Fermi Inc. (FRMI) Earnings Call Transcript & Summary
March 30, 2026
What were the key takeaways from Fermi Inc.'s March 30, 2026 earnings call?
In the fourth quarter and full year 2025 earnings call, Fermi Inc. (FRMI:US) reported a significant net loss of $486 million, primarily noncash, as it continues to build out Project Matador. The company signaled strong demand for its power generation capacity, with management noting that prospective tenants are eager to secure power contracts. Importantly, they have received a 6 gigawatt air permit and filed for an additional 5 gigawatts, which management believes will enhance tenant interest. Guidance for tenant revenues is expected to commence in 2027, but management cautioned that these revenues will not cover full operating costs until the project is fully operational.
What topics did Fermi Inc. cover?
- Tenant Demand and Air Permit Impact: Management highlighted that the finalization of the 6 gigawatt air permit has led to a shift from 'shoppers to buyers' among prospective tenants, indicating increased engagement. CEO Toby Neugebauer stated, 'the engagement changed dramatically,' emphasizing the urgency for tenants to secure power before prices rise.
- Project Financing Strategy: Fermi's CFO, Miles Everson, outlined a cautious approach to capital deployment, stating, 'the next phase of capital deployment... will be sequenced with the execution of definitive tenant agreements.' This indicates a strategic delay in further investments until tenant agreements are secured.
- Cash Burn and Financial Position: The company reported a cash burn of $34 million for the year, with $570 million deployed into construction. Everson noted, 'we have the liquidity to meet our obligations,' suggesting a stable financial position despite the significant net loss.
- REIT Election and Dividend Guidance: Fermi intends to elect REIT status for tax purposes but does not expect to pay dividends in the near term due to anticipated noncash depreciation. CFO Everson stated, 'we do not anticipate generating material REIT taxable income in the near term.'
- Modular MEP Development: Management discussed the emergence of modular mechanical, electrical, and plumbing (MEP) solutions, which could accelerate project timelines. Neugebauer mentioned, 'we're trying to get Schlumberger to build a factory next to us,' indicating a proactive approach to enhance operational efficiency.
What were Fermi Inc.'s March 30, 2026 results?
- Net Loss: $486 million (vs $450 million expected, miss)
- Total Assets: $1.4 billion (vs $1.3 billion est, beat)
- Cash and Cash Equivalents: $409 million (vs $400 million est, beat)
- Investor Capital Deployed: $570 million (in construction, null)
- Common Shares Outstanding: 630 million (null)
- General and Administrative Expenses: $178 million (null)
Fermi Inc. is navigating a pivotal phase in its development with Project Matador. The strong demand for power generation capacity, bolstered by the recent air permit, presents a significant opportunity for future growth. However, the reliance on securing multiple tenants and the complexities of negotiations pose risks that investors should monitor closely.
Earnings Call Speaker Segments
Thanks, operator, and good morning to all of you. It's a pleasure to welcome everyone to Fermi America's earnings call for the fourth quarter and the full year 2025. With me on the line today are Toby Neugebauer, who serves as our Co-Founder and CEO, and Miles Everson, our CFO. Ahead of getting started, please note that forward-looking statements will be part of this call, as defined under the Private Securities Litigation Reform Act of 1995. Management's present expectations form the basis for those statements, and they carry risks and uncertainties that might lead actual results to differ materially. For a thorough look at those risks, please see our annual report on Form 10-K covering the fiscal year that ended December 31, 2025, which we will file with the SEC later on today. The structure for today's call involves 2 parts. To kick things off, Toby and Miles will provide an operational update regarding Project Matador. After that, Miles will take you through our financial results. Following that, we'll open the line for questions. So with that, I'll turn things over to Toby.
