Good morning, everyone, and thanks for being with us on this conference call as we discuss Cipher Digital's business update covering the third quarter of 2026. On the line with me today are Tyler Page, our Chief Executive Officer, and Greg Mumford, our Chief Financial Officer. I'd like to point out that you can find our press release and presentation in the Investor Relations section of the company's website, and a simultaneous webcast of this call is also available there. Please be aware as well that this conference call belongs to Cipher Digital, and taping it or reproducing it in any other way is expressly prohibited unless prior consent has been given. Before we begin, let me remind everyone that our remarks in this discussion, along with our press release and presentation, include forward-looking statements. Such statements cover, among other things, Cipher's financial outlook, business plans and objectives, and other future events and developments, including statements regarding the market potential of our business operations, potential competition, and our goals and strategies. The forward-looking statements and risks discussed on this conference call, including in responses to your questions, rest on current expectations as of today, and Cipher undertakes no obligation to update or revise them, whether because of new developments or otherwise, except as required by law. In addition, this discussion may include non-GAAP financial measures; we may use non-GAAP measures to describe how we manage and operate our business. We reconcile non-GAAP measures to the most directly comparable GAAP measures, and we encourage you to examine those reconciliations, which are filed at the end of our earnings release issued earlier this morning. I'll now hand the call over to our CEO, Tyler Page. Tyler?

Rodney Page executive
#2

Courtney, thanks. Morning, all — glad you could join. Tyler Page here, Cipher Digital's CEO, and I'm happy to have you on the call covering our business update for Q3 2026. Recent months have really challenged our sector, though I'll say upfront that Cipher was designed for exactly this kind of market. You've seen stories asking what direction the industry will take, driven by fresh regulatory moves and swings in the market. Even so, the underlying basics — demand for compute, for instance — keep improving and nothing else. Demand from tenants across our whole pipeline is the strongest it has ever been as of today, and our strategy—something that's easy to overlook when markets are quieter—will keep demonstrating its value. The choices we made early on regarding the partners we work with, the way our projects are structured, how we navigate a regulatory environment that keeps changing, and how we involve our communities were all shaped with exactly these circumstances in mind. With financing markets growing more selective and construction expenses climbing, we've adjusted our approach to keep pace. I'll walk through each of those points in more depth today. Before that, though, I'd like to pause and remind everyone of who we are and what we do. Fundamentally, Cipher's business is spotting powered land sites that the market undervalues, then deploying money, know-how, and disciplined execution to realize their worth via leasing and development. In plain terms, the company generates value by converting limited power capacity into infrastructure locked into long-term contracts. Six pillars support this approach; we originate sites through inventive, low-cost identification and acquisition of land together with power contracts. Those sites are then leased out by securing long-term contracted cash flow arrangements with HPC tenants of the strongest credit quality, and our ties with these tenants keep growing stronger. We provide the financing for these deals — Greg will get into that in more detail — through pioneering capital markets solutions that support sustainable growth; we've completed three project-level financings successfully, and each successive project has achieved cheaper funding; we then deploy that capital to develop and deliver mission-critical infrastructure, building campuses designed around dynamic tenant requirements with expert in-house teams across engineering, procurement and construction. We own and operate the sites while generating recurring long-duration cash flow. And finally, our financing structures let us unlock project equity from stabilized sites, pull that capital back to the parent and reinvest in future development. Greg has described that flywheel on prior calls, and it is central to how we compound value over time. The model has been validated at our initial HPC data centers. In our industry, we were early movers in getting leases signed, and we collaborated intensively with every tenant to fine-tune their design basis—work that sharpened our construction know-how and made our customer ties stronger. That work has yielded three data center campuses with 700 gross megawatts in total, each close to completion and each leased to some of the world's most advanced technology firms. Together, they now represent $16.6 billion of contracted revenue over the coming 20 years, equivalent to approximately $864 million in average annualized NOI projected over that period. Construction is underway on all three projects; Black Pearl has already delivered its first capacity, and further capacity at each of the three sites should come online in stages over the months ahead. With our initial HPC data centers approaching completion, we're building on choices that have worked well for us and sharpening how we proceed from here. Let me take you through a few of those points. Above all, our focus has always been on teaming up with customers of the strongest credit quality, whose strength underpins our capacity to finance every project. We keep strengthening those ties and are also holding discussions with every major hyperscaler and AI lab about our substantial pipeline of sites. Moving on, we remain disciplined about pursuing leases that stand up when you weigh risk against return. In practice, that keeps us focused on the long-term colocation model. We are not a Neo cloud. When it comes to Neo cloud providers, their customers obtain direct access to chips. That kind of approach may generate a larger headline revenue opportunity, but it also brings a considerable increase in risk and financing obligations. There is less visibility into revenue, more risk exposure, and margins are highly sensitive to changes in the cost of capital as well as spot pricing for compute. As a provider of long-term colocation, we offer turnkey data center capacity that tenants fit out themselves. The capital we deploy goes toward the data center rather than the chips inside it. As part of those arrangements, we sign long-duration agreements with counterparties of strong credit quality, and those agreements provide clear visibility into future revenue along with a risk profile that stays more bounded. When capital becomes tougher to obtain, that distinction matters. Predictable contracted cash flows are something lenders and investors value highly, and delivering exactly that is what our model was designed for. In our view, this positions Cipher to produce risk-adjusted returns among the most attractive in the sector, and we intend to keep our focus on that approach. So what has changed on our side? The first change involves the way we set pricing for new leases. Every project gets evaluated using a yield on cost basis — meaning the stabilized yearly income a site generates measured against the full cost to build it. With the market-wide cost of capital climbing, our focus is on making sure returns on new leases keep up, and we believe that's within reach given continued demand growth and the scarcity of available power in the years to come. The gap between our yield on cost and our cost of capital is one route through which we create shareholder value, and we're intent on safeguarding that gap. Beyond that, we're now putting more development capital in at the earliest phases of every project. Early on, as we shifted into HPC data center development, our tenants and we ourselves were ready to put pen to paper on leases prior to having a fully settled basis of design, because speed came first. These days our stance is more measured: before any lease is signed, we get aligned with tenants on what the design needs to deliver, which lowers the danger of sizable change orders and timeline disruptions once construction is underway. Throughout the near-term pipeline, we have worked hard to push design sets to a level between 30% and 60% complete prior to lease execution. Completing the engineering and design work up front means we get a far better understanding of supply chain and construction expenses before we finalize lease economics. In parallel, we're taking a proactive and selective approach to procurement—securing critical equipment early—so that our development timelines remain protected and Cipher is insulated from supply chain availability issues and cost inflation. In addition, we're exploring various new lease structures going forward, including establishing construction reimbursement agreements with tenants prior to executing the final lease. In summary, the fundamentals of our business are unchanged. We continue to concentrate on creditworthy tenants, long-term colocation leases, and returns that warrant the capital we invest. What is different is the rigor we apply to each new project, from the way we price leases to how early we secure design and procurement. That evolving approach, we believe, puts Cipher in position to grow with confidence as we work through a pipeline of roughly 5.9 gigawatts of near-term opportunities. Let's now move to our three contracted campuses.

