Energy Transfer LP (ET) Earnings Call Transcript
August 4, 2026
Earnings Call Speaker Segments
Thanks, operator, and good morning to all of you. Welcome to Energy Transfer's Second Quarter 2026 Earnings Call. With me today are Mackie McCrea, Dylan Bramhall, and several other senior management team colleagues, and they'll be available to help respond to your questions once we finish our prepared remarks. I hope you had a chance to review the press release that went out this morning. Just to remind you, that earnings release includes updated guidance along with a detailed MD&A walking through the segment results, and we'd encourage you to review both the release and the slides on our website so you get the complete picture of the quarter and the growth opportunities ahead of us. One more reminder: we'll be making forward-looking statements under the meaning of Section 21E of the Securities Exchange Act of 1934. Those statements rest on our current beliefs, along with certain assumptions and information available to us right now, and they're covered more thoroughly in our Form 10-Q for the quarter ended June 30, 2026, which we anticipate filing later this week. I'll also be referring to adjusted EBITDA and distributable cash flow, or DCF, and both of those are non-GAAP financial measures. A reconciliation of our non-GAAP measures can be found on our website. Let's begin today by reviewing our financial results for the second quarter of 2026: we produced adjusted EBITDA of roughly $5.1 billion, versus roughly $3.9 billion in the second quarter of last year. DCF attributable to the partners of Energy Transfer, as adjusted, came in at approximately $2.6 billion, compared with approximately $2.0 billion for the second quarter of 2025. Those results benefited from strong performance across every one of our business segments, including record midstream gathering volumes, NGL transportation volumes, NGL export volumes, and crude oil transportation volumes during the quarter. And through the first half of 2026, we invested approximately $2.6 billion of organic growth capital across the intrastate, midstream, NGL and refined products, and interstate segments, excluding SUN and USA Compression CapEx. Now to our 2026 adjusted EBITDA guidance. With our performance in the second quarter continuing to be strong across all of our segments, we now anticipate full year adjusted EBITDA in the range of $18.8 billion to $19.1 billion, which represents an increase of approximately $0.5 billion at the midpoint relative to the guidance range we gave on last quarter's earnings call. Moving on to organic capital guidance. We now anticipate 2026 organic growth capital expenditures of between $5.6 billion and $5.9 billion, excluding SUN and USAC. Our growth capital spending continues to line up with the major themes driving our business today, among them rising demand for natural gas and natural gas infrastructure to serve the growing needs for power generation, growth in the Permian, and expanding global demand for natural gas and natural gas liquids. As a reminder, most of these growth projects are contracted under long-term commitments and are expected to deliver mid-teen returns and considerable earnings growth over the next decade or more. On top of those projects, we're sitting on a substantial pipeline of opportunities that should fuel growth down the road. Moving now to how each segment performed in Q2. Let's begin with NGL and refined products. Adjusted EBITDA came in at roughly $1.3 billion, up against about $1.0 billion in the same quarter of 2025. Driving that gain were record exports from our Nederland and Marcus Hook terminals during Q2, helped partly by new chilling capacity that went into service at Nederland last year; on top of that, we hit record throughput on our NGL pipelines, tied to higher grade and NGL volumes, along with stronger throughput at our Mont Belvieu fractionators. Q2 results also benefited from a $212 million lift coming from bigger premiums on NGL sales for export and domestic supply, plus better margins out of product optimization and blending. That figure also reflected gains tied to our NGL and refined products inventory hedges, $27 million of which we expect to be offset in Q4 of this year. Over in midstream, adjusted EBITDA was roughly $884 million versus about $768 million in Q2 of 2025. The driver was record volumes in the Permian Basin, up 5% thanks to new processing brought online and better plant utilization; we also recorded an increase of about $88 million from NGL prices running higher than a year ago. For crude oil, adjusted EBITDA landed at approximately $834 million, compared to approximately $732 million in Q2 of 2025. Through the quarter, we kept seeing growth across a number of our crude pipelines, terminals and gathering systems. Results also featured a $106 million gain tied to favorable market conditions, including pipeline and export arbitrage, stronger crude oil prices, and strategic petroleum reserve activity at our Nederland terminal. As a reminder, Q1 of this year gave us a benefit of roughly $60 million from our crude inventory value, which hedge losses in Q2 then offset. In Interstate Natural Gas, adjusted EBITDA was approximately $481 million versus approximately $470 million in Q2 of 2025; the bump came mainly from more parking, storage and liquids revenue, along with higher contracted volumes and utilization on several pipelines, among them Panhandle Eastern, Transwestern and Florida Gas Transmission; and for Intrastate Natural Gas, adjusted EBITDA