Hello, everyone, and thanks for making time to be with us today. On the most recent Saturday, we held a Board meeting, and during it we went through everything the team has achieved across the last 100 days; across 30 years in business, this was the first occasion where I saw applause happen more than once. From where I stand, the recognition those team achievements drew was fully earned. Naturally, Fermi received the market's message clearly and unmistakably: bring in a tenant. The hard truth, though, is that securing a tenant is the simpler piece. What you as shareholders need Fermi to accomplish is winning the confidence of investment-grade counterparties, along with the investors whose financing backs construction projects costing multiple billions of dollars per gigawatt; delivering that demands excellence stretching from engineering all the way to accounting. Here at Fermi, what we're building is a private community, run on a private grid, so that we can lead in supplying power to artificial intelligence that will define tomorrow. Yet everything begins and ends with our tenants placing their trust in us — trust with their business and, every bit as crucially, trust with their balance sheet — to carry out this enormous endeavor in conditions where plenty of others are falling short. At Fermi, our view is that the finest route to earning that trust is action, is execution. I ask — I nearly beg — each of you to visit the site. Whenever tenants arrive at our site, the scale and the pace of what we're doing leaves them astonished: 450 million cubic feet of gas pipeline brought in, 10 million gallons of water pipeline brought in, grid connection brought in, a substation built for an 800-megawatt capacity, 60% to 70% finished, and foundations for our gensets either done or nearly done. What truly converted our shoppers into buyers, however, was the air permit. The moment we secured that air permit was the moment our customers' C-suites became extremely, extremely serious about purchasing. As you're aware by now, we hold the 6 gigawatt air permit. On Friday, we submitted a filing for an additional 5, which we are eligible for and which I hold a strong expectation we will execute on. Before anything else, though, I want every one of you to grasp what Fermi expects: tenants. To get the most out of our power gensets, we require multiple tenants. My thinking is that multiple tenants are necessary, since achieving proper efficiency from what we're building with this private grid depends on having diversity of demand. Next, the Board feels considerable concern about any disclosure that could affect negotiations on transactions involving multiple parties and sums in the tens of billions of dollars. So even as we sign new LOIs, we're operating in a mode of coffee as for closers; no coffee gets served until a close is fully complete; it's evident that problems have existed with the stock. And since so many of my friends, my family, and all of you placed your capital in my hands, making me a steward of it, I cannot say strongly enough how gravely I regard that responsibility. At the same time, I can't get caught up in daily ups and downs; what we're creating is a significant business addressing an essential requirement for our clients — safeguarding consumers while serving our nation. At this point I'll pass things over to our Chief Financial Officer, Miles Everson.
Thank you, Toby. We're filing our initial Form 10-K as a listed company, and it covers the stretch starting with our founding on January 10, 2025, and running through December 31, 2025 — roughly 11.5 months. During that window, we went from being newly formed to completing an IPO, and we got the first stage of Project Matador essentially finished. My preference is to describe the numbers the same way our internal management reporting treats them. At this point in our development, a standard income statement can't really show the full economics of what we're building; we haven't begun generating revenue and we're deep in construction. Yes, our GAAP net loss is large, but the vast majority of it doesn't involve cash. What tells the real story is the balance sheet along with the cash flow statement — in particular, the fact that close to $570 million in capital from investors has gone into the physical infrastructure at Matador. Now let's go through the balance sheet. At December 31, 2025, we had total assets of about $1.4 billion. Property, plant and equipment came to $935 million, and practically all of that sits in construction in progress, since nothing has been put into service yet. Cash and cash equivalents stood at $409 million when the year closed; on the other side, accounts payable and accrued liabilities reached $177 million, which mirrors how quickly we're building and how active our vendors have been. Stockholders' equity in total was $1.1 billion. Coming into March 2026, we had roughly 630 million common shares outstanding. Turning to the income statement and what happened operationally, the net loss across the full year came to $486 million. The key point is that about $445 million of it was noncash. G&A expenses added up to $178 million, and $133 million of that figure was noncash share-based compensation connected to equity incentive arrangements put in place when we were formed and around the time of the IPO. The cash portion of G&A came to roughly $45 million, which breaks down as $12 million of personnel costs for a small team of about 35 people, $22 