Comstock Resources, Inc. (CRK) Earnings Call Transcript
May 6, 2026
Earnings Call Speaker Segments
Thanks so much, everybody, and thanks for being with us. It's great to have you on the Comstock Resources call covering our first quarter 2026 financial and operating results. While this call is happening, or once it wraps up, you can pull up a slide presentation on our site, www.comstockresources.com, where the quarterly results presentation is available for download. The deck you'll want is called First Quarter 2026 Results. I'm Jay Allison, and I serve as Chief Executive Officer of Comstock. Joining me are Roland Burns, our President and Chief Financial Officer, Dan Harrison, our Chief Operating Officer, and Ron Mills, our VP of Finance and Investor Relations. If you'd turn to slide 2 of the presentation, please note that what we discuss today is going to include forward-looking statements as defined under securities laws. We do consider the expectations contained in those statements reasonable, but we can't give any assurance that they'll ultimately turn out to be correct. Everyone please move to slide three. Slide three lays out the highlights from the first quarter. Weaker production, which was partly the result of output being affected by severe winter weather during the quarter, caused the financial results to come in lower than what we saw in the first quarter of 2025. Natural gas and oil sales totaled $339 million. Operating cash flow came to $192 million, or $0.66 per share. Adjusted EBITDAX for the quarter reached $251 million, and adjusted net income was $44 million, or $0.15 per share. We had really strong drilling results during the quarter, and those will push production back up over the rest of the year. Nearly every well we turned to sales in the first quarter came on very late in that quarter. Since we last updated you, we've brought six new Western Haynesville wells online, with an average per well initial production rate of 29 million cubic ft per day. Over in our legacy Haynesville, we turned 10 wells to sales, averaging a lateral length of 12,312 ft and a per well initial production rate of 31 million cubic ft per day. Now, on to the power generation hub. On March 19th, the United States Department of Commerce chose our Western Haynesville site to be home to a new 5.2 GW natural gas-fired power generation hub located in Anderson County, Texas, which you can see on slide 4; we couldn't be more excited about this development and about what having a large commercial customer right in our backyard means for us. This project forms part of Japan's $550 billion investment commitment in the U.S. under the U.S. Japanese trade deal. Ownership of the projects would be split between the U.S. and Japan, while NextEra Energy Resources will handle development, construction, and operation. NextEra is moving the project forward actively, pushing ahead on site development, procurement, permitting, and commercial structuring as they work toward definitive agreements with the U.S. and Japan. This project leverages our plentiful natural gas supply along with the strong transmission infrastructure in that area. The Anderson County facility will feature up to 5.2 GW of natural gas fire generation, enough to serve up to 5 GW of large load demand. The facility's natural gas needs are going to be met by Comstock, and by 2031 that volume might get to nearly 1 billion cubic ft each day. Now Roland is going to walk us through additional specifics regarding the financial results that came out yesterday. Roland?
Okay, thank you, Jay. Moving to slide 5, we go over the financial results for the first quarter. During Q1, our output averaged 1.1 Bcfe each day. After hedging, oil and gas sales for the quarter totaled $339 million, which mirrors the reduced production volume we saw in that period. EBITDAX reached $251 million, and cash flow generated during Q1 was $192 million. We posted a $107 million profit for the quarter, equal to $0.38 per share, though that figure includes an $83 million pre-tax unrealized mark-to-market gain tied to our hedge book. If you strip out that mark-to-market gain, exploration expense—which stems from seismic work we're conducting in our Western Haynesville play—along with other non-recurring items and their associated income tax impact, our adjusted net income for the quarter comes to $44 million, or $0.15 per diluted share. Turning to slide 6, we break down natural gas price realizations for the quarter. The quarterly weighted average NYMEX settlement price came in at $4.96 during Q1, while the weighted average Henry Hub spot price stood at $4.90. Spot market sales accounted for 26% of our gas, and the applicable NYMEX reference price for our production would have been $4.94. Our realized gas price averaged $4.27 for the quarter, which reflects a $0.69 basis differential versus the NYMEX settlement price and a $0.67 differential against that reference price. During the quarter, notable disconnects emerged between regional hub prices and NYMEX, which kind of pushed differentials higher in the period. We also needed to buy more expensive gas to replace production that was shut in during the winter storm event. Additionally, we were 72% hedged in the quarter, bringing our realized price down to $3.45. Thanks to third-party gas sales during the quarter, we did boost overall price realizations by $0.05, reaching $3.50. On slide 7, we lay out operating costs per Mcfe and our EBITDAX margin. Lower production in the quarter hurt per-unit costs since a large portion of our field costs are fixed. Operating cost per Mcfe averaged $0.93 for the quarter, which is $0.16 above the fourth quarter rate. Lifting costs and G&A each rose $0.04, driven by the reduced production level. Production ad valorem taxes climbed $0.03 because of higher gas prices in the quarter. Gathering costs increased $0.05, largely from certain prior period adjustments we recognized. All told, our EBITDAX margin for the quarter was 73%. On slide 8, we recap what we spent on drilling and other development activity during the quarter. Our drilling program accounted for a total of $343 million. We drilled 11, or 9.3, horizontal Haynesville wells and six, or six net, Bossier wells, totaling 17 wells for the quarter, or 15.3 net wells. We turned 13 wells to sales, or 11.7 net wells, with an overall average per well IP rate of 31 million per day. On slide 9, we provide a recap of our capital structure as of the close of Q1. At quarter's end, we had $350 million in borrowings still drawn under our upstream credit facility. The borrowing base for that upstream facility stands at $2 billion, while our elected commitment there is $1.5 billion. During March, we put in place a new $150 million credit facility for midstream operations tied to Pinnacle Gas Services. As of the end of March, $47 million remained outstanding under that midstream facility. Our ratio for the trailing 12 months came in at 2.9 times. When the first quarter closed, liquidity totaled just under $1.3 billion. I'll hand things over to Dan now so he can walk through our operations for the quarter.
