Joining us on this call are our President and Chief Executive Officer, Brian Gray, along with Chief Financial Officer, Nathan Ring. After they deliver their prepared comments, we'll open things up for a question-and-answer session. Remarks made during today's discussion will include forward-looking statements regarding anticipated operational and financial results down the road. It's possible that actual outcomes could vary significantly from what those forward-looking statements anticipate. Should you want more information, please see the earnings release issued today as well as the risk factors laid out in our latest filings with the SEC, both of which can be accessed on our website and on the SEC's website. Unless the law requires otherwise, we assume no duty to revise any forward-looking statements we make. Throughout this presentation, we'll be citing some non-GAAP information. Definitions for those non-GAAP measures, along with reconciliations to the closest comparable GAAP measure, appear in today's earnings release and investor presentation. You can find those materials on our website as well. At this point, I'll hand the call over to Brian.

Brian Gray executive
#2

Thank you, Dara. Good morning to all of you. To kick off today's call, I want to point out how well we performed operationally during Q2. A handful of outside challenges put pressure on our financial results, yet the business's underlying performance remained solid; our field execution was strong, turning a record backlog into a 13% year-over-year rise in revenue. Volume for our materials product line grew by double digits, fueled by pull-through demand from contracting services along with contributions from acquisitions made recently. Gross profit rose double digits for aggregates, ready-mix, and asphalt. On a product mix adjusted basis, aggregate pricing rose 8%. I want to thank our teams for doing a good job optimizing prices and controlling costs. The basics of our business remain solid. Leaving out the money we made selling assets in both this year's and last year's second quarters, adjusted EBITDA was up 7% compared with a year ago, which demonstrates that our crews are managing the things within their control and that our self-help efforts are paying off. When you look at the reported figures, adjusted EBITDA was unchanged from last year, and that comes down to several outside factors. Number one, we saw a lag in recovering the added expense of energy. Number two, projects shifted in their timing because of bad weather and construction schedules. Number three, the mix of work and when project incentives landed had an impact on contracting services. Taking the energy costs first, pricier diesel pushed our costs up by roughly $10 million versus the prior year. By applying the mitigation steps we talked about during the previous quarter, we got back $4 million of that in Q2 via fuel surcharges, and we anticipate recouping another $4 million using escalators in our DOT contracts. That said, it won't happen until Q3, since recovering those costs from public agencies trails incurring them by one to two months. Although we expect diesel costs to stay high for the rest of the year, we believe we'll keep recouping most of these increases. Moving on, adjusted EBITDA took a hit from changes to project schedules and weather-related delays across several impact projects. We had planned to generate a substantial volume of asphalt in Texas and to pave two large highway jobs there, but heavy rainfall and revised timelines set both of them back. On the P-209 effort in Hawaii, a reworked construction schedule caused a delay that reduced our concrete and cement volumes. A particularly harsh winter in Alaska stretched out road restrictions, so trucks stayed off the roads through June 15th, which pushed the beginning of the construction season out by more than a month. What matters in all of these situations is that none of the work has been called off — instead, the volume trajectory we had anticipated simply moved into a later period. We know there's still upside on both revenue and earnings. That said, when we look at the quarter, we figure this shift in timing cost us about $10 million in adjusted EBITDA. One more thing: how the market behaved — mainly what kind of work came in and when — had an effect on how we did this quarter, and it squeezed margins in contracting services. Last year in Q2, the projects we took on were bigger general contracting jobs that involved several scopes of work. Those road expansion efforts let us pick up real gains from value engineering and from how the projects performed overall. This year, that type of work made up a smaller share of our Q2. Instead, we did far more asphalt paving, and that line of work usually comes with less risk and thinner margin. Like we've mentioned previously, that type of project is something Knife River is really strong at. It falls right within our core capabilities, and we often receive meaningful performance bonuses tied to quality on these jobs. The tricky part is that those bonus payments typically arrive as a project nears its finish. During the Q2, many of our projects remained in their early stages, which means we hadn't yet seen those bonuses come through. We expect to realize those gains on such jobs in the H2 of this year. When it comes to the Q2, we estimate that market dynamics—primarily the kind of work performed and its timing—had an impact of about $8 million on adjusted EBITDA. As we enter the peak stretch of the building season, we expect contracting service margins in the second half to improve compared with last year. That should come as we complete work on our $1.2 billion backlog, benefit from the scheduling of project bonuses, and gather payments on fuel escalators. The additional paving work we're performing this year will also help drive demand for our higher margin materials, and we expect that to support margin growth for aggregates. We remain sharply focused on our self-help efforts, including price optimization and cost controls. For example, despite higher energy costs and inflationary pressures, our aggregate crews reduced their variable operating costs by 1% so far this year. Meanwhile, our ready-mix crews increased their cubic yards per delivery hour by 12%. Numbers of this kind are exactly why I feel sure our teams are delivering on the EDGE programs, and that we're managing the things within our power. It's my conviction that Knife River was constructed to win over the long haul. The need for what we sell and provide remains solid. Essential infrastructure projects must be completed, and we're in a strong spot to complete them. Government money ought to remain robust, since 38% of IIJA dollars have not yet been used across our states. We expect the IIJA to keep producing work for a while. If lawmakers require additional time to pass the BUILD America 250 Act, then a continuing resolution would probably keep funding at existing levels. Turning to the private sector, we continue to find growing chances stemming from money being put into data center construction, semiconductor work, and energy infrastructure. On top of that, we see promising possibilities for both acquisitions and organic expansion, and I'll get into those shortly. When you put all of this together — along with the operational execution we've shown — it leaves us confident that we can keep enhancing our financial results and create value for shareholders. Now I'll hand things over to Nathan, who will review the financial results for our product lines. Once he's done, I'll offer a few thoughts about our growth strategy. Nathan?