Rodney Page executive
#3

For all of these leases, we've teamed up with top-tier tenants on agreements whose weighted average term comes to 17.3 years—that works out to roughly $16.6 billion in contracted revenue, or about $28.4 billion if every extension option gets exercised. These are long-dated cash flows, very visible, and supported by investment-grade credit. With capacity now live at Black Pearl and the first data halls at Barber Lake starting to come online, those projected cash flows are steadily turning into actual revenue. Let's step back now and take in the whole picture of what we've built. Looking across our operating contracted developments and our future pipeline—covering both grid-connected and on-site generation opportunities—the portfolio now stands at roughly 6.8 gigawatts of capacity. Some of that reflects HPC capacity we've already contracted, along with our legacy Bitcoin mining capacity at Odessa. The vast bulk of it, though, lies in our pipeline, which means considerable growth on top of what's already under contract. We're exceptionally well positioned when it comes to multiple avenues for future growth—through continued site acquisitions and expansion of existing sites, plus adding on-site generation, something our sites are especially well suited for. Moving to Slide 7. I'd like to call out a few key developments from the quarter. First, and most significantly, we amended and expanded the lease at Barber Lake. That new lease adds another 10-year term and lifts total contracted revenue at the site to $9.1 billion. We've also put in place a phased delivery schedule, with individual data halls coming online between the fourth quarter of 2026 and the first quarter of 2027. Second, we're happy to report that we booked our first HPC lease revenue at Black Pearl during Q3, helped in part by capacity we delivered ahead of schedule at our tenant's request. That revenue will keep scaling as we bring additional capacity online at Black Pearl, Barber Lake and Stingray over the months ahead. Third, we made solid progress on our Texas pipeline, securing bat zero classifications at a number of pipeline sites, among them a conditional baseload classification covering 1 gigawatt at Colchis. We anticipate final classifications in December, once the data center audit wraps up. Fourth, we kicked off development of lateral pipelines able to support as much as 2.5 gigawatts of on-site generation. These pipelines will link multiple sites to natural gas supplies, potentially making power available as soon as late 2027. This on-site generation approach gives us an additional route to power beyond the grid and lets us grow the capacity available at existing sites. Lastly, we're proud to back the communities in which we operate. Alongside FluidStack and Anthropic, we committed a combined $10 million toward repairing and upgrading Colorado City's water infrastructure. The money will fund municipal infrastructure upgrades the city has identified to improve water availability for residents in the wake of last summer's shortages. Moving to Slide 8. Let me take a few minutes on the lease expansion we recently completed at Barber Lake — why we went after it, and why it represents such a strong development for Cipher and for our shareholders. Let me start with the figures. Under the amendment, the base lease term doubles from 10 years to 20, and contracted revenue rises to roughly $9.1 billion, which adds $5.2 billion in incremental rent. Importantly, every key project metric at Barber Lake — IRR, MOIC and net present value — improved materially, even once the incremental capital investment the deal required is factored in. As meaningful as those improved economics are, the most valuable piece of the transaction is the direct relationship we are building with one of the world's leading AI labs. In the years ahead, we expect this tenant to become the most significant colocation tenant anywhere in the world, and over time our aim is to develop many data centers on their behalf. The altered structure of the lease also shows that AI Labs is committed to this site for the long term, and we view the site as a strong candidate for future expansion. Making sure Barber Lake is positioned to grow alongside this tenant sits at the heart of our long-term ambitions for the site. Importantly, the amendment also puts in place a phased delivery framework that aligns with our tenant's compute deployment, and we remain on track against that schedule. Data halls will be delivered from the fourth quarter of 2026 through the first quarter of 2027, and our tenant is actively deploying compute right now. Before I take you through our portfolio and pipeline, I'd like to turn things over to our CFO, Greg Mumford, for more perspective on the expanding opportunity we have at Barber Lake.

