Home / Transcripts / Constellation Energy Corporation (CEG) · August 7, 2025

Constellation Energy Corporation (CEG) Earnings Call Transcript

August 7, 2025

NASDAQ US Utilities Electric Utilities earnings 62 min

Earnings Call Speaker Segments

Emily Duncan executive
#1

Thanks, Tanya. Good morning to all of you, and we appreciate you being on Constellation Energy Corporation's second quarter earnings conference call. Today's speakers are Joseph Dominguez, who serves as Constellation's President and Chief Executive Officer, and Daniel Eggers, Constellation's Chief Financial Officer. Other members of Constellation's senior management team are also with us, and once our prepared remarks are finished, they'll be around to take your questions. Our earnings release came out this morning, and the presentation came with it; you can locate both in the Investor Relations portion of Constellation's website. Within the earnings release, plus the other items we'll cover on today's call, you'll find forward-looking statements and estimates about Constellation and its subsidiaries that carry various risks and uncertainties. Factors and assumptions laid out in today's materials and mentioned on this call could cause actual results to come in differently than what our forward-looking statements suggest. For a look at risk factors and other circumstances and considerations that might make results diverge from management's projections, forecasts, and expectations, please see today's 8-K along with Constellation's other SEC filings. References to adjusted operating earnings and other non-GAAP measures also appear in today's presentation. Reconciliations linking the non-GAAP measures to the closest equivalent GAAP measures are in the information found in the appendix of our presentation and in our earnings release. I'll hand the call over to Joe now.

Joseph Dominguez executive
#2

Thank you, Tanya and Emily, for the introduction. Good morning, everybody. We appreciate you being on this call and your interest in Constellation. I realize how busy things are right now, with so many earnings calls happening around the same period, and all of you jumping between them; we're grateful that you care about what we're doing here. Finally, I'd like to express gratitude to our Constellation team for another quarter of strong operational and financial performance. As we always put it, our people form the foundation of everything we achieve. The culture we've created together makes me very proud. It takes ongoing effort and focus, and we certainly don't get it right every time, but our leaders are fully committed to it. They put in that work daily. That's why it's a particular thrill to open this call by sharing that we've earned recertification as a great place to work for a third consecutive year. I've mentioned this previously. This certification is unique because it's the only one awarded on the basis of feedback from your own employees. When I consider them as customers, and as the servant leaders we aspire to be, receiving that input and their recognition of our efforts means the world to me; now, moving on to the quarter and our financial results, we posted second quarter GAAP earnings of $2.67 per share along with adjusted operating earnings of $1.91 per share, which is an improvement over our second quarter performance a year ago. As usual, Dan is with us and he'll take you through the specifics. As you may remember, during the previous quarter we felt somewhat frustrated that we couldn't be out in the market repurchasing shares because of where we stood in the Meta-Clinton deal process. In fact, just between us, I believe we viewed it as a race to see whether we'd get the call in ahead of the announcement or the other way around. Since the Meta announcement came, we've completed $400 million in accelerated repurchases. As with the other ones we've carried out, these stock repurchases keep producing an excellent return; now that long-term contracts such as our Meta and Microsoft deals have become a routine element of our strategy and a standard part of how we operate, and hopefully you believe we're skilled at it, there's no need for us to stop stock repurchases. Let me be perfectly clear: you shouldn't draw any conclusions regarding the timing of a potential new transaction based on whether we happen to be buying shares in the market. Beyond our solid financial results, a lot has happened at the company since we last spoke; we witnessed the One Big Beautiful Bill Act being signed into law, which preserved and in fact reinforced the nuclear provisions and stands as yet another sign of the distinctive and robust bipartisan backing for nuclear; we shared that we were moving the restart of the Crane Clean Energy Center up into the second half of 2027. I recall when we discussed it, people doubted that we'd manage a restart in 2028. Their skepticism was justified; the launch is set for 2027. For the Calpine acquisition, approvals have come through from New York, Texas, and FERC, and we're still on schedule to complete it before the year is out. As discussed earlier, we've announced a 20-year power purchase agreement with Meta covering offtake from the Clinton Clean Energy Center, which will help them fulfill their clean energy requirements; everyone comes out ahead with this deal. Thanks to the PPA, more than 1,100 MW of emissions-free nuclear energy is guaranteed to remain available for decades ahead. It genuinely enables us to put money into projects that boost output and deliver additional megawatts to the grid in Southern Illinois at a pivotal time for America. Meta is the reason this happened. We're thrilled about the partnership, and my hope is that we can keep it going. Outside of the Clinton deal, we're still making strong headway with customers toward securing further agreements to sell the clean, reliable, and available megawatts from our nuclear plants. Now, look, this portion of the call is always where the questions come up. Naturally, you're going to want to know precisely where things stand on each deal. Naturally, I'm going to say we can't discuss deals before they're finalized. And even after that, certain terms will stay confidential. Let me offer as much guidance as I'm able to here. First, if you like using the baseball comparison for tracking progress, all I'd say is that one transaction is in the late innings; we've moved beyond the seventh inning stretch. On that one, "Take Me Out to the Ballpark" has already been sung. On other transactions, I'd describe us as being in the middle to early innings. From where I sit, the most significant point is that we're witnessing interest keep accelerating from a rising number of entities. The second point I want you to keep in mind is that occasionally the pricing and deal terms are settled, yet other elements are needed to make a transaction possible. In the case of front-of-the-meter deals specifically, that means interconnection work alongside the utilities. To connect the dots here, I believe one transaction is well along the path to completion, but we're awaiting certain inputs from utilities. Since the company's beginning, we've said that clean and reliable megawatts represent the most important energy commodity in the world today. The numerous customers we interact with daily share that view. That gives us strong confidence in our ability to keep transacting, whether in front of the meter or in co-located configurations. When the Calpine acquisition was announced, we discussed how vital natural gas is to the data economy and to system reliability. On that note, we were glad to see Calpine's announcement backing a 190 MW data center close to the Fad Hill Energy Center in Bosque County. We anticipate additional deals like this going forward throughout the sector. When it comes to Calpine, combining gas with nuclear, in our view, delivers an enormous edge over competitors; it lets us offer a distinctive product pairing speedy, dependable interconnection at nuclear as well as gas locations with the advantages of supplying our customers a clean, dependable energy offering. Solid clean power, priced at a transparent rate spanning 20 years or longer should the buyer want that. That matters a great deal. Let me change direction somewhat. Understandably, because of its size, we spend considerable time discussing data center clients. You need to keep in mind that a number of our business lines appreciate and purchase clean nuclear, and that trend keeps speeding up. During this quarter, I'm happy to share news of a major new carbon-free energy agreement with Comcast, an organization that has been a terrific partner to Constellation going back many years. Under this arrangement, Comcast is going to back uprates. Through this deal, we observe a link between private customer contracts and our nation's goals of maintaining and expanding clean, dependable energy. As we've discussed previously, we're seeing interest coming from governments.

