Home / Transcripts / Gorilla Technology Group Inc. (GRRR) · May 27, 2026

Gorilla Technology Group Inc. (GRRR) Earnings Call Transcript

May 27, 2026

NASDAQ US Information Technology Software earnings 59 min

Earnings Call Speaker Segments

Jayesh Chandan executive
#1

Thanks a lot. Appreciate it, everybody. Thanks for being here. Bruce and I will keep things pretty straightforward today. Q1 wasn’t exactly a calm quarter. For us, it wasn’t some tidy accounting period tied up with a ribbon; it was the kind of quarter where people nod along politely, Bruce and I follow a prepared script, and everyone acts like the world is different just because somebody sprinkled AI into the script and the release; also, I won’t be reading off a piece of paper today. For me, Q1 was when Gorilla went from turnaround mode into scaling mode. And scaling rarely looks neat in the earliest innings. Anyone who has truly built a company and something meaningful understands that. You don’t construct the data center campus, you don’t lock down power, purchase hardware, roll out GPUs, bring on staff, broaden products, and shift into sovereign AI infrastructure without making some noise in the P&L. If somebody thought we’d have a flawlessly polished quarter while we’re building the next iteration of this company, they might also think British sunshine shows up right on time. A lovely thought, seldom true. Now let me begin with the facts. We brought in USD 28.2 million of revenue, up 55% year-on-year. Even more important, we became operating cash flow positive. Take a moment with that. Net cash from operating activities came to $6.6 million, versus the cash, and more importantly, used in operating activities of roughly $10.7 million in Q1 of last year; this is a massive swing. It’s a favorable swing, roughly $17.3 million better, or a 162% swing. On top of that, we closed the quarter with just over $98.4 million of cash, up 373% year-on-year. Let me say that in plain simple English. Revenue increased, our customers paid us, operating cash flow became positive. Cash remained strong; beyond that, this isn’t merely theory. This isn’t market theater. This is execution showing up on the cash flow statement; now the reported operating loss of about $41.1 million, that figure, you should stop reading right there. If you stop there and if you examine the business, then you’ve actually overlooked the business. The loss was heavily distorted by 2 major items. There was $20.9 million of stock compensation, which had been due for the better part of 3.5 years. We had to absorb that hit. Second, there’s USD 18.9 million of foreign exchange losses. Combined, together, that’s roughly 97-plus percent of reported operating loss. Now excluding those items, the underlying operating loss for the whole company was only $1.2 million. Now that’s real context. So no, it wasn’t a $41 million reflection of the operating business. This was an accounting heavy quarter inside a company that grew revenue 55%, turned operating cash flow positive, and ended up with nearly $100 million of cash. That’s the reason I’m saying this quarter draws a line between accounting distortions and how the business actually operates. The stock-based compensation charge is noncash. It represents an equity compensation that was long overdue and tied to multiple years, something we’ve been talking about with the market. Honestly, I’d prefer to book that charge while our equity value is much higher rather than record it during stressed conditions or make shareholders bear the pain. To put it in plain terms, I’d rather swallow the accounting medicine at roughly $15 and give away the company at $3. That isn’t arrogance. That’s arithmetic. The FX loss hurt. Currency devaluation isn’t enjoyable for anyone, unless someone has a really strange weekend pastime. But once more, look at what actually occurred beneath that accounting line: we brought in cash. What seems to be escaping people is that cash has come in. Our customers paid us, Egypt paid us, milestones were reached. Every one of our advance payments. Let me say that once more: every advance payment guarantee tied to the project has now been fulfilled, and at each individual project stage we released it and the project advanced into final implementation, which means we succeeded. When doubters stepped forward and claimed we wouldn’t be able to deliver, we have now delivered. We are at the last stage of implementation. So yes, the FX < > the projects moved forward, the guarantees came down, and that is the operational story. Now let’s discuss what Gorilla is turning into, which is what excites all of us. When we talked with the analysts before, Gorilla was still mostly seen as a Security Intelligence, Network Intelligence, Smart City technology company. That business is still significant. It’s in our DNA. It is who we are and who we have been for the past 25 years. But the company is now entering a far bigger arena: AI infrastructure, GPU infrastructure, data centers, sovereign compute and secure national digital platform. The transition requires spending before it generates its complete payoff. We’re bringing on people. We’re purchasing hardware. We’re locking down land. We’re making progress on power. We’re taking colocation capacity. I believe most of you saw that press release that came out over the last couple of days. We’re putting money into GPUs, networking, storage, cabling, security infrastructure, operational systems. We could have run the quarter for appearances. We decided to run the business for scale. The simple path would have been to shield near-term EPS, but making sure the right thing happens is to build the company, and building this company matters most to us. Personally, I don’t think PowerPoints operate GPUs. Headlines don’t chill data halls, and hope certainly doesn’t lock in power for us. Above all, execution is the task. That’s what we’re doing. In India, we have signed contracts with Yotta and substantially broadened our AI infrastructure collaboration. This initiative backs large-scale infrastructure build-out and provides us a solid basis for meaningful revenue growth. And if I mention Gorilla turning into a $500 million revenue business next year, I'm not casually tossing darts after a lengthy lunch, alright? I haven't been drinking my wine. What I'm examining is signed demand, contracted opportunity, plus the infrastructure needed to deliver it. Well, since that time, folks will claim, Jay, you've come across as aggressive, that's okay, yet I'd describe it as calculated ambition. Take Thailand, as an illustration: we're moving ahead with our 200-megawatt AI data center campus in Korat; strategic land has been secured and acquired; we've locked in the basis for power planning. We're constructing the physical platform for Gorilla's AI infrastructure. Yet even more crucially, this is an owned AI infrastructure strategy throughout Asia. Thailand isn't merely an idea. It isn't merely a vibe. It's land, power, planning, water, dark fiber, cooling, security, an actual development path. Everybody can claim they are < >. Extremely few can put together the infrastructure needed to power. We're additionally chasing further opportunities throughout Thailand, among them Rayong; in Indonesia, I believe < > you've witnessed, we've progressed by securing a colocation facility in Jakarta and in Batam. Now throughout Southeast Asia, our aim is to merge owned data centers, colocation facilities, GPU deployments, and sovereign AI demand into a single regional infrastructure platform.

