Home / Transcripts / GlobalWafers Co., Ltd. (6488) · November 3, 2026

GlobalWafers Co., Ltd. (6488) Earnings Call Transcript

November 3, 2026

TPEX TW Information Technology Semiconductors and Semiconductor Equipment earnings 67 min

Earnings Call Speaker Segments

Leah Peng executive
#1

Good afternoon, everyone. Thank you for joining us. Welcome to GlobalWafers' Q3 2026 Earnings Call. I'm Leah Peng, spokesperson for the company, and I'm pleased to be joined today by our Chairperson, Doris Hsu. Here's how today's event will unfold. Doris will begin with executive comments, providing insights into overall performance and strategic direction. We will address investor questions received in advance, followed by an open Q&A session. This call will last for 60 minutes and conclude at 5:00 p.m. Before we begin, a quick reminder to ensure everyone has the opportunity to participate. We kindly ask that each participant limited their questions to 2. [Operator Instructions] Before we begin, I would like to remind you that today's discussion may contain forward-looking statements. Please be aware that these statements are subject to various risks and uncertainties, which could cause actual results to differ materially from our expectations. Please refer to the safe harbor notice in our presentation. Now without further delay, I would like to pass the floor to our Chairperson for the executive comments on GlobalWafers. Dorris, please.

