Thanks very much. Good morning to all of you, and a very warm welcome. This is Purvangi Jain speaking from Valorem Advisors; we handle Investor Relations for Chambal Fertilisers and Chemicals Limited. On the company's behalf, I want to thank each of you for joining the earnings call covering the first quarter of the financial year 2027. Before we start, let me offer a brief cautionary note. Certain statements you will hear on today's earnings call could be forward-looking in nature. Those forward-looking statements carry risks and uncertainties, and actual results might therefore differ from what is anticipated. They rest on management's belief as well as assumptions made by management and information available to it at present. We caution audiences against placing any undue reliance on these forward-looking statements when making any investment decision. Today's earnings call serves purely to educate and create awareness regarding the company's fundamental business and the financial quarter under review. I will now introduce the management joining us on today's earnings call and hand things over for their opening remarks; with us we have Mr. Abhay Baijal, Managing Director; Mr. Narinder Goyal, Business Head, Manufacturing Operations; Mr. Anuj Jain, Chief Financial Officer; Mr. Ashish Srivastava, Vice President, Sales and Marketing; Mr. Tridib Barat, Vice President, Legal and Company Secretary; and Mr. Vivek Misra, Business Head of TAN. So, without any delay, I invite Mr. Abhay Baijal to begin his opening remarks. Thank you, and over to you, sir.
Thank you, and good morning to all of you. We appreciate your joining this conference call, where we'll go over how Chambal Fertilisers performed in the first quarter of financial year 2027. During Q1, the Indian fertilizer sector kept facing a difficult environment, dealing with geopolitical uncertainty, high raw material prices and a Southwest monsoon that arrived late. Early in the quarter, geopolitical events in West Asia kept disrupting global supply chains for fertilizer and energy, which drove sharp rises in prices for key inputs including ammonia, sulfur and phosphatic intermediates, alongside higher freight costs and procurement difficulties. Although things started getting better near the end of the quarter as geopolitical tensions eased, raw material prices are still far above their historical levels. The Indian agricultural season got off to a somewhat weak start, with emerging El Nino conditions leading to an uneven arrival of the Southwest monsoon and rainfall below normal in several regions during June. As a result, kharif sowing and fertilizer offtake stayed weak in the early part of the season. At the close of June, summer crop sowing stood at roughly 183 lakh, about 23% lower year-on-year. On an encouraging note, monsoon activity picked up considerably during July, and sowing has sped up since then across the major crop-growing states. Per the Ministry of Agriculture, acreage has largely caught up to last year's levels, and IMACID still expects a normal monsoon; in our view, these developments create a favorable backdrop for agricultural activity and fertilizer demand through the rest of the year. Throughout the quarter, the government of India stayed closely involved with the fertilizer sector, making sure domestic gas was available to urea manufacturers and that DAP and NPK supplies were adequate ahead of the kharif season, while nutrient-based subsidy rates for kharif were raised by roughly 10%; those rates came before the sharp jump in global prices that followed the geopolitical developments in West Asia, so they don't fully capture the cost escalations that came afterward. The industry remains in discussions with the Department of Fertilizers on this issue, and timely subsidy disbursements have helped industry liquidity and ensured fertilizer availability without interruption. One very important development this quarter was the government's approval of the National Investment Policy for urea 2026. In our view, the policy offers a very strong framework for future investment in domestic urea capacity and reinforces India's long-term commitment to self-sufficiency and food security. In line with that, we have kept moving forward with preparatory work for a potential fourth urea plant, though any investment decision will still depend on approval from our Board. Moving to operations and the financial results for the quarter under review: the urea business kept running despite the planned shutdown at Gadepan-I and an extended shutdown at Gadepan-II during the quarter, which got bunched together because of the geopolitical situation. The bulk fertilizer business also turned in a healthy performance, helped by timely procurement of phosphatic and potassic fertilizers ahead of the kharif season. In the quarter, we also broadened the range we offer in ammonium sulfate grade production, and we keep assessing additional NPK grades so that our balanced nutrition lineup becomes stronger. Through the launch of seven new products spanning herbicides, fungicides and insecticides in the quarter, our crop protection chemicals and specialty business kept enhancing its product portfolio. Although sowing delays weighed on demand, the business achieved a substantial gain in profitability thanks to an improved product mix, and our seeds business added two new maize and bajra varieties to its portfolio. Volume and revenue growth continued in our biologicals business, driven by farmers increasingly accepting sustainable crop solutions. That business was profitable as well, helped