Good day, everyone, and thanks for joining the DPM Metals conference call covering our first quarter 2026 earnings results. Right now, everyone is in listen-only mode. Following the speakers' presentation, we'll open things up for a question-and-answer session. If you'd like to ask something during that session, just press *11 on your phone. An automated message will then confirm that your hand has been raised. Should you wish to withdraw your question, press *11 once more. Please note that this conference is being recorded. At this point, I'd like to turn the call over to Jennifer Cameron. Jennifer, please go ahead.
Thank you, and good morning. My name is Jennifer Cameron, and I serve as Director, Investor Relations. I want to welcome all of you to the DPM Metals conference call for the first quarter. With us on the line today are members of our senior management team, among them David Rae, our President and CEO, and Navin Dyal, our Chief Financial Officer. Before we get started, I should remind everyone that any forward-looking information shared on this call carries the forward-looking qualification, which appears in detail in our news release and is incorporated in full for the purposes of today's call. Some of the financial measures we discuss during the call are not recognized under IFRS and are known as non-GAAP measures or ratios. Such measures lack standardized meaning under IFRS and might not be comparable to similar measures presented by other companies. The definitions DPM has established and the calculations it performs rest on management's reasonable judgment and are applied consistently. These measures are meant to supply additional information and should not be viewed in isolation or as a replacement for measures prepared in accordance with IFRS. For reconciliations of these non-GAAP measures, please see the Non-GAAP Financial Measures section of our most recent MD&A. Also note that, unless stated otherwise, the operational and financial information communicated during this call relates to continuing operations and has generally been rounded.
Whenever we mention 2025, that means the equivalent period in 2025, and whenever we cite averages, those come from the midpoints of our outlook or guidance. At this point, I'll hand things over to David Rae.
Good morning, everyone, and thanks for being with us today. First, I'd like to acknowledge how dedicated our teams are throughout all of our operations — their focus on safety, on running things well, and on mining responsibly is what keeps driving our success. We entered 2026 from a strong position, posting record quarterly results while continuing to move our growth strategy forward. With our recent purchase of the Vareš mine and the ongoing progress of our growth pipeline, DPM has shown once again that it is a growing precious metals producer focused on Europe. Let me begin with the first-quarter highlights. We turned out roughly 84,000 gold equivalent ounces, and we are solidly on track to meet our 2026 production guidance. Strong margins continued, with an all-in sustaining cost of $1,686 per gold equivalent ounce sold, against an average realized gold price of $4,955 per ounce. Ramp-up at Vareš is fueling production growth, and that helped us generate a record $203 million in free cash flow. We kept up our return of capital to shareholders as well, giving back $34 million — 17% of free cash flow — via share buybacks and dividend payments, and we closed the quarter holding $575 million in cash along with total liquidity of nearly $1 billion. Now let me go into more detail on our operations and growth projects, beginning with Vareš.
Things at Vareš are moving forward really nicely on the integration and ramp-up front. As planned, mine production kicked off again in January, and during the first quarter we produced roughly 29,000 gold equivalent ounces at an all-in sustaining cost of $892 per gold equivalent ounce sold. By year-end we remain on track to hit the ramp-up to the 850,000-ton-per-year run rate, and development rates climbed as the quarter went on, meeting our Q1 goals. The paste plant build is coming along well, and in Q2 we're planning a 20-day shutdown at the processing plant so we can install and tie in the second tailings filter. That lets us get that filter in place with as little disruption as possible to the higher production rates we expect in the second half of the year. We do anticipate starting the surface drilling program in the second quarter, drilling at priority targets at Rupice and the Borovica targets, along with pushing forward 3D models and carrying out geophysical surveys and mapping to support target generation. In short, Vareš has gotten off to a strong start, and we're excited about what it will contribute to our growth in the years to come. Moving now to Chelopech, it delivered solid production of approximately 43,000 gold equivalent ounces in the first quarter, with an all-in sustaining cost of $1,497 per gold equivalent ounce sold.