All right, thank you, Roland Burns. Moving to slide 10, here we're just giving you a refreshed look at our acreage position in the Haynesville and Bossier Shales spanning East Texas and North Louisiana; at present we hold 1,074,868 gross acres along with 806,980 net acres that hold commercial development prospects in those two shales. The Western Haynesville portion sits on the left, and we've expanded that to more than 540,000 net acres now. On the right side you'll see the 266,570 net acres belonging to our legacy Haynesville position. Right now, 36 wells are flowing on our Western Haynesville acreage, which remains fairly undeveloped next to the legacy Haynesville area. Naturally, given the thicker pay zones and the extremely high pressures found in the Western Haynesville compared with the legacy core, our expectation is that the Western Haynesville will deliver substantially greater resource potential per section than what our legacy Haynesville offers. Slide 11 covers our present drilling inventory for the legacy Haynesville area as of the close of the first quarter. Operated inventory in the legacy Haynesville is now made up of 955 gross locations and 740 net locations, translating to a 78% average working interest; turning to non-operated inventory in the legacy Haynesville, we hold 819 gross locations alongside 98 net locations, for a 12% average working interest. We break our drilling inventory into four categories. First come short laterals, under 5,000 ft; next are medium-length laterals running from 5,000 ft-8,500 ft. Long laterals fall between 8,500 ft and 10,000 ft, while extra-long laterals cover anything beyond 10,000 ft. Within our gross operated inventory in the legacy Haynesville, we currently count 30 short laterals, 141 medium laterals, 337 long laterals, and 447 extra-long laterals. That gross operated inventory divides almost evenly, with 52% of locations in the Haynesville and 48% in the Bossier. Also included in our legacy Haynesville inventory are 114 gross horseshoe locations, 53% of which sit in the Haynesville and 47% in the Bossier. More than 80% of our gross operated inventory features laterals exceeding 8,500 ft in length. As of today, average lateral length across the legacy Haynesville inventory has risen to 10,019 ft; at our present activity levels, this inventory gives us decades worth of future drilling locations. Slide 12 lays out our estimated drilling inventory for the Western Haynesville. That inventory is currently composed of 3,331 gross locations and 2,546 net locations, equating to an average working interest of roughly 76%. Our net location count is an estimate, since the majority of Western Haynesville acreage hasn't been unitized yet. The Western Haynesville inventory leans more heavily toward the Bossier formation, with close to two-thirds of it in the Bossier Shale and one-third in the Haynesville Shale. In addition, our Western Haynesville inventory is split into four distinct categories based on length: short laterals at under 5,000 ft, medium laterals spanning 5,000 ft to 8,500 ft, long laterals spanning 8,500 ft to 10,000 ft, and extra long laterals exceeding 10,000 ft. Within our gross operated Western Haynesville inventory, no short laterals exist at present. There are 1,319 medium laterals, 646 long laterals, and 1,366 extra long laterals. Laterals exceeding 8,500 ft account for 60% of that gross operated Western Haynesville inventory. Slide 13 simply provides an update on our new Horseshoe development program. The Horseshoe well design, naturally, merges two adjacent shorter laterals that are separate into one longer lateral, yielding far more efficient capital use; on average, we achieve 35% savings on drilling costs when a 10K Horseshoe well is drilled versus two 5,000-foot sectional lateral wells. Our drilling inventory across the legacy Haynesville area now contains the 114 Horseshoe locations. Camp Tech 29149 number two began sales during the first quarter, posting a 41 million cubic ft per day IP rate; our 2026 plan calls for drilling 16 Horseshoe wells in total. Slide 14 shows a chart laying out our average lateral lengths drilled, based on when wells reached total depth. Those average lateral lengths appear separately for the legacy Haynesville and the Western Haynesville areas; during the first quarter, 12 wells were drilled to total depth in our legacy Haynesville area, with an average lateral length of 10,872 ft. Those individual laterals spanned from 8,497 ft up to 15,772 ft. The longest lateral we have drilled so far on legacy Haynesville acreage remains 17,409 ft. Also in the first quarter, five wells were drilled to total depth in the Western Haynesville, with an average lateral length of 10,356 ft. Individual lengths spanned from 9,400 ft up to 11,393 ft. Through the first quarter, the longest lateral drilled in the Western Haynesville stood at 12,763 ft. As of last month, we have since surpassed that length in the Western Haynesville, setting a new record lateral length of approximately 14,800 ft. That well, the Dolly Jones RP number one H, reached total depth in mid-April, and we have it scheduled for completion later this summer. So far, 47 wells have been drilled to total depth in the Western Haynesville. That includes 21 wells with laterals over 10,000 ft, and seven of the wells had laterals over 12,000 ft. Slide 15 lays out the 10 wells we turned to sales on legacy Haynesville acreage since our last call. Their average lateral length was 12,312 ft. The individual laterals spanned from a low of 9,465 ft up to a high of 15,143 ft. When you look at the individual IP rates for these wells, they span from a minimum of 15 million a day to a maximum of 41 million a day. The average IP came in at 31 million a day. On the legacy Haynesville acreage, 5 of our 9 rigs are currently drilling. Moving to Slide 16. Here we lay out the 6 wells brought to sales on our Western Haynesville acreage since the previous call; for these 6 wells, the average lateral length was 10,874 ft, and the average initial production rate was 29 million cubic ft per day; at present, 4 of our 9 rigs are drilling on our Western Haynesville acreage. Slide 17 highlights the average number of drilling days along with our average footage drilled each day in the legacy Haynesville area; this covers our benchmark long lateral wells that exceed 8,500 ft in length. During the first quarter, we reached total depth on 12 of our benchmark long lateral wells in the legacy Haynesville area, and the average time to TD was 26 days. Also in the first quarter, our average was 921 ft drilled per day across our legacy Haynesville acreage, amounting to a 3% increase compared with the fourth quarter of 2025. 4 of the wells drilled during the first quarter were our Horseshoe wells, which require a few additional days relative to our typical straight levels. Turning to Slide 18. This one highlights how our drilling is progressing in the Western Haynesville.
In the Western Haynesville, we drilled 5 wells down to total depth during Q1. That brings us to 44 wells drilled to TD as of the close of the first quarter. For those 5 wells during Q1, we averaged 57 days to reach total depth. That's 3 days more than what we saw in Q4. You can also observe this in our Q1 drilling rate of 478 ft per day, which came in 4% below the fourth quarter. Leaving aside the drilling problems we encounter, our sequential drilling results in the Western Haynesville are largely driven by vertical depth, temperature, and lateral length, you know, and those factors differ quite a bit across our acreage footprint. The location of the wells being drilled heavily influences our quarter-over-quarter drilling performance figures. Our quickest well drilled so far in the Western Haynesville remains at 37 days, and that well had a 12,045 ft lateral. Slide 19 provides a summary of our D&C cost for Q1 for our benchmark long lateral wells situated on our legacy Haynesville acreage position. These laterals exceed 8,500 ft. These costs cover all our legacy area wells exceeding 8,500 ft. Drilling costs are tied to when wells hit TD, while completion costs are tied to when wells get turned to sales. In Q1, we drilled 12 benchmark long lateral wells to total depth. Q1 drilling cost averaged $700 per foot, marking a 3% rise versus Q4. This Q1 drilling cost increase stems from a mix of factors, chiefly an overall shorter average lateral length in Q1. We drilled a larger number of Horseshoe wells, and we also had additional wells drilled in our East Texas area, which does require an extra casing string that we use to isolate the localized overpressure SWD zones there. In Q1, we also turned 8 benchmark long lateral wells to sales on our legacy Haynesville acreage. Q1 completion cost came in at $652 per foot. That represents a 9% drop versus Q4. The lower completion cost results from a combination of reduced horsepower usage, better frack efficiency, and a somewhat lower drill-out cost. Right now we're running 3 full-time frack fleets. That follows our addition of a third frack fleet in January. We're adding a fourth frack fleet this month, and we plan to keep 4 frack fleets running through year-end. On the drilling side in the legacy Haynesville area, we've kept up field testing, you know, with our rotary steerable drilling BHAs, and we're truly still making solid progress there. Given the additional information we're gathering and the additional tweaks we're making in that area, it's our expectation that rotary steerable technology will assume a bigger part in the drilling programs we run going forward, helping us achieve additional cost savings; if you look at slide 20, you'll find a recap of our D&C costs for the first quarter. This covers every well we drilled across the Western Haynesville. We reached total depth on 5 wells in the Western Haynesville during Q1. The typical lateral length came in at 10,356 ft. Drilling costs for the quarter came in at an average of $1,534 per foot. That works out to a 3% bump from what we saw in Q4. We also brought 5 Western Haynesville wells online during the first quarter, and those had an average lateral length of 11,177 ft. Our completion costs for Q1 came in at an average of $1,537 per foot, essentially flat versus Q4. Once more, to repeat what was said previously, how our drilling and completion results look in the Western Haynesville depends heavily on which part of the acreage a well sits on, since vertical depths, formation temperatures, and lateral lengths all vary quite a bit. We're also rolling out our new performance initiatives, which we believe will deliver additional time savings and cost reductions. One of the rigs we already have in the Western Haynesville is in the process of being upgraded to a 10,000 PSI rating, and we'll have it at our disposal by late summer. That upgrade will let us push drilling speeds higher in both the vertical and horizontal sections of the hole, cutting our costs even more. Later this year, we're also planning to try out some new drilling motors rated for higher temperatures, which we think will produce quicker drilling times and a number of longer runs. As soon as we start getting more consistent, successful runs out of the rotary steerable drilling system in our legacy Haynesville area, we'll aim to bring that technology into the Western Haynesville area. I touched on this before as well, but we also drilled the longest lateral we've ever drilled in the Western Haynesville to date, coming in at 14,800 ft, and that well beat our original expectations for performance. A bigger hole size was used in the lateral when drilling that well, which let us run larger insulated drill pipe, and that results in cooler downhole temperatures, more dependable motor performance from the downhole drilling assemblies, and extended motor life. We intend to apply this new well design across a greater number of our future wells. Together with the other performance initiatives we're pursuing, this is going to produce a substantially lower and more predictable cost structure for the wells we drill going forward. At this point I'll hand the call back to Jay.
