KEC International Limited (KEC) Earnings Call Transcript
November 11, 2025
Earnings Call Speaker Segments
Good day, ladies and gentlemen, and welcome to the Q2 NFI 2026 results conference call for KEC International Limited. Joining us today from KEC International Limited's management are Mr. Vimal Kejriwal, Managing Director and CEO, and Mr. Rajiv Aggarwal, Chief Financial Officer. As a reminder, every participant's line will be in listen-only mode, and after the presentation concludes there will be an opportunity for you to ask questions. If you need assistance during the conference call, please signal an operator by pressing star, then zero on your touch-tone phone. Please note that this conference is being recorded. I now hand the conference over to Mr. Vimal Kejriwal. Thank you, and over to you, sir.
Thank you, Danish, and good morning to all of you, and welcome to KEC's Q2 earnings call. I'd like to start by giving an overview of how we performed financially during the quarter and H1, as well as the key highlights from each of our businesses. This quarter saw us deliver a solid performance, with record revenues in Q2, considerable improvement in profitability, and strong order intake momentum, particularly in the T&D business. Our top line showed healthy growth, with revenues reaching INR 6,092 crore in Q2 FY2026, an increase of 19% Y-on-Y, driven mainly by robust execution in our T&D business, both within India and internationally. As a result, we achieved revenue growth of 15% for H1, which aligns with the guidance we've given for the year. In line with our strategic focus, the T&D segment's share of overall revenues rose to 65%, compared with 55% in H1 last year. Our EBITDA grew by 34% in Q2 and 27% in H1. EBITDA margins for Q2 improved by 80 basis points to 7.1%, versus 6.3% in Q2 FY2025, while H1 margins climbed by 60 basis points to 7% from 6.4%. Interest expenses as a percentage of revenue came down by 50 basis points in both Q2 and H1, bringing interest cost to 2.8% for Q2 and 2.9% for H1.
Our bottom line has improved a great deal, with PBT rising a remarkable 88% in both Q2 and H1. PBT margins rose a solid 130 basis points in Q2, reaching 3.5%, compared with 2.2% a year earlier, and they were up 100 basis points in H1 to 3.3%, compared with 2.3% a year earlier. We delivered a PAT of INR 161 crore in Q2 and INR 285 crore in H1. PBT and PAT growth keeps outpacing EBITDA. Our focus is clearly on profitable growth, not merely expanding the top line. Profitable growth keeps growing faster than revenue. On order intake, we are glad to report a record YTD intake of more than INR 16,000 crores, which reflects healthy growth of 20% Y-on-Y. Notably, a substantial 75% of that intake has been won by our T&D business across India and the international markets. In addition, we hold L-1 positions of INR 5,000 crores, again mainly in the T&D segment. As of date, we have a strong and well-diversified order book of more than INR 39,000 crores, including the L-1 position. Our order book and L-1 together stand at a record level of INR 44,000 crores. Turning to debt levels, our net debt, including acceptances, stands at INR 6,480 crores as of 30th September, besides INR 5,265 in the previous September.
Higher debt comes from robust revenue expansion, more strategic inventory thanks to favorable commodity pricing, water-project payments arriving later than expected, and some sizable collections that slipped into the months that followed. Looking ahead, we anticipate those debt levels will return to normal. Turning to our individual businesses, T&D remained the primary growth driver during this quarter, posting revenues of INR 4,080 crores — an impressive 44% rise. That outstanding result speaks to our robust execution capabilities spanning numerous geographies. The business keeps up its profitable trajectory, with EBITDA margins in the double digits. Regarding order intake, this business booked INR 12,000 crores in orders spanning India, Middle East, CIS, and the Americas. The T&D business has broadened its geographic reach by winning its first-ever order in a new CIS country. It has likewise landed two landmark orders in the Middle East, among them our biggest EPC order ever at more than INR 3,100 crores in the UAE and our biggest substation order ever at over INR 1,000 crores in Saudi Arabia. These prestigious Middle East wins have broadened both our portfolio and our client base, further cementing our leadership position across the region.
Turning to India, our business there has won a number of orders from different customers. We keep strengthening our position in the promising HVDC segment, and this quarter we landed one more sizable order from a private developer. Right now we are carrying out five HVDC projects — among them a major converter station project spanning three locations, plus four transmission line projects. The proportion of private sector orders in our India T&D order intake has risen considerably this year. It gives me real pleasure to report that this year is a significant milestone for us, as we mark 15 years since the SAE acquisition — a journey that has reshaped our global footprint and established new benchmarks in the transmission industry. Across these years, SAE has expanded not just in scale but also in capability, innovation, and operational excellence. I'm delighted to report that SAE keeps performing strongly, with revenues of INR 429 crores for the quarter, reflecting a robust 35% growth. In Brazil, we continue to see good traction in hardware orders. We have further bolstered our operational capabilities by installing new robotic equipment at our manufacturing facility. This will boost production capacity and lift efficiency. In Mexico, the business continues to see steady order momentum, backed by a positive outlook in the North American T&D market and further helped by the US tariffs on the rest of the world.
On the whole, SAE keeps producing consistent, profitable expansion, supported by strong order inflow and a solid order book along with an L-1 position exceeding INR 2,300 crores. We're seeing meaningful headway in growing our tower manufacturing capabilities, after successful capacity increases at our facilities in Dubai, Jaipur, and Jabalpur. Our beauty facility expansion in Nagpur is in progress and should wrap up by the end of this year. This puts us in a good spot to satisfy rising demand for transmission infrastructure across both domestic and international markets. The tender pipeline in T&D as a whole remains healthy in India and abroad. Within India, the government's focus on renewable evacuation corridors, green energy transmission, and interregional interconnections is generating a strong set of opportunities. A number of large intrastate projects that state utilities used to execute have now moved to the TBCB route, drawing substantial interest from private developers and utilities. That shift is creating a new and promising market for us. Internationally, the outlook is still very encouraging. The Middle East remains a major growth engine, with significant transmission initiatives under way in Saudi Arabia, UAE, and Oman. Beyond that, we are chasing opportunities throughout the Americas, CIS, and Africa.