We expect output to rise in Q2, and Chelopech remains on course to hit its full-year guidance. In Q1, we finished the 10,000-meter drill program at the Wedge Zone deep target as scheduled, and results so far show grades above reserve grade. The Wedge target offers a chance to improve mill feed grades and gold output, possibly starting in 2029. Interpretation, modeling, geotechnical, and metallurgical test work are moving forward to underpin an initial mineral resource estimate for the Wedge Zone deep target, and we look forward to updating you on those results and significant drilling intercepts during Q2. We anticipate the Chelopech North concession will be granted this year, and at the same time, the Brebene exploration license is wrapping up its 50,000-meter drill program and is advancing through a well-defined permitting regime. On April 16, we marked the final production blast at Ada Tepe. As the first new mine in the Balkans in more than 40 years, Ada Tepe has demonstrated DPM's capacity to permit, build, and operate a world-class asset. We now have a chance to set a new track record as we get ready for Ada Tepe's next chapter of responsible mine closure.
We have been focusing on creating and backing small and medium-sized businesses so they can build viable operations that don't depend on mining, and what we aim for is making sure the community keeps thriving and expanding well beyond the point when our operations finish. Our closure plan involves rehabilitating and restoring 95% of the mine area to the Natura 2000 protected area. We recently introduced a microsite highlighting Ada Tepe's story, the advantages that come from DPM's stewardship of the asset, the way that has created value for the local community, and it lays out the plans for its future as a fully rehabilitated site. Our growth priority for 2026 is moving Čoka Rakita permitting forward to support a construction decision. We keep advancing permitting consistent with a well-defined Serbian process to support the start of construction in early 2027. The special purpose planning process, which began in November 2025 and is a key permitting milestone, is still progressing well and is expected to be approved and adopted in the second half of 2026. We are maintaining close and proactive engagement with the relevant authorities to support this permitting process, and we remain confident in the overall progress at Čoka Rakita.
Back in mid-March 2026, we were glad to get the ordinary-course extension of the exploration permit for the Čoka Rakita license, just as we had expected — which shows how well-defined the permitting process is in Serbia. We kicked off a 20,000-meter drilling program, and right now we have nine drill rigs active, with additional ones on the way. A big part of that drilling program is going to go toward infilling and extending the mineralization at Dumitru Potok, and toward raising the drilling density before we begin an economic study. Another 20,000 meters of drilling, along with six to eight drill rigs, will be devoted to the Potoš Čuka license north of Čoka Rakita, going after the same northwest geological trend seen at the Čoka Rakita and Dumitru Potok projects. With a substantial gold-copper inferred mineral resource already outlined at Dumitru Potok and the prospect still open in several directions, we're eager to push the drilling program forward and keep defining what this organic growth prospect can offer. Before I turn the call over to Navin, let me sum up our 2026 priorities. First, we intend to deliver on our ramp-up commitments at Vareš. Second, we're going to move Čoka Rakita toward a construction decision, and then follow up on the considerable exploration potential within our existing portfolio, each of which could drive meaningful value for our shareholders.
Our focus on these priorities will carry forward, guided by the same dedication to mining responsibly and efficiently, to financial discipline, and to creating value. At this point, I'll hand the call over to Navin, who will walk through our financial results.
Thanks, Dave. I’ll briefly review the quarter’s financial highlights, then wrap up with a few remarks about our balance sheet and the capital return program. On the whole, DPM produced record quarterly free cash flow and earnings, and our financial results gained from adding Vareš to the portfolio as well as from stronger metal prices. Turning to earnings and cash flow: revenue came in at $310 million for the quarter, up 115% from the prior year, driven mainly by higher realized metal prices and by including pre-commercial production revenue from Vareš. Adjusted net earnings for the quarter were $168 million, or 76 cents per share, which was more than double the prior year, mainly because of higher realized metal prices and the inclusion of Vareš, partly offset by increased income taxes and costs of sales. Cash flow provided from operating activities was $155 million, an increase of $100 million versus the prior year, primarily on higher adjusted net earnings, partly offset by working capital changes tied to the timing of supplier payments and the cash redemption of certain deferred share units. Free cash flow was $203 million, an increase of $124 million compared with the prior year, largely due to higher adjusted net earnings.
