Home / Transcripts / Constellation Energy Corporation (CEG) · August 6, 2026

Constellation Energy Corporation (CEG) Earnings Call Transcript & Summary

August 6, 2026

NASDAQ US Utilities Electric Utilities earnings 57 min

What were the key takeaways from Constellation Energy Corporation's August 6, 2026 earnings call?

In the second quarter of fiscal year 2026, Constellation Energy Corporation reported strong financial results, with GAAP earnings of $1.42 per share and adjusted operating earnings of $2.55 per share, representing a year-over-year increase of $0.64. The company raised its full-year adjusted operating earnings guidance to a range of $11.50 to $12.50 per share, up from $11 to $12, signaling confidence in continued operational performance and commercial execution. Key developments include the signing of approximately 920 megawatts of long-term nuclear contracts and positive regulatory progress with PJM and FERC, which could enhance future contracting opportunities.

What topics did Constellation Energy Corporation cover?

What were Constellation Energy Corporation's August 6, 2026 results?

Constellation Energy's strong quarterly performance and increased guidance reflect a solid operational foundation and strategic positioning in the nuclear sector. The positive regulatory developments and successful long-term contracts are key catalysts for future growth. Investors should monitor the progress of the Crane restart and ongoing regulatory clarity, as these will be critical for sustaining momentum and enhancing shareholder value.

Earnings Call Speaker Segments

Tim Flottemesch executive
#1

Thanks, Kevin. Good morning, everybody, and I appreciate you being on Constellation Energy Corporation's call for the second quarter earnings. Today's speakers are Joe Dominguez, who serves as Chairman, President and Chief Executive Officer of Constellation, along with Shane Smith, Constellation's Chief Financial Officer; other senior management team members from Constellation are also with them, and once our prepared remarks wrap up, those individuals will be ready to take your questions; this morning we put out our earnings release as well as the presentation, and you can locate both of them in the Investor Relations area of Constellation's website. Forward-looking statements and estimates about Constellation and its subsidiaries, which carry assorted risks and uncertainties, appear in the earnings release and in other items addressed on today's call. Our actual results might not match those forward-looking statements, depending on factors and assumptions covered in today's material and in remarks delivered on the call. For discussions of risk factors and other circumstances and conditions that could lead results to diverge from management's projections, forecasts and expectations, please see today's 8-K and Constellation's other SEC filings. References to adjusted operating earnings and other non-GAAP measures also appear in today's presentation. For reconciliations between non-GAAP measures and the closest equivalent GAAP measures, please see the information in the appendix of our presentation and in our earnings release. I'll now hand the call over to Joe.