We have an order book at a record level and L-1 in T&D of nearly INR 29,000 crores, so we're confident this business will deliver meaningful growth. In civil, revenue for the quarter came in at INR 968 crores. That figure might have been better, though the monsoon lasted longer in some regions, labor was short, and payments in the water segment were delayed. The labor picture is getting better bit by bit, but it's still under where we'd like it to be. Given how payments currently stand in water, we keep taking a measured approach to executing those projects. The business keeps building its order book, with several orders above INR 3,000 crores in the buildings and factories vertical from well-known clients. As a key strategic win, we've extended our footprint in the factory segment further by winning an order for civil and structural works at a thermal power plant, which broadens our customer base with a marquee client added. The business also deepened its presence in residential buildings through a repeat order from an existing marquee client. With labor conditions improving gradually, steady collections from water projects, and a big order book plus L-1 above INR 10,000 crores, we're confident the civil business will post solid growth over the coming quarters.
For the quarter, the transportation business posted revenues of INR 425 crores. Our emphasis stayed on executing new orders on time and finishing projects already under way. Two landmark projects were inaugurated during the quarter by the Honorable Prime Minister — the Vellikatta Himantra Metro Station in Kolkata and the Vanchi Maniyachi Nagarkoil Railway Dublin in Tamil Nadu — and KEC was instrumental in delivering both successfully. Under coverage, the business has won two additional orders for the KICAS together with our JV partner. Coverage has now been implemented successfully across 482 route kilometers, and deployment of the coverage system is under way on another 2,000 route kilometers of the rail network. Safety, reliability, and speed of railway operations will be substantially improved by this advanced rail protection system. We anticipate winning further orders in this segment. International opportunities are being actively pursued by us. With an order book and L-1 exceeding INR 3,000 crores in railways, our strategic priorities are unchanged: completing existing projects at a fast pace, optimizing working capital, and bidding selectively for high-quality margin equity opportunities in domestic and international markets alike. Healthy revenues of INR 524 crores were achieved by our cable business, a solid growth of 19% year-on-year.
We're also seeing profitability in this business improve gradually, thanks to a better product mix and cost optimization. Our capital investment for E-Beam and electromeric cables is moving forward as planned, and we expect commercial production to begin by the end of this year. This plant will serve high-performance applications in defense, automotive, and railway sectors, where superior durability and thermal resistance are critical. Our renewable business has brought in revenues of INR 190 crores. Right now we're executing two large solar projects in Karnataka and Rajasthan. The 500-megawatt solar project in Karnataka is set to be completed this quarter, and the 500-megawatt solar in Rajasthan should be finished early next year. We keep bidding for select opportunities in solar, wind, and gas. The oil and gas pipeline business is well positioned to win its third international order for a pipeline laying project in the Middle East. After sustained efforts, the business has obtained pre-qualification from a leading Middle East utility for pipeline projects — a key milestone in our international growth journey for this business. Given the subdued domestic tender pipeline and the heightened competition, the business continues to focus strategically on expanding its global footprint. Overall, we're pleased with our consistent revenue growth, the improving trajectory of our profitability, and the momentum in order intake.
By concentrating hard on execution, adding capacity, and drawing on a solid, well-diversified order book with L-1 above INR 44,000 crores plus a live tender pipeline exceeding INR 180,000 crores — mainly in T&D and civil — we're set up well to produce ongoing profitable growth across the quarters ahead. Many thanks. We're ready now to take your questions.
Thanks a lot, sir. Ladies and gentlemen, we're now going to start the question-and-answer portion. Anybody who would like to pose a question can press star and one on their touchtone phone. Should you want to take yourself out of the question queue, you can press star and two. We ask participants to wear headsets when asking a question. Ladies and gentlemen, we'll pause for a moment while the queue for questions is put together. Our first question is from Mohit Kumar of ICICI Securities. Please go ahead with your question, sir.
Yes, good morning, sir. And
Morning to you, Mohit.
Here's the numbers. First off, sir, domestic T&D orders were quite robust through the first half, obviously. With tariff-based competitive bidding having been lukewarm this fiscal, are you observing the domestic T&D order prospect weakening? Or does the opportunity stay strong since the bidding activity took place over the last couple of years and the ordering has yet to happen?
I think, Mohit, you've gone through the email. Clearly, in Q1, ordering was on the low side, I'd say. In Q2, orders have started to pick up. Okay. We're witnessing some interesting orders that came in over the last month or two, I'll say. Also, we're now seeing some ordering, some activity, I'll say, shifting toward the southern side — Kakinada and Tuticorin and all of these places. The other point I touched on in my speech concerns the intrastate segment, where many orders, many projects that would otherwise have been carried out by the state utilities have shifted to TBCB. In fact, in a recent one, we are L-1. That's an area where we previously weren't present, since typically I wouldn't have bid for intrastate projects. Beyond intrastate, I think intrastate is also an interesting area. I don't think we should see a major downside, I'll say, in ordering. Another thing is that some of the major orders already awarded, TBCB, which have been won — let's say an HVDC in Gujarat and others — and there are large orders arriving from some private clients that fall outside TBCB.
One of those was announced a while ago, and it's also set to be finalized now. I think during this quarter you'll see quite a bit of finalization taking place on TBCB plus intrastate. I don't think we're worried or concerned about domestic order inflows slowing down.
Understood, sir. No problem. For my second question, I want to ask about the water segment. At the end of September 2025, what are the water segment dues? If my memory of the number is right, it stood at INR 1,000 crore odd at the end of March 2025, correct? Is execution on the projects still going on, or has progress been rather slow?
Mohit, I don't have the precise figure in front of me, but I believe our dues sit at roughly INR 850 crore, or maybe INR 900 crore. INR 875 crore, yes. So dues total about INR 875 crore, and by and large they've stayed flat. Back in March as well, they were hovering near INR 850 crore, INR 825 crore. Typically they would have climbed by INR 40 to 50 crore, and my sense is that amount ought to be coming to us now. The approach we've followed is essentially a cash-and-carry model. Every rupee that comes in, we plow back into executing projects. We aren't adding to our exposure in any meaningful way. At the margin, our exposures might tick up or drift down. We operate in two states, Madhya Pradesh and Odisha. Madhya Pradesh, I'd say, is practically online for all payments. Odisha has moved slowly, though we finally began receiving some payments from there after a long stretch. So where do we stand — are we pleased? We are not pleased. As a matter of fact, that's partly why civil revenues came in below last year's level, since we deliberately slowed down. We had hoped things would improve. We'll see — the conversations with the Jal Jeevan Mission, both at the center and in the states, have turned somewhat more encouraging than previously.
We're actually noticing a bit of trickle even over in Odisha.
