Home / Transcripts / Discovery Mining Ltd. (DSV) · November 10, 2026

Discovery Mining Ltd. (DSV) Earnings Call Transcript

November 10, 2026

Toronto Stock Exchange CA Materials Metals and Mining earnings 56 min

Earnings Call Speaker Segments

Mark Utting executive
#1

Quick introductions: the people on the line today are Tony Makuch — our President, CEO and Chairman; Alison White, our CFO; Duncan King and Gord Leavoy, our two Co-COOs; Dawid Meyburgh, Senior Vice President of Timmins Operations; Eric Kallio, Executive Vice President, Exploration and Growth; and Jose Jabalera, Senior Vice President, Corporate Affairs and Sustainability for Mexico. Tony will wrap things up once all of them have finished, and then we'll take your questions. One thing before we start: please be aware that forward-looking statements will be part of today's call. Those statements are based on what we currently expect, assume, and project about future events. Those forward-looking statements involve risks and uncertainties, and because of them, actual results might end up differing materially from what the FLI describes. You can find further details on slide two, and there's also cautionary language posted on our website. Beyond that, throughout this presentation we'll be citing several non-GAAP measures. Those measures don't have a standardized meaning under GAAP, so they may not line up with how other issuers report. Please check slide three of our deck for additional information, along with the other cautionary language on our website. And lastly, unless we say otherwise, every amount we discuss today is stated in US dollars. At this point, I'll hand things over to Discovery Mining's President, CEO and Chairman, Tony Makuch.

Tony Makuch executive
#2

Morning, everyone, and thanks, Mark. Thanks to all of you for being with us today. I'll begin on slide four. The third quarter represented a period of major achievements for Discovery. During those three months, three core strengths came through very clearly. First, an exploration and development narrative is taking shape in Timmins that I believe is unmatched within our industry when it comes to the potential for creating value. Second, we've secured the key permits needed at Cordero and are now positioned to move that project toward development. In our view, Cordero stands as the leading silver development project anywhere in the world, and it carries tremendous potential for value creation. Jose, who is on the line, will share further details about Cordero later in the presentation. Our third strength is that all of this work is underpinned by existing operations, which in Q3 2026 delivered solid earnings and substantial cash flow. Moving to slide five, which focuses on Porcupine, this slide examines two important emerging narratives in Timmins. They concern our two open-pit projects, Pamour and Dome. During last quarter's call, we discussed Pamour and the potential we see for transforming it into one of Canada's largest open-pit gold mines. Since then, we've released further drill results that keep demonstrating that potential. The other narrative, the more recent one, concerns Dome. In October, we published excellent drill results suggesting that Dome, much like Pamour, could become considerably larger and more valuable than we had previously envisioned. Eric will cover the specifics of the recent results at both Dome and Pamour, but at Dome we've identified new zones to the north, extended mineralization 600 meters to the south, and established that the new zones to the south follow the Dome Fault, which runs through the Paymaster property. Keep in mind that our resource released last year for this was already at 11 million ounces. Dome remains open to the north, to the south, and to the west. We hold 100% of Paymaster, which underpins a highly exciting possibility for Dome to grow considerably larger in this area. Turning to slide six, a very important competitive advantage for Discovery is that we're pursuing growth while benefiting from profitable operations capable of generating solid cash flow. Alison will cover the details, but I'll highlight a few key points. We achieved record production and sales in Q3. Unit costs came in above the prior quarter, largely because of inventory movements, yet both our mining and milling costs per ton improved quarter-over-quarter. On slide seven, you can see that we recorded solid earnings in Q3 2026. We generated $87 million of free cash flow during a quarter in which cash used for capital expenditures rose and reached close to $120 million, up from the previous quarter. Our cash position grew 24% to $450 million as of September 30th. On the subject of competitive strength, one factor that matters critically is this: we're entering a growth investment phase backed by a very strong balance sheet, along with a business able to produce substantial cash flow and finance itself. With that said, I'll hand the call to Alison White, our CFO.

