Home / Transcripts / DPM Metals Inc. (DPM) · February 11, 2026

DPM Metals Inc. (DPM) Earnings Call Transcript

February 11, 2026

Toronto Stock Exchange CA Materials Metals and Mining earnings 29 min

Earnings Call Speaker Segments

Operator operator
#1

I want to let everyone know that this conference is being recorded today. At this point, I'll turn things over to today's speaker, Jennifer Cameron. You have the floor, ma'am.

Jennifer Cameron executive
#2

Good morning, everyone, and thank you for joining us. I'm Jennifer Cameron, Director of Investor Relations, and it's my pleasure to welcome you to the DPM Metals conference call covering the fourth quarter and the full year. With us on the line today are members of our senior management team, among them David Rae, our President and CEO, and Navin Dyal, our Chief Financial Officer. Before we get started, please be aware that any forward-looking information shared on this call carries the forward-looking qualification, which appears in detail in our news release and is incorporated in full for the purposes of today's call. Some of the financial measures discussed on this call are not recognized under IFRS and are known as non-GAAP measures or ratios. Such measures carry no standardized meaning under IFRS and might not be comparable to similar measures that other companies present. The definitions DPM has established and the calculations it performs rest on management's reasonable judgment and are applied consistently. These measures are meant to supply additional information and should not be viewed on their own or as a replacement for measures prepared in accordance with IFRS. Reconciliations of these non-GAAP measures can be found in the Non-GAAP Financial Measures section of our most recent MD&A. Also note that, unless stated otherwise, the operational and financial information discussed on this call relates to continuing operations and has generally been rounded.

Jennifer Cameron executive
#3

When we mention 2024, we mean the equivalent periods from that year, and whenever we cite averages, those come from the midpoints of our outlook or guidance. At this point, I'll hand things over to David Rae.

David Rae executive
#4

Good morning, and thanks to everyone for being with us. For DPM, 2025 proved to be a standout year, showing off the company's strengths in allocating capital with discipline and running operations excellently — the very things that support our aim of being a premier mining business. To begin with, we operate sustainably, responsibly, and efficiently. During 2025, we hit the gold production guidance we had set, which stretches our operational track record to an outstanding 11 years. Meanwhile, we kept delivering robust margins, with an all-in sustaining cost of $1,082 per ounce of gold sold, against an average realized gold price of $4,323 per ounce. Above all, we achieved this while upholding a high standard for responsible mining, with a solid safety and environmental record that has placed us at the top of our industry for the past five years in the S&P Global Corporate Sustainability Assessment. Next, we concentrated on building quality assets. In 2025, we reshaped our growth profile by picking up the high-margin Vare operation, moving Čoka Rakita forward to feasibility, and at the same time defining Dumitru Potok and laying out a 10-year mine life with the potential to extend it at Chelopech, our flagship mine. We finished an initial mineral resource for the Rakita Camp, and that, along with the results for Čoka Rakita, confirmed the Rakita Camp as a Tier 1 gold asset for DPM, delivering a rare mix of scale, grade, and longevity.

David Rae executive
#5

Third, we kept a solid financial footing to back our growth. We generated free cash flow consistently, including a record $505 million in 2025, and returned more than $145 million to shareholders via dividends and share buybacks. Right now we hold $1 billion in immediate liquidity to fund high-return growth. On the whole, we were happy that our 2025 achievements made DPM one of the best-performing stocks among mid-cap precious metals producers. Looking ahead to 2026, our focus is on execution and growth — producing an average of roughly 350,000 ounces of gold equivalent per year across the coming three years, while still holding onto our competitive cost position. Now turning to Vare, the newest member of our portfolio and a major driver of near-term growth: integration and ramp-up work keeps moving ahead very well. Since day one, we have concentrated on embedding DPM's health and safety practices at Vare, making sure the well-being of our people stays our highest priority. Development rates keep advancing according to plan, and mine production restarted in January. That progress stems from our work to overhaul training programs for local employees and to engage with stakeholders — both important steps as we lay a strong foundation for long-term success.

David Rae executive
#6

For Vare, this is a transition year, and our 2026 guidance mirrors that reality. Output should rise each quarter as we advance toward a rate of 850,000 tons per year — a level we expect to hit in Q4 and sustain in later years — and roughly two-thirds of 2026 production should land in the back half of this year. Precious metals output is being stepped up this year, with gold and silver both above what the PFS previously communicated, yielding gold equivalent production exceeding 100,000 ounces. Thanks to that added precious metals volume and stronger prices, cash flow and margins should come in above the PFS, which more than offsets the higher operating costs we foresee this year. In line with how we run every operation, we'll keep looking at ways to optimize the cost structure for 2027 and beyond, aiming at the cash cost per ton metrics set out in the technical report. Our history of optimizing assets and driving efficiencies gives us confidence that we can unlock additional value at Vare, just as we have at Chelopech. Put simply, Vare has started strongly, and we're excited about what it will add to our growth in the years to come.