Got it, sir. Thanks, Nabesh. Appreciate it.
Thanks, Mohit. Appreciate it, sir. We now have Parikshit Kanpal from HDFC Securities on the line with the next question. Go ahead, sir.
Yes, sir. Hi, and congratulations on a decent quarter. Sir, my first question concerns the remark you made earlier during the call that the T&D business is tracking a double-digit margin. If I look at the numbers, double-digit margin, the H1 revenue contributions, EBITDA have been about INR 722 crore from the T&D business, even at 10%. That means the rest of the business is just eleven and EBITDA of INR 58 crore, which is 1.5% EBITDA margin. I'm assuming that cables and civil would be doing much better. Do I have the major losses coming on the margin side, sir, if you can help us understand that?
I don't have the precise figures, but you're roughly right. The issue we faced was mostly on the civil side, also due to heavy rainfall and some projects slowing down. On top of that, we had packed in a bit more water. Civil sits at significantly lower single-digit margins. It's a mix of civil and railways. For cables, I don't have the exact figure, but it would be more than—it would be higher single-digit, I'd say, maybe 6% or so would be the margins. The net margin for non-T&D would be, I don't know, close to 1% or 1.5% overall. That's how the numbers stack up.
So how does it get better from here, sir? I mean, is it simply that the legacy orders are winding down on profitability, and now the mix is shifting toward better margins? When do we see that change? Because at the headline level, margins aren't improving, and it still looks like we're behind the trajectory toward that 8%-9% corridor, and double digits don't seem too far away from here now.
Parikshit, the headline figures are heading in the right direction. From 6.2 we've climbed to 7.1, and we still expect to hit our 8% target for the year, which implies roughly 8.8 or 8.9 across the second half. Nearly 60% of our revenues are still to come in. What's shifting is something we talked about before — the metros, and the Delhi metro in particular, had been hurting us. Those projects are now done. One of them is waiting on the Prime Minister's inauguration, and that's part of why I've got a cash flow problem, since a lot of money is locked up until the line is formally inaugurated. The other one is also very near inauguration. As soon as that takes place, those cash flows will start coming through as well. The drag they were creating is now being halted, and that will contribute to the non-T&D margins. On top of that, on the civil side, if you've noticed, we've announced some pretty large orders, and they carry significantly better margins, with execution on them now beginning. Clearly, we'll see a bump-up on civil margins. One piece is the percentage margin. The leverage benefit will also kick in, because revenues are going to rise.
Right. I believe that's how it will play out. This also comes from cables — we do anticipate some margin improvement there as well. I think all of that combined ought to help us grow our non-T&D. And, as you correctly noted, we have legacy orders, and all of those are being closed out. In H1, for instance, I think we closed 7 or 8 orders — 7 orders in the transportation business. The negative impact from those orders beyond what we had factored in is being closed out. We do expect better overall numbers to come through in H2.
Okay, so the second question is about networking capital, sir. What I mean is, we have a large share of international business — nearly 36% of our contribution comes from international revenues, and those usually carry low working capital. Even so, why does net working capital remain elevated? We've observed that peers with high international order books have seen a contraction in NWC days, but in our situation, the order book is also 45% international. We would have gotten some advances. Even with that, why does NWC appear to be so high?
Parikshit, there's still a substantial amount of advances that haven't come in yet. Over the past two months we've announced some very large orders, and those advances are going to flow in now. The effect of that should be clearly visible in the Q3 numbers. I think the difference is that, if you look at the immediate competitors and so on, most of them have performed very poorly in the Middle East. We have a very large order book and a large revenue coming out of Saudi, where unfortunately there is a 20% retention. Okay. These orders had come in over the last two, I think, two years or two and a half years. Now we've started moving toward completion of many of these orders. From now onward, you'll see a sort of cyclical pattern where advances come in, retentions on old orders get paid, and retentions on new orders keep occurring. We do expect that with the closure of the current lot of projects — I think seven or eight projects we plan to complete and close this financial year in Saudi — that will release a lot of retention. That's why we're slightly different from other people in the international piece.
Of course, Saudi margins are stronger, and that's the reason we've discussed a double-digit margin overall in T&D. The second item, I touched on it briefly regarding the water side. The third item, which hasn't been addressed, is something I also hinted at when mentioning benign poverty prices. Particularly in our cable business and our transmission business as well, steel prices — especially steel — have stayed at a level INR 4,000 to 5,000 lower than what we had assumed earlier, and that has led to us holding some stock, which has worked out well for us. Inventories for the year would be higher by INR 250 to 300 crore versus what existed before, and this is a very deliberate choice. That is one thing that has contributed to the networking. I think the final point we've been talking about is that if you look at our revenues in the last Q4, there was a considerable rise in that revenue. Normally, most of our purchasing happens at 180 days, and a big chunk of liabilities was settled around August, September. When you examine the net working capital, what has occurred is that in some areas the AR has increased, and in other areas the payables have actually decreased.
It's been what I'd call a double whammy, if that expression works, with AR rising while APs have been declining, and that will normalize. Are we concerned? Yes, we're concerned that the figures exceed our expectations. We still aimed to reach 5,000. But the positive side, Parikshit, is that if you've looked at our interest figures, our interest cost has dropped by 50 basis points, and that's where the full benefit of leverage from a 19% revenue increase has shown up. Even when you consider that 19% increase, with net working capital typically at 140 days or 130 days, a portion of the working capital rise is also due to the higher revenue. I hope that's cleared it up.
This is the final question, sir. We're now close to the lifetime high on debt, and I also noticed in your cash flows some entries for bad debts of INR 930 million and forex gains of INR 830 million. Just a clarification on that as well, and how should one view debt from here onward? Have we hit the peak, with debt now trending down directionally, or is there still headroom before we bring the debts down?
I don't believe we're contemplating taking on more debt past this point, or at least it isn't on our list. As far as — I'm not sure what, Rajiv, do you have any other bad debt? In any case, let me just clarify that we recorded a substantial ECL provision, right, both in the quarter and in H1. In fact, our total ECL provision now stands at nearly a lifetime figure of INR 475 crore. Right. That's an expected credit loss provision we're carrying in line with the agreed format with our auditors, and that's the number you're seeing. We have barely any meaningful bad debt write-off.
Right, I was talking about the cash flows, correct? For the half year, there was INR 92 crore. My understanding is that this was solely ECL provisioning, and forex gains of INR 830 million were shown, so.