Greg Mumford executive
#4

Thanks, Tyler. Now at Barber Lake, this transaction produced genuine commercial success. Revenue increased by $5.2 billion, we extended the lease term by a decade with the space sitting directly in front of a leading AI lab, and we established a cost-sharing arrangement generating approximately $500 million of additional revenue over the 20-year term. To secure those improved economics, Cipher opted to commit more capital to the project. That investment consisted of two primary components. Change orders made up the first. As construction progressed, our tenant's requirements evolved in real time, producing roughly $409 million in change orders. Under the lease, those costs would have been the tenant's responsibility and reimbursable to Cipher. Through the amendment, the tenant bears about $50 million, and Cipher agreed to cover the remaining $359 million in exchange for the 10-year extension and the substantial added revenue tied to it. We view that as an attractive trade of near-term reimbursement for significantly greater long-term asset value. Higher construction costs formed the second component, driven by scope changes, inflation, and rising labor expenses. Per the amendment, we share those costs equally with our tenant and recover the tenant's portion through rentalization at a contracted rate of return over the lease term. The right side of the slide shows why we see this as the right capital allocation decision. At original underwriting, Barber Lake was guided at $9 million to $11 million per IT megawatt. We ultimately financed the project at $10.4 million per IT megawatt, supporting an average yield on cost of roughly 15%. Without the amendment, reimbursed tenant-directed change orders, together with general scope evolution and inflationary pressure, would have driven Cipher's cost to $12.3 million per IT megawatt and reduced our average yield on cost to about 13%. So instead, we elected to invest additional capital covering part of the reimbursable change orders and the extra cost to complete, in return for better lease economics and a stronger relationship with the end user compute at our site. Through the transaction, Cipher's cost increased to approximately $13 million per IT megawatt, yet the additional rent restored the project's average yield on cost to around 15%. We also secured 10 years with an improved credit, roughly $5.2 billion of contracted revenue, and better NPV and MOIC for the project. This represented 4% of something more than merely capital required to finish the project. It was an incremental investment made to lock in a materially more valuable contract. We believe the added long-term value we secured at Barber Lake considerably exceeds the incremental equity we contributed to obtain it. With that, I'll return it to Tyler to walk through our current portfolio and pipeline.