reached approximately $377 million, compared to approximately $284 million in Q2 of 2025. That was largely driven by an increase of approximately $113 million from wider basis differentials, plus roughly $17 million more from early volumes during commissioning of the Hugh Brinson Pipeline; this quarter's numbers once again show the quality of Energy Transfer's asset base and its unique operating model, and they reinforce our conviction that the market fundamentally undervalues our business. Now for an update on several of our key growth projects, beginning on the natural gas side of things. We're happy to report that the Hugh Brinson Pipeline has entered commercial service, and we're making headway toward putting the entire Phase 1 capacity of 1.5 Bcf per day into service. Hugh Brinson shipper contracts are kicking in gradually, in line with the effective date spelled out in each agreement. Assuming pipeline commissioning work keeps moving along on schedule, we expect Hugh Brinson to be able to flow the complete Phase I capacity by September 1, 2026. As for Phase 2, which involves added downstream compression, our expectation remains that it will be in service during the first quarter of 2027 and will finish under budget. Also, in the second quarter we finished an additional 14-mile lateral on the Hugh Brinson Pipeline in Abilene, Texas, and it's now ready for service. During that same quarter, we signed an agreement with Crusoe to build the facilities needed to supply natural gas for the previously announced 900-megawatt expansion at the AI factory campus in Abilene, Texas. Beyond that, we anticipate further growth opportunities will emerge in the area. Moving on, our Desert Southwest Pipeline project is coming along well.
FERC just wrapped up six face-to-face sculpting meetings plus two held virtually, all along the proposed pipeline route across Texas, New Mexico and Arizona. Beyond that, as part of the ongoing wide-ranging effort to engage stakeholders, our teams keep working closely with elected officials, county leadership, landowners and the communities tied to that route, and those conversations are still going very well. During our previous call, we introduced the Springville Lateral — a roughly 120-mile addition to the Transwestern Pipeline we already operate — and it should enter service during the fourth quarter of 2029. This 30-inch line will carry about 625 million cubic feet per day and reach southward to natural gas-fired power generation that is anticipated to take the place of 2 coal-fired plants. At this point we have secured pipe and compression costs, and outreach has begun with trial, state and federal stakeholders. Over in Oklahoma, the first among our 4 connections built to serve new power plant loads began operating earlier this year. The next 2 are set to start service, while the rest should come online in the fourth quarter of 2028. Taken together, they will deliver roughly 300 million cubic feet per day of fresh demand growth. On top of that, we are wrapping up negotiations to supply about 250 million cubic feet per day of new power plant demand in Oklahoma. Broadly speaking, customers are now showing interest in raising the commitments they previously made for our natural gas services to large data centers and power plants located at or near these sites. That includes 2 customers in Texas who just added a combined 100 million cubic foot per day to their contracts. We anticipate this trend will both persist and expand in scale. We have strong confidence in our capacity to reach FID on many additional opportunities of this kind, and we remain in advanced negotiations with customers to deliver substantial volumes tied to our natural gas business in Texas, Oklahoma Arkansas, Louisiana, Ohio, Illinois and numerous other states across our pipeline network. Now turning to the Permian processing expansions: our Mustang Draw I plant entered service in June, and our Midland Basin processing complex is already operating near capacity. We still expect our Mustang Draw II plant to be surfaced in the fourth quarter of this year. Moving to our liquids business: in June, we announced an ethane export expansion of approximately 240,000 barrels per day at our Nederland Terminal to satisfy additional customer demand. The project will also add 55,000 barrels per day of incremental LPG capacity. Furthermore, we will be expanding our Mont Belvieu to Nederland pipeline system to handle the added refrigeration capacity and 2 additional NGL ship docks. The project should be placed into service in stages starting in 2028, with the docs expected to be in service in mid-2029. Every bit of our ethane export capability has now been locked up through long-term contracts extending past 2040, and we anticipate that 80% of those volumes will reach Asian markets excluding China. We're looking at growth capital for this project coming in at just above $1 billion, and that 2026 capital expenditure had already been factored into the growth capital guidance we gave previously. During Q2, we finished improvements on our Lone Star Express NGL pipeline, and that work delivers over 90,000 barrels per day of Permian NGL takeaway capability across the pipeline system, which drove record wide-grade volumes coming out of the Permian during Q2. Thanks to this, our total deliverability into Mont Belvieu has reached over 1.3 million barrels per day, and right now our Permian NGL takeaway pipelines are running at roughly 95% utilization. Additionally during Q2, we executed long-term transportation and/or