Home / Transcripts / Gorilla Technology Group Inc. (GRRR) · November 18, 2025

Gorilla Technology Group Inc. (GRRR) Earnings Call Transcript

November 18, 2025

NASDAQ US Information Technology Software earnings 55 min

Earnings Call Speaker Segments

Jay Chandan executive
#1

Thanks a lot. Morning, everybody. Q3 stands out as Gorilla's best quarter ever, since revenue came in above what had been projected, operating profit was solidly in the black, and the bottom line landed at breakeven. Well, we've produced an obvious turnaround in profitability; we've accumulated a cash position of roughly more than $119 million. Our debt has been brought down to $15.1 million, and we've pushed forward with our AI infrastructure initiatives throughout Southeast Asia, Latin America, and the Middle East, locking in multi-billion dollar projects. Simultaneously, we're building an unprecedented pipeline for this company. Put plainly, Gorilla is now performing above the analyst model and expanding more quickly than the market had anticipated. Thanks. Bruce, is there anything you'd like to add?

Bruce Bower executive
#2

Right, so what I want to do is run through a few of the quarter's key points, and then talk about the bigger picture of where things stand. First off, like Jay said, revenue for the quarter set a record for us. On the balance sheet, again as Jay noted, we're holding $121.4 million in total cash. Of that, $109 million is unrestricted free cash, with the remainder sitting in restricted cash. With debt at $15.1 million, that puts us in a strong net cash position of $106 million. This reflects how the business has performed, and it also got a boost from a fundraise we completed in July. As far as our position as a company and how we're doing, you can see we remain on track to hit the 2025 guidance, which calls for revenue between $100 million and $110 million. We've been discussing EBITDA margins above 20% and net income margins between 15% and 20%. We're still on track to achieve all of those. Gross margins across the nine months came in slightly above 35%. That's a touch below what we'd anticipate for the entire year. I believe we'll be on track to land in the 35% to 40% range for the full year. When the quarter closed, our accounts receivable stood at $36 million, and I realize people are watching that number and feeling some concern. Let me just say that we expect the business to collect on some of those — we've already collected on some during the fourth quarter — a couple of sizable outstanding items in Asia, plus some remaining amounts in the Middle East that we expect to collect. Over the nine months of the year, operating cash flow came to — $15 million, and we continue to expect either breakeven or positive operating cash flow for the full year. One more thing, as we look ahead to next year, we issued guidance for the coming year of $137 million to $200 million. I wanted to spend a bit more time explaining how that works, and Jay can jump in as well. Essentially, our approach to forecasting guidance rests on contractual backlog — the revenue we anticipate realizing from signed contracts — and also where we have delivery timelines and defined contractual milestones. Here, we have a signed contract, and for 2026, we have a sizable signed contract with Freyr, and within that contract there are individual deployments. The timing is fairly certain, though it remains subject to some change, which is why we chose a wide range to reflect the conservatism behind our guidance. Even so, the Freyr contract remains a big one at $1.4 billion in total. That works out to over $400 million annualized. Once it's up and running, that's $400 million annualized. Deployment will roll out through 2026. That contribution begins to land in 2026, though it still won't represent the entire sum. Even so, we've got a robust pipeline too, as we hinted at, and Jay can get into that shortly, and that leaves us feeling good about reaching our full-year guidance for 2026. A few more items worth flagging regarding 2026: for quite a while now we've been telling the market where growth is going to come from, how we're diversifying the business and taking risk out of it. What we've observed is that the contract wins, and then the pipeline, sit largely in Southeast Asia, which should get us to our goal of more than 50% originating from Southeast Asia next year. There's also a solid blend of government and enterprise; we'll be diversifying and bringing down government's portion of our revenue. The corporates carry investment grade ratings, and the government clients we're speaking with or have already converted carry investment grade ratings too. We're seeing better credit quality among our end customers. Every one of these items, I believe, points toward a better business mix, a revenue base diversified across all measures, and then enhanced client quality. The final thing I want to do — Jay is too humble to do this himself, so I'll handle it for him — is note that the track record has now stacked up to where I believe we hold many proof points. When this business listed publicly in 2022 through a de-SPAC, that year's revenue stood at $22 million. Guidance for the current year sits at $100 million-$110 million. That's clearly a big jump over a brief stretch. Turning to next year's guidance, it signals two things. First, it's a substantial absolute gain. Second, the percentage growth rate for next year would actually be an acceleration relative to the percentage growth rate for 2025. I think it's quite a testament to the management team to witness an uptick in the revenue growth rate and also after a five times increase in revenue since listing publicly. That isn't the sole highlight. A number of other highlights are, first of all, we hold, as I noted, more than $100 million of net cash. This comes after sitting in net debt when we listed publicly; we had a very painful or even toxic financing mix earlier in 2022, 2023, every bit of which has been cleaned up. The cap table is nearly all common equity. When we discuss winning new contracts now or executing on contracts we've already signed, looking at the balance sheet now, we can fund significant new deployments from our own resources and from project-level finance that several banks have put on the table for us. We expect overall a solid year as we wrap up 2025. We're pretty excited about the outlook for 2026. With that, I'd like to hand it over to Jay for anything further he wants to add regarding the outlook, the pipeline, etc.