Nathan Ring executive
#3

Thank you, Brian, and good morning. As Brian just noted, we're happy with how our operations performed overall and especially with our material product lines, which delivered a strong quarter. Turning first to aggregates, volumes grew an impressive 14% versus last year, driven mainly by internal demand from our downstream product lines across every segment, which shows the advantages of our vertical integration; given this stronger demand for aggregates, we now anticipate volumes rising by a high single-digit percentage for the year. We've also observed greater third-party demand, most notably in the Central segment, where a commercial strategy is being carried out to boost external sales to industrial projects, including data centers and power generation. A portion of that volume gain came from a chance to sell 630,000 tons of lower-priced natural fines. That helped our cash flow and gross profit, yet it pushed down consolidated pricing, which rose 3% as reported. Adjusting for overall product mix, including the natural fines sale, pricing increased 8%. Thanks to our ongoing optimization initiatives, pricing should still rise by a mid-single-digit percentage for the year on an as-reported basis. Aggregate gross margins dipped slightly in the quarter, in part because of higher delivery volumes and increased fuel costs. We delivered 41% more aggregates this year than in the Q2 of last year and have put delivery surcharges in place to offset the higher input cost of diesel. That said, delivery revenue generally comes in at cost plus a small margin, and fuel surcharges are at cost, and both diluted aggregate margins during the quarter. Even so, we still anticipate gross margins rising for the year, and on the whole, we're pleased with how the aggregate product line performed, posting a 12% rise in gross profit versus last year. Ready-mix also enjoyed an impressive quarter, with volumes up 15%, helped by contributions from our Texcrete acquisition. As we've said, this acquisition should double our volumes in Texas this year. We're keeping the forecast we shared in the Q1 and expect mid-teen volume growth for ready-mix in 2026. Gross margin rose 80 basis points, partly because of continued traction and strong execution from our ready-mix PIT Crew. Our production cost fell 6% per cubic yard, producing higher gross profit of 21% compared with last year. Shifting to asphalt, volumes rose 24%, a direct result of more paving in our contracting services product line, while internal asphalt volumes climbed 44%. Looking at the full year, we now expect volumes to rise by a high single-digit percentage. Our purchasing and storage strategy for liquid asphalt led to lower cost and pricing for hot mix asphalt made in the Q2. We also cut production cost 10% per ton, which lifted gross margin by 50 basis points and raised gross profit by 24%. On the liquid asphalt side, we saw better market opportunities in California this quarter, and that helped the product line keep performing as we had anticipated. In contracting services, more paving projects drove a 20% increase in revenue for the quarter. Like Brian said, gross margins came down because of market dynamics — mainly the mix of work and the timing of incentives. We also took on some lower-margin legacy projects through our recent acquisitions in the Mountain segment; once those legacy jobs wrap up and get replaced by new work, we'd expect profitability to improve accordingly. Despite the strong revenue growth this quarter, we also grew backlog by roughly $50 million on a sequential basis. Our Q2 backlog of $1.2 billion strengthens the confidence we have in how we'll perform going forward. Moving to SG&A, our costs remain consistent with what we told you to expect earlier this year. The biggest variance this quarter stems from about $10 million in higher gains on asset sales last year, most notably our property sale in Beaumont, Texas. If you adjust for those gains, SG&A would have risen 3.5%. For the full year, we anticipate SG&A will be roughly in line with last year as a percentage of revenue. On capital allocation, we're still committed to our disciplined approach of reinvesting in the business — maintaining fixed assets, improving operations, and growing the business. This quarter, we put $48 million into maintenance and improvements and $35 million into growth initiatives, including acquisitions and organic expansion. For the full year, we continue to expect maintenance and improvement to land between 5% and 7% of revenue, with acquisitions and new organic projects coming on top of that forecast. We keep a strong balance sheet and liquidity in place to back our growth initiatives and future investment opportunities. This quarter, we amended our Term Loan B credit agreement, raising the borrowed amount by $400 million while also bringing down the interest rate. That transaction funds our recent acquisitions from earlier in the year and also boosts our liquidity, lowers our cost of capital, and gives us more financial flexibility to carry out our strategic priorities. Q2 is normally when we borrow the most seasonally, since we build up working capital to support construction activity; that left us at net leverage of 3.2 x at the end of June, versus 3.1x at the same point last year. Looking forward, we expect to finish 2026 with no borrowings outstanding on our $500 million revolving credit facility and cash on hand, which points to net leverage near our long-term target of 2.5 x. Last, an update on our guidance for the year. Given our performance so far and what we expect for the rest of 2026, we're raising revenue guidance to a range of $3.4 billion-$3.6 billion and reaffirming our adjusted EBITDA range of $520 million-$560 million. The underlying strength of our business encourages us. Once more, looking at things on a comparable basis, adjusted EBITDA was up 7% when comparing the second quarter of 2026 with the second quarter of 2025, leaving out asset sale gains in each period. Our teams are doing a solid job, and because our operations keep showing such strength, we feel confident about our adjusted EBITDA outlook. At this point I'll hand the call back to Brian.