million for professional services, and $11 million of other corporate items like recruiting, travel and marketing. Other expenses, net, were $312 million and were almost entirely noncash. The biggest pieces: $174 million tied to a charitable contribution of Class B units made before the IPO, $61 million of fair value losses on Series B convertible notes, $46 million of losses on embedded derivatives linked to preferred unit financing, and lastly, $24 million connected to preferred unit issuances. Looking at it from a cash standpoint, operating cash use over the year was $34 million. That's our actual operating cash burn as we formed the company, finished the IPO, locked in a 99-year ground lease, built out the organization, and pushed Phase 0 construction forward — we see that as a solid showing of capital discipline. As for investing activities, which sit at the heart of our financial narrative and represent how we put our investors' money to work, net cash used there was $570 million, and essentially all of it went straight into property, plant and equipment at Project Matador, booked as construction in progress. Natural gas power generation took the majority of that capital — over 50% — covering turbine purchases for Siemens F-Class and SGT-800 units plus GE6B fleets, and also mobile generation and balance of plant equipment. Data center infrastructure, substation and electrical interconnection, general construction, land and water development and early-stage nuclear predevelopment made up what was left. Turning now to financing activities: roughly $1 billion came in as cash provided by financing activities. Within that, $746 million was net proceeds from our IPO, $108 million came from preferred units, $100 million was a Macquarie term loan, $76 million came from Series A convertible notes and $26 million was from seed convertible notes. After year-end, we closed 3 equipment financing facilities: a $500 million MUFG nonrecourse turbine warehouse backing Siemens F-Class procurement, which additionally refinanced in full a Macquarie term loan, and a $120 million facility with Keystone National Group that can expand to $220 million for high-voltage equipment such as transformers and switchgear. Then the third, signed this week, for $165 million with Yellowstone, financing more Siemens SGT-800s. Together with the cash we already hold, those facilities provide liquidity sufficient to meet our financial obligations for no less than 12 months, though we are taking a deliberate approach to what comes next. At Project Matador, the following phase of capital deployment will be tied to 2 milestones: first, executing a definitive tenant agreement; second, closing project financing. Those are the gates. We will not commit significant capital toward the next construction phase until both exist. That is how shareholder value gets delivered. Both work streams are moving forward in parallel; on the tenant side, potential tenants are competing for initial power. Active negotiations are underway with multiple counterparties. As of today, though, no definitive lease agreement has been executed. Tenant revenues should begin in 2027, yet even then they will fall short of covering our full operating capital requirements until Matador is fully built out and running at scale; on the financing side, we are actively talking with multiple lenders and moving technical diligence forward now, so we can act quickly once definitive lease agreements are signed. Underwriting for the project level financing rests on the future cash flows that a tenant commitment unlocks; for Project Matador, we expect Phase 0 and Phase 1 combined to surpass $3 billion in total aggregate capital deployment. Our ability to execute tenant leases, raise project level debt and bring in strategic equity where necessary determines the path forward; we believe this can be achieved. These financings, however, are not certain to occur. Should capital be unavailable in the amounts, timing or terms we require, we might be compelled to delay investments, amend purchase commitments or potentially surrender collateral to preserve liquidity; we are stating that plainly because it reflects the reality of building a multibillion-dollar infrastructure platform from a standing start. Also, we think investors ought to actually hear this from us, rather than simply come across it buried in a risk factor. Here's the key point: our liquidity is sufficient to cover what we owe. When and how we put capital to work is a deliberate, strategic decision. At Project Matador, the upcoming stage of capital deployment will be timed to align with signed definitive tenant agreements, along with the project financing tied to them that comes afterward. Additional work remains ahead, and we tackle it daily. Let me also address the REIT election. As previously stated, our intention is to elect REIT status for U.S. federal income tax purposes, starting with our short taxable year that ends December 31, 2025. In our view, this structure fits nicely with the long-duration, infrastructure-focused real estate assets currently under development by us. Because of the expected level of noncash depreciation, we don't foresee producing material REIT taxable income in the near term. So we don't expect to pay dividends until taxable income at some point requires it. Last, for those pre-IPO investors who had a lockup agreement, I'd like to point out that it expires today. Thank you.
Operator, we're ready for questions.
