Thanks, Jim. I appreciate the introduction, and I want to thank everyone for joining us today. First off, I'd like to express my gratitude to Mark Chalmers. Mark retired not long ago from Energy Fuels following close to 10 years with the company. Mark has done an absolutely tremendous job assembling a terrific set of assets and building a great team. As I look ahead to my new role as CEO of the company, I'm simply delighted to take the helm and lead the company into its next generation; there's plenty of work in front of us. As I begin my time with the company, a few things have my attention. One is carrying out our business strategy. Getting the right people on the team matters, and so does making sure everyone across the organization works safely. That's a really critical responsibility. I'm also putting a lot of emphasis on being a good neighbor in the communities where we operate — we want to hold ourselves to very high environmental standards and be a genuinely good partner wherever we go. So looking ahead, my focus is on positioning the company for long-term growth while building stability and shareholder value. With that, let's turn to the next slide, our forward-looking notice, forward-looking statements; I will be making forward-looking statements today. What follows is what we currently expect and assume, and there are of course some uncertainties involved. For the risk factors, I would refer you to our 10-Q filing and the most recent 10-K, as well as other SEC and SEDAR filings. So moving to the next page, the first quarter highlights. By every measure, we had a fantastic first quarter. I'm excited to take you through a few of these accomplishments. First, operationally, we mined 425,000 pounds of uranium, and at our mill we produced nearly 800,000 pounds. At the close of the quarter, our inventory stood at 2.25 million pounds. We also published a Vara Mada feasibility study that came back very positive, with a $1.8 billion NPV and expected EBITDA above $500 million annually. Taken together, those figures really elevate Energy Fuels to a different plane. In addition, we wrapped up the Phase 2 bankable feasibility study for our White Mesa Mill, which delivered a capital cost of $410 million — remarkably favorable and below what we had anticipated. On a stand-alone basis, once that facility is operational, we anticipate $311 million in yearly EBITDA. We also made public the ASM acquisition. ASM—Australian Strategic Materials—which I'll cover later, genuinely lifts us into another tier and enables us to make metals and alloys, and as I mentioned, we'll get into that afterward. In addition, we turned out our first terbium during the quarter. Terbium ranks among those exotic heavy rare earth minerals that everybody covets for magnets, and it truly takes us to a different level. Thanks to those announcements, we've drawn considerable interest from offtakers in the wake of all this news. On the financial side, our balance sheet is strong, with liquidity above $950 million. We brought in $8 million of EBITDA. Our top line came from a combination of contracted and spot transactions within the uranium segment. On top of that, we're continuing to push forward on growing our Phase 1 facilities. Just to remind everyone, Phase 1 refers to our uranium processing line, which we switched over a couple of years back so it could handle rare earth minerals. We're now extending what we can already do in Phase 1 — an effort we refer to as Phase 1B — and that's going to enable us to turn out terbium and dysprosium in commercial volumes. After that comes Phase 1C, which we're adding to allow processing of MREC material. MREC stands for mixed rare earth carbonates, and it moves us into an entirely different tier; the great thing about that is Phase 1C will let us handle rare earth minerals and uranium simultaneously. Finally, during the quarter — at the very close of the quarter... <<inaudible>> Thanks, Jim. And everyone, I'm sorry about that glitch. I'm not certain exactly what went wrong, but I trust you can hear me now. I want to return and begin — I'm unsure where we were interrupted. So I'll restart with the highlights from our first quarter. From essentially every angle, I'd characterize the first quarter of 2026 as an excellent one for Energy Fuels, and I'm eager to walk you through the details. On the operations side, we extracted 425,000 pounds of uranium and put nearly 800,000 pounds through the mill. We closed out the quarter holding 2.25 million pounds of inventory, and we published a highly encouraging Vara Mada feasibility study; that study indicated an NPV of $1.8 billion, and we expect upwards of $500 million in annual EBITDA on a projected basis. By every metric, this elevates Energy Fuels to a new plane and represents a true game changer for us. We also issued the White Mesa Mill Phase 2 feasibility study. CapEx ended up below what we had expected, at $410 million, and that was a nice surprise. That project has strong economics and supports a $1.9 billion NPV. It delivers an IRR of roughly 33%. For Phase 2, we anticipate EBITDA of about $311 million from the project on a standalone basis, which does not factor in the Vara Mada feed or any other feed. This quarter we turned out our first terbium, which is another game changer. It is happening at pilot plant scale. Output is roughly a kilogram each week, and the announcements have drawn incredible interest from every quarter. And the other — sorry, the other announcement, naturally, was that we're acquiring ASM, Australian Strategic Materials. ASM produces metals and alloys — rare earth metals and alloys — and this changes everything. It either seals off or opens up a bottleneck that our industry faces when it comes to rare earths. Financially, our balance sheet is strong; liquidity stands at $950 million. Operating cash flow for last quarter, Q1, came to $8 million. We brought in sales revenue from a mix of contract and spot sales, and keeping a balance of both is something we prefer, and in the past that approach has served us well. On top of that, we're pursuing several exciting opportunities that — well, at least we began pursuing them in Q1. The first is Phase 1B. As you'll remember, Phase 1 of our mill is the uranium facility we converted so it could process rare earths. Right now we can process uranium or rare earths, but not both at the same time. We're working to change that, though. With Phase 1B, we'll be able to make heavies — dysprosium and terbium. We'll also have the ability to produce other heavy minerals such as samarium, europium, gadolinium and potentially yttrium, depending on market conditions.
