Good afternoon, everyone, and thank you for joining us. Welcome to GlobalWafers' Q3 2026 Earnings Call. I'm Leah Peng, the company's spokesperson, and I'm happy to have with us today our Chairperson, Doris Hsu. Here's the plan for today's event. Doris will start with executive comments, sharing insights into overall performance and strategic direction. We'll take investor questions that came in beforehand, and after that there will be an open Q&A session. This call runs for 60 minutes and wraps up at 5:00 p.m. Before we begin, a quick reminder so everyone has a chance to take part. We kindly ask each participant to keep their questions to 2. <<operator_script>> Before we begin, I'd like to remind you that today's discussion may include forward-looking statements. Please be aware that these statements carry various risks and uncertainties, which could make actual results differ materially from our expectations. Please refer to the safe harbor notice in our presentation. Now, without further delay, I'd like to hand the floor to our Chairperson for the executive comments on GlobalWafers. Dorris, please.
Thanks, Leah. Good afternoon, everyone, and thank you very much for joining GlobalWafers' Q3 2026 earnings call. Leah Peng, our spokesperson, will take you through the presentation and respond to some of the questions we've been getting frequently of late. I'll also be taking questions during today's session. Let me start with one message that sums up where GlobalWafers stands today. We invested ahead of the cycle, and we're ready for the next phase of growth. Demand for semiconductors is broadening, but qualified capacity can't be built overnight. It takes substantial capital, loan equipment lead times, and lengthy customer qualification processes. With our global capacity already in place and customer engagement increasing, our early investments are becoming a very meaningful competitive advantage. Although the Novara fire created near-term challenges in the third quarter, other facilities across our global network continued to deliver solid operation, operating and shipment performance. Our strategic direction remains unchanged. And with our global manufacturing footprint, continued progress in capacity ramp-up and a stronger financial position, we remain well positioned to capture growth opportunities as semiconductor demand recovers. With that, let me walk you through our financial performance for the third quarter and first 9 months of 2026. If you have our material presentation materials squeezed, kindly turn to Page 4.
Global wafers posted revenue of TWD 14.9 billion for the third quarter — a 2.2% drop versus the prior quarter, driven largely by the effects of the Novara fire — and gross margin came in at 20%. Across the first 9 months of 2026, revenue was TWD 44.1 billion, a 4.4% year-over-year decline, and gross profit amounted to TWD 9.0 billion, equal to a 20.5% gross margin. The quarter-over-quarter revenue decrease was mostly attributable to the July fire at our Novara 8-inch facility. Absent that fire, third quarter revenue would have delivered double-digit sequential growth. Leah will walk through more analysis detail on the financial analysis afterward. Kindly turn to Page 5. Operating margin for the third quarter of 2026 was 9.8%, and net profit margin came to 10.1%. Over the first 9 months of 2026, operating margin registered 9.9%, and net profit margin hit 16.3%, which includes the effect of Siltronic's valuation gains. Page 6, please. Third quarter EPS was TWD 3.13 per share, lower than Q2, chiefly because of the high comparison base created by Siltronic's valuation gains in Q2 along with the Novara fire's impact. Also, our Siltronic investment gets measured at fair value at the close of each quarter, with changes recognized in nonoperating income or expenses.
Siltronic's stock price climbed roughly 56% between the close of Q1 and the close of Q2, which produced a sizable valuation gain. During Q3 the share price has stayed mostly flat, leading to a similar valuation outcome. Because of that, third-quarter earnings came much closer to mirroring how our core operations actually performed — and even with the Novara fire affecting output and shipments, our base business held fairly steady, delivering solid results and meaningful wins at several of our manufacturing locations. Going forward, our attention stays on Novara's steady ramp back and on keeping operations dependable throughout our worldwide production footprint. Cumulative EPS for the opening 9 months of 2026 came in at TWD 15 per share, almost equal to the TWD 15.29 posted across all of 2025. On repayments, guaranteed deposits included, the figure was TWD 21.2 billion, a decline of 4.5% versus TWD 22.2 billion in the prior quarter. We keep honoring our current long-term supply contracts according to customers' delivery schedules, and at the same time we are in active talks about further agreements with a number of customers, especially in the U.S., where appetite for wafers made locally is still extremely robust. In addition, the Board gave the green light to a cash dividend of TWD 6 per share covering the first half of 2026, amounting to a total payout of roughly TWD 3.17 billion, which works out to a 50.5% dividend payout ratio.
