Good day, everyone, and welcome to the Q3 FY 2026 earnings conference call of KEC International Limited. Joining us from management today are Mr. Vimal Kejriwal, our Managing Director and CEO, and Mr. Rajeev Aggarwal, the company's CFO. Just a reminder that all participants will be in listen-only mode, and you'll have a chance to ask questions once the presentation wraps up. If you require help at any point during this call, please signal an operator by pressing star then zero on your touchtone phone. Kindly note that this conference is being recorded. I'll now turn the conference over to Mr. Vimal Kejriwal. Thank you, and over to you, sir.

Vimal Kejriwal executive
#2

Thanks. Good evening, everyone, and welcome to KEC's Q3 earnings call. We apologize for releasing the results a bit late, since the board meeting only concluded just now. I'll begin with a quick look at how we performed financially in the quarter and over the nine-month period, and then share a few important business highlights. For the quarter, revenues came in at a record INR 6,001 crore, which is a solid 12% increase year-on-year, driven by healthy execution momentum in our T&D business both in India and internationally. Across nine months, FY 2026, with revenue of INR 17,116 crore, our growth stands at 14%. In line with our strategic focus, the T&D segment's share of overall revenues rose to 67%, compared with 57% in the nine months of last year. EBITDA grew by 15% in Q3 and by 22% over nine months. Q3 EBITDA margins rose 20 basis points year-on-year to 7.2%, versus 7% last year. On the EBITDA margin front, the performance reflects slower progress in water projects, closure costs tied to the completion and delay of RODs for metro projects, and delays in settling some of the claims. Despite this, EBITDA margins for nine months are up 50 basis points to 7.1%, versus 6.6% last year.

Vimal Kejriwal executive
#3

Interest costs relative to revenue came down 30 basis points in Q3 and 40 basis points across the nine months, which works out to an interest cost of 2.9% for both Q3 and the nine-month period. On operating PBT, we delivered healthy growth of 37% in Q3 and 53% over nine months. Operating PBT margins rose 60 basis points in Q3 to 3.6%, compared with 3% a year earlier, and were up 80 basis points across nine months to 3.4%, compared with 2.6% a year earlier. Operating PAT came in at INR 171 crore in Q3 and INR 457 crore for nine months. Growth in operating PBT and PAT keeps outpacing EBITDA growth. Those operating PBT and PAT figures exclude the exceptional provision of INR 59 crore that we made during the quarter in line with the new labor code. On order intake, we recorded YTD orders of INR 19,300 crore. It's worth noting that a substantial 70% of that intake was secured by our T&D business across India and the international markets. On top of that, we hold L1 positions worth INR 4,500 crore, mainly in the T&D segment. Our order book is strong at INR 36,725 crore as on date; including the L1 position, order book plus L1 comes to over INR 41,000 crore.

Vimal Kejriwal executive
#4

Now turning to how much we owe: net debt, which includes acceptances, was INR 6,806 crore as of 31 December, compared with INR 5,575 crore on 31 December 2024. Several factors explain the rise in borrowing: robust revenue expansion, growth in strategic inventory thanks to favorable commodity prices, restrained payments on the water projects, and some sizable collections that slipped into the current month. Borrowings have already declined by nearly INR 300 crore during January 2026, and we expect them to return to normal levels by the close of March 2026. We keep a close eye on working capital and stay dedicated to reinforcing the balance sheet. Turning to individual businesses, T&D remains our main engine of growth, posting revenues of INR 4,161 crore — an outstanding 31% increase for the quarter. That excellent result rests on steady execution across geographies. On order intake, the business booked YTD orders exceeding INR 13,500 crore spanning India, Middle East, CIS, and the Americas. Within India, a number of large intrastate transmission projects formerly carried out by state utilities have moved to the TBCB route, which has driven greater participation from private developers and utilities. That change has produced a marked rise in private sector involvement, with six new private players joining the TBCB segment during the year.

Vimal Kejriwal executive
#5

So because of that, private players' share of the market has grown a lot, reaching 75% this year, up from 45% last year. In line with that structural shift, we keep steadily raising our order intake from private sector clients. In the quarter, the business landed its biggest order ever — INR 1,050 crore in India T&D — from a well-known private player, for a 765 kV transmission line plus a 765 by 400 kV AIS substation. Internationally, the business is carrying momentum forward with several L1 orders across the Middle East and Africa. We expect those L1s to be awarded in Q4. At SAE, the business posted revenues of INR 525 crore for the quarter, a robust 70% growth. In the quarter, the business booked a few large power supply orders in Mexico/U.S., a clear sign of an uptick in the North American market. On a YTD basis, SAE has brought in order inflows of roughly INR 1,250 crore for supplying towers, hardware, and poles across North America and Brazil. As a result, the business now holds a robust order book and L1 position above INR 2,600 crore, giving strong revenue visibility going forward. Capacity expansion efforts are moving along well. After successful capacity enhancements at our plants in Dubai, Jaipur, and Jabalpur, the expansion of our Butibori facility in Nagpur should be finished by March 2026.

Vimal Kejriwal executive
#6

We’ve also put modest amounts of capital into growing our hardware manufacturing facilities in Brazil. Those expansions will further bolster our capacity to serve increasing demand for transmission infrastructure in domestic and international markets. The overall tender pipeline in T&D remains healthy across both domestic and international markets. In India, peak power demand keeps climbing, with record highs reached recently and sustained growth anticipated, driven by economic expansion, electrification, and shifting weather patterns. As transmission increasingly becomes a critical bottleneck amid growing grid congestion, policy and execution focus on strengthening transmission infrastructure has intensified. Backed by the government’s emphasis on renewable evacuation corridors, green transmission, and interregional interconnections, this is translating into a robust multi-year pipeline of opportunities for the sector. I’m actually pleased to announce that yesterday we commissioned a large transmission line, Ahmedabad, Navsari, ANTL, running from Ahmedabad to Navsari, a large part of it. We also commissioned the Ahmedabad substation, and power is flowing to the Navsari substation, which has also been built by us. As of today, almost 2,600 MW of power has started flowing in this line, mainly from the Khavda Renewable Energy Park. Turning to the international front, the market outlook remains strong and encouraging.