by a better product mix and benefits of scale. Together with TERI, we set up the CFCL-TERI Center of Excellence for Advanced and Sustainable Agriculture Solutions, which is focused on results and on developing next-generation agriculture technologies. A dedicated lab is operating now, and launches of products are anticipated from FY '28, '29 onward. Given how effective our products are, we will also look into exporting these products. In the quarter, we added a biostimulant called Uttam Aris Gold to the portfolio. Working with TERI keeps strengthening our pipeline of patented crop protection and crop nutrition products. Our Seed-to-Harvest program keeps helping raise farmer awareness and demonstrate product efficacy. We wrapped up more than 1,400 farmer meetings and 500 demos, and we have analyzed over 38,000 trial samples. We also greatly increased our social media activity to reach a large number of stakeholders across Facebook, YouTube and Instagram, surpassing 1.63 crores views. Our technical ammonium nitrate project made good progress in the quarter, with production starting for weak nitric acid and ammonium nitrate solution, while high density ammonium nitrate is nearing commissioning. Sulfur shortages and high sulfur prices affected our joint venture in the market during the quarter, leading to a temporary production shutdown so we would not operate at negative margins; market conditions are improving and customers are becoming more accepting of higher prices. Production restarted in July, and we expect performance to get better from here as market conditions keep normalizing. Lastly, allow me to take you through the financial performance details for the period under review. On a stand-alone basis, revenue from operations was INR 5,000 crores versus INR 5,700 crores, a decline of roughly 12%. EBITDA increased 12% to INR 851 crores, with margins widening to 17% from approximately 13%, a gain of about 350 basis points. Profit after tax rose 10% to INR 703 crores, with PAT margins near 14% compared with 11% in the prior quarter; on subsidy flows, we received roughly INR 2,480 crores of subsidy in the quarter versus INR 2,512 crores a year earlier. As of 30th June, total receivables were INR 3,300 crores, made up of market debtors of INR 841 crores and subsidy receivables of INR 2,460 crores. Turning to how the segments performed, our urea business turned in a resilient result even with the plant shutdown and a prolonged Gadepan-I outage. We posted INR 2,860 crores versus INR 3,109 crores, a decline of 8 <<inaudible>> stemming from reduced production and sales. Even with those lower volumes, the business kept profitability at a healthy level. In complex fertilizers, revenue came in at INR 1,737 crores compared with INR 1,131 crores, a drop of 18%, which mirrors a measured stance on placement during a season when showing was delayed. Segment EBIT rose 67% to roughly INR 239 crores. Crop protection chemicals, specialty nutrients and seed together reported revenue of approximately INR 430 crores versus INR 458 crores, up 6%, which reflects deferred farmer purchases. Segment EBIT for that group nonetheless climbed 13% to INR 108 crores, with margins improving to roughly 25%. Still, in spite of a difficult operating environment, the quarter showed the resilience of our diversified business model, helped by stable operations, food and procurement, and better profitability across key businesses. Going forward, while we keep closely monitoring geopolitical developments and raw material prices, the long-term outlook stays constructive. The National Investment Policy announced recently will have offered a supportive framework for capacity expansion ahead, and the ramp-up of our technical ammonium nitrate project, together with continued growth in our value-added businesses, reinforces our long-term growth prospects. With a strong balance sheet and disciplined capital allocation behind us, we are well placed to create sustainable long-term value for our stakeholders. On that note, I would like to hand things back to the moderator and open the floor for the question-and-answer session. Thank you.
Sir, is it necessary for us to request approval once more for the new urea plant, or does the earlier application still qualify? And at this point, does the decision now rest with the government?
Well, I think it is somewhat a combination of the two. As you are aware, we will need to formally apply, since there is a procedure for obtaining bank guarantees and so forth. That therefore takes place only after the government gives its approval to the project. It is part of the procedure. But I think we are a very strong contractor for this work. That is the first point. And the second point is that, in any event, every decision of this kind was subject to approval by the Board.
Sure. And sir, do you have any timeline for when the application window opens or closes?
No, as far as I'm aware it's already open — it's open now. Our understanding is that projects like this, close to INR 10,000 crores, will move through several phases as far as preparation goes. And we'll be able to — first, our Board has to approve the expansion, and for that you'll need to present some financial figures and all of that. Right now, we're waiting on the financial bids for the — the ones we've floated. The technical bids are with us. The financial bids, once the technical requirements are equalized, ought to reach us around middle October or thereabouts. And after that, when the analysis is finished and the Board approval is in place, we will certainly move ahead.