Congratulations on everything you've accomplished with the site. There are 2 things I'd like to ask about in the near term. First, when you're trying to reach a definitive agreement, what are the main topics being discussed with the prospective tenants you're negotiating with? Second, and more specifically, regarding the near-term energization milestones — with the SGT-800 frames that have arrived in Houston, and the equipment now in your possession, how is the schedule shaping up for getting those assets deployed, and how might that tie into the talks you're having with prospects?
Thank you, Paul. What our tenants raise as the #1 issue, the #2 issue and the #3 issue is that they want every bit of our power, and they want it permanently; however, our model only functions if we have several tenants, which lets you handle the variations in loads; that's really the crux of it. And so from — once they arrive at the site, they're astonished by it and they understand this is somewhere you can produce a substantial amount of power, and they want all of it; as for the SGT-800s, we've been fairly fortunate. So when — and I'll return to the tenant topic. The units arrived, as you know, in Houston. We held them in a free trade zone, hoping perhaps we could catch a break while we waited on our environmental permit. And literally, the moment the Supreme Court issued a ruling on the tariffs, we brought them into the country. We likely saved ourselves $27 million to $30 million; and we make — I'll get the pictures posted. You can see the SGT-800 foundations are set to be poured; but on the tenant side, since I know that's where everyone's attention is. What we're able to share is that we're now in the contracting phase with several new potential tenants. But it's important for everyone to grasp that these transactions are complicated. They involve multiple parties. And Macquarie, as you know better than anyone, these involve billions of dollars.
Yeah, hi Paul — Miles here. I'd just like to tack something on — and this has been our position the whole time — another point, and it isn't some kind of friction, but one item we won't budge on is our insistence on investment-grade wraps. That's the reason Toby mentioned a bit earlier that what this really comes down to is firms asking themselves whether they'll commit their balance sheet. And by firms, I mean the investment-grade firms doing the wrapping on these projects. So the next point I'd tack on is that it isn't merely about our own actions and the things within our control — the end users of the output, or the development partners, also have to examine this and ask whether they can hold up their end of things. Put differently, all of their MEP plus the racks, and so forth. So we're now doing, I'd say, more reverse due diligence than I'd anticipated needing to do, to confirm they can get their equipment ready in time to consume our power, since our power arrives sooner than what most folks can manage for the remaining pieces. That's ranked among the larger surprises — if you'd told me back in the fall, the concern was whether, well, persuading people that we'd be able to deliver the power. Now we're the ones who want reassurance that they've got the MEP, since the power is indeed there and we've got to put it to use.
Miles, if I may squeeze in just one additional question, given that the conversation about demand appears quite strong. On the subject of pricing — could you offer any insight into where pricing is headed compared with what you anticipated at the point you initially began weighing, in a sense, the financial strategy for that initial gigawatt of power?
We remain where we were; and although we'll aim to submit bids at a higher level, we are certainly prepared to state that we remain where we were.
Congratulations on wrapping up your entire fiscal year. What I'd like to do, if possible, is go a bit deeper into those conversations with tenants. I'm curious whether the hurdles differ when Fermi is the landlord compared with your prospective tenants, and how those hurdles might end up pushing back when deals get signed. I believe you mentioned a 12-month figure in your remarks — across the coming 12 months. So I'd like to understand more clearly what the sticking points look like from each side; and thinking about timing, ought we to plan on 12 months? Or might it happen faster?
Yes, I realize the way it lands < >. As soon as they arrive at the site, the reality is they're after the power, and they're attempting to secure every bit of our power at a price set today, since I believe our tenants genuinely understand how scarce the gensets are and that their energy costs are going to rise; so quite reasonably, their focus is on securing the greatest amount of power they can at today's pricing; that's truly the whole story. And it's — as I mentioned, this process has us in the contracting stage right now. On the question of giving guidance about timing, the Board, the coaching, I have an excellent — Fermi's Board is truly excellent < > examine this. Their view is that whenever we give guidance about timing or expectations, that alters how the negotiations unfold, to Fermi's detriment. So on Saturday the Board was quite resolute with me that timing is not something we'll talk about, because doing so shifts the dynamics of — these aren't transactions worth $1 billion. These are transactions worth multiple billions of dollars, and my aim is simply to keep those dynamics as level as I can.
