Thanks a lot, operator. Hi everyone, and happy Star Wars Day. My name is Michael Sheetz, and I'd like to welcome you to Firefly's call covering the first quarter financial results. On today's call, I'm happy to have with me our CEO, Jason Kim, and our CFO, Darren Ma, while we discuss results for the period that closed on March 31, 2026. During this call, we'll be making forward-looking statements, which include, among other things, what the company expects regarding its future financial and operating performance, its growth strategy, and the market outlook. The actual results could end up differing materially from what those forward-looking statements anticipate. The factors that might lead actual results and trends to differ materially are described in the annual and quarterly reports we've filed with the SEC. Firefly undertakes no duty to update any forward-looking statements, and each of them speaks only as of its own date. In addition, on this call we'll be talking about both GAAP and non-GAAP financial measures. You can find a reconciliation between GAAP and non-GAAP measures in the earnings release for the first quarter of 2026. Except where we say otherwise, all financial information discussed on this call is non-GAAP. Our earnings press release, our SEC filings, and a replay of today's call are available on our Investor Relations website, at investors.fireflyspace.com. With that, I'll hand things over to Jason.
Thanks, Michael, and hello everyone joining our Q1 2026 earnings call. Firefly began the year executing well, with momentum building thanks to significant government programs that fit squarely with what we do best. Quarterly revenue hit a record $81 million. With the Artemis program speeding up and NASA's Moon base push requiring robotic landings on the lunar surface every month, the demand signals we've anticipated are only getting stronger. Our early spending to expand Blue Ghost production, along with becoming the first commercial outfit to touch down on the Moon, puts us in position to serve as a key commercial ally as NASA broadens its lunar activities. We have 3 more missions coming, and we're already working toward that objective. We also moved our Ocula lunar imaging service forward via a fresh partnership with NVIDIA, which allows processing in orbit for quicker, more useful data throughout cislunar space. Turning to national security, SciTec, a Firefly subsidiary, landed an agreement with the U.S. Space Force to back the Space-Based Interceptor program within Golden Dome. At the same time, we're delivering and demonstrating the worth of our AI-enabled data processing via the U.S. Space Force's operational FORGE Missile Defense system. On the launch side, a market short on capacity is boosting demand for Alpha after its successful return to flight; we additionally finished the VICTUS DIEM responsive launch demonstration and made consistent headway on our reusable Eclipse rocket during the first quarter. The pace of transformation in the space sector continues to accelerate, and at Firefly we're expanding the revenue-producing capabilities we already have in order to meet demand throughout every one of our business lines. For those just getting acquainted with Firefly, we are a space and defense firm delivering inventive hardware alongside software built for the most demanding missions beyond Earth, serving national security, exploration and commercial technology needs. Four products that generate revenue make up our hardware lineup: the Blue Ghost lunar landers, our electro satellite orbiters, Alpha small-lift rockets and the medium-lift Eclipse rockets. On the software side, Firefly's portfolio resides inside SciTec's AI-enabled defense systems, which have demonstrated their value in national security operations. The benefits AI and data centers bring to our industry are now showing up in how we actually operate, since we provide the no-fill systems that are essential to the U.S. and its partners. When the U.S. government asked for commercial investment along with speed and scale in defense and exploration, we responded. Upgrades and growth for Firefly's co-located spacecraft and rocket factories, clean rooms and test stands, along with our data centers and classified facilities, are funded by our advanced technology products and infrastructure funding. Turning now to business updates. In the first quarter, we reached new milestones in each product line and service. The lunar opportunity has arrived. We've hit some big recent milestones — the NASA Moon Base event, Artemis II making it safely around the Moon, and our Blue Ghost landing and operations on the lunar surface — and those really energized both the industry and the world. The Moon is a permanent destination now. With NASA's Moon base plan, the Artemis program gets a major acceleration, and it sets out a clear, detailed route to a steady cadence of surface missions, backed