fractionation contracts covering approximately 300,000 barrels per day or more on wide-grade assets that stretch into the 2030s. And over at Mont Belvieu, our fractionators stayed at full utilization throughout Q2. We anticipate volumes on our new frac 9 will ramp up rapidly once it goes into service, which we expect late this year. Q2 results came in above what we had projected, with market volatility delivering meaningful upside on top of the record volumes and solid base business performance. As we've mentioned before, any extra upside beyond our forecast will likely hinge on how long market disruptions last and how severe they are, and our business sits in a unique position to seize these gains if they persist. We still anticipate that Mustang Draw, Hugh Brinson and other projects ramping up will drive further growth in 2026. Now that Hugh Brinson is able to enter commercial service and the full Phase 1 is expected to be ready ahead of schedule, we believe it will deliver substantial future upside and further cement energy transfers natural gas pipeline business as the top choice for customers looking for reliable natural gas supply with a broad roster of growth projects under construction, we are intensely focused on executing projects, as Hugh Brinson demonstrates. Getting these projects done safely, on schedule and within budget continues to be one of our highest priorities; we're also staying highly focused on capital discipline, aiming for a long-term annual distribution growth rate between 3% and 5% while keeping our leverage target at 4 to 4.5x EBITDA. Our unmatched connectivity lets us transport energy from every major supply basin to our trading hubs, power plants, data centers, city gates, industrial complexes and other downstream markets across the U.S., along with international markets via our export terminals. That wraps up our prepared remarks. Operator, please open the line for our first question.
To start, I want to say congratulations to Mackie on retiring. Mackie, thank you for all the years you've spent leading. On the fundamentals side, could you go into more detail about what drove the volume outperformance we saw across your segments in Q2? And how does that outperformance shape how we should think about 2027, or the second half of 2026, and 2027 and beyond, especially given what producer customers have said recently? Then, for the rest of this year, circling back to what Tom said about the factors that could push results toward the low or high end of guidance, can you give us more detail on how big these market disruptions are, how long they'll last, and which key variables you're watching to figure out how the disruptions affect the rest of the year?
Thank you, Theresa. It's Dylan here. Let me try to cover all of that by going back to the entire first half of the year. As most of you are aware, in Q1 we raised guidance by $750 million, and that was mostly tied to about $600 million in Q1 results plus $150 million from simply better performance we saw carrying through the rest of the year in our business. This quarter, we're raising it by another $550 million. Most of that comes from strong beats across nearly every segment this quarter. In midstream intra crude, we beat by roughly $100 million, and NGL beat by over $200 million, since we truly saw strong activity everywhere in NGLs — everything from better export and domestic sales, higher fees at the docks, and stronger blending margins. All of this is positioning us for a stronger second half. Now, looking at the plan, we expect the base business to stay strong. We expect volumes to rise and grow across every segment as we move through the back half. A number of projects are obviously coming online here that will help drive that. The early start to Hugh Brinson matters a great deal to us. We're very pleased to have it online — coming online early and under budget, which we believe is really important, because you have to keep in mind this is the same team. These are the same people who will be working on Desert Southwest, so we see this as a great sign of what we'll deliver on that project too. But those contracts will step up as we move through the rest of the year, so we'll really see most of that impact beginning January 1, once all the Phase 1 contracts have kicked in by then. Mustang Draw I and II. Mustang Draw I is on. We keep setting fresh records over in the Permian nearly every day now, since we're truly running those assets flat out. As a result, that effect is going to show up across the rest of the year; it will also carry through into the volumes for our NGLs. Mustang Draw II is scheduled to start up near the end of the year. Our expectation is that it fills up quite fast, though the effect on 2026 is fairly small. That's going to be a major push in '27, just like the Hugh Brinson pipeline. And on top of that, Frac IX, also late in the year — again, we anticipate it beginning to fill up quite quickly once it starts operating, but it's arriving late in the year. So the 2026 effect there is limited; thus, taking all of these together, the underlying business is solid. We anticipate that carrying on. Turning to the volatility we've witnessed, the broader spreads, the elevated commodity prices that everybody observed during Q1 and Q2, we don't actually include a great deal of that in our plan for the second half of the year. The more this keeps unfolding, I believe, is positioning us so that, with a portion of this volatility, we can quite readily reach that upper end of the guidance range. Mackie, please.