Alison White executive
#3

Thanks, Tony, and good morning, everyone. I'll begin on slide eight with several financial highlights that make us proud and that will keep driving the company forward through this stretch of investment and growth. It was another strong quarter, reflecting the momentum we carried out of the first half of the year, much of which has gotten better in each successive period across the past year and half of our operations; we posted record revenues in Q3 of $371 million, up 16% quarter-over-quarter, driven mainly by 8% more ounces sold at our Porcupine operations and by a full quarter of contribution from the Kidd operations following the June 1st acquisition of that site; this was our fifth quarter in a row of growth, powered by higher production from every one of our operations. EBITDA keeps moving in a positive direction, at $181 million this quarter, which is also a record and represents a 7% gain over Q2 and 49% above Q3 of last year. Versus Q2, the improvement came from our first full quarter of Kidd results, which added $72 million of revenue, together with an 8% rise in gold ounces sold at Porcupine. Combined, those factors more than made up for the lower average realized gold price in the quarter. We've maintained solid EBITDA momentum from last year, with year-to-date EBITDA of $529 million, over three times the $171 million posted in the same year-to-date period a year ago. Higher gold prices so far this year have pushed up royalty expense, and as a result our cash costs rose both from that royalty increase and from processing higher-cost tons through inventory, giving us higher cash costs of $1,470 per ounce sold for the quarter. All-in sustaining costs came in at an average of $2,293 per ounce sold, reflecting the higher sustaining capital expenditures we anticipated as we keep reinvesting in the business. The step-up in sustaining capital reflected mobile equipment purchases, additional investment at the Dome mill, and work to reinforce the tailings facility. Free cash flow was $87 million, as stronger operating cash flow was offset by a ramp-up in capital program cash spend of $116 million during the quarter. Against the $11 million outflow in Q2, free cash flow improved by roughly $98 million on the strength of operational performance and sales throughout this quarter. That change largely came from working capital as payables normalized after the accelerated payments processed in Q2 ahead of the quarter-end ERP implementation, partly offset by higher receivables at Kidd, where concentrate sales are collected in the month after sale. Moving to slide nine. Let's go through how we performed against guidance; we remain on track to hit our key cost, production, and capital guidance ranges for the year. The one area where we've adjusted our guidance is Cordero capital, since it's coming in below what we originally anticipated, and because of that we're reducing the capital spend range at Cordero to $20 to $30 million for the year. At Cordero, we paid the change of land use permit fee of $12 million during the third quarter; that figure came in well under what we had assumed in our original fees and growth capital guidance of $90 to $100 million, thanks to a change in the rate applied to the fee. So we've brought 2026 Cordero guidance down to $20 to $30 million, given that we finished Q3 with $18 million in year-to-date capital spend. As planned and as we've communicated throughout 2026, our production profile is weighted toward the second half, and we expect to finish the year within range on all key metrics, with capital and cash costs at Porcupine landing toward the higher end of the range. Moving to slide 10, we'll go through adjusted net income. Adjusted earnings came in at $83 million, or 10 cents per share, versus $92 million, or 11 cents per share, in the prior quarter, and that's up 36% from $61 million, or 8 cents per share, in Q3 2025. The main differences between net income and adjusted net income in Q3 2026 included excluding $19 million of share-based compensation costs tied to the company's roughly 45% mark-to-market share price appreciation, from $8.48 to $12.28 per share during the quarter. The remaining items are nominal impacts that together came to a penny for purchase price adjustments, foreign exchange loss, and transition service agreement fees. Let's go to slide 11 to discuss our capital for the year, as we keep investing in our assets to drive future growth. At Porcupine, we planned $195 to $235 million in growth capital, plus another $25 to $35 million in capitalized exploration spend; beyond that, we expect $120 to $165 million in sustaining capital. That spending targets three priorities: replacing equipment, expanding mill capacity, and building future production through exploration and conversion drilling work that's continuing at a rapid pace across the business and has accelerated as the year has gone on. Second, we're strengthening our balance sheet. As we seek to expand our operations and grow organically, our financial strength will be essential to our future success. On the next slide, we'll look at our total liquidity and how it will serve as a foundation for those future plans. Discovery's total liquidity at quarter end was $844 million. Our cash balance of $450.7 million at the end of the quarter was up $86 million from the end of Q2, with the rest of the liquidity coming from the undrawn portion of the $400 million revolving credit facility. The solid results from our operations produced $203 million in operating cash flow, and that was more than enough to cover the $116 million in cash capital we kept spending as we moved our investment program forward; with this strong balance sheet, we have the financial flexibility to fund our capital programs and push ahead on the strategic priorities that support our vision, and we can do so with confidence as we look toward the future. At this point I'll hand things over to Duncan King, our co-chief operating officer.