Brian Gray executive
#4

Thanks, Nathan. There's some noise this quarter tied to fuel along with the type and timing of projects, but the key takeaway is that our operations keep performing well. We're excited about the second half of this year and about the years ahead. Knife River is positioned well to produce profitable growth for our shareholders over the long term. A big source of that optimism is the growth opportunities in front of us. In the final portion of today's prepared remarks, I want to spotlight two more drivers of long-term growth and value creation: acquisitions and organic investments. Let me begin with acquisitions, a cornerstone of how we grow. Since 1992, we've closed 100 acquisitions, which have helped us widen our geographic footprint, reinforce our materials platform, and establish leading positions across our markets. Our approach doesn't change. We mainly target materials-led transactions in higher-growth, mid-sized markets inside our footprint or in nearby new markets. We're the acquirer of choice in our markets, which helps us stay disciplined on valuation and prioritize opportunities that build long-term value. Going forward, our acquisition pipeline remains healthy. Our markets are highly fragmented, filled with vertically integrated family-owned businesses, which creates hundreds of potential opportunities that fit our strategy; we put particular emphasis on aggregates-based opportunities in markets with strong demand fundamentals and less seasonality; we believe we're well positioned to keep executing acquisitions that enhance the quality, resilience, diversity, and growth profile of our business. Success in M&A investment begins with a disciplined, repeatable process. Since our spin in 2023, we've integrated 16 acquisitions successfully. Step one in our process is keeping the pipeline full by leveraging our local relationships with targeted potential sellers. Second, we perform rigorous due diligence to assess culture, strategic fit, operational improvements, synergy potential, and expected financial returns. Third, we carry out a structured integration plan to capture identified synergies, leverage buying power, and optimize performance. We start capturing these benefits as fast as we can. While year one often involves cultural, back office, and operational integration, the most meaningful financial benefits from synergies usually show up in years two and three as a business becomes fully merged into our platform. Strata is a great example. Buying Strata expanded our presence in key markets within the central region. It brought significant aggregate reserves and rail distribution sites, strengthened our vertical integration, and included a highly respected workforce. As part of the acquisition, we concentrated on executing our integration plan while preserving the strengths that made Strata successful. More than a year later, we're pleased with what Strata has contributed to our central segment and with the synergies we've captured. Backed by a record North Dakota DOT budget and the full integration of the two teams, we expect Strata to have a record year in 2026 and to beat our original EBITDA projections by more than 15%. Strata shows the way we spot strong companies, bring them aboard effectively, and generate value via our platform; beyond buying businesses, putting money into organic efforts matters greatly for our long-term expansion plan too. During the last 18 months, roughly $140 million has gone toward organic projects, mostly aimed at growing aggregate reserves and building greenfield developments so we can reinforce where we already compete. Much like how we pursue acquisitions, we handle organic investment chances with discipline. After our regional operating crews spot projects, we assess every one of them just as thoroughly as we would any purchase, looking at the market opening, potential for growth over time, and whether it fits our financial requirements. Consequently, such projects should produce returns above our capital cost while boosting our margins. A major organic project of ours is currently taking shape in South Dakota. Across the last several quarters, about $85 million has been put toward creating a strategic quarry with rail access close to Sioux Falls, which will widen our market footprint, boost distribution strength, and act as a lasting substitute for our main quarry in that area. That quarry holds around 70 million tons of premium quartzite reserves and connects to two Class I railroads. Phase one brings rail service to South Dakota and sets up rail distribution reaching Nebraska and Iowa, which includes backing our Sioux City operations. That phase should be up and running during the H1 of next year. This move bolsters our transport network, cuts the cost of delivering to our plants, raises supply adaptability, and puts us in position to supply top-grade aggregates to customers throughout the region for decades ahead. Another instance of organic growth paying off is the prestress site we constructed in Spokane, Washington; we've talked about this before, yet its worth keeps rising as demand grows for what it produces. The Spokane location is a cutting-edge plant unlike anything else in the Western United States. It has widened our output capacity, our geographic footprint, and our capacity to handle intricate infrastructure and commercial building work. During the Q2, we landed a sizable deal to furnish prestress components for a semiconductor plant in Idaho. Pursuing and securing that project would have been impossible without what the Spokane plant offers in capability and scale. Past this major impact project, we're noticing more chances in data centers, advanced manufacturing, and among other large-scale infrastructure builders who want prefabricated concrete goods; we likewise think the facility is set up well to gain from upcoming bridge replacement and infrastructure funding, giving us a solid path for growth in the years to come. In the end, Spokane and Sioux Falls represent precisely the sort of organic investments we aim for, efforts that sharpen our abilities, lift profitability, and produce appealing long-term returns for shareholders. Buying companies and investing organically both matter to our growth plan, together with strong performance in our established operations. Prior to wrapping up, I want to acknowledge our team for achieving the safest Q2 ever in our company's history. That outcome is a testament to how dedicated our people are to the safety culture we've built and to watching out for each other in every single task, on every job, each and every day. As we look forward, the basics underpinning our business remain solid. Since most of the construction season is still ahead of us, we know exactly where to concentrate: operate without injury, take excellent care of our customers, and seize the chances available throughout our markets so we can boost profitability and generate value over the long term. I appreciate you spending time with us today. Operator, please go ahead and open the line for questions.