Joe Dominguez executive
#2

Appreciate that, Tim. Morning to all of you. We're glad you could be on this call, and we value the ongoing attention you pay to Constellation. Today brings an excellent set of developments to share: robust performance, raised outlook, favorable regulatory news, and solid advancement on strategic deals. Yet, as we always do, we'll begin with the piece of our business that matters most — our team. To start, I'd like to honor Bob Wallace, who stepped down this week from Constellation's Board following over 25 years of remarkable contributions to Constellation and the companies that came before it as a Board member. From the days when Constellation first stood alone as a company, through the period we spent within Exelon, and across the years following our split, Bob was instrumental in shaping the company's path toward the lasting success we now celebrate. There's nobody else like him. Speaking for everyone here at Constellation, I extend my gratitude to Bob for his leadership, his counsel, his camaraderie, and his devoted service; we send him every good wish for retirement. Godspeed, Bob. I'd also like to express my thanks to the women and men of Constellation for producing yet another quarter of strong operational and financial performance. Through the mid-Atlantic heat wave that came just before the 4th of July holiday, our team came through, hitting a nuclear capacity factor exceeding 99%, all while steering our dispatchable generation fleet safely through tough operating conditions as the newly formed organization meshed together well. Their commitment and execution help keep the grid dependable at the very moments our customers and communities required it most. Constellation is a unique company, and we take pride in building a workplace where people choose to build a career doing meaningful work for America; so it makes us particularly happy that Constellation has earned recognition as a Great Place to Work for the fourth year in a row. As you're aware, this certification carries real weight because it can only be achieved via direct feedback from our people. I'm happy to share as well that, for the first time ever, Constellation has been named the world's top business for people with disabilities; and lastly, we were thrilled to accept the Points of Light honor as one of the nation's 50 most community-minded companies, reflecting the positive impact we create daily through volunteerism and investment in our communities. Now, I realize some might view these awards and recognitions as pleasant but perhaps less significant than the financial and operational results we'll discuss shortly; that isn't how we see it. In our view, our values rank as the most important things; and when I speak in a few minutes about what it takes to restart Crane and secure the overwhelming public support, which we have, and doing it in a place known for the worst moment in U.S. nuclear history, then I believe you'll come to see why we feel our enduring community values are so vital to our business. Now let's turn to the quarter and our financial results. For the second quarter, our GAAP earnings came in at $1.42 per share, while adjusted operating earnings were $2.55 per share. Because of how well our team has performed commercially and operationally so far this year, we're raising the low end of our operational earnings guidance by $0.50, bringing the range to $11.50 to $12.50 per share. The midpoint we're using now equals the previous top end of the guide, and there's still plenty of room for us to create additional value during this year. Shane will walk everyone through the specifics when he speaks. Since we laid out our business and earnings outlook back in March, we've achieved meaningful progress on a number of key focus areas, which bolsters our confidence in generating long-term value for our owners; back in March, I was candid in saying that new uncertainty in the regulatory environment had put us behind our targeted time line for wrapping up long-term agreements. I expressed hope that PJM, with FERC's oversight, would act swiftly to deliver the clarity needed so that work vital to our nation's future could move ahead. I'm aware plenty of people doubted reforms could get done quickly and worried the PJM process would stretch on for years, which sadly has happened before; those worries, however, never came to pass. What we're actually witnessing is PJM, pushed by FERC, moving at the pace required. And although more work lies ahead for PJM to nail down the details, I'm happy to say this progress is giving customers more confidence to assess long-term solutions and proceed with planning and contracting activities. Since our previous call, we've signed long-term nuclear deals totaling roughly 920 megawatts, which align with how we view long-term value. The average duration on these contracts is 18.5 years, and the counterparties are investment-grade customers. As we discussed, and as I explained to you last quarter, we'll keep letting our customers take the lead on how and when their agreements get disclosed, so they can safeguard their procurement strategies. Now to Crane. The restart has seen important progress as well. During the quarter, the NRC granted the Crane new fuel licensing amendment request, which opens the way for receiving new fuel and marks yet another significant milestone on the path to bringing the facility back into service during the second half of 2027. Beyond that, FERC approved the waiver request allowing the transfer of capacity injection rights from our Eddystone facility, which is set to close, to Crane. We anticipate this transfer will help resolve many of the transmission contingencies flagged in PJM's initial deliverability review and will set the stage for Crane to provide full value to the grid. To further enhance the value and exceptional long-term durability of our nuclear fleet, we keep extending the operating lives of our clean energy centers. During the quarter, we submitted subsequent license renewal applications for the Ginna and Nine Mile Point 1 clean energy centers. Governor Hochul and the New York Service Commission deserve credit for making these extensions happen. They saw how much clean, dependable nuclear power is worth, they extended the ZEC program, and that moves our strategy forward — keeping these vital assets safe for New York and for America. Keep in mind that because of these programs and license extensions, Constellation genuinely occupies a distinctive position, with most of our generation locked in through 2050 and past that point. Work on integrating Calpine is going nicely, and throughout the merged company we're witnessing solid teamwork as groups spot ways to unlock further value on your behalf. On top of that, we're happy to report that a deal has been struck with LS Power for the sale of the Brazos Valley Energy Center. Once regulators sign off and the transaction closes, this divestiture will fulfill the last DOJ condition attached to the Calpine purchase. When savvy private equity purchasers who have lengthy histories and face competitive power markets will hand over more than $1,400 a kW for Texas assets in a weak ERCOT market, that alone reveals what the efficient gas fleet we now hold is really worth. Last, our capital allocation strategy keeps moving ahead. So far this year, we've put roughly $2.2 billion into share repurchases that are opportunistic and accretive. Shane will cover this, but these buybacks are already delivering upside to our earnings.