Jay Chandan executive
#3

Thanks, Bruce. Yeah, that was quite a strong quarter, wouldn’t you say? If there’s anyone out there still questioning whether this is structural, I’d politely recommend a trip to the optometrist. So, to build on what Bruce covered and to make the evidence crystal clear for all the skeptics, our revenue — the consensus analyst model had it at approximately $26 million, $26.2 million. We actually posted $26.5 million. The gross profit estimate stood at $9.5 million. We achieved roughly $9.9 million. On operating income, IFRS operating income was projected at minus $6 million. We came in at a positive $4.4 million. That’s a significant swing. Adjusted EBITDA was estimated around $5.6 million. We hit $6.8 million. Adjusted net income was around $3.5 million. We closed quarter three at $6 million. Our non-IFRS EPS was $0.26. The Gorilla actual came in at approximately $0.257, which is in line. On IFRS EPS, the expectation was negative $0.8. We finished at breakeven, which is $0.00 — a 100% improvement. Analyst-implied debt was roughly $21 million. Gorilla’s actual was approximately $15.1 million; we intend to bring that down substantially before this year ends. We also had modeled unrestricted cash, restricted cash, and the total cash position. Today we are largely on top of all of it. Why? Because we achieved profitability at the operating level — not adjusted, not dusted with magic, not something you’d miss if you squint, and so on; this is genuine profitability. We operated the business efficiently. We delivered on major projects throughout the region; we are delivering major projects throughout the region. We kept our costs in check. More importantly, we produced a real operating profit. This isn’t a one-time event. This is what we refer to as discipline. Second, we accomplished this while scaling rapidly. Most companies only become profitable once they halt investing. We became profitable while carrying out national infrastructure programs across Southeast Asia, the Middle East, LatAm, and beyond. Anyone who has worked in this industry can tell you that isn’t merely coincidence. It is pure operational muscle. Third, we have visibility. When I say visibility, I mean genuine visibility. The $1.4 billion Southeast Asia data center project isn’t a rumor; it isn’t a letter of intent. It isn’t a whim; it is a contract, and it is underway, already feeding into our scheduling and revenue plans for 2026 and beyond, of course. The first phase by itself accounts for $100 million of annual revenue for the first three years. This is what structural means; now, people also ask me about the $7 billion pipeline. I’m going to demonstrate that this isn’t something we discovered under a sofa cushion. Okay? It has come from governments, telcos, serious institutions that are designing their national AI and digital sovereignty strategy. The part we play in those initiatives isn't a one-off thing. It repeats, it scales up, and it's becoming more and more essential. Beyond that, our balance sheet serves as a strategic asset too. We hold more than $110 million in unrestricted cash along with over $15 million of debt, and because we're teamed up with big partners such as TerraStrata on data centers, delivering isn't just a hope for us; we're putting capital behind it to make delivery happen. And lastly, thanks to growing alliances with companies such as Intel, EdgeCore, HP, and NVIDIA, plus the continued buildout of our sovereign 5G local interception cybersecurity platform, we're no flash in the pan. Those relationships endure because we get the job done. Let me return to the Q&A portion now — we haven't reached a peak as of today. If anything, where we stand now is the foothill ahead of the ascent. Our figures hold steady. The profitability is genuine. The backlog is well defined. The demand curve in front of us, especially when it comes to AI data centers and national infrastructure programs, is considerably bigger than whatever is formally baked into the guidance today. With that said, I'd be glad to open things up for questions and answers. Hello, Mike.

Michael Latimore analyst
#4

Excellent. Yeah. Well done on the strong morning. Well done on these fantastic results.

Jay Chandan executive
#5

Thanks.

Michael Latimore analyst
#6

About your 2026 guidance, what kind of large deal contribution is baked in — from the low end up to the high end? Or put another way, which factors push you toward the upper portion of that low-to-high range?

Jay Chandan executive
#7

That's. Mike, good to hear from you as well. Before anything else, let me give you some numbers to anchor this, Mike. Our 2026 revenue guidance spans approximately $137 million to $200 million. Only two components support this. First, contracted backlog where delivery milestones are very clearly defined. Second, phase one of the Southeast Asia data center project, which by itself accounts for $100 million across 2026 through 2028. From later phases of that $1.4 billion program, guidance includes zero revenue, and zero comes from any other new mandates currently being structured. The truth, though, is that phase one is far smaller than the remaining phases of the AI data center program. Once timelines and the side consequences get finalized alongside the customers, we'll then quite materially expand our revenue base for both 2026 and 2027 as well. Beyond that, as you're aware, a pipeline has also been built by us. Within it sit several national projects at a late stage, which likewise involve data centers, public safety, network intelligence, our 5G lawful interception programs, and so forth. The current 2026 guidance contains none of that. What you've asked me about — the range we provided — rests on backlog driven by a base case assumption. It also hinges considerably on certain very important issues confronting us right now. One is shortages of semiconductor materials, plus deliveries from companies such as NVIDIA, Dell, HP, Supermicro, and so on and so forth. Even so, additional AI data center bases and new sovereign mandates represent upside sitting above all of this, and they will crystallize, and so they'll turn into our future guidance as well. My personal view is that the number we published is very sensible and conservative, which is exactly why, for now, we've deliberately kept the rest out of it.

