Home / Transcripts / Firefly Aerospace Inc. (FLY) · March 19, 2026

Firefly Aerospace Inc. (FLY) Earnings Call Transcript

March 19, 2026

NASDAQ US Industrials Aerospace and Defense earnings 62 min

Earnings Call Speaker Segments

Michael Sheetz executive
#1

Thanks, operator. Hi everyone. Michael Sheetz here, and I'd like to welcome all of you to Firefly's call covering the financial results of our fourth quarter. Joining me today are our CEO, Jason Kim, and our CFO, Darren Ma, and together we'll be reporting on the period that closed on December 31, 2025. During this call, we'll be making forward-looking statements, which include, among other things, what the company expects regarding its future financial and operating performance, its growth strategy and its market outlook. It's possible that actual results will differ materially from what those forward-looking statements contemplate. The annual and quarterly reports we've filed with the SEC lay out the factors that could cause actual results and trends to differ materially. Firefly undertakes no obligation to update any forward-looking statements, and each of those statements speaks only as of its respective date. Also, on this call, we'll be discussing both GAAP and non-GAAP financial measures. You can find a reconciliation of GAAP to non-GAAP measures in the earnings release for the fourth quarter of 2025. Except where otherwise stated, all financial information we reference on this call is non-GAAP. Our earnings press release, our SEC filings, and a replay of today's call are available on our Investor Relations website at investors.fireflyspace.com. With that, I'll hand things over to Jason.

Jason Kim executive
#2

Thanks, Michael, and good to have everyone with us for the call covering our fourth quarter and the close of 2025 — a year that reshaped Firefly, since we grew annual revenue by more than two times, reaching a record $160 million. We achieved the one and only successful commercial landing on the moon, wrapped up a landmark IPO that put our balance sheet in a stronger position to grow over the long term, and brought SciTec into the fold, adding further weight to what we contribute on national security, together with defense contract awards for our Elytra orbiter and our Alpha vehicle. A new chapter has begun for us as a full end-to-end space services provider, and we delivered on every one of those milestones as we enter merely our ninth year of existence. Firefly operates in space and defense, supplying inventive hardware and software for the toughest missions beyond Earth in service of national security, exploration and commercial technology that illuminates the path toward a daring space ecosystem broadening humanity's future. Four products that generate revenue make up our hardware: the small-lift Alpha rocket, the medium-lift Eclipse rocket, the Blue Ghost lander and the Elytra satellite orbiter. With SciTec now part of us, Firefly's portfolio covers AI-enabled defense software with operational proof, including missile warning and defense. Tailwinds from artificial intelligence and data centers across the industry are turning into operational reality for SciTec, which supplies vital no-fail systems supporting national security. We're answering the U.S. government's demand for commercial capital and scale within the defense sector. We continue advancing our cutting-edge technology offerings and paying for infrastructure improvements, enlarging Firefly's spacecraft and rocket factories along with SciTec's data service centers and classified facilities. Toward the end of last year, Ramon Sanchez joined us as Chief Operating Officer to propel production scaling and operational execution while we strengthen safety, quality and reliability throughout our product lines. Firefly's product suite is deliberately shaped to capture the expanding opportunities within the space sector; notably, renewed attention to the moon as a leading priority strongly validates Firefly's market position, confirmed through Blue Ghost Mission 1's success and sped up by our contracts covering missions 2, 3 and 4. We welcome NASA administrator Jared Isaacman's choice to accelerate the Artemis missions. The agency acknowledges that Firefly's motor missions "offer a unique opportunity to test and refine technologies and integrate systems that will provide insight for future crewed missions." Administrator Isaacman's recent push for a monthly cadence of lunar landers heading to the moon's South Pole beginning next year represents precisely the forward thinking Firefly supports. Because the lunar opportunity is so large, Firefly started last year examining ways to scale our flight-proven technology into bigger lander designs. On top of that, we have advanced expansion of our spacecraft cleaning room this year, supported by money from the Texas Space Commission, so we can build multiple landers at the same time. I'd also like to thank the industry for honoring Blue dose Mission 1, which sits on a