David Rae executive
#7

Moving on to Chelopech, the flagship asset that keeps driving our success, we anticipate steady high-margin output consistent with the updated life of mine plan released last week. We're happy to have hit our goal of extending Chelopech's mine life to 10 years. Still, it's worth noting that this excludes the potential of the new Wedge Zone deep discovery as well as the prospectivity at Chelopech North and the Brevene exploration licenses. Since drilling results so far show grades above reserve grade, the Wedge target offers a chance to boost mill feed grades and gold production, possibly starting in 2029. The first drilling results from this discovery, located in a comparatively underexplored part of the mine concession, show that this area holds strong promise for further discoveries. We're currently finishing a 10,000-meter drilling program in the first quarter and expect to give an update in the second quarter. In addition, we expect the Chelopech North concession to be granted this year, and at the same time the Brevene exploration license is moving through a well-defined permitting regime. Our growth priority in 2026 is to advance Čoka Rakita permitting to support a construction decision. Late last year, we completed the feasibility study for Čoka Rakita as planned, confirming robust economics for a high-margin underground gold mining operation contributing almost 190,000 gold ounces annually for the first five years at first quartile life-of-mine all-in sustaining costs of $644 per ounce of gold sold.

David Rae executive
#8

Given those encouraging results, we are now moving into execution readiness and the construction permitting phase, and we expect the first concentrate output during the first half of 2029. Back in November, we cleared an important permitting hurdle when we received approval to kick off the special purpose planning process. Permitting work is ongoing, and we have a detailed timeline for permits aimed at enabling construction to begin in early 2027. The majority of baseline studies needed for the environmental and social impact assessment are now finished, and we expect the special purpose spatial plan to be approved and adopted in the second half of 2026; after that, DPM anticipates filing the exploitation field application as set out under the Serbian permitting framework. We stay closely and proactively engaged with the relevant authorities to help move this permitting process along, and our confidence in the overall progress at Čoka Rakita remains strong. Turning to exploration work at the Rakita camp, in early December we reported initial inferred mineral resource estimates for Dumitru Potok, Frasen, and Rakita North totaling 2.6 million ounces of gold and 1.9 billion pounds of copper. These mineral resource estimates show the Rakita camp's potential as a gold-copper system at district scale, with all three prospects still open in multiple directions and located alongside several other high-potential targets along a six-kilometer trend.

David Rae executive
#9

In the span of 14 months after we announced those first discoveries, they have quickly developed into a sizeable inferred mineral resource of gold and copper—a striking accomplishment for such a brief period, which highlights the considerable potential of the Rakita camp. At present, drilling has been halted on the Rakita license, the Čoka Rakita license, while we await the customary renewal of permits, and we expect to restart in the second quarter of 2026. Once the permit is renewed, we are planning 20,000 meters of drilling, with a substantial share of that allocated to infill and extension work on mineralization at Dumitru Potok and to raising drill density before we begin any PEA or other economic study. In the meantime, active drill testing continues on the adjacent Potaj Čuka license, located north of the Rakita license. Before I pass the call to Navin, let me summarize our priorities for 2026. We plan to deliver on the ramp-up at Vare. We will be advancing Čoka Rakita toward a construction decision, and we will be following up on the substantial exploration potential across our existing portfolio, both in Serbia and in Bulgaria, each of which can drive meaningful value for our shareholders. We will keep executing on these priorities with the same commitment to responsible, efficient mining, financial discipline, and value creation.

David Rae executive
#10

I'll hand things over now to Navin, who will walk us through the financial results and give a detailed review of our guidance.

Navin Dyal executive
#11

Thanks, Dave. I'll cover the year's financial highlights, give an overview of our 2026 guidance and the updated three-year outlook, and finish with some commentary on the balance sheet and return of capital program. Unless otherwise noted, everything I say will focus on results from continuing operations. Turning to the financial highlights for the year, we achieved consolidated production and costs in line with guidance and delivered record financial results, including revenue of 950 million, adjusted net earnings of 443 million, or $2.39 per share, cash flows provided from operating activities of 492 million, and free cash flow of 505 million. Those record financial results reflect strong operating performance, the low-cost nature of our operations, a favorable commodity price environment, and an initial contribution from Vare following the closing of the Adriatic acquisition last September. Looking at earnings and cash flow in more detail, revenue was higher than the prior year due primarily to higher realized metal prices and post-acquisition revenue from Vare, partially offset by lower volumes of gold sold at Ada Tepe. Adjusted net earnings increased compared to the prior year due primarily to higher revenue, partially offset by higher costs of sale and higher mark-to-market adjustments to share-based compensation expenses.