With Phase 1C, we'll have the capability to handle MREC material. That material is sourced from ionic clays, and it will allow us to simultaneously process uranium ores and rare earth ores — something that isn't possible for us today. I should also mention that at the close of the quarter, we released our sustainability report. It offers a great showcase of what we've been doing in the sustainability space, and I'd encourage you to spend some time reviewing it. It's available on our website. If you're new to Energy Fuels — new investors, that is — I'd like to give you some background on our capabilities. Energy Fuels started out as a uranium company. Our company has participated in the uranium sector for over forty-five years, in a range of different capacities. That uranium capability was developed via mining and processing operations at the White Mesa Mill. Drawing on that expertise, we extended it into the rare earth minerals space. Keep in mind that each rare earth element and each rare earth mineral carries a certain amount of uranium or thorium; all of them are radioactive to some extent. Thanks to what we know and have learned in uranium, we have been able to establish ourselves as a leader in the processing of those rare earth minerals. Monazite is the mineral we favor. Monazite comes out of heavy mineral sands as a byproduct, and that has given us a way into the heavy mineral sands sector. Through the ASM acquisition we have secured and now hold three heavy mineral sands operations, along with one more mining operation known as Dubbo. In a few minutes I'll explain why monazite is the mineral we've chosen. Those three sectors may appear fairly unrelated, yet in fact they fit together quite smoothly, and the common thread among them is that each includes radioactive elements. That is essentially what makes Energy Fuels the company it is today. Alright, if we take a look at the worldwide footprint for Energy Fuels, the dark blue dots and highlights over on the far left show where our uranium operations sit. Then in the middle of that left side, you've got the yellow box — that's the White Mesa Mill, and it's really the piece that ties everything together and makes all our other activities possible. Along the bottom of the slide, the red boxes mark out the heavy mineral sands projects and opportunities we have. Those are going to give us titanium and zirconium products, and on top of that they'll supply the monazite we'll run through the White Mesa facility — our mill right here in Utah. With ASM now part of the picture, we have an operating metallization facility in Korea, and we intend to duplicate it with a metals plant over here in the United States, so it's genuinely a worldwide footprint, genuinely a growth story, and genuinely an exciting story for critical minerals in the U.S. Now turning to the uranium highlights: as you recall, Energy Fuels is the largest uranium producer. Combined, La Sal and Pinyon Plain yielded 425,000 pounds in the past year — sorry, in the most recent quarter. Output from those 2 mines for last year totaled 1.7 million pounds. White Mesa Mill produced about 800,000 pounds during the first quarter. As of right now, roughly 1.2 million pounds of uranium has come out of that mill. We continue to build a stronger strategic uranium base, and when opportunities arise we sell into the spot market. Alongside that, we of course have long-term agreements that we deliver into. The United States relies heavily on imported uranium, and we're trying to help address that issue. It still surprises me that we import uranium ore — or uranium material — from Russia. I know that will end before long, but we want to be part of the solution. When we consider where the uranium market is heading, it's hard not to be enthusiastic about developments in nuclear energy and the growing need for more uranium. So we'll continue supplying uranium via both the remaining contracted volumes and spot transactions. Those legacy agreements will run out within the next few years. Keep in mind that they come with lower pricing, yet they allowed us to enter the business several years ago—or rather, to bring our uranium operations back online several years ago—and future contracts will still include floor and ceiling prices; so the opportunities there have us excited. Moving along to the following slide, the White Mesa Mill located in Blanding, Utah truly is what makes everything possible for us here at Energy Fuels. In any sense — however you look at it, it's genuinely a national treasure; 45 years have passed since it was built, and yet it uses cutting-edge technology and equipment to process not just uranium but rare earth minerals as well; folks frequently ask what it would take to duplicate that facility, and assigning a price to it is difficult since duplication isn't simple, largely because of permitting hurdles, though the timeline required to duplicate that facility would make it extremely, extremely costly. As far as I know, no other company in the Western world does this kind of dual processing of rare earths along with uranium; and the experience we've built in uranium processing gives us an amazing record when it comes to handling both uranium and rare earth feedstock. Our mill is the sole commercial-scale monazite processor in the United States. Turning to the rare earth highlights, what we're creating is a genuinely fully integrated supplier of critical minerals, from the mine all the way to alloy. With the ASM acquisition, our plan is to capture value throughout the supply chain, and because vertical integration makes us self-reliant, we don't