Vimal Kejriwal executive
#7

The Middle East remains a major growth driver for us, with substantial opportunities in Saudi Arabia, UAE, and Oman. Meanwhile, we're seeing a distinct uptick in opportunities throughout Africa and the CIS region. Africa, which saw a slowdown after COVID, is now experiencing a gradual recovery, with numerous tenders reaching the market. Beyond that, demand stays strong across the Americas, especially in Brazil, Mexico, and the U.S., fueled by needs for towers, hardware, and poles. With an order book and L1 position in T&D exceeding INR 26,000 crore, we're confident about delivering sustained and significant growth in this business. In civil, the business kept building its order book, with multiple orders above INR 4,000 crore in the building and factories vertical from well-regarded clients. Over the quarter, the business notched successes across hospitals, thermal power projects, metals and mining, and residential building segments, including an order for additional civil and structural work on a 150 MW thermal power plant from a prominent private sector player, two orders from a leading steel manufacturer for executing upstream and downstream facilities, and a luxury villa development project from one of India's largest real estate developers.

Vimal Kejriwal executive
#8

We're also in a good position to win orders on a handful of greenfield hospital projects. For the quarter, the business posted revenue of INR 923 crore. That figure might have come in higher, except for constraints on labor, work fronts released late on certain projects, and slower disbursement of payments on the water projects. The labor situation is getting better bit by bit, though it is still short of optimal levels. Given how payments currently stand in this segment, we keep taking a measured approach to execution on water projects. With a substantial order book and an L1 position exceeding INR 10,000 crore, along with labor availability improving gradually and collections from water projects anticipated, we expect the civil business to post solid growth over the coming quarters. Revenue for the quarter in the transportation business came to INR 349 crore. In this quarter, the Honorable Prime Minister flagged off the final section of Ahmedabad Metro Phase Two, where KEC carried out the ballastless tracks, BLT works. The business keeps its focus on Train Collision Avoidance System, TCAS, projects under Kavach, working alongside our JV partner. Kavach has now been successfully implemented by the business across 611 route kilometers, and the Kavach system is presently being deployed on another 1,836 route kilometers of the railway network.

Vimal Kejriwal executive
#9

Given the government's ongoing emphasis on rail safety, modernization, and indigenization programs like Kavach, we anticipate broader rollout across the railway network over the medium term. We expect to win further orders in this segment. The business is also positioned well to capture orders in the automatic block signaling, ABS, segment, which boosts railway line capacity via automation. We are actively chasing international opportunities, particularly in the MENA region. With an order book and L1 exceeding INR 3,000 crore, our priorities are clear: speed up completion of projects already underway, optimize working capital, and bid selectively for high-quality, margin accretive opportunities in both domestic and international markets. Our cables and conductors business has delivered healthy revenues of INR 556 crore, a strong growth of 37% year-on-year. Profitability in this business is also improving consistently, driven by a better product mix and cost optimization. Notably, it has also posted its highest ever profitability for the 9-month period of this year. The business continues to see a steady inflow of orders for supply of cables and conductors. Our capital investment for E-beam and elastomeric cables is progressing as planned, and we expect production for elastomeric cables to commence by the end of this financial year.

Vimal Kejriwal executive
#10

Revenue from our renewable business came in at INR 122 crore. On a notable front, we've entered the wind energy space, landing a breakthrough order from a well-known private developer for a 100+ MW wind project located in southern India. The 500 MW of solar projects already underway in Karnataka and Rajasthan are moving along nicely and should be finished during this quarter. We keep bidding on chosen opportunities across solar, wind, and BESS. We're in a good position to pick up a few additional renewable orders in Q4. The oil and gas pipeline business has booked its third international contract, this one for a pipeline laying project in the Middle East. With domestic tendering subdued and competition intense, that business keeps deliberately concentrating on growing its global reach. We're hoping the upcoming Union Budget will bring in supportive steps that speed up infrastructure build-out even more, especially in power transmission, renewables, and transportation. In summary, with a sharp emphasis on execution, greater capacity, a strong and diversified order book along with L1 of more than INR 41,000 crore, and a live tender pipeline exceeding INR 180,000 crore, notably in T&D and civil, we're positioned well to keep delivering profitable growth on a sustained basis over the coming quarters.

Vimal Kejriwal executive
#11

Thanks. At this point, we're ready to take your questions.

Operator operator
#12

Thank you. At this point we'll move into the question-and-answer portion. If you'd like to pose a question, you can press star and one on your touchtone phone. Should you want to take yourself out of the queue, press star and two. We ask that participants use their handsets when asking a question. Ladies and gentlemen, we'll pause briefly while the queue is put together. Our first question comes from Balasubramanian at Arihant Capital. Please go ahead.

Balasubramanian A analyst
#13

Good evening, sir, and thanks a lot for giving me the chance to speak. Sir, turning to the transportation side—

Vimal Kejriwal executive
#14

Good evening, everyone.

Balasubramanian A analyst
#15

On transportation, we've felt pressure on revenue, though the order book is getting better, along with new tech. I'd like to get a sense of how this segment is being repositioned and what the plan is to get momentum back. I believe earlier you mentioned an emphasis on technology-led projects such as Kavach and GPS, and a deliberate move away from low-margin field work. I just want to understand how the mix will shift over the next 3 to 5-year time frame. And if you could give more details on this transportation segment, that would help.