by ongoing support from satellites and lunar orbit. In the past, our growth strategy called for moving from one landing a year to multiple landings a year, and right now we're seeing a stronger demand signal from NASA. The agency's goal is to have robotic spacecraft touching down on the lunar surface every month starting next year, along with bigger lander flights that would help build out the infrastructure needed for a sustained human presence there. Over the coming 7 years, the initial 2 phases of NASA's Moon base architecture add up to a $20 billion initiative, giving Firefly numerous chances to take shots on goal. When you put Blue Ghost together with our electric spacecraft — the sole commercial lander that has operated successfully — we provide the perfect system for delivering and sustaining a lot of the payloads and capabilities that are required, including navigation, orbital communications, surface observation, power infrastructure, exploration drones, rovers, cargo and support systems for humans on the Moon. There's enormous potential sitting unused on the Moon, and when it comes to the regular cargo runs and services NASA requires to keep a long-term human footprint there, Firefly is leading the charge. During a congressional hearing last week, NASA administrator Isaacman asked for Blue Ghost to serve as a template and for launches to happen often. We're already working toward that goal, as we mentioned before. Our new cleanroom, which is 4x larger than the one we currently have, saw substantial advancement during the first quarter. A lunar lander production line capable of supporting frequent missions becomes possible because of this. By drawing on our vertical integration, we're expanding operations, and at the same time we're putting money into our Blue Ghost supply chain. We're partnering closely with all our key suppliers, putting long-term deals in place and building strategic stockpiles so that they scale up alongside us—this safeguards delivery quality, timing, and volumes. At the same time, work on putting together our Blue Ghost lander and Elytra orbiter is moving along nicely for Blue Ghost Mission 2, and we expect to wrap up assembly along with payload integration by this summer, right on schedule. We've given the name Blue Ghost Mission 2 riders to the dark, and our team is pushing toward yet another historic achievement: pulling off the first American touchdown on the far side of the Moon while hauling NASA payloads alongside commercial ones. On top of that, work continues on our other lander agreements — the Blue Ghost Mission 3 preliminary design review is now finished, confirming the design of the vehicles meant to carry payloads to the Gruithuisen Domes on the Moon. Next up, the team is getting set to wrap the critical design review for Mission 3, and at the same time preparing to finish the preliminary design review for Blue Ghost Mission 4, which heads to the lunar South pole. Turning now to Elytra. We're happy to welcome NVIDIA as a new Firefly partner, and our first joint effort is now part of the Ocula lunar imaging service. Inside the high-resolution telescopes from Lawrence Livermore National Laboratory, the Jetson module from NVIDIA was installed, then sent to the Firefly spacecraft facility so it could be integrated onto our Elytra orbital vehicle. At the outset, this Elytra will serve as a transfer vehicle and a communications relay in support of Blue Ghost, and following that, it will launch our Ocula service, which is designed to support advanced mapping of lunar services, mineral detection, and reconnaissance over a 5-year period while in lunar orbit. Data from our Ocula gets handled quickly aboard Elytra and sent back to Earth autonomously through the NVIDIA Jetson module, working alongside AI software from Firefly that is enabled by SciTec. That lets Firefly reduce the downlink limitations coming from the Moon by doing the processing in orbit before anything is sent to Earth, turning it into real-time, actionable insights for both government and commercial customers. Firefly's AI software is also going to support more advanced space domain awareness. In Earth orbit, our AI algorithms and data fusion technologies have already been demonstrated in critical national security missions. Elytra's software will let it pull from several onboard data sources at once, giving it a sharper fix on objects and faster updates on what's happening with space operations out in the cislunar region. Those abilities should also transfer to the space domain awareness effort Elytra has coming up for the Defense Innovation Unit's Sinequone project. High-resolution telescopes from Lawrence Livermore National Laboratory are part of that mission too — the very type that underpin our Ocula offering. After the mission's critical design review wrapped up, the team got underway with building and testing the ELECTRO flight hardware.