All right, and there are only a couple of items I'd like cleared up. First, I believe the letter to shareholders brought up term sheets along with a number of agreements. I simply want to confirm, first, whether an actual LOI exists with any among those 5, 6, 7 tenants you're in negotiations with, or whether that is more or less the following stage. And second, could you clarify any of the short-term financings, such as the one from MUFG? Does any of these financings carry a condition requiring that a lease be signed by XYZ by a certain date? I believe what we've said — the thing we're at ease with — is that executing new LOIs will be part of our ordinary business operations, and we will not be offering comments about them. After that, I think one lesson we've picked up so far is that we don't wish to alter the negotiating dynamics. Each of these financings stands on its own. And I'm certain we've disclosed it. Miles, I just would rather not speak about the...
Yes. We have no tenant signing covenants, so to speak, Vikram, attached to our financing arrangements; and the other point to keep in mind is that these financings are nonrecourse to parent, which I think matters a great deal when you consider the overall public company. And then what has not shifted is that we do have an agreement with Texas Tech under which there will be a tenant by the end of 2026. That stays the same, and we're working collaboratively with them to move that forward. So that is probably the most important thing at the moment — to understand that we're still fully engaged, and we feel really good about where we stand, frankly.
Right, it's just a 200-megawatt tenant. I'm not trying to — I don't mean to talk it down, but that ought to be < >. That falls short of what we expect. Here's how we see it. There isn't a tenant asking us for 200 megawatts. That isn't the issue on our end.
They're asking for additional capacity.
Right. Suppose we were forced into a situation where a single tenant could only be 200 megawatts — that would create an issue on our end. The real challenge is that what they're after is gigawatts.
Miles, you brought this up before, but at this stage, what further work at the site do you intend to do before we get a first tenant lease signed and you lock in project financing? Can you tell us anything about more specific CapEx spending or cash burn you expect during this year?
Yeah; so when it comes to development, we'll be very disciplined about aligning it with both the signing of a project financing and our tenant leases. The — but as far as how far we'll go — and look, these things shift; this is a long-term project, not one that lasts 30 days. But here's what we'll do: get the site ready so it can receive our power generation equipment. It's mostly there today. A bit of incremental work remains to be done, which would let us put those generation assets into service the moment we see tenant agreements that line up with when that installation happens.
Right. I'd say what we were getting at is that Fermi isn't doubtful, exactly, but we really need to confirm that when we develop, it lines up with the MEP our tenants are able to secure. And to your question about whether our stance as a business has shifted as we've grown — I'd put it this way: a year ago, our emphasis was on giving people room to carry out strong due diligence on us. Since then we've changed direction and brought people on board; we brought in an excellent individual from Meta who assists us in evaluating how quickly our prospective tenants actually execute.
Sorry in advance if you hear anything in the background — I'm at an airport right now. So thinking about what your tenants require in terms of power, and the mix of tenants, plus the sequencing of when their data centers get built out and when they actually need that power — what does that look like? When you're in conversations with customers, how far ahead are they planning around locking in power, measured against the point where the data center is at full operation?
First off, that answer changes from one tenant to the next. And it's the #1 — well, not the #1, but it lands in the top 3 items of diligence for us, or rather the way we rank tenants, is clearly, can you be financed, meaning do you carry investment grade, that's number one; but the #2 item is that we, in contrast to most companies out there, hold a tremendous amount of power generation that we're eager to deploy. And so — that is — there isn't a single answer here. But if you consider how we operate the business and how we rank the folks we'd sign contracts with, that's likely our #2 item. How quickly we're not — we're able to have the power given all the site work we've completed up to now. We're able to have the power, which we now understand probably sooner than some of them are able to have the MEP. So that turns into how we rank who we sign with.
And for the follow-up, it's sort of — just returning to that first possible tenant and those talks that got called off, or at least perhaps called off but pushed back, when exactly did they require power? Because I'm just kind of wondering, if power is lacking, how are they getting power if they're not getting it from you?
Looking back, and again, I don't think — I hope that first tenant turns out to be a tenant. So that's just what I want to get across. When we consider the timing of their power needs, it really made us realize that we must truly ensure these tenants have the MEP. In my view, that's a larger bottleneck than we had initially expected.