Joseph Dominguez executive
#3

You saw how much interest there is with the GSA deal. A lot of you have been busy working through industry calls this week and last, so it may have slipped past you that the New York Department of Public Service staff put out a significant white paper. In it, they ask for a 20-year extension of the ZEC program in New York, which covers more than 3,000 of our megawatts. The staff in New York determined that preserving nuclear is necessary for the state to hit its clean energy targets, and that our facilities should be relicensed. You'll recall New York led the way as the first state with a policy backing existing nuclear plants, since it recognized how important they are as clean, firm, and reliable. By extending the ZEC program, these plants are assured of being around to serve New York for decades ahead. We suggest you read that paper. As I mentioned, this has been a tremendously exciting quarter at Constellation Energy Corporation, and in a lot of ways, a quarter of historic significance. It's a quarter in which everything we've been telling you is now happening. The customer backing and bipartisan political support for nuclear, with the One Big Beautiful Bill Act now behind us, is simply enormous. Constellation Energy Corporation has proven it can get deals done. Reliable natural gas matters to the data economy and to America, and that's clearer now than ever, which supports our Calpine deal. So does our ongoing capacity to grow both organically and inorganically through M&A, and above all, the strength of Constellation Energy Corporation's commercial and operational results; that is, naturally, the basis for all we do, and it's why I always begin these calls by thanking our wonderful team. Let me move to slide six. Passing the One Big Beautiful Bill Act was an unambiguous victory for nuclear power. Keep in mind, it passed with support from every Republican, and it kept and in fact broadened the nuclear production tax credits from the Inflation Reduction Act, a bill that every Democrat voted for. One of the few points these two bills share is backing for existing and new nuclear plants. There are plenty of issues our country struggles to agree on. Like you, I wish there were more we could settle. One fact stands out. Nuclear energy's advantages for families, for local communities, for states, and for the economy overall is something all of us can get behind. I want to thank President Trump and political leaders from both parties for taking action to preserve and advance nuclear power in this country. The bill keeps the crucial 45-year production tax credits for existing facilities through 2032, and it leaves us highly confident that those tax credits will be renewed in the years ahead. The 45Y Clean Energy Tax Credit is maintained for uprates and new nuclear as well, granting the complete credit to projects breaking ground through 2033 and a partial credit up to 2035, since it's understood that getting new nuclear off the ground takes time. On top of that, a fresh nuclear energy community bonus worth 10% is layered onto the 45Y credit. Both the Crane Clean Energy Center and all of our upgrade projects should be eligible for that 10% bonus, in our view. Lastly, the legislation prolonged the tax measures scheduled to lapse under the Tax Cuts and Jobs Act of 2017. Dan will speak to these further meaningful favorable effects for our company. As you're aware, backing for nuclear from the administration carried on beyond the legislation. On behalf of the industry, I felt great pleasure standing with President Trump in the Oval Office as he put his signature on the executive orders conveying complete backing and an unmistakable aim from his administration to safeguard and grow nuclear power, given its importance to America's economic and national security. The nuclear EOs properly concentrate on sensible measures to grow the current fleet via expedited licensing, greater domestic conversion and enrichment, and quicker deployment of new reactors, while keeping the NRC's reputation as a dependable regulator that puts safety above all else. This administration, much like numerous policymakers across both parties, understands that American energy matters greatly for prevailing in the AI competition with China. The AI Action Plan revealed in July urges making data center and energy infrastructure permitting more efficient and building a grid capable of keeping up with the speed of AI innovation; we intend to be central to that effort. It isn't only Republicans who are acting to bolster nuclear, whether new or existing. At June's close, besides backing the extension of the ZEC program out to 2049, which we just covered, New York Governor Hochul advocated constructing one gigawatt of nuclear in upstate New York to underpin a dependable and reasonably priced electric grid while delivering the zero emission required for a clean energy economy; this comes after our efforts at Nine Mile Point on an early site permit. As I've told all of you previously, I believe one of the distinct benefits we possess at Constellation is the land we hold surrounding our current plants, because to us it simply stands to reason that in building out new nuclear, we'll do so in communities already equipped with all the infrastructure and tremendous backing for the plants that exist there. Above all, a skilled workforce is available to run the new nuclear units. We're eager to take part; we recognize this work is in its early innings, yet I believe it will serve as a signpost for other states. I'm eager about the chances to grow nuclear generation in states such as Maryland, Illinois, Texas, and Pennsylvania. Bringing it all together, although political and customer sentiment doesn't always track logic and facts, here it plainly does. Dependable, clean, always-on nuclear power ranks as the single most vital energy commodity in the world right now. Thanks to Constellation, all of you, our owners, hold more of that commodity than anybody else. Together we'll accomplish remarkable things for America. Moving to slide seven, I'd like to spend a moment on the PJM Capacity Auction and our outlook from here. First, prior to discussing upcoming auctions, I believe we should establish some context regarding the past. A story has taken shape suggesting data centers bear full blame for rising prices. Keep in mind that such a story is untrue. Of course, demand has climbed because of expansion in the data economy, because of items such as vehicle electrification, because of broad economic growth, and because of America's reindustrialization as our country follows its America First strategy. Every one of these forces is collectively pushing demand higher, and under straightforward supply and demand economics, prices will increase. The main driver behind the step change we witnessed in the PJM capacity price comes from FERC mandating modifications to the PJM market that were completely essential to close reliability gaps. What made those modifications necessary?