Also during Q1, Firefly hit key Elytra testing goals tied to Blue Ghost Mission 2 — among them separation trials proving out the mechanisms that will release the European Space Agency's Lunar Pathfinder satellite once it detaches from our Blue Ghost lander; that underscores how Elytra can handle and deploy heavy, mission-critical payloads throughout cislunar space. In addition, the team wrapped up first-round interoperability checks so our Elytra orbiter can talk with Blue Ghost on the far side of the Moon and tap a backup comms relay for NASA's LuSEE-Night payload. That lets NASA's radio telescope run as long as 2 years on the lunar surface even with no direct line of sight back to earth. This relay capability aboard Elytra is the bridge to our commercial product, offering substitute communications paths that cut down blackout windows and boost connectivity for many upcoming lunar missions, both for Firefly and for our customers. At the recent Space Symposium event, we witnessed rising interest in Elytra's strong capabilities paired with our AI-driven software for dynamic space operations serving national security, space exploration and international missions. That interest spans space maneuverability to novel orbits, de-orbit services for multiple spacecraft and long-haul communications. During the symposium, U.S. Space Force Major General Purdy underscored the need for stronger national security capabilities in cislunar space, covering transportation, communications and navigation systems past earth orbit. After deployment, those assets need protection and constant monitoring, and the Moon is the best vantage point for that as the ultimate high ground. Our Elytra vehicles are ideally suited to enable such missions thanks to high-thrust precision Spectre engines, generous fuel and payload capacity and AI software. General Saltzman noted in his April 30 congressional testimony that speed, scale and clear demand signals matter greatly, and Elytra puts us in position to seize that with a responsive on-orbit capability. We'll keep expanding our Elytra production line as demand climbs steadily. Turning to our SciTec software offerings within our spacecraft business. We're thrilled to be chosen by the U.S. Space Force to back the Space-Based Interceptor program under Golden Dome. In a Space Force press release only a week ago, this program was unveiled to build a space-based missile defense interceptor system that will prove out capability integrated into the Golden Dome architecture by 2028. Space Force granted a chosen set of companies, among them Firefly's subsidiary, SciTec, contracts worth up to $3.2 billion in total. This vital program will bring about next-generation space-based tracking and advanced interceptors merged with artificial intelligence to counter the speed, maneuverability and lethality of threats. As the prime contractor, we keep delivering on the operational U.S. Space Force FORGE system, supplying a modernized AI-enabled missile warning and tracking architecture. We're swiftly handling enormous volumes of data from satellites across all orbits from LEO to MEO to GEO to provide high-quality mission-critical information to our war fighters for defending against threats. Following the Space Force's operational acceptance of FORGE last year, during Q1 we received a $109 million engineering change proposal aimed at speeding up and broadening data center delivery. Within the opening 30 days of the Iran conflict, this vital system handled thousands of threats, helping safeguard our war fighters. Additionally, the team finished the interim ground readiness review for the Space Development Agency, which ties to our responsibility for providing mission management and data fusion ground components under the proliferated warfighter Space Architecture Satellite Constellation Tranche 1 tracking layer. In more recent developments, the Air Force Research Laboratory granted us a contract supporting work on the advanced algorithm R&D and verification architecture through implementation of deep learning and advanced AI algorithms on processors with small size, weight and power. Such a capability enables improved target detection, tracking and custody, and it lends itself to future on-orbit processing missions. Last week, we also heard General Caine, Chairman of the Joint Chiefs of Staff, emphasize during a congressional hearing how urgently critical investments are needed in space-based command and control, artificial intelligence, and advanced surveillance and reconnaissance. This capability addresses modern multi-domain threats, in which operations are coordinated and synchronized across air, land, sea, space and cyber domains. Our demonstrated AI software and on-orbit processing abilities are strongly positioned to back these multi-domain operations. Turning to launch. In March, Alpha Flight 7 successfully resumed flying and achieved all mission objectives, having deployed a Lockheed Martin demonstrator payload and validated key Block II subsystems. Also, during the first quarter, Firefly assisted Lockheed Martin on the U.S. Space Force's VICTUS DIEM mission, carrying out 2 responsive space exercises to rehearse and further emergency launch protocols needed in an actual threat scenario. VICTUS DIEM represents the second tactically responsive space effort Firefly has finished to date, following our record-setting VICTUS NOX mission, which lifted off with a 24-hour notice. The initial VICTUS DIEM exercise featured a rapid payload processing demonstration in which spacecraft arrival operations, checkouts, mating and encapsulation were finished in under 12 hours. The second exercise featured a 36-hour rapid launch simulation to rehearse and further emergency launch protocols needed to carry out tactically responsive space missions in an actual threat scenario; our attention now is on delivering our first Block II vehicle, set to make its debut on Flight 8, which is targeted to launch late this summer. Block II is built to broaden Alpha's deployable launch capabilities for critical responsive space missions including hypersonic testing, national security missions and commercial satellite launches for domestic and international customers. Firefly wrapped up qualification testing for the Flight 8 first and second stage tanks and shifted into the integration and test phase as we move toward launch. The major enhancements across Alpha from Block II center on boosting reliability and production rate, reflecting our company culture of safety, quality and reliability. And we're working ahead. For Flights 9, 10, and further missions, our structures and engines are currently in production, coming off the automated fiber placement machine and moving into assembly, while we keep aiming at 3 additional Alpha launches during 2026. Regarding our 2027 manifest and past that, we spoke with both first-time and returning customers at this year's Space Symposium and are seeing robust interest in Alpha following the success of Flight 7. Looking ahead, we're glad to note that Sweden's recent defense budget sets aside tens of millions toward orbital launch infrastructure investment. Our partners abroad are eager to introduce Alpha to the market in Sweden and in other allied nations, responding to rising worldwide demand for satellite launch capabilities. This strategy lets us boost our launch rate while also creating new markets, making our launch sites more resilient, and delivering a national security edge. Firefly also just entered an agreement with Seagate Space to work jointly on developing an offshore launch platform supporting responsive sea-based Alpha launches. Jointly, we'll mature the design of an integrated offshore launch system able to meet the distinctive needs of liquid fueled orbital rockets. Such capabilities match the Space Force's requirements for adaptable infrastructure that supports responsive small launches and removes single points of failure.