Vimal Kejriwal executive
#16

Our approach now is to finish the legacy projects already underway, so that we’re able to bring in the cash flows as well as the various claims that sit in the system. We’ve clearly pulled back from civil projects in the country, given how intense the competition is. In some tenders we’ve seen 13, and in one of them I saw 41 bids come in. Those are mainly from local road contractors, I’d say, because of a slowdown in what I’ll call the NHAI business. So our focus has been on, as I mentioned with Kavach, some additional orders are expected in Kavach, perhaps within the next couple of weeks or so. Then we’re focusing on PSI, which is power supply, and also on automatic signaling, ABS. So that’s 3, 4 areas we’re working on. On the metro side, we’re looking at BLT as well as power supply, and also third rail and electrification. The other piece here is international. We’ve begun bidding. I won’t say aggressively, but we’ve begun bidding, particularly in the MENA region. So a couple of countries where we have a large T&D presence and focus are the countries where we’re bidding.

Vimal Kejriwal executive
#17

When you look at revenue and the order book, we made a very deliberate choice — I'd call it a very conscious decision — to shrink the business for a couple of years until we're clear of the old projects. This year, I believe we're already L1 on orders worth roughly INR 700 or 800 crores. We might pick up a few more. We're also L1 on a large private sector railway starting contract. Our focus is on staying away from projects that need large block work or that involve working on existing high density railway lines. We do expect that in the upcoming budget there's talk of high speed, new high speed railway corridors coming — those would be new lines and so on, not on existing ones, which is where blocks are required. So we're waiting and watching. We're not being very aggressive in this business, at least for the next one year.

Balasubramanian A analyst
#18

All right, thank you. Right now we're carrying out 5 HVDC projects, plus one more from a private developer. So how big is the overall HVDC opportunity, both in India and internationally, and how do we plan to capitalize on it?

Vimal Kejriwal executive
#19

I'm not sure I have a figure for the overall opportunity as such, but I believe there's talk of two additional HVDC projects coming up in India—one in the south and one in Rajasthan. There's a big HVDC project in Saudi that's under bidding at the moment. As a rule, each of these comes in at roughly INR 25,000 crore. I don't have the precise value for each of these projects, but they will be... So adding three of them together, that would likely be INR 75,000 crore or more.

Balasubramanian A analyst
#20

All right, sir. Sir, for my final question: the civil-only data center pipeline stands at INR 2,000 crore. And how much of that entire pipeline are we bidding on, or what would you say the expected win rate is, along with the margin profile for data center projects, and how does that line up with our bidding and strategy side? And second, I believe we've entered wind energy with a 100+ megawatt order, and we're also bidding on solar and storage, the battery storage side. And right now, the government is planning to open things up for China or other countries. How is this landscape changing, particularly for renewables, and how will the landscape change, particularly for renewables, over the next 3 to 5 years? Thank you.

Vimal Kejriwal executive
#21

When you look at China, we're an EPC player and we don't compete there. Chinese EPCs don't compete in India. Honestly, if the government opens it up, we'd be happy, because it relieves the supply chain constraint I've mentioned each quarter. So for me, as an EPC, that would please me greatly, since a typical substation project that used to take about 12 months is now stretching to 18 to 24 months. If things begin moving, we're generally glad, particularly on the T&D side. We carry no module responsibility, so whether Chinese modules are arriving, keep arriving, or stop entirely, it makes no difference to us. In data centers, we've executed 5 data centers so far, and we're actively bidding on additional ones. What we're finding on data centers is that most orders get divided among, you know, various parties. So although the whole cake looks very large, what shows up in bids are quite small slices. We're therefore examining it, choosing and deciding which segments to play in.

Vimal Kejriwal executive
#22

At the moment, we're putting in bids for civil work in certain cases, and for civil plus MEP in others. We believe this will be an exciting sector, though so far there have been big announcements, but all of these still need to become actual tenders and so on. Currently, very few tenders are open in the market, but I think that will change, so we aren't overly concerned about it. It will definitely grow. Yeah. Thanks. Thank you.

Balasubramanian A analyst
#23

Understood, sir. Thanks.

Operator operator
#24

Thanks. Our next question comes from Vaibhav Shah at JM Financial, whose line is now open. Please proceed.

Vaibhav Shah analyst
#25

Yeah, so first off, on the civil side, what's our JJM exposure at this point, in terms of both order book and receivables?

Vimal Kejriwal executive
#26

So overall, looking at the order book, our total exposure is roughly about INR 1,400 crores, right? And AR would be approximately INR 900 crores, which was, I'd say, pretty much on par with the prior year, except that it has risen by around INR 7,500 crores or so. So, as I mentioned before, Vaibhav, what we've been doing is that it's nearly like cash and carry. So whatever funds come in — and we're exposed to just 2 states, Odisha and MP, and we've by and large been receiving money from both, not to the level we'd like them to pay, but whatever they do pay, that's the kind of, I'll say, investment we're making in the projects.

Vaibhav Shah analyst
#27

So when we look at the civil segment's order backlog of INR 11,000 crore, if that INR 1,400 crore is taken out, we'd be left with roughly 9 to 9.5 thousand odd crore once the JJM portion is removed. So does that piece, which comes to about 10%-11% of the order book, really have that big an effect on execution? Or are there other reasons too?

Vimal Kejriwal executive
#28

There is going to be an effect, and here is why: within the civil segment, the execution cycle tends to be quite quick. So if certain orders are not, say, not launched at an early stage — and in that early stage you also carry out rafts and similar work — then revenue in the initial portion of projects runs fairly high. Because a number of projects have been held up owing to a lack of funds, that has had an effect. On top of that, I would put the impact from our water business at INR 400 to 500 crore. So overall, if you want a rough figure, civil alone could mean perhaps INR 1,000 crore of impact on revenues, in terms of the total number.

Vaibhav Shah analyst
#29

All right. So across the whole of last year, civil brought in revenue of roughly INR 4,500 crore. That being the case, might we expect a drop of about 15 odd % this time around?