Duncan King executive
#4

Thanks. I'm looking at slide 13. I'll go over how our mining performed, and then I'll hand it to Gord Leavoy to walk through our processing and production figures. Mining rates went up during the third quarter, hitting more than 1.2 million tons; we closed the quarter with 1.7 million tons sitting in stockpile. As Tony said, mining costs per ton came down versus both the previous quarter and Q3 2025; in fact, they got better by more than 10% against Q2 of this year and by more than 20% against the same period a year ago. That gain stemmed from reduced mining costs per ton at both Pamour and Borden. Site-level operating cash costs came in at an average of $1,470 per ounce, compared with $1,387 in Q2. Site-level all-in sustaining costs rose to $2,123 per ounce, a bit above the $2,028 per ounce we saw last quarter. The rise in all-in sustaining costs was mostly tied to how inventory movements affected operating cash costs, plus greater sustaining capital expenditures connected to mobile equipment purchases at Borden, investments at the Dome mill, and work aimed at buttressing the number six tailings management area. I'll now turn things over to Gord Leavoy, Co-COO, to discuss milling.

Gord Leavoy executive
#5

Thanks, Duncan, and good morning everyone. During Q3 2026 we milled 943,000 tons, which came in 4% above the prior quarter. In comparison with the same period in 2025, tons processed rose by 135,000 tons, or 17%, which shows the gains from the investments we've made at the mill over the last year; on 48 days in Q3 we went past 11,000 tons per day, and on 16 days we went past 12,000 tons per day. Thanks to how both mining and milling performed, we delivered record output of 70,564 ounces in Q3, 5% above the previous quarter. Gold poured and gold sold each rose 8% quarter-over-quarter. The increase in production was mainly driven by the higher tons processed. There is also a positive effect versus last quarter that comes from a higher average grade. As you've heard, our milling costs per ton came down. In Q3 they averaged $20.10 per ton, which is better than both $21.50 per ton in Q2 and $21.20 per ton in Q3 2025. I'll now hand the call over to Dawid Meyburgh, Senior Vice President, Timmins Operations, who will discuss the Kidd operations.

Dawid Meyburgh executive
#6

Thanks, Gord, and good morning. My remarks will go through slide 14. On the whole, Kidd's operations turned in a solid performance during Q3 of 2026. That marks the first complete quarter of results following the acquisition on June 1st. Revenue for Q3 2026 came to $72.3 million, compared with $29.7 million for the month of June in Q2. Production costs were $45.1 million, against $18.9 million in the month of June during the prior quarter of 2026. We recorded a small loss from operations after depreciation. Even so, we did generate positive cash flow. Turning to capital, sustaining capital was mostly tied to infrastructure upgrades and paste holes at the mine. Kidd's growth capital was largely related to tailings buttressing and mill plant modifications needed to support processing of Borden ore, which is targeted to start in 2027. At this point I'd like to hand the call over to Eric Kallio, EVP Exploration and Growth.