Theresa, apologies for cutting in — Mackie here. I appreciate your kind words, but allow me to give a quick recap of his point. What we saw in the opening six months of this year demonstrates the stream advantage and worth our assets deliver under any circumstances. We can shift gas along our intra interstate pipelines running west to east and east to west, reaching all the major hubs, and we can chill less ethane or more ethane, plus more propane, more butane. What I believe occurred — naturally, the conflict played a major role — yet weather factors are always in play, no matter what. Still, I think it genuinely highlighted how varied our assets are and how we can pivot and gain from whatever takes place, whether at home or abroad, in a significant way. And I think our assets along with our people demonstrated exactly that during the first half of this year.
To make sure I have this right, Dylan — when it comes to where commodity prices stand and all that movement we've witnessed across the last few months, should I take it that your updated guidance remains quite reachable absent any meaningful rise in volatility, and that should such volatility stick around or climb further, it would add to the revised range?
Yes, definitely.
Excellent. Now regarding your dry gas holdings, it's really encouraging to hear that Hugh Brinson Phase 1 is apparently surpassing even your internal forecasts. Could you share additional details about where things stand with Desert Southwest — permitting included — as well as how the project is being executed overall? And considering how large and visible this project is, how has that development effort tracked against what you originally anticipated? Also, when you think about extracting the most value from that corridor broadly, what possibilities are there for bringing in additional demand via laterals, power generation interconnections, data center load, and similar things, stemming from Desert Southwest and Transwestern as time goes on?
Theresa, it's Mackie speaking once more. Indeed, Hugh Brinson had us thrilled, and DSW has us just as thrilled. It will fundamentally transform things, particularly in that region; how many new markets will emerge is still uncertain — just yesterday, a utility based in Southern Mexico reached out wanting to connect with us. So there could be upside extending down into Mexico, but the Phoenix area and Arizona are seeing tremendous growth. Grant and his group have excelled at government relations, staying ahead of the curve with every stakeholder and constituency — be it the indigenous communities, of which there are numerous distinct ones across that state, or the local, state, and federal agencies — they're handling that daily. Regarding what we expected, we might be slightly exceeding our forecasts when it comes to survey permission and advancing toward getting this pipeline constructed; all of it is going remarkably well. As everyone is aware, the steel was ordered quite a while back. The compression was arranged quite a while back too, and we have the identical team, as Dylan noted, with Mike and what his group accomplished on Hugh Brinson — we anticipate the same for DSW. So it will deliver tremendous value for our assets and for our partnership across the Southwest region of the United States, and we're extremely enthusiastic and anticipate delivering it on schedule in the latter portion of 2029.
Does it catch you off guard that Waha basis tightened up that fast? Also, do you think there's still gas trapped in the Permian that hasn't been hooked up yet? And once more, congratulations on bringing Hugh Brinson online ahead of schedule.