Miles, what I mean is, you had a hand in that...
Right. So, at first their plan was to have electricity available for themselves to sell and generate income from in 2027, all right? But your broader question has 2 pieces, I think — the first being the timing of when off-takers require power. If you examine the portfolios they've mapped out, the majority fall in '27 and '28, which is when consumption of that power becomes necessary. That said — and this matters — you can find it reported in the papers. Certain other sites simply can't supply the power they promised to these parties. As a result, we anticipate, and have already observed, some possible reallocations regarding where they'll obtain power they believed was already secured but in fact is not.
Our position is unusual, since we hold considerable power, and that fact is acknowledged globally.
I wanted to ask about one thing. Given that there are several new LOIs moving forward along with the first one, I was hoping to get a sense of whether the possible range of those tenants has grown — as in, are different kinds of tenants involved? Or does it remain roughly those hyperscalers? Clearly investment grade, but I'm just trying to determine whether those horizons have widened somewhat.
The single item I'd call notable, I believe, is meaningful involvement from chip makers — not some of them directly, not directly — I think they're becoming quite worried that those chips hold value only because of the power supporting them; so regarding scope, that's the sole shift I would point to. Miles?
I'd put it the same way. The people making the chips are asking, in a much more hands-on way, where will the electricity actually be supplied from? And honestly, what they really care about is where all the usage of their chips is going to be supplied from.
My take is that everyone's overlooking those markets—the top chip manufacturers are starting to see that they've fallen behind quite a few businesses. That shifts how things work, so yes, it does widen things out. On our end, the crucial point—and you're as aware of this as anyone—is that we truly require a varied mix of load to get the most efficiency out of our gensets. So what I believe you're watching us do involves somewhat more math—not somewhat, considerably more math. Having a broader, more varied load base serves us better for getting the most efficiency from this private grid we're in the process of constructing.
Sure. Nick, one more point regarding how the market is behaving: what we're seeing more and more on the MEP side is the rise of what you might call modular MEP. If you picture a chip manufacturer, the thing that truly matters to them is how quickly they get to token. So you examine the entire value chain and ask yourself, where can I find spots to accelerate? There are chances to accelerate MEP's timing. As a result, you're seeing additional modular participants enter to help bring that about, and that's a massive plus for us, since we've got the power.
Absolutely. That's yet another area where our attention has sharpened considerably. One advantage we've gained from working in oil and gas is the concept of modularization. And once more, when it comes to recruiting, we're adding individuals who can assist us in conducting due diligence and working with our clients' supply chains for MEP. Those have genuinely been a central priority for us over the past month.
Great. And so, Miles, you brought up that today the IPO lockup is set to expire, and the plan remains to file as a REIT for 2025. I just want to check whether there are any particular management sales that have to take place, ones we ought to watch for, in order to meet that requirement?
Yes. So no management sale is strictly needed for the — when this lockup ends. That said, to satisfy the REIT 550 rules, there's going to be what I'd describe as a sell-down done in an orderly way, and we're working to get that completed. And then we have a few months in which to get it done. And we're in — we've brought on an adviser to assist with that; so I very much expect that it will be handled in an orderly manner, Nick; but that's been the case since day 1. And now is when we're concentrating on getting it executed.
Clearly, the issue here is me and my relatives. Right now, our family holds roughly 38% of the company. What I'd like to see happen — though I can't make any promises — is that any reduction in our stake goes to a buyer who makes things better. By that I mean I want one plus one on that sale to come out to three or four. That's the reason we brought in an adviser, to help identify who might purchase a block; and honestly, I'd prefer to barely sell anything at all, particularly given where prices sit today. If we do go through with it, though, I want the outcome to bring something to the Fermi brand; that's what we're aiming for. And we did — I'm not sure whether it's been signed, but we certainly reached a verbal agreement to bring on an adviser and run a process that, once more, turns into something accretive that all of you feel good about, rather than a sell-down of my family's stake that dilutes things.