The dividend record date is July 4, 2027, and the payment date is January 22, 2027. Yes. It was January 4, sorry. The dividend record date is January 4, 2027, and the payment date is January 22, 2027. This distribution gives our shareholders a meaningful cash return, which reflects the Board's commitment to shareholder returns while keeping the financial flexibility needed to support the company's long-term growth. Okay. Please turn to Page 7. We believe the semiconductor industry is entering a new super cycle, with industry research firms raising their forecasts, and the market is expected to exceed USD 1.6 trillion in 2026. AI, HBM and advanced computing are driving structural growth, while demand is broadening into mature node power, connectivity and industrial applications. Silicon wafer shipments keep growing year-on-year, with recovery extending across wafer sizes and advanced packaging adding to demand. So that means the recovery is not only for 300-millimeter advanced product, but also for even smaller diameter, 200-millimer or even 6-inch wafers — all wafer sizes are recovering right now. Rising construction costs, loan equipment lead times and lengthy qualification cycles limit how quickly new wafer capacity can come online. As the supply-demand balance tightens, qualified production ready capacity becomes increasingly valuable.
The early expansion investments GlobalWafers made give us a first-mover advantage — with our current capacity running at full utilization across every wafer size, and new capacity being developed around the world, we're in a strong position to meet rising customer demand. Kindly turn to Page 8. We're already seeing the payoff from those early investments. Our U.S. operations keep getting better, and a growing number of customers are talking with us about long-term supply agreements for our U.S. capacity, which shows how much they need a dependable local source. At our manufacturing site in the U.S. and Japan, we continued to hit record operating milestones, while our 12-inch expansion in Italy ramped up steadily. Building on that operational momentum and growing customer demand, I'm pleased to announce another important milestone in our strategic partnership with Micron. Today, our Board approved a proposal to issue up to USD 500 million in 10 years privately placed convertible bonds, with Micron as the sole subscriber, subject to shareholder — subject to GWC shareholders' approval. Our long-standing wafer supply relationship, together with the planned 10-year supply agreement, provides a solid foundation for a stable stable supply and long-term capacity planning, and the proposed convertible bond would further deepen our collaboration, extending beyond wafer supply to strategic capital cooperation and long-term supply chain development.
Through a mix of long-term customer commitments and financial backing, these arrangements are going to help us plan further capacity down the road, boost supply stability, and reinforce our advanced semiconductor material manufacturing capability — especially in the U.S. — across technology transitions and industry cycles. Given its 10-year term and 0.5% coupon rate, the proposed convertible bond would deliver long-term funding at relatively low cash interest costs, all while keeping flexibility in our capital structure. In our view, Micron choosing to take part in GlobalWafers' long-term development via this convertible bond shows the trust that has been built over many years, along with its confidence in our future growth potential. International investors also gave very strong backing to our global growth strategy in September. We finished a USD 1.4 billion GDR offering, with investor demand coming in at approximately 4x the offering size. That response shows confidence in our global manufacturing footprint and long-term growth potential. The offering also substantially reinforced our balance sheet, taking us from TWD 18.6 billion in net debt at the close of Q2 to TWD 26.3 billion net cash at the close of Q3. With this stronger financial position, we have greater flexibility and more resources to support ongoing operations, navigate macroeconomic uncertainty and industry cycles, and invest in future growth.
With semiconductor demand bouncing back, we’re in a stronger position to seize emerging supply opportunities and move our local-for-local manufacturing strategy forward. Within that wider growth plan, I want to call out one area where customer momentum is especially strong: our 12-inch SOI business. 12-inch SOI is one of the product areas—one of them—where we see very clear mid- to long-term growth potential. As the market keeps shifting from 8-inch to 12-inch, silicon photonics is emerging as an important new growth driver on top of established applications such as RF SOI, Empower SOI; in particular, customer demand has strengthened noticeably recently. And the demand we are seeing already exceeds our existing 12-inch SOI expansion plan. We also hold a unique strategic position in the U.S. Our Missouri facility is currently the only site in the U.S. with a 12-inch S manufacturing capability together with GlobalWafers proprietary SI layer transfer technology and vertically integrated in-house substrate supply. This gives us a strong strategic position; our new 12-inch SOI capacity in Missouri is still ramping up as additional tools complete qualification and utilization improves. Our immediate priority is to accelerate the ramp of our existing capacity by debottlenecking to further increase our output and maximize the utilization of our existing assets.
Meanwhile, because customers are asking for more, we're looking at ways to grow our 12-inch SOI capacity even further. Talks are already underway with several customers, and these include LTAs and prepayments intended to cover over 90% of that proposed additional SOI capacity. With the current fab and infrastructure already built, any added expansion could draw on those assets and would mainly need more equipment, which gives better capital efficiency than the first phase did. Even so, we'll stay disciplined on capital allocation — how big and how soon any next-stage investment happens will hinge on a number of things, among them long-term customer commitments, how profitable our current capacity is, government support as well, and the overall return on investment. On the whole, we're still very positive on the mid- to long-term outlook for 12-inch SOI, especially silicon photonics. Going forward, our focus will be on bringing operations back at Novara, Italy, speeding up the ramp of new capacity, and pursuing expansion down the road with disciplined capital allocation; with our global manufacturing footprint, strong customer partnerships, and greater financial flexibility, we're well placed to seize growth opportunities and bolster our long-term competitiveness. I'll now turn it to Leah, who will take you through demand trends in key applications, then give an overview of the company and some financial performance.