You might want to reach out to us to verify things and go over far more specifics, but I don't believe there's any cause for concern. No need to worry on this front, right?
Regarding the debt, at this point you're confident that this represents peak debt, and you're no longer considering the remainder?
We believe that will represent the highest point of our debt. I think it has begun to decline. I think there are 3 or 4 sizable payments that we had been talking about. You know, Afghanistan — we have gotten a large amount of money, but there was some chunk that was meant to arrive from one of the lenders, which we were hoping for, and there were discussions that it should come in, but I think it has been delayed for some reason. I think now they have shifted it to Q4. In Q4, a large chunk would arrive from there. I think in addition we have some very large advances on the order releases that we announced, which will also come in, hopefully within this month. There are some other payments, as I said, from Saudi retention, etc. I think the debt will come under control. Plus, I talked about DMRC commissioning itself. That will free up a lot of cash for us.
Understood. Thanks.
Thanks, Parikshit, and thank you, sir. The next question is from Sumit Kishore of Axis Capital. Go ahead, please.
Good morning, sir. Thank you for the chance to speak. T&D put in a very strong showing, but non-T&D, with civil out in front, has again come in weak. You've given a number of the explanations. Civil revenues fell 14% in the first half — how should we think about that as it settles over the full year? What does the second half look like? That's my first question. Just a follow-up to the earlier question. You're at 138 days of net working capital now — how do you expect that to normalize by the end of the fiscal, in terms of the number of days of state?
Sumit, where Civil is concerned, we do expect overall growth of 10 to 12, 15% perhaps for the year. Last year we did around INR 4,400 million. Hopefully, for the year we should be around INR 5,000 million. Okay. As I said earlier, the negative has basically happened because there is a very, very poor — I will say not poor, we did not take any new orders on the infra side. The entire metro revenues are now not there. Three of four projects have been completed, so the revenue flow has come down. We have announced some very large BNF orders, and execution on those orders has started now. We are clear that we will be able to make up for this shortfall. I think we are around INR 1,800 or INR 1,900 crore of revenue for the first half. In the second half, we will be able to easily reach close to INR 5,000 crore.
So that would imply close to INR 3,000 crore of civil revenue in the second half, and that's a pretty steep year-on-year increase. Since civil's margin profile is significantly lower, this will hurt your chances of exceeding 8.5% margin in the second half, which you'd need just to reach 8% for the full year.
Yeah. Sumit, another thing that's happening is that over the past six months, as I mentioned, the metro projects have pretty much wrapped up, and their margin profile was relatively very weak. That's one factor. Beyond that, several of the older projects have also been closing out, and with the newer projects in our order book, the margin quality is considerably better. Much better, sorry. So what happens is that any revenue we now begin booking in civil will come in at improved margin levels, and that's the reason we've been referring to at least 8% margin overall for the entire business across the full year. Apart from that, I already said T&D is above double digits. We are taking into account the lower margins from these businesses when we cite that 8% figure.
Got it — that’s very clear. On all net working capital, at 138 days, would that come in below last year once things normalize, or would it still be elevated? My sense is we’re expecting it to stay around a similar level — 180 to 120, yeah.
My view is that we ought to reach that level at a minimum. Yeah, that's our expectation.
Just one small accounting question here. When you share the T&D order book along with the fiscal year-to-date inflow, might you give us some sense of how that splits between international and domestic for T&D? That way we can see what portion is domestic.
I don't have the precise figure, but my recollection is roughly INR 12,000 and INR 4,000. I don't have the exact amounts — perhaps Abhishek can provide them to you afterward — but for the year, order intake was around INR 16,000, I believe. So, in broad terms, approximately INR 12,000 from international and INR 4,000 from India.
That's quite clear, but within the INR 12,000 crore in T&D, would international also be a big part of that — how much would be T&D international?
That figure covers only international T&D — INR 16,000. And when I mention INR 12,000, I'm also talking about international T&D.
Understood.
Appreciate it, Sumit. Thank you. Thanks very much, sir. Moving on, we have a question from Vaibhav Shah of JM Financial on the line. The floor is yours. Yeah.
Sir, on the Afghanistan payment, you said you'd received a portion and that the bulk was coming in for Q. Could you elaborate on the value?
Thanks, Rajiv.
Okay, Vaibhav, so with regard to the Afghanistan payment, there were three situations that made up the total funding across five projects. Three of them are more or less closed. The World Bank and USAID have paid us the money. We've already recovered close to about INR 450 crore so far. The ADB payments are still pending. Those projects have been canceled, and the bank guarantees have been returned to us. They are processing our payment. The total amount outstanding with ADB comes to roughly about $30 million. We expect a majority chunk should come in during quarter four, as Vimal mentioned. Although actually, we had been expecting that payment in Q2 or Q3, but for some reason it has been delayed. We expect this payment to arrive in Q4. There is no doubt when it comes to the payment recovery. ADB has confirmed in writing that they are processing the payment and that they will release it shortly.
Other than ADB, are there any receivables still outstanding from Afghanistan?
Other than that — yeah. When it comes to Afghanistan, no other payments come in besides ADB. The one exception is that we've now kicked off the project with the World Bank, so those payments will begin coming in on a regular basis as well.
And then my second question: what should we expect for capital expenditures in 2026 and 2027?
Normally, our CAPEX has run about INR 250 crore to INR 300 crore, and I think that's the right level for us. This year it could come in above that, given the cable expansion and the factory expansion. With all 3 factory expansions plus the cable this year, we may reach roughly INR 400 crore. Right. Other than that, we've generally been at around INR 250 crore to INR 300 crore.
Alright. Sir, last question: our interest cost came in at roughly INR 170 crore for Q2. For the second half, might we see the actual interest cost come down, or will it stay at comparable levels quarter by quarter?
There would be some decrease—perhaps INR 20 crore to INR 25 crore—across quarter three and quarter four. The total interest cost we anticipate, consistent with what we guided earlier, comes to roughly about 2.5% of our revenues. Our guidance of 2.5% of revenue is something we continue to maintain. Last year's overall interest cost could see a reduction of maybe INR 25 crore to INR 30 crore.
Alright.
Regarding the civil business, sir, you noted that some high-margin orders are entering execution and that we'll see a sharp pickup in the second half. That momentum ought to carry through 2027 to 2028 as well, and margins should also strengthen from the current levels of around 5%.