Eric Kallio executive
#7

Thanks, Dawid, and good morning to everyone. I'm on slide 15. I'm pleased to report that exploration had another strong quarter, with excellent progress across all our projects, including Pamour and Dome, and those are the two I'll concentrate on today. Beginning with Pamour, let me note quickly that this project sits 18 kilometers east of Timmins and is centered on the historic Pamour Mine. It also occupies an ideal geologic setting, spanning a 6-kilometer strike length along a northeast-trending volcanic band, situated just north of the Destor-Porcupine Fault. As for the new drilling, we're continuing programs that began in 2025, carried out in preparation for an updated resource in early '27, targeting three principal areas: the main pit at the center of the image, Pamour West along strike to the west, and the north contact zone to the north. Results from each area appear on the image and come across as extremely positive, with some of the strongest coming from the east and west sides of the main pit; holes to the east targeted the lower and east portions of the deposit, including multiple robust intercepts that extend it further east and to depth, while holes to the west targeted the western limit and also extended mineralization there. Going through the list of holes from these areas, there are quite a few highlights, but one of the key ones I want to flag comes from hole PAM-29, which cut three solid intervals: 4.58 grams per ton over 20.7, 7.39 over 18, and 1.8 over 29 meters on the north side of the phase one pit. Beyond showing impressive grades and widths, our initial work indicates these intercepts come from new structures branching off the main trend and remain open to the northwest. In addition, we keep seeing very strong results from Pamour West and the north contact areas, with holes at Pamour West returning multiple strong intercepts near the historic pit, plus extensions of mineralization reaching up to 900 meters to the east. Holes at the north contact continue to confirm and expand the new results we reported in Q2. Now moving to my next slide, number 16, we see the first of two images giving different angles on the new intercepts, this one a view from the south looking north. The key things to note here are the historic main pit and the Pamour West pits, located at the center and on the left side of the figure, along with all the new results shown in white text; also notable is the overall strike length, now approaching 4 kilometers, and the large area that still remains to be tested both below and between the two pits. Moving to slide 17, we see a second view from the opposite side, offering a somewhat better look at holes at the north contact and in the Pamour West areas. As before, the new assays appear in white and are indicated to be showing quite encouraging results in both zones and along strike. Taking everything above into account, we are really happy with how things are going so far at Pamour, and drilling continues with four rigs. The new resource update is now well underway and on schedule for early 2027. Moving now to slide 18, we see the Dome, where some very exciting developments also keep coming. As described previously, Dome is a historic mining property that has already produced more than 17 million ounces, and where we already hold an 11 million-ounce resource, while we are also working to upgrade and expand it for an updated estimate later this year. Geologically, the mine sits on the south limb of the Porcupine Syncline, just north of the Destor-Porcupine Fault, and the heart of the historic mining is centered on two main structures, the Greenstone Nose and the Dome Fault, which lie in the middle of the various pit outlines. Looking at the new drilling, we can see it all lies within the immediate pit area but is concentrated on the north and south sides. Results there keep looking very encouraging in both. Drilling to the south comprised 22 new holes aimed at the southwest extension of the Dome Fault from the current pit, and it has continued to indicate excellent grades and widths from the south edge out to as much as 600 meters southwards, with highlights including 3.41 over 17.3 and 1.42 over 17 in Dome 46, plus 3.56 over 21 in Dome 44. Worth noting is how shallow the new intercepts are, and that all of them remain open for expansion. In addition, we had another 14 holes on the north side of the property, targeting vein systems around the Greenstone Nose beneath the north wall of the resource pit, and those were very successful too, with multiple strong intersections both inside and north of the current resource. Also, as in the southern area, I would note that several of the new zones sit at shallow depths and remain open for expansion. On my next slide, number 19, we have another image of the Dome giving two different views across the target area and a bit more detail on the results, with the top one covering the south part of the pits, looking northeast, and the other covering the north, looking southwest. Key things to know here are the red and green outlines, which show the current pits, pit shells, and underground workings, along with the shallow depth and excellent grades and widths in both areas, which remain open for future testing and expansion. Especially striking, I think, is the large gap in resources in the upper image south of the main pit and below the new intercepts. With all that in mind, I believe it's fair to state that, just as with Pamour, drilling here has left us highly satisfied, and we'll keep going with two to three race rigs across both the north and south. Our new resource update is also well underway now and set to be finished in early 2027; that brings me to my final slide, and I'd simply like to finish by noting what a strong year of drilling it has been across every one of our projects. We are working hard right now on fresh resource updates for all of them. I'm very excited to announce these and to discuss the full potential of these projects in greater detail early in the new year. With that, I'll hand the call over to Jose Jabalera, our senior VP Corporate Affairs and Sustainability, Mexico. Where is Jose? He was on the line. He was on the line. Jose?

Mark Utting executive
#8

Jose has joined the presentation remotely, and we might be experiencing some connectivity problems. I’ll just briefly address — I’ll just briefly address slide 20, and you’ve already heard quite a bit of what’s on that slide. Of course, we’re extremely pleased to have received both the MIA approval and the change of land use, which in effect wraps up the federal environmental permitting process. Announcing that has been a genuine advantage, and our change of land use fee, as you’ve heard, came in significantly below what had originally been factored into our guidance, which let us lower it. With the permits secured, we’re proceeding to update the feasibility study, capital, and cost estimates; that work is going well and ought to be finished around the end of the year, and we look forward to sharing that information with the market. We believe it will once again underscore what an exceptional project Cordero is and, frankly, how significant it is for future supply in the silver industry. I’ll stop there and hand the call back to Tony.

Tony Makuch executive
#9

Hey, thanks, Mark. Jose, I kind of missed you. Appreciate you jumping in there, Mark. I’ll just finish up now — I’m on slide 21. Q3 2026, as you’re getting, was a standout quarter of achievement for Discovery’s people. Our geology and exploration team continued to demonstrate the enormous exploration upside; they delivered exceptional exploration results at Porcupine, which underscore the huge growth potential in our Canadian gold business. Pamour and Dome both increasingly appear set to become large-scale, highly valuable open-pit mines in Timmins. Say what you like — that isn’t a forward-looking statement. Keep listening. Following that, our colleagues in Mexico did a great job getting the federal environmental permits finalized at Cordero, and they're now pushing ahead to advance this silver project that leads the industry. So keep watching. In my view, there's plenty to feel good about with this project. Our team — particularly the folks at Porcupine and across the whole company — delivered solid operational and financial results, and the operations are plainly demonstrating their capacity to help carry out all of our ambitious growth plans successfully. With that said, thanks once more for joining our Q3 call, and we're glad to take whatever questions you have.