The Space Port of the Future report has urged adaptable manifesting, quick integration, and launch-to-orbit schedules of 24 hours or under for certain payloads — something we demonstrated with VICTUS NOX. Every lesson gained from constructing, testing, and flying our Alpha rockets lets us enhance and lower risk for Eclipse. While demand keeps rising for additional launch capacity from a wider set of providers, our reusable medium-lift vehicle is advancing toward its first flight. Build and test work is underway on all the major flight articles for our initial Eclipse vehicles, our Miranda flight engines included; during the first quarter, we finished qualifying the Eclipse interstage, a vital primary structure linking the first stage to the second stage, along with the liquid oxygen transfer line within the composite overwrap pressure vessels. Lately, we've been moving through the test campaign on Eclipse's first stage tanks, which stand almost 100 feet high; this risk reduction testing lets us drive the tanks past their limits so we can confirm flight margins. That wraps up the business summary, so I'll hand things to Darren for a look at the first quarter financials.
Thank you, Jason, and good afternoon to all of you. Our Q1 revenue hit a record, powered by solid business fundamentals. As Jason pointed out, we have several growth drivers in place, and that gives us confidence about reaching our long-term objectives. On today's call, I'll go over the financial results for the first quarter of 2026, and then I'll hand things back to Jason for closing remarks. For those of you who are new to Firefly, I want to stress again that key operational metrics are what drive our financial performance. When it comes to our spacecraft solutions segment, the usual approach is to book revenue progressively across the life of each contract, tied to hitting milestones. That gives us a steadier, recurring stream to balance out the launch side, which depends more on specific events. On launches, what matters to us is how many we perform. Take our Alpha vehicle, which is already in service: the revenue gets recorded at a single moment, once the launch takes place. With Eclipse, still in development, we book revenue according to the percentage of completion, measured against program milestones under the Northrop Grumman partnership. After Eclipse becomes operational, we'll record revenue the same way we do for Alpha — at the time each launch happens. Let me now move on to our first quarter results. During this quarter, we achieved $80.9 million in revenue — the strongest in the history of the Company. That's up against $57.7 million in Q4 and $55.9 million during the same period last year. Growth on a sequential basis came from ramping FORGE and the Golden Dome Space-Based Interceptor programs, having SciTec for a complete quarter, and a successful Alpha launch. Breaking down the total, spacecraft solutions brought in $67.6 million while launch contributed $13.3 million. As we closed out the first quarter, backlog stood at roughly $1.3 billion, essentially unchanged versus the prior quarter, which mirrors both the shift of backlog into revenue and the scheduling of new awards. Jason already touched on this, and we share that enthusiasm: there are favorable forces at work across the industry — NASA's opportunities tied to Blue Ghost, demand from customers for Alpha, further missions involving Elytra, and growing appetite for what our AI software can do. Thanks to where we sit in the market plus these sector catalysts, Firefly feels confident about the trajectory of our revenue growth over the long term. On a GAAP basis, gross margin for the first quarter came in at 21.6%, versus 27.7% during the quarter before. That shift largely reflects a larger share of cost-plus program contracts contributing to revenue. GAAP operating expenses totaled $113.1 million in the first quarter, up from $101.6 million in the fourth quarter. This rise mostly came from having SciTec's operating expenses in the books for the entire quarter, along with our ongoing R&D spending; when it comes to operating expenses, the main gaps between GAAP and non-GAAP figures involve stock-based compensation expense, one-time transaction-related expenses and intangible amortization. Non-GAAP operating expenses hit $93.7 million in the first quarter, up from $80.5 million in the fourth quarter. That quarter-over-quarter growth reflected our sustained R&D investments tied to the Alpha Block II production ramp and Eclipse development. GAAP operating loss reached $95.7 million, compared with a $85.6 million loss in the fourth quarter. Our non-GAAP operating loss totaled $76.2 million, against a $64.5 million loss in the fourth quarter. For the first quarter, our GAAP net loss was $96.7 million. In Q4, that figure stood at $41.1 million. Remember, during Q4 we recorded a $37.1 million tax benefit that was onetime in nature, related to acquiring SciTec, plus an $8.4 million onetime gain from settling contingent liabilities. When