Okay. Sir, how much of WNA and ANS revenue and volume have we booked in Q1, if we have done it?
Prashant, we haven't shown it in the segment, which indicates that we haven't really booked it, even though we have made sales. Commercially, the product has been accepted; we have made the margins on it. <<inaudible>>. Moderator, may I ask you to — there's a lot of background noise coming from somewhere.
Okay. We could mute it, if it is possible.
Yes, go ahead.
Yeah, apologies. We were discussing WNA and ANS; the sales have been made. The way it works is that the project has to be commissioned in every respect. Only after that can you begin booking it in our books. So at present, any sales we have made are not reflected in the profit and loss account. Instead, they go toward adjustments of the — our decapitalization in this case, since we are earning some profits on the sales we are making. So it is in effect decapitalizing the project. Still, we will very soon be putting it into the P&L account.
Alright, sir, but could you break out the sales among G-I, G-II, and G-III for me?
I believe I'll turn that question over to Mr. Anuj Jain for a response.
Yeah, so what you're asking is: G-I comes to roughly 96,000 tonnes, G-II sits at 1.85 lakh tonne, and G-III is 3.29 lakh tonne.
All right. Sir, will it be our aim to make use of the entire 1.27 million tonnes of G-III by November itself, and can that be done?
No. I think as far as the plant's run rate goes, the most we can manage is roughly 9.5 to 10, depending on how circumstances unfold. Finishing that quantity in the time left before the policy period ends is not possible.
First, regarding the complex utilizer business. Margins came in much stronger this quarter. Was that mostly due to buying inventory earlier at cheaper prices? Or did any other factors play a part?
No, it was — actually, on the last call, when we talked about it, we mentioned that we hold sufficient inventory stock for — during the kharif season. So some purchases were made ahead of time, and that has benefited us in this placement and...
Yeah, I can hear you.
Yes. What I had talked about — the final thing I said was that our discussion concerned the placement or the purchase of NBS fertilizers, NPK fertilizers. So my answer was that yes, we did have an advance purchase. That came out on the last call, the previous quarter, and it helped us place, create the revenues necessary and also the margin.
And what margin are we expecting going forward?
It's going to decline, since as the averaging of prices occurs, as we keep doing that, we will do so; we'll still hold on to a certain number.
All right. And then secondly, regarding the TAN volumes you're aiming for this year, what portion is already committed with customers?
Well, it's with vendors that we're committed, yes. We don't actually have commitments with the customers. With vendors, yes. As of today, I believe we've locked in roughly 8.5 lakh tonne. That 8.5 lakh tonne is already committed.
I have a couple of questions. The first one concerns the existing urea, which runs out by December. Could you give us any update on whether it will be extended, or which group it would now come under?
No, that falls under the NIP 2012 policy. As I understand it, this is a group separate from the NIP 2015. Treatment will probably differ, and we are already talking with the government; they requested certain data, that data has been supplied, and the department is currently carrying out its internal workings.
Suppose we said the policy last updated in 2015, where you’ve got different groupings, what we have, let’s say, for G-I and G-II. If we first — if you assume that, if you treat that as a grouping, then what impact would that have? <<inaudible>> This is hypothetical.
I’m not following your question. Are you saying they would put it in the new group, the old group?
Yes. If we had to put it entirely under one of the earlier groups, what sort of financial impact would we likely be seeing?
That is a hypothetical question, and no answer can be provided for it. I have just explained that we are — this set of the new plants is a plant that has not been fully depreciated at only about 8 years into production. And even according to the government's old policies, the timeline for a plant to become fully depreciated is 15 years; so there is no way to mix the 2 policies.
All right. My second question concerns the new NIP 2026, now that you're moving forward with it. Look, compared with the earlier policy, NIP '22, the ROE profile appears relatively dilutive, correct? So what is — why does it still make sense for us to pursue? And what sort of spread should one expect on an EBITDA per tonne basis once it's fully commercialized?