Yeah. I mean, it's obvious that Waha has been in pain and producers have been in pain. That pain has lasted a good long while, and everything was backed up there, and man, Hugh Brinson has set it free. And I'm aware there's a second pipeline that's also about to start up, not already running. So it stands to reason that when suddenly the Bcf climbs to perhaps 4, 4.5 Bcf by the first quarter of next year, the situation improves, and that's already been demonstrated. So this doesn't come as a shock. It maybe tightened faster than our expectations, which ties into the second half of what you asked: there's a great deal of pent-up volume, a great deal of shut-in gas, a great deal of DUCs that get brought online, and producers had been restraining themselves; and this is truly going to set loose production in a major way, oil certainly. But when it comes to gas and NGLs, volumes are going to increase exponentially. Who knows. We might actually fill up 4.5 Bcf over the next year, we'll find out; but we're quite excited about — extremely excited about turning that on now, and so are our customers.
That's quite straightforward; and congratulations on the ethane export expansion you completed recently. Could you discuss your expectations for how that capacity will ramp up? I'm aware you mentioned the timing for when the docs arrive. But do other constraints exist, such as VLEC construction, or simply the period required for international ethane crackers to begin operating? I'm unsure whether additional international ethane crackers exist, but anything further you could share regarding your anticipated ramp would be useful.
Yes, I'm Adam; we scheduled it so the unit should commence operations in mid-'28, after which it will keep ramping through mid-'29, and that aligns with what we anticipate from our customer, since these are newly built crackers. Consequently, a ramp will occur that reflects their bringing 2 units online.
First, I'd like to address something — the release mentions that we should expect announcements about new gas pipelines for power customers later this year. Does that refer to bigger backbone-style projects where you're making headway, or is it more about laterals serving data center demand?
It's everything you just mentioned. We have many opportunities — some of which you're aware of, and some you aren't — involving laterals under 18 or 20 miles, with a few spanning only a handful of miles. And beyond that, yes, we're developing at least one additional large intrastate pipeline, plus we're also working on one more interstate pipeline; it's a bit early to discuss that one. We're quite hopeful about bringing these to the financial line, and with any luck, we can share more details in November.
All right, great. Now for my second question: when it comes to the Green Chile project for Project Jupiter for Oracle, is the current plan to change the route so it goes around the New Mexico state lands, and then what about looking ahead for Desert Southwest? Could you discuss the regulatory approach for New Mexico and explain why the process for Desert Southwest ought to differ from what happened with Green Chile?
Keith, Adam here. The first part is mine, and I'll have Mackie come in for the second part. Regarding Green Chile, without going into details, that project has had our full attention, and I won't walk through precisely what the process looks like going forward, but we are and have been coordinating with the FERC as well as the BLM and every stakeholder who has a role, and we have a lot of confidence that they grasp how important these data center projects are and how important it is to be able to get through the regulatory process to bring these projects — which matter greatly to our industry and to the country — online. So we stay in touch with them continuously and have strong confidence that this pipeline will enter service and will succeed in the end.
Yes, and I'll take the second portion of that. No is the response. On DSW, we aren't expecting any challenges of a similar kind, mainly because the matter at hand involves a data center. And as everyone knows, throughout many years in this nation, there have been all sorts of incorrect convictions regarding climate change. It's the end of the world, and a great deal of that — those very same environmental advocates are now also migrating, and at present they're attempting to halt data centers; thus it has sort of turned into a 4-letter word. In our view, Oracle has performed far better at bringing out the realities of how these systems operate as closed loops; the amount of water they use is nowhere near what's being promoted. In this specific instance, they have in fact turned to bloom technology, which produces significantly fewer emissions. So this, we think, is far more of a protest activity centered on data centers. Yet, as Adam just mentioned, we have confidence that we will arrive there, perhaps somewhat later than our initial expectation, but arrive there we will; and as I stated, DSW is progressing extremely well.
Mackie, I hope retirement treats you really well. All the insight you've shared across the years has been much appreciated. If we could, I'd like to circle back to the Permian somewhat more, and regarding Hugh Brinson 2, could you perhaps walk us through, I suppose, how quickly that ramps up. I'm just attempting to figure out when it will reach full capacity.
Sure. Phase 2 hasn't actually been adjusted by us; we continue to expect to be on, likely, in the middle of the first quarter, possibly as late as March 1, though it might happen earlier. As I mentioned, Mike and his crew have performed so well. We rule nothing out when it comes to being ahead of schedule, but at this point, roughly the middle of the second quarter — no, pardon me, the first quarter.