Hsiu-Lan Hsu executive
#2

Thank you, Leah. Good afternoon, everyone. Thank you very much for joining GlobalWafers' Q3 2026 earnings call. Leah Peng, our spoke person will walk you through the presentation and address some of the frequently asked questions we have received recently. I will also take questions during today's section. Let me begin with one message that capture GlobalWafers position today. We invested ahead of the cycle, and we are ready for the next phase of growth. Semiconductor demand is broadening, but qualified capacity cannot be built overnight. It requires substantial capital loan equipment lead times and lengthy customer qualification processes. With our global capacity already in place and customer engagement increasing. Our early investments are becoming a very meaningful competitive advantage. Although the Novara fire created near-term challenges in the third quarter, other facilities across our global network continued to deliver solid operation, operating and shipment performance. Our strategic direction remains unchanged. And with our global manufacturing footprint, continued progress in capacity ramp-up and stronger financial position, we remain well positioned to capture growth opportunities as semiconductor demand recovers. With that, let me walk you through our financial performance for the third quarter and first 9 months of 2026. If you have our material presentation materials squeeze, kindly turn to Page 4. Global wafers reported third quarter revenue of TWD 14.9 billion, representing a a 2.2% decrease from the previous quarter, mainly due to the impact of the Novara fire, and gross margin stood at 20%. For the first 9 months of 2026, revenue totaled TWD 44.1 billion, down 4.4% on year-over-year, while gross profit reached TWD 9.0 billion, with a gross margin of 20.5%. The sequential revenue decline was primarily due to the July fire at our Novara 8-inch facility. Without the fire, third quarter revenue would have achieved double-digit sequential growth. Leah will provide further analysis detail of the financial analysis later. Please turn to Page 5. In the third quarter of 2026, operating margin stood at 9.8%, while net profit margin was 10.1%. For the first 9 months of 2026, operating margin was 9.9%, while net profit margin reached 16.3%, including the impact of Siltronic's valuation gains. Page 6, please. Third quarter EPS came in at TWD 3.13 per share, down from Q2, mainly due to the high comparison base from Siltronic's valuation gains in Q2 and the impact of the Novara fire. And our investment in Siltronic is measured at fair value at each quarter end with changes recognized in nonoperating income or expenses. Siltronic share prices rose approximately 56% from the end of Q1 to the end of Q2, generating a significant valuation gain. In Q3, the share price remains largely stable, resulting in a comparable valuation game. As a result, Q3 earnings more closely more closely reflected our underlying operating performance despite the impact of the Novara fire on production and shipments, our underlying operations remained relatively stable with strong performance and notable achievements across multiple manufacturing sites. Looking ahead, we remain focused on the gradual recovery at Novara and maintaining stable operations across our global manufacturing network. For the first 9 months of 2026, cumulative EPS reached TWD 15 per share, nearly matching the TWD 15.29 recorded for the full year 2025. Regarding repayments, including guaranteed deposits stood at TWD 21.2 billion, down 4.5% from TWD 22.2 billion in the previous quarter. We continue to fulfill existing long-term supply agreements based on customer delivery schedule, while actively discussing additional agreements with multiple customers right now, particularly in the U.S. where demand for locally manufactured wafers remain super strong. The Board also approved a cash dividend of TWD 6 per share for the first half of 2026, with a total distribution of approximately TWD 3.17 billion, and a dividend payout ratio of 50.5%. The dividend record date is July 4, 2027, and the payment date is January 22, 2027. Yes. It was January 4, sorry. The dividend record date is January 4, 2027, and the payment date is January 22, 2027. This distribution provides a meaningful cash return to our shareholders, reflecting the Board's commitment to shareholder returns while maintaining the financial flexibility to support the company's long-term growth. Okay. Please turn to Page 7. We believe semiconductor industry is entering a new super cycle with industry research firms raising their forecast and the market is expected to exceed USD 1.6 trillion in 2026. AI, HBM and advanced computing are driving structural growth, while demand is broadening into mature node power, connectivity and industrial applications. Silicon wafer shipments continue to grow year-on-year with recovery extending across wafer sizes and advanced packaging adding to demand. So that means that the recovery is not only for 300-millimeter advanced product, but also for even smaller diameter, 200-millimer or even 6-inch wafers, all wafer sizes are recovering right now. Rising construction costs, loan equipment lead times and lengthy qualification cycles limit how quickly new wafer capacity can come online. As the supply-demand balance tightens, qualified production ready capacity becomes increasingly valuable. GlobalWafers' early expansion investments give us first-mover advantage with our existing capacity fully utilized across all wafer sizes and and new capacity development underway globally, we are well positioned to support growing customer demand. Please turn to Page 8. The benefits of our early investments are already becoming visible. Our U.S. operations continue to improve with a growing number of customers discussing long-term supply agreements for our U.S. capacity, reflecting their need for a reliable local supply. In our manufacturing site in the U.S. and Japan continued to achieve record operating milestones, while our 12-inch expansion in Italy steadily ramped up. Building on this operational momentum and growing customer demand, I'm pleased to announce another important milestone in our strategic partnership with Micron. Today, our Board approved a proposal to issue up to USD 500 million in 10 years privately placed convertible bonds with Micron as the sole subscriber, subject to shareholder subject to GWC shareholders' approval. Our long-standing wafer supply relationship together with planned 10-year supply agreement provides a solid foundation for a stable stable supply and long-term capacity planning, the proposed convertible bond would further deepen our collaboration extending beyond wafer supply to strategic capital cooperation and long-term supply chain development. By combining long-term customer commitments with financial support, these arrangements will support further future capacity planning, enhanced supply stability and strengthen our advanced semiconductor material manufacturing capability particularly in the U.S. through technology transitions and industry cycles. With the 10-year term and a 0.5% coupon rate, the proposed convertible bond would provide long-term funding with relatively low cash interest costs, while preserving flexibility in our capital structure. We believe Micron's willingness to participate in GlobalWafers' long-term development through this convertible bond reflects the trust built over many years and its confidence in our -- in future growth potential. Our global growth strategy also received very strong support from international investors in September. We completed a USD 1.4 billion GDR offering with investor demand reaching approximately 4x of the offering size. This response reflects confidence in our global manufacturing footprint and long-term growth potential. The offering also significantly strengthened our balance sheet moving us from TWD 18.6 billion in net debt at the end of Q2 to TWD 26.3 billion net cash at the end of Q3. This stronger financial position provides us with greater flexibility and resources to support ongoing operations, navigate macroeconomic uncertainty and industry cycles and invest in future growth. As semiconductor demand recovers, we are better positioned to capture emerging supply opportunities and advance our local-for-local manufacturing strategy. Within this broader growth strategy, I would like to highlight one area where we are seeing particularly strong customer momentum, which is our 12-inch SOI business. 12-inch SOI is one of our -- one of the product areas where we see very clear mid- to long-term growth potential. As the market continue to migrate from 8-inch to 12-inch, silicon photonics is emerging as an important new growth driver on top of established applications, such as RF SOI, Empower SOI, in particular, customer demand has strengthened noticeably recently. And the demand, we are seeing already for exceeds our existing 12-inch SOI expansion plan. We also have a unique strategic position in the U.S. Our Missouri facility is currently the only site in the U.S. with a 12-inch S manufacturing capability together with GlobalWafers proprietary SI layer transfer technology and vertically integrated the in-house substrate supply. This provides us with a strong strategic position our new 12-inch SOI capacity in Missouri is still ramping up as additional tools complete qualification and utilization improves. Our immediate priority is to accelerate the ramp of our existing capacity by debottlenecking to further increase our output and maximize the utilization of our existing assets. At the same time, given the additional demand from customers, we are evaluating opportunities to further expand our 12-inch SOI capacity. We are already in discussions with multiple customers, including LTAs and prepayments that are planned to support more than 90% of the proposed incremental capacity of our SOI. Since the existing fab and infrastructure are already in place, any further expansion could leverage these existing assets and will primarily require additional equipment resulting in better capital efficiency than the first phase. That said, we will remain disciplined in our capital allocation the scale and timing of any next stage investment will depend on several factors, including long-term customer commitments the profitability of our current capacity and also government support and the overall return on investment. Overall, we remain very positive about the mid- to long-term outlook for 12-inch SOI particularly for silicon photonics. Looking ahead, we will focus on restoring operations at Novara, Italy, accelerating new capacity ramp-up and pursuing future expansion with discipline in the capital allocation with our global manufacturing footprint, strong customer partnerships and enhanced financial flexibility we are well positioned to capture growth opportunities and strengthen our long-term competitiveness. Next, I will hand over to Leah to walk you through demand trends across key applications, followed by our company's overview and some financial performance. Thank you very much, Leah, please.