Let's return to what you were saying about tenants. Obviously, several months back, the discussion centered on essentially a single customer absorbing the entire initial gigawatt. Now it appears you might be juggling an effort to satisfy several different parties at once; so I'm curious whether that initial gigawatt could end up divided among several tenants each taking smaller megawatt figures, or whether that won't happen, or what you'd call the base case going forward? And second, you said pricing has stayed in roughly the same range as before, but I'm wondering whether the way rental revenue is structured relative to operational shells will continue to match the earlier structure, or whether the different discussions you're having with possible new tenants might be altering that?
My firm — to start with, nobody is looking for under 200 megawatts. I mean, we're actually attempting to persuade them to take less. If you ask us, when we run our numbers, we'd prefer to sign 5 deals of 200 megawatts each; that's the correct approach — that's excellent — and the issue — not an issue, the chance we have is that we've got 2.3 gigawatts, with the F-Class units on the way. Our team was over in Germany recently, and they were — 2 of them sat at the loading dock. So look, our aim is — I doubt we'll manage with 3 tenants for the first 2; that would count as a win, and my guess is we'll only manage with 2. But...
Miles here — so, Skye, this is my take. Let me frame it like this: deals we pursue will probably be 500 and up only, and that's within our capability. So it comes down to allocation — provided we're able to spread those first commitments across the 2-plus gigawatts Toby mentioned. What I keep coming back to in these conversations is that every one of them is asking for ROFRs on energy volumes down the road. And you can't focus solely on that first allocation — you also have to think about how the ROFR gets allocated so you stay in compliance with whatever ROFR we sign up to.
Regarding the pricing piece, nothing has shifted from what we previously communicated. I'd say our engagement with MEP is growing — that isn't to say we're entering the MEP business, but rather that our aim is to ensure every problem our clients face gets addressed. So this isn't a strategic shift; it's about strengthening what we deliver to our customer.
Nice work on what you've accomplished so far. Regarding that roster of potential tenants, might you — might you give us some detail about the way it has changed since the air permit got approved?
The final piece of that question didn't reach me. What I caught was airport permit; that phrase is the one I like best. It held zero appeal for me.
Yes. No, could you just talk about how the tenant list has changed since the air permit got finalized?
The tenant list stayed the same. What changed dramatically was the engagement. Basically, the way I'd put it is that shoppers turned into buyers. I mean, this is among the biggest air permits ever. I believe the biggest gas gen project sits in Florida. That one is only 3.5 gigs. Ours is 6. As all of you probably know, we applied for another 5. I mean, we're looking at becoming the location where the biggest gas generation set on the planet could be built. And I think the C-suites at every one of our customers instantly became worried, thinking, hey, we had better act while things are good so we can use our West Texas freight.
Excellent; and as a second question, when it comes to modular MEP development starting to appear, what's typically the foundational unit for these modular operations? And how much can they speed up the timeline to power?
I visited the Schlumberger plant in Shreveport, wow, Fermi. 6 weeks may not seem like much time back, yet at Fermi 6 weeks is 6 weeks, whereas at most companies it'd be 6 years; still, I'd call it a total game changer; and I believe it will be dramatically dramatic — my view is that a year from now, nobody will be discussing stick building MEP. Truly, truly not; it's simply such a transformational approach and a far more cost-effective approach for building MEP. We're going to plug and play MEP into powered shells. That's where the business is headed. I'd urge all of you, I'm certain to let you go tour their factory, and I'm aware there are a couple of other companies. But honestly, it took us 1 minute to realize, wow. We're attempting to get Schlumberger to build a factory next to us.
If I could, I have 2 questions. First, earlier you mentioned cash burn, and I realize there are a number of scenarios; but could you simply lay out the parameters for what cash burn could look like in FY '26? Second, tied to that, I believe you have an $885 million equipment financing facility, which as I understand it right now is nonrecourse. Could you tell us when, if at all, that would be brought onto the balance sheet? And then, connected to both of those, please remind us how the funding is structured.
Well, to start with the cash burn, I often say that I have an aggressive personality but I'm a financial CISI; and I — every day we have a standing call at 4:00 Eastern 3:00 Central, and on that call we go over the cash position daily on the recourse side. And my focus is on it pre-tenant, meaning, again, aggressive personality, financial CISI. Miles, I don't — as far as I know, none of it gets brought onto the balance sheet.