Navin Dyal executive
#12

Adjusting items, net of taxes, that don't reflect the company's underlying operations, include a 27 million non-cash fair value adjustment on inventory at Varesh, recognized in costs of sale, the 2025 Bulgarian levy of 22 million, acquisition-related costs for Adriatic incurred by DPM of 15 million, and the fair value adjustment on Vare copper stream liability of 9 million. Cash flow provided from operating activities came in above the prior year, driven mainly by higher earnings generated in the period, partly offset by the timing of collections from sales, payments to suppliers, the payment of the 2025 Bulgarian levy, and higher income taxes paid. Free cash flow, which is calculated before changes in working capital, was higher than the prior year, due primarily to the higher earnings generated in the year. Turning to our cost metrics, all-in sustaining costs of 1,121 per ounce of gold sold for the year were 29% higher than the prior year, due primarily to higher mark-to-market adjustments to share-based compensation expenses, lower volumes of gold sold, and a stronger euro relative to the U.S. dollar, partially offset by higher byproduct credits reflecting higher realized prices for copper and silver sold. Mark-to-market adjustments to share-based compensation expenses resulted in an increase of $242 per ounce of gold sold in 2025, compared to only $28 per ounce of gold sold in 2024.

Navin Dyal executive
#13

When it comes to capital spending, sustaining capital expenditures came in at 33 million for the year, which was lower than 2024. The main reason was changes in deferred stripping costs at Ada Tepe stemming from revised stripping ratios versus 2024, and it stayed consistent with the mine plan. Growth capital expenditures reached 56 million for the year, higher than the prior year, driven by costs tied to the Čoka Rakita project being capitalized starting at the beginning of 2025. Last night we shared an updated three-year outlook covering production and all-in sustaining costs. With the silver and polymetallic Vare mine now added, we are moving to reporting production and all-in sustaining costs in gold equivalent ounces. All-in sustaining costs will no longer be reported on a byproduct basis. Across the next three years, metal production should average roughly 350,000 ounces in gold equivalent ounces annually. That production growth comes mainly from Vare's contribution along with steady output at Chelopech, partly offset by reduced production at Ada Tepe as it approaches the end of its mine life by mid-2026. All-in sustaining costs across the next three years should average around 1,450 per gold equivalent ounce sold.

Navin Dyal executive
#14

This guidance takes into account swings in metal output and sales from one year to the next, plus the effect of increased operating costs in local currencies, together with a stronger euro against the U.S. dollar assumed for 2026, which is higher than in 2025. At Vare, once the mine reaches commercial production, we'll be looking at ways to optimize the cost structure for 2027 and beyond, aiming at the cash cost per ton metric set out in the Vare technical report. We expect greater exploration investment across the coming three years, which reflects our track record of creating value through exploration, particularly in 2026, with room to grow in later years, subject to how the company's exploration efforts turn out. Sustaining capital expenditures over the next three years reflect steady spending at Chelopech and mainly underground capital development at Vare. Our three-year growth capital outlook, tied primarily to the Čoka Rakita project, anticipates construction beginning in early 2027 and first concentrate production in the first half of 2029. Growth capital expenditures in 2026 also cover spending at Varesh to support development and ramp-up to commercial production, along with limited spending on the Loma Larga project, pending resolution of the environmental license revocation.

Navin Dyal executive
#15

Our balance sheet remains strong, with consolidated cash of 498 million, no debt, and a new credit facility that is undrawn. That new facility carries 400 million of capacity plus an accordion feature lifting it to 550 million, and it comes with better terms, greater flexibility, and cheaper pricing. A balance sheet this solid reflects how intently we concentrate on disciplined financial management, and it gives us room to fully fund growth as well as our exploration process. Our approach to allocating capital has been disciplined and consistent, resting on three basic considerations: keeping a strategic cash position so we can fund organic growth and go after strategic transactions; reinvesting in the business to grow value and support its long-term sustainability; and giving excess capital back to shareholders via a combination of dividends and share repurchases, aiming to maximize total shareholder returns over the long term. We stay committed to returning capital to investors through dividends and buybacks, which shows our confidence in DPM's future and our dedication to creating shareholder value. In 2025, we returned 145.5 million in total to shareholders by repurchasing roughly 10 million shares for a total cash payment of 116.1 million, along with 29.4 million in dividends paid.