Joseph Dominguez executive
#4

Keep in mind, those adjustments became necessary since the prior market structure acted as though we inhabited a fantasy world in which every megawatt possessed the same dependability as nuclear. Even though the data had been shouting at us for a long stretch that particular generation types are just more dependable than others, implementing those modifications took more time than it ought to have, and the postponed auctions only worsened the ambiguity. The design phase is done, and the market is functioning. In the most recent auction alone, a total of 2,700 MW of fresh and upgraded generation capacity cleared on an extremely brief window following the prior auction, delivering additional supply to meet rising demand. Via PJM's RRI process, which Governor Shapiro along with Constellation and numerous other parties backed, we understand that over 9 gigawatts of new, firm, dependable supply will be operating by 2032; on top of that, we observed over 300 MW of generation taking part in the auction instead of retiring. We were glad to back the consumer protection price cap that Governor Shapiro advocated, and it succeeded. It begins to steady prices so we could move into the elevated prices that were unavoidable given the design revisions FERC has implemented. We believe that will keep helping customers through the transition; this matters because we recognize the attention on customer expenses, particularly for residential customers. Once more, let's frame all of this, beginning with the essential point that generation costs have in fact fallen 38% relative to where they stood between 2010 and 2024. That stacks up quite well against transmission and distribution costs, which did not fall but rather climbed 290% and 57% respectively. Electric wires expenses are not the only ones. Water, sewer, and trash have risen 77% on average. Car insurance, which all of us pay for, or at least ought to, has risen 125%. We recognize how this hits everyone's wallet, and we will do whatever we can to lessen these effects. The competitive generation market has been an extraordinary tale, especially when set against other parts of the energy ecosystem. Constellation is doing more than any other party to fulfill its role in providing the reliability America requires. We're pouring billions of dollars into restarting, uprating, and prolonging the operational lives of nuclear generation. We had over 1 GW greenlit through the RRI process, among them Crane plus the Byron and Braidwood uprates. We're launching Crane sooner than originally intended, shifting it into the second half of 2027 with the goal of attempting to place it in the capacity auction for the period starting June 1, 2027; there's still work remaining on that front, but I'm optimistic we can manage it. We have three sizable uprates on which we are finishing engineering work, amounting to nearly 900 MW that we might add at LaSalle, Calvert, and Limerick provided there's sufficient customer backing. Last week, we unveiled our partnership with GridBeyond to leverage AI in helping our customers cut peak energy usage. Through this initiative, consumers will get the chance to lower their power expenses and open up fresh income sources, while also assisting the market in preserving grid dependability as we handle rising demand. If we trim peak usage by just a modest amount—25% or 22 hours annually—it would make room for 76 GW of additional demand to be integrated; that stands as the strongest approach for managing the new demand. The most recent auction outcomes yet again demonstrate that markets, rather than monopolies, function best to draw in massive private funding. Anyone watching can see the huge enthusiasm from numerous players to construct generation within these markets. When these firms put up private capital, it means the businesses—not trapped monopoly ratepayers—bear the financial exposure, the market exposure, the technology exposure, and the construction exposure, instead of leaving captive customers stuck with the fallout from bad choices for decades ahead. We are certain about how policymakers will see these matters. Moving to slide eight, back in June, I felt immense pride in sharing that the Crane Clean Energy Center will come back sooner, and having Governor Shapiro there was wonderful. To provide a few additional specifics on that, the fuel is now in hand. All the key equipment is accounted for; our staffing stands at 70%, and we are reviewing every element of the strategy. Honestly, our confidence in that team is sky-high, since the facility was in such extraordinary shape when Bryan and his crew placed it into layup during 2017. Saying I take pride in everything done here would be putting it mildly. Prior to handing things to Dan, I want to briefly address the Calpine transaction. You'll find the specifics on slide nine. The longer we collaborate with the Calpine group, the more enthusiastic I become about merging the skilled personnel from both organizations. Three of the required clearances have come through, and we are cooperating with the Department of Justice regarding a second request for information. Ideally, this keeps us on course to finish up with the department and see the deal finalized before the year is out. The earlier we finalize it, the earlier we can bring American households and companies the distinctive benefits of combining these operations. I feel enormous pride in the regulatory crew that secured the three approvals already in hand, and I remain optimistic we'll obtain the final one soon; with that said, I'll pass things to Daniel Eggers, after which I'll offer a few closing remarks once Daniel is done, and then we'll at last open the floor to your questions.