I think you've raised a very pertinent point that this is — yes, it is dilutive compared with the last policy. Definitely, it is. But the advantages of scale at a single location also had to be factored in when designing every aspect of this policy. So in brownfield, especially with Chambal having 4 or possibly 4 plants at the same site, you will appreciate that it will be almost like — not only the largest in India, it will possibly be the largest, second largest in Asia after Qatar, <<inaudible>> and so forth. Now the benefits of scale are tremendous. You must appreciate that in terms of fixed cost, manpower costs and so forth. And second, the optimization of various possibilities with the plant located at one place, not only regarding capital expenditure, but also regarding how operating costs, et cetera, can be brought down; so we have to take all of that into the totality of things. Plus, you must also appreciate that very many other synergistic benefits flow out of scale when we have a large presence in urea and a growing market. As you know, we today have consumption of close to 404 to 405 lakh metric tonnes, while consumption is only 305, 306 — sorry, production is only 305, 306 lakh metric tonnes. So that gap and the reach of our entire dealer network and the cross-sell opportunities arising from that, those are also benefits that cannot be ignored. So we would like to believe that we have a good investment case. Of course, it is subject to approval of the Board. And the most important thing for us is to see how we can optimize the capital cost expenses.
On the timeline side, when would you indicatively expect the plant to be commissioned, and what sort of spreads would one see on a steady basis once it's running at full capacity?
Which spreads do you mean — spreads on what?
On an EBITDA per tonne basis.
Per tonne EBITDA, I believe, is roughly — if I recall correctly, depending on the policy, the one aspect still unresolved here is the dollar rate at which it gets converted into the revenue stream. That figure is something like, taking today's value, it's almost INR 13,500 or thereabouts. And if you take the cost under that along with the other items, I'd say we'll still be around INR 12,000 a tonne.
Got it. On the timeline side, sir, when should we expect that to happen?
Look, that hinges on the contract's effective date and on when the whole process I mentioned is ready to begin and get project construction underway; my view is that we could, even given how things stand today with tight schedules for critical equipment, manage to deliver it sometime between 2030 and 2031, to 2030, sorry.
All right. One final question, then I'll rejoin the queue. Look, given the substantial capital investment we're undertaking, correct? Clearly, we hold a solid amount of net cash, our balance sheet is strong, and cash flow from the existing business comes in steadily. Beyond that, though, are there any other projects? Because in the last few calls, we discussed exploring plenty of other projects, whether along the chemical value chain, in nitric acid, or otherwise. So any color you can provide regarding — are there any additional projects?
Yes; the encouraging signs we're witnessing in our TAN business are certainly making us optimistic about moving forward in that area we just referred to. Furthermore, the, as I said, the effects of having these 4 plants in place also mean we've gained additional raw material sourcing capabilities when it comes to ammonia. And that likewise feeds into this entire model, which is number two. And number three, I mentioned last time, I think that we're holding discussions on a JV abroad for phosphatics. Along those lines, I'd say some progress has been made, and we're proceeding ahead with certain actions. So whenever we reach that situation, we'll definitely inform you about that as well.
Sir, what might the Gcal per metric tonne come to for the new plant at the point when we set it up?
It should be comparable to what we achieved at Gadepan-III.
Has there been no technological improvement since then?
It's possible there might be. What I mean is, I don't have complete knowledge of whether any could arise regarding catalysts, or whether some could come about regarding easing certain pressures in one area or another; that is something we'll find out when the technology suppliers get back to us on those specifics.
All right. And sir, Anuj, what did gas cost us in Q1? And what's the net cash sitting on the books?
The cash price in Q1 — the government has declared only this provisional price, so on an NCD basis it comes to $17.25 for the quarter.
And what about net cash?
Our net borrowing stood at roughly INR 200 crores.
200 crore rupees.
Yes, and let me congratulate you on the strong operational performance — that margin improvement is a good one, by the way. Monsoon onset was delayed this year; I believe it arrived late in July. So are you suggesting the effect on product sales will show up in Q1? The monsoon keeps improving as we move forward. Do you expect Q2 demand to be stronger than what we anticipated perhaps last quarter?
Yes, absolutely. That's something I pointed to in my opening remarks. You can see it, for example, in how fertilizers have picked up as of today. I'm looking at what was happening in mid-June versus now in July. In this month alone, we've had roughly 3 lakh 80,000 tonnes of farmer sales of urea and about 92,000 to 93,000 tonnes of NPK sales. So the pickup works out to nearly 19,000 to 20,000 tonnes per day, which is quite good given how things are improving. And beyond that, once sowing has advanced to a certain level and the shortfall is being recovered, sales of various other specialty nutrients and crop protection chemicals should follow.
All right, sir. So on the whole, you're observing that Q2 will move along better than what we had expected?
Right. Our view is that Q2 will likewise move along well, and channel liquidation is taking place as well, which is going to generate the second round of demand.