Leah Peng executive
#3

Thank you, Doris. Let me begin with demand trends across key applications, our company overview and financial performance. I will also address the frequently asked questions we have received recently. So in Page 10, AI infrastructure remains the main growth driver, supported by rising data center investment and border AI adoption. Memory fundamentals are particularly strong with tight supply, robust HPM demand and increasing long-term supply commitments, improving demand visibility. Smartphone and PC shipments faced pressure by premium and AI-enabled devices continue to drive higher semiconductor content. Industrial demand is strengthening while automotive recovery remains gradual. Power infrastructure, ADS and the physical AI provided additional growth opportunities, advanced packaging and HBS stacking are increasing manufacturing complexity and wafer requirements, while silicon photonics is driving demand for specialty substrates such as SOI. Overall, increasingly complex manufacturing process and rising semiconductor content across applications are driving silicon wafer demand. These structural trends reinforce our positive long-term outlook for the industry. Please turn to Page 13. Leading research firms have raised their global semiconductor market outlook, with global revenue expected to nearly double Y-o-Y to approximately U.S. 1.6 trillion and approached USD 2 trillion in 2027. Memory and AI remain the key growth drivers with strong HBM demand and supply bottlenecks accelerating capacity investment. Global fab equipment spending is expected to reach USD 118 billion in 2027. These trends support sustained growth in silicon wafer demand, driven by both capacity expansion and increasing wafer consumption. In Page 14, to capture opportunities from strong semiconductor demand and tightening supply, GlobalWafers successfully completed a USD 1.4 billion GDR offering in September, with approximately 4x over subscription, reflecting strong international investor interest. The proceeds will support foreign currency raw material procurement and the future growth opportunities across our global manufacturing network strengthening our local-for-local supply capabilities. The GDR also transformed our financial position from net debt of TWD 18.6 billion at the end of Q2 to net cash of TWD 26.3 billion at the end of Q3. Our debt ratio declined from 56% to 52%, while the current ratio improved from 128% to 163% and and the quick ratio increased from 108% to 150%. With a stronger balance sheet and improved liquidity, we are better positioned to fund future expansion, capture growth opportunities driven by AI and advanced semiconductor demand. And then we get industry cycles, the offering also burdens our global institutional investor base, enhancing market visibility and trading liquidity. In Page 15, you can see that GlobalWafers is entering the next growth phase with 3 key advantages: order demand, operating readiness and disciplined capital. Demand recovery is expanding beyond advanced nodes into material applications and specialty wafers created broader growth opportunities across all of our product portfolio. Also recovery varies by market. More importantly, our early investment are translating into measurable operating results. Let me now update you on our expansion projects in the U.S., Italy and Japan. In the U.S., GWA major Phase 1 equipment installation is largely finished and several Tier 1 customers have complete qualification. Monthly shipments have reached new highs for fourth consecutive months. Demand for local supply and long-term customer commitments support further ramp-up positioning GlobalWafers America to increase its revenue contribution as utilization improves. At our Missouri facility, 12-inch SOI output reached a record high in Q3 with more than half of the newly installed equipment qualified for volume production. Several RF SOI and silicon photonics products have entered volume production, while major customers are discussing multiyear supply agreements to secure future capacity. In Italy, our new 12-inch facility was unaffected by the fire and the expansion remains on schedule. Customer qualifications are progressing, volume shipments have begun and monthly ARPU continues to reach new highs. In Japan, the Utsunomiya expansion is fully complete. Utilization remains high and shipments volume reached another record in Q3. Higher utilization and improved product mix have helped the facility turn profitable contributing positively to our revenue and earnings. These milestones demonstrate that our global manufacturing network is moving from capacity investment toward increasing production and customer supply. Our established footprint across 3 continents also provides a competitive advantage, take significant time and capital to replicate. Combined with our strengthened financial position, GlobalWafers has the demand opportunities, manufacturing capabilities and financial foundation to turn the next semiconductor growth cycle into tangible business growth. Please turn to Page 17 for this quarter's financial highlights. Third quarter revenue was TWD 14.9 billion, down 2.3% from Q2. Demand across our major wafer sizes and production lines remain very strong. And before Novara fire, we had expected double-digit sequential revenue growth However, the mid-July fire disrupted production and shipments at our Novara 8 inch line, resulting in a slight sequential revenue decline. The fire impact extended beyond 8-inch wafer sales as Novara also supplies surplus trades for SOI products affecting related SOI production and revenue. We are reallocating capacity across sites to support supply, but other facilities are already operating at high utilization and current-size transfers require careful coordination due to differences in product be manufacturing capability and customer qualification requirements. The revenue decline, therefore, mainly reflected the Novara incident rather than weaker end market demand. Core support and the gradual recovery at Novara remain our priorities for mitigating this impact. Our gross margin declined to 20% and reflecting new capacity real cost depreciation and the product mix resulting from the fire at the Novara facility. Operating margin remained stable at 9.8%, mainly due to reduced accruals for remuneration following the decline in electronic share price. EPS