Cosmos Chiu analyst
#10

Thank you, Tony, and to the whole team. First of all, Tony, congratulations on being inducted into the Canadian Mining Hall of Fame. My first question is probably about Pamour, as Eric mentioned. Just so I can confirm, is there a new resource update scheduled to come out in Q1 2027? And if so, would areas such as Pamour West be included in it? How much additional drilling will this upcoming resource update take in?

Eric Kallio executive
#11

Yes. We're planning a new resource update for Pamour and to announce it early in Q1. That will be done alongside all our other projects as well, TVZ, Dome, Borden, and Hoyle Pond. We'll be including new drilling from '25 and '26, which comes to roughly 100 holes or so. The new update will cover a much bigger area than the first one did. It was mostly focused on the main pit, and now it will cover the Broulan and Pamour West area, plus areas to the north where we have the north contact. Bear in mind, for all those areas, we'll be doing the study using only the holes we have, which includes both historic and new ones, but there will still be large areas that need more testing down the road. It will cover all of those areas.

Tony Makuch executive
#12

So the response to that is that additional drill holes still need to come out; through 2027 they keep drilling heavily, doing both infill work and expansion, correct?

Cosmos Chiu analyst
#13

So, more forward-looking statements, eh, Tony? And it's probably good to see the exploration results coming out of Dome as well. Could I ask about how things might be sequenced with the Dome pit and potentially Pamour getting bigger — it's called the Pamour expansion — and as you said, both of those look like they could be large-scale open-pit assets. How should we think about the sequencing? And then, on top of that, you also made a smaller acquisition this past quarter in Paymaster. Could you talk a bit about what that acquisition means and about the land package you've picked up through Paymaster?

Tony Makuch executive
#14

Maybe I'll start by talking a little bit about the sequence. First and foremost, I think we're continuing to focus, and our priority is advancing Pamour; we're mill-constrained at this point in time, and that's our focus with Pamour. As we discussed previously, we're now looking at adding some mill capacity by transferring the Borden ore through one circuit at the Kidd met site; also, though, as we discussed, we're looking at building a new gold circuit at Kidd, which will then allow Pamour to go there. Once Pamour is going there, that gives us the ability to advance Dome. There could be further expansions over time after that, but in terms of the land position, it gives us geography, it gives us a place to do other things. Maybe, Eric, you can give us a little bit of color on the geological significance of this area.

Eric Kallio executive
#15

Right, so those new claims sit right along the western edge, and they include a continuation of the same geological structures we’re currently testing. A fair amount of exploration drilling has already been done there, and several different targets have been identified with meaningful drill holes, some of which are actually extensions of zones we already have at Paymaster. That lets us explore the ground between them, and also potentially develop new resources located very close to the Dome mill.

Tony Makuch executive
#16

I think we may have laid out part of our goal at times: we have the Dome mill there, and when you actually look at some of those things — where the previous Dome resource sits and where it doesn't relative to the mill — some of this drilling helps us figure out a way, if we can, to keep that mill running for a longer stretch, right? Again, plenty of work ahead, plenty of positives, and plenty of forward-looking statements, but we expect significant positive results to come out of here over the next few quarters.

Jake Savage analyst
#17

Hello, everybody. Congratulations on yet another solid quarter at Porcupine, and on the Cordero permits too. I'd like to know whether you could provide a bit more detail regarding how Borden operated, especially any mining physicals, along with any news on the growth capital projects there.

Tony Makuch executive
#18

Duncan, mining costs at Borden.

Duncan King executive
#19

Oh, right — we moved things over from the contractor, and we took on the majority of their production staff, sorry. Development work is still handled by a contractor. So we've shifted that around considerably, and we're seeing much more footage for each man shift.

Tony Makuch executive
#20

And there's that too, yeah, we moved away from the contractor in operations and purchased quite a bit of new equipment, so that's creating some work during this period of time; we believe there's meaningful upside at Borden in terms of what we're able to achieve here. Was your question about all of the growth plans or specifically the growth at Borden?

Jake Savage analyst
#21

Any fresh news on the big projects would be welcome.

Tony Makuch executive
#22

A technical report remains in progress, and we anticipate releasing it during early 2027. It will bring together the revised resource estimates for Pamour along with the drill results, revised resource estimates for Dome with those drill results we are discussing, covering part of the mill expansion work, the mill expansions or changeovers at Borden, plus new mill expansions, which as we mentioned for Kidd involves a new gold circuit and how that ought to be integrated. All of this work is underway and, as I said, arriving in Q1 of next year. In the same way, regarding the growth plans I discussed, we are finishing a revised feasibility study and capital cost estimate, among other things, for Cordero. We anticipate releasing that near the end of this year or in early Q1; it ought to help lay out a route by which we can keep moving these projects forward. There is considerable exploration potential, which underpins our requirement to develop and invest in mills and mines, and then how that translates into higher production, reduced costs, and essentially greater value.