Thanks a lot, Leah — go ahead.
Thank you, Doris. I'll start by covering demand patterns in our major applications, then give a company overview and review financial performance. I'll also take up the questions investors have been asking us most often of late. Turning to Page 10, AI infrastructure is still the primary engine of growth, helped along by growing data center spending and wider AI adoption. Memory fundamentals look especially solid, given constrained supply, healthy HPM demand and more long-term supply commitments, which gives us better demand visibility. Smartphone and PC shipments came under pressure, yet premium and AI-capable devices keep lifting semiconductor content. Industrial demand is picking up, while automotive's rebound is still gradual. Power infrastructure, ADS and physical AI offer further growth avenues; advanced packaging and HBS stacking add manufacturing complexity and raise wafer requirements, and silicon photonics is fueling demand for specialty substrates like SOI. All in all, ever more complex manufacturing processes and growing semiconductor content across applications are propelling silicon wafer demand. These structural forces strengthen our constructive long-term view of the industry. Now please turn to Page 13. Top research firms have lifted their forecasts for the worldwide semiconductor market, with global revenue projected to almost double year over year to roughly U.S. 1.6 trillion and to near USD 2 trillion in 2027. Memory and AI stay the principal growth engines, as robust HBM demand and supply bottlenecks speed up capacity investment.
Global fab equipment spending should hit USD 118 billion in 2027. Silicon wafer demand is set to keep growing on the back of these trends, supported by capacity expansion as well as rising wafer consumption. On Page 14, to seize opportunities arising from robust semiconductor demand and tighter supply, GlobalWafers wrapped up a USD 1.4 billion GDR offering in September, with roughly 4x oversubscription, which shows strong interest from international investors. Those proceeds will go toward foreign currency raw material procurement and future growth opportunities throughout our global manufacturing network, reinforcing our local-for-local supply capabilities. The GDR also shifted our financial position from net debt of TWD 18.6 billion at the close of Q2 to net cash of TWD 26.3 billion at the close of Q3. Our debt ratio fell from 56% to 52%, the current ratio rose from 128% to 163%, and the quick ratio climbed from 108% to 150%. With a stronger balance sheet and better liquidity, we are better positioned to fund future expansion and capture growth opportunities driven by AI and advanced semiconductor demand. And then we get industry cycles, the offering also burdens our global institutional investor base, enhancing market visibility and trading liquidity. On Page 15, you can see GlobalWafers entering its next growth phase with 3 key advantages: order demand, operating readiness and disciplined capital.
Recovery in demand is broadening past advanced nodes into material applications and specialty wafers, which has opened up wider growth possibilities throughout our entire product portfolio. On top of that, the recovery differs from market to market. Even more significantly, the investments we made early on are now producing operating results you can measure. Let me give you an update now on our expansion projects in the U.S., Italy and Japan. In the U.S., equipment installation for GWA major Phase 1 is mostly done, and several Tier 1 customers have finished qualification. For a fourth straight month, monthly shipments have hit new highs. Demand for local supply plus long-term customer commitments underpin additional ramp-up, positioning GlobalWafers America to grow its revenue contribution as utilization rises. At our Missouri facility, 12-inch SOI output hit a record high in Q3, with over half of the recently installed equipment qualified for volume production. A number of RF SOI and silicon photonics products have already entered volume production, and major customers are negotiating multiyear supply agreements to lock in future capacity. In Italy, our new 12-inch facility was not affected by the fire, and the expansion is still on schedule. Customer qualifications are moving forward, volume shipments have started, and monthly ARPU keeps hitting new highs. In Japan, the Utsunomiya expansion is entirely complete. Utilization stays high, and shipment volume set another record in Q3.
Better utilization and a richer product mix have helped that facility become profitable, adding positively to our revenue and earnings. These milestones show that our worldwide manufacturing network is shifting away from capacity investment and toward more production and customer supply. Our established footprint on 3 continents also gives us a competitive edge that would take considerable time and capital to replicate. Along with our strengthened financial position, GlobalWafers has the demand opportunities, manufacturing capabilities and financial foundation needed to turn the next semiconductor growth cycle into tangible business growth. Kindly turn to Page 17 for this quarter's financial highlights. Third quarter revenue came in at TWD 14.9 billion, down 2.3% from Q2. Demand across our major wafer sizes and production lines remains very strong. And prior to the Novara fire, we had expected double-digit sequential revenue growth. However, the mid-July fire disrupted production and shipments at our Novara 8 inch line, which resulted in a slight sequential revenue decline. The fire's impact went beyond 8-inch wafer sales, as Novara also supplies surplus trades for SOI products, affecting related SOI production and revenue. We are reallocating capacity across sites to support supply, but other facilities are already running at high utilization, and current-size transfers require careful coordination due to differences in product be manufacturing capability and customer qualification requirements.