we look at non-GAAP, the net loss for Q1 was $74 million. The prior quarter's net loss was $58.5 million. GAAP basic and diluted net loss per share for the quarter was $0.61, compared with a $0.26 loss in the previous quarter. When you look at the first quarter, our non-GAAP net loss per share, both basic and diluted, came in at $0.46. In the previous quarter, that figure was a loss of $0.38. We closed out Q1 with 160.1 million shares outstanding. Looking ahead, we expect our total share count to increase by about 1 million shares every quarter. Stock-based compensation expense for the first quarter was $12.5 million, and in the prior quarter it was $12.6 million. Adjusted EBITDA in the first quarter came to a loss of $64.7 million, whereas the fourth quarter saw a loss of $57.3 million. Let's move on now to our balance sheet. We wrapped up the quarter with $811.6 million in total liquidity. That figure includes $551.6 million held as cash, cash equivalents and short-term investments, along with $260 million we could still draw from our revolving credit facility. After the quarter closed, we expanded that facility's capacity to $305 million, and none of it has been drawn yet. First quarter capital expenditures totaled $16.3 million, up from $12.1 million during the fourth quarter. The increase from one quarter to the next reflects testing and upgrades tied to Alpha Block II production as well as growth in spacecraft manufacturing, which positions us to take advantage of NASA's faster-paced lunar opportunities. Free cash flow came in at negative $78.9 million, versus negative $79.3 million in the fourth quarter. Just a note before we go on: during Q2, we'll be making the last payment tied to the SciTec acquisition, which comes to roughly $24 million. Moving on to what we expect for revenue in 2026 — because our business keeps performing well, we're still confident about delivering substantial year-over-year growth, and we're reaffirming the $420 million to $450 million range we shared during the March call. We appreciate your interest in Firefly, and now I'll hand things back to Jason for his closing comments.
Thanks, Darren. During Q1, we saw proof of the direction we've been working toward all along. Firefly isn't merely taking part in the space economy — we're actively molding it. This marks a pivotal point for our sector, spanning everything from our lunar touchdown to missile defense systems, and from responsive launch to space domain awareness powered by AI. We are providing the integrated capabilities that shape what space exploration and defense operations will look like going forward. NASA is picking up speed. The space force is putting money in. Our partners abroad are getting ready. Firefly is prepared; with hardware and production that have proven themselves on missions, software and operations that have been battle tested, and our Firefly team innovating and executing quickly. We are on the verge of a new era in which things that once seemed impossible turn into certainties. Firefly possesses the full end-to-end ecosystem needed to bring that about. We appreciate you being on today's call. Michael, over to you.
Thank you, Jason. Operator, we're ready to take questions.
This morning, you announced that SciTec secured a key spot among 12 companies total on the Space Force's Space-Based Interceptor program. Could you expand on that a bit more — where you stand there, and how SciTec speeds up Firefly's growth trajectory?
Thank you, Sheila. I'll circle back to what we've mentioned on earlier earnings calls: Firefly holds multiple shots on goal for Golden Dome. We've also pointed out that many of SciTec's capabilities in battle-tested AI development on the FORGE program, which became operational last September, have been seen extensively in real operations, especially in Iran. So a great deal of those battle-tested algorithms can transfer very well to other programs such as Golden Dome. And if you recall what General Guetlein has stated previously, among the toughest elements of an architecture of this size and complexity is command and control, along with the power control and the ground processing. And since SciTec possesses battle-tested AI and has exercises, no fill missions and real-world operations. All those algorithms can transfer to Golden Dome too. And then, as you're aware, our Alpha rocket can take 1 ton to orbit and 2 tons to suborbital; so it's really rightsized to launch hypersonic tests, potentially targets for things like space-based interceptor. And so we have multiple shots on goal.
Great. And Jason, maybe you said while going through the slides that you expect a $20 billion opportunity across the early stages of the Artemis Moon Base program over the next 7 years, based on listing missions and large landers. I suppose what are you hoping — and I'm certain you spoke about it at Space Symposium, what feedback are you getting from the customer regarding that? And could you discuss your operational readiness to support that kind of cadence?