Michael Latimore analyst
#8

Yeah. Okay. That's great. Appreciate it. Is there anything you can share about EBITDA margins and how they could trend in 2026?

Jay Chandan executive
#9

Of course. Bruce, would you like to handle that one?

Bruce Bower executive
#10

Sure. So we would guide for a sort of 15%-25% range.

Michael Latimore analyst
#11

All right, that's great. This will be my final one, I believe. Could you share a bit more about what will actually be delivered under this big 2026 contract? What's the fourth item that will be handed over during Q1 and across 2026?

Jay Chandan executive
#12

Mike, thanks for asking that. The proper way, Mike, to think about that initial $100 million as run-rate billings — speaking for myself, I believe most folks assume that once you land a $1.4 billion contract, it flips on like a light switch and money immediately starts pouring in. That's simply not how it happens. I'm certain you're quite familiar with data centers. We've been discussing this together for a long while now. The initial piece is roughly 6 MW-8 MW. That amounts to several hundred high-density AI racks. Obviously, we don't bring them all up on a single day. They get energized in scheduled waves once the power, cooling, and every network zone has been commissioned. Revenue climbs within each batch as those batches are powered. Next, if you consider the GPU capacity, that turns into a crucial element because it tracks along with those waves. When the racks come online, for instance, we install the clusters via our NVIDIA and partner ecosystem, and that lifts the GPU-as-a-service usage line. Beyond that, we layer our services in over time. Not simultaneously. A single big bang approach simply isn't possible. That means video intelligence — for instance, for cities, transport, and borders — big data analytics, constructing your large language models for government as well as telco, developing your inference engines, and so forth, your cybersecurity, your network appliances, and intelligence platforms, plus items like environmental intelligence and smart policing. As national workloads land on the platform and utilization rises, usually from 30%, 40% all the way to, say, 70%, 80%, that simultaneously deepens our revenue at the very same levels as the physical capacity. Borrowing a point Bruce made earlier, if you'd like us generating roughly $300 million-$400 million in steady-state revenue, the GPUs must all be running and syncing harmoniously together. Getting there requires a controlled ramp, as I mentioned — not a big bang. We expect, once again, working very closely with NVIDIA on this, that we will have all of it commissioned and live by the close of 2026. Hopefully that addresses your question, Mike.

Michael Latimore analyst
#13

Got it. That's great. Many thanks. Wishing you the best for the remainder of the year.

Jay Chandan executive
#14

Appreciate it, sir.

David Williams analyst
#15

Morning, everyone. Nice work on the advances and wins you've achieved here, sirs.

Jay Chandan executive
#16

Thanks, David.

David Williams analyst
#17

I suppose one thing to start with concerns the guidance. Clearly, you touched on this somewhat earlier, yet it seems there could be a bit of upside there. I suppose, if you consider the market risks, perhaps on the supply side, plus just market dynamics, what's your view? I mean, how would you measure that from the guidance's midpoint all the way to the top end? My suspicion is that upside opportunity outweighs downside risk. Would it be reasonable to believe that?

Jay Chandan executive
#18

David, that is entirely reasonable to believe. More upside exists. Why? Because look, allow me to lay out the guidance risks for you. Your question, I believe, has two parts. The first is customer deployment timing. Big AI infrastructure and data center programs depend on client-side readiness. Site access must be there, as you know the market extremely well, along with power allocation, import clearances, customer procurement cycles; any of them can move from one quarter to another. Even a minor shift of a week or two alters that substantially. Second, supply chain constraints today are likewise a major challenge. Consider the demand, and GPU servers are in high demand, not only within the United States, but around the world, correct? If you consider items such as networking equipment, longer lead times can result from those too. I'm not sure whether you've noticed lately, but memory prices have jumped 40% over the past two months. Then there are items like regulatory and compliance approvals. There are items like project phasing across multi-year platforms. You must even factor in geopolitical sensitivities in specific regions such as Southeast Asia, Middle East, Latin America, and so forth. As for our upside, I spoke about that before. For us, it concerns when these programs come live. Our goal is to have all of them live by 2026 and ensure we drop all these clusters via our NVIDIA partnership and our partner ecosystem and ensure we drive the GPU as a service usage line. Once we've driven that, and keep in mind, these are all purpose-built data centers. That means a single customer holds 100% occupancy. Okay? That means our revenue would reach scale the moment the switch is switched on. What we're attempting to do is work extremely closely. I mean, I did tell you about the risks, but with all those risks in mind, we're also examining the upside. We want to ensure our upside actually helps offset the risks at the lower end. I hope that answers your question.

David Williams analyst
#19

All right, it did. Thank you very much.

Bruce Bower executive
#20

May I also include one more point?

David Williams analyst
#21

Yeah.