Understood. Might commissioning flows land in Q4, similar to how Phase 1 went?
The final phase is mostly compression, so once it arrives, we'll probably kick off commissioning around late January or the beginning of February.
Understood, that helps. If I may, just one more. Regarding the additional egress capacity the Permian requires, what's your read on how this plays out now — specifically, at what point will the basin require additional egress, and where do you believe that gas is headed, plus how does ETE's approach fit in?
That's a fantastic question for us. Where is it headed? Not many companies can truly be asked that, since they lack the means to deliver it to the destinations people desire. A significant number of the shippers on Hugh Brinson are, in fact, Florida-based customers. So we'll transport volumes to any destination our customers, our shippers, request, and our capabilities are so extensive that we can take it out of the Permian Basin, shift it to Phoenix, as we were just discussing, shift it to South Texas, shift it to the Dallas-Fort Worth region, to Carthage in each Texas, naturally, the Hughes channel — pardon me, at Houston Ship Channel. So our abilities to move it west to east are tremendous, as we've mentioned, and we also possess strong capacity to move it east to west, which serves our customers, particularly power plants and data centers that want to source from Katy and Carthage, something we can handle and virtually no one else can. So we're positioned extremely well across Texas and, in the same way, in Louisiana and heading east; our capability is enormous to take an MMBtu from a field in Southwestern Pennsylvania and deliver it to a customer in southern — along the coast of Louisiana or even to Florida. So the response to that is we will transport volume and put it to use wherever the customers wish it to go.
To start, you mentioned some NGL recontracting extending into the 2030s. Could you refresh us on how much recontracting exposure we have left for the rest of the — up to the close of the decade? Are rates facing downward pressure? Or has the anticipated wave of gas, along with the NGL volumes tied to it, changed market pricing or brought about a degree of balance — more balance — in supply and demand?
Yeah. Adam here; we're extremely <<inaudible>> pleased with the headway achieved so far this year in recontracting our Y-grade business out of the Permian; as noted in our prepared remarks last quarter, we signed 300,000 barrels a day of Y-grade deals. That, together with what we anticipate from growth in our midstream segment via our affiliates, we believe positions us very well for the rest of the decade in our Y-grade business, allowing us now to shift attention toward expansion at Mont Belvieu and to evaluate items such as possible new fracs, further new ethane exports, since our Y-grade business truly is what feeds the beast. On the second part of your question, or the first part, regarding rates: we are recontracting at market rates, and additional capacity has come online, yet we do think we've hit the floor on those rates and that, going forward, any further contracting will occur at higher rates.
Understood. Thanks for that context. So, staying with the recontracting topic, Enbridge mentioned MLO2 being rerouted, and that rerouting needs capacity somewhere else compared to Apple. I'm wondering, are there additional chances to make use of this asset alongside other projects being considered in Canada? And what effect does the 250 of available capacity have on your recontracting talks for that pipeline going forward?
Yeah, it's Adam once more. I'll kick things off; our belief in MLO2 hasn't changed. We continue to believe that the project, as it was conceived and shared with the market, will eventually prevail. What we perhaps didn't fully recognize was how complicated the regulatory landscape in Canada has become at this moment. So we're looking toward the latter part of the year for greater clarity, since those Canadian producers are engaged in what seems like quite intricate discussions with the government, and USMCA is on the horizon; so when all is said and done. DAPL is built and in place, while MLO2 is a project that can very much be executed. But regarding shifting our attention to what we're prioritizing on DAPL, we're talking with every Bakken producer, and the way those talks are progressing gives us encouragement. Still, we're genuinely rethinking how the DAPL ETCO system will be utilized moving forward; and as I mentioned, in the end, we believe MLO2 returns to that picture. Yet keep in mind that we earlier disclosed the Southern Illinois Connector project, which transports 100,000 barrels per day of heavy Canadian heavy over 15 years on the ETCO line. Our efforts to grow the ETCO line and make that product movement possible give us far greater flexibility from Patoka down to the Gulf Coast, letting us shift Pat II volumes into Pat III volumes, and we anticipate being able to optimize those flows and seize added commercial opportunities via that Patoka South business.