Looking at our cost figures, the all-in sustaining cost came in at $1,686 per gold equivalent ounce sold — which we refer to here as GEO — against an average realized gold price of $4,955 per ounce, which speaks to the high-margin, low-cost character of our operations. The all-in sustaining cost per GEO sold rose 12% versus the prior year, driven mainly by a stronger euro against the US dollar and by higher royalties stemming from elevated metal prices at Chelopech and Ada Tepe, along with higher royalty rates at Ada Tepe. Mark-to-market adjustments on share-based compensation expenses added $186 per GEO sold to our all-in sustaining cost, versus an increase of $188 per GEO sold in the prior year. We remain on track to achieve our all-in sustaining cost guidance for the year, and we are watching closely those market dynamics beyond our control that affect costs — metal prices, foreign exchange rates, and oil prices — and how they move relative to the assumptions behind our guidance. In the first quarter, the rise in crude oil prices, which began to be seen at the start of March, had only a minimal effect on our all-in sustaining cost. Given how sustained higher oil prices could affect diesel and freight costs, which represent roughly 3% and 12% respectively — or about 15% in aggregate of our total all-in sustaining cost — we have provided an oil price sensitivity for the balance of 2026.
For every $10 a barrel move in oil prices, we expect roughly an $11 per GEO sold effect on our all-in sustaining cost. That breaks down into an estimated $3 per GEO sold from direct diesel costs and $8 per GEO sold from freight costs that sit within selling costs. We keep watching these market dynamics, and we have a comprehensive supply chain strategy in place to adapt to these global market challenges and to identify and mitigate emerging risks. Turning to the parts of our costs that are more within our control, on a cash cost per ton basis, performance at Chelopech and Ada Tepe matched our expectations for the quarter. At Vareš, DPM continues to evaluate opportunities to optimize the cost structure during this transitional year. On capital spending, sustaining capital expenditures of $3 million came in lower than the prior year, due primarily to no capitalized stripping costs at Ada Tepe as a result of its upcoming mine closure, partially offset by the timing of expenditures at Chelopech. Growth capital expenditures of $34 million were higher than the prior year, due primarily to the capital expenditures at Vareš, including the capitalization of certain pre-commercial production operating costs, partially offset by lower costs related to the Čoka Rakita project, due primarily to timing of expenditures.
Our balance sheet and cash position remain solid — we had consolidated cash of $575 million, carry no debt, and have a $400 million revolving credit facility that's undrawn. Given that considerable financial strength and our robust free cash flow, we're well placed to fund growth opportunities and exploration prospects, while still delivering peer-leading returns to shareholders via our enhanced share buyback program. Near the end of March, we renewed our normal course issuer bid, which lets us repurchase as many as 11 million common shares — roughly 5% of our public float — and supports our plan to return as much as $200 million to shareholders in 2026. We bought back about 700,000 shares for a total cost of $25 million. Together with our quarterly dividend of $0.04 per share, that meant 17% of our free cash flow went back to shareholders in the first quarter. Year-to-date through the end of April 2026, we had repurchased in aggregate roughly 1.1 million shares at a total cost of $40 million. Our capital deployment stays disciplined, balancing our wish to reinvest in growing and optimizing the business with our commitment to returning capital to shareholders. To close, our mining operations keep delivering strong performance, and we strive to maintain our track record of generating significant free cash flow.
At this point, I’ll hand the call back over to David so he can share his closing comments.
Thanks, Navin. DPM is at a thrilling juncture. As a precious metals producer that keeps expanding, we offer a development pipeline that leads our peers, a demonstrated method of allocating capital supported by an outstanding operating record, along with ongoing gains in our share price. Our attention stays fixed on carrying out our strategy so we can produce better-than-average returns for shareholders as a mid-tier precious metals company whose way ahead for creating value is clear. With that said, I'd like to begin the question-and-answer portion of the call.
Thanks. We’ll now move to a question-and-answer session. Just a reminder: if you’d like to ask a question, press *11 on your phone and wait until your name is called. If you want to withdraw your question, press *11 once more. Please hold while we put together the Q&A roster. Our first question is from Fahad Tariq at Jefferies. Your line is open.
Hello, and thank you for taking my questions. You brought up higher labor costs in the press release. Could you perhaps discuss the dynamics behind that and what you're observing?
Hi, Fahad. Navin here. This breaks down into two parts. First, when we initially acquired Vareš, we recognized that its cost structure had a significant expatriate element. Looking ahead to the rest of this year, we'll be reviewing that structure and aiming to localize the workforce at that site, which should bring down what we currently see as an elevated starting labor cost at Vareš. At Chelopech, we have a two-year collective agreement in Bulgaria. That agreement is currently in its middle period, and each year we go back and review labor increases on an annual basis. What you're seeing for 2026 versus 2025 comes down to two factors. First is the Vareš effect of that higher labor cost, and second is simply the natural adjustment, or the labor increases, that occur year-over-year.