depend on any other link in that chain. We have an outstanding team working at the White Mesa Mill, and at the pilot plant we are actively turning out heavy minerals that we have been shipping off for validation. As was said earlier, we are getting ready to grow Phase 1, and that takes in Phase 1B, which is going to let us handle terbium and dysprosium. With Phase 1C we will be able to make and process MREC. MREC, as I noted earlier, is derived from ionic clays and represents a valuable supply of rare earth minerals, and we are going to be thrilled to be capable of turning out uranium along with rare earths at the same time. After that comes Phase 2. And with Phase 2, we are currently going through permitting. Our hope is to have those permits in hand by the close of next year. Once it is fully commissioned, we will have the capacity to process and turn out more than 6,000 tons each year of NdPr. So we will genuinely rank as a major supplier of rare earths. So the thing people ask us all the time is why monazite? And what appeals to us about monazite is that it brings a number of advantages. To begin with, it is an extremely high-grade source of rare earth minerals. Usually it holds 50% to 60% total rare earth minerals contained, yet it is rich in neodymium and praseodymium. And in the same way, it is rich in dysprosium and terbium. So those are really appealing.
On top of that, uranium is there as well; we pull it out and sell it as a byproduct of rare earth processing. So there are a good number of benefits that come with monazite. One more plus: since it's a byproduct of heavy mineral sands, the costs of production get spread over multiple commodities; and again, White Mesa Mill is the only plant in the U.S. that can handle that commercially; so we proceeded with the purchase. We announced the transaction on January 20 with Australian Strategic Materials, ASM. For Energy Fuels, ASM really presents a one-of-a-kind opportunity. There are very few rare earth metallization plants outside China, and ASM operates a commercial facility in Korea. The vertical integration this allows—from the mine all the way through to alloys—gives us a huge competitive edge, with better margins and a bigger market share, and our offtakers have shared very favorable feedback and perspectives. The acquisition is proceeding very smoothly; we just got our FIRB approval. FIRB stands for the Foreign Investment Review Board, which is Australia's counterpart to CFIUS in the U.S., and securing that approval mattered a great deal within the process. Our target is to complete the deal in early July. And once more, things are going quite well. Turning to the heavy mineral sand portion of the business—heavy mineral sands remain a truly essential product. They allow us to get the monazite as a byproduct. However, heavy mineral sands are a source of titanium and zirconium minerals. Those materials get used in many industrial applications, such as pigments, metals, ceramics, chemicals, refractories, foundries and nuclear applications. Energy Fuels has three heavy mineral sands projects. And through the ASM acquisition, we'll also hold a significant polymetallic operation. The Vara Mada Project is our project in Madagascar. We're advancing it. We're working towards obtaining a government stability agreement, also called an investment agreement. That work has been underway for some time. But with the recent change in government, we've had a little bit of a delay getting that investment agreement signed. Even so, our dialogue with the authorities in Madagascar remains quite constructive, and we expect to keep building on that through the remainder of this year. Turning to the Donald Project in Australia, we are in the process of acquiring a 49% joint venture stake. Donald is ready for construction and holds every permit it needs. Our aim is to reach a final investment decision within the coming months. What is primarily delaying us at present is the completion of our financing and offtake arrangements. Progress on those fronts has been strong, though, and we anticipate being in a position to confirm FID before long. Bahia is a project we fully own, located in Brazil's Bahia state. Drilling work is underway there. Our goal is to complete either a scoping study or a PFS by later this year. Then last, there's Dubbo, which came to us through the ASM acquisition. Dubbo isn't a heavy mineral sands project — it's polymetallic, though it holds very high grades of critical minerals, and we anticipate it will provide extra feedstock to the White Mesa Mill in the future. Moving to the following slide, it's quite compelling because it shows just how international our operations really are—especially regarding the supply of rare earth minerals to White Mesa Mill. To repeat, we have three heavy mineral sands projects that will produce monazite: one is in Australia, another is in Brazil, and a third is in Africa and Madagascar. Those projects deliver monazite feedstock into White Mesa Mill. That mill will then take those rare earth minerals and turn them into oxides. After that, the oxides get shipped either to Korea or—once our U.S. metallization facility is constructed—to that site, where processing happens inside the United States. After that stage, those materials are purchased by makers of magnets as well as by the companies that produce the final goods. That makes us genuinely worldwide in scope, and we're enthusiastic about what lies ahead in those markets. With that said, I'd now like to pass things along to Nate. Our CFO is Nate Bennett, and he'll walk through some of the financial results for the quarter.