was TWD 3.13 per share compared with the TWD 7.9 per share in Q2. This mainly reflect the high comparison base from Siltronic's substantial valuation gain in Q2. despite the impact of the Novara fire, the underlying operating performance remained stable. Please turn to Page 18 for our financial performance for the first 9 months. Revenue was TWD 44.1 billion, down 4.4% Y-o-Y, partly reflecting the impact of Novara fire. Gross margin was 20.5%, reflecting new capacity ramp-up costs and depreciation. Net prefer increased to TWD 7.2 billion, and EPS reached TWD 15 per share, close to the 2025 full year EPS at TWD 15.29 per share. Please turn to Page 19 for a closer look at our income statement. The simulated figures on the right exclude the impact of major expansion projects in the U.S., U.S., Italy and Japan as well as the mark-to-market changes on Siltronic shares. On this basis, gross margin actually improved from around 31% in Q1 to around 34% in Q2 and Q3. Simulated EPS also increased sequentially from around TWD 5 in Q1 to over TWD 26 in Q2 and over TWD 7 in Q3. For the first 9 months of 2026 simulated gross margin, it is close to 33%. We simulated EPS of $18.66 per share. This quarter-by-quarter improvement in both adjusted gross margin and EPS demonstrates the continued strength of our underlying operations. Please turn to Page 20 for the balance sheet. Our GDR issuance in September strengthened our financial foundation. At the end of Q3, cash and cash equivalent totaled TWD 60.8 billion, while total cash and cash-related assets reached TWD 135.4 billion. Inventory slightly increased -- it reflects the gradual arrival of supplies and polysilicon purchase to support our ongoing new expansion. The stronger financial foundation supports the working capital and the investment needed as our facility ramps up. It puts us in a better position to meet customer demand and convert our installed capacity into future revenue and earnings. Now I would like to address both questions we have received from investors recently and those we anticipate will be raised. So the first is the industry outlook. What is our outlook for the silicon wafer industry, okay? We still remain very positive on the industry outlook. Advance the mature markets continue to exhibit a 2-speed recovery. While the pace of recovery is uneven. The overall tertiary remains upward and we expect supply-demand conditions to be tighter in 2027 than in 2026. The outlook for advanced nodes remains very positive. Demand continues to be driven by AI-related applications. And semi or estimates that the number of fabs or production lines beginning operation or shipping first silicon will increase significantly from 13 in 2026 to 23 in 2027, providing clear support for wafer demand in 2027. Therefore, we expect advanced more demand to remain strong, while qualified 12-inch wafer supply should become progressively tighter. The material market has gradually recovered on inventory normalization, improving demand from power analog automotive and industrial applications. We saw clear strengthening in fundamentals. Okay. The next question is our own business outlook for the Q4 2026 and the first half 2027. Okay. Demand improved significantly across all wafer diameters and all production lines in 2026. Overall capacity utilization remained very high and the market recovery became increasingly evident. Prior to the fire in Novara, we have been quite optimistic about the second half operations. However, the Fire Novara facility in mid-July affected a key portion of our 8-inch capacity as well as the SOI productions. We continue to mitigate impact through global capacity allocation and higher utilization. We are working intensively to increase shipments in the fourth quarter. Looking into the first half of 2027, the gross drivers are clearer, demand continues to increase and demand already exceeds supply for a number of products, including certain small diameter wafers, creating room for pricing improvement, remain growth, better pricing, the gradual recovery of Novara capacity and the ramp-up of our new facilities. This will all support our operating performance in 2027. In conclusion, we remain very optimistic and promising about outlook for 2027. Next question is our utilization rate. What are the current utilization rates across the company's wafer diameters? Demand has improved across all major wafer diameters. So if we exclude the newly expanded production lines, which are still ramping up, our existing 12-inch capacity are all fully loaded. Demand for 8-inch and 6-inch wafers is also very strong. The utilization are also close to full capacity. The demand recovery has also burdened from advanced to mature node and smaller diameter products. Utilization of our compound business -- compound semiconductor business such as gallium nitrite and the silicon carbide, this also very good. So their utilization rate is very high. This demonstrates that continued increasing customer demand for high-quality compound semiconductor substrates. Your next question is regarding our Novara fire recovery status. Okay. So our recovery efforts for the 8-inch production in line -- 8-inch production line Novara Italy continue to advance, with the exception of certain back-end process that remain under reconstruction. All major manufacturing operations have resumed, and AP products have also started to ship process have not yet been restored are currently supported by other sites. However, those supporting sites are in soups operating near for capacity. Therefore, the reallocation must accommodate the existing orders and certain critical equipment have long lead times. With the result, near-term production and shipments remain affected. In addition, qualified capacity cannot be replaced on a one-for-one basis because products, process capability and customer qualification requirements -- these are all different, increasing the complexity of core-site capacity allocation. Regarding the insurance, our insurance claim process for both property damage and business interruption loses have commenced. We continue to provide supporting documentation to determine the final amount of loose and insurance proceeds this final amount is not decided yet. So we haven't booked any related insurance income in our financial statements. The next question is regarding the subsidy in our expansion projects in U.S.A. and