steadily expanding list of prestigious awards. A few examples: BGM1 received the Robert J. The Collier Trophy, the Jackson Aerospace Memorial, and a spot on TIME's Best Inventions of 2025. We don't treat those accolades as a reason to take it easy — they're a testament to the hard work and success of the remarkable team we've assembled, and they motivate us to keep pushing forward as we pursue increasingly bold missions to the Moon in the years ahead. Firefly, working alongside SciTec, secured a spot on the Missile Defense Agency's Scalable Homeland Innovative Enterprise Layered Defense, known as SHIELD, and that award comes with a $151 billion cap spread over 10 years. As the Department of War urges the industry to operate with commercial-level speed and scale, SHIELD gives Pentagon organizations a way to place orders rapidly via a single contracting mechanism, centered on deploying AI and machine learning tools that we're continuing to develop. SHIELD acts as a critical support mechanism for Golden Dome, and we stand ready to contribute through our full end-to-end capabilities. Keep in mind that there are several Golden Dome elements we're able to support, like launching surrogate targets and hypersonic tests using our Alpha rocket, or bringing together data processing from a worldwide sensor network to carry out fire control alongside SciTec. Now on to our business updates. During the fourth quarter, even with the 43-day federal government shutdown, we hit new milestones across every one of our revenue-generating products and services. Let's begin with launch. On March 11, Alpha's seventh flight made it to Orbit successfully. That mission actually started back last year, when I set up a reliability team specifically for Firefly. We went through weak points, made our processes better. We added new launch ports, improved how we handle contamination, and introduced more training sessions. When it came time to move Alpha's first stage, our team took things slowly and carefully. Anything we found was looked into thoroughly, and once the vehicle got to Vandenberg, the Alpha team put in hard work getting through static fire testing. I stood with the team as we spent 2 days attempting static fires; we tried several ports and, on day two, completed a clean 22nd static fire test. Throughout the entire process, the team remained composed, unflappable, and level-headed, dedicating themselves completely to carrying out each phase in a disciplined, step-by-step manner. After we began making attempts to launch, that same fierce discipline persisted, and although scrubs can be irritating, I take pride in how the team would stop any time they felt the need to examine possible risks more closely. Then, when the day of launch came, everyone on the team was working together and hearing one another out. I was present inside the launch control center as Alpha lifted off, going up at the very start of the window. During the flight, I monitored our telemetry as it came in, and the trajectory variance bar for our climb to orbit indicated we stayed precisely on target the entire ascent, moving smoothly through each phase of launch until the payload was deployed roughly 45 minutes afterward. In addition, we performed a relight of the second stage during this flight, which provided further confirmation of Alpha's upper stage capabilities. Every mission objective was achieved, including the deployment of a test demonstration for Lockheed Martin. As anyone with knowledge of this sector would anticipate, our team did not treat the Stairway to Seven milestone as complete until the deployment had truly taken place. Above all else, that achievement felt deeply rewarding in terms of pride relative to what the team pulled off and how well they executed. With Flight 7, our muscle memory got stronger, and it gave us the repetitions required to establish a launch cadence. On top of that, we confirmed important subsystems tied to Block 2, and that validation sets up enhancements beginning with Slide 8, among them bigger mass savings, production that's better optimized, and reliability gains throughout the whole Alpha vehicle. Block 2 was built to broaden what Alpha can do for deployable launches in support of critical response to space missions — things like hypersonic testing, national security work that includes Golden Dome, and commercial satellite launches serving customers both domestic and international. Turning to the international market, Firefly's strategy for launching and running operations out of other allied nations is phased, using a launch-as-a-franchise approach; under that approach, Firefly collaborates tightly with a strategic international partner to fly our Alpha rocket from that partner's launch site and address rising satellite market demand worldwide, all while building additional resiliency for our country and its allies. One illustration: Firefly teamed up with the Swedish Space Corporation to send Alpha up from Esrange Space Center in Kurina, Sweden.