Okay, Dan, thanks. Roland, I appreciate it. Everyone, please go to slide 21. I realize we're working within a 90-day window on this call—that's understood. What has characterized the Comstock narrative across the last five years is our effort to secure meaningful drilling prospects in the Western Haynesville, and that's not simply about the most recent 90-day window. During those five years, we've signed leases or bought drilling rights covering 728,000 gross acres, made up of roughly 30,000 separate leases throughout that span. On the whole, the terms of our leases are advantageous and back our development plan. Thanks to that plan—across five years, not merely the most recent 90 days—we currently have 2,546 net locations pinpointed across our acreage. Three additional companies have now come alongside us, actively drilling and operating within the Western Haynesville Basin. From our standpoint, the Haynesville Shale ranks as the single most critical basin for delivering natural gas to Gulf Coast LNG facilities, and increasingly to data centers under construction in Texas and Louisiana. The emergence of the Western Haynesville changes everything, given that the market is peering ahead and asking where the natural gas we need will originate. Everyone poses that question. Our tie-up with NextEra, dating back to 2015, paired with our prime locations and the drilling outcomes Dan just described in the Western Haynesville, produced the March 19, 2026 announcement of what, exactly? That the U.S. Department of Commerce picked our Western Haynesville site to be home to a new 5.2 GW natural gas fire power generation hub situated where? In Anderson County, Texas. Our present objectives for the company number five, and the fifth is the one you'll truly want to hear. Five objectives. First, strengthen our legacy Haynesville drilling program, something we achieved by adding 114 horseshoe wells into our near-term drilling program, the ones Dan mentioned—those wells perform fantastically. Right now, three of the five rigs we've deployed across our legacy Haynesville area are drilling horseshoe wells. Second, aim to remain the low-cost operator. Marrying the lowest cost with plentiful drilling inventory situated nearest to rising natural gas demand is what will push Comstock's market value upward. Third, clearly, keep safeguarding the balance sheet, which got a major boost from the divestitures we completed in 2025, along with our strong hedging program described on slide 22, plus our solid financial liquidity totaling nearly $1.3 billion. Fourth, back the expansion of our midstream business, Pinnacle Gas Services. Our creation of Pinnacle Gas Services back in 2023 to gather and treat our natural gas in the Western Haynesville both underpins our drilling program and opened the door to power generation hub possibilities. By retaining control of our midstream, we can hold producing costs down and secure future value through infrastructure ownership. PGS is now positioned to obtain its own separate credit facility. We think we're getting close to wrapping up an extremely robust effort to bring in an equity partner, which would let us keep expanding our midstream footprint and seize upcoming chances to link the Western Haynesville to premium markets. And then, point five, which has dominated a lot of this discussion, is getting the best possible results from how we drill and complete our Western Haynesville wells. Among the 44 wells we've drilled up through Q1, a number feature differing vertical designs; they went down to assorted depths with laterals of assorted lengths, and those were drilled and completed using assorted techniques and equipment, as Dan has endlessly discussed. We've likewise flowed those wells using assorted drawdown levels. Results from well to well have differed, which is what you'd anticipate in a fresh shale play. That's the positive side, since we're quite heartened that we're figuring out the optimal approach for drilling and completing these wells so we can unlock enormous natural gas worth and riches down the road. I appreciate the time you've given me today. Questions will come; we'll hand things to Ron if you'd like to dial in and pose questions to Ron. I'd also like to add one further remark. As you know, having been an original founder or developer in the Legacy Haynesville back in 2008, we took lessons from errors committed there, and we did learn. We get it. What we hoped to avoid across our more than 700,000 acres in the Western Haynesville, which could hold wealth unlike anything seen before, given that it was a rich basin 20 or 30 years back, is repeating the errors that happened in the Legacy beginning in 2008, 2009, and 2010. That amounts to 4 million acres in the Legacy. We figure we hold roughly 800,000 acres within the Western Haynesville. Those errors consisted of drilling too quickly since leases were running out, and value got wiped out. The rocks are fixed; they can't shift. Our job as a company is to turn those rocks into something valuable. The method for doing so — and yes, I realize cash burn plus a sluggish pace of resource delineation is somewhat burdensome, I understand — is what we're carrying out to build the value we already hold; with that said, I'll open things up for questions.
Hello there, and good morning, everyone. We appreciate you bringing us onto the call.
Hello, Carlos. Carlos.
How’s it going, Jay?
I appreciate you putting the focus on cash burn and the risk from how slowly we’re defining resources, plus investor patience. That headline works for me. That’s the reason I mentioned it in what I said earlier, since I believe it’s spot on; it isn’t a bad thing. It’s a good thing, though it isn’t a good thing for everyone. I simply wanted you to hear that from me, all right? Thanks for being straightforward and for creating that headline. It was a help to me.
No, absolutely. I'm grateful that you made that point and walked us through your perspective regarding the value you see over the long haul. So let's begin right there, if that's alright with you — perhaps you could elaborate a bit on what you're initially thinking. You're facing a difficult gas market, just like every one of your peers, and under the plan you currently have, as you noted, that cash burn period might get stretched out. Just how much patience do you think investors will show, given that they recognize this long-term value story, yet you still need to work through some number of quarters in which your output and your spending have at times failed to match, or line up with, what you told everyone three months earlier?
Correct.
Give us some context on all this — that would really help.