Navin Dyal executive
#16

Our existing NCIB came to an end in March. The board of directors has given the green light to renewing the NCIB, pending approval from the TSX. As a reflection of how confident we are in DPM's future and our dedication to shareholder value, for calendar year 2026 the board of directors has authorized buying back as much as 200 million of the company's shares — $200 million worth of the company's shares. To wrap up, our mining operations keep turning in strong performance, and we hold a strong cash position that lets us meet our guidance and carry on our track record of producing significant free cash flow. I'll now hand the call back to Dave for his closing remarks.

David Rae executive
#17

Thanks, Navin. DPM and its shareholders are in an exciting period — shareholders were rewarded in 2025 with share price performance in the top quartile. As a growing precious metals producer, our future offers a peer-leading development pipeline and a prudent approach to capital allocation, underpinned by an exceptional operational track record, for continued share price appreciation. We stay focused on executing our strategy to deliver above-average returns for our shareholders as a mid-tier precious metals company with a clear path forward to drive value. I'd now like to open the call for any questions.

Operator operator
#18

Thanks. If you’d like to ask a question right now, press star 1 1 on your phone and hold until your name is called. If you want to pull your question, just press star 1 1 once more. Give us a moment while we put together the Q&A lineup. The first question is from Fahad Tariq at Jefferies. Your line is open — go ahead.

Fahad Tariq analyst
#19

Hi, thanks for taking my question. Regarding Rakita and the permitting, could you maybe walk us through the specific permits that are still remaining? Is it only the special purpose spatial plan, or is there something more? So far, as you've moved through the permitting process, have any surprises come up?

David Rae executive
#20

Appreciate the question. A few distinct elements make up the work that has to be finished before we can secure the EIA and the construction permits. Right now several efforts are underway simultaneously. One of them is the special purpose planning process — in effect, something like a land use permit — where we submit details about what we intend to do. That covers roads, access, land conversion, use for items such as power, water, tailings rehabilitation, and all of those. How it operates is that the government, following a standard process, asks for input, seeking to learn what other things people might wish to see included in the work we file, so that we can offer confidence and clarity regarding what we need to do. The stage involving those questions has wrapped up, and a group is now assembled and moving forward with the work we will need in order to answer what we call the SPSP process. We expect that during the next couple of months we will reply to those questions, bearing in mind that most of that work has already been done through our engineering process, and that we are really just examining any outstanding questions into which we can provide input.

David Rae executive
#21

We expect that to wrap up early in the second half of the year. Beyond that, we will also finish a Serbian feasibility study — and again, much of that effort is already complete, but it has to be done together with local firms and local engineering staff, some of whom are in fact already part of our project team. That will be completed around the same time, and we expect it to be ready in Q4, early Q4 of this year. In addition, we will be aiming to finish an EIA and to secure its approval late this year, early next year — let's say January. With all of that in hand, we expect to be in a position where a construction permit has been issued. Again, early in the first quarter next year. Hopefully that helps.

Fahad Tariq analyst
#22

That's quite straightforward. So regarding the Rakita camp, I suppose a drilling permit — is that simply the usual process? Or is there something unusual about it?

David Rae executive
#23

This is just the standard process. We receive an exploration license for eight years, structured as three plus three plus two. The initial three years of activity are now finished. After that, we submit a report explaining what we actually carried out compared with what we had stated we would carry out. Then we lay out what we intend to do during the following phase. Everything on that front has been completed, and at this point we are simply awaiting word back from the ministry. It is the usual process.

Fahad Tariq analyst
#24

And then last thing, just shifting over to M&A from a more strategic angle. I saw the increase in the revolving credit facility. It sounds like the environmental permit at Loma Larga still has to be sorted out, and spending there has been kept to a minimum. I don't know, just putting all of that together, is there anything to infer in terms of possible M&A and possible acquisitions that would replace Loma Larga with something else?

Navin Dyal executive
#25

Perhaps I'll begin with the revolver. For us, the revolver is basically a facility for working capital. It isn't intended for any specific purpose tied to M&A transactions. It's really just so we have that liquidity on hand. Maybe I'll move on to that

David Rae executive
#26

That’s for David to perhaps respond to. Please don’t infer anything from that regarding the project activity ahead of us or the potential status or intent with respect to Loma Larga. Where Loma Larga is concerned, our aim is to protect value, and to that end we stated at the outset that we would allow things to settle down, after which a few different activities will be necessary, engagement among them. We’ll share more on Loma Larga as this year unfolds. I believe there have been a couple of thoughts about where our primary focus as an organization lies. Quite clearly, that is in the Balkans right now, where we have both Chelopech, with an extended mine life. We have a great deal of excitement around Vare and our capacity to make things happen there, along with tremendous success from our exploration team in Serbia and also at Chelopech.