Joe Dominguez executive
#3

Now moving on to Slide 6. Like I said at the start, during this quarter we signed long-term contracts totaling 920 megawatts for nuclear power. I'm not able to share the pricing, but I can tell you that these agreements acknowledge the worth of clean, reliable nuclear energy that already exists, treating it as a premium offering. Following a strong quarter of deal signings, we've now placed approximately 30% of our clean baseload generation under long-term arrangements, and our pipeline of prospective transactions remains strong and busy. Let me spend one more moment on the agreement announced during this quarter with Walmart, our partner. Walmart, I should note, has supported clean energy development for many years. This contract, however, is their inaugural nuclear power purchase agreement and the first such deal involving a major retailer. Walmart is essentially helping shape the way corporate buyers view nuclear energy, which mirrors a widening understanding that meeting ambitious decarbonization targets demands around-the-clock carbon-free generation; this deal marks just the start of a fantastic partnership with this iconic American corporation. The Walmart agreement, alongside the others signed this quarter, underscores how broadly appealing our products and capabilities are to every type of customer. Now to Slide 7. I'd like to give some further background on regulatory changes that are enhancing conditions for customer contracting. Back in June, FERC gave us solid affirmation, signaling clearly that it wants to act faster in creating new avenues for serving large loads. FERC instructed each RTO to demonstrate how its current tariffs allow for just and reasonable interconnection of large loads to the grid, or else submit tariff revisions. FERC additionally settled disputes over the rules governing new transmission services for co-located loads and told PJM to justify why it cannot offer those services sooner. Along with backing the exploration of co-located options and pressing for quicker resolution, FERC has shown openness to weighing creative methods that eliminate obstacles to economic growth, such as examining generation and load jointly at a single point of interconnection — an approach Constellation has long promoted. Efforts such as these might establish a significant route for customers to obtain affordable solutions faster while preserving reliability and advancing broader economic development aims. As these frameworks take shape, the worth of existing generation and infrastructure will grow ever more evident. Our fleet occupies a unique position to assist in achieving these goals by using assets already in operation, linked to the grid, and able to serve rising customer demand more efficiently than numerous alternatives, even as we add new capacity to satisfy that rising demand. Last week, PJM put out proposals for the reliability backstop procurement, or RBP, along with the Interim Resource Adequacy Service, or IRAS. Though parts of PJM's proposals require clarification and additional review, we are now headed toward resolution and certainty, which will let customers and suppliers make investment choices with better visibility and confidence in the market rules. PJM has set a distinct goal of 6.8 gigawatts for the RBP, and right now we're in the middle of bilateral matchmaking — a process meant to connect customers with new supply while cutting how much capacity is eventually needed via certain central procurement. PJM has put forward holding the procurement auction this autumn, with results anticipated by the close of the year. All in all, the pace of progress has us pleased. Anyone who has tracked PJM over the years knows that the speed FERC is demanding of PJM is unheard of, and a number of the worries we voiced earlier in the year on that subject are now being resolved. Running alongside the PJM and FERC processes, Constellation and other stakeholders are pressing EPA to state plainly that any curtailments FERC tariffs ultimately order should not count toward the 50-hour yearly cap on backup generator use at data centers. That step could open up significant optionality for our data economy customers while maintaining reliability and bringing down energy costs for every customer. Keep in mind what we've said previously. Across more than 99% of the hours in a year, we hold abundant unused capacity in generation as well as in the wires grid. What we face is a peak capacity issue, not one of energy. The trick here is to handle a small number of peak hours that raise reliability issues while simultaneously capturing the stranded capacity available in every other hour of the year. Done correctly, this lets us actually add these critical technologies and reduce energy costs for ordinary families and businesses; to wrap up, there's still work to be done here, but the trajectory and the pace look highly encouraging; we encourage PJM to continue. Moving to Slide 8. On this slide I'll finish my comments and circle back to the idea I raised at the outset regarding business values and our emphasis on communities. This slide describes the tremendous progress achieved at Crane by generating a win-win-win for Pennsylvanians, the surrounding communities and our customer. I won't walk through every item on the slide, you can read the text on your own. Rather, I want to point out a parallel between what's required to build, operate and launch nuclear plants and what's required to build, operate and launch data centers; and the fundamental point I'd like you to weigh is this. Just as with nuclear, public reaction to data centers, whether moratoriums or opposition in certain places, can at times be intense. Nobody can dispute that. Yet as the Crane case demonstrates, the worries driving opposition to data centers are anything but impossible to solve. In fact, I'd argue that if we can restart Crane at Three Mile Island and gain overwhelming political and public backing, then we can surely gain public backing to build a 21st century data economy in our communities. Ultimately, what matters most is the confidence we build by upholding the proper business principles centered on improving and strengthening the places where we operate. Everything shown on this slide is what it boils down to: employment, the tax base, and giving back to the community. Done properly, it delivers results; having said that, I'll now hand things over to Shane.