Yes. What we're hearing from NASA's chief, Jared Isaacman, is exactly the kind of forward-leaning approach that fits the way we operate here at Firefly. Just in the past month, since NASA put out its plans for a Moon base, those ideas have come to the forefront. Even before that, we'd been planning ahead, getting our cleanrooms and production line capabilities built out so we can handle several lunar landers annually, not just a single one. And this development only strengthens and magnifies the signal we're seeing on the demand side. If you think about maintaining a long-term human footprint on the lunar surface, a great deal of technology has to be proven first — both to gain a deeper understanding of the Moon and to sustain crew environmental control and life support systems there, along with delivering freight and providing surface mobility like rovers and light terrain vehicles. Every one of those areas is something we're actively developing, including landers designed so they can become template production-line vehicles, which lets us keep pace with the launch cadence NASA requires for these kinds of technologies. Among our efforts, we've expanded our cleanroom footprint to four times what our current cleanroom offers. That available square footage and physical setup is a plus for our rate. We also have Ramon Sanchez, our new Chief Operating Officer, who joined us during Q4 of the prior year. He's introduced many strong practices along with knowledge around how production flows, how we use labor, and how we use equipment, which is assisting us as we increase output on our production lines. On top of that, we're vertically integrated. A key factor when it comes to scaling up lunar landers is having the hardware assembled and the parts on hand, so we produce the avionics, the harnesses, carbon composites, and structures ourselves. Beyond that, we're putting money into portions of our supply chain for essential critical components. We're coordinating very closely with our supply chain so they give us dedicated backing, plus strategic inventory. Quality, safety, and reliability matter enormously to us. That's where our attention is too, since ultimately what counts is launching these lunar landers more often. We also intend to construct larger lunar landers, and we already have designs for those. Beyond that, we want to make sure each mission is likely to succeed, exactly as happened with Blue Ghost Mission 1.
I'd like to quickly follow up regarding the space-based interceptor award to SciTec, and just get a sense of how they fit in — how do you view the ground station role ramping up? Specifically, the infrastructure SciTec currently has, is that what would be used to work on and support a space-based interceptor under Golden Dome? Would new infrastructure need to be built out? If you could help us think through what that involves in a bit more detail, and where we saw several contracts go out to different companies to work on it — are there other competitors potentially playing the same role here?
Seth, I believe I said during last year's fourth quarter that the SciTec acquisition was strategic, and it genuinely is. It really strengthened Firefly's entry into national security. In particular, SciTec serves as the prime contractor on FORGE, and that's a program of record worth multiple hundreds of millions of dollars. It's applying AI today in real-world operations. If you recall what General Guetlein said regarding Golden Dome, he's seeking to defeat or stay ahead of threats possessing speed and maneuverability, plus lethality. One thing that counters that is AI and its use. And since SciTec possesses that capability, along with a rich history of 45 years of algorithms that have also supported the Space Force, the Air Force, and the Missile Defense Agency, all those battle-tested operational algorithms get brought to bear for things such as golden dome ground processing. So with AI processing, you could accelerate the time lines, because the threats are very advanced. And regarding the capabilities SciTec has, they can mix and match many of those algorithms together to apply them to this mission.
All right. All right. Great. And so regarding the total amount they contributed during the quarter, are you able to share that?
Yes, Seth; we haven't provided that as a separate figure, but FORGE and Golden Dome, Space-based interceptors, the revenue did ramp-up in Q1 this quarter.
Following up on what you said regarding Alpha once Stairway to Seven succeeded — I'd like to dig deeper. You mentioned demand from customers is stronger, yet backlog stayed roughly level during the quarter. Should we read that as expecting orders that came in once the quarter had ended? And what's the right way to view those order trends across the year?
Kristine, absolutely — interest in Alpha is strong coming off the successful Alpha Flight 7 Stairway to Seven mission; all of the post-flight data has been completed. Nothing was off-nominal. As you'll recall, I was alongside our team inside mission control. The launch was flawless. A Lockheed Martin demonstrator flew on it too, and we managed to insert it into the correct orbit; we even performed the second stage relight. Much of what moves us toward Block II — many components and technologies that will boost manufacturability and reliability for Block II — got tested on Flight 7, among them the avionics, the in-house avionics, the in-house batteries, plus certain temperature protection systems. So those results leave us very, very pleased. Given all that, during Space Symposium there was considerable interest from both existing and new customers. It simply comes down to timing. Many of our government customers, as you're aware, are working through their own funding timing, and we also had plenty of conversations with new customers; so regarding anything further, I'll hand it over to Darren.