Sir, I have a few questions. First, regarding the urea business, we’re seeing better profitability even though volumes are lower. Is that due to the ammonia — possibly surplus ammonia sales — and maybe the currency as well? And if you could, would you share what the surplus ammonia benefit was?
No, let me start by pointing you to what Anuj said about the relative quantities at Gadepan-I, II and III. Gadepan-III was a dominant factor this quarter, so that was the first instance. The second instance was that we had a currency uptick, which directly affects margins where Gadepan-III is concerned. Third, we also had some ammonia sales with better margins. So those 3 factors contributed to the better margins.
Sir, in NPK we have observed that subsidy rates have not been revised as of yet while costs remain elevated. Local production is also at quite a low level, so I am wondering what is likely holding back the subsidy announcement. And if it does not come, could that create certain difficulties, perhaps even from an import perspective?
Yes, let me frame it this way. Subsidy announcements were indeed delayed. Normally this happens once or twice annually, one in May for kharif and one for rabi. The kharif figure is what it is. As I said in my opening remarks, the industry has been in continuous engagement with the government to try to secure better terms, because otherwise demand destruction will occur through much higher prices for farmers. That is one issue that exists. The second issue is that production has been lower because sulfur availability in particular has been a problem for most phosphoric acid manufacturing. That has contributed to reduced output for the phosphatic fertilizer industry in India. Thirdly, there has been logistical disruption from Saudi Arabia and elsewhere regarding the importation of materials, particularly finished fertilizers such as DAP and so on; so these 3 factors have combined. Nevertheless, there were opening stocks and <<inaudible>>. Because of that, we are in a somewhat comfortable position, I think, though the stock will need replenishment going forward and quickly enough. So the sense is that I do not know, the government may feel that yes, they will definitely do something by October. An interim release was contemplated, but it has not yet materialized. As far as Chambal is concerned, we took calculated positions in our purchases starting from January onwards, and although it was not intended that way, it has somehow worked out. We have, as you know, taken about 8.5 to 9 lakh tonnes of material, and that will flow into the system; and we are keeping a good pace of sales, especially as I said, even in new grades such as ammonium sulfate and so on, which we believe is a grade with a lot of promise going forward. So overall, I think Chambal has planned its inventory and its sales, I would say, more rightly than possibly others. So this advantage will flow.
So essentially, from what I gather, the kharif season has wrapped up at least as far as the government is concerned. The next step will likely have to be rabi, and that's what will push things forward further, at least on your end and for the industry?
Yes, that's right.
And sir, that comment earlier about an EBITDA of roughly the new plant — as it stands, a plant of about 12,000-odd tonnes — I mean, is that the base earning, or could there be upside coming from retail savings or from ammonia savings? And I'm also a little confused about the variable — the 12% to 15% variable cap clause on ROE. I'm not sure whether that was also in the earlier policy. So what I'm trying to understand is, say, for example, because of any savings or efficiencies you try for, if your reported ROE ends up higher than 16%, does it get capped at 16%, or is there potential thanks to the efficiencies you can get?
So I don't think there's a gap as such on the 16%, because the government isn't controlling your investment; so supposing theoretically you were to do it at INR 9,000 crores, the brownfield project. You can also work the math that, yes, it could rise depending on efficiency, the prices we get, the energy gain, et cetera, that is there in the system. That's one part. The other part is that, yes, what I said is the most important variable thing in this product today is getting the capital cost to a level where the numbers work for us, and that has to be seen through a plethora of actions we have to carry out — managing the exchange, the taxes and so on and so forth — so that we get absolutely the right combination of this. So that's the effort currently underway to see that we get the best possible combination on this part. So I hope I've answered your question on that side. As far as 12% to 16% is concerned, that's only an indicative range of what the government thinks, that there's a floor and ceiling system in this, which, if you know it in the old policy, was also there — that you could earn a little bit more in case the IPP went beyond a certain number and some part of it flows into your profits. But that is subject to the fact that your gas price should not be more than $14; so as long as the gas price floats between $14 or $6.5 or $7, whatever the case is, you can get that benefit. That's a theoretical benefit; but the other benefit there is, supposing you're able to get the project cost to a certain number and you're operating the plant more efficiently, those are not capped.
All right. Then, sir, my final question — how exactly does allocation of the plan work? I'm simply trying to grasp the mechanics here. You mentioned that you're well positioned. But suppose several applicants come forward, since the quantity is capped, if I understand correctly, at 8 million to 10 million tonnes. What happens if other applicants also wish to proceed? So how does that process unfold? I mean, what makes you confident that you — right?