John Tumazos analyst
#23

Thanks for taking my questions. First, for a generalist or someone far away in America, could you walk through how the 43 to 101 rules affect Porcupine as a single property? Is it necessary to update everything, and does that put you off updating just one pocket at a time, like Owl Creek or bits and pieces? Do you have to produce one unified total report?

Tony Makuch executive
#24

Since they all feed into a central mill, we have to update them all together, right?

John Tumazos analyst
#25

I feel for Dawid and Gord and the whole team working on this huge study. Looking ahead, Tony, perhaps to January '29 or '28, when your third NI 43 to 101 comes out. My guess is that some portions of the Pamour open pit won't make it into the pending second study, since the spacing is too wide, and parts of Dome, parts of Paymaster, Owl Creek might not be included, Kidd might not be included, and at Hoyle and McIntyre you haven't started the drilling yet. It seems as though roughly half of the good news will land in January, which will be very good, and then another half of the good news, or something along those lines, arrives a year or two afterward. Forgive me for looking ahead.

Tony Makuch executive
#26

No, those are good points, and I really appreciate you raising that, because it's true. We're going to come forward, and we're releasing a PEA now because we need to collectively move all these projects ahead and try to advance them as we go. There will definitely be differences once we start processing material at the Kidd met site rather than at Dome at the mine site, and that will give us some ability to advance projects a bit differently once it happens. In effect, this is a first phase of PEA, so to speak, in 20, the beginning of 2027. We expect it to be redone in 2028, probably redone in 2029, with some further updates in 2030. I see it progressing from PEA to PFS and perhaps further than that as we keep growing and obtain more detailed engineering and more information, right? It's only, as you said, half the story, it might only be a quarter of the story, John.

John Tumazos analyst
#27

Pardon me.

Rabi Nizami analyst
#28

Thanks, and I appreciate you taking my question. Congratulations on the quarter to this point and on the year to date. I have just a few quick ones. Most of what I wanted to ask has already been covered. Regarding the Dome mill, it's good to see that throughput is stable and rising, with unit costs declining for tons milled. Can you comment on how you see those milling unit costs continuing to improve, maybe in Q4 and as we head into next year? Along with that, do you think much of the improvement you're working on over the near term is coming from the mining cost side, or is there considerably more left to do on the milling cost side too?

Gord Leavoy executive
#29

The bulk of the cost reduction comes through throughput, and that comes from the repairs and rebuilding work we're continuing in the mill; we haven't fully completed it yet, but we're pressing on, and we still have months of work remaining.

Tony Makuch executive
#30

When we put money into the plant, whether we’re fixing things or modifying them, and throughput is climbing, we understand the biggest opportunity over time from cost savings is that downtime will keep shrinking, availability will keep growing, and upset conditions will keep decreasing—those conditions that force us to make repairs or take actions that add extra costs. It’s an investment, and we’re seeing unit cost improvements arise from higher throughput, as Gord mentioned, and then from lower costs simply because those unexpected events no longer occur. Part of what we’re aiming for isn’t only raising throughput and isn’t only bringing cost down—it’s actually raising metallurgy recovery as well.

Rabi Nizami analyst
#31

That all sounds fine, and it's encouraging to hear. A pattern is emerging, and further movement along that pattern lies ahead. Turning to Kidd, you mentioned that a portion of the CapEx being spent there already looks forward to Borden beginning to integrate into the met site next year. Could you share any color on what kind of work is underway there at present in anticipation of that? A second question, somewhat connected, is whether, for the Kidd base metal site, having now run it for a full quarter, you have a clearer picture of how you see that asset carrying on into 2027 and beyond? I saw that you also have a drill rig running at Kidd Creek, so I have two questions about that.

Dawid Meyburgh analyst
#32

My first question concerns the capital associated with processing Borden material at the Kidd met site — there are two components to it. We're going to receive the Borden ore at the Kidd mine site, where the surface crusher and the load-out facilities feeding onto the rail are located, and that rail connects to the Kidd met site. We performed some work on the bins and the crusher so that they can handle Borden ore and keep doing so sustainably going forward; then, at the met site itself, a few modifications were needed around the circuits. Not a lot, since our operation is really about floating sulfides—that's the core of what we do. There are some modest changes at the met site, and those account for most of the capital spent at Kidd tied to processing Borden ore. As for the second part, I'm not certain I followed it, but we do have the ability to treat base metal ore independently of Borden ore, and we expect to run those circuits. They can operate at the same time. Given how the Kidd met site is set up, it has four distinct circuits, and the bins we have give us the capability to handle the two ore types entirely separately, if that was the question.