Yeah, I think you've got it all there, Jason. Also, just remember that during this quarter we worked through the backlog, and it was a record revenue quarter too.
Thanks, that's really useful. Let me shift over to the Moon side of things. With NASA possibly choosing to bypass Artemis altogether and head directly to the Moon, Blue Ghost stands out because of what it can do — you pulled off the first successful landing by a commercial outfit. That said, I'm curious: as other players speed up work on their human landing systems and the amount of payload potentially heading to the Moon grows a lot, where do you see Blue Ghost fitting into that picture once there's more volume to go around? What's its place in that ecosystem? And how should we frame the longer-term chance for Blue Ghost? Jason, I believe you also mentioned that a lander with more payload capacity is something you're exploring down the road.
Right. When it comes to the Blue Ghost family, we've got designs for bigger landers. Many of the core technologies behind our successful touchdown and the 14 days of service operations during Blue Ghost Mission 1 can carry over into those larger lander designs too. Looking back at NASA's budgets, the CLPS 1.0 effort — a very successful one — saw its funding grow from $2.6 billion up to $4.2 billion. Then, for the expected CLPS 2.0 effort, the figure should land near $6 billion. If you consider landings after 2030, there are at least 3 missions carrying 500 kilograms to the lunar surface under CLPS, plus 12 missions with 3 tons of mass headed to the lunar surface, while the other 15 come in at roughly 8 tons of mass to the lunar surface. All of that sits within our road map; in fact, the bigger lunar lander designs we have can scale up to satisfy that need. So what NASA wants isn't only more frequent launches of these lunar landers — the size, or magnitude, of the landers themselves keeps growing too. And since we hold plenty of capabilities built on shared, vertically integrated components like carbon composites, engine technology, and avionics — we're a company that builds large things. Our Alpha rocket stands 100 feet tall, and our Eclipse rocket stands 200 feet tall. So constructing a bigger lander is exactly the kind of work we're suited for.
Excellent. That's really useful. And at what point do you expect those demand signals to solidify into contracts?
Kristine, we already have plenty of inquiries coming in. For instance, there's CX-2. There's MoonFall, CS-8, and CLPS 2.0 as well; and most of those are solicitations that have already been released. So provided NASA keeps to its timeline, performers could be awarded contracts no sooner than Q3 of this year for a number of them.
This is Laura calling in for Edison. I'd like to ask a bigger-picture question: how are we supposed to view AI's part in your company right now? With the NVIDIA partnership you just made public, plus that R&D contract you handed out, should we picture AI mainly as a tool backing up SciTec's software? Or is it also turning into something more and more essential for spacecraft autonomy and similar areas?
Laura, you've got it exactly right — in our view AI matters enormously for space. Among our visions is a desire to push more and more processing onto orbit. That's the reason this SciTec acquisition, done in the fourth quarter of last year, is so strategic: we were planning ahead, and SciTec's software runs operationally on the ground right now, with large data centers handling no-fill space force missions and programs of record. Yet they likewise bring operational know-how in carrying out processing on orbit in space. So that's among the things we picture at Firefly; we hold the entire ecosystem for launching satellites, constructing them, and running them with onboard processing powered by SciTec's algorithms, delivering AI and processing at low latency, since many missions we pursue — particularly in national security — come with extremely tight time lines to be effective. Our freshly announced partnership with NVIDIA concerning the Moon through our Ocula service, aimed at accomplishing space domain awareness faster by means of AI and SciTec algorithms, is a textbook illustration of that: taking capabilities that function on the ground or in lower earth orbit and then putting them to work at the Moon, since the Moon represents the ultimate high ground. Thus we anticipate ever more AI deployment on orbit. Beyond that, AI gets used throughout the company to boost productivity, so we witness it both in the products we deliver and in how our work gets done too.
Nice work on the advancement here. To build on the Alpha talks that took place at Space Symposium and elsewhere — I'm curious, with the solid ties you have in government defense, ought we to anticipate that upcoming launches will keep skewing mostly government? Or might you branch out into civil or commercial? Clearly there's plenty of robust demand coming from government, but I'm wondering whether you'll make an effort to diversify that, or whether that isn't — shouldn't be what we expect?
