentioned, regarding that $150 million of Google-related net income in 2030, could you break out, if you can, the portion from generation versus what comes from the microgrid management fee?
Those details are confidential. What I can tell you is that when you consider the microgrid management fee revenue, it's really tied to a pricing and ramp schedule that was negotiated contractually. When you consider the generation side for that particular project, as Marne noted, we begin to earn a cash return on that investment while construction is underway, and once it's placed in service, think of it as a utility-like, risk-adjusted return. Taking those factors into account, that gives you a way to think about the $150 million of net income in 2030.
Understood. That helps. So only a quick clarification, then. Previously, you folks pointed to the Related Digital site as a possible customer to take that load, and I'm not sure whether it came up in the slide deck — I wasn't able to locate it. Is that still in the pipeline, I wonder?
It's Marne speaking once more. Let's begin with the 700 or the 75 megawatt — the 75-megawatt project. We keep working closely with that customer, and we anticipate an LPCSA by year end, with service to that customer starting in early 2027. I should add as well that Related Digital is currently taking service at that site under a different tariff. We would definitely pursue the LPCSA and expand that load going forward, though really that gets underway in January.
Understood — that covers everything I wanted to ask. Thanks.
Thanks, Nicholas.
Thanks.
Morning, everybody. Nice work closing that large transaction.
Thanks,
Andrew.
Good morning.
My first question concerns the Google deal and how quickly it ramps. I realize you've said the load is confidential and isn't the thing we should focus on, but please help me grasp the earnings contribution in '27, '28, and '29 ahead of the $150 million in 2030. I'm not after exact figures — but is it roughly linear? Does it climb in a hyperbolic way? And past 2030, ought we to view that $150 million as essentially a flat line forever through 2048, or what's the right way to think about it there?
Great question, Andrew. As we mentioned, the microgrid management fee starts in late 2027, and it steps up from '27 to 2030 across that stretch; that schedule was negotiated and I'm unable to disclose it, but just understand that between '27 and '30 it is ramping; then for the generation facilities, we begin earning that return on invested capital starting in mid-2027. As Marne mentioned, those assets start being placed in service in 2028 and 2029, and then will be fully in service for the year of 2030. Then in 2030, those assets start to depreciate across the following 20 years through 2048. Viewed through that lens, it ramps up to 2030, and then we begin depreciating those assets. I think another key point that's really important to highlight is the unlevered free cash flow stemming from this opportunity. As we've disclosed, we have $2.4 billion of unlevered free cash flow, but that figure is after netting out the $1.8 billion of generation. Clearly there's a lot of cash benefit that will be ramping once we get past the spend period for the $1.8 billion tied specifically to the generation we're discussing here for the $150 million.
Great, that's very helpful. Next question: considering how large and extensive this Google project is, how prepared are you for additional demand? The figures you're citing are quite substantial. Do you think a pause might be necessary? And if that's the case, what factors would constrain you? Would it be supply chain, land, labor, regulatory, or something different?
Andrew, that's a reasonable question. In Wyoming, one advantage we enjoy, I believe, is the adaptability our tariff gives us and the chance to draw not just on our own resources and investments but on other parties' as well, which we've already done via PPAs, collocated generation, and similar arrangements. We definitely see ongoing room to expand. As you observed, we added the 2.5 for emerging opportunities. We recognize that additional opportunities probably exist past that. Still, to this point, we've accomplished quite a bit by way of market purchases. We've discussed shifting our approach and keeping our focus on collocated PPAs along with investments. I anticipate those will carry on. We'll be evaluating that with transmission in mind—we just filed the CPCNs for it—and there may be further investment past that. At present, I don't see a ceiling, since we can take advantage of the adaptable service available to us under the LPCS tariff.
Andrew, it's Linn here. I believe there's one more key thing worth noting regarding our 2.5 gigawatts of possible upside: a lot of those customers approach us already holding generation reservations and similar arrangements, and that helps reduce the risk for us too.
All right. Great. If I may, just one more. Regarding the merger, during Montana's most recent meeting, a few questions came up concerning NorthWestern's Colstrip facility and how part of it could be set aside for large load customers rather than the general ratepayer population. I realize that isn't your asset, but how open might Bright Horizons be to letting those 370 megawatts serve ratepayers instead of being reserved for data centers? Or do you believe that ultimately may not be required as a condition for the merger to be approved?
Andrew, thanks for raising that. We are clearly quite conscious of what is going on in Montana with the commission, the conversation regarding Colstrip, and honestly, the open docket that NorthWestern Energy already has concerning Colstrip; we should be careful about discussing what Bright Horizons will do under its go-forward leadership, and so on. I believe there is an opportunity for us to serve customers in the best way we can, and I think Colstrip could be part of that at some point. All options will be on the table, so to speak. Again, I think a key focus will be what is best for customers. We will concentrate on that.
That's where I'll stop. Thanks very much.
Thanks, Andrew. Appreciate it.
We appreciate you joining us this morning and for your interest in Black Hills. I’d like to take one more moment, as Marne did, to express thanks to our team. The first three quarters of 2026 have been remarkable, and we are already far along in the fourth quarter. Thank you to the team for your unwavering dedication to serving customers as well as you do. I ask each of you to please have a Black Hills Energy safe day. Thank you.
Thanks. That brings us to the end of this call. We appreciate everyone joining us. You’re welcome to hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Black Hills Corporation transcript - plus 133,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Black Hills Corporation earnings transcripts and 133,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.