Nice quarter and congratulations on increasing the guidance. I’d like to move fast and ask about the Haynesville shale. A resurgence is obviously happening there, plus there’s been some M&A. At the same time, you own really solid Haynesville properties through both Tiger and Gulf front. Could you describe how ET is exposed to the Haynesville shale comeback we’re witnessing?
Haynesville, sure — Mackie here once more. Right, Haynesville, like everyone is aware, depends entirely on gas. It has zero connection to oil; therefore, when output topped out around 17.5 Bcf several years back and then dropped to 14, that explains the rebound. My sense is that we, and likely the bulk of the industry, feel quite bullish about oil and gas prices when looking 3 or 4 years ahead and further. So there are enormous reserves in the Haynesville, and our pipeline position is excellent. In fact, we operate 4 42-inch pipelines crossing Northeast — I mean, Northern Louisiana. In many instances we were marketing part of that capacity at very attractive rates. So we’re — it creates a flexible network; we even shifted some gas out of Perryville back to the market and southward down Gulf front; thus we’re ideally placed for any level of volume growth, and we expect volume growth in the Haynesville to keep going for several more years.
For my second question, I want to zoom out a bit to the bigger picture. Your confidence in the additional natural gas demand hasn't wavered. Some chatter suggests gas turbines face longer wait times for delivery and that permits keep slipping; yet based on what you said earlier, it sounds like nothing has changed at all and power-sector nat gas demand is still extremely robust. Could you share a few thoughts on that?
Sure. Adam here. A slowdown simply isn't showing up in what we observe. Sure, we pick up the same chatter regarding permitting holdups and regarding certain data centers facing construction setbacks and delays in their build-out — we mentioned this during our prepared remarks. One pattern we keep noticing, and in our view it's a real positive for our company and for the sector, is that in the places where those data centers are going up, they're now growing further within those very locations. These locations tend to be welcoming, such as Abilene with the Stargate 1 project, and then the Stargate 2 project sitting right next door in Shackelford County — we anticipate additional expansion occurring in places of that kind. You've also got the meta announcement in Louisiana, where they're boosting the capacity they're constructing for their data center in a region that clearly embraces them. So a slowdown really isn't something we're observing; what we do observe is certain companies shifting direction and focusing more on places where they're already building and already receive a warm welcome, rather than brand-new greenfield sites.
Yeah, that's Mackie speaking. I want to expand on that point a bit. Let me build on what was just said. When you take a look at certain forecasts that are emerging right now regarding LNG demand, it's climbing toward the early 2030s, reaching 2031 to 36 Bcf. That works out to roughly a 16 Bcf increase. We're aware of what's happening within our own systems when it comes to power plant expansion and industrial expansion too; we're pursuing markets such as steel companies — 2 steel companies located in 2 separate states. There's quite a bit of industry, even in Oklahoma, that we're going after. So power plants aren't the only source of demand. There's demand tied to LNG; there's demand from population growth across the South, plus demand from commercial business. I mean, it's all of it; and it's tough not to feel bullish about natural gas growth across the coming 10 or 15 years.
This is Andrew sitting in for Julien. I've got maybe just a couple of things up front. First, given the data center interest we're seeing sort of in Texas, in the DFW corridor area, plus the possible interconnection holdups we're also seeing as recently as last week with the legislative hearings, could you perhaps talk about the opportunity set you folks are seeing in that area, just given the connectivity you've got with Hugh Brinson? And maybe more specifically, could you discuss how you're seeing the competitive dynamic in that state, sort of what sets you folks apart from competitors? And do you anticipate that competitive dynamic might potentially hurt your return profile on these projects?