Alright. Now, turning to the balance sheet — with the cash balance rising and how fast that increase has happened, could you remind us of the minimum cash level you prefer to hold and what the strategy is behind it? Is the plan to accumulate cash so Čoka Rakita can be self-funded, or should we simply anticipate that it will be returned through capital returns over the remainder of this year? Thanks.
Right, thanks. So, we've built a solid record as careful allocators of capital, and our strategy really centers on keeping the balance sheet very, very strong—while also acknowledging the need to put money back into the business. As you can see from the guidance we issued for this year, as we move Čoka Rakita forward through the year, we anticipate capital commitments, both pre-commitment and possibly committed capital too, tied to construction costs later in the year. Since Vareš is in a transition year, capital is running higher this year until we get to commercial production by year-end. We're reinvesting in the business. Beyond that, I'd note that exploration—this year is probably the year we've spent, or committed, the most into our exploration program. For all these reasons, the way we think about cash is making sure we have enough to advance and grow the business, while also making sure we give a healthy amount back to shareholders through our sustainable dividend and by continuing our share buyback program, where we're targeting up to $200 million this year.
Perfect. Thanks so much.
Fahad, we certainly keep an eye out for M&A when the right chance appears, though given the organic growth portfolio we have, it isn't something we're required to pursue. Nothing out of the ordinary is a stretch for us. What we'd be seeking is something offering specific synergies for our organization, like what we found with the Adriatic transaction, which brought in Vareš. That rounds out how we think about capital allocation.
Thanks. Cosmos Chiu from CIBC has the next question, and your line is open now.
Thanks, Dave, Navin, and the team. I'd like to start with a question about Vareš, if I could. You said the processing plant is going to be taken down for 20 days at some point in Q2. Has that already occurred, and if it hasn't begun yet, when might it begin? Also, while the processing plant is down, will you keep mining underground and building up potential stockpiles? Do you currently have any stockpiles? If you don't, will you instead use that equipment to carry on with underground development? Could you speak to a few of those points?
Those are excellent questions. The shutdown is set to take place during the second quarter. The expectation is that it will occur in May. Naturally, we keep fine-tuning that plan, and it's quite possible those 20 days could end up being shortened. Essentially, our point is that doing it at this point, given the production rates in Q2, is preferable to pushing it into Q3 and Q4, when we'll have far more chance to show what Vareš can do. Regarding our activities over that period, the situation we face may be somewhat different from other locations. At Chelopech, this surface material oxidizes more slowly than it will here. We need a certain amount of care in what we do so that recoveries aren't compromised. We have strong confidence in our capacity to achieve the recovery we require and to have everything functioning as needed to get the material mined, brought to surface, and delivered to the process plant. Because we have that confidence, we're actually able to shift activities around. As you mentioned, development work continues, and decline development is our top priority. Ventilation development is another item that will contribute to readiness for growth in the quarters ahead.
Right now, if you just hold onto the thought that on the mining side we can achieve more than what we've shown so far at the process plant. So, in terms of what we're doing during this period to keep pace with the process plant's capacity, it's not really something that worries us.
Thanks. Dave, as you noted in your prepared comments and also in the MD&A last night, you're achieving the targeted development rates underground. What would those be? Could you share that with us? And then, to reach 850,000 tons per day by year-end, we've discussed the advancement rates. We've discussed the ventilation. What about the paste backfill plant? As you said, that's going to be finished sometime in Q3. Is that also on something of a critical path as well? Let's talk
Let's start with the paste plant. The paste plant is, more than anything else, a way to control costs. We can run at full production without it, but doing so means using more cement. What really happens once we bring it in is that we gain the ability to optimize that plant so it runs well, and the key will be getting that facility operating effectively, with everyone trained and understanding what needs to be done to keep cement costs under control. That covers the paste plant side. On development rates, we're currently north of 400 meters per month — in fact, well above that. That figure combines decline development, ventilation, and lateral development. Then the final point is what's driving our tonnage: one thing we've mentioned is that right now we're on roughly a two-heading-to-three-stope production setup. The more you raise that, the greater your flexibility and the more capability you have to manage production along with the mix of materials and grades going to the mill. The plan is essentially to go from that two toward four by the close of this quarter, and we'll be at five or six once we get into the final quarter of the year.
Is that useful to you, Cosmos?