No, let me frame it this way: first, they must have the plant up within 5 years. Greenfield applicants are numerous, and brownfield applicants are numerous as well. The real question is who moves first. You have to appreciate that in this line of business, there aren't too many vendors, so to speak, qualified to supply plants of this kind. Should they be booked early, or should the shops be booked early, then whoever holds first mover advantage enjoys a bigger edge over the rest.
Understood. So it's the deadline by which the plant must be completed that gives you that comfort?
That's not the only thing. I mean, anyone who then has to put up INR 300 crores, INR 400 crores of bank guarantee has to consider whether they can really deliver inside that window, since that's a financial matter as well, and that's a kind of entry barrier too, because if you aren't confident, you might not step in.
I wanted to ask about the TAN business. Right now, India's TAN market relies on imports, but as Indian companies bring new capacity online, domestic supply could roughly equal demand by FY '28. If demand growth or import substitution falls short of expectations, do you see a risk of temporary oversupply? And if that happens, how do you expect capacity utilization, pricing, and industry margins to look over the medium term, sir? Also, there have been reports that Reliance Industry is evaluating entry into the TAN business. How do you see the potential impact if a large player enters this market?
That's a very pertinent point you've raised. Let me answer your first question first. Yes, we are aware that capacity is expanding in this space. So Indian supplies will rise, though Indian demand is rising too, which is the good part. Infrastructure — roads, ports, bridges, and so on — faces continuous stress, and all of that will require, including, I would say, very large demand projected at almost 86, I mean something like 3 lakh gigawatt or whatever has been discussed regarding expansion of thermal capacity and all that. Coal mining also needs infrastructure in terms of blasting requirements for infrastructure and all that; all of it is going up, which is quite encouraging. So from my own experience, I would say, my own assessment is that we will be short or slightly long in the market perhaps for no more than a year or so, and we will have to manage in this situation. But going forward, the market is again going to get short in terms of demand exceeding supply. And in that sense, we don't have a problem with capacity utilization. Number two, it also depends on the pricing structure you have in the plant in terms of both fixed and variable costs. I believe we do have a good mix there. Third, you rightly mentioned that Reliance are coming in, which means they're going to bring a very large capacity should they plan to enter. Definitely, we'll see what happens then. I can't speculate right now about what kind of capacity is coming in, what the time line for their execution is, and so on, so that is a bit out into the future, a hypothetical question. But as of now, I see no roadblock.
Also, given that TAN realization right now is elevated because of geopolitical factors, how should we think about that?
Could you say that again? Should we be considering it?
In the medium term, how ought we to view margin and sustainable realization, sir?
No, that's fine. Right now, what Mr. Mishra tells me, I think, is that as of now our margins are better than what we budgeted.
Sir, at some point the return on investment under the new investment policy <<inaudible>>. Even so, we will still manage decent savings when it comes to the benefits of a single location and <<inaudible>>. I simply wanted to ask: once you factor in the <<inaudible>> advantage, would that be comparable to the new investment policy?
Himani, would you mind saying that again? The middle part came through a bit muffled for me. I didn't catch it — you mentioned something regarding the old policy and the new policy. Could you go over that once more?
Sir, my question was this: when we compare the new policy with the old one, ROI comes out somewhat weak and diluted. Still, the advantages of a single location will deliver substantial operational benefits for us. So what I'd like to understand is whether those operational benefits will close the ROI gap.
No, not truly. Not truly. A gap exists. A gap still remains. But as I mentioned, being a skilled player in any commodity business is itself a strategic advantage. That, then, counts as a very significant advantage when it comes to how the market gets played out in distribution terms and so forth, along with the synergistic benefits that will flow from it.
Sir, when it comes to phosphates around the world, given the war in the Middle East, what's your read on supply out of North Africa? Are they being hit because of ammonia or sulfur? I just wanted your perspective on global phosphatic supply.