Rodney Page executive
#5

Thanks, Greg. Now let's look at the portfolio we currently hold. We'll begin with Barber Lake. The build is still tracking to plan, and compute deployment across the facility has started with our tenant. We're eager to report more milestones as we hand over the first data halls over the next few months, and the last data hall at the grid-connected site is anticipated to be delivered in Q1 of 2027. During the last few months, we picked up 685 acres of neighboring land to back expansion possibilities at the campus. Turning now to Black Pearl and Stingray. At Black Pearl, we handed over first capacity in August, ahead of plan and at our tenant's request, and booked our inaugural HPC lease revenue. As of today, 18 megawatts of critical IT capacity have been delivered, and the rest of the Phase 1 data halls are moving through MEP fit-out. For Phase 2, foundations and building steel are finished and electrical work is in progress; working closely with our tenant, we're lining up a phased delivery schedule that fits their compute deployment plans, and construction is tracking those dates. We also picked up 256 acres of neighboring land to back future growth at the campus. Next we go to Stingray, where earthwork, grading and pad preparation are close to done and steel erection is moving forward, with shell construction anticipated to wrap in the fourth quarter; we're also carrying on with site grading that could support later expansion phases at the site, and we're eager to give updates on Stingray's progress as construction accelerates over the quarters ahead. Odessa, the last Bitcoin mining site we operate, turned in a solid third quarter, generating roughly 296 Bitcoin. We keep assessing how to monetize Odessa's speed-to-power value as an HPC development site, which stems from two sources: our long lead time equipment and on-site infrastructure, plus the remaining term of our PPA. Combined, these give any future developer a meaningful time-to-power edge; we're eager to share updates as those discussions move along. Now let's move to an update on the pipeline we're developing. Both Reveley and Ulysses hold full interconnection approval and sit outside ERCOT's batch process. Demand for sites that can be available in 2027 is extremely strong, but our focus is on landing the right leases for Cipher, not merely the first ones that come along. As I noted earlier, we're collaborating with prospective tenants to advance design elements up front, which will lower the risk of cost and schedule effects from change orders once construction gets underway. We think this deliberate approach is the correct one in a market dealing with inflation and supply chain difficulties, and that spending more time on design and tenant alignment before lease execution will generate more shareholder value over the long term. Turning to 2028, we obtained a conditional baseload designation for Colchis, our 1 gigawatt site. We have fully complied with the data center audit and anticipate final classification in December. With its size and the way it connects to the grid, we see Colchis as a foundational piece of the portfolio we're building for the future, and interest in that site has been incredibly strong. We're talking with several counterparties of the highest caliber, and in line with how we handle everything in the pipeline, we're putting engineering and design money in up front. The site now covers 622 acres, which puts Colchis in a good position to be leased once the final classification comes through. A number of other sites in our portfolio picked up valuable PCLR designations in the study blood category, and we anticipate news on those in the coming year. I do want to take a moment on on-site generation, which for Cipher we see as the next big value driver over the near term. During Q3, we started work on lateral pipelines that can support as much as 2.5 gigawatts of generation, with the possibility of first power coming online as early as 2027. Because of that timing, this capacity is in high demand across both our contracted sites and our pipeline sites, and right now we're in early-stage but active commercial negotiations covering roughly 1 gigawatt of data center leases supplied by on-site generation. Slide 16 lays out our portfolio in full as it stands today, including additions made during the quarter. I won't go through each element, but a few deserve highlighting. In the quarter, we bought Horizon, a 70-megawatt site located in Texas. Horizon holds an executed interconnection agreement with the utility and should energize in 2029. Our site acquisition team keeps building out the pipeline, and Horizon is a fine illustration of what they find. We acquired that site at an attractive price, and we believe our expertise can unlock significant value there as an HPC campus. I'd also like to point to the PCLR designations at Mikeska, Apollo and the Stingray expansion. Out of roughly 150 conditional studied load sites, only 11 initial sites received this designation, and these were three of them. With PCLR status, these sites can draw full power before local transmission upgrades are done, so we expect to get the full megawatts we requested on the time lines we submitted, with a portion subject to curtailment; we should have more clarity on the curtailment terms next year, but we see multiple ways to engineer backup generation for that portion, which would let us commercialize these sites even before local transmission upgrades firm up full power. Counting the potential 2.5 gigawatts of on-site generation capacity from our lateral pipeline investments, our portfolio as a whole today totals 6.8 gigawatts. We believe hyperscalers and AI labs will show strong demand for our pipeline sites, and we'll be disciplined about how we bring each one to market, prioritizing creditworthy tenants, long-term contracts on attractive terms and returns that create lasting value for our shareholders. With that, I'll hand the call to Greg, who will take you through our financing activities, capital structure and financial results for the third quarter.