Carlos, first off, there's nothing straightforward about it. Picture walking into day one of a high-level math class and gaining nothing from it, and by the time you leave, you can hardly recall the instructor's identity — that's the level of confusion here. Look at what we laid out: sure, we came in under our production target for the period by, well, 10%, 12%, 13%, whatever it adds up to, and our CapEx came in higher. If you've got that plan of ours in front of you, which is — saying "no" feels too absolute, but it's no M&A. When you bring acquisitions into the picture, you're usually issuing stock, boosting output, and growing inventory, and that churns things up quarter after quarter, year after year. Acquisitions have not been part of what we've done. Without them, the sole route to higher output involves a delay—perhaps 90 or 120 days—but a delay is unavoidable, since if your goal last year was shielding the balance sheet and you idled one, two, three, four rigs, that lost output shows up twelve months down the road. The result is a moment of reckoning; we idled those rigs. Acquisitions were not something we pursued. Each month, we continued tacking on roughly 2,000 to 3,000 acres in our Western Haynesville position, and the bulk of that consists of our highest-quality acreage; that spending continued. Then, to reverse the cycle, we sold $445 million in assets that our business plan didn't consider important over the next 15 years. Once you complete that kind of sale, you reduce that debt, and then what? Well, you'll need to take on somewhat more leverage. We did indicate we'd spend beyond cash flow by perhaps $400 million, $450 million, or whatever amount, depending on natural gas prices. What this quarter shows is that production declined. Yes, we came up short. The headline didn't capture it. We should get something favorable out there regarding the largest data center in the U.S. Some of you aren't putting that out there. Sure, production came in short, and CapEx ticked up a bit. When you avoid M&A and don't constantly flood the market with equity by issuing shares to everyone whenever you make acquisitions, you end up with a quarter like this one; we safeguard every single share that everyone holds. Production is lower. But guess what? Now production is climbing. For Q2, our production ought to rise by 13%, 14%, 15%. Carlos, in my view, we've rounded the bend. That bend is tough. Honestly, that three-month timeframe is a challenge, largely since real money has to be spent on those four additional rigs. Those horseshoe wells must actually perform. Dan Harrison should have the latitude to determine the optimal approach for drilling and completing Western Haynesville wells in a repeatable manner — in both the Bossier and the Haynesville — and those spots could sit up to 90 mi from one another, never mind merely 20 mi from where we are, stretching west to east. Carlos, as I see it, the hardest part is now behind us. It's conceivable that in the second quarter, because we brought on that fourth frac fleet, you'll notice us being somewhat careful. Well results are strong. The money we received last year went toward reducing our debt, and we aren't taking any drastic steps that would wreck value in the Western Haynesville. As I said, with the acreage we hold, if you keep the four rigs we currently have running in our Western Haynesville, every acre we possess will be HBP, all of it, with those four rigs. We don't even require those four. The plan holds up. In the past, Carlos, you'd remark, "Well, you picked up another 15,000, 20,000 acres. That's another $20 million-$30 million. You basically nailed it for the quarter." That isn't our intention. We don't foresee that happening out there. We just don't see it. Our observation is that somewhere between one and two thousand acres come onto the market every month. If a larger supply existed, we would seize the opportunity. The availability simply isn't out there. At that stage, my view is that we've already made it past the hard part, and everything we're now talking about concerns something already behind us — a passage that was genuinely tough to get through. We got through it. Now let's turn to what lies ahead.
That works for me, Jay. Thanks for clarifying that point. I'll direct my next question to you, Dan. Could you give a short explanation regarding the Hutto Rodell IP? It appears that it came in below the wider group, and honestly below the initial output levels for every well you turned on, the mean across all wells you turned on in the play. I'm curious whether you could specify for us what caused it? Was the completion approach the issue, or the geology? What exact adjustments could be made on your following pad so that whatever caused this weaker showing versus your really strong, high-quality IP rates over in the Western Haynesville doesn't happen again?
Yep. Well, that's a fair question, and I'll start with the very short version, and then I can expand a bit more.
Go ahead and elaborate.
So, out of the 36 producing wells we have, 7 were drilled what I'd describe as uphill. The laterals essentially trend upward rather than downward. Due to the geology, most of them actually decline considerably. When it comes to the TVD gap between the hill and the toe, the Hutto Rodell is by far the farthest one. From the hill down to the toe, it's close to 1,400 ft. The primary factor we didn't achieve a solid IP on this well is that it produced a large amount of water while flowing back. Throughout the entire flowback, we were seeing very high water volumes. It's the same situation for wells in the core or wherever we happen to be — when you're producing a lot of water, achieving a high IP rate is simply difficult. That's the reason our IP rate on this well wasn't good. We're still sort of attempting to triangulate and zero in on whether it might be about more than just the geometry. There could be some geology at play. We did have our Brown Trueh eart BB well, which I'd say is adjacent to it. It's roughly a mile away. Both were Haynesville targets, and both were drilled uphill. The Brown Trueh eart didn't extend as far uphill, yet it too produced a lot of water during flowback. We got a somewhat better IP because the water wasn't as high. Those are — of the 7 wells we've drilled uphill, those 2 wells, the Brown Trueh eart BB and the Hutto Rodell, are in our deeper pay. Those deeper TVDs fall in the 17,500 to 18,500, 18,800 range. A lot of water was produced during flowback from both of those wells. We've drilled 5 wells up on our shallow acreage in the 14,000 to 16,000, 16,000 to 17,000 TVD range that also went uphill. Not up 1,400 ft, but perhaps up 600 ft or 700 ft from the hill to the toe. During the initial portion of flowback, those wells produced a bit more water. By the time we released flowback, the water volumes had declined. That's why I say I'm not sure I'll hang my hat 100% on the fact that they were drilled uphill for the high water volumes. I believe it contributes to higher water volumes. Whether it's the sole reason for the high water volumes, I don't know. Right now, we are fracking another well right next to those, the Jones number one. Don't confuse it with the Dolly Jones number one that I referenced as our long lateral we just drilled. So that's one more well for Jones, and it sits directly alongside the other 2. This one is in the Bossier, whereas those 2 are Haynesville wells. We'll simply need to watch how it performs to determine whether we can reach some conclusion that it comes down to geometry, or whether it might just be a matter of Haynesville versus Bossier. There's a bit of geology involved in that response as well. To put it briefly, whenever you produce a large amount of water while flowback is happening, IPs become difficult to obtain. Out of the 36, we've likely had 3 wells—I'd say among those 36—where water volumes during flowback were really high, and that had a major impact on the IP rates.
That's the water from our fracking operations.
That's load water, not formation water. Right. And this covers — look, across the wells we've tested so far, we're drilling from one end to the other. I mean, we're talking about roughly 50 mi to 60 mi. Picture going from East Texas all the way down to the deep Natchitoches Fault Zone in Louisiana. That's an enormous span, and there's a great deal of variability in what these wells will produce and how they'll perform and the volume of water they'll yield. So that plays into it. Then the other piece, I'd say, is kind of comparing the Western Haynesville with the core. In the core, everything there, we don't really have many wells that go downhill or uphill in TBD terms. They're basically all pretty much horizontal, maybe somewhere around 85 to 95 degrees, or perhaps even a bit flatter. Out in the Western Haynesville, it's a different story. We've got wells where — you know, holding acreage is the reason we drill some of these wells uphill. On a two well pad, one heads south, going down dip, and one heads north or northwest, meaning it's going up dip. But we have far more dip. There's much more dip in the Western Haynesville, and that produces these higher angled wellbores.
Got it. I'm going to hand it back over. Thanks, everyone.
That's a really good question. Appreciate it.
Hello to Jay, Dan, Roland, Ron, plus everyone else from Comstock joining this call.
Good morning.
Jay, I hope you'll pardon me if what I'm asking comes across as fairly elementary, but I was hoping you might lay out the full picture, as you see it, regarding this Texas power generation hub. You've issued quite a few announcements about it, as we know. From where I sit, it appears that you are — I believe — the owner of the surface where this site will be located. At least, that's how it seems to me. You'll be providing gas to the power gen facility. My understanding is that part isn't yet finalized. Perhaps you could walk us through what roles Comstock is playing in this, and how near you are to locking in commercial terms for the gas sales.