Vimal Kejriwal executive
#30

I can't give you the precise figure. There's going to be a slight decrease, all right? I wouldn't call it a major drop, but a modest decrease is possible.

Vaibhav Shah analyst
#31

Second, on margins, your guidance calls for a 100-basis-point year-over-year gain across the full year for FY 2026. Margins over the first nine months came in at about 7.1%. So how do you view that full-year target now?

Vimal Kejriwal executive
#32

So I think margins are definitely going to decline given the way things are unfolding, alright? That's because of the water slowdown, which clearly carries a much higher margin, along with some other newer projects. And on top of that, I think it's the way we had anticipated our legacy situation, where arbitrations and consolidation and so forth were underway. So since those have been dragging on far longer than we had expected, we've also, out of prudence on BESS, begun making provisions for some of these figures, whereas earlier we had thought we would be able to, you know, secure the orders and close the books accordingly. So I think at this point, if you look at the numbers, we'll probably land somewhere between 7 to 7.5, alright? We're hoping it reaches 7.5, but I, today, don't have the confidence to tell you it will be 7.5. So it should fall between those two numbers. So I think what we've delivered so far is 7.1, and maybe there could be some improvement in Q4, but overall, the numbers could be between 7 to 7.5.

Vaibhav Shah analyst
#33

Then for 27 and 28, it ought to land near 9, which is what we had been aiming at before, right?

Vimal Kejriwal executive
#34

My sense is that it's premature at this point to make a call. Whether we can hold at 9, I'm not sure, but I'd say it's a bit soon. Perhaps once we prepare the annual accounts, we'll be in a position to review the figures, though it will certainly come in above what we're delivering in this count, this year.

Vaibhav Shah analyst
#35

And sir, last thing on the debt side—we're still holding to our goal of about INR 5,500 crore of debt by year-end, right?

Vimal Kejriwal executive
#36

Yeah, I think so. Honestly, we've been discussing internally whether we ought to push it down even more, but INR 5,500 strikes me as a safe figure. We will definitely hit that number.

Rajeev Aggarwal executive
#37

What about the working capital days?

Vimal Kejriwal executive
#38

Rajiv?

Rajeev Aggarwal executive
#39

Somewhere between 100 and 110, up to 115 days.

Vimal Kejriwal executive
#40

The range of 110 to 115 days — that's the point Rajeev is making.

Vaibhav Shah analyst
#41

Alright, thank you, sir.

Vimal Kejriwal executive
#42

Thanks, Vaibhav. I really appreciate it.

Operator operator
#43

Thanks. We’ll take the following question from Parikshit at HDFC Securities. You’re live.

Balasubramanian A analyst
#44

Yeah. Hello, sir.

Vimal Kejriwal executive
#45

Hello there, Parikshit.

Balasubramanian A analyst
#46

My question concerns debt. If I look at it quarter over quarter, execution has been mostly flat, and even so, our debt has risen. Is there any specific reason it is climbing, considering that we have not seen any ramp-up in execution on a quarter-on-quarter basis?

Vimal Kejriwal executive
#47

So, Rajeev, looking at it quarter over quarter — Parikshit, what actually happened when you compare this quarter with the last one?

Rajeev Aggarwal executive
#48

60 crore.

Vimal Kejriwal executive
#49

On a quarter-over-quarter basis, I believe that comes to approximately INR 300 crore?

Rajeev Aggarwal executive
#50

Three hundred.

Vimal Kejriwal executive
#51

There's INR 300 crore of debt. My sense is the sole cause for that was a few bigger receivables from Saudi that were shifted into the opening week of January. So we've already reduced our debt by INR 300 crore. That means we're in fact now back at where we stood in September.

Analyst analyst
#52

Alright. So second, on the margin side, we've lowered our guidance. Last quarter too, at 8 to 8.5%, we said 8%, and now we're moving to 7 to 7.5%. I realize there are pressures, but specifically around these commodity increases that we've observed in copper and others, mostly copper, so what's the effect on our margins for next year? How are we covering the commodity-side risks? So I could grasp how you're managing that risk.

Vimal Kejriwal executive
#53

So, Parikshit, regarding copper, we barely have any exposure outside of our cable business, and that cable business is 100% hedged. We have a very clear policy there: the moment an order comes in, we hedge it. Okay? So where copper is concerned, I don't think we carry any exposure. Maybe something minor here or there, but you can treat it as essentially no exposure at all. In fact, for me, if my cable team manages to secure more manufacturing clearance and all that, revenues could grow, because then it will be at a much higher copper than what it was last year. So I don't see any impact of copper on my numbers. Yeah.

Analyst analyst
#54

So to return to the margin question — we've been pointing out each quarter that the older products, the yellow legacy items, are now winding down. So what is it that's coming back and hitting us again on margins? And do you think margin pressure could keep going for a few more quarters?

Vimal Kejriwal executive
#55

So Parikshit, I think what's going on is that frankly we've been somewhat displeased about how long these closures are taking. Our expectation was that projects would gradually be wrapped up. For instance, we've shut down no less than 10% of the railway projects we hold. Speaking just in overall figures, a further 20% should be finalized during the current quarter. So here's what happens, and let me give a straightforward illustration. We pick up a project and we anticipate it will be closed since the client has consented to removing a portion of scope that can't be executed. Then the client turns around and says, "No, no, I want that part done." So you're stalled on it for a further six months. That kind of thing keeps occurring. There are three metro projects I have where the viaducts are complete, CMRS has been carried out, and they're set for commissioning. Sadly, sadly, no inauguration has taken place for them. Consequently you must keep maintaining them and continue spending, INR 15 to 20 crores each month. Fine, all of it will end up in claims, but the claim. So as of now we've set aside provisions for that. So sadly, there are problems that are striking, things you could not have foreseen, saying this is what will come up.