in Italy. So government subsidies and incentive programs are progressing as planned. In the U.S., GW continued to meet the milestone requirements for the chich program on schedule and expect to receive a significant milestone payment from the U.S. Department of Commerce by the end of this year. So we will also apply the , the advanced manufacturing investment tax credit in accordance with applicable requirements to pursue tax credit related to its U.S. expansion. In Italy, the second and third subsidy instruments are currently under review and are expected to be received progressively in line with project milestones. Overall, GlobalWafers expects to receive about USD 100 million in government subsidies by the end of 2026. But the actual amount and timing of recognition will remain subject to the review progress policy requirement and administrative procedures of the relevant authorities in each jurisdiction. Okay. The next question is about silicon carbide outlook, okay? So based on our customer -- our recent customer engagement and correspondence and our current order activity. We believe that silicon carbon market is gradually entering its next growth cycle. Demand is expanding beyond EV into high-growth, high-voltage applications such as AI to centers, with infrastructure, renewable energy and the industrial market, customers are also planning a transition from 1,200 volt to 3,300 volt and above, raising the requirements for material quality and reliability, supported by broader demand and tightening supply. We have absorbed higher SiC wafer shipments and a gradual stabilization in ASP. Utilization of our IT-related capacity remains at a high level. So based on the current customer demand, order visibility and the emerging application trends, we remain quite optimistic about the future SiC market. The next is our CapEx for outlook for 2027 and 2028. Okay? So our previous global expansion cycle is gradually moving into the ramp-up stage as major construction projects on completed CapEx has already come down from its peak and expected to decline significantly in 2026 compared with 2025. Looking to 2027 and 2028. Market demand continues to strengthen with a number of customers seeking additional supply and longer-term cooperation. To meet this demand, we will accelerate the ramp-up of new capacity and maximize existing capacity through debottlenecking. If mid- to long-term demand exceeds available capacity, we will carefully evaluate further expansion possibilities. For any new investment, key considerations include substantial customer demand and long-term commitment government support. Also, due to the higher construction operating costs the pricing and commercial terms must appropriately refine these costs while our profitability, ROI and payback will also be important factors. Accordingly, actual CapEx figure for 2027 and 2028 will depend on customer demand, ramp-up and debottlenecking progress and the economies and timing of our potential new projects. For GWA, we will continue to ramp up and debottleneck Phase I were advancing Phase II planning with the Phase II building and certain infrastructure already in place, further expansion could be more capital efficient and faster than Phase I. The next question is about the corporate bond that we just announced with Micron. So how does this USD 500 million private placement of convertible bond related to the strategic funding announced previously, given that the parties already have a 10-year LTA while use CB structure instead of prepayment, okay? The USD 500 million private placement of convertible bond approved in principle by the Board today, this is exactly the strategic funding referenced when GlobalWafers and Micron announced the long-term collaboration. The parties have already established a stable foundation for corporation through the 10-year LTA. The CB will further deepen its relationship we believe that key customers' willingness to support GlobalWafers long-term development through CB also reflects its confidence in our prospects and future growth potential. Our prepayment is typically linked more directly to future product purchase and delivery arrangements. The purpose of the strategic funding is broader in addition to supporting the party supply relationship it is intended to support global water strategic needs, including the development of our U.S. operations and the enhancement of supply capabilities. So we plan to use the CB structure to secure fund while preserving capital structure flexibility. Under the current plan, the CB will have a 10-year tenure and a 0.5% coupon rate. This will allow GlobalWafers to obtain long-term funding with a relatively low cash interest burden. At Issuance, the CB will remain a debt instrument and unlike with the right issuance of new shares, this will not immediately increase the number of common shares outstanding. So our goal is to strike an appropriate balance among long-term funding, capital structure flexibility, interest of existing shareholders and a sustainable relationship with the key customers. The next question is regarding memory. So looking further, if memory prices declined in 2028, the memory makers are just wafer starts while lower component costs support a recovery in consumer demand. Do you expect a supply demand gap for 12-inch and 8-inch wafers to widen or narrow? Okay. We believe that it is important to distinguish memory pricing from wafer starts. While normalization in memory price does not necessarily imply lower wafer starts. It could also reflect additional supply coming online where underlying demand from AI HB and server memory and the data center applications remain strong. At the same time, if lower component costs support a recovery in smartphones PCs and other consumer applications with demand to broaden from today's AI and the high-end driven market into more mature node applications. Therefore, we do not currently view 2028 as a simple reversal of the current demand cycle, but whether the potential broadening of the demand base. We expect 12-inch supply demand conditions to remain relatively tight supported by AI applications. We are aiming to show benefit from improving customer power analog, automotive and industrial demand with conditions vary by product. So above is our response to the questions now. Now I would like to turn it over to Doris for the Q&A session. Doris, please.