Daniel Eggers executive
#5

Thanks, Joe. Morning, everybody. Starting with slide 10: for the second quarter, GAAP earnings came in at $2.67 per share, and adjusted operating earnings were $1.91 per share, which is $0.23 per share above the prior year. Much like the second quarter of last year, the fleet ran extremely well and delivered essential round-the-clock supply during a stretch when PJM experienced peak loads that went well beyond what its summer demand forecast had projected. Once again, our commercial team came through in managing a stretch of severe volatility, in which at moments we observed real-time pricing in the triple digits across a large portion of the East Coast. Beyond the solid results from our generation and commercial teams, we also recorded $201 million from the Illinois ZEC program tied to banked credits. That mirrors what you saw in the second quarter of 2023. As you'll remember, the Illinois ZEC program has an overall cost cap among its consumer protection provisions, yet it let us bank excess credits to apply in later years whenever there was a fall to the cap, and that's exactly what we did once again this year. The effect of those credits and the banking mechanism has consistently been baked into our full-year 2025 guidance. Slide 21 in the appendix lays out further detail on how the Illinois ZEC program works mechanically. For the bulk of our fleet, full-year gross receipts remain at or above the PTC floor, so significantly fewer PTCs were accrued this quarter versus the second quarter of last year; that's a favorable result, and the means-tested program keeps functioning as we anticipated. It will create noise when you compare year-over-year results quarter by quarter. The remarkable stock performance this year translates into greater book compensation expense on our side, generating some earnings that we'll keep watching. With that said, we are reaffirming our full-year operating EPS range of $8.90 to $9.60 per share. Turning to slide 11, as I noted earlier, our fleet performed superbly during a stretch when it was called upon to back unseasonably high demand throughout our operating footprint. Our nuclear team delivered its second-best fleet production ever in the second quarter and came in ahead of plan with a capacity factor of 94.8%, generating more than 41 million MWh of reliable, available, and emissions-free power. We finished three refueling outages during the quarter, averaging 19 days in duration, which beat the industry average by more than two weeks. Executing these outages so much better than the industry delivers incremental benefit to the grid, to energy in the communities where we operate, and naturally, more power to sell. It really stands as proof of the operational excellence of our nuclear organization. Our renewables and natural gas fleets likewise came in ahead of plan for the quarter, with renewable energy captured at 96.1% and power dispatch matched at 98.3%. Our plants keep performing when they're needed most. Moving to slide 12, our commercial team is off to another strong start this year. By continuously optimizing our portfolio, securing above-average margins on retail sales, and achieving success selling value-added products tied to the clean attributes of our nuclear plants, we're generating value from ongoing market volatility. With our power and gas products, we keep seeing strong renewal rates and new business win rates, which speaks to the lasting relationships we have with these customers. Our scale and our capacity to develop products that address customer needs is genuinely a competitive advantage. Over the past eighteen months, we've devoted considerable time to discussing the enormous demand for long-term clean, firm, and reliable power coming from data economy customers, and rightly so. It has arguably eclipsed our achievements in selling those same products to our traditional commercial customers. To illustrate, through June of this year, the volume we've sold of hourly carbon-free and emission-free products is nearly twice what we signed during all of last year. Let me add a bit more detail about what these sales look like. Keep in mind that offering time-maxed clean power has existed for only a little more than two years in PJM. We're pleased by the expansion in what remains a fairly new market; what's also notable is that buyers of these products have largely come from industries beyond the data economy, which shows how broad the demand is for these offerings. These products are appropriately priced at a premium relative to typical CNI deals, rewarding us for the distinctiveness of a scarce, firm, around-the-clock carbon-free energy solution. Lastly, these products come in varying durations, yet they generally carry far longer terms than what our traditional commodity business offers. Data center customers we already serve represent another area of tremendous growth. Looking only at the accounts we've served continuously across the past three years, their usage during the first half of 2025 rose 45% versus the first half of 2023. This jump in usage is likely not something only Constellation Energy Corporation is experiencing, but it does signal the rising demand originating from the data economy, the expansion of existing sites, and improvements in energy density, even within facilities that already exist. Moving to slide 13, I'd like to make a few brief remarks regarding the financial effects of the most recent capacity auction. As a reminder for everyone, to assist with your modeling. Now that the nuclear production tax credit is in place, working out the benefit from higher capacity prices is admittedly somewhat more complicated than simply a P times Q and hinges on expectations for gross receipts. Whenever we fall below the nuclear production tax credit floor, upside in pricing will initially offset nuclear production tax credits being generated, and once above the floor, we would keep the upsides. Fortunately, based on where current forwards stand, our nuclear fleet sits above the nuclear production tax credit floor for 2026 and 2027. The uplift in capacity markets will flow into our earnings outlook, assuming prices hold. The additional earnings we're seeing beyond the nuclear production tax credit floor are going to be reflected in our enhanced earnings bucket. With that being said, regarding the trio of Illinois facilities participating in the CMC program until the middle of 2027, whatever revenue exceeds the CMC price gets returned to customers. Even though those three CMC plants in Illinois cleared the auction, we won't see any outside benefit from them. When it comes to financial impact, we're concentrating solely on Constellation Energy Corporation standalone and excluding Calpine because of where we stand in the approval process; looking at 2026, the net EPS effect on Constellation Energy Corporation comes to roughly $0.50 per share; for 2027, if we assume those same capacity prices roll forward into the 2027, 2028 auction, we'd anticipate an EPS boost of about $1.50 per share. To give some perspective on these earnings gains, that delta upside is measured against a conservatively low figure — roughly $200 per megawatt day — that's baked into our expectations. Moving to slide 14, our balance sheet strength remains fundamental to the company and to how we allocate capital.