Jayesh Chandan executive
#2

Speaking for myself, Jay, I think Gorilla has a believable route to roughly more than 500 megawatts of AI infrastructure capacity by the close of 2028. That's not a 5-year horizon I'm describing. If we execute the right way, I could even push beyond that. Today, demand sits well above a couple of gigawatts. So execution has to happen across Korat, whether that means Rayong, whether that means Bangkok, whether that means Jakarta, Batam, Singapore, Malaysia, the Philippines, and other opportunities in the region; now, 0.5 gigawatt of possible AI infrastructure isn't typical for an organization our present size. I've been told this before. Plenty of people have said to me, Oh, you're too small, how will you ever build it? That's exactly why this opportunity is so meaningful for an organization our size. And here's the key thing. We aren't turning into a one-dimensional data center company. We haven't halted products. Raj, who serves as our Group CTO, keeps developing platforms. He keeps deepening our Security Intelligence capabilities. He keeps widening our Network Intelligence portfolio and driving our sovereign technology road map ahead. In Taiwan, we keep chasing new customer opportunities. With Chelpis, for instance, as you saw a couple of weeks ago, we're pushing forward our quantum safety and security. With Astrikos in India, we're reinforcing our intelligence layer that assists with predicting and optimizing infrastructure spanning cooling, IT load and physical systems. That counts because the future of AI infrastructure won't be measured by how many GPUs I possess and can point to. It will be measured by whether that infrastructure is secure, resilient, sovereign, efficient and, more importantly and most importantly, trusted. Now, compute without control, to me, is simply expensive heat; now, Gorilla's edge is that we're constructing the infrastructure layer and the intelligence layer side by side. We're also putting very heavy investment into people. Plenty of people doubted us last year. And now I can say that, over the last several months, we've brought on more than 100-plus employees and over 200-plus contractors spanning delivery, engineering, finance, compliance, operations, commercial functions, procurement and so on and so forth. That isn't overhead merely for the sake of overhead. That's execution muscle. Nobody, and personally, Gorilla, can deliver multibillion-dollar scale with a village hall committee and a lucky spreadsheet. No, that simply doesn't work; we're building the organization needed for the next phase. So when you examine Q1, don't view it as a small quarterly miss against an old model. View it as the first visible quarter of a company that is going to be much larger and is being built. The old gorilla was about proving that we could turn around. The new gorilla is about proving we can scale. We're raising our full year 2026 guidance to $160 million to $200 million. And I'm personally focused on what it takes to build a profitable $500 million revenue business next year; that will require execution. It will require discipline. It will require capital. That’s going to take execution. And even more critically, it’s going to take continued effort from us throughout every market in the Middle East and Asia, plus other strategic places; even so, the path forward is extremely, extremely, extremely obvious. Top-line figures are climbing. The people we serve are actually paying. Let me say that once more. The people we serve are actually paying. Cash from operations is in the black. Our cash position is solid. We’re locking in land. We’re locking in capacity. Hardware is being purchased by us. Data centers are going up because of us. New offerings are being created by us; we’re putting money into our workforce; we’re constructing the capital structure needed to finance bigger initiatives. None of that is exaggeration. That isn’t Jay feeding you nonsense; that is real execution. And honestly, in an AI sector where an excessive number of businesses promise the moon before morning coffee and offer excuses by supper, from my own perspective, execution is turning out to be quite a breath of fresh air. Therefore my statement to the marketplace is extremely straightforward. Gorilla is past the stage of demonstrating it endured. Gorilla is demonstrating it can construct something much larger and greater. My story can be argued about by the market. Let markets take pleasure in that argument. It gives folks a way to pass time between the spreadsheets; however, the cash flow statement has already begun to say its piece. So, thank you. I’m going to pass this to Bruce, who is going to take you through the figures in a manner I found enjoyable and now — Bruce?