Bruce Bower executive
#22

David, there are a few more points I'd want you to hold onto. First off, when it comes to data centers, the chance we have there — that contract — is an umbrella arrangement we hold with Freyr. At the time of the announcement, that $1.4 billion figure rested on the deployment schedule as it stood back then. It's entirely possible additional deployments get layered on. Should that happen, it would give us yet another avenue for upside. Second, naturally, everything we've discussed so far concerns the contractual backlog and the data center piece — nothing else has come up. Government contracts are still something Gorilla is bidding on aggressively. Several bids went in not long ago, and we're waiting to hear good news from a couple of governments in Asia. Then there's the fact that One Amazon, along with certain MOUs signed with government customers in the past, has come up many times in our conversations. Right now, none of that sits in the guidance, since neither a date nor an amount has emerged yet. The moment we have those — a clear, crystal view of both the date and the amount — they too would enter the guidance for next year. Delivering everything under the data center contract isn't the whole story, even though that's the largest driver. Gorilla has plenty of paths to win next year.

David Williams analyst
#23

Yeah. That's awesome. Really useful detail. My bad. Please continue.

Jay Chandan executive
#24

No, no. You go first, David.

David Williams analyst
#25

All right, thank you. Bruce, perhaps you could help us figure out how big the backlog really is? You've mentioned several items, though neither the dollar figures nor necessarily the timing are available. If we tried to look at your overall backlog and what you expect for the coming year, what approach should we take to gauge it?

Bruce Bower executive
#26

Our backlog follows a very strict set of criteria. For 2026, $85 million sits in backlog, and for that portion we know the precise date and time, the paperwork is signed, and work is underway right now. Then there's the data center contract we referred to, which is signed and in the process of being implemented, yet when exactly the deployments happen remains — we have a solid sense of it, but it isn't locked down. As Jay said, a few things still need to be lined up, or there are other parties we must coordinate with before that can be pinned down. The pipeline, by contrast, covers a qualified lead where we believe a decision will come within the next three to six months and budgets exist, but no contract has been signed and there's no dollar figure or date attached. So there are two pieces. First, backlog is extremely strict. For us, pipeline is essentially about converting a customer either where signing has occurred but no amount or date is attached, or where they commit and later execute a contract, at which point we know the amounts and dates and can shift that into backlog.

David Williams analyst
#27

Okay.

Jay Chandan executive
#28

I hope that answers your question.

David Williams analyst
#29

Question.

Jay Chandan executive
#30

Sorry to cut in on you too, David. The pipeline has expanded quite vigorously, if I can put it that way. Should it speed up even more, I figure I might have to send myself a congratulatory card; even so, the deals themselves are extremely far along. Think about what we were doing a couple of years back and where things stood last year — we were putting together POCs, putting pen to paper on MOUs, and that sort of thing, whether that meant smart education over in the U.K. or in the Middle East previously, and so forth. Our data center project has sped up past what we had anticipated. I don't want anyone concluding that data centers are all we build. We also deliver a great deal of ancillary support services on top of that. That $1.4 billion, to give one example, served purely as a catalyst. As soon as governments and telcos witnessed our ability to deliver sovereign-grade AI infrastructure, that essentially set off a wave of interest. Now, without naming anyone, the demand wave sitting behind Freyr is considerably bigger than Freyr by itself. That ranks among the main reasons our pipeline sits well north of $7 billion. Look at the GPU infrastructure — for us it has shifted out of the realm of ambition and into urgency. Thanks to our work with players such as NVIDIA and EdgeCore, plus our own appliances inside government circles, we now view that strategic infrastructure as essential rather than optional. What's also happened is that we've begun collaborating with companies like TerraStrata down in Brazil, who are supplying capital and aiming to construct some genuinely massive data centers too. All of these amount to whole country platforms rather than merely incremental pilots. And then lastly, here's what we're doing: we're ensuring we can formally count a big chunk — call it even 20%-30% of that $7 billion — as getting signed very quickly in 2026; that lets us be far more confident about our multi-year expansion. To put it briefly, David, the opportunity is quite comfortably substantial for us, and it keeps growing at the same time. It is certainly not a single-year anomaly.

David Williams analyst
#31

All right. Let me squeeze in one more, if that's okay. When you look at the rivals you're up against out there — the big heavyweight, so to speak — why do they pick Gorilla? What sets you apart, and what's behind these wins? Thanks.

Jay Chandan executive
#32

Good question. What's behind the wins? I'd say we've demonstrated what we're capable of, okay, to get where we stand now; our approach is to collaborate with governments so we grasp exactly what they need, what they require on commissions, what they require across their ecosystem, and from there we assist them in standing up national workloads. Now, Gorilla has occupied this space for ages. As you can imagine, we've been around 24 years. Next year we'll be marking 25, right? We operate as a full-stack AI operator. I believe I touched on this during my initial speech at the NASDAQ, and I said our aim is to be an AI stack operator. We handle the architecture design, we construct the data centers, we bring the GPU stacks together, we run the platform, and we remain a long-term partner to governments and telcos. Now, beyond all that, what we give these clients of ours — at both the enterprise and government level — is sovereign control and predictable economics; that matters enormously, very, very, very much, because our clients know precisely who operates their infrastructure, who bears responsibility for their uptime and performance. Last of all, it comes down to capability. Now, as you're aware, we've been delivering national cybersecurity infrastructures. We've constructed four data centers in Egypt under our $270 million contract. We're carrying out multimillion-dollar projects, national projects spanning Southeast Asia, Middle East, LatAm, and so forth. What's taken place is that we're outpacing our competitors. Our execution speed, our capacity to structure these projects, and our operational discipline are turning us into the preferred partners where you grasp this probably better than most people do. AI infrastructure cannot fail. It cannot fail. It just cannot fail. It has to involve people who possess a very strong operational discipline. I think that's the responsibility we take. We will build, operate, and manage responsibly. Look at it this way. Everyone's out there trying to sell buildings and servers; what we're trying to sell is outcomes; that's it. It's as simple as that.