Daniel Eggers executive
#6

Having an investment-grade balance sheet paired with robust free cash flow gives us strategic room to finance the Calpine purchase, plus make future growth investments and give capital back to our shareholders. During our Q1 call, we expressed frustration that we couldn't buy back stock during the brief downturn. In Q2, after the Meta deal was announced, and while we restated that additional long-term PPAs fit within our approach, we managed to launch an accelerated share repurchase program worth $400 million. We anticipate that treating data economy deals as routine components of our operations will give us latitude regarding when we can go into the market to repurchase stock moving forward. Adding this quarter's $400 million, we will have bought back $2.4 billion of our outstanding shares from the start of our repurchase initiative, with roughly $600 million still available under the existing board authorization. We'll stay opportunistic about delivering that capital back to our shareholders. Now let me discuss the One Big Beautiful Bill Act. Joe has already covered how enthusiastic we are about the nuclear PTC support, yet there are several other important advantages for Constellation from this law. The One Big Beautiful Bill Act provides an extra 10% bonus on the 45Y credit for nuclear energy communities, which will deliver added tax benefits for new nuclear megawatts. We anticipate that the Crane Clean Energy Center, along with our remaining uprate projects, will be eligible for this bonus. We additionally gain from the general corporate measures in the law. Shifting from 40% to 100% bonus depreciation across our whole capital plan, fuel included, plus an immediate deduction for research and development costs, will substantially improve our cash position. These measures produce an anticipated $200 million — $300 million in yearly tax cash favorability each year for Constellation standalone. We expect that advantage to increase with Calpine and the capital plans in place there. We're thrilled about Constellation's results and our financial standing as we approach closing Calpine later this year. With that, I'll hand the call back to Joe.

Joseph Dominguez executive
#7

Thanks, Dan. Nice work. From our vantage point, the first half of this year was quite strong both financially and operationally, and Dan and I have gone over that. We've had some genuinely big policy victories, and there are excellent, meaningful chances ahead of us to keep extending the wins you've already watched us deliver. During the back half of this year, our attention is on completing the Calpine deal and truly putting in the effort needed to unite these two outstanding businesses. There's really nobody else quite like our company, and the distinctive, solid base we have will generate worth for our shareholders annually. We turn out strong cash flow along with base earnings, and the nuclear PTC shields those, which, as you can now see, enjoys enormous backing from both parties. It seems fair to anticipate that this policy will keep going. Across this decade, our earnings rise at 13%, and whatever long-term arrangement we strike would add to that expansion, plus to our base earnings. We've demonstrated a history of discovering methods to boost our earnings; with this latest update, you can observe our efforts on restarting the Crane Clean Energy Center. We've completed transactions with Meta and Microsoft. We have the Calpine purchase. I'd say we're quite shrewd at identifying those opportunities and seeing them through. Starting next year, Calpine contributes $2 in EPS along with $2 billion of free cash flow before growth. Naturally, Dan went over a portion of the cash advantages the One Big Beautiful Bill Act brings us. We have uprates that have now cleared the engineering stage, and we're looking to work with customers to deliver them onto the grid. The PTC doesn't just shield the nuclear fleet — when people worry about inflation's effects, it also grants us distinctive safeguards via elevated PTC floors that rise alongside greater inflation. It feels as though we possess an extraordinary base for seizing value from every opportunity in front of us, for satisfying what the data economy requires, for meeting the needs of plain growth right here in America, and for grabbing the value you're owed as our shareholders. For many decades ahead, our current fleet is able to supply customers with the clean, dependable power they require right now. An extraordinary platform. In our view, it has no equal anywhere in the world where you compete. I look forward to your questions.

Steve Fleishman analyst
#8

Hi there, good morning, and thanks for the updates. First, about that potential late-stage data center deal — you mentioned interconnection could be a key sticking point. Could you talk about what the timeline looks like for that particular one you've already had to work through? And more broadly, what are utilities seeing these days when it comes to PJM interconnection schedules? How lengthy are they? Any high-level thoughts on that as well?