Vimal Kejriwal executive
#56

So in the end, we're running somewhere around 270 to 275 projects. That means, one way or another, you keep going — and you do get a few surprises. I wouldn't say we're pleased about lowering our estimates, I'll put it that way, but what's happening is what's happening. So we had to come out and say, you know, this is where things stand. Last time, when we said 8%, we felt quite confident we'd get to 8%. But now, given what's happened and the delays on certain projects that are... Take water, as I mentioned. Water is a project with a double-digit margin. Well, if it isn't executing, that hurts. Some of the newer projects have slipped. Let me give you a simple example. I have a couple of projects in NCR. Now, owing to, you know, a few earthquakes that occurred and so on, the seismic zones were revised, and the design parameters were revised too. So every one of those projects is on hold, since the developers are redesigning them all. So there are all sorts of reasons. One is a slight delay in closing out old projects, and there's also a delay in kicking off the more profitable projects, where revenues, in certain cases, have arrived more slowly than we'd anticipated.

Vimal Kejriwal executive
#57

I'd say those are essentially the two factors behind it. That said, I want to reassure you that both our new orders and the existing order book are reasonably profitable, and that's what gives us confidence in these figures. Another thing we ought to consider is that EBITDA is one measure, but we should also be looking at PBT and similar metrics. So when you examine that interest cost, although it hasn't declined in absolute terms, as a percentage it has been trending downward. Ultimately, a 30% to 40% increase is occurring below the line as well. The other element, I believe, is what we talked about in civil, and I did mention that we've fallen short by INR 1,000 crore of revenue for a variety of reasons. This has likewise resulted in underrecovery of overheads. That's one more piece that is taking place, and for that we're now running a special program and so on to figure out how we reduce costs, et cetera. But it is taking time. I hope that's clear, Parikshit.

Analyst analyst
#58

To sum up, I think one way you're being affected on railway and civil is that your working capital is tied up and your debt has built up. And second, the margin pinch points keep persisting in these two segments, correct? So on a normalized basis, if one were to look at it, assuming these two headwinds are behind us, what kind of margins on the core business—that's not these sector into it? What should one look at while marking the margin?

Vimal Kejriwal executive
#59

Let me address that—if what you're after is T&D margins, then here's the answer: your question wasn't entirely clear to me, but on T&D margins, we will be—and indeed we are—at double-digit margins.

Balasubramanian A analyst
#60

What I asked was this: if you set aside all those pain points and headwinds tied to metro projects and a portion of the civil projects, then on a core basis, what margins would you have reported had those headwinds not existed?

Vimal Kejriwal executive
#61

At that point, you'd be nearer to 9%-10%. No, that's very clear.

Balasubramanian A analyst
#62

At what point quarterly do we think we'll begin reaching that, since I'm either 2 quarters out from it or 3 quarters out from it?

Vimal Kejriwal executive
#63

If you're looking at 9%-10%, I could always point to FY 2028, but that's the reason I didn't answer the earlier question about FY 2027 margins — what I did say is that it will definitely be higher than this. Okay? 9%-10% — I need to clean up that whole closure of all the projects, mainly the railways ones and also some of the civil metro projects that are there, which are now getting commissioned, so I think that will get cleaned up. So I think by FY 2028, we'll definitely be at — I don't know whether it's nine or ten, whatever number we're talking about — but next year it will be better than what we're talking about. This year we said 7%-7.5%. Next year, I'm clearly saying it will be better than that. As for the number, I think in a couple of months we'll be able to give an exact figure for what we expect to achieve.

Balasubramanian A analyst
#64

Sure. Thanks for giving me the chance, and I wish each of you the very best.

Vimal Kejriwal executive
#65

Thanks.

Operator operator
#66

Thanks. Amit from PL Capital is up next on the line. Go right ahead.

Balasubramanian A analyst
#67

Hello, sir. I appreciate the chance to speak.

Vimal Kejriwal executive
#68

Hello there, Amit.

Analyst analyst
#69

Hello again, sir. You did give a very thorough explanation of why the margin guidance came down. I just want to get a handle on what's keeping your plans from moving forward here. You mentioned three metro projects slipping because dispatches aren't taking place. I'd like to understand, on the customer side, is something causing them to push those projects back? So what's going on at the customer site?

Vimal Kejriwal executive
#70

Okay, Amit, there are a number of reasons, but let's take two or three. First, as I mentioned a moment ago regarding Gurgaon and all of that, the zone changes have had an effect, along with the design and safety parameters the government has notified, and many projects — particularly in high-rise residential — now need to be redesigned with far, far bigger foundations, et cetera. Or the alternative for them is to reduce the number of floors, et cetera, which obviously no developer wants to do. That's one reason. Another reason, in a couple of cases — right now we have two cases in Mumbai — is that the developer hasn't been able to fully acquire the plot, which is now under acquisition. That has pushed back the work front by, I'd say, nearly two quarters. In another industrial project, I think the client wanted to switch technology because he got a much, I'd say, cheaper and better technology. So he has put the project on hold, saying, "Let me redesign that entire project and come back and talk to us." That was, I think, an INR 300 crore project, and it's completely on hold. So there are different reasons.

Vimal Kejriwal executive
#71

And when I mention delays on the work front, those are always caused by the client. I'm not claiming it's on my side that things are held up. If it were on my side, that would be my problem. These are all different reasons that are occurring. Or let me give another example as well. I spoke about grid, grid, gridlock and all of that. We have at least — I'll say — 4 or 5 projects in transmission that are progressing at, I'll say, a snail's pace, since ROW isn't available. There's one project where the substation land has not been available for the last 8 to 9 months, and that project was included in our revenue targets and carried a higher margin. Now, for 8 to 9 months, that land hasn't been available. So we're stuck when it comes to the growth projections and the margin projections that we had provided. I hope I've made myself clear, Amit, on these points.