So the revenue drop was mostly about what happened at Novara, not a sign of softer demand in the end markets. Our top priorities for softening that blow are core support and getting Novara back on track step by step. Gross margin fell to 20%, which mirrors the real cost of depreciation on new capacity along with the product mix coming out of the fire at the Novara facility. Operating margin held steady at 9.8%, largely because accruals for remuneration came down after the electronic share price declined. EPS came in at TWD 3.13 per share, versus TWD 7.9 per share in Q2. The main reason is the tough comparison base created by Siltronic's big valuation gain in Q2. Even with the Novara fire weighing on us, underlying operating performance stayed stable. Turning to Page 18, let's look at financial performance for the first 9 months. Revenue reached TWD 44.1 billion, a 4.4% Y-o-Y decrease, which partly mirrors the Novara fire's impact. Gross margin stood at 20.5%, mirroring new capacity ramp-up costs and depreciation. Net prefer rose to TWD 7.2 billion, and EPS hit TWD 15 per share, near the 2025 full year EPS of TWD 15.29 per share. On Page 19, we take a closer look at the income statement. The simulated figures on the right leave out the effect of major expansion projects in the U.S., U.S., Italy and Japan, plus the mark-to-market changes on Siltronic shares.
So with that as the backdrop, gross margin actually got better, moving from roughly 31% in Q1 to roughly 34% in Q2 and Q3. Simulated EPS likewise rose quarter over quarter, going from about TWD 5 in Q1 to more than TWD 26 in Q2 and more than TWD 7 in Q3. When we look at the first 9 months of 2026, simulated gross margin comes in near 33%. We simulated EPS of $18.66 per share. This sequential gain in both adjusted gross margin and EPS shows that our underlying operations remain strong. Kindly turn to Page 20, where the balance sheet is shown. The GDR issuance we completed in September made our financial foundation stronger. As Q3 ended, cash and cash equivalent came to TWD 60.8 billion, while total cash and cash-related assets got to TWD 135.4 billion. Inventory went up slightly -- that mirrors the steady arrival of supplies and polysilicon purchases that support the new expansion we have underway. This stronger financial foundation backs the working capital and the investment required as our facility ramps up. It leaves us better placed to satisfy customer demand and to turn our installed capacity into revenue and earnings down the road. Next, I want to take up the questions investors have sent us lately as well as those we expect will come up.
Let's start with the industry outlook. What's our view on the silicon wafer industry? We're still quite positive about where the industry is headed. The mature markets are still showing a 2-speed recovery, and the pace of that recovery is uneven. But the overall trajectory is still upward, and we expect supply-demand conditions to be tighter in 2027 than in 2026. Our view on advanced nodes is still very positive. Demand keeps being driven by AI-related applications. And Semi estimates that the number of fabs or production lines starting operation or shipping first silicon will rise significantly, from 13 in 2026 to 23 in 2027, which gives clear support for wafer demand in 2027. So we expect demand for advanced nodes to stay strong, while qualified 12-inch wafer supply should get progressively tighter. The material market has been recovering gradually on inventory normalization, with improving demand from power, analog, automotive, and industrial applications. We saw clear strengthening in the fundamentals. Next question is our own business outlook for Q4 2026 and the first half of 2027. Demand improved significantly across all wafer diameters and all production lines in 2026. Overall capacity utilization stayed very high, and the market recovery became increasingly evident.
Before the fire in Novara, we had felt quite optimistic regarding second-half operations. But the mid-July fire at the Novara facility hit a key portion of our 8-inch capacity, along with the SOI productions. Through global capacity allocation and higher utilization, we keep mitigating the impact. We are working intensively to raise shipments in the fourth quarter. As we look into the first half of 2027, the gross drivers are clearer: demand keeps rising, and for a number of products demand already exceeds supply — including certain small diameter wafers — which creates room for pricing improvement, remain growth, better pricing, the gradual recovery of Novara capacity, and the ramp-up of our new facilities. All of this will support our operating performance in 2027. In conclusion, we remain very optimistic and promising about the outlook for 2027. The next question is our utilization rate. What are the current utilization rates across the company's wafer diameters? Demand has improved across all major wafer diameters. So, excluding the newly expanded production lines, which are still ramping up, our existing 12-inch capacity is all fully loaded. Demand for 8-inch and 6-inch wafers is also very strong. Utilization is also close to full capacity. The demand recovery has also burdened from advanced to mature node and smaller diameter products.