Suji, with Alpha, demand isn't the issue; our rate keeps climbing annually since there's such enormous demand from national security plus commercial and on the civil side too; yet what I'd say is that many of the advantages of the Alpha rocket — a 1 ton to orbit capability and a 2-ton to suborbital capability, along with responsive launch capability as shown on VICTUS NOX and more recently with VICTUS DIEM — that truly suits national security purposes extremely well. Since when you consider national security purposes, were a conflict to occur, particularly a near-peer conflict, our launch sites would be among the vulnerable things. Thus we have a deployable alpha capability that we'd like to field. Through that capability, resiliency comes from having a deployed capability should any of the U.S. launch capabilities become inoperable. We're opening a launch pad in Sweden, marking the first time we take Alpha Global. Yet with our deployable launch system, we can bring it to other locations. So the resiliency connected to the 1 ton capability that is rightsized to counter threats U.S. adversaries might place into lower earth orbit, plus the 24-hour response time line demonstrated on VICTUS NOX — that's a combination supporting national security very, very well.
All right, that sounds good. Now I have a separate item regarding Elytra. Given that we're doing our initial lunar satellite deployment along with the second Blue Ghost, could you take us back through how Elytra's revenue framework operates, and is it possible to begin generating revenue from that mission? Also, does working with NVIDIA give you better pricing power or a bigger revenue upside than what existed previously? Any details you can share would be useful.
Sure, Suji. The Elytra unit flying on Blue Ghost Mission 2 falls under the overall contract, which means it gets counted within that agreement. We secured Blue Ghost Mission 2 at a value of $130 million. On board, we have multiple commercial payloads, such as a Rover originating from UAE, plus a few additional commercial payloads that serve as add-ons beyond the base. Beyond that, the Ocula imaging service also functions as another add-on. So all of this is being recognized progressively, just as we talked about during the call.
Wonderful. And Darren, when it comes to Ocula, is your capacity to bring in revenue strengthened by the NVIDIA partnership?
That certainly forms a piece of the Ocula imaging service, though I'll hand it over to Jason to check whether he'd like to contribute anything further on that point.
Yeah, Suji, the way I see it, with Ocula aboard Blue Ghost Mission 2, we'll get the chance to test out various modes. And beyond transmitting the unprocessed data gathered from lunar mapping and surveying, plus preserving space domain awareness data, down to the ground so it can undergo further processing, we'll also be able to showcase and trial AI on our NVIDIA module situated on the Ocula sensor, leveraging SciTec algorithms. So a great deal of fresh discovery lies ahead, and those are exactly the sorts of things that both the Department of War and NASA want to see more of. So expect more developments on that front.
This is Liam filling in for Mike today. I'd like to ask a broader question regarding NASA's plans for putting a base on the Moon. Which form of power generation do you believe would be the most practical for supplying electricity to a lunar operations grid? And what kind of part might Firefly be able to play in providing power to that grid?
I'll refer back to Blue Ghost Mission 1, when we made a successful landing. We carried out 14 days of operations on the surface, and that's the longest stretch any commercial mission has achieved there. We also had an engineering chase proposal examining how to run slightly into the lunar night. By drawing on our in-house batteries, we managed to run 5 hours into the lunar night and still obtain — collect data from it; so one option available to us going forward is simply installing additional batteries while we harvest solar energy through our solar arrays, which would let us continue heating critical components such as avionics and instruments aboard the lunar lander so they endure further into the lunar night. We're able to scale up our solar energy too. That's a capability we've demonstrated with Blue Ghost Mission 1. There are, however, additional possibilities, for instance radioisotope heater units, RHUs. As you recall from the Mars missions, there are also other varieties of RTGs that could be employed. Nuclear powered plants are another option you could use. NASA will want to look further into all of these, since the fundamental requirements for maintaining a permanent presence on the Moon include power, communications, and navigation. Firefly intends to keep supporting NASA across all of those areas.
Then finally, regarding Blue Ghost — considering NASA's bigger desire for landers compared with three months back — what should we expect for gross margins at a steady state once mission cadence increases? Also, I suppose, has your perspective on Blue Ghost margins shifted at all?
Yeah. Nothing has — the sole change in that area is that the program has sped up. Before, our plan was to secure — we'd get several chances per year, but that has now truly picked up pace. Our thinking about gross margin in that case hasn't actually shifted. We don't typically disclose spacecraft gross margin separately. I mean, spacecraft solutions covers Blue Ghost, covers Elytra, and also covers our software solutions business.
I appreciate all of you joining us on this call today. We're eager to talk with you once more when we share the financial results for our upcoming quarter. Thank you, everyone.
And this concludes our conference. Thank you for participating, and you may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Firefly Aerospace Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Firefly Aerospace Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.