Bruce Bower executive
#33

As the finance person here, let me tack something onto that. When I was digging into the reasons behind our wins while putting together some investment materials, all of this surfaced. Another point: because of our track record and the ties we've built with hardware suppliers in Taiwan, plus the fact that we apply our own software to turn that hardware into appliances, we end up giving customers a meaningful cost advantage versus a rival. Of course, NVIDIA GPUs represent the largest expense, and there isn't much room to maneuver there. But on the parts where we do have room, we're able to offer something like a 30%, 540% reduction in cost alongside stronger performance. That brings down the total data center cost by 5%-7%. 5%- 7% might seem minor, yet with a billion-dollar data center, the cash saved is substantial. Beyond delivering everything a customer wants regarding sovereign data infrastructure and quicker time to market, it's also less expensive. Ultimately, enough factors add up that comparing us against a competitor becomes really tough.

Jay Chandan executive
#34

That's a valid observation.

David Williams analyst
#35

Excellent. I really appreciate you both making room for us today, and I'm eager to watch what you accomplish. Many thanks.

Jay Chandan executive
#36

Thanks a lot.

John Roy analyst
#37

Thanks. Jay and Bruce, clearly there's been plenty of talk regarding 2026. I'd like to pull back briefly and consider what comes after that. These items tie together. First, will you have to add sales headcount in order to convert that pipeline into backlog? Could you share some detail about what the pipeline looks like past 2026? And finally, what's your plan for all that cash? Is it earmarked for growth? What purpose does it serve? I'm just curious.

Jay Chandan executive
#38

That's a very, very good — no, no, no; it's a good question. You surprised me with that one. No, but look, I can say that my pipeline stands at $7 billion, and I could sign each of these deals, and everything would be perfectly fine. That's not the reality. It will bring its own difficulty. It has its own difficulties. Will I grow my sales team? Our sales organizations are already firmly in place. Currently we have over, what, 250-plus full-time staff. We also have over 200-plus contractors; so right now we're pushing our limits. The salesperson, there's a single salesperson who handles everything, and that's me. I ensure I'm present before every individual customer, every individual project. It makes no difference if the project is worth a million dollars or a billion dollars. I ensure I'm there to provide them with confidence and direction. What are we targeting? I believe you somewhat alluded to this regarding what the future holds. As far as I'm concerned personally, right, if the programs and partnerships ahead of us come through the way I anticipate over the next, say, three to six months, I'd want us to be — and this is my own personal target, so please don't take it as the company's target — at roughly $500 million in annual revenue by 2027. That isn't official guidance, incidentally. It's my target for what this platform can achieve. So that's where my focus is. I want to reach that point, but we must ensure we've assembled every Lego block in place so that we're no longer a project shop, ensure our pipeline is genuine and expanding, ensure we can hold more cash and that it matches our ambition. More crucially, it speaks to the kinds of acquisitions we can also pursue so that we're able to provide support. We require teams. We require people. Just to show you the scale, we've been on a huge hiring push in Taiwan. Thailand has nearly, what, 60-plus people. We're examining India. We have roughly 150-plus new hires underway in India. We're also exploring acquisitions for the first time in India and in the U.S. Stay alert for further information, and I'm confident we'll be in a position to give you additional updates as your course continues.

John Roy analyst
#39

No, that sounds good. Regarding the cash, perhaps Bruce can walk us through some highlights on where that money may be going.

Bruce Bower executive
#40

Yes. Every one of the major contracts carries a capital requirement on Gorilla's end. With government customers in particular, that can cover performance guarantees as well as working capital. On certain data center projects, we must finance the CapEx upfront, then deliver to the customer afterward. Here, we're actively negotiating with banks. In fact, Jay and I are in New York this week to meet with lenders. We've got term sheets in front of us from those lenders, and they'll cover the vast majority of it. It's similar to taking out a mortgage on a house — there's an equity piece, and that equity piece would come off the balance sheet; we expect we currently hold more than enough cash there to fund the first deployment or two, and ideally even beyond that. As I said, the business ought to produce substantial cash during the fourth quarter; that will carry us into much higher revenue figures over the next three to six months.

Jay Chandan executive
#41

Yes.

John Roy analyst
#42

Excellent. Thanks a lot, and nice work on a strong quarter.

Jay Chandan executive
#43

Appreciate it.

Bruce Bower executive
#44

Thanks, John.

Brian Kinstlinger analyst
#45

Excellent. Appreciate it. Congratulations on every one of the business development wins during the past several months. Regarding the Freyr contract — hi there, Jay. On the subject of that Freyr contract, I'm wondering, or my assumption is that margins there sit substantially above the operating margin your current business earns. The trade-off comes on the CapEx side. So perhaps cash returns don't match what the EBITDA margins show, though those EBITDA margins are extremely high. I simply want to check whether my assumption holds.