Shane Smith executive
#4

Appreciate it, Joe, and good morning to all of you. If you'll turn with me to Slide 9. For the second quarter, GAAP earnings per share came in at $1.42, while adjusted operating earnings per share reached $2.55 — a figure that sits $0.64 above what we posted in the same quarter a year ago. The improvement on a year-over-year quarterly basis stems largely from accretion tied to Calpine, stronger capacity pricing in PJM, and solid results out of our commercial business, which has again produced value via elevated realized customer margins as well as through portfolio optimization amid volatile conditions. That robust showing fed into the better full year outlook I'll walk through in a moment. Working against our favorable quarterly drivers were a greater number of planned nuclear refueling outage days and the timing of revenue recognition under the Illinois ZEC program. As we've noted on earlier second quarter calls, the timing of Illinois ZEC revenue can shift from one year to the next. During this quarter, we recognized $85 million of bank credits, versus $200 million in the prior year. That timing item was already baked into our 2026 guidance and does not affect full year results. This true-up also represents the last planning year adjustment prior to the Illinois ZEC program's conclusion in May of 2027. You can find further detail on the program on Slide 19 of the appendix. Let's move to Slide 10. Our nuclear fleet posted a 93% capacity factor, producing 40 terawatt hours of reliable, low-carbon electricity, all while finishing 6 planned refueling outages. As anticipated, the quarter carried extra planned outage days, dragging our capacity factor down by 1.8% relative to the second quarter of 2025. Our 23-day average refueling outage duration this quarter encompassed the successful rollout of our turbine upgrade at Byron Unit 1. And despite that extended outage, the team still beat the industry average duration by 40%. Such an excellent outcome in a quarter marked by heightened planned refueling activity reflects the consistency, discipline and expertise of our nuclear operations team, who carry out this work efficiently and, above all, safely. Now to Slide 11. We are lifting our full year adjusted operating earnings guidance range to $11.50 per share to $12.50 per share, up from the earlier range of $11 to $12 per share. Strong commercial execution, paired with the advantages of our disciplined capital allocation, gives us the confidence to boost the midpoint of our full year guidance by $0.50 per share only halfway into the year. We'll take another look at our full year outlook on the Q3 call once the summer is behind us. These updates are reflected in the modeling appendix on Slide 25. On to Slide 12; we remain in a position of financial strength, underpinned by our strong investment-grade credit ratings. That strength affords us flexibility to serve our customers best, invest in our business, and return capital to shareholders in a disciplined manner. Since the first quarter call, we've returned just under $2 billion of capital to our owners via share repurchases. Altogether, counting the $335 million we mentioned during the Q1 call, roughly $2.2 billion has been directed toward accretive share repurchases across the 4 months that have passed since our business and earnings outlook at the end of March. As for the $2.8 billion of authorization still available, we'll keep acting opportunistically when putting it to work. After a highly competitive process, we announced today an agreement with LS Power to divest the Brazos Valley Energy Center for $860 million, equal to about $1,420 per kilowatt. Despite the recent softness in ERCOT, it was encouraging to witness interest at such a high level for this asset. The very competitive process made clear that buyers appreciate the long-term worth of gas-fired assets that carry the potential for utilization rates that are even higher. Subject to approval, this divestiture will fulfill what remains of the DOJ settlement obligations tied to the Calpine acquisition. All told, the assets the DOJ required to be divested should bring in gross proceeds of approximately $5.9 billion, and on a nearly $1,200 per kW basis that represents a healthy premium relative to the implied $960 per kilowatt purchase price for the Calpine assets. Turning to Slide 13. As we discussed in March, meaningful opportunities exist to grow our earnings and free cash flow over time. A few of those growth levers have already begun turning into tangible contributions. The sensitivities we provided in March were shaped by active discussions with a diverse set of customers; given that we have now executed nearly 1 gigawatt of nuclear PPAs within the range this view contemplated, revisiting this table seemed worthwhile. Although the agreements announced today have later start dates and aren't expected to materially affect 2029 earnings, they give us additional visibility into sustained growth in our base earnings over time. Separately, we're also updating our 2029 capital allocation sensitivity range to reflect the share repurchases completed so far. The updated range now includes a <<inaudible>> of $0.20 per share, with potential upside of greater than $0.75 per share. The low end reflects the benefit from repurchases already completed, while the high end reflects the meaningful optionality still available under our buyback authorization and our ability to keep deploying capital when attractive growth opportunities appear. Finally, I'd like to highlight an update regarding the nuclear production tax credit, shown on Slide 17 in the appendix. After the IRS published the 2025 inflation adjustment, we revised our forward PTC strike price assumptions, incorporating a 2.8% adjustment for 2025 and continuing to assume 2% inflation annually in 2026 and beyond; the projected 2030 PTC strike price will rise from $49.88 to $50.88 per megawatt hour. This change will boost our view of 2030 base earnings by approximately $0.30 per share. On a wider note, because the PTC is tied to inflation, we'd see additional benefit to our baseline earnings projection if inflation runs above the 2% long-term figure we assume, and that's one more element backing our objective of keeping base earnings growth in the double digits through the 2030s. So with that, I'll hand the call back over to Joe.

Joe Dominguez executive
#5

Appreciate that, Shane. Wrapping things up now in a down-to-earth way — what we're noticing is how much pace matters when it comes to the regulatory side. Day by day, those we serve are getting a firmer sense of certainty, and it's our hope that PJM along with FERC can stay on schedule and provide regulatory clarity before the year is over. Beyond that, members of our team are working hands-on with customers and policymakers, looking at various avenues for hooking new large load up to the grid, and those discussions are going well. Our attention stays on our core strengths — running our assets at world-class levels, assisting customers in reaching their energy and sustainability goals, and building long-term value for our owners, our customers, and the communities in which we live and work. We appreciate you spending time with us today, and the team is ready to take your questions.

Nick Campanella analyst
#6

It's really encouraging to hear about the new long-term nuclear agreement. I suppose, could you discuss whether it meets your criteria for long-term value — specifically regarding price and duration — and how should we view the customer? From what it sounds like, this is a hyperscaler, but might it simply be a more conventional C&I arrangement? Also, is this a single deal that adds to Walmart? How should we interpret all of that?

Joe Dominguez executive
#7

Right. Well, I won't — like I mentioned, I'll stick to the principle that we allow the customers themselves to describe their deals and make them public to whatever degree they decide. That said, Nick, it aligns with how we see long-term value for the nuclear fleet; and my sense is this represents one of numerous opportunities that we keep observing in the marketplace.