Jason Kim executive
#3

In partnership with SSC, we're leveraging Esrange's existing infrastructure as the basis for building an Alpha launch complex, enabling orbital missions from the European mainland. We're likewise exploring a similar arrangement alongside SPACE COTAN that might permit Alpha launches from Hokkaido Spaceport in Japan. Such co-launch collaborations serve as a force multiplier, generating a win-win-win for the U.S., our allies, and industry. Meanwhile, at our rocket factory, we completed acceptance testing of the qualification article for the second-stage liquid oxygen tank on Alpha Flight 8, positioning us for the upgraded Block 2's debut. Meanwhile, significant progress is being made on extensive modifications to the ground support infrastructure at the Alpha stage test stand, positioning us to certify Block 2 enhancements ahead of its first flight. We work hand in hand with our domestic and international clients to incorporate findings and insights gained from previous Alpha missions. Block 2 delivers major gains throughout Alpha, including increased length and greater structural robustness, batteries and avionics brought in-house, and refined propellant tanks. We are thoroughly analyzing the information from Flight 7 as we prepare for Alpha Block 2's inaugural launch on Flight 8. We're looking at three more launches before the year is out, bringing Alpha to four total launches in 2026. Now, on to Eclipse. All the lessons from Alpha carry over, scaled up, into what we consider a medium-lift vehicle that's reasonably priced — including the tap-off cycle engines and the carbon composite structures, which really set us apart from the usual approach of starting a brand-new vehicle program from nothing. Our automated fiber placement machine gave us efficiencies; it's flexible enough to produce carbon composite structures at rate for every rocket and spacecraft we build. Quality, cycle times and safety of our structures all get better thanks to the ASP — something we've benefited from since the machine first appeared in late 2023. Every main flight component for our inaugural Eclipse vehicle is either being manufactured or has already gone through testing. The Miranda engine from Eclipse has now passed over 100 hot fire tests, and our team is getting ready to kick off the qualification campaign. With that in mind, we've started putting together several Miranda flight engines. On top of that, we finished qualification of the Eclipse interstage — an important milestone for primary structure as we build the first flight vehicle. We've also wrapped up qualification testing on the liquid oxygen transfer line for the Eclipse's first stage, running the assembly through a demanding campaign on our test stand as we get set to integrate that line with the vehicles. This pipeline supplies oxidizer to our Miranda engines by way of the propellant tank, and while in flight, the LTL delivers oxidizer to those engines at a pace equal to filling 300 bathtubs every minute. On the Eclipse program, work on assembly and integration is moving forward, and later this year we aim to hand the first stage over to Northrop Grumman, our partner in developing the vehicle. Once Eclipse is fully realized, combining our first stage with the second stage that Firefly builds, our goal for the first launch is no sooner than 2027. Within under 10 years, Firefly has amassed orbital flight heritage of real value that extends into our medium-lift vehicle — proof of what our expert team can do, given the hard-won lessons and drive they bring to ambitious missions like these. Now turning to spacecraft, a category that takes in SciTec. We're building several landers and orbiters at the same time, while also pushing forward our AI data center systems in support of the Future Operationally Resilient Ground Evolution program, or FORGE for short. Let's begin with SciTec: September 2025 saw the United States Space Force formally accept, on an operational basis, SciTec's FORGE architecture for AI-enabled space exploitation, modernized and delivering a transformative jump in capability spanning missile warning and tracking, missile defense, battle space awareness and technical intelligence. Keep in mind that FORGE is a sophisticated, operational defense program belonging to the United States, functioning as the brains behind our country's multi-orbit missile warning and tracking architecture. SciTec handles enormous volumes of data at speed, along with satellites in every orbit — LEO, MEO and GEO — to hand our war fighter high-quality, mission-critical formation for defending against missile threats. In the first days of the Iran conflict, FORGE gave the Space Force's 11th Space Warning Squadron real-time data, and that data shaped defensive operations that responded to over 1,000 threat events. As a veteran, I want to thank America's service members and those of our allies for defending our nation. Firefly teams continue supporting the 11th Space Warning Squadron's vital 24/7, 365 mission, which is part of the defensive systems that evolved during this operation. We are rapidly incorporating unique operational lessons into new FORGE generations during what is the most extensive missile engagement in history. FORGE is making sure the world's most advanced tool for missile warning, tracking, and defense stays ahead of what threatens it. In Q4, the team secured a contract worth 8 figures from a U.S. customer we can't name, to provide time-dominant space control software, and that deal could grow substantially. Also during the fourth quarter, SciTec finished the interim ground readiness review with the Space Development Agency. That review covered SciTec's part in supplying the mission management and data fusion ground components for the proliferated war fighter space architecture, satellite constellation, Tranche 1 Tracking Layer. Also, the SciTec group received a $109 million engineering change proposal tied to the Space Force's FORGE enterprise OPIR services contract, aimed at speeding up and broadening data center delivery. That pushed the overall contract worth from $263 million up to $372 million. SciTec's standout contributions across several FORGE components are exemplary, since the team achieved operational acceptance of FORGE for threat missile warning back in September — the first instance in 50 years where the U.S. Government switched the prime contractor for missile warning ground systems. On top of that, SciTec's background in on order processing, its data center strengths and AI-enabled applications give Firefly a differentiated software layer sitting atop the physical layer required for space data centers. Now turning to Blue Ghost. During Q4, we wrapped up structural qualification tests on the completely stacked Blue Ghost Mission 2 lander along with the Elytra orbiter at NASA's Jet Propulsion Laboratory. We likewise finished the payload integration readiness review for BGM2, taking delivery of NASA's LuSEE-Night and commercial payloads, among them the Rashid Rover 2 from the UAE Mohammed Bin Rashid Space Center; critical Blue Ghost Mission 2 hardware is converging, as we move through structural integration of both the lander and the electric transfer vehicle. We're pushing ahead toward launching our upcoming lunar mission, with windows opening no earlier than late in Q4 and stretching into Q1 of next year. Similar to how our first mission worked, we'll keep monthly windows of one week so that we can be certain of arriving at the service right when Lunar Day begins — this being the first American effort planned for the moon's far side. Progress continues on Blue Ghost Mission 3 as well; over Q4, the team completed the preliminary design review, confirming that the vehicle is engineered to bring payloads to the Gruithuisen Domes on the moon. In addition, we finished the system requirements review for Blue Ghost Mission 4, which establishes readiness across the vehicle's subsystems and lets us place orders for long lead items needed for the mission to the moon's South Pole. Much like Alpha grew into Eclipse, the technologies behind Blue Ghost can carry over into larger vehicle designs that are able to provide further support to the U.S.

Jason Kim executive
#4

The administration's aim of keeping a lasting human footprint on the moon, plus investigating other worlds, remains in place. Moving on to Elytra, we just finished separation testing on that system, which is set to serve as a transfer vehicle in support of Blue Ghost Mission 2 — a key step as we push ahead toward assembling flight hardware. To put it in context, this Elytra travels to lunar orbit alongside Blue Ghost, then separates once in orbit. From the far side of the moon, it will pass along data through long-haul communications. It also carries our Ocula commercial imagery and mapping service, delivering high-resolution imagery and videos plus multi-spectral phenomenology data to our customers. Ocula demonstrates how we can responsibly attach payloads and services onto our landers and orbiters, given the flexibility built into our modular design, processes and teams. On top of that, during the fourth quarter we wrapped up the critical design review for the Defense Innovation Unit's Sinequone project, advancing spacecraft development ahead of the DIU's space domain awareness demonstration mission. The team likewise finished a NASA study contract tied to a planetary defense mission known as Trinity. Such a mission, if pursued, would employ an Elytra DART spacecraft for near earth object reconnaissance, drawing heavily on nonrecurring engineering from our spacecraft designs; with that business summary done, I'll hand things to Darren so he can walk through the fourth quarter financials.