Bruce Bower executive
#3

Appreciate that. I believe Jay already went through every one of the key points. My aim was just to drill down on a handful of those, plus some additional figures that caught my attention. First off, like Jay said, revenue climbed 55% compared with the same period a year earlier. Looking at the guidance for the entire year, the range sits at $160 million to $200 million versus the prior year. That tells us we're already where we need to be against our forecast for growth over last year. Beyond that, that revenue is turning into cash from operations. During the first quarter, we gathered in — we gathered in payments on invoices from 3 sizable clients. As a result, net cash overall came to $6.6 million. After the close of this quarter, we also secured the release of every guarantee tied to our big project over in Egypt. In essence, the free cash side of the balance sheet looks extremely robust, while restricted cash — which had been an extremely large figure 12 months earlier — has fallen to nearly 0. When the quarter ended, we held $98.4 million in cash and cash equivalents. To me, that demonstrates we've got a fortress-like balance sheet capable of handling the projects we've laid out. So between the coax work, the buildout into colocation facilities, and the efforts at Yotta, among other things, this is what carries us through the initial phases. On top of that — our debt situation keeps performing well in the sense that it keeps shrinking; we now have $13.2 million in debt. That leaves us sitting in a very solid net cash position. My final point would be that when you examine the top line alongside operating cash flow, obviously we're thrilled with these results; but we've also been investing, and much of this reflects operating leverage in that the operating expense line — which appears in the financial results as other operating expenses — is essentially the SG&A figure; it rose just 16% versus a year ago; that's down to some of the big hires we brought on last year and some of the significant budget increases we made last year. So those investments are genuinely paying off for us. And I expect the second wave of investments we're now making to build out the infrastructure offering will pay off similarly before long. The final item I wanted to address was really — so Jay brought up some of the figures regarding FX losses and stock-based compensation. I'd point out — so there was a $1.1 million operating loss once you strip out those 2 major revaluations. Worth noting that we hold substantial balances in 3 currencies in — besides U.S. dollars, clearly, in Taiwan dollars, Thai baht and EGP. Given geopolitical developments during the first quarter, every one of those moved against us. Taiwan, Egypt, and Thailand have each now stabilized their currencies. Therefore, a recurrence of that scale isn't something we anticipate. Next, a portion of those currency-related losses did appear within the operating results, since they were tied to fluctuations in the value of receivables. In my view, that obscures how profitable the business truly is. So assuming exchange rates stay steady—meaning absent any major geopolitical disruption—we ought to return to a far healthier net income picture. Now, on the matter of—over the past few months, plenty of people have asked us: alright, you've got all these projects, and you've said you're pursuing project financing. Where does that stand? Without getting too far into the weeds—something I believe our lenders would prefer I avoid—we're quite pleased with how things are moving. We hold several term sheets that we've either already gotten and are awaiting signature before entering the documentation stage, or we're already in that documentation stage. After that, the following announcement regarding financing at the project level will essentially confirm it's closed, and it will identify which project, among the various ones, is being funded. So that covers my update on project financing—yet we're really pleased with the trajectory, and it stacks up favorably against the projections we held when we committed to these projects. So the profitability exists. That's everything from my side. I'll hand things back to Jay, and we can begin taking questions.

Jayesh Chandan executive
#4

Thank you, Bruce. Operator, we're happy to take the questions.

Brian Kinstlinger analyst
#5

Kevin, this is Kevin calling in for Brian. I'd like you to discuss the anticipated schedule for the various HPC AI agreements you've made public — the ones you'd announced — covering the several phases, the three 3-year initiatives, and the 200-megawatt facility located in Thailand, plus anything else I may have overlooked, especially regarding when revenue is anticipated to start for each phase.

Jayesh Chandan executive
#6

Kevin, it's a pleasure to hear from you. Appreciate it; we've kicked off construction on our campus in Korat. I'll begin there. We've already begun discussions with the EPCs; we're examining the water supply. We're examining the power supply. Construction ought to commence roughly between Q3 and Q4 of this year. That's the point when we'll possibly begin considering pouring concrete; regarding the remaining projects, Yotta is already underway. Orders have already been submitted to our OEM partner, Supermicro, for our distributor in India. We're navigating all the customs procedures, the government of India's import rules and stipulations, which is quite a laborious undertaking; that has already begun, and we anticipate our initial delivery arriving by the close of July. We've already received confirmation from our very close partner, Supermicro, who has essentially provided us with the initial delivery timeline. The second phase for Yotta, which is the considerably bigger project, is slated to be delivered by the end of August; and following that, on a monthly basis we have — through November, we're going to finish all deliveries. So when you examine the revenues arriving on our books, you'll notice the first phase's revenues landing on our books starting in September. Then continuing, the second phase would run from October, November, and December. In Asia, which you brought up, that was your initial inquiry; we are — as you're aware, we've just finalized the colocation arrangement with NeutraDC within the past couple of weeks. That revenue is anticipated to reach our books starting in the middle of Q3 or Q4 of this year, since, once more, we have the data center, we have the power, and everything is fully connected. We've now settled on the complete design architecture together with the customer. We're collaborating with our — once again, our partner, Supermicro, to obtain the delivery timeline. And at present, the delivery timeline appears to fall somewhere between August and September. So we'll continue updating the market as our schedules develop. I trust that addresses your inquiry.

Michael Latimore analyst
#7

Nice work on the Q1 numbers. Your cash flow is impressive. I believe you lifted the bottom end of your outlook compared with the beginning of the year — that range was $137 million to $160 million. What was the primary reason for that, perhaps?