Our compound semiconductor business—things like gallium nitride and silicon carbide—is also performing very well. Their utilization rate is really high. That shows customer demand for high-quality compound semiconductor substrates keeps rising. Your next question concerns the status of our Novara fire recovery. All right. So our recovery work on the 8-inch production line at Novara, Italy keeps moving forward, except for some back-end processes that are still being rebuilt. All major manufacturing operations have restarted, and AP products have begun to ship as well; the processes that haven't been restored yet are being supported by other sites right now. But those supporting sites are running close to full capacity. So the reallocation has to fit the existing orders, and certain critical equipment has long lead times. As a result, production and shipments in the near term are still affected. Also, qualified capacity can't be swapped out one-for-one, because products, process capability and customer qualification requirements all differ, which makes core-site capacity allocation more complex. On insurance, our claim process for both property damage and business interruption losses has begun. We keep supplying supporting documentation to establish the final loss amount and insurance proceeds; that final amount hasn't been determined yet.
To date, no related insurance income has been recorded in our financial statements. The following question concerns subsidies for our expansion projects in the U.S.A. and Italy. Government subsidy and incentive programs are moving forward as planned. In the U.S., GW has kept meeting the chich program's milestone requirements on schedule and anticipates a significant milestone payment from the U.S. Department of Commerce before this year ends. We will also apply the advanced manufacturing investment tax credit under the applicable requirements to pursue tax credits connected with its U.S. expansion. In Italy, the second and third subsidy instruments are presently being reviewed and should be received progressively in line with project milestones. On the whole, GlobalWafers anticipates receiving roughly USD 100 million in government subsidies by the end of 2026. However, the actual amount and the timing of recognition will still depend on the review progress, policy requirements and administrative procedures of the relevant authorities in each jurisdiction. Okay. The next question concerns the silicon carbide outlook, okay? So, drawing on our customer — our recent customer engagement and correspondence and our current order activity, we believe the silicon carbon market is gradually moving into its next growth cycle.
Demand keeps growing past EV into high-growth, high-voltage uses like AI data centers, plus infrastructure, renewable energy and the industrial market, and customers are also planning a shift from 1,200 volt to 3,300 volt and above, which raises the bar on material quality and reliability, backed by wider demand and tighter supply. We've taken in higher SiC wafer shipments along with a gradual stabilization in ASP. Utilization of our IT-related capacity is still at a high level. So given current customer demand, order visibility and those emerging application trends, we're still quite optimistic on the future SiC market. Next is our CapEx outlook for 2027 and 2028. Okay? So our prior global expansion cycle is gradually entering the ramp-up stage as major construction projects on completed CapEx has already come down from its peak and is expected to decline significantly in 2026 compared with 2025. Looking at 2027 and 2028. Market demand continues to strengthen, with a number of customers seeking additional supply and longer-term cooperation. To meet this demand, we'll speed up the ramp-up of new capacity and get the most out of existing capacity through debottlenecking. If mid- to long-term demand exceeds available capacity, we'll carefully evaluate further expansion possibilities.
When we look at any new investment, the main things we weigh are strong customer demand and long-term commitment from government support. Beyond that, because construction and operating costs run higher, the pricing and commercial terms need to properly reflect those costs, while our profitability, ROI and payback remain important factors as well. So the actual CapEx number for 2027 and 2028 will hinge on customer demand, ramp-up and debottlenecking progress, along with the economics and timing of our potential new projects. At GWA, we'll keep ramping up and debottlenecking Phase I, and we're moving forward with Phase II planning — with the Phase II building and some infrastructure already in place, further expansion could be more capital efficient and faster than Phase I. The next question is about the corporate bond we just announced with Micron. So how does this USD 500 million private placement of convertible bond tie to the strategic funding announced previously, given that the parties already have a 10-year LTA while using a CB structure instead of prepayment, okay? The USD 500 million private placement of convertible bond approved in principle by the Board today — this is exactly the strategic funding referenced when GlobalWafers and Micron announced the long-term collaboration. The parties have already established a stable foundation for corporation through the 10-year LTA.
We think the CB will take our ties with key customers even further. Their readiness to back GlobalWafers’ long-term development through the CB also shows, in our view, their confidence in our prospects and in our future growth potential. Our prepayment tends to be tied more directly to arrangements for future product purchases and deliveries. The strategic funding has a wider purpose: beyond supporting the party supply relationship, it is meant to serve global water strategic needs, including developing our U.S. operations and enhancing supply capabilities. So we intend to use the CB structure to secure funds while keeping our capital structure flexible. Under the current plan, the CB will carry a 10-year tenure and a 0.5% coupon rate. That lets GlobalWafers obtain long-term funding with a comparatively low cash interest burden. At issuance, the CB stays a debt instrument, and unlike a rights issuance of new shares, it will not immediately raise the number of common shares outstanding. So our aim is to strike a suitable balance among long-term funding, capital structure flexibility, the interest of existing shareholders, and a sustainable relationship with the key customers. The next question concerns memory. So looking ahead, if memory prices fall in 2028, the memory makers are just wafer starts, while lower component costs support a recovery in consumer demand.