I believe they definitely need to improve. We feel quite confident about next year and so on, because two or three things have shifted. First, we have largely exited certain infra projects where, historically, we now see margins running low. Second, we have essentially raised the minimum size threshold for the orders we take in. Overheads are improving. Looking at the last four or five civil orders, nearly every one of them is worth at least INR 400 crore. Those orders clearly carry better margins. On top of that, the capability build in the civil business has been substantial. We do expect improved execution, and therefore we expect to hold margins at the quoted levels. We do expect the civil business to grow by at least 15 to 20% next year. Okay. At, I would say, higher single-digit margins.
Sir, in civil, what would you say are the two or three main sub-verticals you're focusing on?
Civil, basically — first is obviously residential, which has now grown into quite a big figure for us. Second is factories. Third would be data centers. And fourth, sorry, also — and fourth would be water pipelines outside India.
So no metro at this point, is that mostly the case?
Metro — let me frame it this way: nothing aggressive. Alright. For quite a while now, we haven’t put in any metro bid. We might simply place a bid just to stay present in the market for a period. Nothing, not at standard margins. Okay. In addition, we’ve been examining underground. We are continuing to examine it, alright? It remains a long way off, but that’s a segment where margins have come in stronger. Clearly, CAPEX there is enormous, so we’re still working through what has to be done regarding the underground portion of it. Okay.
Sir, just one final data point. What is your JGM order backlog at this moment?
Yes. INR 1,600 crores. Mostly in Odisha — I think 1,000 or how much? How much in Odisha? INR 1,000 crores would be in Odisha, and INR 600 crores would be in MP.
All right, thank you, sir.
Thanks, Vebhosh. And thanks to you.
Much appreciated, sir. The next person to ask something is Subramaniam Yadav, calling in from SBI Life Insurance. Your line is open — go right ahead.
Thank you, sir, for the chance to ask. Sir, I'd just like to get a sense of where your debt will stand by the close of this year?
Our expectation is that it will come in at roughly INR 5,000 crore.
INR 5,000 crore. Yes, sir. Sir, you said there was a bit of a delay in collections during Q2, and that we got it in October. Could you point out how much that was and which sector it came from?
I don't have the precise figure, but a portion of the payments were international ones that were due in September and actually arrived during the first week of October. Those are coming through, though the amount isn't significant. Yes, there was an overflow — I'd put it at nearly INR 4,500 crore — and that occurred in the first and second week of October.
Alright. You mentioned, sir, that we’re seeing a bit of a reduction in Q3 as a result of this collection.
Yes, absolutely. Q3 will see some reduction, and Q4 will see the balance. When I say 5,000, that's how it will be carried out.
All right. And sir, besides this water collection that we’re looking at — since that remains at roughly INR 875 crore, which is more or less the same if you view it from the beginning of the year — which other sector, aside from water, is adding to this pain?
I'd say the biggest one is the metro segment within Civil, right — because when you look at how earlier contractors performed there, a substantial portion of the payments comes due late in the process. Like I mentioned, of our 4 projects, 3 are finished. One could be commissioned any day now. The second is also 75% ready for commissioning. The third, the Chennai one, ought to be commissioned in January. Those involve very large back-ended payments. Once commissioning happens, you get a big chunk of money — roughly INR 200 to 300 crore of cash flow would come in from commercializing those projects, or ROD, as you call it. Okay. Then we had announced some very large projects, order intake in Saudi, and Saudi, so those cash flows would come in as well, along with retention from Saudi.
Alright.
Alright. Thanks, Kreshal. Thank you, sir. I really appreciate it.
Much appreciated, sir. The following question is from Harshit Kapadia of Elara Capital. Kindly proceed, sir.
Appreciate the chance to speak, and congratulations on a really strong T&D performance, sir. I just wanted to ask about that INR 180,000 crore order pipeline. Could you break it down between T&D and non-T&D, and within T&D, how much would be international versus the India project?
Broadly speaking, the T&D figure comes in at about INR 60,000 to 65,000 crores. Within that total, India accounts for roughly INR 20,000 to 23,000 crores — that's the India pipeline.
All right. And as far as international goes, the main regions would be the Middle East?
The region involved is the Middle East, along with Africa and the CIS, and a small portion is also coming from America Tower Supply.
All right, then. So inside that roughly INR 120,000 crores, how do we split it between railway and civil — railway, civil, solar?
Civil would account for roughly half of that, and the remainder would be split between renewables and railways.
Okay, and sir, I just wanted to ask — some news reports are saying that since TPAs haven’t been signed for many renewable projects, there could be a slowdown in the renewable tenders that come out. Are you seeing any trend like that, sir?
Not at this point. Actually, over the past 30 days — the most recent month, including the current one — we've put in bids and taken part in reverse auctions for what I believe is 19 NTPC tenders. What had been announced, along with the tenders themselves, still doesn't show us any meaningful deceleration.
Alright.
Let's see what happens with it.
That's reasonable, sir. Regarding the T&D growth you reported for this Q2, what was the split between domestic and international?
Growth at home has outpaced the international side, though only modestly. All right. If I had to give an average, I'd call the two about the same. Okay. Home is a bit ahead, even with the rain and everything else.
All right, sir. All the best to you, sir. I appreciate your taking all those questions.
Thanks, Arshad. Thanks, sir.
Teena Virmani of Motilal Oswal Financial Services has our next question. Ma'am, the line is yours.
Thank you, sir, and congratulations on a solid set of numbers. So, right now — yeah. Sir, my question has to do with the segments outside T&D. T&D has performed quite well over the last few quarters. In the railway business, when we look at the revenue run rate, it appears comparatively lower, and you have consistently said that payment-related issues have kept you moving slowly. How do we see this business developing going forward? Because historically it was a very high-growth segment earlier, and for the last three, four years it has been declining continuously. Where do we see it bottoming out and growing from there on? When we look at the first-half run rate, it is around INR 900 crore of revenue, which we have seen in the railway segment. That's my first question. Then I'll ask you, sir.
So Teena, for railways this year we’re expecting to do about INR 2,000 crore. Right now our order book stands at approximately INR 3,000 crore. If you set aside the next INR 1,000 crore for H2O, then I think we still have an order book that’s enough to do another INR 2,000 crore this year as well. What we did was take another look at the whole railway ordering structure and so on, and we’ve exited a number of, let’s say, segments such as Pure Play, Civil, where road players were giving us major competition because NHAI wasn’t awarding them orders. They all moved into railway, and you know what competition is like among those players. I think that is one reason you’re seeing a lower order intake. On top of that, our main focus has lately been somewhat more toward the technology side. That’s why I mentioned TCAS, signaling, BLT. So a lot of our orders now come from the metro segment. We are already carrying out one project in Bangladesh, and we have bid on quite a few projects in the Middle East. I think you’ll see a sea change in the segment-wise numbers in railways.