Well, I'd say that's an excellent question. And I enjoy your headlines as well, you know. We came in slightly under on production, blah, blah — that's a fine headline. I just wish you'd mention what we're up to with NextEra, but since you raised the question, I'm glad to address it. When you consider all the activity swirling around — you know, AI, hyperscalers, everything that's taken place, plus everything still lacking funding — to us, that's just background noise. What's actually occurred here is this: if a hyperscaler sits in your office, most of them, you know, will tell you, "I really like Texas." It's a state with abundant natural gas, and that's what we need to fuel the generation that the NextEras of the world envision. They're fans of it. You need a location that works. If you can step forward, the way we've done with the Western Haynesville, and you're sitting in a truly excellent geographic spot, there are plenty of people around. You do hold a large footprint, so as the saying goes, the sky's the limit. Here's how it unfolds: NextEra says, "Okay," then the federal government steps in with that agreement involving the Japanese, and states it. The Japanese respond, "You know, we've pledged this $550 billion." After that, the federal government selects NextEra. NextEra then picks where their basin could be; it traces back to that 2015 relationship we share with NextEra; they told us, "You know, we've conducted a lot of business with you previously. We're big fans of the Western Haynesville; we've visited out there. This is the spot where we'd like the data center to go." What happens next: we don't hold the surface. Our only involvement, in terms of dollars spent, Charles, is supplying the gas. Put differently, when it comes to obligations for construction and that sort of thing, we don't carry those. What we bring is delivering the gigawatts to them — the 5 GW, the billion, whatever the figure is, and it could climb much higher than that — to supply the data for the turbines. It's a fantastic situation, because it starts at the U.S. government level, moves to NextEra's level, and then it's our gas. As everyone knows, our business is natural gas. When it comes to the advantages, it's like whatever large gift sits beneath the Christmas tree. Those advantages will be the earnings, whatever those turn out to be. You simply hold off and unwrap them once everyone else has finished negotiating what the conditions are going to be, and once you know when your first power is required. It's impossible to picture that we'd be the party holding the acreage we secured, owning the upside along with the midstream. The midstream is essential to deliver that gas, to supply what NextEra views as an enormous role for U.S. shale gas in powering AI hyperscalers and data centers.
Understood. Thanks, Jay, for walking us through that. If I may, I'd like to pose a follow-up regarding the Western Haynesville. Those maps are really something I appreciate. On page 16, where the red dots show where your latest well results sit, I'm curious whether you could speak to the wells that — it appears two of your wells are positioned farther up dip. Could you describe what you're observing in terms of how the play shifts? My assumption is that you likely have lower D&C since there's less vertical depth, but also what you're seeing regarding productivity at those wells as you go further up dip.
Yes. I'll hand that over to Dan. Charles, one caveat I should mention. Think about the locations we drilled — Circle M, back in 2022, which we brought into production for a total of eight months that year, before moving on to drilling operations across 2023, 2024, and 2025. Suppose you took an area where a number of our wells already exist and chose to drill between them; in that case, it would be possible to put in many, many, many, many wells — perhaps even hundreds — using infill drilling, and since gathering infrastructure is already available close by at that same pad location, you'd have what you need. Should your goal be lowering expenses, that approach would get you there. That was never in our strategy, and it's exactly why we headed 40 mi, 50 mi up to the north to spud Elijah 1 — because seismic data was available, and we had well control. We've got 1,000, perhaps 100 penetrations throughout this whole footprint, you know. On top of that comes the seismic, and at this point we have cores. Prior to having that core, we'd head north since the plan was — and this circles back to Carlos — do you possess sufficient patience to delineate this? Well, in a single year, moving 40 mi, 50 mi northward is fairly rapid delineation. That was never accomplished with a core, not with any control. We aim to keep those rigs occupied, and in 99% of cases that means maintaining our acreage holdings rather than doing infill drilling near already identified, repeatable locations — that would represent a separate business strategy. With that said, I'd like Dan to address that question.
I will absolutely restate what he just mentioned. Every spot where we are drilling is meant to retain acreage. I would put it at over 9 out of 10 being for that purpose. Charles, those 2 dots are actually 2 pads right there; on that slide, those 2 dots stand for the 2 Bumpurs and 2 Pollard wells at that site. On every pad we drilled, we had 1 well heading north and 1 well heading south. 1 of the Bumpurs goes north, the NMH goes north, the BHGJ goes south, the Pollard TFG goes north, and the Pollard MBK goes south, you know, retaining acreage. Those, we began after reviewing just, you know, what we constantly do, correct? Reviewing well performance. We understood we likely were not stimulating these wells enough. We need to pump larger fracs. All 4 of those wells had larger fracs pumped in that region than what we had pumped on the offset wells in that small area you are looking at. All 4 wells look really good. I will sort of mention, 2 of those wells that went uphill were sort of 2 of the wells I was referring to when I answered Carlos's question earlier.
Right.
During the initial 48 hours of flowback, a small amount of water might show up, but honestly, we never observed significant water volumes. By the point flowback had ended and we were bringing the well onto initial production, things had essentially cleared up. From the hill down to the toe, the rise is only roughly 600 ft to 700 ft. All 4 of them are performing quite well. We could not be more pleased with them. Those wells probably fall in the 14 to 16,500 TVD range. Possibly the toe on the down dip wells sits nearer to 17; pressure is lower there, and drilling and completion runs cheaper. In fact, our fastest and least expensive well drilled so far — the record well we reached TD on in 37 days — was the direct offset to one of those pads. That was the Jennings pad, the Jennings Lower, the Jennings FSRA. The Jennings FSRA sat immediately beside those wells. It was up dip. TD was hit in 37 days. We simply got some excellent motor runs. The EUR will come in somewhat lower simply because there is less pressure and the depth is shallower. We balance that against the quicker drilling and completion expenses. Faster to drill, lower drilling and completion costs.
Dan, that's really helpful context. I appreciate it.
That's a really good question — thanks for asking.
Hello, everyone, and I appreciate you taking the time today.
Derrick, good morning to you.
Jay, thanks for those opening remarks that gave us the broader perspective. Dan, perhaps I could direct my first question to you. When you consider some of the fresh ideas your team is currently piloting, this quarter you brought attention to rotary steerable drilling systems and your initial well featuring a large-bore configuration. Could you maybe describe what impact these advances might have on costs, assuming they pan out the way you expect?