Analyst analyst
#72

Yes, absolutely. Sir, regarding that INR 180,000 opportunity you mentioned, how much of it comes from the Middle East? Could you give some detail on the segment-wise prospects within that INR 180,000, and on the split between domestic and international?

Vimal Kejriwal executive
#73

Hang on, let me pull that up for you. So roughly speaking, on transmission, out of that figure for transmission across India plus international, it would probably be around 40 to 50 thousand. The Middle East would probably come in at around INR 15,000 crore or so, okay? Then there's railways, and then civil is a big chunk, almost INR 60,000 crore, with INR 20,000 crore of that from international. And renewables would be around INR 30,000 crore. Those are the broad numbers.

Balasubramanian A analyst
#74

Okay, so sir, given these prospects, I'm assuming this covers the next 12 to 18 months. So what should one think about — this year, I think order intake has been reasonable, with 19,000 already won and close to 5,000 L1. Any color on order inflows and conversion over the next 3 to 4 quarters?

Vimal Kejriwal executive
#75

So normally, this isn't a 12 to 18 month thing. It's more about tenders that have been announced and are in the pipeline. So I'd say more like 6 months, sort of thing, rather than 12 to 18 months. So the order pipeline will... And even over the last one year, we've been seeing that same order pipeline, you know, give or take INR 5,000 crore here and there. So this pretty much stays constant. Whatever tenders come in, new tenders keep getting added... Typically, in transmission, our success ratio has been between 10%-15%, okay? And for the other businesses, it would actually be lower. Okay, renewable would be much lower than that, and civil is also. So we'd look at maybe somewhere around INR 30,000-INR 35,000 crore as our order intake target for next year. We haven't firmed it up yet because the budgets are still getting firmed up. But typically, I think we should be looking at around INR 35,000 crore.

Analyst analyst
#76

Got it. Sir, one final point on margins. So I believe T&D mentioned it's running at double digits. I just wanted to ask about water — is there any chance that can recover again after perhaps a couple of quarters? How are things looking on your collections? How much collection is outstanding? And we're noticing a number of players intentionally slowing down. Is there any hope around the budget for water, or that these matters get sorted out over the next, say, couple of quarters, for water?

Vimal Kejriwal executive
#77

So, Amit, over the—let’s say we take that nine-month stretch—I don’t have the precise figure in front of me, but my recollection is that we generated roughly INR 600 crore of cash flow, right? And we executed INR 600 crore worth of projects. So that’s somewhere in the INR 50 to 70 crore range, okay. We’ll see what this budget brings—whether the allocation rises above the INR 65,000 crore they set last time. I was told they actually spent just INR 25,000 crore. How much has truly been spent, I can’t say for certain. Let’s watch for what announcements are in the pipeline on water. Typically, though, most of that funding has ultimately come from the states. So we do expect—if you extrapolate the same pattern—that by next year we should be able to exit our water projects, because this year as well, by the time the year ends, we’ll likely deliver about INR 800 crore of revenue. Okay. So let’s keep our fingers crossed that, you know, additional money can come through. But optimistically, if the same trend holds, then within 12 to 15 months, we should be able to close out all our projects. Okay.

Balasubramanian A analyst
#78

Got it, sir. Sir, last thing from me on the SAE Towers update — how has performance there looked, in terms of the balance sheet and order wins?

Vimal Kejriwal executive
#79

SAE has been performing well. Their order book stands at approximately INR 2,600 crore, okay? That's nearly two years' worth of turnover for them. So I, I don't think we're concerned. Our margins have easily been in double digits. Orders have been very strong, particularly from the North America market. And also, what's happening on the balance sheet is that whatever profits we're generating are being used for debt repayment. Debt has, debt has decreased over, I think, the last few years by almost INR 200 crore, and it will keep, you know, declining by INR 100 crore-INR 150 crore annually. So I think that, that business is doing very well.

Balasubramanian A analyst
#80

Okay, sir. Sir, only one clarification regarding China. You mentioned the benefit from Chinese imports, so I simply wanted… I didn’t catch that point. So is it that certain components aren’t being made or there’s a shortage, and that’s where projects are getting stuck, and imports from China would help there? So, if you could name—

Vimal Kejriwal executive
#81

Yeah,

Balasubramanian A analyst
#82

Where's that going to be useful? Yeah.

Vimal Kejriwal executive
#83

I'd rather not get into naming names there, since all my OEM friends would come after me. But essentially, what's going on is that this is also placing considerable pressure on the players in India, because up to now, transformer... Now they're thinking, okay, ... So—

Balasubramanian A analyst
#84

All right.

Vimal Kejriwal executive
#85

On imports, I believe I've heard that some have begun arriving. I can't confirm that—it's just hearsay. Still, it's clear to me that delivery schedules in India are getting better, all right? And as an EPC, that benefits me, because rather than spending 24 months on a project waiting to finish a station or substation, I can now complete it in 15 to 17 months. That lowers costs and, you know, supports better turnover and a quicker turnaround for me. So that's the way we see it. Okay.

Balasubramanian A analyst
#86

So what you're saying is that some of the finished product has also been coming in through imports, correct?

Vimal Kejriwal executive
#87

I realize that orders have already been submitted.

Balasubramanian A analyst
#88

Alright.

Vimal Kejriwal executive
#89

I’m not sure if any products have arrived yet, but I do hear that components have begun to come in. Some very critical components—

Balasubramanian A analyst
#90

Understood.

Vimal Kejriwal executive
#91

Those things were delaying some of the substation commissioning, the GIS commissioning, and so on. From what I understand, a few of them have arrived. That said, to be honest, all of this is just hearsay as far as I'm concerned.

Balasubramanian A analyst
#92

Sir, in your view, roughly what share of components—maybe just for understanding, or what exactly is—

Vimal Kejriwal executive
#93

Yeah,

Balasubramanian A analyst
#94

Alright. Alright.