How do you see the supply-demand gap for 12-inch and 8-inch wafers — widening or narrowing? Okay. We think it's important to separate memory pricing from wafer starts. A normalization in memory prices doesn't necessarily mean fewer wafer starts. It could instead reflect extra supply coming online, while underlying demand from AI HB, server memory, and data center applications stays strong. At the same time, lower component costs could support a recovery in smartphones, PCs, and other consumer applications, with demand broadening from today's AI- and high-end-driven market into more mature node applications. So at present we don't see 2028 as a simple reversal of the current demand cycle, but rather as a potential broadening of the demand base. We expect 12-inch supply-demand conditions to stay relatively tight, supported by AI applications. We aim to show benefit from improving customer demand in power analog, automotive, and industrial, with conditions varying by product. So that's our response to the questions now. Now I'd like to hand it over to Doris for the Q&A session. Doris, please.
Yes. The first question is whether the company has any plans to raise product prices going forward. That's the first question. We received some questions from several different audience today. So okay, here's our answer. Market demand visibility continues to improve with the supply and demand conditions tightening in certain products. The overall pricing environment has become more favorable, and we are continuing to work with customers on price adjustment right now. Energy and raw material, labor and operation costs have increased significantly. Freight also increased significantly. While the investment cost of new capacity is also much higher than in the past. We, therefore, believe that pricing needs to appropriately reflect current supply-demand condition, cost cost structures and product value price adjustments will be negotiated on a case-by-case basis depending on product specification, supply-demand conditions and contract renewal timing and individual customer circumstances rather than being applied a certain percent price increase across all products. So different view, of course, different views during pricing discussions are very nature. But with improving supply-demand conditions, we believe the current market environment is increasingly supportive of pricing or pricing return to a more reasonable and sustainable levels. This is the first question. And the second question is on existing 300-millimeter capacity is operating at high utilization while consolidated gross margin continues to reflect several factors.
Which of those two is putting more pressure on us right now—pricing on contracts we already have, or the costs of bringing new capacity up to speed as we look toward 2027? And what would you point to as the main drivers behind improvements in ASP and gross margin? Okay. My view is that both of the factors you mention play a role, yet the bigger strain at present comes from bringing our global expansion projects online: our existing 300-millimeter capacity is still running at very high utilization, while the new capacity in the U.S., Italy and Japan keeps absorbing depreciation, energy, labor and the initial operating costs incurred during qualification and ramp up. Because of that, the advantage of strong utilization at our existing capacity has not yet shown up in full within consolidated gross margin. Looking ahead, gross margin gains ought to come from rising utilization as that new capacity ramps up, from better pricing and product mix, and from improved absorption of depreciation and fixed costs as volume increases. Our simulated profitability, once the major expansion projects are excluded, is already substantially above the reported margin, which shows how resilient our underlying operations are. So yes, that's my answer to the second question. And next is...
All right. Up next are the test questions that came in. So we’ll pick which ones we’re going to answer.
All right, yes. On the topic of OTA repricing — your question concerns our long-term agreements, and specifically what approximate spot percentage of OTA volume comes up for expiry in 2027 and can be renegotiated at prevailing market prices. As you know, each quarter we report the repayment balance. When you observe a decrease in that figure, it reflects a decrease in the prepayment, which signals that a growing number of LTAs have been fulfilled. In other words, we hand the money back to customers. So a smaller prepayment remainder indicates smaller LTAs. And we always honor our LTAs. Thus, once a current LTA reaches expiry, then we are able to — when new spot orders or new LTAs come in, naturally the price will certainly be adjusted according to the new cost conditions. And with certain customers, some LTA customers, if they did not take the volume they committed to under the LTA over the past several years, then we have greater flexibility to negotiate a new price with those customers too. That is how we handle LTA pricing. So — but here is a very clear answer for you: you will see more and more new LTAs, and we have multiple LTAs under discussion.
A lot of them are quite near to wrapping up. So you'll be seeing additional new LTAs plus more spot business at better pricing. And given that demand is strong, I think total ASP will begin rising from 2027. It isn't just the LTA — not just the new LTA — but product mix improvement as well, which is another factor. So that's a fast answer to your question. Okay, next. The question concerns real demand versus precautionary stocking. A Japanese peer said customers have begun building up wafer inventory over worries about supply chain disruption and rising prices. How does GlobalWafers tell apart genuine demand from precautionary stocking by customers? We've heard about this situation, since overall operating cost is actually going up — freight, higher raw materials, more inflation. So there's a lot of material cost increase, and COG has risen a lot. So naturally, we're asking customers to raise the price. And many of our customers realize the supply is so tight, and it gets tighter and tighter quarter-over-quarter. So they believe wafer price will keep growing in '27 and '28. As a result, some customers are really assessing how they can pre-stock more wafers to avoid too much impact from the wafer cost.