Darren Ma executive
#5

Thank you, Jason, and good afternoon to all of you. For Firefly, a company that is 9 years old, 2025 stood out as a pivotal twelve months. We pulled off a landmark IPO, posted annual revenue that set a record at $159.9 million — a jump of 163% compared with the prior year — and wrapped up the strategic purchase of SciTec, the biggest deal we have made so far. Those moves, which reshape what we are, have made this business stronger for the long haul and show how committed and farsighted our people are; on this call today, I will walk through the financial results for the fourth quarter and for the whole of 2025, and I will also share the revenue guidance we are giving for 2026. Let me stress once more that what drives Firefly's financial numbers is how operations perform. The operational measures that matter most are how many launches we conduct and how well we deliver on program milestones in both our spacecraft solutions segment and our launch segment. To be specific: over in spacecraft solutions, where SciTec now sits, we typically book revenue according to the percentage of completion for each contract. When it comes to launch, the count of launches is what we track. For our Alpha vehicle, which is operational, revenue gets recognized at a single point in time — when the launch takes place. With Eclipse, as long as it remains in development, we book revenue by percentage of completion tied to program milestones under the Northrop Grumman partnership. After the Eclipse vehicle becomes operational, recognition will follow the same approach used for Alpha, occurring when launches happen. Now let's move to the fourth quarter results, and note that these include SciTec for the final 2 months of the year; quarterly revenue reached $57.7 million, the largest in the company's history; for comparison, that figure was $30.8 million in the third quarter and $9 million during the same quarter one year earlier. Breaking down total revenue, Spacecraft Solutions brought in $50 million while launch contributed $7.7 million. The quarter-over-quarter gain came mainly from hitting several milestones throughout the spacecraft business. We closed out the fourth quarter with total backlog of roughly $1.4 billion. That is up from $1.3 billion when the third quarter ended, and 22% higher than the $1.1 billion recorded a year before. Among the metrics we watch closely, backlog stands out as a signal of how revenue will perform down the road. Gross margin for the fourth quarter came in at 27.7%, versus 27.6% during the preceding quarter. Let me pause here to explain how folding SciTec's government contracts into our spacecraft business shows up in our financial statements. Looking at revenue, most of those contracts work much like the spacecraft programs we already have, with revenue recognized on a percentage of completion basis, which offsets the more event-driven nature of the launch business. Direct costs tied to carrying out contracts go into cost of goods sold, whereas indirect costs appear under SG&A. Given that mix, R&D will fall as a share of total operating expenses, and SG&A will rise as a share of total operating expenses. GAAP operating expenses came to $101.6 million in the fourth quarter, compared with $70.7 million in the third quarter and $57.1 million in the same quarter one year ago. The sequential and annual growth mainly came from expenses tied to the SciTec acquisition. Adding SciTec's operating costs for the last 2 months of 2025 pushed up stock-based compensation and brought in a full quarter of public company costs. On the operating expense side, what separates GAAP from non-GAAP figures is chiefly stock-based compensation, one-time deal-related costs, and amortization of intangibles tied to the SciTec acquisition. Non-GAAP operating expenses came to $80.5 million in the fourth quarter, versus $61.3 million in the third quarter and $55.6 million in the comparable quarter last year. Once you strip out those GAAP versus non-GAAP differences I just listed, the sequential and annual growth was driven mainly by including SciTec's operating expenses for the last 2 months of 2025, a full quarter of public company costs, and higher research and development spending across every program. That covers R&D investments in Alpha Block 2 upgrades, Eclipse development, and Elytra to back our growth objectives. GAAP operating loss was $85.6 million, against a loss of $62.2 million in the third quarter and a loss of $77.2 million in the fourth quarter of last year. Non-GAAP operating loss was $64.5 million, against a loss of $52.8 million in the third quarter and a loss of $75.8 million in the fourth quarter of last year. Our GAAP net loss for the fourth quarter was $41.1 million. In Q4, we booked a one-time $37.1 million tax benefit connected to the SciTec acquisition, plus a one-time $8.4 million gain on settlement of contingent liabilities. That compares with a loss of $133.4 million in the prior quarter. Our non-GAAP net loss for the fourth quarter was $58.5 million. That compares with a loss of $51.4 million in the prior quarter and $80 million in the comparable quarter last year. GAAP basic and diluted net loss per share was a loss of $0.26, on a weighted average share count of 155.6 million. We finished Q4 with a share count of 159.3 million shares. Going forward, our total share count will typically rise by about 1 million shares per quarter. Non-GAAP basic and diluted net loss per share for the fourth quarter was a loss of $0.38, on a diluted average share count of $155.6 million. Stock-based compensation expense was $12.6 million in the fourth quarter, reflecting our first full quarter as a public company. That compares with $4 million in the prior quarter, which reflected roughly 7 weeks as a public company after our IPO on August 8. Adjusted EBITDA in the fourth quarter was a loss of $57.3 million, against a loss of $46.3 million in the third quarter and a loss of $67.7 million in the fourth quarter of last year. Turning to our balance sheet. We closed the quarter with cash, cash equivalents and short-term investments of $893 million, which included $260 million drawn from our revolving credit facility. Thanks to our solid overall liquidity, we're able to fund growth initiatives in a sensible way while sticking to a disciplined stance on allocating capital. Just to remind everyone, during Q4 we finished the SciTec acquisition. The amount we paid consisted of $277.4 million in cash, net of cash acquired. Q4 capital expenditures came to $12.1 million, versus $8.9 million in Q3 and $2.7 million in Q4 of 2024. That quarter-over-quarter rise came from planned test stand upgrades supporting Alpha Block 2 production, Eclipse development, spacecraft manufacturing, and expansion of other facilities; looking at 2026, we presently anticipate capex will climb beyond 2025 levels as we keep putting money into our infrastructure to back the rising number of opportunities Jason mentioned earlier. Free cash flow showed a loss of $79.3 million, compared with a loss of $62 million in Q3 and a loss of $42.9 million in Q4 of 2024. What drove the quarter-over-quarter change in free cash flow was mainly payments tied to buying and integrating SciTec. That figure includes $24.5 million of cash payments connected to the SciTec acquisition. As a reminder, during Q2 we'll make the last SciTec acquisition-related payments, roughly $24 million, and those will show up in our cash flow. For a bit more context, we anticipate cash usage over the upcoming quarters will rise somewhat relative to Q4 of 2025 as we keep investing in the crucial areas of our business to support growth objectives. Now on to our outlook for the coming year; at present we expect full year 2026 revenue to land between $420 million and $450 million. Backing this outlook are the 4 Alpha launches Jason talked about, along with a program milestone standpoint. That covers delivering on all 3 Blue Ghost missions, ongoing work on our Eclipse and Elytra programs, and software development tied to key government programs. To sum up, the midpoint of our revenue outlook implies a year-over-year gain of 172%. I want to thank everybody for their interest in Firefly. With that, I'll hand the call back to Jason for his closing remarks.