Nick Campanella analyst
#8

All right, that's helpful. Next, you brought up participation in the PJM bilateral process. Could you share specifics? Clearly, that would represent additional capacity offsetting that 6 gigawatt number, yet is it possible hybrid arrangements could come into play if the nonpeak problems could be solved? Also, perhaps discuss those 5 gigawatts of additional capacity that might qualify, which you pointed out during the previous call.

Joe Dominguez executive
#9

Sure, I'll — Dan Eggers is somewhat in charge of that area. Therefore I'll invite him to jump in on this. Still, the bilateral process is kept confidential, and that's how we'll handle it. However, you ought to presume that every chance we get to bring on more megawatts is under discussion with clients alongside what we already can do. Consider this. I brought it up during the call. America's optimal result involves leveraging the unused capacity sitting within the U.S. grid. That covers transmission lines plus generation resources. It's the quickest route and additionally lowers expenses. In what way does it lower expense? On the transmission side, we understand that every fixed cost component of the network gets distributed across additional hours of use, which pushes the hourly usage rate lower. That's the mechanism on the transmission side. Regarding energy in competitive markets, the effect is that it applies downward force on capacity pricing as time passes. Keep in mind, the capacity price that generators pursue in PJM, or what's termed missing money, equals the gap between their build-and-operate costs and what energy markets pay them. Thus, the more that current generators are used efficiently and fully by customers, the less they must rely on a large capacity payment; we've observed this across the years. When energy and ancillary services rise, capacity prices fall. Consequently, every incentive here means ordinary households and companies benefit from accessing this unused capacity. Our clients understand that. Meanwhile, we must handle the peaks. Those can be handled using batteries, demand response, peaking assets, and other generation types might play a role too. Yet they still need to determine not only the peak but also what happens during every remaining hour of the year. That's where our fleet turns into something hugely valuable, since it's a fixed-price, clean energy source they can rely on for decades, and that's exactly what they're after. So this sort of concept where we attempt to — or this idea that current and future are entirely split and never merge, that simply isn't how customers actually view their procurement approaches. The backstop auction fits into that. Yet it's also part of what we do daily in our discussions with clients. Dan, I mentioned that I'd pass things to you, but then I kept speaking about it instead.

Dan Eggers executive
#10

It was excellent. Nick, here's what I'd tack on to Joe's point: whenever we submitted those megawatts into the interconnection queue, we covered the entire spectrum — everything from uprates on the baseload side through to batteries and peakers. Our aim in all of this is always to deliver whatever our customers require, correct? So having solutions matters. The bilateral market is obviously somewhere we're able to get those deals closed. We'll find out how it goes and what remains to be tackled in the RBP once we arrive at that stage.

Joe Dominguez executive
#11

Absolutely. Nick, let me jump back in on this. Dan, I appreciate that. And Nick, I want to return to another significant element of this. What the EPA ultimately does here, along with how it clarifies its regulations regarding backup generation at sites, is going to be really important, because when resources must be curtailed to handle those limited peak hours, using those backup generators might be the most effective approach for us to address peak demand and accomplish what we've been discussing in terms of truly leveraging the stranded capacity in the system and bringing prices down for customers.

Steve Fleishman analyst
#12

I have two questions regarding the recent agreements. They come from nuclear, correct? The majority of your nuclear operations sit within PJM. Is it fair to conclude that these deals are located there?

Joe Dominguez executive
#13

Steve, we won't specify exactly where they came from. That said, your point is accurate. The bulk of what we have is in PJM.

Steve Fleishman analyst
#14

All right. And I believe there's been a bit of worry that with connect and manage, or IRAS, can customers sign up for what's already there — whatever contracts you happen to hold — have they sort of baked in whatever results might emerge from that?

Joe Dominguez executive
#15

Yeah; Steve, I suspect I went on about this for too long a moment ago, so let me offer one concrete illustration. Say that under connect and manage, a customer is weighing whether to deploy batteries or lean more on backup generation. They're able to do so and still satisfy what we understand the proposed rules will require down the line. Even so, they will still have to purchase power, they will still have to purchase energy for every one of the remaining hours they aren't controlling — the remaining 99%. That's precisely where the resources already in place can deliver fast answers. If not, we'd be stuck waiting for each data center to wait for each megawatt to get interconnected and constructed. And should that happen, we may as well give the keys to China. This economy will never get built if the result is that we must wait for new power plants to be built before we can connect any data center. That's obviously not what FERC has in mind. That's obviously not what Secretary Wright has in mind. What we're attempting to do is handle the peaks, plenty of devices can do that, yet the foundation for expanding at least this early stage of the data economy will, in my opinion, rest heavily on generation that already exists, just as it has.

Steve Fleishman analyst
#16

All right, and I have one more thing to ask. Regarding the spread you gave for what these contracts could be worth — my understanding is that it runs from $20 to $50 per megawatt hour, which is quite broad. Could you offer any indication of which direction things are moving inside those bounds?