Fahad Tariq analyst
#27

Excellent. Thanks so much.

Operator operator
#28

Thanks, and please hold briefly while we bring up the following question. That question is going to come from Eric Winmill at Scotiabank. Your line is now open, so please go ahead.

Eric Winmill analyst
#29

Thanks a lot. Hi, David, and congratulations to you and the team on such a solid quarter. If you don't mind, I have one quick question from my end. Is there anything further you can share about Bulgaria — what you're seeing on the ground there? From what I understand, an election may take place there later this year. I'm also aware they adopted the euro early on. And there may be some royalty changes as well, though it appears Chelopech is largely grandfathered. I'm curious whether the new concessions and some of the outlying areas get the same treatment. Thanks, I appreciate it.

David Rae executive
#30

Switching to the euro went very smoothly. For a great many years, of course, the Bulgarian lev has been pegged to the euro. That has now recently carried through into full adoption not only inside the Eurozone and membership running from the EEA through to the EU, but also through the euro being adopted as of 1 January. Everything there has proceeded well. On the election process, you’ve got that right. An election is in fact expected at some point during April. That isn’t out of the ordinary. Government has changed a fair number of times across the last several years. There is a clearly established set of procedures for engaging with the authorities on mining, and nothing in that has shifted when governments have changed. I would describe things as operations as usual with respect to what we are doing. Yes, we do expect that elections will be coming in April. Your final question concerned the royalty. A royalty applied to those mines under a clause. Sorry, Dominic, did you want to?

Navin Dyal executive
#31

I'll jump in on that. Yes. Eric, on January 30th, Bulgaria's government approved fresh royalty rates for mining concessions. Gold royalties went up from 2 to 6 percent, and copper went from 2 to 5 percent. You're also correct that these new rates don't cover the existing Chelopech concession, since it has fixed royalty terms. They apply only minimally to Ada Tepe, but since Ada Tepe is nearing the end of its mine life, we've already factored that into our outlook for next year, and for this year too. The Chelopech concession does expire in 2029, and we do expect the new rates to apply when it's renewed. As for whether they apply to other concessions, they would apply to any new concessions we have, like Chelopech North or whatever concessions, once those concessions have been granted.

David Rae executive
#32

It comes down to when the two concessions—the permits for Ada Tepe and Chelopech—were granted. Chelopech's was already in place, and it contains no provision allowing increases to be introduced. That's the reason we're confident it holds until the concession comes up for renewal, while Ada Tepe was a new arrangement put in place, say, in 2016 to 2017, and under that one, any changes could be applied. So that explains the distinction between them.

Eric Winmill analyst
#33

Great, thanks — that added clarity is much appreciated. If you don’t mind, perhaps just one more question from me: when it comes to M&A, how significant do you view acquisitions as a component of your strategy from here onward?

David Rae executive
#34

We are clearly quite opportunistic as an organization—if we spot something that makes sense, we'll act on it. Eric, I think you can also see that we've enjoyed a great deal of success when it comes to building out our organic growth portfolio, and I'm happy to say that compared with where we stood five to six years ago, we now find ourselves in a very different position. We keep actively watching for M&A, but whatever we pursue has to make a difference, and we aren't chasing on value just to pick something up. There's no necessity to have something, though if something of interest turns up, we'll certainly engage. At this point, however, regardless, if you look at the four million gold equivalent ounces we added last year, that certainly sends a message about what we can do with our existing portfolio. We look, but there's no need to engage unless we see something particularly interesting that's going to really help create something accretive to the organization going forward.

Eric Winmill analyst
#35

Okay, thanks a lot. That means a great deal to me. Congratulations once more, and I’ll rejoin the queue. Cheers.

David Rae executive
#36

I appreciate that.

Operator operator
#37

Thank you. At this point, I'd like to return the conference to Jennifer Cameron so she can offer some closing remarks.

Jennifer Cameron executive
#38

Thanks a lot. Appreciate all of you being here today. Should anything else come up, don't hesitate to get in touch, and we're looking forward to speaking with you folks in the weeks ahead. Thanks, and take care.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete DPM Metals Inc. transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to DPM Metals Inc. earnings transcripts and 131,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.