Look, I'll give it a shot, based on the limited understanding I have about phosphatic markets. The North African market, which I believe is mostly what you're referring to, <<inaudible>>; as I mentioned in my opening remarks and as you'll also notice in the results, we went through an extended shutdown for 2 reasons. First, sulfur wasn't available and its price was extremely high; so they have plenty of phosphate but are deficient in sulfur and ammonia, though ammonia is relatively more manageable. They get supplies coming from Trinidad and Tobago and elsewhere. So that's an alternative route for obtaining ammonia. In any case, ammonia makes up 22% or less in certain grades. But if you're going for constant, they also export a lot of TSP funds, which is the world of much ammonia. So that handles the ammonia issue. Sulfur, though, is an essential element. And sulfur is what's required to manufacture phosphoric acid. So there, from what I understand, recently they've managed to source supplies from North America. And that has now got production running. There were, I think, a few cargoes available to them from the Gulf and Middle East during that quiet stretch. But ultimately, I'd say they remain a very strong contender for supplies to the Indian market as well as the world market. And as long as they hold a lot of phosphatic reserves, as long as they continue raising their capacity and leveraging their position, I'm sure they'll be able to capture markets in that sense, because you know China has been more or less out of the phosphatic market for the last 1.5, 2 years. Saudi Arabia is stepping in with expansion; however, we're now constrained by logistical issues. For the short period, I'd say North Africa is more or less a big supplier in that market.
And sir, is Chambal getting its supplies mostly just from North Africa?
No — as I mentioned, our base includes quite a lot of Russian exposure. The majority of the plot material arrives from Russia, while a portion comes from North Africa, specifically DAP or TSP. So in the mix for this year especially, we had a big amount from Russia, since we largely did the NPK side.
Only a couple of things I want to ask. First, regarding the <<inaudible>>, you mentioned that <<inaudible>>.
Can you hear me at this point?
Right. My question concerns NIP 2026. You mentioned that provided the product cost is gotten right and we can achieve improved efficiency, then the <<inaudible>> aren't capped at the 16% ROE. So under the earlier policy, 2012, there was some sharing of that efficiency or — is that still the case in 2026?
As far as I'm aware, under the earlier policy, for up to the 8 years, no gain sharing applies to efficiency gains. And I believe the same holds in this policy.
Got it. So when you mention that we can achieve the right product cost, is that mainly because it's largely brownfield? Or what's going to drive a lower project cost for us compared with other players?
I won't make comparisons with other players, since that's their business first and foremost and their own strategy. It hinges on what kind of contract function it is, whether we handle it ourselves or via our own project team, as we awarded it in an LSTK mode when we shifted some of the risk to the contractor carrying it out. So those are one or two key structural decisions. Beyond that, the timing of placement, the kind of tax structure you adopt in terms of how we go about executing the project, the time line for execution, the financing structure, which will define the interest during construction and so on. Many, many factors go into the project cost. All of them must be hit right in time. And most important is time execution. If we are able to — and we have a track record there, as you know. So that's what gives us the confidence that, yes, we can definitely execute and get the required return.
All right. Then the second question concerned phosphates. You already run a JV with <<inaudible>>, so I'm simply trying to get a sense — since we appear to hold quite a few projects or opportunities, whether in urea or the nitric acid value chain — of what thinking sits behind looking into one more JV in phosphate. Why not do it alone, perhaps in India, rather than overseas? Any views or detail you could share?
What I can say is that we have looked at even a full-scale granulation plant running on rock, beginning with rock. And the problem that keeps facing us is the fact that, first, there is the time needed for execution in India. Second, the cost of building a project is not very different from what it would be if we went abroad to do it — that is number two. Number three, <<inaudible>> has a particular structure when it comes to priorities. They are already raising their phos acid capacity from 500,000 tonnes to 700,000 tonnes, and that should be operational, I believe, around the middle of next year. April to June '27, roughly. That gives us additional capacity and scale. It ranks among the largest phos acid capacities in <<inaudible>>, one of the biggest. That opens certain other opportunities for us in how we exploit the asset — not just for supply into India but also for moving it into perhaps some value-added segments and so forth. So those are further matters that are also feasible for the market. So this has a different sort of structure, given the thinking and the objectives behind that particular JV. The other JV we are discussing is tied only to supplying materials into India for the granulated <<inaudible>>, and there we will be on both sides — selling as well as purchasing, or rather producing as a partner somewhere; so that is the rationale for doing that particular JV.
I wanted to ask about the <<inaudible>> project. My sense is that over the last few quarters, the expectation was that, looking at the year overall, we should be able to ramp up utilization quite high quite fast; so for FY '27 as a whole, we could see utilization above 70%, 80%. Does that still hold, given what's happening in the market?