Jayesh Chandan executive
#8

Bruce, would you like to handle that?

Bruce Bower executive
#9

Yeah, absolutely. So, as you're aware, the way we build our guidance is by starting from what's already under contract. We're not just guessing, looking at the whole pipeline and assuming some conversion rate and crossing our fingers. That's not how we do it. So there are 2 things giving us confidence. First, the schedule — like Jay said — looks really favorable for us to come in above the prior bottom of the range, which was $137 million. And second, Q2 and Q3 are coming together with more signed revenue than we'd initially budgeted for. So somewhere in between — by the time Q3 wraps up, I believe we'll land in a stronger position than we'd first expected. Those 2 things pushed us to conclude, alright, the lower bound of this range has to go up. As for the $200 million, that's still being extremely cautious. You heard, for example, that one of the phases involves October, November delivery. If something goes wrong and it slips into next year, I'd rather not bake that into this year's guidance and then end up embarrassed, right? It's far better to stay conservative with the market — say less than you'll deliver, but be upfront. Then once things are 99% locked in, we'll revise the guidance accordingly. Jay, anything I left out?

Jayesh Chandan executive
#10

No, I believe you've described it exactly right. Mike, it's nice to hear from you once more. To repeat, we're collaborating extremely, extremely intently. As you might expect, much of the worldwide political climate concerning shipments and everything else has proved somewhat difficult too. We're ensuring we receive the proper focus at the topmost level within NVIDIA, ensuring we finish it — via Charles, who is the Co-Founder of Supermicro at Supermicro, and ensuring we can have every delivery brought to us. The positive aspect regarding India, though, is that we already have the delivery schedules, which is the reason we raised the guidance's lower end. After we clear the obstacles during the coming days or weeks, we'll return to you with something firmer, perhaps an increase for the top end of those figures.

Michael Latimore analyst
#11

When we're talking about that $200 million figure, what portion falls under the AI, data center, and digital infrastructure bucket?

Jayesh Chandan executive
#12

It's approximately 60% to 70%. Growth will keep happening in our core business, but since this AI piece is brand new, our revenue there is jumping from 0% to nearly 150% of that. So that's exactly where we stand.

Michael Latimore analyst
#13

And regarding that Egypt contract, you've reached complete rollout. Does recurring income keep coming in at this point?

Jayesh Chandan executive
#14

Correct. We've got recurring revenue spanning 5 years, which we told the market roughly 3 years back, following the completion. So our target for finishing is somewhere between the middle and third quarter of the coming year; right now we're at the last stage of implementation. Like I said before, we've been through all the steps. Every delivery has been made. The customers are extremely pleased. Something I'd like to point out is that at present we carry nil, or close to nil, advance payment guarantees across all projects. Each of our projects has been delivered without issue. The overall advance payments — well, as you're aware, 3 years back, those advance payments sat well above $50 million, with $60 million essentially held hostage by our clients, which clearly matters a great deal to them; it lets us show we're delivering. As of today, that figure is $45,000. I want that point stated plainly. So it shows we've delivered, and the customers have paid us.

Michael Latimore analyst
#15

That's excellent. Now, for my final question, let's discuss gross margin. What's the right way to frame gross margin expectations for the year?

Bruce Bower executive
#16

Sure. Gross margins came in at low 30s last year. With the AI-focused business expanding, margins are going to increase. For the data center GPU-as-a-Service implementation, gross margins land somewhere around 75% to 80% in a worst case, and they can go even higher. So for the full year, that's going to push gross margins upward. This quarter, we recorded a gross margin that was lower than we'd prefer because the mix was basically tilted somewhat toward more hardware; and honestly, we got a bit more aggressive with pricing simply to bring an additional customer on board. That said, we've announced the contracts that will make up the growth phase spanning quarter 2 through Q4, and the margins attached to those are significantly higher compared to the traditional business — the gross margins, at least; so we anticipate them rising. Regarding the guidance update Jay mentioned, once we update the guidance, we'll have a clearer view with a fairly narrow range around what that figure will be.

Jayesh Chandan executive
#17

If I could jump in — sorry, Mike. Let me just add one quick thing to that. For Bruce and me, honestly, this quarter felt like a mobilization period, all right? We've been pulling the costs forward. You can see it — we've brought on staff, a huge number of them, new hires for an organization our size. Getting infrastructure ready. We've been purchasing hardware. We have to run POCs. There's data center capacity we're on the hook to pay for. Nobody signs for data center capacity without paying. A big chunk has to go out the door upfront. Then there's project delivery and technical deployment. So those are the costs that have landed in Q1; and now, most importantly, Mike, we're also standing up our capacity ahead of the full revenue curve arriving, correct? Which means the concept comes first here, but gross margin recovery comes after as utilization rises. You've been around this space so long, you get data centers better than nearly anyone. For us, AI infrastructure doesn't scale at no cost; so more importantly, we're making certain the platform is up, running, getting ready, steady. We're handing our 99.999% SLAs to our customers and making sure that all of our GPU deployments, our data center revenue, our managed revenues are all improving materially over a period of time; that was just to add to Bruce's point.