That won't land on the holdco balance sheet. Then regarding cash burn — what does it look like while we're before a tenant signs? From that angle, we've got ample cash. After a tenant is in place, project financing is what we'll pursue. Clearly, by then, sufficient cash exists to fund that initial tenant contract and to complete the deployment plus commissioning of the gensets.
So Miles, earlier in this call, you talked about the possibility of giving up some assets so we could keep cash flow going. Could you give us a bit more detail on how that could actually shake out, and which assets might be involved? Is there anything else you can share on that subject?
Sure. Let me make this plain, Rich. Doing that is not something we intend at all, and we don't expect it to occur; but when you run through every scenario that could come up, you know, you ask yourself, what options do I have available, and that would be one option if it came to that; but as of today, we have no intention of going that route. Still, if it came to that, you'd do it with a genset or 2, since demand is abundant. I mean, we receive a lot of inbound calls asking whether we might relocate our equipment to someone else. That holds no appeal for us. The only reason I brought it up is because — well, it's just wise to ask what options exist if you're forced to use them, what do I have? So I wouldn't want anybody to believe that this sits on our list of things to do at this point, given what we're seeing with tenants and how everything is timed. Honestly, I don't even enjoy discussing it; these gensets carry tremendous value; and I would put my 2 boys up for auction before I'd ever let one of these gensets go; and the dumbest thing I've probably ever done is that even before we had the tech lease, my family essentially made a commitment to purchase those SGT-800s. So in effect, I auctioned off my children's future for that. So it's the worst thing — as I said, my boys get auctioned off first, and after that we'd consider the gensets.
Well, that's affection. All right, and after that...
Kindly verify their current position.
All right. My second question concerns the land lease, the ground lease. From the standpoint of a power resource, a tenant, or whatever else, what needs to be in place by this date or that date to meet any requirements for keeping your position?
It's a notice to proceed with construction. So nothing has to be built, meaning we're further along; but yes, an actual data center isn't required. A tenant and an agreement with that tenant are required, and it has to be 200 megawatts. I won't play that down. Getting a 200-megawatt deal would be difficult, since nobody wants that little of power.
And to be clear, that's by 12/31/26.
Yes.
Several items have already been addressed, though I have a single follow-up regarding, roughly speaking, the cash or investment needs before tenants arrive. Might you provide somewhat more detail on, for example, the turbines currently in your ownership where the foundation work is already underway? Can you offer us an approximate sense of what CapEx remains in order to complete installation of those and thereby have things ready for the initial tenant? Alternatively, should an exact figure be impossible, perhaps some sense of what proportion of the total capital cost of those projects that represents? My assumption is that the bulk of the effort is already finished, yet it would still be helpful to have some sense of it, please.
Okay. We are doing the real math regarding foundations for the F-Class units. Once more, a great image is provided by 2 of those. I hope — let us post it on the website so the public can view the F-Class units. My desire is to have those foundations put in. Clearing of the site is complete, geotechnical work is finished. Each generator takes up only 1,300 square feet. Those figures aren't available to me; literally at this moment they are out for bid. And should you be around here following this call, we will be arguing over how much money those — the foundation we must finish concerns the SGT-800s; and to be clear, my view is it ought not to exceed $10 million. Yet I would place that particular item among the sources of consternation and debate at Fermi America. Rather than leaving those SGT-800s parked in Houston, I want them obtained, since they must return to Amarillo, and keeping those class units in a costly storage facility makes no sense. My focus is squarely on the foundations. Regarding our arrangement with Excel, we have secured a further extension that I believe runs about $8 million or $10 million-ish. My view is it ought to cost $4 million. You will likely notice a pattern: the CEO claims everything ought to cost half of whatever is presently quoted.
Everyone, that wraps up the question-and-answer portion for today, and it also brings today's call to a close. At this point you're free to hang up your lines, and we appreciate your taking part.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Fermi Inc. transcript - plus 133,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Fermi Inc. earnings transcripts and 133,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.