Greg Mumford executive
#6

Thanks, Tyler. As Tyler laid out, the need for our capacity is still strong, and we think Cipher is nicely placed for this market. One area where that comes through plainly is the performance of our financings at the project level. Even as capital has become harder to access throughout the industry, our project bonds have beaten peers by a meaningful margin, which stems directly from the creditworthy tenants and financeable lease terms we have made priorities since the beginning. A core piece of our strategy is funding each project efficiently through flexible structures that let us recycle capital into new development as time goes on. We also understand that the way we fund our next stage of growth matters a great deal to our shareholders, and we keep that in mind with every financing decision. Today, I will go through where our capital structure stands, the specifics of our recent convertible offering and how we are thinking about funding growth from here. I will then go over our third quarter financial results. To begin, let's look at our current capital structure and liquidity position. As we discussed on earlier earnings calls, all three of our contracted campuses are financed at the project level via a dedicated senior secured bond, with the parent supplying equity alongside. This structure keeps each project's debt isolated, with repayment coming from long-term contracted rent paid by investment-grade counterparties and principal amortized over the underlying lease terms. Over time, our pricing has consistently gotten better—starting at 7.8% for Barber Lake, then 6.8% for Black Pearl, and 6% for Stingray. I'd like to take a moment to highlight how these project bonds have weathered a credit market that has been more difficult. While the credit market for AI infrastructure more broadly has seen a substantial repricing during the past several months, Cipher's project bonds have fared much better. That relative performance matters to us, because it confirms choices we made long before market conditions became more challenging. Since the beginning, we have intentionally focused on tenants with the strongest credit and on lease structures designed to be financeable; when markets are steady, those decisions tend to go unnoticed. In conditions such as the current ones, they set us apart in an obvious way. We think the comparative outperformance of our bonds shows the resilience of the cash flows we have under contract, the caliber of our counterparties, and our expanding record of getting deals done. That credit standing has a direct bearing on how readily capital is available for our upcoming projects and on what it costs. Following the quarter's close, once the Barber Lake deal was finalized and we could pin down the expense with strong confidence, we sold $850 million in 0% convertible senior notes maturing in 2032, carrying a $15.31 conversion price, and directed part of those proceeds toward our investment in the Barber Lake lease amendment. Choosing the convertible market allowed us to secure six-year corporate capital carrying a 0% coupon alongside a 35% conversion premium. To further protect shareholders, and in line with the growth we expect, we allocated about $90 million to a capped call. That effectively offsets dilution through $28.35 per share — 150% above the reference share price. At the same time, we equitized about $166 million of our 1.75% convertible notes due in 2030 using common stock, retiring over 90% of those notes and removing substantially all cash interest expense tied to that issuance. On the whole, total debt is about $6.7 billion. That figure includes $4.5 billion of nonrecourse project level secured notes plus $2.2 billion of convertible notes at the parent, and nearly all of them carry a 0% coupon. After accounting for cash and cash equivalents, net debt comes to roughly $3 billion. On a pro forma basis for the October offering and the Barber Lake funding, we hold approximately $724 million of unrestricted cash and cash equivalents. What really matters here is that the money is in place to carry our contracted projects all the way through. For Barber Lake, we used part of the convertible proceeds to cover the added investment required by the lease amendment, and the cost safeguards written into the Black Pearl and Stingray leases limit what Cipher can be exposed to beyond the agreed CapEx thresholds. Our working capital is sufficient to navigate a challenging market environment while continuing to invest proactively in our development pipeline. In short, the way our capital structure is set up fits nicely with the cash flows from our contracted projects, those projects have full funding, and the parent balance sheet gives us room to back our pipeline. With that, let's turn to a look at our financial results for the third quarter of 2026. In the third quarter, revenue reached $27 million, compared with $25 million during Q2. This period, as Tyler noted, includes our first revenue from HPC leasing and introduces segmented reporting. GAAP net income for the quarter was $32 million, whereas last quarter we had a GAAP net loss of $268 million. The shift largely stemmed from a $127 million noncash gain related to our warrant liability, versus a $151 million noncash loss in the previous quarter. Adjusted EBITDA also showed improvement, moving to a $10 million loss from a $30 million loss in Q2. Compensation and benefits decreased to $39 million, mostly because of lower stock-based comp. G&A came in above where it stood last quarter, largely because of consulting fees tied to transactions and a $3 million charitable donation to Colorado City. In Q3 we offloaded 632 Bitcoin, bringing in $45.5 million of cash and booking a $0.5 million realized gain — a swing from the $24 million realized loss we recorded in Q2, which reflects the fact that this quarter's sales came out of lower-cost 2026 production as the market recovered. Turning now to below the operating line: interest income reached $33 million, lower than $36 million, since restricted cash was directed into construction. Interest expense fell to $59 million from $67 million. Capitalized interest rose to $37 million, up from $16 million, as construction spending picked up across Barber Lake, Black Pearl and Stingray—a jump that more than offset the first full quarter of interest expense tied to the Stingray notes. Turning now to the balance sheet as of September 30, 2026: at the close of the third quarter, total assets came in at $7.7 billion, which is $3.4 billion above the December 31 level and basically flat compared with June 30, since we put substantial capital to work on our three projects during Q3. Restricted cash declined by $1.5 billion over the quarter, finishing at $2.2 billion. Property and equipment, in turn, increased $1.8 billion to $3.9 billion, a reflection of active construction at our sites. We also continue to invest in our pipeline. Intangible assets rose by $48 million, driven mostly by activity around site acquisitions, and security deposits held with utilities increased by $62 million. Now looking at liabilities: accounts payable, accrued expenses and other current liabilities are still shaped by the usual timing of construction billing and payments. Deferred revenue came to $46 million, reflecting tenant prepayments as well as change orders billed before recognition. Ahead of taking your questions, I want to wrap up with several key points. The Barber Lake amendment more than doubles the contracted revenue at that site and raises the project's returns across every key measure. We issued long-dated capital carrying a 0% coupon, paired with a cap call that protects shareholders from dilution. Right now, every project we've contracted has the money it needs to reach completion, and the parent company still holds additional liquidity. On top of that, the design and procurement work underway positions us to provide stronger certainty on cost and scheduling for each lease we sign going forward. Conditions in today's market are tougher, and we think that plays to Cipher's advantages. We have a substantial backlog of hard-to-find power prospects, deepening relationships with major hyperscalers and AI labs, and enough financial flexibility to be picky about which prospects we pursue. We aren't chasing growth merely for growth's sake. Our goal is converting those prospects into long-term contracted cash flows and delivering lasting value per share. Thank you for your ongoing support. Tyler and I are happy to take your questions.

Ryan Gravett analyst
#7

With what you just told us about Barber Lake plus the wider rise in construction expenses the industry is facing, how ought we to view upcoming CapEx needs and cost per megawatt as we move forward? Also, do you anticipate being able to lift rental rates to match build-cost inflation on upcoming projects and still hold development yields steady down the road?

Rodney Page executive
#8

Appreciate the question. I'll give that an initial shot, and afterward, Greg, feel free to layer in more detail, since you're likely closer to where financing costs sit on a day-to-day basis. Broadly speaking, I'd note that we've been operating in an environment where supply chains are strained and labor costs are inflationary. Our view is that 2027 will carry that pattern forward; answering you with precision is tough given how heavily design requirements factor in. The way I'd frame it is that tenants clearly understand costs are rising. They also know that when they partner with a firm like Cipher, we will in turn arrange financing for the build on their behalf; so to this point, what we've observed is a readiness to raise rent to keep pace with higher financing costs. Beyond that, I think we're witnessing structures evolve. By that I mean tenants are more and more open to considering arrangements such as CapEx reimbursement agreements set up in advance, which lets them protect schedule by advancing dollars up front to lock in our long lead equipment, with the option to finance it later on. I'd add that tenants are also exploring ways to potentially remove costs from their designs, as thinking around these data centers keeps shifting. So my read is that right now there's a willingness to respond to these pressures. Greg, not sure whether you'd like to add more detail on what we're seeing in the financing markets.