Joseph Dominguez executive
#9

Sure, Steve, I'll take those in the order you raised them. For the one I mentioned, my hope is we close it out during this year. Clearly, that work sits with other parties, though we're coordinating and communicating closely. When it comes to making broad claims about interconnection timelines, I'd say that's just not feasible. People are increasingly understanding that situating projects near generation facilities and major transmission buildouts is what accelerates things. Every project is different. Broadly speaking, the approach we presented to all of you twelve months back has become the accepted industry playbook for doing this in the most efficient way. Fortunately, utilities across the board have been much more responsive compared with where things stood a year ago. At the outset, when we began looking into these possibilities, it was fairly typical for studies and similar procedures to stretch beyond twelve months. In my view, every one of the utilities—credit to them, and we value their efforts—has discovered methods to accelerate the technical analysis and to handle the numerous incoming applications in a systematic manner. Certain utilities, we've observed, are bundling applications together so they can process them faster. It appears that everyone is reacting to the demand for quicker turnaround. That's encouraging to witness. Even so, ultimately, location is what matters for these facilities. One location might give you solid information while another provides poor information. The key point is that utilities need to openly exchange that data, allowing customers to grasp how feasible various projects are across different areas. From what I can see, they are already doing this.

Steve Fleishman analyst
#10

Does this come down simply to scheduling and expense, or could there be some danger that it simply won't work at all?

Joseph Dominguez executive
#11

Steve, if I thought it couldn't work, I wouldn't be bringing it up on this call. Right, it's really more that we simply have to allow them to complete their process and determine the point at which the interconnection functions. We'll update you on that. What I believe people on calls like this often assume is that we spend eight or nine months just arguing over dollars per megawatt hour. These transactions involve a great deal of complexity. You've witnessed that with Microsoft. You've witnessed that with Meta. You've witnessed that in what Talon has made public. There's simply a great deal of process involved. Certain aspects of this fall under our customer's control and our own. Once you're on the grid, you truly need other parties to participate. Confirming that the equipment required for upgrades can be obtained and everything of that nature winds up consuming quite a bit of time, as you can imagine; we believe our position is fairly strong.

Steve Fleishman analyst
#12

Alright. There are a million things I could ask about PJM, but I'll leave those for others. I just have a few other items regarding new nuclear. Has your approach shifted on that front? For instance, are you more open at this point to putting money into new nuclear? What risk-reward terms would need to be in place for you to move forward?

Joseph Dominguez executive
#13

Yes. Steve, my sense is this won't represent some dramatic leap in how Constellation operates. I see it more as a gradual progression. Over time, with the effort Bryan Hanson and his group at Nuclear have devoted to examining the designs, and beyond merely evaluating those designs for feasibility and how they'd run, also digging deep into the specific cost entries associated with each individual component, in order to gain a clearer picture of how the unit will really be built—whether it's modular, as with an SMR, where the machinery is sourced from, schedules, every bit of that is something we are actively honing daily. What I'd tell you is this. Broadly speaking, with every week that passes, I gain more comfort regarding a clearer grasp of cost frameworks and how long the job will take to finish. Our assurance, I'd say, is building, though it's building bit by bit, rather than through any huge jumps. My view is that it's fairly workable. I believe it's extremely, extremely tangible. Not every design out there, in my opinion, will end up functioning and being able to succeed in the market. We have a solid sense of which ones we believe will come out on top; we've held numerous discussions with businesses about how Constellation, because of its distinctive real estate access, its know-how in operations, its know-how in construction, all of that might be applied to support one of these businesses. I'm quite enthusiastic about where this might lead. I'm not at a stage yet where I could tell you on a call such as this what the expense will amount to, and here's the timeline we expect for getting it done. Do I believe we'll reach that point? Yes, I do.

Steve Fleishman analyst
#14

All right, that's great. Thanks a lot.

Jeremy Tonet analyst
#15

Hello there, good morning.

Joseph Dominguez executive
#16

Hi, Jeremy.

Daniel Eggers executive
#17

Good morning, Jeremy. How's it going?

Jeremy Tonet analyst
#18

Fine, thank you. I'd like to follow up a bit further on the auction, if that's alright. You pointed out the obvious advantages of demand response and how crucial it will be down the road. I was hoping you could share a bit more about your thinking on the level that showed up in the most recent auction, what the trends are, and how you expect this to develop going forward, or what it would take to get more.

Joseph Dominguez executive
#19

Well, one factor that will be needed to get more is that ELCC change. For those listening who don't track this in fine detail, PJM assigns an electric load carrying capacity to each resource that is bid into the auction: demand response, combined cycle machines, nuclear plants. The headliner, naturally, is always nuclear plants, since they are the most robust, dependable units on the system. Everything else receives something of a discount from that point. When it came to demand response in that most recent auction, the ELCC, the carrying capacity for peak, was under 70%. Financially speaking, that means that when you bid a megawatt of demand response, the price you received was reduced by more than 30% straightaway; that somewhat restricted how much demand response took part in the market. In the upcoming auction, that figure rises to above 90%. How it pays to bid in for demand response will shift during the upcoming auction. What is required of them will shift as well. Rather than needing to be available for 18 hours, it will extend to 24 hours. One reason we became involved with this new company to develop these AI-driven solutions is that we believe there's a bear there. Will demand response on its own be a solution? No, but it must be a distinctive and significant contributor. I call it distinctive because it offers remarkable speed in delivering reliability. I give PJM credit for enhancing the ELCC. I wish they had done it for the last auction, but there's no point crying over that spilled milk. I believe it will deliver megawatts in the future.

Jeremy Tonet analyst
#20

Got it, that's quite helpful. Thank you. If we could remain on the auction topic — after the latest one, we've seen governors and other stakeholders paying attention. What do you expect regarding state-level moves tied to PJM changes going forward — could that include incentives to bring on new supply, or further reforms? And might Constellation pick up opportunities from that?