Bharath Nagaraj analyst
#18

I believe you said that 100 additional staff members were brought on board, along with 200 fresh contractors. My guess is that this will only be partially captured, or perhaps, as Bruce indicated, completely captured in Q1, and you're still bringing on more people. So I'm just curious, how much do we anticipate operating expenses will rise by over the next few quarters? And essentially, that connects to any remarks regarding what the EBITDA target ought to be for the upcoming quarters this year? That's my first question.

Jayesh Chandan executive
#19

Bruce, if you'd like to handle the first part, I'll cover the second part of that.

Bruce Bower executive
#20

Okay. So, as we said, those people came on board as contractors. That's part of why gross margin is under pressure — many of those contractors show up as costs at the project level rather than in SG&A. On the SG&A side, it came in at just above $7 million for the first quarter. That figure will grow in the quarters ahead. We'll keep scaling up operations. But it won't — for one thing, its growth won't match the pace of revenue growth. And second, since we're bringing in business with higher gross margin, gross margin should improve, and that carries through to EBITDA margin. So at the close of last year, we had $101 million in sales, along with $20 million of adjusted EBITDA, or $19.5 million of adjusted EBITDA. So my expectation is that it will grow past that margin, reaching 25%, 30% or more. I'm going to — once the final numbers are in, we'll provide the exact figure.

Jayesh Chandan executive
#21

Right, and let me build on that point for the back half of the year. I believe the market needs to grasp that the headcount we're bringing on simply isn't sufficient. We're going to scale that by another five times, perhaps even ten times, across both full-time employees and contractors. Let me walk through one piece of this, okay? At present, we bring contractors in to bid, and that's because they're co-located, standing up all this infrastructure and similar work. But consider the execution side. We need staff for delivery and program execution, and those are people we'll be bringing aboard. We'll be looking at engineering and infrastructure build-out; we'll be running data center operations. To stand up just one data hall, we'd require approximately three hundred-plus individuals on average — with, say, sixty people per shift, that comes to one hundred eighty people, and once you fold in everything else, you land at roughly three hundred people for each data center operation. There's your GPU deployment, your technical enablement. There's your product development. There's your SOC, NOC and managed services; after that comes finance, compliance, procurement and project controls, export controls. A dedicated legal team has to exist for all the export controls involving the U.S. government and NVIDIA, and we must support that. And last, we have to have our commercial support and what I refer to as our customer success. Now once more, Bharath, we aren't gathering these employees like stamps, all right? We're transitioning from a lean turnaround business into scale execution. So the mobilization across Q1 and Q2 ought to be understood as hiring straight into what I'd call backlog execution. We aren't hiring and then waiting for new projects to arrive. These projects are already signed; we're looking at roughly — we have $3.2 billion coming from the year projects. We have a further $2 billion of signed contracts. So that puts you at about $5-plus billion of backlog execution. Second, the Korat data center build-out, that will require at minimum another 1,000 to 2,000 people. The India GPU infrastructure, which is up and running. The team from India is sitting here with us today in Asia, in Southeast Asia, and we're standing up all of our infrastructure teams and so forth; then there's your Southeast Asia colocation capacity; we've outsourced the bulk of that work to our friends at NeutraDC. But after that comes your security, network intelligence and so forth. So we're building what I'd call 0.5 gigawatt of ambition. And luckily, that is going well in our favor today.

Bharath Nagaraj analyst
#22

That's quite useful context. Let me just ask a few quick follow-ups. Regarding how much data center capacity, or AI capacity, you're planning to have in place by the close of this year — I believe you said 60% to 70% of the upper end of your guidance would come from that; but as far as the actual capacity goes, what figure are we talking about? I recall it was around 100 megawatts historically, and perhaps that was at the lower end; so I just wanted to get clarity on what that number looks like for 2026? Since I think for 2028, you've cited 500 megawatts.

Jayesh Chandan executive
#23

That's a genuinely excellent question, Bharath; so our target is somewhere in the range of 100 to 150 megawatts by the time this year ends. By the close of 2027, my own aspiration is to finish the entire 500 megawatts — we've already gotten inbound interest on several other land sites and government approaches from various different parts of Asia. We've received inbound inquiries about how we could scale up to roughly 2 gigawatts as well. Those are discussions taking place at this very moment; but my own aspiration, as I mentioned, is that by the end of 2027, I want at least 0.5 gigawatts of power capacity, with the intention that I've signed another gigawatt — another gigawatt of — a full gigawatt of development capacity too.

Bharath Nagaraj analyst
#24

Great. Sorry—actually, I've got a few additional ones, if you don't mind. Regarding the—obviously, there's a great deal of competing need for GPU. How sure are you that the—every GPU for every one of these projects is going to be delivered, considering what's happening with the supply chain? I mean, you've secured quite a few orders. The pipeline is fairly substantial. And so that's what I was thinking about.