Absolutely. Thanks, Ross, and good morning to all of you. Turning to the financial updates for Q1 2026, if you could move to the next slide. Our strong financial position remains intact as we get ready to develop our long-term projects. We ended with working capital of $957 million and total assets of $1.4 billion; that working capital still reflects the $621 million in net proceeds from our convertible note offering completed last year in the fourth quarter, which we have not yet drawn down. Working capital also takes in 2.2 million pounds of uranium, roughly half sitting in finished inventories and the other half in process or in ore piles. This liquidity affords us the financial flexibility to advance our strategic projects, stay opportunistic as the market evolves, and deliver on our guidance. On the P&L, our net loss keeps improving, at $11 million in Q1 2026; that compares with a net loss of $26 million in the prior year Q1 2025 and a net loss of $21 million in last quarter, Q4 2025. The improvement stems from higher uranium revenue and sales as well as greater income from our marketable securities from invested cash. Partly offsetting that are higher operating costs and transaction costs, as you can see in the P&L, as we progress our global strategy. Now, noting our guidance, we do expect uranium sales to carry on through the year, helping offset our burn rate as we move our projects and strategy forward. On our segment footnote, footnote 19 of the 10-Q, we noted that our uranium segment is showing promising results as we begin to be profitable, and we expect that trend toward profitability to continue in our uranium segment. On revenue and sales, we took advantage of spot price increases during the quarter, selling 100,000 pounds at an average price of $95.88. As for our long-term utility contracts, as forecasted, we sold 410,000 pounds at just under $64 a pound; we anticipated these sales at this price, tied to some of our initial long-term agreements entered into back in 2022 and 2023. We entered those agreements when uranium prices were starting to rise. Those contracts really supported the decision to proceed with mining at Pinyon Plain and our La Sal complex. Now on uranium production and moving through the year. At Pinyon Plain, we mined 375,000 pounds at an average grade of 1.12%, which came from a lower ore grade area as mining moves between high-grade zones. Such ore grade fluctuations are expected as we mine different segments of the ore deposit, and we expect ore grades to rise throughout 2026. We had anticipated these ore grade fluctuations, and they were factored into the mining production guidance we provided. And when you look at the mill, we kept processing Pinyon Plain and La Sal ore through Q1, in line with our guidance; we processed more than 800,000 pounds, as Ross mentioned through March, and during April we hit the 1 million pound milestone for the year. These results are genuinely exciting, since the last 2 quarters have clearly demonstrated what the mill can do, which has been better than expected, given that it had not run at these levels for many years. Our all-in costs for mining, transportation and processing remain within the expected range of $23 to $30 per pound, and we expect that to hold for the remainder of the year. We also expect processing at the mill to keep going throughout 2026, though we should note that we will pause processing for planned maintenance downtime set for the end of Q2 and the start of Q3. Since the mill — and we do know that the mill processes ore faster than we can mine it — the downtime will really let mine production catch up with mill processing and rebuild our ore piles at the mill; and we do expect our mill processing to stay within our guidance of 1.5 million to 2.5 million pounds for the year; now turning to our inventory and our cost. We keep seeing a decline in our inventory cost as we produce low-cost Pinyon Plain pounds, dropping to $36 a pound at the end of the quarter. This decrease is expected, and we continue to see this — we expect to keep seeing this decrease as we mine throughout the rest of the year at Pinyon Plain. And we note our cost of goods sold, we expect it to fall closer to $30 per pound throughout 2026 as we sell through our inventory and add low-cost Pinyon Plain production. And that will really help improve our gross margins and our profitability in our uranium segment. Turning to our inventory, we finished with 1.1 million pounds at $36 a pound, with another 1.1 million pounds in process and ready to be processed. This really gives us sufficient inventory to meet our processing and sales guidance and to meet our long-term utility contract commitments for the remainder of 2026 and the first part of 2027. Now just an update on the guidance. As noted on our previous slides, we do continue to anticipate being within our guidance ranges. Starting with mining, we mined 425,000 pounds between our Pinyon Plain and La Sal complex. We'll continue to mine during the planned downtime at the mill to replenish the ore piles there; and we expect our ore grades and pounds at Pinyon to increase as we move into higher-grade zones. On the mill processing side, as I mentioned earlier, we surpassed our processing milestone of over 1 million pounds in April, and by the end of Q2 we're beginning to approach the lower end of the range. Even with the planned maintenance downtime, we expect to land within the anticipated range. Turning to sales guidance, we sold 510,000 pounds in Q1. We anticipate that sales will keep pace and align with our guidance, through both sales under our long-term contracts and spot sales, contingent on market conditions. With that, I'll hand it back to Ross for some closing thoughts on our 2026 activities.