Greg Mumford executive
#9

Absolutely, and thanks for asking, Ryan. So we touched on this somewhat during the prepared remarks for the call, but I believe it's worth emphasizing once more: there are roughly 20 to 25 high-yield issuances out there that are funding construction for a wide range of different tenants, with various backstop arrangements, and sort of spanning the entire spectrum. Among that group, three of the four bonds trading tightest by spread are ours. I think that matters because it reflects what we've done historically, which is to target counterparties of the best quality. But it also shows our focus on ensuring we maintain ongoing access to the capital markets at an efficient rate. So we're highly focused on making sure we have that access to the capital markets. We believe that given where our bonds are trading, we'll be able to go out and keep financing our projects, assuming we stick to our knitting and concentrate on truly high-quality tenants.

Eric Luebchow analyst
#10

I'd like to bring up the Odessa project. I'm aware that — the Odessa site. I'm aware New Era Energy signed a PPA with Luminant for a different project. And I was hoping to understand how, if in any way, that affects the monetization opportunity at that site.

Rodney Page executive
#11

Absolutely. So my view is that our opportunity at that site is still very strong when it comes to monetizing it for HPC. I say that because that PPA they signed is one we know well. What I mean is that's a structure which, as a developer, we wouldn't sign. What we're aiming for is behind-the-meter setups in which our $1 trillion market cap tenants would bear the very onerous requirements of any PPA; so they're taking that on. That said, any tenant with interest in that site requires access to it as fast as possible and generally wants hard to obtain long lead equipment, which we have. So we maintain — discussions are ongoing. My view is that we're holding an extraordinarily valuable piece of unlocking that puzzle. I don't see us putting any equity into that site if things proceed the way I expect them to; we'll simply earn a return from our ability to unlock tenant interest at that site. But those discussions are ongoing, and we remain very confident.

Eric Luebchow analyst
#12

Great. And just one more question from me, Tyler. Given how much you're exposed to Texas and a few of the regulatory complications that come with ERCOT, how are you thinking longer term about geographic concentration versus considering sites beyond Texas? I realize you do have one site, or one pipeline site, in Ohio, but how are you weighing that over the longer term? How concentrated do you want to be?

Rodney Page executive
#13

Yes, sure. That's a great question. We've devoted an enormous amount of time to thinking about this. The truth, I think, is that Texas and its changing regulatory landscape are pretty much on par with virtually every other data center location across the United States, in the sense that the environment is simply evolving, whether that involves regulatory approvals, taxation, community engagement, et cetera. Obviously it's attracting the most attention because so much build-out is planned there. And clearly, we have a lot of exposure there. Over the long run, our view is that data center construction is essential to the future of the United States economy. We're in an election cycle right now. There's plenty of noise. Over the long run, whoever holds office doesn't matter. This is a crucial component of the success of the country and the state of Texas. So even though Texas is drawing a lot of scrutiny right now from — from investors wondering what this means, we don't really believe it differs materially on those factors from a risk standpoint compared with other locations. We'll have to see. We've been operating in ERCOT for a long time. Broadly speaking, we consider it a really, really well-run system. We're excited to be building in Ohio; we're looking at sites in other locations. But I'd also point out that, across the board in other locations, you're seeing things such as really long time lines to power availability as well as more onerous deposit requirements. And so while diversification is always appealing in theory, if you're considering a site where, in order to get access to it, you've got to post hundreds of millions of dollars of deposit for five years to get an interconnect in the 2030s, that's just not quite as attractive. So look, on the one hand, we're always looking. We evaluate sites constantly; but we remain very confident in Texas, no matter sort of how that process evolves, frankly.

Greg Lewis analyst
#14

Tyler, I wanted to dig a bit deeper into those lateral natural gas pipelines you're working on. Obviously, getting to market quickly for power seems like something companies with power access will keep leveraging over the next couple of years. When we think about that pipeline, how do we also need to handle the equipment side—converting the natural gas flowing through those pipelines into power?