Jayesh Chandan executive
#25

Yeah. Well, look, if I possessed a magic wand and could gaze into my crystal glass, I'd be delighted to say that everything can be delivered before this year concludes, and that I'll be boosting revenues considerably in the following year, but that requires time. NVIDIA is putting out a great deal of—I mean, when you look at what NVIDIA has coming now, you're seeing the next generation of Vera Rubin arriving too. Customers are now eager to consider that too and perhaps discuss it with us. But at times that shifts the whole goalpost too. So we're ensuring that customers' architectures stay unchanged. So we need to ensure customers remain grounded, correct? There's a lovely shiny object sitting out there. Customers wish to sprint toward it. So we must hold them grounded. Then regarding delivery, luckily we've encountered no significant problems whatsoever when it comes to NVIDIA so far. The worldwide worries or problems right now, which are like a nose around my neck, don't appear to have generated a big issue as of yet. However, what has generated a certain amount of delay is the present shortage of memory and storage in the marketplace; and on top of that, we're now also witnessing CPU availability shortages in the marketplace. So we're collaborating with our partners. So right now we are extremely, extremely, extremely tightly integrated with Supermicro. We're working each and every day. As a matter of fact, I was there the entire week prior alongside them; we're going to spend the entire next week at Computex in Taiwan too, where we're sitting together and formulating our plans regarding how we guarantee that the memory doesn't—I mean, obtaining the GPUs is wonderful, but our capacity has to grow, correct? So we're working hand in glove with each and every significant partner of ours throughout the region to guarantee that it doesn't stumble.

Bharath Nagaraj analyst
#26

Just a quick, minor question about accounting. Regarding the stock-based compensation expenses, since you recognized most of what you'd indicated you would back in Q1, would it be correct to say the rest of the quarter ought to be very small? Is that accurate, or have I misunderstood?

Jayesh Chandan executive
#27

Bruce?

Bruce Bower executive
#28

Yeah, I believe you've got that right. What I mean is, we had some deferred stock-based compensation that had been sitting around for 2 years. For a number of reasons, we chose to make the payment during this quarter, so it's no longer an overhang.

Jayesh Chandan executive
#29

Bharath, let me jump in here, and I promise I'm not joking around. I've come across remarks such as, oh wow, the CEO got compensated and so on and so forth. No, it isn't only the CEO. This applied to the staff too, plus everyone else throughout the organization. I want the market to be clear that this pay was owed going back almost 4 years, ever since we became a public company. And workers have to receive their money. Their stock has to be handed over to them. Sadly, it landed in this quarter. That's fine. Were I to withhold pay from my team, that would be the incorrect thing on my part; therefore I'm establishing the proper precedents.

John Roy analyst
#30

So Jay, clearly there's been plenty of discussion regarding bigger and bigger projects, AI infrastructure, GPUs, data centers, and so forth. I got curious — I know Bruce mentioned funding a bit — about your thinking on how you plan to finance these enormous projects? And what's your position on that? Maybe just take a step back and walk us through where things stand.

Jayesh Chandan executive
#31

John, great to hear from you. I was asking myself when you'd pose a question to me; that's a completely reasonable question, and honestly, it's the correct one. Gorilla's scale has shifted, correct? You and I know we speak often; what we're dealing with isn't small software deployments. We're signing and chasing large AI infrastructure, GPU data center projects throughout India, Thailand, Indonesia, Malaysia, Singapore, Philippines, and so forth. That calls for capital. And there's no telling of my story or this story today in which we signed multibillion-dollar opportunities to buy GPUs, reserve data center capacity, procure networking, memory — I was just telling Bharath about it — memory and storage, secure power, buying land, building data centers without funding the business properly, right? I mean, GPUs require money. I mean, I don't know whether people grasp that purchasing a B300 server costs me over $0.5 million. That's not counting networking and all the other extras that come along with it. So when a customer says they need 1,000 servers, you're looking at roughly $500-plus million of investment just for the GPUs on the servers. And then you've got networking and so forth, which runs you another $20 million to $25 million. It's a substantial sum. Beyond that — so where do we stand today? We haven't yet leaned on dilutive equity to finance the build-out today. Our strategy has been to safeguard shareholders while assembling the capital stack needed for our particular club, okay? We're actively pursuing vendor financing; we've gotten term sheets in the range of approximately $0.5 billion to $1 billion across all the vendor financing and debt structures. We're moving forward with various debt financing. We have term sheets and bank-led proposals between $300 million to more than $700 million, $800 million that contemplate lending at the project or the SPV level instead of depending purely on the listed path. You recall what Bruce said last quarter, we're ensuring it's nonrecourse. And I think people must grasp when Bruce said that, he meant it genuinely. So we're also examining different levels of SPV structures. Now that matters because infrastructure assets could be financed against their own cash flows, the contracts, equipment and the project economics where possible. So we're working with various levels of structures at the SPV level. We're also building Gorilla Capital. Again, the market seems to have forgotten about it since it's what I call a strategic funding platform. What we're aiming for is to pull in capital that can stay invested for a long time — that includes pension funds, endowments, and, my apologies, institutional investors whose structures are able to back a long-life infrastructure asset investment lasting 7 to 10 years; at this point, we're aligning the funding with the asset itself. GPUs, data centers — excuse me — and contracted infrastructure revenue shouldn't be funded through short-term thinking. The capital structure now needs to line up with the commercial life of those assets. Even more significantly, we're staying extremely disciplined when it comes to shareholder impact. We won't pursue financing just for the purpose of financing. What we're trying to achieve is ensuring growth, profitability, and shareholder value; so here's what the market has to grasp — I have no clue what's going on with me, sorry. My apologies. Across our AI infrastructure and data pipeline — data center pipeline — we're looking at potentially over $5 billion in signed contracts and executable opportunity. The market is already aware of this. If our intention is to take Gorilla from a $100 million revenue business last year to $500 million revenue next year plus annualized business for the next 5 years, then this business needs to be funded the way a Sirius infrastructure platform would be. So growth demands capital, and even more importantly, profitable growth demands highly disciplined capital. That's the reason we aren't raising money because the business is weak. I believe the market needs to understand this, John. We aren't raising money because the business is weak. We're putting capital together because the opportunity ahead of us is much, much, much bigger. And the distinction is quite straightforward. What I want to say to you, to the whole market, and to everyone listening on this call is that we're funding growth through a mix of vendor financing, SPV level financing, and long-term — long-duration institutional capital; but we're doing so very carefully to safeguard our shareholders, keeping them in mind at all times. I hope that addresses your question.