That's great, Dave. So perhaps just one final item. You noted that for Q1, all-in sustaining cost came in at $1,686 per ounce, and that figure included $186 from share-based comp. You also said the full-year guidance of $1,300 to $1,450 an ounce stays unchanged. Maybe I'm overthinking this, but in trying to line up those numbers, Navin or Dave, is your point that the full-year $1,300 to $1,450 will be achieved even with the $1,686 included, or should the $186 an ounce be stripped out?
Cosmos. I think you can probably back that out. One thing about share-based compensation, or the mark-to-market adjustments on it, is that we usually don't budget for it during the year, since it depends entirely on how our share price moves. As you'd have seen in the first quarter, share prices across all mining companies kind of went up. They've kind of pulled back with the onset of the war. Likewise, you could see a pullback or a negative kind of adjustment there going forward, depending on where share prices move. Now, all of us would love to see our share prices kind of move up in one direction, but we typically try to think about it without those mark-to-market adjustments when we kind of issue our guidance, simply because we don't budget for it going forward. Yep,
That's great. Honestly, it's a bit like taxes—nobody likes them, yet paying them also shows you're earning more. In this case, it signals that your share price is climbing, so that's a positive. Cool. Thanks to Dave, Navin, and Jennifer for taking all my questions. Thank you.
Alright.
Thanks. Just a quick reminder that if you'd like to ask something, hit *11 on your phone and then hang tight until your name is called. Up next we have Don DeMarco calling in from National Bank. Go right ahead.
Thanks, Jennifer, and good morning, David and team. Yes, perhaps I could just build on a few of the Cosmos questions — it's encouraging to see that the Vareš ramp-up has gone so well so far. You mentioned pushing forward the decline lateral development. I may have missed it, but could you say something about how grade and throughput will vary quarter by quarter across the rest of the year as you progress toward that 850k ton per year target?
I can't remember the annual average right off the top of my head, but for Q1, I believe we indicated it was especially — if you look at silver grade, it came in above what we had initially expected. That said, bear in mind that the way Vareš is progressing involves us carrying out several activities that deepen our understanding. We've performed extra grade control. As you may recall, we mentioned during Q1 that we would undertake additional work. By the close of Q1, we had reached the first half. By the close of Q2, we will have finished all grade control for the remainder of the year. What I can't yet say is how that reconciliation is affecting the grade we're achieving, but right now, it certainly isn't negative. It's quite possible that we'll end up seeing higher grades come through, especially in silver and gold. We observed that in Q1. A very nice problem to have, with just under 1 million ounces of silver produced. The information contained in the guidance — we don't usually go beyond that — but as a rough rule of thumb, you're going to see considerably more confidence in the information that's arriving as we finish grade control and carry out additional work, and it's all tied to decline development and working off the decline and, in a sense, getting ahead of where we're producing.
To wrap up on that last comment, Don: 90% of what we produce this year comes out of Block 1, and that really makes the forward projection a bit simpler. As we learn more, we'll work it into our guidance, but I think that's about all I can offer at this point, Don.
Thanks for that. So turning to Bulgaria—there were elections there last month, and I'd be curious to get your view on whether there's any read-across to the Chelopech operations broadly, perhaps on permitting. Naturally, a Bulgarian royalty has been involved, and some of that has been shifting lately. Perhaps you could speak to what the new government means for the fiscal regime around mining.
Okay, starting with royalties — yes, a change did come into force as of the beginning of this year. The impact really falls only on Ada Tepe. Under that contract, unlike the arrangement we have at Chelopech, there was a provision stating that any rise in royalties would be carried through. We had been on a sliding scale running from 1.5% to 4.5%, and clearly we sit at that 4.5%, and what has now happened is it has gone up to 6%. That explains why you are seeing a higher royalty figure at Ada Tepe. At Chelopech we are not exposed to this until the concession comes up for renewal, which as things stand is 2029, though naturally we would move on that sooner. Another thing people usually raise — and I will get to your other point on permitting timelines and similar matters shortly — is how the changed government is being viewed. There had been some worries over whether continued alignment with the EU would be maintained, and I think both the president and the new prime minister have taken care to stress that he is strongly aligned with both the EU and NATO.