Jason Kim executive
#6

Thanks, Darren. As we begin 2026, we're carrying forward the momentum we had at the close of last year. Going into this year, Alpha had already made a successful return to flight, and we had a solid backlog worth $1.4 billion, backed by a very strong balance sheet that will help us pursue our growth objectives. Our attention is firmly on getting Alpha Block 2 delivered, with a number of launches coming up for our customers. Tailwinds across the industry — from the increased emphasis on the moon and the potential for data centers in space — are confirming Firefly's strategy as we get ready to go back to the lunar surface and take advantage of SciTec's operational data center capabilities. We've strengthened our leadership team and are pushing ahead across multiple programs, with safety and quality emphasized throughout the company. Our focus is on launching, landing, and operating space systems reliably and repeatedly, from the earth to the moon and beyond. Thanks for being on the call. I'll hand it back to Michael.

Michael Sheetz executive
#7

Thank you, Jason. Operator, we're ready to take questions.

Sheila Kahyaoglu analyst
#8

When it came to 2026 during the prepared remarks, you brought up 3 more launches taking place this year — Jason, Darren, and that includes Block 2 getting underway. Could you perhaps walk us through how the timing shapes up from this point forward, and what the important milestones look like?

Jason Kim executive
#9

Sheila, I appreciate you asking that. Jason here. Alpha Flight 7 delivered a huge win for us; the team deserves a lot of pride for what they got done on that mission. They're working through every bit of post-flight data right now. From where I sit, though, I was alongside the team inside the launch control center, and the first stage performed nominally in every respect; we lifted off at the very first moment of the window, and the same goes for the second stage, the payload deployment, and the relight of the Lightning engine on that second stage too. So the results there have us feeling very good. At the same time, though, production has already been underway on the inaugural Block 2 rocket, which will be Flight 8, and we're additionally building 9 and 10. It's moving through production when it comes to the carbon composite tanks, plus the engines and the avionics. So clearly, we're constantly coordinating closely with our customer regarding their customer readiness. We're coordinating closely with the range — and the FAA regarding range availability. There's — clearly, I don't need to go into much detail about weather and safety considerations too. All of those are factors we take into account. Still, we're eager to speed up the road map for our shift to Block 2; it's a rocket that's more reliable and more manufacturable, still relies on the same carbon composites, still relies on the same Reaver and Lightning engines, yet we managed to derisk the in-house avionics and batteries that we flew, particularly the avionics flown in shadow mode aboard Flight 7, and so those results have us really pleased. Even so, we keep producing. That's the way we see the 2026 cadence.

Sheila Kahyaoglu analyst
#10

Great. Maybe I could squeeze in one more about SciTec. Congrats once more on getting that deal closed recently. Could you describe the momentum you're building in that business and how it feeds into the revenue outlook for this year?

Jason Kim executive
#11

Sure, I'll begin and then hand things over to Darren. SciTec has been a really strategic pickup for us. When we evaluate acquisitions, we start with strategy and whether it aligns with ours. We also consider culture and whether there's a cultural match, plus how accretive the deal is, and lastly the synergies tied to SciTec's software capabilities. From day one, SciTec has brought substantial value, particularly to our efforts in the national security and defense space; they run a no-fail operational program known as FORGE, and we take real pride in it since it has supported the recent conflict ever since becoming operational in September, handling more than 1,000 missile messages for our national defense; their focus has been on executing FORGE, though they're simultaneously engaged in numerous other efforts such as the Space Development Agency ground processing for the tracking layer Tranche 1. They're also favorably positioned for efforts like Golden Dome, since they can draw on much of their 40-plus years of algorithms built for missile tracking and missile defense, including the FORGE program. Their capabilities are extensive, spanning not only missile warning and missile tracking but also multi-domain areas such as air battle management system; so they've been a tremendous addition to the team. I'll have Darren cover the revenue side.