And while I’m on that point, let me add that at the board level we’re fairly optimistic regarding the railway business expanding over the next few years or so. You might still see a flattish or a downward result for next year, but beyond that, we do expect the railway business, with whatever consolidation we are doing, will definitely pick up. This isn’t a business we are writing off. We are very clear that this business holds huge potential. It’s a matter of time — we’ve made some wrong calls and wrong projects, and execution got delayed, perhaps for some our fault and perhaps for the client’s fault. I think we are getting over it, and maybe we’ll take another six months or a year to completely consolidate properly and come back. I think overall, we remain very positive on the business in the long term.
All right, all right. Given the shifts occurring in your project mix within this business, is it possible for margins to get better from here on out?
Margins must get better. If they don't, we'll have to close the business. We're very clear on this: unless this business gets to the margin level we're aiming for, okay, there's no joy in running it. Should margins fail to improve over the long term, we'll make our decisions. I believe our decisions are quite clear.
Looking ahead, perhaps something in the 7%-8% margin range could still remain achievable for railways.
Another language.
Understood. Understood. The same applies to the civil businesses. Regarding this year, you brought up several of the difficulties as well as several of the projects. Where do we expect this civil business to land during this financial year, for FY 2026? Looking ahead, you spoke of a growth rate of about 15%-20%, but.
Yes, Tina, as I mentioned, we're expecting roughly INR 5,000 crore from the business, compared with INR 4,400 crore last year. For this year, margins should be — I'd say — in the mid-single digit range. That said, starting next year, we do expect them to begin creeping up toward the higher single digits. The goal, again, is how quickly we can get to a 9%, 10% margin. I don't think we'll manage that next year, but the year after, certainly. For next year, we're clearly looking at growth of at least 15%-20%, so almost, let's say, INR 6,500 or so in revenue, up from the INR 5,000 we expect this year.
By the end of this year, or perhaps the very start of next year, would all of those slow-moving projects be finished?
I'd say most of those civil matters are already wrapped up, honestly. Okay. I really don't believe we're carrying too many projects that are moving slowly. In fact, there are very, very few.
Understood. Understood. That's all from me. I'll return in a few days.
Thanks, Teena — I appreciate it.
I appreciate that.
Thanks, ma'am. Balasubramanian A from Arihant Capital has our next question. The line is yours — go ahead.
Good morning, sir. Thank you very much for the opportunities. Actually, where renewables are concerned, we have the ambition to generate at least INR 3,000 to 4,000 crore of revenue, roughly, over the coming two to three years. But right now, it accounts for just 4%-5% of revenue, more or less. What would you say are the main bottlenecks? Is it the margin for share and land issues in India? Are there any model suppliers on the Middle East side? What kind of working capital requirement is there compared to other projects? How do you see this business looking over a three to four years' timeframe?
Usually, working capital in this business is far more forgiving than in other sectors or segments. When it comes to working capital, I'd say we're in decent shape. Broadly, looking at the YTD project to date, the majority of projects are positive. If you view the whole project in that light, working capital doesn't strike me as an issue here. On margin — yes, there's been considerable pressure on margins in new tenders, mainly since every player is chasing IPOs. Over the last 3, 4, or 6 months, the count of IPOs coming out of solar companies has been extraordinary. These are players who've pursued a significant increase in competitive intensity, I'd say. Alright. We're gradually seeing that ease off now. People have come to realize they're killing themselves by doing it. That's the first point. Plenty of projects are emerging in the private sector, more along captive lines. There are at least 3 or 4 large groups putting up big projects for captive use by their own sister concerns, be it metals or elsewhere.
We have a sufficient pool of names to work with. I believe we're in discussions with them and aiming at them, since what counts for them is quality rather than merely the price. Third, we've also begun submitting bids for wind. In my view, it's only a question of timing. As we said before, during this year we ought to be announcing our first wind EPC as well. Fourth, I'd mention that through the experience we now have from executing these 2 big projects of close to 1 gigawatt, we've also built up considerable capability when it comes to cost optimization and team building too. We have a solid team in place at this point. I think that leaves us far more confident. Fifth, thanks to our backward integration with cables and our knowledge of substations, and so on, I believe we can contribute a great deal of value on cost for these projects down the road, which explains why we've been speaking of INR 3,000 to 4,000 crore — not next year, but the year after, and so forth — and how do we get to INR 3,000 to 4,000 crore? I think we're quite optimistic about getting there. The final point I'd make would be international. Up to now we haven't been concentrating on international, because our aim was to finish these 2 projects.
With those projects almost finished, that provides a great deal of confidence, and it also instills plenty of confidence in the clients we're speaking with, who ask, "Have you handled large projects?" If you look back and say I've completed 1 gigawatt, very few people—apart from one or two of our competitors—have handled projects of that size. Internationally, that's something we've now begun to examine. Perhaps not this year, but next year, we will certainly have a few international projects—not the mega-sized ones which others are doing, but maybe 300, 400, or perhaps 500 megawatts. Yeah.
Alright, sir. On the Saudi Arabia side, for large T&D orders, the competitive incentive has actually come down. Earlier, if you look at 7 to 8 bids, but right now, it's been reduced to 3 to 4 bids. What has driven these consolidations? Is this a permanent structural shift or a temporary phase? How do you look at this market in terms of competitive intensities? Is there any concerning project resolutions maybe in coming years?
To put it another way, the number of competitors isn’t going down, and there’s no consolidation among competitors. What explains the smaller number of bids you’re seeing is the size of the market. In Saudi, bidding works by invitation, which isn’t the case with other clients. Another thing that happens is that when the client issues a tender, they assess the situation, your status, how many projects you have, and what your capability is here. There’s a lot of background noise. I think what’s happening is that the client then considers who has the capability to carry out the work, and on that basis, they invite companies to bid. It isn’t automatic that any Tom, Dick, and Harry can come and bid in Saudi. Which is what happens when they see that, okay, let’s say contractor A has too much work and doesn’t have the capability, then they may not invite him. That’s why in some tenders and projects of very critical importance, they have been inviting fewer people to come and bid, which is why in some tenders, we’ve been seeing only four or five or three.