Let me put it this way: from the little I've observed over the last 1.5 months — we began in earnest with ammonium nitrate <<inaudible>> around 15th of June, and we've now had close to a month of volumes — I'd say the market has responded well to our product, whether on quality, on delivery schedules, or on pricing. That gives me confidence that even though this is a lean season, it can definitely move ahead, and we can look forward to a better season starting from the third quarter, beginning sometime in the first week of October and so on, as the market picks up; and as you know, our <<inaudible>> capacity is nearing completion and will also start very soon. So that tells us that with the 3 products in the pipeline — <<inaudible>> as well as <<inaudible>> — we run the combination in the most profitable manner. And, as you know, we've also started putting up warehouses and so on; two are close to completion. One is already complete. That gives us the ability to place our material advantages with the users. So all of that mix, the marketing mix, I think, is coming together, and it should be finished by somewhere around end of December — all the marketing mix elements as the large product elements; so that gives me confidence that we'll be able to generate the necessary numbers and the volumes.
Given the significant CapEx — and possible additional CapEx — on the way, I have just one quick question. When it comes to capital allocation, how do you see dividends or buybacks playing out from here?
On dividends, I think — whatever figures we’ve achieved, we will certainly keep the numbers we have. I don’t see any change there. In any case, we have a policy. There’s a profit figure. We have stated that roughly 25% will be paid out on that. So I don’t believe that’s an issue. As for buyback, I think we’ve always said it depends on the fact that if we aren’t able to — if we don’t have visibility regarding projects and so forth. In that case, we will certainly step in; but apart from that, I don’t think a buyback is on the horizon.
The first thing I want to ask about is why building a cannulation plant in India costs more than doing it internationally. Could you shed some light on which parts of the overall process carry the higher cost? And roughly what the cost difference would be.
We actually ran a theoretical exercise on the West Coast of India, looking at all the elements — land, development, port facilities and so forth. In this plant, Darshita, the core units are the sulfuric acid plant, the phosphoric acid plant and the granulation plant. On top of those, there are plenty of other expenses — storages, some disposal, raw material storage and the like. So the outside battery limit, OSBL, that cost tends to outweigh even the cost of the <<inaudible>>, which is the inside battery limit cost. We have crunched these numbers a couple of times — you need infrastructure to move the rock, to store the rock; if you are doing potash grid, you need potash-type storage; you need a great deal of equipment to hold the ammonia, since <<inaudible>> you have no ammonia backup, <<inaudible>> ammonia at certain times, and those are very costly items. Taken altogether, it is the outside battery limit that drives a lot of the cost increase, plus, naturally, the — and we did that calculation, and we brought in some consultants for it. Figures that had not previously been factored in, and when you run the numbers, you apply the higher limit plus 20%, not the minus 20% on the quote; so it was working out more expensive to do it that way than through a JV outside.
Understood. And second, I believe somebody has already raised the question of what's behind the holdup in the government's subsidy announcement. We've circled this topic repeatedly for quite some time now, but what's your best guess for why there's been such a long delay, especially when NPK production has already dropped considerably over the last quarter, and we're already running into problems getting hold of it anyway?
In my view, the government was monitoring, and continues to monitor, 2 things. How much stock is there? How is El Nino developing, what's the state of stock depletion? And do they have a sufficient pipeline for the next month, or the first month, of the rabi season, and so forth. I'd imagine, if I held some position in the Department of Fertilizers, that would be the thinking; so it comes down to a balancing act. The government must also consider its fiscal position. They already have a policy, as you can see with urea, involving cost plus, where every cost gets absorbed. There's a policy for DAP too, where all costs are blocked. So the only question is what their focus happens to be. Is it just that there are 2 grades, while the others are kind of supplementary grades, or perhaps other grades, for which they might lack that sensitivity, I don't know. I mean, this is my — I don't know, my assessment is that perhaps they're striking a balancing act regarding the NPK subsidy. DAP is open when it comes to advantage and disadvantages. So it's now more or less like urea.
Sir, one final question from me about the e-token that's been announced, I believe in a few states so far, where farmers face a limit on how much urea and DAP they can purchase. Have you come across this? Could there be — I mean, in your view, what's the government's thinking here, first of all? And second, if this gets rolled out across all of India, do you see DAP and urea consumption declining in any case?
Darshita, as things stand right now, there was an agitation 2, 3 days back in <<inaudible>>, and the government has put the e-token system on hold.
Hello everyone, thanks so much for being with us on today's call, and I hope we managed to answer everything you asked. Should anything else come up, you can get in touch with our investor relations partners at Valorem Advisors. Thanks again for taking part in the call.
Thanks. That brings this conference to a close on behalf of Chambal Fertilisers and Chemicals Limited. We appreciate you being with us, and you can go ahead and disconnect your lines now. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Chambal Fertilisers and Chemicals Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Chambal Fertilisers and Chemicals Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.