From what we've gathered, though, I'd say it remains quite limited, since the majority of our peers are running their capacity at extremely high levels. And essentially, we — every one of the peers, GlobalWafers included, stays in very close contact with our customers. That's because all of our customers keep requesting additional supply. So we will certainly go over with each customer how much inventory they hold for this item and for that item, and after that we'll determine which customers are in urgent need of wafers, and those customers will get wafers from us first. So we — not just GlobalWafers, but I believe the peers and everyone across the industry likewise coordinates very closely with each and every customer, aiming to serve the customers with genuinely urgent demand first. Yes. On the separate question of why our Q3 depreciation came in below Q2, I don't believe that's the case. My understanding is that our Q3 depreciation should be above Q2. Still, we'll verify it, and once we have the details, we'll send an email.
Right. The reason is that our Korean subsidiary scaled up a few years before the U.S. fabs did. As a result, a portion of its depreciation has simply finished. Also — please keep in mind that with our U.S. expansion, the preparation there will come online gradually. At our GWA now, since we've hit substantial completion on construction, construction depreciation has already started, and we expect facility depreciation to come online as well.
Yes. Yes. Thanks for what Leah said. Our accounting head also brought this up regarding our Korean fab — we have multiple fabs and we adhere to our accounting policy. And I know that this year, some of our equipment will become fully depreciated, which happens in Q3 — quite a lot of it, in fact. So that was somewhat slower, but depreciation from our new sites keeps rising; with new expansion, new depreciation continues to increase. That trend won't change over the next several quarters, yes. Okay. I think I'll take one more question, and then I'll open it up to the audio questions.
Yes. All right. Philip Lee here, from Morning Star. So your question is that you brought up long-term commitment from customers. Government backing and the profitability of existing capacity are major factors when it comes to new expansions. Out of those 3, which one is nearest to being negotiated and confirmed? Are there any details you're able to share?
Yes. I don't think these are new factors. In fact, we began around — we began applying these criteria a number of years back when we kicked off the expansion in — the decision was made in 2022. So at this point, we're discussing fish or perhaps even additional expansion, like what I mentioned regarding SOI, where we're just about to begin our Phase II expansion for 12-inch and so forth. We apply those same criteria when evaluating. So to answer your question about which one is nearer, that hinges on the specific production lines and on which country the new expansion is located in. So if, say, we're discussing the U.S., I believe we do receive a great deal of backing from the U.S. government. Yet at the same time, some uncertainty remains regarding future policy. We're continuing to engage with the government, attempting to determine what future policy will be and how much support we could obtain should we proceed with further expansion. So it was clear, but at present we need to learn a bit about future expansion and profitability — right now, certain operations are doing better than others. So this is — internally, we govern, we understand very well how large the gap is between the current profitability status and our goal, and how quickly that gap is.
So at that point we'll know how quickly they can get up to speed on our operation and bring the table to profitability. Customer commitment, then, is the simplest piece. We have plenty of customer commitment. Take the 12-inch, for instance. In fact, customer demand from committed customers far exceeds what we can build in Phase I, so at present customer commitment means SiC. And it isn't just variable commitment — every one of our customers is ready not only to commit and sign a contract but also to make a prepayment. I'd say they're very positive. So of those 3 items, customer commitment is the easiest. Profitability comes second. The third one, common positive on each one, is that there are still matters we're discussing with each country's government right now.
Thanks. So, ladies and gentlemen, we're now opening the floor for questions from the live audience. <<operator_script>> Kindly keep yourself to 2 questions each time. And our first one comes from Sunny at UBS.
Was the audio coming through clearly for you?
Yeah, yeah. That’s perfect.
My first question is whether you could give us a little more color on how we should think about the pace of recovery over the next few quarters. Earlier, you said that Q3, absent the fire incident, should have achieved double-digit top line growth. Now, looking ahead, the Italy fat is gradually resuming operations, pricing is starting to improve, and you're ramping up more supply. So I wonder how we should think about top line momentum perhaps in Q4 and also into early 2027?
Absolutely, Sunny — you really do have an excellent memory, and you're right. If there had been no fire in Italy, we actually could have delivered above 10% growth in Q3 on a quarter-over-quarter basis. But we didn't get there, and the fire was the reason. Internally we ran a simulation, and it's quite clear that absent the 5, we would have hit double digits — specifically 12%, above 12% year-over-year growth. So looking at Q4, the coming quarter — the current quarter, I should say — the momentum remains very strong right now. In fact, it's even stronger than we had anticipated. To secure additional capacity, some customers are even willing to pull their price adjustment forward — moving the new price adjustment into Q4. A few have raised this. The constraint, though, is that we lack sufficient capacity to supply them. So demand is stronger than what we — stronger than our forecast from a couple of months back. Q4 demand is therefore very strong. That said, the super majority of Q4 prices remain at the old LTA levels or the price negotiated for 2025. So pricing was still the old price, not much in the way of price increases, but the promise has improved.