We still observe seven or eight in certain tenders, and in cases where it’s fine to invite the whole junta—if I can put it that way—those aren’t very critical. That’s just how it is. It’s hard to claim there’s consolidation, but yes, competitive intensity on large and critical projects has dropped significantly, since the client isn’t bringing others in.
Understood, sir. Thanks.
Thanks, sir. The next question is from Ashwani Sharma of Emkay Global Financial Service Limited. You have the floor.
Yeah. Thanks for the chance to ask. And congratulations on your set of numbers, sir. For my first question, I wanted to ask about the tender pipeline in data center within the civil business.
On data centers, the figure we currently have is approximately INR 2,000 crore, but that covers only the civil portion. Alright. We've also begun bidding on the MEP side. What happened was that, I'd say, during the last two quarters — Q4 and Q1 — very few data centers were announced. From Q2 onward, we started seeing some activity again, because I think deep seek and others had some influence somewhere, and people slowed down their data center plans. Now we're seeing that people have picked back up whatever they'd worked on before, and they're returning. We do expect considerably more data center inquiries going forward. Inquiries were low in Q1 and even in Q4 of last year, but starting in Q2 we began receiving some, and I think it's getting better.
Thanks, sir. And second, on the T&D side — particularly domestically — are we running into any ROW issues? There's been a lot of news flow about the ROW side. What's your read on that, sir?
The ROW problem is definitely real—there's no doubt about that. Someone earlier brought up transmission bottlenecks and related matters. It isn't that bids aren't being sought for the transmission lines. What's happening is that they aren't reaching completion owing to ROW. All right. ROW is certainly present. A few months ago, the Ministry of Power once more issued a revised guideline providing for substantially greater compensation, yet implementation remains voluntary for the states. Certain states have put it into effect. Wherever that has happened, I'd say the ROW difficulty is improving. I won't claim it's entirely solved. The issue is also more pronounced in places such as Gujarat, Rajasthan, and so on, where a great deal of solar development is taking place, because what occurs is that the person whose land is acquired—the solar developer gets compensated in full. Where the transmission is built, you receive a right to pay, a right to use and pay. So those payments come in lower. There's a great deal of, I'd say, resentment among the various landowners and so forth, which is now being worked out through the higher compensation. Our hope is that conditions around ROW should improve, but at present, I'd say they aren't good.
All right, thanks a lot, sir. Sir, one final accounting question. At this point, what amount of retention money is on the books?
While I can't give you a precise figure, it's going to account for no less than 20%-25% of our year. Perhaps we could talk with Abhishek about that afterward.
Yes, I’ll take care of that, sir. Thank you so much.
Much appreciated, sir. The next person in the queue is Sakit Kapoor of Kapoor & Company. The floor is yours.
Hello, sir. Thanks for giving me the chance to speak. I hope you can hear me clearly. Good day to you, Kapoor sir. Sir, historically what we've observed is that our execution in H2 tends to be considerably stronger compared with how H1 plays out. Even taking a cautious view, what ought we to expect from H2 when it comes to revenue execution, and then how should the margin profile appear for the entity overall?
Sageet ji, what usually happens is that H2 accounts for about 60%. The ratio of H2 to H1 is always typically 60 to 40. It may vary in particular years, but it shall be<<foreign_lang>>.
Regarding the margin, sir?
For the foreign language segment, we're sitting at 7%, while guidance is roughly 8%. Clearly, to hit that guidance, H2 is going to need to come in above 8.5%. That's how we're viewing it.
We're on track to get there.
Yes, yes, yes.
Regarding the cable segment, sir, our capital expenditure there is complete. When is commissioning going to happen, and what contribution can we expect from that business going forward? And third, how has our subsidiary Spur done on this pipeline project, <<foreign_lang>>?
Spur has not done well — if I can put it that way — since <<foreign_lang>> oil and gas <<foreign_lang>>, we do have certain projects in the international market, but those are under the KEC name, as KEC as an entity holds the qualification, not KEC spur. <<foreign_lang>> international <<foreign_lang>>, we hold a substantial qualification in KEC spur. Our expectation is that KEC spur will begin improving as an entity. Okay. Okay, sir, sir. <<foreign_lang>> investment <<foreign_lang>>, the one in aluminum conductor, that has already been fully commissioned, and full revenue from it has already begun coming in. We had anticipated INR 500 crore-INR 600 crore. Let's see where we land, but on the conductor side we ought to be near those figures for revenue. Regarding the electromeric cable and E-beam, what I stated was that we will commission the first one — the electromeric portion is due for commissioning in Q4 — and E-beam, which needs far more approval owing to its radioactivity, etc., that one will be commissioned in Q1 of next year. <<foreign_lang>> revenue Q4 <<foreign_lang>> revenue Q1 <<foreign_lang>> from Q2 onward, I think we should also start receiving the full revenue from that expansion. Okay.
Also, the solar E-beam is part of our product lineup, correct? And so is the EHV cable segment?
Right, <<foreign_lang>> solar<<foreign_lang>>. After you get the E-beam installed, material costs and everything else will be optimized. Obviously, margins on solar can get better, since once E-beam treatment is applied, the cable's quality improves and raw material usage goes down. Starting in Q2 of next year, that will definitely have a positive effect on our margins.
Regarding the EHV segment, what about H2 high voltage?
EHV <<foreign_lang>>. We already offer a complete range of <<foreign_lang>> products: copper <<foreign_lang>>, copper <<foreign_lang>>, and aluminum <<foreign_lang>>. There might be a modest revenue effect in a few places, but that line is at capacity. Our bookings are full.
Thank you, sir. Wishing you the very best as well. I hope those payment problems are sorted out soon. Across the whole industry, everyone is getting bogged down in the receivables area.
Fingers crossed on that. There's interest from outside the country. Thanks a lot.
Appreciate it, sir, <<foreign_lang>>. Thanks.
Thanks. Thanks, sir. The next question we have is from Amit Amwani of PL Capital. You may proceed.
Hello sir, I appreciate the chance to speak.
Hi there, Amit.
Hello, sir. Starting with the first question, sir — you brought this up in your opening remarks regarding U.S. demand and tariffs. I just wanted to get a sense of whether there's any effect on supplies coming from your Mexico-Brazilian facility into the U.S., and what your current read is on U.S. demand for these subsidiaries. Are you seeing any tariff impact at all on these subsidiaries, by any chance? That's my first question.