Hsiu-Lan Hsu executive
#4

Yes. The first question is does the company have any plans to raise product prices going forward? That's the first question. We received some question from several different audience today. So okay, here's our answer. Market demand visibility continues to improve with the supply and demand conditions tightening in certain products. The overall pricing environment has become more favorable, and we are continuing to work with customers on price adjustment right now. Energy and raw material, labor and operation costs have increased significantly. Freight also increased significantly. While the investment cost of new capacity is also much higher than in the past. We, therefore, believe that pricing needs to appropriately reflect current supply-demand condition, cost cost structures and product value price adjustments will be negotiated on a case-by-case basis depending on product specification, supply-demand conditions and contract renewal timing and individual customer circumstances rather than being applied a certain percent price increase across all products. So different view, of course, different views during pricing discussions are very nature. But with improving supply-demand conditions, we believe the current market environment is increasingly supportive of pricing or pricing return to a more reasonable and sustainable levels. This is the first question. And the second question is on existing 300-millimeter capacity is operating at high utilization while consolidated gross margin continues to reflect several factors. Is this greater pressure currently coming from existing contract pricing or from new capacity ramp-up costs looking into 2027? What are the key drivers for ASP and gross margin improvements? Okay. I think both factors you're talking about have an impact, but the larger pressure currently comes from the ramp-up of our global expansion projects existing 300-millimeter capacity remains highly utilized right now, while new capacity in the U.S. Italy and Japan continues to absorb depreciation, energy, labor and initial operating costs during qualification and ramp up. As a result, the benefit of high utilization in our existing capacity is not yet fully reflected in consolidated gross margin. Going forward, gross margin improvement should be driven by higher utilization as new capacity ramp up, better pricing and product mix and improve the absorption of depreciation fixed costs as the volume increase. Our simulated profitability, excluding the major expansion projects is already substantially higher than reported margin, demonstrating that the resilience of our underlying operations. So yes, that's my answer to the second question. And next is...

Leah Peng executive
#5

Okay. Next will be the test questions we received. So we will choose the ones we will answer.

Hsiu-Lan Hsu executive
#6

Okay. Yes. Regarding OTA repricing. So the question is regarding your long-term agreements, roughly what percent spot percentage of your OTA volume expires in 2027 and can be renegotiated at current market prices. If you -- I think every quarter, we always report our -- the balance of our repayment. And whenever you see the reduction of our -- that means the reduction of the prepayment. That means that more and more LTAs are fulfilled. So we return our money back to customers. So the smaller, the remainder of the prepayment means that the smaller the LTS are. And we always honor our LTAs. So when the current LTA expire, then we can -- when we have the new spot orders or new LTAs, of course, the price will be definitely adjusted based on the new cost cost conditions. And for some customers, some LTA customers, if they didn't -- if they didn't take the volume committed in the LTA in the past several years, then we have more flexibility to discuss the new price with the customers as well. That's how we are managing LTA pricing. So -- but a very clear answer to you is that you will see more and more new LTAs, we have multiple LTAs under discussion. Many of them are very close to the conclusion. So you will see more new LTAs and more spot business with improved prices. So because of the strong demand, so I believe that the total ASP will be starting from 2027. It's not only the LTA. It's not only the new LTA, but also the product mix improvement, that is another factor as well. So that's a quick answer for your question. Okay, next. The question is about real demand versus precautionary stocking. A Japanese peer mentioned that customers have started building up wafer inventory because of the concerns over supply chain, supply chain disruption and rising prices. How does GlobalWafers distinguish between real and demand and precautionary stocking by customers? We heard about this situation because the whole operation cost actually is increasing, including freight, increased raw material increase inflation. So a lot of material cost increase and COG has increased a lot. So of course, we are asking customers to raise the price. And many of our customers, they realize that the the supply is so tight, it's getting tighter and tighter for quarter-over-quarter. So they believe that wafer price will keep growing in '27 and '28. Therefore, there are some customers, they are really evaluating how can they pre-stock more wafers to avoid from any too much impact from the wafer cost. But as far as we learned, I think it's more -- it's still very, very small because most of the peers have very, very high utilization of the capacity. And basically, we -- all of the peers, including global wafer, we work very closely with our customer. We because all of our customers are asking for more supply. So we definitely will check with the customer how much inventory you have for this one, for that one, and then we will decide which customers need a wafer badly, then we will supply the wafer to those customers first. So we -- not only GlobalWafers, I think the peers also all the industry people, they work very closely with each -- with every customer to try to supply to the real urgent demand customers first. Yes. The various question why was our Q3 depreciation lower than Q2, I don't think so. I think our Q3 depreciation is supposed to be higher than Q2. But that being double check, if we find the details, we will email.