Joseph Dominguez executive
#21

I think there will be. Consider what Governor Hochul is doing with New York's RFP for nuclear — I can picture similar things taking shape in other places. I mentioned additional states where we have operations and where fresh nuclear development could make sense. Depending on what Bryan and his team are able to accomplish, I'm fairly confident bringing that stuff on won't take us 10 years. It'll happen far more efficiently. Over the long haul, I think that's real. Jeremy, the one item states will need to weigh — something we've advocated — is that a number of states have mandated that fossil fuel plants exit the system by a set date. It shouldn't shock you that we'd suggest they reconsider those mandates; we've put forward some proposals. A few of the concepts being floated strike me as quite solid. Take one example: suppose a plant's retirement is set for 2030. As a middle-ground approach, it could start lowering its output relative to a historical baseline — and its emissions — in 2027, 2028, and 2029. That would let it bank those emissions, which could then permit operation from 2030 through a newly set retirement date, right? By reducing air pollution over those intervening years, such a facility could essentially buy itself an extension. That idea has come to our attention, and we're behind it. Allowing certain generating facilities to keep operating so the market has time to react strikes us as entirely logical. Now, I realize there's been no shortage of discussion regarding monopoly build versus competitive market build. Building a monopoly won't speed anything up. For the next few years, we'll be dealing with a tight system. We need demand response to show up. States may need to take another look at when units are scheduled to retire. We'll have to push those dates out to get through this interim period. After that, nine gigawatts will enter the system by way of PJM's RRI. The reason we're in this position isn't that markets failed. The reason we're gathered today comes down to flawed regulatory architecture—something that's finally been fixed, though the fix arrived far later than it should have and left the market shrouded in doubt for an excessive stretch of time. Sitting on these calls complaining about what's already done gets you nowhere. Should somebody out there be spreading the claim that competitive markets have broken down, or that the hyperscalers deserve all the fault here, my response would be to label that pure rubbish. That just isn't what happened.

Jeremy Tonet analyst
#22

Got it. That's helpful. Thank you.

Joseph Dominguez executive
#23

All right.

David Arcaro analyst
#24

Hi there, thank you very much, and good morning. I'd like to ask whether you could speak to where pricing is heading in the talks you're currently holding regarding certain of these data center agreements. Clearly, we've observed that capacity auction results have come in at higher levels, and it certainly appears that demand-related conversations have been running pretty hot. When it comes to pricing, what are you observing in these latest negotiations compared with what happened before?

Joseph Dominguez executive
#25

Yes, David, I won't address, to start with, David, good morning, and thank you for joining the call. I won't discuss particular deals, since I'd rather not point to any individual transaction when it comes to timing. What I believe all of us are witnessing is that the market keeps growing tighter. Capacity is growing harder to come by, and its price reflects that. Given the availability of alternative resources — considering what the One Big Beautiful Bill Act did regarding renewables, and considering the FERC restrictions affecting items such as storage — my view is that those supply components will face pressure. On our prior call, we mentioned that combined cycle machine costs are climbing. Taken together, all of these factors, along with the way available megawatts are being consumed, will render what already exists even scarcer. On balance, that ought to mean pricing keeps climbing. To put it another way, the message I'd give customers is that right now is a favorable moment to start holding those conversations.

David Arcaro analyst
#26

Great, thank you. I appreciate it. So, looking at the various possible structures or offerings you have, how do you view the trade-off between front-of-the-meter virtual and colocated, on-site data centers? What has the level of interest been like, perhaps on the colocation side? Is there a typical structure emerging for some of the deals currently moving forward?

Joseph Dominguez executive
#27

Yeah. Let me adjust the terminology slightly here, so I can give you a precise answer. When I refer to colocating, I mean proximately located. I believe nearly all of it will be proximate—that is, of size, correct? It will be situated close to major power elements, whether that's the power plant or key components of the transmission grid, which again tend to be near power plants. What I think you're really asking, Joe, is whether that will be front of the meter or behind the meter—this broader issue that has been before FERC for quite a while now. I don't believe anyone at this point has abandoned hope that FERC will tackle and allow flexibility for genuine behind-the-meter configurations. I was actually in Pittsburgh with the President during the summit that Senator McCormick put together, which was truly a wonderful event. You can't listen to the President speak without concluding that he feels very strongly that behind-the-meter things and generation built specifically for data centers must be part of the solution set available to customers. Right now, look, because of the ambiguity on this matter at FERC and what's happening with the selection and appointment of FERC leadership, we don't have an answer on that yet; we keep considering it as a longer-term option. What we're focused on at present is all front of the meter. If that, David, is roughly what you were driving at.

David Arcaro analyst
#28

Yeah, no, that's useful. I was wondering whether siting things together and providing your own assets — perhaps land, or possibly transmission interconnection — might create additional value compared with an option that's somewhat more, I suppose, remote or virtual, which was how I understood the Clinton deal.