Amit, here's what's going on: with a 50% tariff on steel, our exports into the U.S. aren't really being hurt, I'd say, since every country faces that same tariff. But for Mexico, under the USMCA there's a relaxation — if you use U.S. steel, then products from our Mexico factory enter the U.S. market tariff-free. What was happening had to do with steel pricing in the U.S. and Mexico. Steel from India, Turkey, and China was much cheaper when supplied into the U.S. Now, with the 50% duty, we're finding that Mexican steel — even with U.S. steel, Mexican towers, even with U.S. steel — is becoming competitive. The U.S. market has actually opened up for Mexico for U.S. tower supplies, okay, when you look at the earlier situation. Not that it was a large market for us, but the larger market was from India, and for the Mexico plant, it was Mexico itself. That's it. That's one impact, which is positive for Mexico as far as tariffs are concerned. Okay. The second piece, although you're not asking me, is that there's a significant increase happening in Mexico itself for the demand.
At the moment, looking at my factory in Mexico, roughly 60 to 70% of what I produce goes to the local Mexican market. Okay, we have definitely observed an increase taking place — you see, if you look at President Sharman, she's an environmental engineer. What's happened is that she has driven a great deal on the renewable side, in contrast to the other president, and as a result of that we're seeing considerably more demand arising within Mexico itself. When it comes to Brazil, Brazil was barely serving the U.S., apart from some small hardware products, which they continue to make, but Brazil, so far as our products go, isn't affected at all by the tariffs.
Got it, sir. Yes, yes, sir. That's very clear. My second question is about margins. You guided earlier, and now we're targeting 8%. As I recall, I think you were giving some 8.5%. Now you're formally saying 8%. Is there any downside risk to 8% as well? Second, which segment are we seeing some drag in, you know, where we're not able to meet what we expect? Any color on that? The second part of this question is, looking at your current order book, and you said there was a double-digit margin in T&D, how much more is left? Are we eyeing mid-10, early 10s in T&D, given the current order book scenario that you have?
Well, Amit, I don’t believe we can push the margin past a certain point in T&D. That said, certain individual projects carry margins much higher than the figures we’re discussing. Okay. I’ve said this repeatedly — take a market such as Saudi. Some of our projects there sit at 7 to 8% margins. Others run at 20% plus as well. Incidentally, the same holds true in India. In India too, we’ve completed projects at a lower margin. I’ve also handled projects at 20% plus there. What drives margins in the EPC business is more the complexity, and the competition expected on specific projects.
All right. Is there room for the margin to rise? In the T&D market, perhaps 50 basis points in certain spots could increase.
Broadly speaking, I believe your point is correct. The range we've been referencing is 8%–8.5%. We aren't discussing anything above that; we're at the lower bound of 8%, since whatever has occurred regarding the delays in civil and so forth may or may not produce some slight margin erosion. In a lot of instances, we're speaking with the clients and so on, explaining what has taken place, and then the clients have to pay up. Until they do pay up — that's precisely why we've turned somewhat more conservative and said we ought to sit closer to 8%. I don't believe we're seeing much risk to those figures unless, let's say, steel and cement prices suddenly spike or something like that, which we aren't observing at all. I don't think we're seeing any meaningful risk to what we're discussing. No.
Got it, sir. Finally, regarding the labor shortage—you’ve been flagging this issue for a while now. Our order books are expanding, and we’re growing as a whole; we’re in an upcycle, with very strong growth anticipated in the years ahead. How are you handling this? I believe this is the main concern, and you’ve been calling it out, I think, for nearly 2 or 3 years. I just wanted to understand: will this be accomplished through some mix change, or naturally, since T&D is rising, will we be able to handle this? I just wanted more color on this situation and on how we deal with it going forward.
I believe you're completely right, Amit. This is something I've discussed for a while now. I even brought it up today. For one, if you look at how my order intake breaks down, close to INR 12,000 million of those figures originates internationally. Generally speaking, we don't run into any major labor problems in overseas markets. We've hired people from India, from other countries, from Egypt. There are plenty of other nations across Africa too. These days we aren't using labor gangs or anything like that. On the international side, I'd say we're fairly protected from the labor issue. When it comes to India, our need was roughly 30,000 before. We had 17,000. Right now we're already at, you know, 24,000 and short of what's available. That figure keeps fluctuating. The Bihar election is also sadi, so all these people have left. Starting tomorrow, they'll begin returning again. The first set ho gaya elections, so some folks from those regions are already back. So a shortage definitely exists, and it could also be specific to certain pieces, like in T&D. I don't face a shortage in civil or in stringing, but erection is where the shortage lies.
I believe those issues are being worked on. What we're also attempting to do is raise our mechanization quotient substantially. Take India — we never used to do erection with cranes or towers. Now we've begun doing a great deal of erection using cranes, something you would typically do in the Middle East before. Or consider civil works: previously you had fitters arriving, cutting, and bar bending होता था, side per bandshe there. These days we're deploying automatic bar bending machines, and we've installed bar bending plants at a few of our projects. We're also in discussions with Tata's and others. In fact, we're purchasing mesh, steel, and such materials directly. The aim is to figure out how to cut down on labor requirements, or work alongside them, to boost productivity through far greater mechanization. For instance, we're now doing plastering with drones. Many such tools are being brought in. How do you lower the need for masons? Each individual category of worker is being tackled one by one. Yes, the challenge persists. I'm telling you, we could certainly have delivered at least INR 200 crore–INR 300 crore more in civil had we possessed a full contingent of 30,000 people.
All right, though at this point it's already hitting an improved figure. That's probably among the reasons we're indicating we'll perform better in civil. Also, across the coming three to four months, there's no festival on the calendar until the next Holi. With luck, the labor force will stay put where it is. I hope that addresses what you asked, Amit.
Yes, sir. I really appreciate you taking the questions.
Thank you, sir. Ladies and gentlemen, that was the final question for today. At this point I'd like to pass the conference over to Mr. Vimal Kejriwal for his closing remarks. Thank you, and over to you, sir.
Thanks, Ganesh, and thanks to all of you for staying interested in KEC. I really appreciate it.
Appreciate it, sir. That brings us to the end of this call for KEC International Limited. Thanks for being with us, and you can go ahead and disconnect your lines now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete KEC International Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to KEC International Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.