Leah Peng executive
#7

Yes. Because our Korean subsidiary has expanded a few years earlier than the U.S. fabs. And so some of their depreciation are just graduated, yes. And our -- please note that in our U.S. expansion, their preparation will gradually come online. In our GWA now, because we have reached substantial completion in our construction. So now the construction depreciation already kicked in and we expect that the facility depreciation will come online.

Hsiu-Lan Hsu executive
#8

Yes. Yes. Thanks for Leah's answer. Also our accounting head also mentioned about this at our Korean fab, we have several fab and we follow our accounting policy. And I know that this year, some some make quite a lot of our equipment will be fully depreciated which is Q3. So that was like slower but our new depreciation keeps increasing from the new existing sites, new expansion size new depreciation keep increasing. This trend will not change in the next several quarters, yes. Okay. I think I'll take one more question, then I'll open the audio questions.

Leah Peng executive
#9

Yes. Okay. This is [ Philip Lee ] from Morning Star. Your question is that you mentioned long-term customer commitment. Government support profitability of current capacity are key considerations of new expansions. Which of the 3 is closest to be negotiated over confirmed. Is there any details you can share?

Hsiu-Lan Hsu executive
#10

Yes. I think these are not new factors. Actually, we started around -- we started these criteria several years ago when we started the expansion in -- we made the decision in 2022. So right now, we are talking about fish or even further expansion like what I said that SOI we are about to have our Phase II expansion for 12-inch and so on. We also use the same criteria to check. So the answer to your question is which one is closer. This depends on what production lines and also which country this new expansion have. So if, for example, if we're talking about U.S., I think we do have a lot of support from U.S. government. But at the same time, there are still some uncertainty for the future policy. We're still working with government, trying to figure out the future policy, how much support we can get if we make further expansion. So it was clear, but now we need to know a little bit about future expansion and profitability right now, there's some operation is performing better than the others. So this is -- we internally, we govern we know very well how far the gap is the current profitability status versus our goal on how quick the gap is. So we know then how soon they can closely get our operation and close the table profitability. So customer commitment is the easiest part. We have a lot of customer commitment. Actually, for example, the 12-inch. So actually, the customer commitment customer demands way over the capacity we can build for Phase I so customer commitment right now is SiC. It's not only variable commitment actually customer all of our customers are willing to not only give you a commitment sign a contract but also pay prepayment. I think they are very positive. So for those 3 items, the easiest one is customer commitment. And the second 1 is profitability. The third one common positive each 1 is there are still something we're still discussing with each country of government right now.

Leah Peng executive
#11

Thank you. So ladies and gentlemen, the floor is now open for live questions. [Operator Instructions] Please limit yourself to 2 questions at a time. So the first is Sunny from UBS.

Sunny Lin analyst
#12

Could you hear okay?

Hsiu-Lan Hsu executive
#13

Yes, yes. Perfect.

Sunny Lin analyst
#14

So my first question is to maybe see if you can provide a bit more color on how we should think about the pace of the recovery for the coming few quarters. Earlier, you talked about Q3 without the fire incident should achieve double-digit top line growth. Now if we look ahead, the Italy fat is under gradual resumption of operation, pricing start to improve, you're ramping up more supply. And therefore, I wonder how should we think about the top line momentum maybe in Q4 and also into early 2027?

Hsiu-Lan Hsu executive
#15

Yes. Sunny, you you definitely have a very good memory. You are correct. We saw if there was no fire in Italy, actually, Q3, we could achieve over 10% growth Q-on-Q growth. But actually, we didn't make it. The reason was fine. And we internally, we run a simulation and it's very firm that without the 5, we could achieve double-digit actually, it's 12%, over 12% Y-o-Y growth. So for Q4, this -- the coming quarter -- right now, the current quarter I think the momentum is still very strong. Actually, it's even stronger than what we expected. Some of the customers in order to get more capacity are even willing to pull ahead of their price -- new price adjustment price adjustment pulling the price adjustment to Q4. Some was talking about this. But the bottleneck is that we don't have enough capacity to supply. So the demand is stronger than what we -- is stronger than our forecast a couple of months ago. So Q4 demand is very strong. But super majority of Q4 prices are -- remain at the old LTA levels or the price negotiated 2025. So price were still the oil price, not too many price just but promise has improved. And also we do see some very, very strong demand from customers. So that's current state. So we believe that Q4, I think it will be a better quarter than than Q3. And starting from Q1 2027, I think we will have not only more capacity from new expansion fabs. But also, we will have better price than -- better ASP than Q4 2026. That's our view.