Jay Chandan executive
#46

That's correct, Brian. To begin with, it's good to hear your voice. To begin with, Freyr isn't a construction job. In my view, it's an AI infrastructure partnership built for the long haul spanning Indonesia, Malaysia, Thailand, Vietnam, Philippines, and beyond; what we're doing right now involves designing, building, operating, and monetizing it as the years pass. Right now, when our data center goes live, hosting the racks isn't all we'll be doing there. We're additionally stacking many services on top of it. Video intelligence, as I mentioned, big data analytics for government, cybersecurity platforms, smart policing, and so forth and so on; in my view, Freyr serves as the entry point. What we sell on top of it, plus everything within that footprint, is where the true worth lies. Viewed through that lens, yes, you're absolutely right. A higher margin is what it carries. Your EBITDA is far greater. Where cash generation is concerned, it may in fact, given the CapEx, the extensive CapEx investment, run slightly full cycle. What we'll do is then bring in our own operations team. Even more crucially, we'll also put our own stack of solutions on top of them, assisting them in progressing from building large language models to inference engines and climbing the value chain, advancing from H100 to H200 to GB200, GB300, and whatever follows. Consider it this way. To me, constructing data centers represents just one piece of it. Picture us as creating, curating, hosting, and protecting your data. That's the job we do.

Brian Kinstlinger analyst
#47

Thank you, that's great. Looking ahead to 2026 and thinking about that first big contract—the Egypt Smart City one—how do you expect the economics to shift next year compared with 2025, on the revenue side? Is it going up, coming down, or staying roughly flat? And how does the mix look different in 2026 versus 2025?

Jay Chandan executive
#48

Brian, that's an excellent question. If you think back to when we had our first conversation a couple of years ago, I told you my initial priority was making the business less risky. Specifically, I wanted to lower the risk in how we deliver, and I described three approaches at the time—I'm not going to waver on that now. The first step was locking in the contracted program. After completing the technical validation alongside the Egyptian government, we went on to recognize our revenues, and so forth. As you're aware, government clients accounted for 95% of our revenues. Our goal was to shift away from projects and toward predictable, milestone-based, long-term collections, which keeps our cash exposure contained. Building that took roughly 18 months. At this point, we find ourselves able to make our balance sheet stronger and, even more crucially, bring down debt. What's happened as a result is that we've gained room to breathe, letting us re-engineer the business while simultaneously developing what I'd call our capabilities. Moving from project-based schedules and programs toward a complete deployment—these things have helped lower our execution risk, the timing risk on revenue, and our financial risk. As we head into 2026, I can say confidently that we now have something more predictable and more stable from quarter to quarter than what we had before. I hope that addresses your question. Yep.

Brian Kinstlinger analyst
#49

Yeah, kind of. Some of this I'll handle separately. What I'm wondering about is that you had several MOUs, and that includes the one with Amazon. There's also a Smart City contract. Do you have any news about how things are moving? I don't need a rundown of every single one, but perhaps where you're noticing greater momentum toward the conclusion of any of those MOUs that are really big.

Jay Chandan executive
#50

Yes. The One Amazon project is moving forward at full speed. As you're aware, a proof of concept has already been finished by us in Panama, and at this point we're moving into Marco Grosso. You witnessed the signing take place at some point during last month. There's an initial $100 million program, and out of that, a substantial portion is what we expect to get for tech deployment. Now, naturally, plenty of matters exist that we must be concerned with, since we have to think about the sensors, the manner in which they get deployed, how each actor has been tracked, how it turns into a flow of environment and health intelligence, and so forth; these get monetized across decades. Work on that has already begun on our end. It's expanding, and for 2026 that is excluded from our guidance. As I mentioned, we've also put signatures on our MOUs with companies such as TerraStrata; this isn't one single site. What we're discussing is 120-plus megawatts, to be carried out across the coming 24 months. Connect that with our Freyr project and so forth. We anticipate that this will likewise turn into a portfolio of additional AI infrastructure projects, and those are repeatable. We're additionally collaborating quite closely with the projects, and I'm aware of what everyone has on the tip of the tongue. Take Thailand, for instance — we are coordinating very closely with the government there. Just to give you a bit of confidence that we're certain an outcome will come and there's light at the end of the tunnel within the next few months. Regarding the overall One Amazon and the remaining MOUs that we have already signed, our team works around the clock, and we're ensuring that every platform establishes the digital backbone and ensures we are positioned atop their infrastructure plate. Once again, none of these are part of the 2026 guidance.

Brian Kinstlinger analyst
#51

Great. For my final question, that was useful. Jay, you correctly pointed out that you put money into growth. You said something about that, and you've followed through. With the strong awards and the expanding pipeline, are there any major investments you must make right now when it comes to people, staffing, or facilities to seize the opportunities ahead of you? Anything significant you can discuss or put a figure on?