We’re also seeing demand from customers that is very, very strong. That’s where things stand right now. So our belief is that Q4 will be a better quarter than Q3. And beginning in Q1 2027, I think we’ll have not only additional capacity from newly expanded fabs, but also pricing that is better — a better ASP than in Q4 2026. That’s how we see it.
Doris, I want to verify this since it matters a lot. So for Q4, given what you can see right now and the production situation at the Italy fab, is it possible for you to deliver top-line growth above 12% year over year?
No, we can’t, since Novara is still—we’re recovering, but Novara volume, the recovery volume, remains quite small. So we’re still dealing with the lost Novara capacity and revenue. That’s why I’m saying growth will improve. Q4 will come in better than Q3, but it won’t be as high as 12%. That 12% referred to this: absent the fire, our Q3 revenue would have been more than 12% above Q2 on a grouping basis. I apologize for not stating that clearly.
Absolutely, happy to address that. My follow-up question concerns how supply and demand become tighter, particularly as we move toward possibly the second half of 2027 and into 2028. And when you're allocating capacity market by market — suppose memory clients negotiate new contracts more aggressively to back a more meaningful capacity expansion for that period, whereas logic clients are less aggressive — at a high level, how would you approach allocating capacity across end markets, given the quite different pricing dynamics?
Yes. Internally, we have a strategic internal policy covering roughly what percentage of revenue goes to memory versus what percentage to non-memory. So in-house, we have that in our location. Then for the memory portion, we negotiated with customers. My hope is that we can secure a better price to cover our cost increase. So we talk with customers, different memory customers, and we decide how to allocate the memory capacity reserved for the customer who can — who can achieve — at least get closer to our target price. That's how we work with our customers. For the non-memory, the analog part, or for the non-memory area, there are a lot of applications like silicon photonics and power SOI, RF SOI, all the — even for compound materials. So we have a lot of revenue. And for those categories, we just based on similar to what we did before that based on the customer, the partnership, how long we've been because the demand is very tight, right? Demand is very strong and supply is very tight. So we care about long-standing partnerships. So our criteria is a customer partnership in LTA setters, if they are the customers who are willing to sign LTA and paper impairment, they will get the capacity first.
So that remains the priority. And for customers whose company policy makes it impossible to commit to any LTA, then we just — we'll certainly take care of them. We'll essentially make the call based on their pricing situation and business terms.
And coming up next, we have Lucas calling in from Morgan Stanley.
My first question also concerns pricing moves. You mentioned that across all diameters, your products are running at close to full capacity. Even so, we'd like to think we can assume the pricing talks will go very smoothly. Yet we keep picking up some customer resistance to the price increase for next year, particularly from the biggest foundry customers. So we're just wondering how we should square that gap — is it due to customers' inventory, or is there something else we've overlooked?
Yes. Yes. Okay. So yes, you're correct. Certain customers have been more receptive to the price adjustment, and others have not, which is accurate. I understand that because each of them has their own — we have differing reasons for that. But as a wafer supplier, we work very closely and we very clearly expressed our position that if some customers insist on no price improvement or a very limited pricing movement, then we have no choice but to allocate a little bit lower. But we — I mean, there are still a lot of — in addition to price, I think there is still a lot of value in partnership with each customer. And so — it's not only that, but because, of course, we know that some of our customers do have more wafer inventory in-house, so they have less pressure than others to try to mine to get a lot of wafers or even paying a little bit higher to get the wafers — so some inventory availability, that's one of the reasons why they are more — they're stronger, they are tougher to set our price adjustment requests. So that's one of the key reasons, that's very true.
Yeah. Yeah. And with luck, we’ll be able to push through additional price increases into ’28 too. So for my second question, I’d also like an update on where things stand with your 12-inch silicon carbide, and at this point, how should we think about a meaningful revenue contribution from 12-inch silicon carbide arriving in ’27 or ’28?
12-inch silicon carbon is performing fine. Yet in terms of volume, since this is a new project, volume remains in ramp-up mode. It's not just us being in ramp-up mode — our customers are also in ramp-up mode. So we do have very healthy 12-inch spent carbon, though right now the volume isn't that high. But per the forecast, I think 300 million of silicon carbide holds very good potential down the road. Because quite a lot of customers are requesting that same concept and similar material, perhaps for different applications. So we think 30-meter in car by 2027, the revenue will still be in the low single-digit weight amount of our — I mean, the revenue, but it will ramp up quite smoothly over the next several years.
Thanks. And everyone, we want to say how genuinely grateful we are to each of you for taking the time to join us today. That brings this earnings call to a close. Thanks so much, and enjoy a wonderful evening. Thank you. Bye-bye.
Thanks. Goodbye.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete GlobalWafers Co., Ltd. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to GlobalWafers Co., Ltd. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.