Shane Smith executive
#17

Steve here. Once again, when it comes to safeguarding how sensitive our customers are about precise pricing, that range will stay exactly where it is. That said, I believe it's worth pointing out that back in March, when we made that disclosure, we were clearly in discussions with quite a few different counterparties, and every one of those transactions matched that profile. So our comfort level with leaving that sensitivity where it stands is fine.

David Arcaro analyst
#18

I wanted to ask — perhaps we could move the discussion to the ERCOT market. I'd like to hear your perspective on the Batch Zero process. Are there projects you're working on alongside partners in that program? I'm interested in how you expect that to develop going forward?

Joe Dominguez executive
#19

Yes. I'll hand that over to Dave Dardis to comment. The answer is yes. Thanks to buying Calpine, we also have some projects where we were quite early first movers, I believe, in Texas, where we've secured the required approvals, and we're moving ahead with clients on it; but a number of our sites fall within the Batch Zero process; and so we're assessing what it means to respond to the questions raised by the Governor's letter, and we're hoping to see movement here from ERCOT and the Texas PUCT to make those things clear soon. David, anything to add?

Dave Dardis executive
#20

The only thing I'd probably mention is that Governor Abbott has made it plain he's a strong advocate for building data centers the right way in Texas. He gets how much this matters for the state's ability to compete, and in the end for America's ability to compete too. So as far as I can tell, nothing's shifted on that front — he's said Texas ought to be the epicenter of AI. My sense is his position on that hasn't moved. That said, like everyone in these roles, especially with the midterm elections approaching, they aim to stay attuned to the people they represent. And what Governor Abbott has sought is some fairly sensible information to be folded into Batch Zero. Our view is that all of it can be handed over without much delay, and we don't believe it ought to cause any significant holdup, and in the end we'll move through that process and get answers fast. So we regard this as a short-term step that the industry can handle, and we're eager to collaborate with the Governor and the PUCT.

Joe Dominguez executive
#21

And David, I'd say a number of the responses you're going to get here are likely to be quite impressive. You see some pretty imaginative figures floating around regarding things like water consumption, for instance. A few of the approaches to water usage that we're observing from certain clients involve bringing order consumption down to what a restaurant or a big store would use for data centers. So my sense is this will really surprise people. I believe these are appropriate questions to raise, since not every data center operates the same way. So perhaps the goal here is to single out those that haven't managed water resources as efficiently. Still, my feeling is that plenty of solid responses exist.

David Arcaro analyst
#22

For sure. Yeah, that's quite useful. I'm also wondering whether you might share your perspective regarding the power market side — specifically, what lies ahead for ERCOT power pricing and spark spreads going forward. We're aware the market has been squeezed, so I'd love your take on that, plus perhaps how battery storage is influencing the market from this point onward as well.

Joe Dominguez executive
#23

Yeah. Appreciate that question, David. This topic surfaced during the prior quarter. I believe Jim and Andrew touched on it somewhat. What Texas is showing us matches exactly what we expected. Battery storage, along with the other factors you mentioned, kicked in sooner and are showing up on the grid ahead of the load. As a result, we discuss data centers in Texas frequently; however, when you actually examine where that build-out stands in terms of construction, you'd discover that the bulk of the data centers that are anticipated remain somewhere in the construction phase rather than on the grid. So Andrew, as I recall, was the person who noted that we'd anticipate seeing — weather-dependent, and absent the right weather, you won't get much price movement in Texas. That's exactly what happened this year. It was entirely, entirely anticipated by us at Constellation, entirely anticipated by Calpine, and we arranged our market position to match. My sense is the market will begin to firm up once those data centers are completed and you begin to observe the market reaching more or less balance.

Jeremy Tonet analyst
#24

I'd like to move over to Slide 13, if that's alright. So we're examining the earnings and free cash flow before growth opportunities in '29. The capital allocation appears in bold on that table, I believe. That could be something new for this quarter. I noticed the share repurchases listed. But on the growth investment side, I'm just curious whether there's anything new we should be considering when it comes to this table?

Shane Smith executive
#25

Jeremy, this is Shane. When we first disclosed this back in March, what we provided wasn't a floor — it was more like $0.50 plus, framed as upside. So the purpose of that $0.20 floor is to reflect the ground we've gained over the past 4 months through those accretive $2.2 billion of buybacks. I wanted to put that floor in place. That naturally lifts our thinking on the upper end, and we'll find out what lies past that. On the growth front, clearly we're still looking at opportunities, but nothing has been disclosed that would speak directly to that range right now.

Jeremy Tonet analyst
#26

Understood, that helps. Now I'm curious more broadly about the discussions you're having with customers, and whether the tone has shifted as time has passed at PJM. You're observing certain gains when it comes to energy prices, and capacity prices at a later date. So I'd like to know how that has shaped those discussions, including with existing large load, plus their appetite for reducing risk on power exposure, or price exposure, as time goes on. I'm just interested in how those discussions may have evolved.