Vimal Kejriwal executive
#95

No, it isn't about whether the value is big or small. The issue is simply that a single small component can prevent the whole commissioning from going ahead.

Balasubramanian A analyst
#96

Yes, that's correct.

Vimal Kejriwal executive
#97

All right, so Amit, you’re going to need to rejoin the queue. Quite a few folks are waiting.

Balasubramanian A analyst
#98

Thanks.

Vimal Kejriwal executive
#99

No need to be concerned.

Balasubramanian A analyst
#100

Thanks a lot. Thanks a lot.

Operator operator
#101

Thanks. Our next question comes from Ashwani at Emkay Global Financial Services. Your line is open.

Balasubramanian A analyst
#102

Yes, hello, sir. Good evening. Thanks for giving me the chance.

Vimal Kejriwal executive
#103

Hello there, and good evening.

Balasubramanian A analyst
#104

I think that covers most of what was asked. There's just one more thing, sir, about last year — I mean the last calendar year, when we got an oil and gas pipeline order in the Middle East. How are prospects shaping up at this point? Crude has held steady recently, hovering near $65. So are you seeing any fresh opportunities opening up for us in that region?

Vimal Kejriwal executive
#105

So I'd say we're still not in the big league, so to speak. So whatever we're targeting right now, I don't think those things are going to be affected by... Actually, the order we received in this was this year. Okay, so personally, I don't think that, since we're not large players like some of our competitors, we could be impacted by projects being scrapped or not coming through. For us, it's still a bit of just testing the waters, let me put it that way. So I don't feel there's any issue... Also, since you brought up the topic of oil prices, quite a few other people were asking me about payments and transmission. So clearly, we're seeing a very robust transmission pipeline and payments arriving absolutely on time. So we still haven't seen the effect of crude oil and all that on these projects. Maybe some very marquee projects, or projects such as NEOM, may get impacted, but other than that, we haven't heard of any transmission line projects being impacted. Oil and gas — since we aren't large players, we aren't keeping a very close track of what's happening.

Balasubramanian A analyst
#106

Sir, are there any renewable opportunities you see for us in the Middle East?

Vimal Kejriwal executive
#107

Absolutely. There are big opportunities out there. We had intentionally held back, since we truly wanted to sort ourselves out in India first, and this year we are commissioning — actually, we have commissioned close to 850, 950, 950, 850, right. So roughly 850 MW of solar capacity has now been commissioned by us, across two sizable plants. That has given us a great deal of confidence, you know, telling us that yes, we are capable of handling bigger projects. So we have begun examining those markets now, okay? In both, I would say, Saudi and UAE.

Balasubramanian A analyst
#108

Okay, thank you very much, sir.

Vimal Kejriwal executive
#109

Thanks, I appreciate it.

Operator operator
#110

Thanks. We’ll take the next question from Harshit at Axis Capital. Your line is open — please go ahead.

Balasubramanian A analyst
#111

Thanks very much for giving me the chance, sir. Sir, would you mind—

Vimal Kejriwal executive
#112

Yes.

Balasubramanian A analyst
#113

Could you discuss the labor shortages we dealt with previously, what effect they had on the current quarter, and when we might expect that situation to return to normal?

Vimal Kejriwal executive
#114

On the normalization front—this issue has persisted for a long time, as you know. And actually, our board was just discussing that very matter, asking whether... I think the sole point raised was that with MGNREGA winding down and a new scheme being funded by the state, perhaps more people might begin working outside, since they may—the scheme may not be, you know, it could take a while for things to settle and so on. So should that occur, it isn't what the government wants, but if it does occur, then perhaps labor supply could improve. Still, let me share something with you. At one point we had 18,000 laborers; that figure has now reached 24,000. As the order book grows and all the execution expands, the requirement rises. So I think we will face a shortfall of 2,000 to 3,000 or 4,000 people. We're taking a range of measures, but it's hard to say when this labor shortage will end. Very, very hard.

Balasubramanian A analyst
#115

But could you give us any sense of the quantum effect—like, what kind of impact that's having on a quarterly basis, or anything along those lines, if you can offer any color on it?

Vimal Kejriwal executive
#116

When you look at the figures, roughly INR 500 to 600 crore for the quarter may have been affected — revenue we could have captured more of, particularly on the civil side.

Balasubramanian A analyst
#117

Alright, understood, sir. Thanks.

Vimal Kejriwal executive
#118

Thanks. I appreciate it.

Operator operator
#119

Thanks. Our next question comes from Saket Kapoor of Kapoor & Co. on the line. Please go ahead.

Analyst analyst
#120

Hello?

Vimal Kejriwal executive
#121

Hi there.

Analyst analyst
#122

Thanks. I hope you can hear me okay, sir?

Vimal Kejriwal executive
#123

Alright, we can hear you now, yes.

Operator operator
#124

Audible.

Analyst analyst
#125

Yeah, yeah, thank you, sir. Sir, first of all, sir, you mentioned that the NEOM project is being affected by oil prices. So could you shed a bit more light on what we're trying to convey, sir?

Vimal Kejriwal executive
#126

Right, <<foreign_lang>>, many marquee projects over in Saudi are being hit. Just yesterday or the day before, I came across one about that Golden Cube, and that one's being affected too. Well, everything I heard, <<foreign_lang>>, NEOM's, uh, 6% of 100 <<foreign_lang>>. That's the word going around, okay? But the discussion was, you know, the query was about oil prices <<foreign_lang>>? So, Saket ji, oil price <<foreign_lang>>, you know, aspirational project <<foreign_lang>>. However, when it comes to essential projects, okay, be it transmission, be it oil... Like, let me tell you, they had a big HVDC project that they had shelved for 12 months, and now it's back, which we had assumed <<foreign_lang>>, but back it has come. So j<<foreign_lang>>, what exactly are they up to? If you look at the bulk of our T&D business in Saudi, it's been about hooking up renewable power.