Darren Ma executive
#12

Yeah, Sheila, from a financial standpoint, I'd say we're carrying that sort of momentum as we move into 2026, right, especially with the SciTec acquisition. What I mean is, if you look at the midpoint of our guidance, at the $435 million figure, 80% of that revenue has already been booked; so SciTec makes up a piece of that; and when you stop and consider it, like Jason mentioned, this was a strategic acquisition. If you examine how it gets incorporated into our financials, what you're essentially seeing is the character of the SciTec government contracts — their costs, as I brought up earlier during this call, are mostly recorded within cost of goods sold and G&A; so yes, we're really enthusiastic about the SciTec acquisition and what it brings to us this year.

Kristine Liwag analyst
#13

Congratulations on getting Stairway to Seven off the ground successfully. Could you discuss how, for launch 8, some of the testing has already been completed? Can you give us an idea, with the upgrade, of how much Flight 8, 9, and 10 have been technically derisked for the remainder of the year in 2026? Have you run additional tests on any of those elements? And how should we think about that derisking?

Jason Kim executive
#14

Kristine, thank you; this is Jason. People matter every bit as much as hardware and software. I think back to last year, when we held our production engineering stand down. We examined the vulnerabilities in every department. We developed process improvements and a great deal of extra training. On the people side, there is far more rigor, collaboration, and active listening among the teams. We truly built up a great deal of muscle — strengthened the team's muscle memory throughout production and operations. We witnessed that in the fruits of the Stairway to Seven — a successful Flight 7. That said, many upgrades from Block 1 to Block 2 were actually derisked on Flight 7. We flew the in-house avionics, which proved out some functionality, and we are poring over that data. I could watch real-time data telemetry from it, and it was nominal; beyond that, batteries were derisked too. The automated flight termination system was derisked as well. In routine operations, we always test each of our carbon composite locks tanks and RP tanks, along with the Reaver engine and the Lightning engine, as part of our normal course of producing, integrating, and testing our Alpha rocket; so we are simply working through all of that. As I said earlier, we did qualify and successfully pass our second stage locks tank, and we keep achieving milestones; so all of that is derisking the Block 2 program. I will say that I have high confidence in the designs and the processes that have truly enhanced our safety, quality, and reliability culture, and especially our people too.

Kristine Liwag analyst
#15

Thanks, that's really useful. Now, may I follow up with another question regarding SciTec? You brought up the FORGE program. This marks the first occasion in 50 years when a brand-new plant contractor for a missile warning ground system was chosen by the U.S. federal government, and that strikes me as quite significant. So could you discuss why this program matters so much, and given the operations taking place in Iran along with the threat landscape, might we witness an acceleration during 2026 of what you're delivering to the government under this program? Additionally, regarding the revenue outlook for 2026, what needs to happen? What accounts for the gap between the low end and the high end? Which variables ought we to be monitoring?

Jason Kim executive
#16

Thank you, Kristine. I'll begin and then hand things over to Darren afterward. What I'd say is, indeed, you're completely correct — FORGE is a hugely important and consequential program of record. And SciTec is no newcomer to matters of this sort. For more than 40 years, they've backed programs of this type for the Missile Defense Agency, Space Force, and Air Force; thus they possess a collection of algorithms that may be combined in various ways, which keep being modernized and improved. Here, FORGE does employ AI, and it enables you to multiply the effectiveness of every operator present in the room; consequently, the 11th Space Wing is in fact utilizing this operational system right now, and it backs 24/7, 365 operations for conflicts like the one in Iran; so this truly matters. I'd say it's the most sophisticated missile warning and missile tracking system available, handling a high rate and high volume of data from every low earth orbit, medium earth orbit — which are steadily coming online — and geosynchronous orbit missile warning and missile tracking OPIR satellite; and it genuinely assists us in protecting our homeland. So I'd say there are plenty of upside possibilities for further additions to the program. As we noted, a hardware purchase took place, and I'll let Darren elaborate a bit more on that.

Darren Ma executive
#17

Right. Kristine, Darren here. So as we move forward — look, you've already seen what Q4 looked like, and from a revenue standpoint that hands us a lot of momentum as we enter 2026. Like I told Sheila, when you take our midpoint guidance figure, 80% of it has already been booked, so our comfort level with that guidance figure is fairly high. And then, as the Alpha launches pick up pace, that's going to keep that figure steady. Still, on the question of where upside could come from, one item worth flagging is that we have substantial opportunities for upside, and our positioning for capturing them is strong. Take, for instance, what Jason walked through on this call — NASA needing to speed landers up to a monthly cadence beginning in 2027. None of that sits in our numbers as they stand today.

Sujeeva De Silva analyst
#18

You mentioned, though, that NASA is looking to increase how often lunar missions happen. So I'd like to know how you view Firefly's capacity to back a quicker tempo of moon missions, compared with what you've already described?