Sunny Lin analyst
#16

Doris, I double check because it's quite important. So for Q4, now based on your visibility and also the production situation of the Italy fab, could you achieve more than 12% year-over-year growth for your top line?

Hsiu-Lan Hsu executive
#17

No, we can't because Novara is still -- we are recovering, but Novara volume, recovery volume is still very small. So we are still suffering from the loss of Novara capacity and revenue. So I'm talking about that the growth will be better. Q4 will be better than Q3, but it's not 12% that high. The 12% was that if there was no fire, our Q3 revenue should have been grouping over 12% higher than Q2. Sorry for not making myself clear.

Sunny Lin analyst
#18

Sure. No problem. My second question is now as supply-demand tightens, especially going to maybe second half of 2027 and 2028. And when you allocate the capacity by a market. Let's say, if memory clients are more aggressive in negotiating new contracts to support the more meaningful capacity expansion for that period. While maybe logic are less aggressive. From a high level, how would you think about the best way to allocate capacity by the end market given very different dynamics for pricing?

Hsiu-Lan Hsu executive
#19

Yes. Internally, we have our strategic internal policy that how much -- roughly how much percent of our revenue is allocated for memory, how much percent for non-memory. So internally, we have a we have in our location. And then for the memory part, we negotiated with customers. I hope that we can get the a better price to cover our cost increase. So we talk with customers, different memory customers, and we decide how to allocate the memory capacity reserved to the customer who who can -- who can achieve -- at least get closer to our target price. That's how we work with our customers. for the nonmemory that analog part or for the non-memory area, there are a lot of applications like silicon photonics and power SOI, RF SOI, all the -- even for compound materials. So we have a lot of revenue. And for those categories, we just based on similar to what we did before that based on the customer, the partnership, how long we've been because the demand is very tight, right? Demand is very strong and supply is very tight. So we care about long-standing partnerships. So our criteria is a customer partnership in LTA setters, if they are the customers who are willing to sign LTA and paper impairment, they will get the capacity first. So still, this is the priority. And for the customers who are not whose company's policy it's not possible to commit any LTA, then we just -- we definitely will take care. We will kind of make the decision based on their price condition and business terms.

Leah Peng executive
#20

And next will be Lucas from Morgan Stanley.

Unknown Analyst analyst
#21

So my first question is also about pricing action. So as you said that all diameters of your products are reaching nearly fully loaded. But somehow, we hope that we can assume that the pricing negotiation can actually be extremely smooth. But somehow we just keep hearing some customer pushback about the price hike to next year, especially from the largest foundry customers. So we are just wondering that how could we reconcile this difference like it is because of the inventory from the customers? Or is there anything that we have missed here?

Hsiu-Lan Hsu executive
#22

Yes. Yes. Okay. So yes, you are right. Some customers are more supportive for the price adjustment, some are not, which is true. I know that because of some -- each of them have their -- we have different reasons for that. But as a wafer supplier, we work very closely and we very clearly expressed our treasure from causing if some customers, they insist in no price improvement or a very limited pricing movement, then we have no short but to allocate a little bit lower. But we -- I mean, there are still a lot of -- in addition to price, I think there are still a lot of value in partnership with each customer. And so -- it's not only that, but because, of course, we know that some of our customers, they do have more wafer inventory in-house, so they have less pressure than others to try to mine to get a lot of wafers or even paying a little bit higher to get the wafers -- so some inventory availability, that's one of the reason why they are more -- they're stronger, they are tougher to set our price adjustment requests. So that's one of the key reasons, that's very true.

Unknown Analyst analyst
#23

Yes. Yes. And hopefully, we can have more price hiking to '28 as well. So my second question is, I just also want to know about your 12-inch silicon carbide progress and right now, how could we -- how should we expect a meaningful revenue contribution from 12-inch silicon carbide into '27 or '28?

Hsiu-Lan Hsu executive
#24

12-inch silicon carbon is doing okay. But volume-wise, because it's a new project. So volume is still in the ramp-up mode. It's not only we are in the ramp up mode. Our customers also there in the ramp up mode. So we do have very healthy 12-inch spent carbon right number volume is still not that high. But according to the forecast, I think 300 million of silicon carbide have very good potential in the future. So because quite a lot of customers are asking for the same concept and similar material, maybe for different applications. So we think 30-meter in car by 2027, the revenue will be still in the low single-digit weight amount of our -- I mean, the revenue but it will be ramping up quite smoothly in the next several years.

Leah Peng executive
#25

Thank you. And ladies and gentlemen, we would like to express our sincere appreciation to all of you for your valuable participation today. The earnings call concludes now. Thank you, and have a wonderful evening. Thank you. Bye-bye.

Hsiu-Lan Hsu executive
#26

Thank you. Bye-bye.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete GlobalWafers Co., Ltd. transcript - plus 261,000+ transcripts from 13,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to GlobalWafers Co., Ltd. earnings transcripts and 261,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $145 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.