Sure, Mackie here — Adam might chime in too. As we've mentioned previously, back a few years ago when data centers first began ramping up, we'd review the maps and see where many of the planned facilities were being sited, and they happened to sit right along our pipeline routes. So for one thing, it's simply lucky that we hold such a large amount of big-inch pipe running across a good portion of the country, particularly the South. That gives us a real edge. Take Abilene, for instance. It's experienced significant growth, and in our view it's going to develop into something quite remarkable as a market. As it happens, a 42-inch pipeline was under construction right next to Abilene just as everything was taking off there. So in some ways we simply got lucky with where our assets sit, though credit also goes to our excellent teams, who can step in and secure strong agreements on behalf of the partnership. And we leaned heavily on a capability that no one else can match: selling firm gas to these customers. The reason is that we not only have large-diameter pipe flowing in from several regions and even several basins inside Texas, we've also reinforced it with storage. Across 6 U.S. states, we hold 237 Bcf of storage capacity. A large share of it sits in the southern region, which gives us tremendous ability to maintain gas supply through extremely turbulent periods — something these data centers absolutely depend on. Turning to legislation and similar matters, one step we've taken — and I may be wrong here, Adam can set me straight — is that essentially all, or at minimum the overwhelming majority, of the power plant data centers we serve are handled through <<inaudible>> meters. Honestly, all the chatter about those 2,000 requests or Infonet on ERCOT down in Texas doesn't really apply here. Our customers aren't hooking up to the grid — they sit behind the meter. They'll generate their own power, so they won't interfere with anyone else or with any of our customers, even though that's what a lot of the talk out there suggests. Essentially, just about everything we're pursuing is behind-the-meter generation that serves those data centers, and that covers natural gas too. So for a large share of those customers, it simply won't be an issue.
Understood. That makes sense, and it's quite clear. I suppose, as a follow-up question about your growth CapEx outlook, could you perhaps discuss how much visibility you have into possibly keeping up the current run rate growth CapEx — let's say somewhere between the middle and upper part of $5 billion — while also holding to the same internal return threshold that you have? And I think, just as a related point from a natural gas standpoint, could you perhaps talk about which geographic regions, apart from the more evident ones like Texas, Arizona and Florida, are seeing more constructive commercial discussions?
Yes. Listen, I'll begin here, Andrew. That's a very, very good question. As you can tell from all of our conversations today, along with all the others we've been having with you, we have plenty of opportunities here. Honestly, this is a great position for us to be in right now, because looking forward, we can identify solid projects with strong returns. So when you factor in not just the ones we've already announced and discussed, but also those we call shadow projects out there, they're right at the point of becoming — I believe you could see something around the 5.5 — $5.6 billion, excuse me, up to $5.9 billion that we've got for this year, and if you extended your view all the way through 2029, our visibility is sufficient that we anticipate that figure remaining at that $5 billion, $5 billion plus level, clear out through 2029. That was kind of a wide-ranging thing you asked. When it comes to details about regions and that sort of thing, I'm going to hand this off — I'll look toward Dylan for a moment here to...
Yeah. Let me address that — I believe what you're getting at there relates to returns. When we consider this pipeline of opportunities, we are in no way reducing our hurdle rate for returns. Actually, as I see it, looking at these projects, our required return is likely rising, simply because the set of opportunities is so outstanding. These projects are top-notch; demand is what's driving them above all; and we're constructing facilities for clients to match what they need. We aren't — nothing is being pushed through; the opportunity set is simply that good. So there's no erosion where returns are concerned. Therefore, as Tom — like Tom said a moment ago, we expect this figure of $5 billion — $5 billion and above to carry through to the close of the decade, accompanied by the same robust returns we're enjoying today.
Adam here. I might speak to the regions where we're observing these possibilities, and honestly that means every region, though it's wherever we have operations. To name specifics: Texas, Oklahoma, Arkansas, Louisiana, Ohio, Illinois, and Florida too. Across each of those states, chances on the natural gas side keep appearing. When it comes to data centers, some states are more welcoming than others, and activity is definitely heavier in those. Yet as Mackie said in an earlier response, a great deal of this also ties to reindustrialization, with manufacturing returning to the U.S. That's something we witness frequently. Expansions are showing up often, and every one of those requires natural gas — dependable, clean natural gas — plus the adaptability our network is able to provide.
Thanks again to each of you for being with us on this call. It's clear we've put up a strong quarter, a strong year, and the view ahead looks extremely bright indeed. So we're genuinely grateful. Thanks to everyone, and we're eager to hear the questions you'll have next. Bye.
Thanks a lot. That brings the conference to a close. We appreciate your joining today's presentation. You're welcome to disconnect your lines at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Energy Transfer LP transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Energy Transfer LP earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.