Jason Kim executive
#19

Right. Thanks, Suji. Jason here. Right, we've been putting money into CapEx along with growing our clean rooms, plus our avionics, batteries, and integration and test facilities that we run in-house in Cedar Park, Texas. Some of NASA's senior top executives recently toured our facilities; and we demonstrated to them that we're carrying out operations on Blue Ghost Mission 2. Plenty of hardware is being integrated right now, with lots of welding underway for the lander and the electric transfer vehicle alike. We've got all the payloads too for Blue Ghost Mission 2. Beyond that, we're hitting milestones on Blue Ghost Mission 3, which passed PDR, and Blue Ghost Mission 4, which passed SRR. Through expansion, we've managed to grow our clean room footprint, which we owe to the Texas Space Commission for a grant it gave us last year. So we're finishing that up this year. That's going to let us steadily scale up how many lunar landers we can build at the same time. So when we hear NASA Administrator Jared Isaacman say, "Hey, we want to go to the moon South Pole with robotic missions every month starting in 2027." That's simply confirmation of the investments we've already made; and so many of our designs are scalable and modular. That way we can keep benefiting from the streamlined approach of building and integrating these lunar landers at rate. We're also able to secure strategic inventory to help us with our suppliers. I'll hand it over to Darren.

Darren Ma executive
#20

I'd say you captured that nicely, Jason — meaning the money we're putting into increasing spacecraft output.

Sujeeva De Silva analyst
#21

Good, and for my next question, I'd like to direct it to Darren. Could you discuss the pattern we ought to anticipate for revenue generated by each Lunar mission? Does it stay more or less consistent across missions, or might it climb over the coming several?

Jason Kim executive
#22

Suji, with each Eclipse contract we've secured, our Blue Ghost missions have been scaling upward. If you remember, mission one for Blue Ghost came in at approximately $100 million, and those figures have quickly risen into the $150 million to $200 million band, with possible extras too, such as what Jason brought up regarding Ocula plus data sales through the imaging services we've obtained.

Michael Leshock analyst
#23

About Alpha — with the information returned from Flight 7 and the upgrades you'd already implemented to its TPS, I'm curious whether you anticipate the thicker thermal protection allowing flight at higher-stress inclinations on upcoming missions. Alternatively, might there be additional alterations to Alpha's TPS down the road?

Jason Kim executive
#24

Michael, Jason here. Appreciate the question. So far, everything I've observed has appeared nominal. We'll keep working through all the information we collected. In fact, we added extra telemetry aboard the first stage, enabling us to obtain readings from the temperature protection system sensors installed as a supplement, which lets us confirm everything learned from earlier launches; once we have all that information and process it, we'll be in a position to share additional details; nevertheless, we have strong confidence that the modest thermal protection system additions on our Stage 1 booster. It provides us the capability to encompass even more categories of launch trajectories moving forward.

Michael Leshock analyst
#25

Great. Then, regarding SciTec, are there any further contracts you're bidding on that might represent significant jumps in the growth you already anticipate for SciTec?

Jason Kim executive
#26

Yes. As I noted earlier, SciTec holds the program of record for missile warning and missile tracking processing through the U.S. Space Force FORGE program. The Space Development Agency also has them under contract to support Tranche 1 ground processing for tracking. I believe there certainly are additional kinds of competitions out there, particularly in the multi-domain area — for instance, air battle management system. Beyond missile warning and missile tracking, every algorithm SciTec possesses can be applied to missions such as air moving target indication and possibly ground moving target indication; so those represent upside opportunities for SciTec. Also, as I mentioned, SciTec is very well positioned thanks to over 40 years of missile tracking and missile defense algorithm work that is in operations, like FORGE; for efforts such as the Golden Dome program, which we now hear is a $185 billion opportunity. And looking at that opportunity, the most critical element for that architecture to succeed is ground processing, integration of sensor data into decision-making, things like fire control; so SciTec is very well positioned for those kinds of missions.

Colin Canfield analyst
#27

Colin, you're asking about the FY '27 National Defense Strategy and the growing emphasis on satellite-based architectures — what does that mean for demand in intelligence, orbital intelligence satellites, and orbital transfer vehicles? Basically, how often are you hearing from acquisition officers that they'll move past programs with 2 or 3 suppliers toward a wider group of acquisition partners?

Jason Kim executive
#28

Jason here — appreciate the question. When it comes to the national defense strategy, we're extremely bullish and fully committed, for this year and going forward. Through a contract with the Defense Innovation Unit known as the Sinequone project, we just cleared our CDR, and we're building out a rendezvous proximity operations capability using our satellite Elytra, which can perform dynamic space operations and carry various space domain awareness sensors, among other payloads. Our view of the future is that space won't stay sedentary. To evade threats, or even pursue them, you'll need dynamic space operations capabilities. Elytra fits those missions well, since it offers substantial maneuverability and precise in-house engine thrusting drawing on heritage from our Blue Ghost Mission. It also carries plenty of fuel capacity, and we're embedding a great deal of autonomy into the system, so it genuinely supports rendezvous proximity operations, space domain awareness, and similar missions. In LEO, it can support MEO and GEO, plus cislunar missions too. Beyond that, we anticipate far greater demand for missile warning, missile tracking sensors, and satellite processors. Thanks to FORGE, SciTec has strong capability in processing huge volumes of data and converting it into high track quality. They also bring experience with onboard processing on orbit. That's why we're putting investment into this capability — to enable more on-orbit edge processing and further cut latencies between sensing and the actual warfighting decision-making.