Rajeev Aggarwal executive
#127

Mm.

Vimal Kejriwal executive
#128

And so what they're doing as well, much like us, is that <<foreign_lang>>. Right? And the power they aim to generate from renewables. So one more thing we need to grasp is that even if the price declines, their internal consumption, in my view, is declining, since they're depending far, far more and increasingly on renewables. So their revenue coming in might be the same amount, perhaps from a — even with a lower price, because the content is clearly rising.

Analyst analyst
#129

Alright.

Vimal Kejriwal executive
#130

Yes, indeed.

Analyst analyst
#131

Sir, second, sir, you said that this Chinese entry as a supplier into the EPC segment would benefit us. So, sir, regarding the CapEx that we and others have done in our cable segment, is there any threat from them participating in that cable segment and then pushing margins down? Because they do, sir, compete at lower levels on margins.

Vimal Kejriwal executive
#132

Mm.

Analyst analyst
#133

What impact is that going to have?

Vimal Kejriwal executive
#134

Saket ji—

Analyst analyst
#135

Right.

Vimal Kejriwal executive
#136

What they've discussed, <<foreign_lang>>, does not amount to opening the whole sector to everything. Their talk centers on <<foreign_lang>>, regarding substations, transformers, and so forth, GIS, and so forth. They're also discussing opening up additional power plants, power equipment. Since <<foreign_lang>>, you need to build far more fuel-BESSd power plants. So I think it focuses more on that segment rather than on items such as cables—and cables generally haven't seen much in the way of imports. At least no major imports on cables have come to my attention. <<foreign_lang>> has been of very high quality—400 kV, 500 kV cables and all that. Normal cables and conductors I have not seen. A conductor arriving into India is something I have never heard of. Okay? So no impact from that on my cable and conductor business do I see. No.

Analyst analyst
#137

All right. And sir, what exactly are the ground pillars from the cable segment? We have also done CapEx, and going forward, what kind of thrust are you seeing, sir — order booking and the trajectory ahead?

Vimal Kejriwal executive
#138

When you take a look at this quarter, our revenue has gone up by 37%. Right? So I'd say things are looking good, and a big chunk of that growth is also coming from our conductor business. So at the moment we're fully booked for the next couple of quarters, a<<foreign_lang>>. Order booking <<foreign_lang>> as a result of the very high pricing for aluminum and copper. So a lot of customers are still waiting to see <<foreign_lang>>. So I'd say order booking is a bit on the low side, but it's just a matter of time before it picks up. I don't think we're concerned, since we have enough orders today.

Analyst analyst
#139

That's right, sir. Dhanyavad, sir, and thanks for holding this call in the evening. Thank you, sir.

Vimal Kejriwal executive
#140

Thanks a lot. Appreciate it.

Rajeev Aggarwal executive
#141

I appreciate that.

Operator operator
#142

Thanks. The next question comes from Rupesh at Nayan M. Vala Securities. Please go ahead.

Rupesh Uttvani analyst
#143

Hello, sir. Can you hear me?

Vimal Kejriwal executive
#144

Sure, go ahead.

Rupesh Uttvani analyst
#145

Sir, first off, I just need a bit of clarification. I think I missed the guidance you gave on margins. So could you say that again for me?

Vimal Kejriwal executive
#146

What's the outlook on margins?

Rupesh Uttvani analyst
#147

Yes.

Vimal Kejriwal executive
#148

So we've said we're at 7.1% for the nine months. For the year, we should land between 7% and 7.5%.

Rupesh Uttvani analyst
#149

Alright. Alright, sir. And sir, on a few earlier calls, you mentioned that you would shift Civil's focus toward building and factory work, with high-realization buildings, you know, high-ticket-size, high-ticket-size orders for that segment. So if you could give a mix on the building and factory, building and factory order book within Civil versus the other projects.

Vimal Kejriwal executive
#150

I don’t have the precise figure, but my sense is that within that 11,000, roughly 60%-65% would be buildings and factories. Still, let me make one thing clear. <<foreign_lang>>, it all sits in buildings and factories. 100%.

Rupesh Uttvani analyst
#151

Alright. Alright, sir.

Vimal Kejriwal executive
#152

On top of that, the size has been increasing. All right?

Rupesh Uttvani analyst
#153

All right, sir, that's really good to hear. If I could just fit in one final question: with PGCIL, this whole PGCIL situation—does it have any effect at all on domestic T&D revenues, or is the impact, you know, minuscule?

Vimal Kejriwal executive
#154

Let me frame it this way: I don't believe revenues are being affected. First, we have a substantial order book. Second, you probably joined the call later, so I mentioned earlier that on TBCB this year, 75% of orders went to the private sector. Right? And orders have come to us from nearly every major private-sector client — Adani, Sterlite, IndiGrid, all of them. So we're receiving plenty. Claiming that nothing is being impacted wouldn't be accurate, but I, I don't see any, any meaningful effect from that, particularly on revenues for the year. I think our India business has performed very well this year too.

Rupesh Uttvani analyst
#155

All right, sir. That's all I had to cover. Thank you very much, sir.

Vimal Kejriwal executive
#156

Thanks. Thanks a lot.

Operator operator
#157

Thank you. Ladies and gentlemen, that brings us to the end of the question portion for today. I'll now pass the conference over to Mr. Vimal Kejriwal, who will offer closing comments. The floor is yours, sir.

Vimal Kejriwal executive
#158

Appreciate all of you for joining and for the ongoing interest in KEC. Thanks. Many thanks to each of you.

Operator operator
#159

Thank you. That brings this conference to a close on behalf of KEC International Limited. We appreciate your participation, and you can now hang up your lines. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete KEC International Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to KEC International Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.