Looking at it that way, there are no worries. And then, last item on the list, the new government has a specific set of priorities, and one piece of that involves making progress on matters that matter for foreign direct investment, along with figuring out how to clear away the factors that are slowing these processes and keeping groups from being attracted to come into the country. Our view is that this will translate into more transparency and, in fact, quicker progress on permitting. We consistently describe it as well defined, but we also note that historically it has been slow in Bulgaria compared with, let's say, other nations in the region. It's genuinely encouraging to see some signals, and the president has been saying this, that we can expect those processes to be reduced and simplified. The next item to keep an eye on, then, is what happens with Chelopech North. There, the government is going to have far more capability to get things done than it has had historically, and I think all of this is genuinely a positive for Bulgaria.
Appreciate the detail — that answers everything on my end. Best of luck for the remainder of the quarter, and thanks.
Appreciate that, Don.
Thanks. We'll take our next question from Jeremy Hoy at Canaccord Genuity. Your line is open now.
Hello there, and thank you for taking my questions. Most points have already been covered, so perhaps this gives you a chance to highlight some exploration upside. With the Rakita prospects, it's evident that scale is building there. A great deal of attention is focused on that area. It appears there could be a standalone operation at that property. Looking across Vareš, Chelopech, and the other regional prospects at Rakita and nearby properties, is there anything you would like to call out as an opportunity that you believe could deliver meaningful uplift to NAV at some point down the road?
I'd say first off, the exploration group has done a truly excellent job of creating value. As I understand it, the most recent figure on our numbers is $15 an ounce for discovery costs, and that includes Čoka Rakita up to now. That is pretty remarkable. We're clearly quite enthused about developments at Čoka Rakita, and to the north there are some similar pencil porphyries of the kind that would be a trigger for Dumitru Potok. There's certainly additional potential there. Within that roughly 5 to 6 kilometers north-south and 2 to 3 kilometers east-west, that's mainly what we call Potoš Čuka. We're currently engaged in surface work of some kind plus a bit of drilling there, and we expect to do more over the remainder of the year. You'll be hearing more on that as we go forward, and the MD&A contains some commentary on it. Let's turn to Chelopech for a moment. For as long as I've been at the company, Chelopech has had an 8-year mine life, and last year we managed to turn that into 10 years. If you examine it, part of that actually came with a decrease in grade. Now what we're seeing with things such as Wedge Zone deep is quite exciting.
We have completed 10,000 meters of work. We are in fact assessing that right now, and our plan is to come forward during the second quarter and discuss it in somewhat greater detail. We have mentioned that this could potentially affect our production activities starting in 2029. We believe that is quite realistic, and the grades at this location run approximately three times the reserve grade for Chelopech. That is genuinely exciting. There is essentially no drilling at depth there. Historically, the thinking was that the conditions needed for a high-sulfidation epithermal system below sea level did not exist. Below 750 meters at Chelopech. This has been found once we reach that range of roughly 900 to 1,000 meters. We are keen to determine whether this represents a dislocation, something that has shifted from a higher level or a different location, or whether it is a secondary pulse. That could make a substantial difference to our future. We are becoming quite enthusiastic about Chelopech, and our team has been very busy with 20,000 meters of drilling across various locations and 50,000 meters in Brebene alone as we move that from a geological discovery toward a commercial discovery. Although the excitement over the last couple of years has mainly centered on Serbia, we believe Chelopech will also be a significant part of things going forward.
At Vareš, as noted in the script, drilling is already underway in the Vareš areas, and we expect to do considerably more from now until year-end. We've added a new contractor, and we're working with those two separate contracting teams based on what we learned in Serbia, with our leadership in Serbia and Bulgaria actually controlling it. We expect very interesting developments there between now and the end of the year. My hope is that we'll have a bit of a wealth of things to discuss given what we're seeing at present. This won't be purely a Serbian narrative with Chelopech underpinning everything. I believe we'll have three assets demonstrating the potential to extend life and perhaps even affect medium-term production.
Excellent. We’ll be eager to hear how things turn out on each of those fronts, then. Thank you, Dave, Navin, and Jennifer. Have a great day.
Thank you. That brings the Q&A portion to an end. At this point, I'd like to hand things back to Jennifer, who will offer some closing remarks.
Thanks, and I appreciate all of you being here today. We're eager to keep this discussion going and to bring you more updates down the line. Until then, should anything else come to mind, don't hesitate to get in touch, and we'll talk again next quarter. Many thanks.
We appreciate everyone joining us on today's call. That brings the program to an end. You're welcome to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete DPM Metals Inc. transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to DPM Metals Inc. earnings transcripts and 131,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.