Sure, I'll take that. Regarding rotary steerable, it will likely see deployment further down the line in the Western Haynesville. We've completed a number of runs already in the legacy Haynesville. As for the system we're currently employing, we began running it roughly five or six months back, I believe; we're continuing to make adjustments. It's a process of learning, you know. I can tell you, we've enjoyed some truly outstanding, I mean genuinely outstanding runs so far with that rotary steerable system. We've also experienced a few that didn't get very far, simply because of certain problems with the tool that they are, you know, working to refine. I'll mention that when the same technology was introduced in the Permian Basin several years back, I mean, it required 18 months or two years for them to refine this tool to the point where it was performing smoothly. This isn't something that happens overnight. It's, you know, all these tools that perform well in other basins, the final basin they arrive at, you know, is the Haynesville, purely because of the depths and the temperatures. That's roughly where things stand; we're extremely enthusiastic about, you know, the outstanding runs we've achieved. We need to accumulate more of those, and we need to accomplish them with greater consistency; after that we will introduce it into the Western Haynesville, since that's simply a far more, you know, challenging environment in terms of temperatures. A great deal of, you know, we've run quite a few of them on these Horseshoe wells. Just, you know, extremely happy with it. Plenty of running room there. I believe, you know, the 10,000 rig that arrives at the end of the summer, we're extremely excited. We're going to be able to pump faster, just more horsepower downhole, better ROP, shave off some days, pretty excited about that. You know, perhaps the most thrilling item is this most recent well we drilled that was, we drilled the big hole laterals, 8.5 in, you know, bit size rather than a 6.75 in. We, we held certain expectations for it when we began drilling it. We required a project that provided us the capacity to drill a long lateral, correct? You have to spend considerably more money before you ever reach the lateral because you've got all your casing strings up top. They must be a whole size bigger. The casing must be one size bigger, right? Prior to reaching the lateral section, you're essentially operating at a loss, correct? Costs run somewhat higher. You need what you'd consider an extended lateral that you believe you'll penetrate more quickly in order to offset that and achieve break-even, or perhaps end up at an even lower cost. What happened in our case was that we ended up at a lower cost than anticipated. The drilling expense for that particular well came in below every one of those bars shown on slide 20, referring to our cost per foot. Just marginally lower; additionally, we believe it's somewhat more foreseeable than what we've achieved in the slim hole. We're able to slide and rotate with slightly greater efficiency compared to the slim hole. There are certain intangible advantages stemming from that which we believe will benefit us; we simply have to drill additional ones, correct? Clearly, you need to see, well, the evidence of success; we've completed just one. It appears very promising. We intend to implement some modifications ideally in the vertical portion, currently working on that. We believe we'll bring that cost down somewhat, yet we're extremely enthusiastic about it. Specifically, we assumed perhaps we'd have to drill 14,000 or 15,000 in order to break even against the slim hole laterals we've been drilling, when in fact there's no need to drill that much; we might only require drilling 11,000 ft or 12,000 ft for it to be cost competitive, you know, with the slim holes.
So, Derrick, if we circle back to what Charles Meade brought up before — a number of these are Bossier, and a number are Haynesville. When Dan mentions a specific well, look, we could be 80 mi out, we could have a different Haynesville, and it isn't the same Haynesville he's referring to today. Put another way, each one varies somewhat, and that explains the significant value that got wiped out across the legacy Haynesville during 2008, 2009, 2010, and 2011. Not only did too many rigs end up drilling it, but they also had leases running out on them. On top of that, you had gas prices — natural gas prices — falling apart. We take all of that into account, and I really like what you raised, that larger-picture idea, since it's similar to us putting a bunch of those seeds in the ground and those trees beginning to mature. You can't rush it. Even with an unprecedented bull market opportunity, in my view, coming toward us for LNG and data centers — I believe our timing will line up perfectly for that, purely because we're sitting in the right geographic spot in America. That's what sets it apart. If you hold the basin — sure, there are 50 other firms out there drilling things, yet they don't hold what we hold. You've got to handle it differently. When something is valuable and precious, you've got to handle it as valuable and precious. And that's precisely the message we're attempting to deliver to everyone today; maybe that's the wrong sort of candy in the candy store and you don't care for it, but that is the product we're offering. I'll say this: the board is fully behind it, and management too. The Jones family, nearly every single day, they're involved in it, they get it; we'd prefer to move faster, yet you can't. You'll land in trouble if you move faster. I think it's somewhat like what Carlos asked as well. I believe we've gotten past that curve, because it's output declining while CapEx climbing that leaves you with indigestion. I've got it as well, and I'm aware everyone does. I believe we've gotten past that curve on that front. Output ought to rise. We ought to see truly excellent growth across the remainder of this year, especially during the third and fourth quarter. We did bring on that additional frac rig. I'm not sure — I simply see plenty of sunshine ahead.
Derrick, was your question addressed by what I said?
That's fine. Jay, I'm with you regarding NextEra. Considering that latest event and how significant and unique it is for you in this industry, simply based on size and how close the development is, I share your view that it's a major event that likely isn't receiving sufficient attention or coverage this morning. However, I wanted to return to Dan about a different subject, since I believe this matters too when assessing the play. Obviously, the D&C optimization work you all are currently doing. Dan, when you consider what you're observing at present with restricted flowback testing so far, would that be an optimization lever you'd probably adjust as you move development forward in Western Haynesville?
Absolutely. I think, well, I'll put it simply. We have to be pumping larger fracs, improved stimulation. When you use those larger stimulations, the rock volume you're contacting out there needs to stay open. Should it all remain open, you're looking at substantial reserves. For it to stay open, you need that highly conservative drawdown. I'd say we're likely, perhaps even somewhat more conservative with drawdown this year and beyond compared to where we stood only during the past six months. You know, larger EURs come from that, and PV-10 values improve considerably. If those volumes can still be obtained in the initial two years, your rate of return really won't be impacted. It'll be roughly the same figure. For me, that's the solution. A considerable resource sits underground. I mean, because of the thickness and the pressures involved with large fracs, you're contacting plenty of reserves out there, and those fracs must be kept open. Whatever you've created, it has to remain open so you can pull out those volumes and that value. Larger fracs, with a very conservative drawdown moving ahead.
Hey, Derrick, so, you know, we actually send folks out there in person. Dan and a few other really strong individuals from the drilling team headed over to Germany 2 weeks back. They were physically there at the Baker facility. Basically, getting eyes on it, getting hands on it. What can we adjust, how do we make it improved, quicker, more efficient? So, we bring them over. In other words, if those folks are willing to educate you and demonstrate what we ought to be doing possibly, and they will use their own funds to create whatever we require, then we make the trip. I believe that matters, whether it's Carlos, Charles, Derrick, anyone who raises these kinds of inquiries, we're happy to have them here. We've provided our absolute finest. It shows up in a single word, it shows up as a feeling, it shows up through what we've done across 38 years. We hand over our very best, and we never spin some strange tale; this tale is a tough one; it's the best one, even so. Once more, regarding the equity side, each and every share is valuable. We handle it as something valuable.
Great. Perhaps one additional question, simply because investors would benefit — I realize plenty of them have this on their minds. Speaking in a philosophical way about guidance: whenever your team puts out guidance, ought we to view it as P 50 with some risk applied, meaning roughly a P 45 to P 55 band? I recognize that all of you are delivering your utmost with the guidance regarding what you believe you can achieve, yet I would appreciate whatever additional perspective you might offer.
Basically, Derrick, what we hand over is our finest estimate, grounded in what the timelines for drilling and completion suggest. Beyond that, I'm not sure there's anything further I can add.
When it comes to the Western Haynesville versus what we call Legacy, I'd put it this way: up to now, Legacy has likely been somewhat more predictable than the Western Haynesville. My sense is that using a more conservative drawdown along with larger fracs — the more conservative drawdown — will make guiding the Western Haynesville volumes more predictable going forward, I believe, than it was looking back.
Yeah, sheer volume in the Western Haynesville will take out some of the lumpiness.
That all tracks. Appreciate you taking the time, everyone.
Those were excellent questions. Thanks, Derrick.
Hi everyone, I'd like to shift toward the financing aspect for a moment. Naturally, you secured the Pinnacle credit facility, and you touched on it briefly. It appears you're combining it. It sits on your balance sheet. I'm curious whether that debt has recourse to Comstock. Also, you've discussed additional financing required at the Pinnacle level. I understand you're trying to remove Quantum, which presumably compensates them. Are you also seeking to raise extra equity at the Pinnacle level? Do you believe this credit facility will suffice for the near term?