Thanks, Nate. So, to close out our presentation, I want to talk about a handful of objectives we have for the rest of 2026. To my mind, it all comes down to execution. We have an amazing asset base, amazing mines to develop, and an amazing facility at White Mesa, but right now delivering on execution is what matters most. As a result, we'll be focused on permitting for Phase 2. We'll direct our attention to Phase 1B and 1C, and get that construction started and finished. We're hoping to have Phase 1B and 1C up and running late in '27; we hope to reach Donald FID very soon, and that's taking up a lot of our attention. We'll continue advancing our Vara Mada Project on both the engineering front and the investment agreement and government relations front. We have a significant social outreach program and a significant emphasis on the communities in that area, and that will carry on. We'll keep pushing forward the drilling and engineering work at the Bahia Project. And lastly, I would say a major priority for me is making sure our company operates safely and sustainably. Once more, I'd urge you to check out our Sustainability Report, which we just put out. I believe you'll find it quite impressive. So look, I'm very proud of what this team has achieved in the first quarter. Taking over leadership of this company and driving it ahead through the remainder of '26 and past that is something I'm thrilled about, and I'm really looking forward to what lies ahead for us. That said, I'd like to wrap up our formal presentation here, and I believe we're ready to open things up. I'll hand it back to Jim for the Q&A.
Maybe I'll begin with the uranium side. I'm just curious — what amount of finished inventory do you want to keep on hand? Obviously, we saw you sell 100,000 pounds on the spot market in Q1, at close to $100 a pound. If prices returned to roughly those levels, should we expect you to sell as much as the top end of the sales guidance range?
Yes. Look, Anthony, I think the first thing is that we've got to hold enough inventory to satisfy our contractual obligations; so above all, I'd call that a driver. The other area — the other way I'd answer that is we want to keep some optionality so we can switch the mill from processing uranium over to processing rare earths, depending on market conditions; so it's somewhat of a balance. And if you look at our guidance, our uranium sales ranges are pretty high. That's largely the reason — because we want to keep enough inventory to feed our contractual obligations. We want some going into the spot market, but we also want optionality and flexibility to shift the mill operations from uranium to rare earths at any point in time; so it's a great point, but we'll keep processing uranium as heavily as we can. When prices go over $100 like they did earlier this year, we'll certainly take advantage of that. And again, longer term, we do see uranium prices escalating. And again, we want to maintain some optionality around that. So it's somewhat of a balance, and I'd say it's somewhat of an art, but that's pretty much why we're going the direction we are.
Great. And perhaps just to follow up on that: so it looks like during the first quarter you sold roughly half of your long-term sales commitments for the year. Should we expect the rest of that to arrive in the second quarter? Or will it be spread out differently across the year?
Look, I think it will be spread out across the year. Again, we have big contractual obligations in the first quarter, and we'll be meeting those contractual obligations through the balance of the year. But some pretty big sales came as a result of our contract — one of our big contracts. But yes, I anticipate we'll smooth that out through the balance of the year, the balance of those sales.
Good quarter — well done. To start, rare earth firms on their own carry notably richer multiples than diversified miners do. Once this rare earth operation grows and Donald, ASM, and Vara Mada are all combined, would you consider separating the rare earth business and operating as two separate companies, one rare earth and one uranium?