Rodney Page executive
#15

Thanks, Greg. That's a really good question. At a high level, I'd say what really drives tenant interest in on-site generation is the time-to-power story; put differently, grid power is simpler in many operational respects, but getting a data center running faster is so valuable that when regulatory or other obstacles affect the potential timeline for grid-connected assets, tenants are ready to get creative. What we've seen, I think, is that tenants prefer a site where they can handle their own generation while also having a route to grid connection; so our sites are extremely valuable. Our thinking on the laterals is this: we have sites situated close to large pipelines. We have sites that are grid connected or will be grid connected soon. And that expansion capacity can be quite enticing to a tenant looking to do very large build-outs. Now regarding the equipment, securing it is one of the genuinely difficult pieces. There simply aren't sufficient turbines and reciprocating engines available worldwide. How we're structuring it in our envisioned deals is that an IPP—a very well-known, reputable, creditworthy IPP—would work directly with our tenant to arrange for equipment to be supplied and operated, and then that IPP would face the tenant under a power purchase agreement; so ultimately, Cipher's role will be financing and building a data center. We'll need to figure out how we build and operate that differently, since the power source differs from the grid. But the equipment challenges and operating it all sit between the tenant and the IPP, rather. That's one of the difficult aspects of pulling it together. We're already in advanced discussions on about 1 gigawatt of deals; so we feel very well positioned there. We've got multiple interested tenants at multiple sites, and we're thinking about the long-term viability of just how big our sites can be over time.

Greg Lewis analyst
#16

All right, that's really useful. Then I have one about Horizon. That 70-megawatt site — I suppose, first, since it's under 75 at that size, my assumption is it falls outside batch 0. And second, does that shift your thinking at all about possibly expanding that site over a longer horizon?

Rodney Page executive
#17

Yeah, I believe it does. What I'd say is that ERCOT's rules could change. Right now it sits outside that framework, because you're correct that it's under the minimum threshold, but I wouldn't be surprised if those regulatory review pieces shift as time goes on. So that's part of what makes it appealing today. We're hoping it remains appealing from that timing standpoint — keeping that timeline intact. Sites like that — let me pull back to the big picture. What's really distinctive about the way Cipher runs and generates value versus, say, a conventional data center developer is that a great deal of the equity value we'll ultimately build stems from the valuation increase from what we do to a site. So we've identified sites in nontraditional locations; we secured them on extremely cheap terms. And then a huge jump in value occurs once we bring that site to market. What's taken place across the market generally, sites — there's now such a scarcity of available sites that I'd say valuations on parcels of dirt with an interconnect have risen enormously everywhere. On top of that, the regulatory requirements regarding deposits have turned them extremely, extremely costly. So we're constantly hunting for pockets where we could generate that exceptional value creation. And I'd say it's reasonable that looking at sites around 70 megawatts in size can hold a lot of value, and we're still able to buy them cheaply. For us, the ROI analysis on such sites is exceptionally appealing.

Brett Knoblauch analyst
#18

I want to go a little deeper on the additional expense at Barber Lake. The change orders, those I understand, but take the supply inflation — at what point does much of that cost actually become fixed? You've said the equipment is secured, I know. From what I understand, labor cost is more or less locked in as soon as you sign a GC. So maybe I'm simply unclear on when everything gets locked in on your end? Could you expand on that, and on what caused the increase?

Rodney Page executive
#19

Let me give you some context to start, and then I'll turn it over to Greg for a few of the details. Broadly speaking, the way costs are structured at every one of our first locations boils down to the fact that our tenants were in a genuine rush — a genuine hurry — to lock down those sites. And honestly, we were in a genuine hurry to get those leases signed as well, since this amounts to a total recharacterization of cyber, correct? I bring that up because acting so fast left our design packages not very far along. What this has meant — and the tenants were ready to go along with it — is that we've seen a greater number of change orders during the past year than we would have anticipated. My priority right now—I believe we partner with the finest long-term leasing tenants anywhere. So our approach is to meet tenants' wishes wherever possible. Yet once they request really sizeable change orders, that creates ripple effects on both cost and timeline. And repricing those modifications in a shifting environment is where that exposure thematically originates; for instance, you might have to add more crews to manage a revised schedule so you can accommodate a shift in the tenant's design concerning cooling infrastructure or something similar. That then ripples through the entire construction process. Before I hand things over to Greg, I want to emphasize one point, since as we consider our upcoming leases — something we touched on earlier in this call — our confidence in demand is very high. The environment is quite different now as we move through what amounts to a vertical climb in transforming this company. That gives us room to be more deliberate about our next-generation leases. With those next-generation leases, we will not — we've deliberately refrained from signing them until we've settled on a design set of 30% to 60%, which greatly reduces how much those costs can vary. So that's the structural origin of it; and of course, the sites continue to evolve. Before turning things over to Greg, I want to share something I learned this morning: we've just handed the RFS notice to Barber Lake covering the initial 51 megawatts of critical IT. We're working with those tenants in a way that keeps them happy and generates rent across multiple locations and multiple tenants. That said, this first environment has been quite dynamic, because we've had to manage a lot of change orders at one site where we were converting a Bitcoin mining facility. So for these initial builds, it's just been a very fluid operating environment. Greg, I'm not sure whether you want to add anything further, but.