Tony Makuch executive
#33

The second part of your question concerned our plans for Kidd. We remain involved at Kidd, though I can't say how much longer we'll continue running it. What matters most to us right now is grasping the situation fully, ensuring it stays safe and productive. Our gold operations at Porcupine are growing substantially, and as we've mentioned regarding the met site and other matters, we'll spend the coming period determining the optimal route forward for everything — for people and for Discovery as we proceed. We're actively exploring that. That's a big area we'll be looking into over the coming period, and we'll just watch how things develop. It's a deep mine. It's been operated extremely well, and the same crew has been in charge there for a long time, and the operational results, the ability to hit the plan, and safety and so forth, are without equal, in my view, at any mine in the industry worldwide. As I mentioned, it remains safer to work there than, most likely, to work at home. So.

Rabi Nizami analyst
#34

Thanks for taking my questions, and congrats once more.

John Tumazos analyst
#35

May I aim this at Eric? Eric, which areas for 2028 — sorry, 2027 — do you think you might drill that haven't been drilled so far? Are there plans for Kidd, the Hollister and McIntyre area, Paymaster, Fuller? Where do you see the new theaters of opportunity?

Eric Kallio executive
#36

We'll be carrying on work in several of the same areas, but we'll add some new ones too. It's the two combined. We may have touched on this a little earlier — there's still plenty of drilling left at Dome and Pamour, simply given the recent success. We've pushed the limits out considerably, yet sizeable gaps and extensions remain there, so that will form a major part of the projects ahead. Work will continue at the mines as well — Hoyle Pond and Borden. At Borden we'll be trying to extend the zone further; this year we drilled to the edge of the inferred resource and somewhat past it, but we'll keep making some large step-outs and examine the resource's overall size. We have the new properties from McEwen Mining, over at Paymaster, just to the west. We'll be examining some of those spots there; then around the Kidd mine site, we began some work this year and we'll keep it going. We're looking at even more targets on the Kidd package north of Timmins. A lot of it is the same, but the big focus is Pamour and Dome.

John Tumazos analyst
#37

Eric, ten years back, the good folks at Goldcorp used to give presentations, and they discussed TVZ and Paymaster. Is there any resource or data from the Goldcorp days for TVZ, Paymaster, Hollinger pit, or from McEwen for Fuller that you could feed into your 43 to 101 rather than starting fresh? Or does any data of that kind help the process?

Eric Kallio executive
#38

Drilling has happened at TVZ, we've discussed that previously, but the hole spacing remains too wide to qualify even as an inferred resource; it does establish a broad target model, which we've demonstrated runs all the way from 900 to about 1,600. Plenty of success there, but even so, we're talking holes 100 to 150 meters apart, so we couldn't convert them right away. Portions of that will be included in this update, and after that we'll keep drilling in that area. Some internal studies were carried out at the Paymaster, but none of them, again, as things stand qualify for 43 to 101 right now. We'll need to examine them, and beyond that we may reinterpret them given the different gold prices we have today and that sort of thing too. As for Hollinger, we still believe there are some solid opportunities to extend the pit at the existing Hollinger pit toward the south. We'll begin examining the model for the other areas; we have so much other work underway at the moment that we'll concentrate more on the other items.

Tony Makuch executive
#39

I'd say it's fair to call TVZ one area where we're making progress, though there's still plenty of work left at TVZ. The Paymaster across that whole region and the way it fits together, I think that will come with time. The same applies to Hollinger. There's a substantial amount of work ahead of us at Pamour and Dome, and then Hoyle Pond to keep Hoyle Pond operational and keep that thing running, and the same as Borden. Some of these, we're just going to — they'll be the next ones. That's why, over the next three to five years, you're going to see significant exploration updates year over year over year, right?

John Tumazos analyst
#40

Thanks. And thanks for what you do for the shareholders.

Cosmos Chiu analyst
#41

Hello, Tony, can you hear me at this point?

Tony Makuch executive
#42

We can hear you at this point. Now we can.

Cosmos Chiu analyst
#43

Okay, fine. I guess the operator isn't exactly my biggest fan.

Mark Utting executive
#44

Cosmos, it's great to have you with us again.