Yeah, that's a fair point to raise, since rare earth players do command high multiples, uranium players get somewhat smaller ones, and heavy mineral sands players sit at multiples lower yet. Our thinking is that we'd like to be integrated across all 3 of those sectors. Controlling our own feedstock matters enormously, both technically and commercially. So when I consider it, Soundarya, I think that staying in this business — whether we end up as a monazite processor or as an MREC processor — means we want control over our own molecules. That's why spinning off the heavy mineral sand portion of the company is something we might look at down the road. At present, though, it serves as such a critical feedstock source for us, and we want to keep control of it. I’ll let you and the other analysts work out the valuation approach. Still, looking ahead, I expect most of our revenue to be generated by rare earths; uranium will keep contributing revenue; and heavy mineral sands revenue will be increasing. How you assign weights to those in deriving our valuation is something we’ll simply have to accept. That said, I’d be reluctant to surrender control of the feedstock that goes into our mill.
That's quite clear, Ross. And moving to another topic, what's your current read on the uranium market? Prices have been quite strong, after all, and they're holding around that $80 a pound threshold. Are any utility customers showing signs of urgency or wanting to lock in domestic supply? Or is contracting still proceeding slowly?
Yeah, that's an interesting question. You certainly come across all those headlines about various companies in the SMR business, for instance, with some amazing future projections for selling SMRs. And uranium is the only thing that will feed those SMRs, right? So — but we haven't yet seen utilities ramping up their buying schedules. I fully expect we will see that. I'm confident we're going to see far more focus on making sure they have uranium supplies going forward. But I — to the best of my knowledge, we haven't really seen a huge increase in demand or in discussions from the utilities so far; but look, I fully expect that to change. When you look at projected demand, every research group out there studying uranium and the nuclear industry shows the supply and demand balance is going to start coming out of whack over the next few years, and you're simply going to need more uranium. So look, I personally remain very, very bullish on uranium. And we talk about it internally here quite a lot.
I guess I wanted to explore the remarks about Vara Mada — there seems to be a bit of a delay there. Could you say more about how big that delay is, and what would need to happen for you to perhaps get things back on track? Are there any milestones or triggers during the year you could point to that might give better visibility there? I'm just trying to get a sense of where you stand in that process.
Let me begin by noting that the government change that took place in September, October of last year really slowed the process down. We were very close to signing an investment agreement around that time. But with the government change, that slowed things down. We've been spending a considerable amount of time in country in Madagascar. And I'm joined here by Nathan Longenecker, our General Counsel, who's been personally spending a lot of time in Madagascar. So let me have him answer that as well.
Yes, we've been — we're still working to move it forward. The government we're dealing with is fairly new, though we've met with its top officials on a fairly regular basis. Those talks have gotten a good amount of backing from the highest levels; the government has supported the project, but several things still need to be put in place. And it's — the document has many aspects to it, so getting it finalized takes some time. That's broadly where things stand in our work with the government.
Okay, sure — that's reasonable, and we'll continue monitoring how things develop. Related to that, I'm curious whether you have any updated perspective on buying monazite on the open market while waiting for certain upstream assets to hit final investment decisions and eventually begin producing? Monazite prices seem to have fallen quite a bit lately — any view on possibly treating that as more of a bridge until your own assets come online?
Yes, Brian, definitely. Sourcing monazite is something we'll need to do; we have three internal sources of monazite. We also hold an agreement with Chemours for sourcing monazite from them. To keep Phase 2, the White Mesa expansion, running at full capacity, we're going to require additional sources — just a modest amount, but some extra sources will be needed. So our business development and partnership team is very active out there, searching and holding talks with a wide range of monazite suppliers. My sense is that the groups producing today sell their monazite almost entirely into China. And the Western companies doing that are seeking other outlets for their monazite. So we have many discussions under way with many different groups, and we will secure additional monazite sources to feed our mill.
What I really wanted to ask about first was the uranium processing side. From what I gather, there are a few options — you could do a longer processing campaign, or change over to rare earths or something along those lines. So some choices do exist there. I was just curious what your current thinking is on how long you intend to process uranium.
Yes. Look, I think, first of all, the mill operates at a faster rate than our mines turn out ore. So the mill will always stay ahead of the mines, at least for the time being. And we've reached a point where we should be able to process ore for probably another 4 to 6 weeks. After that, we'll take the mill offline for maintenance and carry out certain upgrades, which will allow us to accumulate additional uranium stockpiles. At that point, we'll need to decide whether to resume operations with uranium or with rare earths — and market conditions will play a big role in that. So, as you can see, we've processed more than 1 million pounds so far this year. And we'll simply have to determine whether we're comfortable holding stockpiled uranium or whether we'd rather keep producing rather than switch to rare earths. So look, I fully anticipate that we'll get through the next, call it, month, 1.5 months; we'll shut down for probably a couple of months for maintenance and then make a decision on whether we're going to start back up with rare earths or with uranium depending on market conditions.