Greg Mumford executive
#20

Yes. Yes, and thank you, Brett, for asking. I believe it's crucial to separate those two distinct categories—the first being change orders, for which we qualified to receive reimbursement, and the second being a form of cost inflation spanning a number of different verticals. One item we mention is scope evolution. That's essentially a broad catch-all category; but in general, it means circumstances arise at these sites—these enormous infrastructure builds—that may result in lower productivity than you likely anticipated beforehand. And a portion of that may stem from a tenant arriving with their racks and ships ahead of schedule, and you want to accommodate them to the greatest extent possible, you locate storage, then you get them installed while construction continues around them, so you sacrifice some productivity. Broadly speaking, inflation in OFE equipment wasn't among the primary factors, although we did encounter a degree of inflation and lengthier lead times, which left some crews essentially waiting around for equipment to arrive. But without question, the labor market has been tight. I mean, I doubt we're the first to tell you this or the last. It's a matter we're quite conscious of and considering for the next build; but 1.5 years ago, at the time we signed these deals, the market looked very different from today. So one point we've discussed frequently is concentrating earlier on engineering, design and tenant alignment, and ensuring we can secure risk transference regarding those labor costs with GC or subcontractors sooner; and to return to that point. So absent the deal we completed, had we been reimbursed for the change orders and had we covered that extra, roughly $350 million to $400 million of general cost evolution, our costs would have come to approximately $12.3 million per critical megawatt. That falls just beyond our range of $9 million to $11 million. And that ignores the reality that out of that $350 million to $400 million, we likely could have devoted more effort to dividing it up and allocating it. And that is—that's the reason behind having a cost-sharing mechanism in which 50% is reimbursed to us along with a return of capital.

Brett Knoblauch analyst
#21

Great, that's really useful—and perhaps just one quick follow-up. The December audits are supposed to be more or less finished. Are the potential tenants or customers you're talking with holding off until the audit process wraps up? Or, if you've got conditional base load and you're near the front of the line and everything proceeds on those sites, can those be leased even before that audit happens? Or how should we think about the various classifications you've received?

Rodney Page executive
#22

Well, I'd say Colchis truly is a crown jewel, since a 1 gigawatt front of the meter site is an extremely rare thing. Several of the world's most highly regarded tenants are very interested in that site, and I expect it will be a genuine catalyst for an uplift in our valuation. I think that site is just so attractive. People are pushing their diligence forward, examining lease frameworks. They're obtaining 30% to 60% design sets, working out precisely what they want to do. I don't expect we'll have a final signed lease before securing an interconnect, or if we did, it would definitely carry a conditionality tied to receiving that interconnect. So I sort of see it as getting the same result either way. If someone wants to proceed and we conclude we've found the right dance partner and the right structure is in place, in theory we could proceed with a condition precedent; but my gut tells me that one way or another, you're going to need the interconnect in hand.

Michael Donovan analyst
#23

Congratulations on the progress. You brought up PCLR sites and the use of on-site generation and support workloads when the grid is curtailed. Are batteries also under consideration, and do prospective tenants lean one way or the other?

Rodney Page executive
#24

Yes. That's one of the ideas we're examining. In my view, the market doesn't fully appreciate what the PCLR designation means. If I had to sum up the market today, it's simply that everything is far too short term. So that could be a potential solution. But the key point is that when we focus on how long it takes to get power available, I doubt that demand characteristic will shift much over the next few months. Hopefully, though, we'll make headway through the ERCOT process. And fairly soon, we'll be discussing the studied load designation sites. That may come next spring. And at that point, I believe the PCLR designation will matter a great deal; so we'll see. Our sense is that as we watch tenant building requirements evolve, uptime requirements evolve, and cost considerations evolve, the notion of having a firm timeline to power while possibly needing to engineer around being able to curtail or switch to on-site generation or whatever is something quite interesting. I don't believe the market fully appreciates just how significant those designations are. And then at a high level, how do you expect yields on cost for projects powered by on-site generation to compare with grid-connected projects? Greg, would you like to take that one?

Greg Mumford executive
#25

Yeah, I'll give that a shot. Based on the conversations we've had and what we've observed so far, my expectation is that pricing won't differ much at all. If a tenant has marked that particular site or opportunity as a top priority on their end, then what we're finding is that lease on cost — sorry, yield on cost — talks during these lease negotiations are coming in fairly comparable to what we see at our front-of-the-meter connected sites.

Rodney Page executive
#26

My sense is that a greater share of those lease conversations are going to center on the SLA, and really on aligning with whatever each site is prepared to accept, simply because the generation source differs from one to another.

Rodney Page executive
#27

Okay, thanks to all of you for joining the call. I'd like to remind everybody that we're genuinely at the steepest section of the Ascent right now as we transform this company. I realize the market is under plenty of short-term pressure with everything that's happening; even so, I'd encourage each of our investors to adopt the view that what we're doing is constructing expressways that let AI reach the market, and we're collecting a long-term toll. So while we work through the daily headlines, everyone should remember that we're building enormous sites that will generate tolls for us across multiple decades, and afterward we'll be left holding a very valuable expressway. So all the key fundamentals are in place as we transform the company, and we mentioned the headline that we're now also collecting rent at Barber Lake, with a meaningful portion of that site already delivered. And we're genuinely excited about where we'll go from here over the coming months. So thank you for your continued support. Cheers.

Operator operator
#28

That brings us to the end of today's conference call. Thanks for joining us, and you're free to disconnect at this point. Have a great day, everyone.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Cipher Digital Inc. transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Cipher Digital Inc. earnings transcripts and 131,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.