Joe Dominguez executive
#27

Right. Jeremy, it feels as though this topic has been on my mind for 20 years, though realistically it's closer to 2 years. Nothing hurts getting deals done more than vagueness and doubt. I believe I've remarked — and those of you who have listened to our calls for some time will recall, we were debating which pieces of the transmission service large load ought to pay for and be exempted from; and my suggestion, as I recall, was simply — you need to spell it out for these people, and after that they can plan accordingly. My expectation is that quite soon the whole data economy will be putting as much as $1 trillion each year into infrastructure once every element is accounted for. These folks are eager to move forward. You saw that Morgan Stanley report recently, and the returns on the money going into the data economy and these AI models are being validated. What our customers are after is clarity on the rules of the road. Once they have that, they'll work around them. Certain areas require better execution, and PJM's connect and management program is in serious need of improvement; yet the truth remains that ultimately, clear rules and rule clarity will be what drives deal flow our way and brings these nation critical projects to completion for these large customers; so throughout this year as we've been — at the start of the year, our starting point was really the executive order the President signed alongside the hyperscalers, plus the pledges they made, and everyone was attempting to work out how that would translate into real-world practice. A great deal of solid work has happened. And while we don't see eye to eye with everything PJM has put forward, we commend them for delivering the clarity that's required in this situation. And naturally enough, that is driving something of a pickup in contracting activity. And I think that once clarity arrives, here in PJM we'll witness what we've witnessed in numerous other places, where deal flow begins with something of a bang.

Sophie Karp analyst
#28

All right. Nice work on a solid quarter and the announcements you made. I'm curious — in your view, what comes next for co-location in the PJM? Is there going to be something like a definitive document issued by PJM that serves as the last word, so to speak, on this matter, giving all of us the clarity we need, and if so, when?

Joe Dominguez executive
#29

Yes. Sophie, you're aware that Constellation has been pushing hard to speed this along. There have been some deadline extensions granted for responding to that. Bottom line, we expect rule clarity on co-location to arrive somewhere between the first and second quarter of '27, which is well before where PJM previously stood, given that their earlier target was 2029; so FERC has applied helpful pressure on PJM and the RTOs here to deliver some clarity. We've got a few thoughts. One item I brought up during my prepared remarks was the concept of modeling load and generation at a single point of interconnection. What I mean by that is bringing in batteries, bringing in other generation resources at sites where generating facilities already operate, and then placing a load alongside them; so a data center could sit adjacent to a power plant that's already running, while that plant gains supplemental capacity capability by incorporating batteries and other devices. Those hybrid approaches — blending new capacity resources with existing generation and co-locating that alongside load — that's the opportunity we foresee ahead. Things are still — still progressing a bit more slowly than we'd like, though considerably faster than what people expected back at the start of the year. But to answer what you asked, given the 90-day extensions, we anticipate hearing back from PJM around November. I'm glancing at David. Is that accurate, David?

Dave Dardis executive
#30

Exactly.

Joe Dominguez executive
#31

After that, we expect FERC to issue an order sometime between Q1 and Q2 of the coming year.

Sophie Karp analyst
#32

Great. Then here's a broader question. You've been putting a fair amount of capital toward share buybacks, which makes sense because of the variability and the opportunistic nature of that. How are you thinking about kick-starting the organic investment cycle, maybe into new builds on top of the nuclear start you're working on? Is there anywhere in the U.S. where you believe the economics currently support that?

Joe Dominguez executive
#33

We're having some productive discussions in New York regarding nuclear's future. But at this moment, nothing is what I'd call just around the corner when it comes to putting money into new nuclear. What you're watching us do, and what you'll keep watching us do, is get our sites ready for new nuclear development, since that effort has to happen regardless. The permitting, the early site permits that are required; so once we've managed to work out the construction schedule and pricing and the customers on the other side of that, we want to have a range of locations available for customers to come to. New York represents a very exciting opportunity for us, and that's something we're pursuing alongside Governor Hochul and her administration. But it won't yet appear in financial disclosures for capital. It isn't that imminent.

James West analyst
#34

Joe, you've sort of stood apart somewhat, yet been a pretty distinct voice in the market regarding certain stranded generation assets or assets that aren't fully utilized, even as plenty of folks keep pushing for new generation. I believe you've already explained your rationale, but I'm interested in the customer angle — when you discuss this dormant capacity with them, what do they think? Would they actually come out and say, "Look, that's sitting right here, it's ready. We'll put infrastructure beside it or close by." And beyond that, do they also ask, "Would you be open to adding a bit more capacity, though we'd begin with what already exists?" How is that dialogue with customers developing?