Understood. So I suppose, assuming nothing shifts from this point on, how might that shape your view? In other words, which way would you be leaning given the conditions as they stand right now?
Right. Were nothing to change, we'd likely resume uranium processing and carry on with that uranium processing for the rest of the year.
All right, understood — that's perfectly clear. And then my second…
And look — please continue. Go right ahead, Justin.
Sorry about that, please go ahead and finish what you were saying. Apologies for cutting in.
Well, look, what I was about to say is that Phase 1C is really going to give us optionality for processing rare earth minerals alongside uranium. Now Phase 1C is going to be geared toward processing MREC materials. But once we've got that up and running, hopefully next year, that will let us avoid having to choose between processing rare earths or processing uranium, and we can do both at the same time, albeit from MREC material. So that's the reason we're very heavily focused through the rest of this year on being able to process MREC next year.
Understood. That's clear. So I suppose, yeah, perhaps we should go into that a bit, if you're willing to hear me out on it. So I suppose you'll have your own separate lines and there's no need to, like, use the same tanks and all of that for 1C. I suppose, to obtain the MREC, would you be getting it from third parties? Or could you — I suppose you could presumably build up your own MREC stockpiles at some stage? Is that the idea? Or is it mostly just sourcing from ionic clay deposits?
Yes. It would mainly come from ionic clays. In the early days, when we ran the mill, we did make an MREC material at our own facility from monazite. But we don't expect to do that going forward; we will probably source from third parties. And there are a number of third parties out there seeking a home for their MREC. So we believe we could help fill that gap.
Understood. And then, if I could follow up on the longer term, once you've got your own dedicated rare earth processing lines up and running and you're working through monazite, would you still keep the ability to take in extra MRE for ionic clay?
Yes, absolutely.
Or would that cause a blending problem?
No, no, no. That separate facility we are constructing, this 1C, is going to let us keep processing MREC while also processing monazite through Phase 2. So that capability to process MREC together with monazite will always be maintained by us.
All right. Perhaps just a final one as a follow-up on that point. I realize this is somewhat of a leading question, but given that capacity, does it shift your strategic thinking in any way regarding having your own potential upstream ionic clay feed? I mean, right now you don't have one in the portfolio. I'm simply wondering whether that might perhaps alter — what your upstream asset base could look like over the long run?
Yes. Look, how I'd respond to that is to say we will always remain opportunistic. And should an opportunity arise to acquire an ionic clay and MREC producer, we would definitely consider it if it made sense.
I just wanted to revisit Donald for a moment. And I was wondering whether you might provide some sense of what's still left when it comes to finalizing that offtake agreement out there, which in turn would help us get to the FID?
Yes, good to talk with you, Noel, and thanks for asking. So a few things. The Donald Project will produce a heavy mineral sand — heavy mineral concentrate as well as monazite. So there are 2 separate offtake agreements that we need to finalize. The first agreement relates to the heavy mineral concentrate, while the second involves several different materials—not a single rare earth element but likely four or even more minerals that we'll recover. Because of that, aligning offtake contracts for each of these commodities requires considerable time. Regrettably, this process has run longer than we expected. Once those offtake deals are secured, your financing is affected as a result—the two are closely linked. We're therefore holding talks with multiple financing counterparties and offtake counterparties, and these are quite distinct parties—separate groups that must be coordinated with one another. That has made things difficult. On top of that, there's the added layer of having a joint venture partner. We're working alongside Astron, so any financing arrangements we sign and any offtake deals we commit to also have to be acceptable to our JV partner and fit what they need. So something that from the outside appears like it ought to be a pretty straightforward process is in reality fairly complicated and takes a lot of time; and regrettably, that has held us back from reaching that FID sooner; but Noel, I'd say our focus is very strong. We're aiming to get to the FID as fast as we can. Getting that mine operational at the earliest possible moment is a priority we carry with us daily.
Great, that does help clear up a few things for me. And in the past, we've discussed a little bit how, on the rare earths, what the market wants has been kind of shifting and evolving, I suppose, over the last year or so, and that has shaped to some extent your choices about which products you're going after and the order in which you pursue them at the mill. So I'm wondering if you could give us a bit of an update on how you see demand for the specific elements changing going forward?