Great question, Leo. We're currently conducting a process, pardon me, aimed at raising equity in Pinnacle. With luck, we can share details during the next conference call. Things are progressing nicely; it's a fantastic chance to bring aboard more of a common equity partner instead of the preferred equity partner we currently have with Quantum; this gives us the chance not only to redeem the preferred units, which carry a sizable distribution, and welcome a common equity partner, which will, you know. I believe we'll gather some additional equity to assist in paying down part of the, you know, contribute a bit of equity to Pinnacle together with the credit facility. You know, it's at a Given how the midstream is being developed, clearly you must construct everything beforehand, you know, and be prepared for the wells and handle everything well before the volumes arrive. You know, we've accomplished that and invested heavily—it's, you know, very capital-intensive initially with our second train being installed. It will be up and running this summer. You know, once that's finished, you know, we'll possess substantial treating capacity, and we'll essentially only be spending funds on, you know, heading out and connecting the wells, you know, moving forward. The CapEx will be somewhat reduced as you progress in Pinnacle. Then the volumes will, you know, appear for that, you know, later on. That's how a midstream operator works. I believe we're hoping the process, you know, as I mentioned, Jay said, is proceeding well. We'll get that sorted, you know, shortly, and we feel that might even underscore the value the midstream company holds. You know, I think it'll begin to gain much more clarity in the figures. Yes, it's entirely consolidated since we hold the majority interest and maintain full control of the entity; it operates under a separate credit structure. The upstream has its own complete structure that encompasses the bonds and the credit facility, while the midstream has only the credit facility, in two distinct credit structures. There's no recourse linking the two to one another.
Okay. That covered everything really well.
Leo, I would describe Quantum as having been an ally for some time. That's great. Their fund model operates like this — you see, provided we're able to buy them out, and that's going to happen, and bring in an equity holder with a much longer horizon, investments spanning years and years and years, so the gathering gets expanded while we keep control of it, that represents the following move. Demand has been held back, just like I've mentioned to you, and results from that ought to look strong before long.
All right. That was quite comprehensive, everyone. I truly value that extra detail. I just wanted to return to the Anderson County 5 GW facility you mentioned. Could you give us at least a bit more detail regarding where things stand right now on the commercial talks for gas supply? Is it still somewhat of a competitive situation? Are they in discussions with several parties, or have they narrowed things down to Comstock at this moment? Can you tell us whether there is any kind of high-level signal about how that gas might be priced, though I don't know where the talks stand currently?
Well-
No, we don't make any comments on that, Leo.
Yeah.
That question is actually far larger than what you've put forward. On that subject, we have nothing to say.
Yes; we should mention as well, and NextEra’s remarks make this clear, that our arrangement is such that we serve as the gas provider, so that isn’t the case. We are—and, as you know, every negotiation brings in numerous parties. That’s what continues right now; in our view, that’s a process NextEra is managing, and during their earnings call they stated plainly that Comstock is the source of the gas. There’s no argument about that.
Yep. Great question. Nobody has the answer that's disclosable now.
Got it. I appreciate it, everyone.
Good morning.
Good morning.
Perhaps we could begin with what happened in Q1 on realizations. I realize plenty of factors were shifting around, and it may partly be a one-off item, yet I'm simply wondering whether you might share any main lessons from that period regarding your thinking on marketing going forward.
Sure, sure. Looking at Q1, gas was extremely turbulent. There was enormous swing in both spot pricing and first-of-the-month pricing. February stood out as highly abnormal — the NYMEX price ended up being fixed extremely high right at the end, and nearly right after the month began, spot prices sat at roughly 50% of that level. It was a really odd quarter. We also took a hit from certain production that needed to be shut in when the storm hit. Then there were the delays that resulted, and since many wells were scheduled to start up, you ended up with postponements of multiple weeks for wells that never got going, because, as you know, we had to stop the frack equipment, drilling rigs couldn't be moved, and so on, owing to terrible road conditions, particularly across Louisiana. There was simply a great deal of noise. Our view is that this was particularly true in the Haynesville. We don't see that as something genuine that should be carried forward. Once you return to a gas market that's more typical, well, we typically aim to have roughly 75% of our gas nominated for sale on a first-of-the-month basis, with 25 in spot, which lets us make adjustments if a well goes down or when new wells start up. That's roughly our approach, you know. It lines up reasonably well with the fact that around 55+% of our gas is hedged, so our intention is for those hedges to be genuinely connected to that first of the month — meaning you wouldn't want them linked to spot prices. I believe our approach would remain much the same. My sense is that in Q1 we might have fared better had we simply kept more production open to sell in the spot market; we likely would have captured a much stronger price. And I think that with little gas on hand to satisfy those first-of-the-month obligations, we probably lost some ground on realizations during that stretch when gas prices were elevated.
Thanks for that answer. Jay, I hear what you're saying about the need to build this asset properly, and I want to return to the Western Haynesville. When we talk with investors, the focus stays on the state data coming from the basin, and what we observe is a decline in cumulative production across six or 12 months for the 2024 and 2025 vintages. To some degree, I believe that matches the IPs you show in those decks. Given the optimization work and the effort to get this right, could you take us through what you're seeing internally on the latest EURs and how they stack up against the first wells that may have fallen in that 3 BCFE to 3.5 BCFE per 1,000 ft range?
Well, I would say the first wells we drilled in the play, the initial six or so, were located in Robertson County. What we've observed is that if we simply stopped today and measured everything across the 36 wells we have producing, the strongest performers have been the ones in Robertson County, when compared with those in Leon. So far we have just one producer, way up on the northeast end, roughly 50 mi, 60 mi away, the Elijah 1; that's also a very strong well up there. Generally speaking, on average, the top wells so far have been the Robertson County ones. We've got good, thick pay and rock qualities there. Let me go back and mention that 15 years ago, around then, Encana came out here and drilled the very first two shale wells, and they drilled them in that area. We pulled those wells harder at the start. Those are the early wells. When you look at 2022 and 2023, those are the wells. As you move into 2024, 2025, you're in the stuff that shifted over into Leon. I mean, still good wells. It's just that we're going to have that variability across the footprint.
Okay. Thanks for making room for us. I appreciate it.
Thanks. Morning, everyone. Appreciate you having us on the call. I simply wanted to check in on — you folks mentioned how Western Haynesville is being developed. Could you take us back through the timeline, more or less, and the pace leading up to full unitization in that area? Are we still looking at roughly that late 2027 window, or has anything shifted?
You mean with regard to HBP, Paul?
Yeah, regarding whatever they HBP.
Yeah. I believe you continue. Once more, acreage gets added by us each month. You know, should you examine the model that exists currently, those four rigs stay occupied during this year, the following year, a portion of, or perhaps even, possibly by the midpoint of 2028, everything has been HBP'd by you. That is assuming. On that, it's a fairly solid estimate. What I mean is, I believe the actual issue is, must you drill wells that you don't want to drill during a timeframe when you don't want to drill them? No is the response. You know, a couple of rigs were had by us a number of years back. A third one will be added by us. The third wasn't added by us because gas prices were low. We arrived afterward in the previous year and brought in four, and that had no effect on, you know, maintaining the acreage that has been leased by us. I believe the actual issue is, with the rigs currently held by us, or even should you cut them by one rig, I simply accept the downside, might all the acreage that has been leased by us now be held? Yes is the response.