Joe Dominguez executive
#35

Absolutely, every one of those things. Something that has truly stood out is how savvy our clients have become about the grid — they're now on par with the energy companies themselves. Honestly, and I don't mean to offend anyone, that wasn't the case 2 years ago. So this mix of resources, plus what batteries are capable of, what demand response can deliver — all of our sophisticated customers get it. . And I appreciate the bit of recognition for being a clear voice. Still, I'd argue the strongest voice on this topic is actually Department of Energy Secretary, Chris Wright, who has been stating precisely what I've said on these calls now for 3 years; and that's since been supported by study after study from Duke and Brattle and many others who've addressed the same subject. So at times when we discuss capacity, it's for the layperson, simple to mix that up with energy and it becomes quite complicated rather fast in our business. But our clients grasp it. And what they want from us is all of the above, really. I think you're basically seeing that in our contracting, where we're relicensing facilities that are adding life. We're discussing uprates with clients, which is exciting. You saw that in the Walmart deal. But it doesn't operate to the exclusion of recognizing that the existing megawatts have an important role to play in this ecosystem.

James West analyst
#36

Understood, that makes sense. You also brought up batteries. Have we reached a point with battery tech where genuinely substantial long-duration storage can now serve as a backstop for the grid?

Joe Dominguez executive
#37

In my view, batteries already serve that purpose. We touched on some of this regarding what we're observing with batteries in Texas. Of course, once you start discussing long duration, things get quite technical. To put it plainly, though, what I mean is 4-hour batteries, and our view remains that 4-hour batteries play a very significant role; and as you're aware, Calpine has ranked among the U.S. leaders when it comes to developing and integrating those batteries. And today at Constellation, we're leveraging that considerable expertise.

Julien Dumoulin-Smith analyst
#38

Okay, a few things I want to clear up. Let's begin with bilateral, if that's possible. You mentioned it's confidential, I realize that, but could you give us some sense of the schedule, since the RBP clearly has a defined point at which it comes down? How are you viewing the timeline, particularly given where you stand in those talks relative to this possible RBP that's arriving in the coming months? Does it trail by a few months after that, or does it perhaps come before? What's your thinking on that, and what factors might be at play?

Joe Dominguez executive
#39

Right, Julien, and I apologize — I should have made this clearer sooner. In my view, the RBP represents one path, though it isn't the only path for discussions with customers. And in fact, I believe customers will weigh whether they'd like to take part in it or instead pursue something entirely different — a bilateral arrangement of their own, which is what they've been doing for a few years now, well before this PJM process was ever conceived. So I'd say all of that is unfolding. What customers are trying to figure out is whether what I'm doing on the contracting side will satisfy the demands of a future PJM rule, so that I can be confident I'm in compliance, correct? And I grasp what my obligations around backup and curtailment could look like; so once we gain some clarity regarding what PJM is putting forward, they can manage that; they can say, sure, I don't yet know precisely. FERC hasn't given it a rubber stamp. Actually, "rubber stamp" isn't the right term; but FERC hasn't approved it. Still, I understand what PJM is proposing, and at that point I can begin devising a plan to satisfy whatever requirements emerge from it. The backstop forms part of that; however, it's possible not every client will rely on the backstop; it's merely another route to fulfilling the requirements.

Dan Eggers executive
#40

Julian, let me jump in with something here. When we talk about contracts today, we mean contracts that have been signed. So if someone were asking whether we're relying on anything tied to the FERC rulings or the PJM rulings — these deals don't hinge on how those turn out.

Joe Dominguez executive
#41

Yes. Sorry, I didn't know that. .

Julien Dumoulin-Smith analyst
#42

Right, that piece made sense. No, no, no. No, it didn't. Still, I'm grateful that you verified it in any case. And thank you for that. If I could shift very fast to the opposite side of things. Clearly, there's plenty of interest in Illinois; they launched a nuclear procurement proceeding this year. You folks are an evident party on the other side. And my guess is you'd rather not hash this out during the call itself. But could you address the schedule for what the state intends to accomplish regarding procurement in Illinois, given that, based on my understanding, it covers existing operations plus new nuclear? In what way would that schedule unfold together with whatever else you've got in motion? And clearly, you've got a CMC expiration next year. Any thoughts on that you'd be willing to offer, considering where things sit right now together with the state's broader new nuclear emissions?

Joe Dominguez executive
#43

Well, I believe the state has a procedure in which they will conduct an IRP and afterward, in the end, a procurement plan; and we will have input into those matters; there is nothing separate that we are in discussions about with the state of Illinois, to be completely clear, we will find out what they produce from the IRP. In our view, New York is a fantastic model for what Illinois ought to be pursuing.

Joe Dominguez executive
#44

Well, once more, I appreciate how you keep following Constellation. The team here truly delivered an outstanding quarter. We intend to wrap things up and make the remainder of the year outstanding as well. I'd like to wish each of you a safe remainder of the summer, and I'm eager to meet up once the third quarter concludes. Thanks once more.

Operator operator
#45

Thanks for joining us on today's call, everyone. That brings the program to a close. You're free to disconnect now. Have a wonderful day, all.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Constellation Energy Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Constellation Energy Corporation earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.