Jay Chandan executive
#52

Absolutely. I believe I mentioned this, Brian; this matters enormously because I think a lot of folks assume, "Oh, no, we're a tiny company. We lack the resources to do what we do." What we're doing at this moment, and let me be blunt about it, right? These are all figures behind it; we're putting a lot of emphasis on our M&A narrative too, since that gives us deep execution capabilities. At the same time, we're also examining how we grow into some of the world's fastest-expanding economies. India first; now, if you check the India AI market at present, and I might be a bit off with these figures, but we're seeing roughly $9.5 billion today; by 2032, I believe, or 2033, it should reach approximately $130 billion. That's a tenfold growth of the AI market. The nation is also — I visited there not long ago. The nation is also doubling its data center capacity from 940 MW-950 MW to somewhere near 1,800 MW-2,000 MW by 2026. We're discussing a transformational shift. This is a huge national change regarding AI, compute, cloud, and digital sovereignty. Our spending in India isn't superficial. Our potential acquisition is likewise not superficial; it places us in a triple-digit billion-dollar economy, and there we're establishing our own local team, our own regulatory stance. Even more importantly, we're pursuing sovereign-grade projects at scale right now. India is one major market for us moving forward. The second market, which we mentioned and which will also provide us scale and personnel to help deploy in the local market, is the United States; now, the U.S., as everyone is aware, is the biggest AI market globally, accounting for about 36%-38% of worldwide AI spending today. That said, it's also where public safety, digital infrastructure, your GPU demand, defense, and so on are all reaching into tens of billions of dollars, separate from the data center market and the AI market. For me, the acquisition there we're chasing is quite intentional. It provides us an established platform. It provides us enormous customer credentials. Even more importantly, it provides us execution depth; that's something you'd want me to address as well, to deliver — can I deliver actual AI infrastructure and public safety programs in a nation such as the United States or India? This is how we'll accomplish it. For Gorilla, the U.S. is turning into what we refer to as a second engine over the coming 2 to 3 years — it isn't merely some side project. Here's how to think about it. What we're acquiring isn't revenue; what we're acquiring is capability. That hands us scale. Scale in a hyper-growth market comes to us from India. Credibility in the globe's most mature AI and law enforcement ecosystem comes to us from the U.S.

Brian Kinstlinger analyst
#53

Excellent. That was really useful. I appreciate your time in answering my questions.

Jay Chandan executive
#54

Of course, Brian. Any time at all.

Barrett Boone analyst
#55

Jay, Bruce, congratulations on a great quarter.

Jay Chandan executive
#56

Thanks, sir.

Barrett Boone analyst
#57

I've got just a handful of things to ask. To start, it's clear that these days you handle the design, construction, and running of AI data centers, you offer GPUs through a service model, and you're bringing to market your own branded AI GPU platforms alongside partners such as EdgeCore and Intel. Meanwhile, you're also strengthening ties with NVIDIA and the broader GPU ecosystem. In what way should investors view the unified flywheel that you're putting together, and what part does Gorilla play strategically within the coming phase of AI compute infrastructure?

Jay Chandan executive
#58

That is a really intriguing thing to ask. I'll be brief. In short, we aren't operating in a single niche of AI infrastructure. The market, I believe, has to grasp that. What's the reason? Since we are constructing the entire engine. The data centers serve merely as one anchor within it. We architect them. We construct them; we operate them. We retain ownership of them, as they involve long-term contracts for hosting, power, capacity, and similar arrangements. Beyond that, we layer GPU as a service through our NVIDIA-based platforms alongside our partners. That provides us usage-based recurring revenue as the workload scale. This is a crucial phrase that the market has to grasp. When we grow, we will grow too. When our customers grow, our revenues will grow automatically; that phrase is known as usage-based recurring revenue as the workload scale. Then, beyond that, we discussed the flywheel. The flywheel is quite straightforward. Data centers generate GPU demand. Your GPU demand draws in our software. The software subsequently secures longer and deeper national engagements. Consider it a three-pronged approach. How ought someone to view us, whether investors or customers? They ought to view us as a sovereign-grade AI operator, not merely as a project contributor or a box shifter. We are definitely not a box shifter in that regard.

Barrett Boone analyst
#59

Thanks, Jay. That brings in some really useful context. Moving on from what we discussed regarding data centers — you've mentioned Quantum Safe Networks, plus the Intelligent Network Director platform, which handles lawful interception along with network intelligence. Rather than viewing these as products sold on their own, how ought we to regard them as commercial entry points into bigger sovereign infrastructure and national security initiatives? In what way do they function collectively?