John Roy analyst
#32

Yeah, it does, in fact. That sort of raises a follow-on question, which is about the pipeline. Could you provide any sort of insight into the pipeline? I'm aware there are some large figures out there. Just wondering whether perhaps you might be able to sum it up with some...

Jayesh Chandan executive
#33

Absolutely; so as of today, the pipeline — the contracts that are signed, or what I'd describe as backlog, stands at well over $5 billion, alright? What remains to be signed, or is in negotiation and discussion, is well north of an additional $5-plus billion. That figure leaves out any of the build-out we're currently doing in Korat or in Rayong, and so forth and so on. So — and when I brought this up earlier with Bharath, I made it extremely clear to him that what we're aiming for — my own personal ambition would be to land a full gigawatt there. If I secure the full gigawatt with offtakers — and incidentally, just so you know, we never sign any colo; no land gets purchased by us absent an offtaker. I have offtakers signed and entirely prepared to assume the capacity on day 1. Not one single hour will I spend on GPU power without an offtaker in place. So our revenue will land on the books the moment the date arrives when the ribbons have been cut; so if we achieve the 1 gigawatt, then what you're facing is — you already know what the revenues look like. I won't throw out any figures at this moment, but we will be looking at a significant upgrade from even that $500 million plus figure.

Barrett Boone analyst
#34

Jay, Bruce, well done on kicking off 2026 so strongly. As we went through earlier on this call, receivables dropped by a meaningful amount over the quarter. Could you explain what's behind the improved collections? And how should we view cash conversion ahead as we scale up toward that $500 million revenue goal?

Jayesh Chandan executive
#35

I'd love for Bruce to kick things off, and then I can add my thoughts. Bruce?

Bruce Bower executive
#36

Okay. The main factor behind this is that we have three key clients, something we shared in the 20-F. Throughout 2025, we made deliveries, sent out invoices, and then going into 2026, we laid out the terms and made clear that payment needed to be collected. Two of those clients have consistently paid right away, and that's exactly the type of customer we appreciate. As for the third, it comes down to straightforward business reasoning: we point out that in Egypt, our partnership began in July 2023, when the contract was awarded to us. We've reached this point together. We've provided so much for you. Is it unreasonable to expect timely payment? And this customer does acknowledge the worth and the fundamental value of the infrastructure we've established. So that's been helpful, along with how our product tends to keep customers locked in. One more thing I'd mention is that when it comes to new clients, we are very strict about the payment terms for those we're bringing on board. Jay?

Jayesh Chandan executive
#37

Sure thing. Thanks, Barrett. Bruce, that was genuinely pretty interesting. You already took all my points. So, Barrett, let me just build on that — from my perspective, revenue is great. Obviously, everybody appreciates revenue. But what distinguishes an actual business from a brochure is cash, right? We generated operating cash flow. You already know the figures — I won't go through them again. There was a massive positive swing, $6.6 million and so forth — a $1 million and so forth; but the bigger question is what caused it? I believe, once again, we have some work to do in educating the market. To start with, our customers paid us. That might seem incredibly obvious; however, with big infrastructure programs, how customers pay is among the strongest indicators of how well delivery is going. It reflects the caliber of the company. Customers don't hand over significant cash out of generosity, right? They hand over cash because milestones are getting hit, documents are getting approved, and projects keep progressing. The second piece is that we've sharpened our approach to project discipline as well; we are no longer a company with $20 million in revenue. Internally, we're pushing harder on invoicing, collections, milestone tracking, project governance — all of that customer acceptance. Winning big programs isn't sufficient — we have to turn those wins into recognized revenue and then into cash. So the challenge is making certain we operate this business at a profit. The third and most crucial element of the business is — now that we're building a company where cash conversion is turning into a component of the operating model, rather than something taken off the top. What comes next is scale. If we're truly serious about heading toward $500 million of revenue, then working capital cannot be allowed to turn into, for me, a museum of unpaid invoices. We need disciplined contracting, delivery, acceptance, billing, collections, cash application, and so forth. So Barrett, as we scale into data centers and GPU, cash flow is never going to move in a perfectly straight line. I wish it would, but every one of these is a large program; so we're going to make sure we hold our ground each and every month. Still, the Q1 signal matters a great deal. We grew revenues; we brought receivables down. We brought advanced payment guarantees down. I mentioned this to Mani earlier. It's dropped from $50-plus million to $45,000. That speaks to the next stage of our business evolution. So put simply, as we continue scaling, cash conversion is going to be key — it will be the single most important metric for us, which Bruce and I personally are monitoring and will keep monitoring like a hawk. Revenue draws attention, but for me, cash is what earns respect. So for me, going forward, cash will be our standing ovation, Barrett.