Joseph Dominguez executive
#29

Yeah. Look, my sense is both approaches are feasible. Given, once more, how close the land surrounding the plants sits to these key elements, I believe it will prove tremendously valuable. That's something we've discussed since day one. My opinion hasn't shifted. If anything, my confidence on this point has only grown stronger. I expect that's how this will ultimately unfold. What I hoped to highlight during my prepared remarks on this call is that once Calpine is behind us, we gain the chance to sit adjacent to the major element. A gas plant could be there, along with related transmission. Thanks to Constellation Energy Corporation's distinctive strengths, our ownership of that nuclear fleet, and our commercial expertise — right — we'd be able to take that interconnection and pair it with a clean energy offering for 24/7 clean power, which delivers to the customer not just the sustainability benefit they're after — and we certainly observe that appetite for sustainability — but also what else they're seeking: price certainty across a 20-year deal. Achieving that with a gas plant is quite tough, since the natural gas input cost is unknown; it will always be tied to an index to some degree. It's extremely challenging, because you can't predict how future environmental rules could affect CO2 costs. Usually, with a long-term gas plant arrangement, you're either saying, "Hey, this will be indexed to something on the supply side," or, "We require a long-term supply contract. You must address how firm that supply contract is." You wind up discussing with the customer, you know, what occurs should a carbon tax or a regional program take effect, or should something else arise. The wonderful part about holding nuclear megawatts is that, as you've witnessed, providing a price sheet for clean, firm energy that will remain available for decades ahead poses no difficulty for us. That's precisely where the pairing delivers.

David Arcaro analyst
#30

Excellent. Yeah, that's helpful. Thanks so much.

Joseph Dominguez executive
#31

Okay.

Sophie Karp analyst
#32

Hello there, and good morning. I appreciate you giving me the chance to ask. What I'd like to know is how utilities are handling interconnection requests — and the growing wave of them — and how, as a consequence, that could end up affecting you. What we're observing is that utilities keep asking for contracts that run longer, provisions like take-or-pay inside those agreements, or assured returns, and things of that nature. Based on what people are telling us, plenty of data center customers consider these terms extremely burdensome, correct? Looking at it from where you sit, might that carry consequences for your operations in the areas where you run? Is it possible you'd see data center customers moving out of certain territories seen as harder to work in, heading instead toward markets that are more vertically integrated, where operating might prove simpler for them? How do you see it?

Joseph Dominguez executive
#33

Well, what I believe is happening across American politics, and which brushes against the American regulatory compact — be it in markets that are vertically integrated or ones that are competitive — is a sort of wish to impose on data centers every cost tied to shifts in supply-demand fundamentals. That's roughly the reason I said what I did during the prepared remarks, aiming to push back on a narrative I regard as inaccurate. In a vertically integrated market, we definitely are seeing tariffs getting put together there that strike data center developers as highly burdensome. Every state — whether it runs an integrated monopoly model or a competitive market — will, I believe, make certain choices here, and those choices will effectively push development toward specific regions that prove more welcoming. Take Pennsylvania: I've watched it choose to be pretty friendly on purpose. Northern Virginia has chosen on purpose to be pretty friendly toward the data economy. We'll keep watching how that plays out. The way I see it, the truly absurd piece of this is that when you're in a region whose neighboring state is putting up data centers, then any change to supply-demand fundamentals stemming from that growth will hit your state too, even if you ban data centers within your own borders. The grid, as everyone knows, does not halt at state lines. There aren't 50 separate electrical islands. We're all interconnected, so supply and demand touches every one of us. My sense is that the majority of well-informed governors and policymakers have concluded that these impacts must be lessened as much as we can, yet deliberately attempting to hold down data center development just to hold down costs would work about as well as, oh, I don't know, New Jersey trying to sway interstate milk prices by telling its residents to quit drinking milk. That simply doesn't work. You're seeing tons of activity in that space, but still, I think reason will win out. We've got to steer through what will be a harder handful of years. We started from a difficult position because the market design was flawed from the outset, producing prices that were not genuinely competitive. Everyone here is mature enough to recognize that this situation must be handled in a manner that serves American households, and Constellation Energy Corporation is contributing its share toward that effort.

Sophie Karp analyst
#34

Thanks. Just a brief question, if that's alright. Plenty has been mentioned regarding the nuclear credit along with the One Big Beautiful Bill Act, yet might there be additional provisions in there you could talk about that could help you indirectly — perhaps tied to depreciation, or something capable of driving growth that, you know, might serve as a secondary relief and also be good for your business?

Joseph Dominguez executive
#35

Bonus depreciation obviously had a major effect. Dan, you touched on that somewhat. I believe you could put a number on it.

Daniel Eggers executive
#36

So yes, when you combine bonus depreciation with R&D expensing, our expectation is that somewhere in the range of $200 million to $300 million could be saved annually looking out over the horizon. Calpine ought to be factored into that as well, and once the deal has closed, we'll get back to you with an update. Clearly, that goes beyond what the bill sets as the federal statutory tax rate. Something else worth noting: the 45U and 45Y credits matter a great deal, along with that 10% adder tied to 45Y for nuclear communities. That's one more incremental opportunity; from where we sit, these represent the most significant items among what we're concentrating on right now.

Sophie Karp analyst
#37

Thanks; that's everything from my side.

Joseph Dominguez executive
#38

Thanks, as always, for spending part of your morning with us. Dan, I realize everyone's schedule is packed right now. I hope our responses addressed what you wanted to ask, and in our view this marked the close of a terrific opening six months for us during 2025. We're eager to keep delivering for our owners and for each of our stakeholders. Until we speak again, take care.

Operator operator
#39

Thank you, everyone, for joining us on today's call. That brings today's program to a close. You're welcome to disconnect at this point. We hope you all have a wonderful day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Constellation Energy Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Constellation Energy Corporation earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.