Jay Chandan executive
#60

On the quantum question—glad you asked, Barrett, and I'll be brief since we're almost out of time. There's a lot of misunderstanding about this piece of our business. To start, the opportunity here is massive. Just post-quantum cryptography by itself should surpass $100 billion-$150 billion worldwide within the next decade, as governments modernize everything from national networks to financial systems to defense communications, and so on. Now consider this: every single country is going to require it—not want it, require it. It's non-negotiable. Our Intelligent Network Director was never merely a product. Here's what happens: once a country allows you to watch all of its network traffic, its lawful interception, its cyber posture, they aren't simply piloting some tool; in effect, they hand over the keys to their national nervous system. That's the piece the market has gotten wrong. Selling a product isn't our goal. What we're really doing is operating their national nervous system—and that turns into an entry point for data centers, sovereign cloud, public safety modernization, AI workloads, complete national security stacks, and so on. Then, going forward, Quantum Safe Networks widens that door for us even further. Why? Given how we safeguard countries' backbone communications, we're in the room by default. It doesn't matter whether we're talking about Taiwan, Thailand, Egypt, or LatiAm—location is irrelevant. For the next stages of their data centers, GPU infrastructure, national analytics, secure workloads, and critical infrastructure protection, we're already in that room; as you're aware, we signed two projects. Those involved 5G lawful interception safeguarding national critical infrastructure; these technologies now serve as the entry point for programs worth hundreds of millions of dollars across their lifespan. So what's Gorilla up to? We're in that room. We're at the negotiating table. We might sign tens of millions of dollars today, but my goal is turning that into hundreds of millions of dollars across their lifetime. Here's one way to think about it: whether you're looking at Intelligent Network Director or Quantum Safe, neither stands alone. Picture them as a handshake binding us together around bigger sovereign-scale national infrastructure programs. That's my view of it from the IND angle.

Barrett Boone analyst
#61

Appreciate that, Jay. That's really useful. I've got just a single additional question to leave with you.

Jay Chandan executive
#62

Of course.

Barrett Boone analyst
#63

During the last several years, your company moved beyond merely staying afloat and reached a point featuring all-time-high sales, robust earnings, an AI data center commitment spanning multiple years, and a pipeline worth several billion dollars. Considering the coming 2 or 3 years, what do you believe the market fails to recognize regarding Gorilla's path?

Jay Chandan executive
#64

Barrett, that question really puts me on the spot, doesn't it? Fine. Here's the main point I want everybody to take away: we've moved past being a project-based business. The direction we're heading is toward operating sovereign AI infrastructure, got it? Look at phase one, for example — in Southeast Asia by itself, we're talking about hundreds of billions in yearly revenue. Everything that follows is just larger when it comes to scope; and the timeline, and none of that has made its way into the guidance so far. Let me say that again; the guidance doesn't include it. And second, our pipeline keeps expanding. At this point, our pipeline stands at roughly $7 billion, spanning telecom companies, law enforcement, infrastructure, and governments — all of them multi-year national platforms. And once you've demonstrated you can deliver, it's uncommon for you to remain a single-contract vendor. That's understood in the market. Turning to the third piece, the balance sheet — I believe that's drawn a fair number of questions. As I mentioned, we hold in excess of $119 million in unrestricted cash. Excuse me — $107 million unrestricted, with roughly $120 million in total cash still on the books. What that means is we're able to finance substantial data center construction without a moment's hesitation. Twelve months back—and your wording was spot on—staying alive was what occupied us. These days we're drawing up architectures at a national scale, and we're being quite explicit that our aim is to avoid watering down our shareholders as a matter of course. Alongside our partners, we're looking into an extremely broad set of inventive arrangements, ranging from vehicles at the project level through to revenue sharing plus other unconventional possibilities, which allow us to expand aggressively while not surrendering the business to those partners. I did mention what I aspire to. To repeat, that aspiration belongs to me personally; it isn't part of guidance. It isn't a target. Looking ahead at how everything is progressing and the partnerships we have lined up, my goal is to be running at roughly $500 million in yearly revenue by 2027, and then keep growing from that point onward. Last thing — I believe Brian addressed the flywheel topic earlier, and you did too, Barrett. Each data center we bring on delivers GPU and hosting revenue over the long term. Beyond that, as we grow, the more infrastructure we run, the more software intelligence we're able to push through it. What do you think the market isn't seeing? That was your question, I believe. What investors aren't seeing is this: Gorilla is no longer a little company just trying to stay alive. It's becoming an operator of sovereign AI across multiple regions, with contracts that run a long time, margins that keep getting better, and a genuinely bold revenue target. Most folks still picture the Gorilla from before — back when we were doing $22 million in revenue. Believe me, once I reach 20 — I mean, if my own personal goal comes true, I'll be satisfied — and we get to $500 million, that's growth at an exponential rate that few have ever witnessed. The Gorilla you'll be introduced to over the coming year is going to be a completely different creature, Barrett. That's what the market has yet to understand.

Barrett Boone analyst
#65

Thanks, Jay.

Jay Chandan executive
#66

I appreciate it very much. I want to thank all of you for spending your time and tuning in. To those of you investing as institutions and as individuals, here's what I'll state plainly, and nothing about it was written down or rehearsed beforehand. Because of your conviction, we went from merely surviving to operating at scale. These days, folks ask me about survival. That point matters a great deal. Alongside Bruce and everyone else on the team, you remained by my side through each and every fight we've had on the road to where we are; a new chapter now begins. Winning contracts isn't the only thing we're doing; we're also constructing the AI infrastructure of nations. This company has been molded by your belief, and everything we've been building in the years to come will certainly be defined by it. Above all, my thanks go to each and every one of you — I'll name individuals such as Sam, such as Christian, such as Gunther, who genuinely stayed with me while the rest of the world was still catching up. With results, I plan to pay back that trust. Thank you. Thanks to all of you for listening in. Have a lovely day.

Operator operator
#67

This concludes today's conference call. Thank you for your participation. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Gorilla Technology Group Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Gorilla Technology Group Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.