Barrett Boone analyst
#38

Got it. There's just one final item I wanted to ask about. Regarding what you put out today, you mention that pairing infrastructure with AI offerings provides Gorilla with an advantage. Could you explain how all of it fits together and how those offerings assist you in securing infrastructure contracts that maybe a data center competitor focused on only one segment could not?

Jayesh Chandan executive
#39

That's genuinely a great question. Once again, I believe markets and a great many investors appear to have overlooked this as well. The straightforward truth, Barrett, is that we aren't merely selling space, power and cooling. If you go to a data center provider that specializes in just one piece of the puzzle, what you get is a building, some racks, electricity, and a help desk. That's useful, sure, but it's not exactly Shakespeare, right? I'm using a British timeline reference there. Why do I say that? Because Gorilla provides the entire operating layer that sits around the infrastructure. Think of it this way: we take care of site assessment, power planning, cooling infrastructure and architecture, feasibility studies, and data center readiness. We also take care of racking, stacking, cabling, GPU commissioning, network integration, and cloud enablement. And when it comes to security — whether that's physical security, access control, cybersecurity, your SOC capabilities, your NOC monitoring, CCTV, or access controls — every single piece of it is built and managed by us in-house. We run it too; meaning we provide 24/7 monitoring, managed services, remote operations, preventative maintenance, life cycle support, all of it; so for us, we aren't just handing over a room with very, very lovely blinking light. We make certain our products are sitting in it. And that's the reason we put investment into Astrikos, right? Consider the distinction. We have security intelligence products, which genuinely assist customers in protecting their critical infrastructure, their endpoints, their users, their cameras, their operational networks. We've got network intelligence products arriving from our friends at Astrikos. We have built our own SD-WAN, secure tunneling, orchestration and edge connectivity for products. Our intelligence layer for business covers everything—operational data, infrastructure data, video, IoT analytics, and the decisions themselves. So whenever we meet with a government, a telecom operator, an enterprise, or really any infrastructure partner, we're not handing them a building and wishing them luck. That's not what we do. It's not a strategy. What you'd have there is just real estate with electricity, right? Because of this, Gorilla ends up much better positioned than competitors who only run data centers. With Gorilla, they get both capacity and control. Think of it this way: what customers worry about is sovereignty, security, latency, compliance, that whole list. They don't want to juggle 12 different vendors for it. Usually, if you walk into a data center, you'll find 10 to 12 different vendors handling things. Our presence means there's a single point of accountability when problems arise. That matters enormously. Beyond that, our approach brings us leverage, it brings us scale, and it sets us apart. It also produces something known as the Gorilla edge — yes, the pun is deliberate. When you look at the whole stack, from design through development, deployment, and operations, everything included, we sit in the number one position. Picture an ordinary data center: think of it as someone giving you just a garage. But what counts even more is that it's Gorilla handing over that garage. Along with it come the engine and the security system. What this does is give you command of the operation, along with somebody who's alert at, let's say, three in the morning — not unlike me being up at two this morning — right when it really matters, Barrett. I hope that answers what you asked.

Jayesh Chandan executive
#40

Thanks a lot, Pamela. I truly appreciate that. To the analysts, investors, and employees who are on my call today, many thanks for standing behind us. Here's the thought I'd like to leave with our investors: the business has been rebuilt; the technology has been proven; the cash has been collected. Operating cash flow has gone positive, and at this point we're stepping into a far bigger arena — AI infrastructure. An AI infrastructure company is what we've been all along, right? We've been putting the blocks together. If you go back and hear what I told people in my first interview on the NASDAQ back in July of 2022, I stated that we were heading toward building an AI infrastructure platform as a Service; that is precisely what we are doing. A data center forms one piece of it. This isn't a pivot. So I'd ask you not to use that word. A pivot is not what we're doing. The platform is being built, and we will close it and secure it. GPU capacity is being built. Sovereign compute is being built, and we're ensuring that national platforms function; land is being bought. Power is being secured. Data center capacity is being taken. New products are being built. New people are being hired — more people are needed to deliver. So this isn't scale being talked about from a distance; it's actually being built; so my message to the market is very simple. Judge us on execution, judge us on cash, judge us on delivery and judge us on whether we keep scaling. Everything else, as far as I'm concerned, is commentary. And honestly, there's been no shortage of commentary from folks who are just sitting on the sidelines, and those people can't even build a sandwich, never mind an AI infrastructure business; so Gorilla isn't only getting started. The market is free to doubt the story if it wants, but our direction of travel cannot be ignored. Thanks so much for listening in. Have a lovely evening.

Operator operator
#41

Thank you. And this concludes today's conference call. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Gorilla Technology Group Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Gorilla Technology Group Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.