All right, that makes sense. And on that note, about the negative side of things — could you discuss the flexibility you have regarding how you run operations in the quarters ahead? What might prompt a change to the approach you're currently taking, meaning 5 rigs in Western Haynesville, 4 rigs in the core, plus those 4 fleets spread across the acreage?
What exactly are you asking?
What would cause the present approach to shift?
Yeah. If we, yeah, cut rigs or, you know, bring on more rigs. I believe that in the end, we're trying to find the ideal moment to relocate one of the legacy Haynesville rigs over to the Western Haynesville; that choice is still up in the air. I'd say the current cadence is likely the program we'll be running, you know, steadily perhaps even through next year. We'll watch for the chance to add the Move one of the rigs to the Western Haynesville. I think it's sort of the largest decision we need to make.
Yes, Paul, my understanding is that the count is 9. Keep in mind 5 are in the core and 4 are in the Western Haynesville. As we view it right now, that figure isn't changing. In other words, it's holding steady. As Roland mentioned, I believe every one of those rigs—all 9, with a single exception, Dan, feel free to correct me—can be relocated to the Western Haynesville.
That's right.
If it became necessary, we could relocate a rig from the core area over to the Western Haynesville. My view is that nine works well. My view is that it gets done everything we're aiming for across 2026 and 2027. It satisfies any agreements we had for supplying gas. We've got a way to move that gas out; we've got the rigs out there doing that work. We've got the frac crews locked in for that. My view is that it works well.
Yeah, the sole additional point I'd make on that is simply, regarding the pace, I figure 4 works well, plus we've got, you know, every one of these items, still those matters we continue picking up knowledge on. The 10,000 rig upgrade is on its way. There are certain high temp motors that we'll be putting through testing at the close of the year. We have this sizable hole that appears quite promising, and we're attempting to work additional ones of those into the blend. That rhythm involving rigs is basically we'd like to gain understanding on a few more of these items prior to putting rigs into the Western Haynesville.
I see. That makes sense. Thanks for spending some time with us. I'll stop here.
Thanks, Paul.
Hi, good morning.
Hello, Noel.
Hey there, how are you doing? I'm just attempting to piece together a bit of what you mentioned, right? You have to show that the formation can stay open once the frac is done. If I've got this correct, is your choke protocol one piece of that, or does proppant play a role too, say? Will there be a need for quite a bit of investigating there? Or, sorry, testing in that area as we move forward?
I think the drawdown accounts for the bulk of it. Every fracture system, as you're aware, will naturally close with time, since you produce some large.
Sure.
The quantity of gas. That is simply how things naturally develop. You know, you observe somewhat more of it in the deeper formations compared to something that is really shallow. You know, it's possible to reduce that, bigger amounts of sand, greater sand concentrations. You know, how viscous the fluid is that you're using for fracking in terms of generating a bit more fracture width when you place that sand in there. Every one of those factors plays a role, I believe the bigger lever is the speed at which you draw them down. You know, as we've said, we want exposure to a large rock volume since the resource is so enormous, and then we want to be extremely conservative regarding how quickly we pull it back out.
Thanks, that's helpful. So, you brought up Robertson County — the place where a few of those initial wells were located. My understanding is this is kind of a major fork in the road, though I'd guess it's far too soon for you to actually possess the numbers on it. That said, do you have any rough idea how distant you are from, say, picking out a core area for the play, perhaps with an eye toward starting or moving in the direction of a manufacturing-style approach across a tighter portion of the play?
Honestly, everything has gone quite well. I'd be reluctant to claim we've learned enough to pinpoint where the play's core sits. There's still plenty of acreage awaiting the drill bit. Up at the northeast end, just a single well is on production — Elijah 1. We have a number of others in that area.
Sure.
That’s the spot where the Dolly Jones was drilled with a 14,800 ft lateral, and we’re going to complete it later this summer. We’ve got to bring many more of those in; up to now, I’ll simply put it this way, none of this acreage has been something we dislike. There’s only some slight variability, but everything appears solid.
Right, so our view is that a lot of the variation in results stems from how the wells were completed, from the landing zones chosen, and from the way they were drawn down. My sense is that those initial Robertson County wells got drawn down quite aggressively, which is why they delivered so much gas early on. With the tighter choke we're using in Leon and elsewhere, we still expect to see really solid EURs, in the neighborhood of 3.5 Bcf per thousand. The thing is, we can't produce them as aggressively. The data simply presents itself differently. We continue to observe really robust recoveries from these wells; in fact, you've seen wells from other operators that will clearly go past 4 Bcf and 5 Bcf per thousand. A great deal of it comes down to what your objective is: if the goal is to extract all the gas as fast as possible, your EUR will come out lower. If you handle the choke correctly, your EUR will come out higher. That's the trade-off we're figuring out. Looking back at those earliest wells, we believe we drew them down too aggressively. Certain ones could take it, and certain ones could not.
Exactly.
On the whole, I don’t believe that actually implies, you know, that this is the sole region with those sorts of EURs. What I mean is, I think we’re going to see, you know, a really high— You know, Elijah is going to be a well with a much greater EUR than 3.5+; no question. I think our earlier wells were likely overpaced—sorry, under-stimulated. We believe, you know, after reviewing all the information, that the improved frack design now will lead to improved recovery.
Let me put the sheer scale of this into perspective. Across our entire footprint — that 740,000 gross acres — we've got more than 1,000 penetrations where we've observed what these molecules actually look like, including what the Haynesville Bossier looks like. Now take a competitor up to the northeast: 75,000 net acres, a single well drilled, and their comment was, "We like what we've seen." From the spot where our first well was drilled, that's 80 mi away. Put on a pair of tennis shoes and cover 80 mi — you're looking at two, three days of walking. That's the distance involved here. That's the size of this play. That's how thick portions of it are. It's exactly why we describe ourselves as being at the very start of this. We refuse to wreck the basin we control the way things went in the Legacy during 2008, 2009, 2010. Far too many wells. Nobody knew how to drill or complete them. Laterals couldn't be made long enough. Nobody understood which proppant to use. Midstream wasn't there. Every one of those pitfalls has been steered around in the basin we refer to as the Western Haynesville.
Alright, I appreciate that viewpoint.
To begin with, you've spent 1 hour and 20 with us — 1 hour 30. I mean, my hope is that it's clear just how much we care about sharing the truth with you and about being upfront regarding where we stand in this major endeavor. I want to express my gratitude, as always, for your willingness to examine the business plan. And I always want to point out that whether we're talking about the Joneses, the board, or management, we're genuinely all of one mind, and we aim to act in a way that is fair and correct for everyone. A bond holder, an equity owner — it makes no difference. We, we truly strive to remain resilient and carry out our responsibilities. What we see is that Comstock represents a fantastic opportunity when it comes to LNG. It's a fantastic opportunity for power generation, for the data center angle, and it's a fantastic opportunity given the abundant inventory we possess. If you're able to tick off those boxes — with the pinnacles that we hold and the tiers beneath them and the banks standing behind us — and then the expansion tied to LNG, with Golden Pass and Cheniere, Venture Global, etc., etc., we appear to be positioned to score a major victory. If you simply remain with us and continue posing questions, that will improve us, and we're grateful for it. Thanks for your time.
Appreciate everyone for joining the call today; that wraps up the session, so you're free to hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Comstock Resources, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Comstock Resources, Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.