Colin Canfield analyst
#29

Understood. Then, when it comes to the discussions you're having with customers, how much does that extra SciTec capability basically push them — or not push them — but make them more confident about steering Firefly toward doing difficult, intelligent satellite work? In essence, if you had to give a rough time line, would 2030 be reasonable to describe as Firefly resembling what millennium looked like 5 years ago?

Jason Kim executive
#30

Well, I can't discuss other organizations I've previously led, but what I can say is that the capabilities Firefly plus SciTec delivers are extremely advanced. As I've mentioned before, space is difficult, yet landing on the moon is even more difficult, and we became the first and only commercial company to accomplish that successfully, stable and upright. If you consider it, we successfully rendezvoused with the moon, and we managed to carry out the 14-day operations with 10 different NASA payloads successfully. And so all those lessons learned, also shared with our Elytra spacecraft, created a truly powerful capability that can perform things such as RPO and space domain awareness, as well as long-haul resilient communications missions and transfer vehicle missions too. But adding SciTec delivers a lot of best practices for software development, existing algorithms to process any type of sensor phenomenology because SciTec does have a sensor phenomenology, subject matter experts with the software developers, and they possess a lot of secure software development practices that we can move between our spacecraft and our SciTec programs. So it really provides us with a lot more capability synergies, if you will, to pursue these types of no-fill critical missions that are — also need to be affordable and advanced.

Seth Seifman analyst
#31

This is Laura, filling in for Edison. To start, I'd like to know whether you've formed any early views regarding opportunities in space data centers. Are they technically or economically viable, in your view? Or might this be something Firefly would be interested in pursuing?

Jason Kim executive
#32

Thank you, Laura. Jason here. I'm glad you asked. Well before interest in data centers based in space picked up again, Firefly had already been picturing a future in which ever more processing happens off Earth, since there are many benefits to that. A few examples: space offers substantial power generation along with considerable thermal radiator capacity, and beyond that, latency drops when you can sense and process on orbit and deliver results straight to users efficiently. A key reason the SciTec acquisition we made was such a strategic move is that we were assembling the components needed to make a system like this possible; and so given SciTec's strengths in dealing with software applications, with frameworks, with ground-based data centers, they hold a great deal of expertise that we can bring to bear on orbital data centers too. When you consider it, orbital data centers essentially amount to the hardware and physical layers plus the frameworks. But what gets placed on top of that? Well, we have SciTec, which provides the software applications that actually go onto orbital data centers. So that's the effort we'll undertake in close collaboration with our subsidiary, SciTec; and we'll be in a position to, say, link various orbital constellations to one another. That way we can open up improved collection possibilities, with LEO and MEO and GEO satellites working alongside one another in a manner never seen previously. So there is substantial upside potential in what we're pursuing with SciTec and our Elytra spacecraft.

Analyst analyst
#33

This is Alex, filling in for Seth. There's possibly one topic we haven't discussed all that much during this call, which is Eclipse. I'm aware that you guys mentioned a few updates — you're moving closer to handing over the first stage to Northrop later in the year, and that initial flight is currently aimed at no sooner than 2027. I'm just wondering whether you could possibly take us through a few of the milestones we ought to be watching for there. Across the coming months?

Jason Kim executive
#34

Sure, I'll begin, and I can — Darren may chime in with more. Jason here. Eclipse is something we're genuinely thrilled about. All the knowledge we've gained and everything we're manufacturing on Alpha, which includes our carbon composite structures along with our tap-off cycle engine technology, is bringing down risk for Eclipse; therefore, we weren't required to begin from nothing when it came to creating our engine technology, and we can scale it up in size for our tap-off cycle engines. As for the carbon composite structures, we've already been running the automated fiber placement machine since 2023, which is when it was set up at our Texas factory. That means we've got substantial experience producing the tanks and structures and domes and locks and transfer lines through our established methods; and beyond that, each individual piece of the Eclipse program is either being developed, being built, or being tested. So the headway we're making has us genuinely thrilled. More than 100 hot fire Miranda engines are now behind us. Actually, I recently visited Rocket Ranch and saw 2 in a single day. And beyond that, we're already constructing the flight engines for the first launch, which are Miranda engines too. Considerable headway is being made on the first stage tank; we went ahead and tested the inner stage past qualification at that point. Our locks transfer line was also put through testing, which marks meaningful headway. So testing is taking place across the board. Our target remains the same: handing over the first stage to our co-developer, Northrop Grumman, near the end of the year. Then, regarding the complete variant of Eclipse, in which Firefly constructs both the first stage and the second stage, we're expecting no sooner than 2027 for that inaugural launch.

Michael Sheetz executive
#35

Much appreciated, operator. Thanks to all of you for being on this call, and we'll speak with you in the next quarter. Take care.

Operator operator
#36

This concludes our conference. Thank you for participating. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Firefly Aerospace Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Firefly Aerospace Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.