Cosmos Chiu analyst
#45

Perhaps a follow-up question here. I realize Jose isn't on the line, but, Tony, I'm confident you can handle all of these questions. Could you walk us through some of the various alternatives for potentially realizing value at Cordero, whether that's building it or bringing in a partner? As for the timing of when that might come out, won't we only find out once you have some kind of updated numbers from an updated feasibility study? Maybe you could touch on that, Tony.

Tony Makuch executive
#46

Those are good questions. The first thing we had to do when it comes to moving Cordero forward and where we want to take it, we definitely need to secure our permits, and we've been working on updating our feasibility study mainly around capital cost estimates, and looking at a few minor items; we aren't changing the mine plan or the process plant design that's in the feasibility study. We're simply filling in some of the holes up to certain areas. We expect that to come out, as I said, toward the end of this year, early Q1. From there, our goal next year is probably to move into more detailed engineering and keep advancing the project that way, while we're able to look at alternatives and consider what the best avenue is for advancing this project for our shareholders. We believe the best thing we're going to do is have an updated feasibility study, then have the detailed engineering. Our shareholders and all of us know what the true value of this project is, and then we can take a look at a lot of the different options, whether we build it ourselves, and it is a buildable project, or work with a partner or look at other ways to advance this project. In the silver space, this is probably one of the best silver projects globally, and don't think the zinc part of this project isn't strong as well. We know it's a valuable project, and we're going to advance it. It's really going to be a lot of stuff, starting from the beginning of next year toward the end of next year. We expect to have a lot of these things sort of examined and answered, and see where we're going to go, right? Does that answer your question? Did that answer your question? Good.

Cosmos Chiu analyst
#47

Yes, it did. I just, yeah, perhaps one more brief question, and it builds on the cost guidance for the year. It's great to see that you've held your cost guidance at $1,950 to $2,250 an ounce, which is admirable given today's climate where everybody is discussing inflation and we've seen some others among your peers actually increase their cost guidance. It's very good that you've kept it. On that point, Tony, could you actually discuss inflationary pressures in the Timmins area, inflationary pressures regarding input costs? On that, I see that you're constructing a camp at Borden. Is that part of the strategy when it comes to retention? Is that part of what you're aiming at with the overall package for bringing workers into the Timmins camp?

Tony Makuch executive
#48

To start with, cost pressures are significant, correct? Where fuel is concerned, diesel prices have gone up considerably, and there's pressure when it comes to people and access, plus pressure on buying equipment and parts. That pressure exists, but we're also looking at other areas regarding how we spend money and attempting to locate other spots that kind of restore the value that's there. It's a mix. In certain areas we do have cost overruns, in other areas we have cost under runs, and then the net result is that we're working hard to understand those things. You've put your finger on something there. Part of it involves putting money back into operations—making the mill more efficient—or reinvesting to build a camp at Borden, and some of it is about lowering operating costs. When we talk about operating costs, that's not merely the per-unit amounts you pay for labor or for parts; we do a great deal of loss control. What matters is spending a dollar and receiving $3 of value rather than $2.50, or else losing money on what we spend. We engage in that practice extensively, and the camp will assist us when it comes to attracting and retaining people. At the moment, this is essentially a camp where crews drive in and drive out. I don't want to sound sexist, but when you put a group of guys up there working 12-hour days and then they have to go home and cook and clean for themselves, once you're past 7 days, I doubt you'll keep getting the best productivity for long. I believe it will more than repay its cost through productivity gains for people, safety for people, and simply a more positive attitude in the workplace. That's the sort of investment we're attempting to make — investments in people, investments in equipment, investments in the assets — to achieve greater productivity and better operational performance. Cost pressures are constant, and certain ones—like diesel prices—are beyond our control on a per-unit basis. What we can control are the other actions we take, and those are the areas we're focused on.

Cosmos Chiu analyst
#49

Great. Thanks, Tony. Congratulations once more on a really strong Q3, and that covers everything I wanted to ask. Thank you.

Tony Makuch executive
#50

Thanks.

Mark Utting executive
#51

Thank you so much, operator. Once more, I appreciate everyone joining this call. As you have already heard, there are several highly significant catalysts arriving shortly, including revised cost and capital estimates for Cordero, plus a resource update and a PEA for Porcupine. I can say that we are eagerly anticipating sharing those details with the market. It seems fitting to close with a forward-looking note that in our view these developments will make clear just how much value remains to be built at Discovery Mining. Thanks once more for being with us, and we will speak with you again next quarter.

Operator operator
#52

This concludes today's call. Thank you for attending. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Discovery Mining Ltd. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Discovery Mining Ltd. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.