Look, I think the shift in demand you're detecting in the market has more to do with what people are making. What we're seeing, I think, is that dysprosium and terbium demand remains very heavy. Now, the fact is, not everyone can produce dysprosium and terbium. Magnet manufacturers, I think, are trying to design magnets that reduce reliance on dysprosium and terbium, but they certainly haven't cracked that puzzle yet. And so big demand remains for DY and TV in these magnets. And I think that will continue for the foreseeable future. Looking at our mill operations, my view is that we should aim to turn out the complete range of heavies. That covers not just dysprosium and terbium but also samarium, gadolinium, europium and yttrium, since there's demand for those minerals in the market. Consider yttrium: the aerospace sector's requests and appetite are extraordinarily high. So I expect demand for the heavies will stay extremely strong. At the same time, though, I believe you'll continue to see teams working to engineer the heavies out of the system. Building on that point, the benefit the heavies provide is enabling these electric motors to run at extremely elevated temperatures. And no one has yet worked out how to achieve that absent the heavy minerals, the heavy rare earths, being present. So honestly, I believe a bit of wishful thinking is at play there. Maybe that changes someday down the road. But as of right now, we aren't observing — what we are observing is considerable interest from prospective offtakers on the DYMTB side of things.
I'd like to know what market signals you'd need before going forward with a few of those medium-term uranium projects? As you said earlier, mined ore is sort of the key constraint in the uranium segment. At today's uranium spot price, would it make economic sense to bring a couple of them into production?
Your timing is really good, since we actually met just yesterday about this, discussing our project pipeline and how to rank those projects. Look, at current prices, you begin to think about bringing some of them online. And one question you always have, I suppose, is where will this pricing head? And if prices go well above $100 a pound, which we expect will happen at some point, that turns a lot of the pipeline into a genuine opportunity. So at these prices, we're fairly pleased with what we have running. La Sal and Pinyon Plain are operating. Nichols Ranch sits on standby. And I think our view is that we should — we will keep permitting the development projects. We'll keep advancing those projects and be ready to put them into production once we feel there's a long-term sustainable price above a certain threshold. And that threshold differs from project to project. But we do have this pipeline, and we will look to bring them online as prices allow. So look, it's a very current topic; and I'm sorry, I can't give you a hard number where above x dollars this project would come into production, but we think about that every day.
Understood. No, that helps. And building on that point, I'm curious whether you'd ever think about selling Nichols Ranch as an ISR project — clearly it differs quite a bit from the conventional portfolio. Do you view that as a possible source of some additional liquidity later on? Or is the intention to develop it eventually?
You mean Nichols Ranch? Just to be clear?
Yes.
Yeah. Well, if someone puts an offer on the table to purchase it, we would definitely give that consideration. But — well, Nichols Ranch has us quite enthusiastic. We really value the fact that it's ready; it sits on standby; it can go straight into production. It would probably take us 4 to 6 months to get it operating if we decide to move forward. So having that optionality is something we appreciate. That's not to say that a great offer for it wouldn't get us to think about it. So — but the optionality it gives us today is something we like.
Understood. No, that really helps. And I have just one more quick item for you. Although I realize the ASM transaction has not yet closed, I wanted to ask briefly about the Dubbo Project and what you would plan to do with that asset assuming the acquisition does close, which is my working assumption. Could it serve as feedstock for White Mesa? Or would it instead need to run more as a standalone project from your perspective?
Yes. That is actually an excellent question, since this is not a heavy mineral sands project. It is a polymetallic project carrying substantial critical minerals credits such as niobium, along with the rare earth minerals as well. ASM's current plan is to use it — running a heap leach there and doing a kind of semi processing to make a rare earth hydroxide, which would then be shipped to the White Mesa Mill for treatment there. That approach was largely driven by capital cost considerations on ASM's side, compared with constructing a mill and producing more of a concentrate. So we want to revisit — once the transaction closes, we want to revisit those engineering studies, confirm whether we agree with the direction ASM was taking or perhaps not, and then assess what the best alternative is for capturing value from Dubbo, because it does contain — as I mentioned, it holds a whole host of other minerals, again, such as niobium, which would be a really interesting product or mineral to produce. But we simply have to evaluate it and determine what makes the most sense. As things stand, though, they intend to produce a hydroxide that we would then bring to White Mesa, and we could process it in the White Mesa Mill, much like an MREC material.
Well, I’d simply like to thank everyone for joining; this marks my first earnings call in the role of new CEO, and I’m thrilled to be here and thrilled to move the company ahead. And I’d just ask that you keep watching our company, since we have plenty of exciting things taking place. So, thank you.
Ladies and gentlemen, that brings today's Energy Fuels Q1 2026 Conference Call to its close. Thank you all for taking part. You're free to disconnect your lines now. Have a wonderful day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Energy Fuels Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Energy Fuels Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.