Kathryn Thompson analyst
#5

Hello, and thanks for fielding my questions today, plus for the information you provided during the prepared remarks. I'd like to return to a few of the challenges we saw this quarter. To be more specific, could you walk through SG&A along with last year's gain on sales, and explain how those affected optics, especially during Q2? What does that mean for optics' first-half results? And even more significantly, what should we anticipate for the second half of the year? Thanks.

Brian Gray executive
#6

Yes. Morning, Kathryn. Brian here — I'll have Nathan address the opening portion of what you asked, and in particular discuss the asset sale gains from the prior year and what effect they had on SG&A as well as our EBITDA, adjusted EBITDA. Nathan?

Nathan Ring executive
#7

Yes. Thanks for that. Morning to you, Kathryn. Nice to hear from you. I'm pleased you raised that point. I'd like to unpack it a bit. I believe it matters a lot for grasping what actually happened this quarter. As you pointed out, it's SG&A, and that line rose roughly $12.5 million this quarter versus the same period a year ago; within our SG&A, we count the gains from selling assets, which I mentioned in my remarks. By asset sales, I simply mean sales of property, plant, and equipment. A year ago, we recorded roughly $10.3 million of gains from asset sales, with a Texas land sale being the standout. This year, that figure sits at about $600,000. So the gap between the two years on asset sale gains is quite large. If we strip those out and start by examining SG&A alone, our costs actually rose 3.5% inside SG&A, once again excluding those gains. For one thing, we keep managing our SG&A effectively, and let me note here that we anticipate the total, gains included, will be similar to last year when measured as a percent of revenue. On the next piece, let me point you to page four of the slide deck. I find it genuinely useful for seeing how this fits together within our presentation. Once you look at those gains and run the comparison of adjusted EBITDA, it becomes clear the whole company did quite well, and I said as much in my prepared remarks. We're up 7% on adjusted EBITDA, excluding those gains. Kathryn, I appreciate the question. These gains arguably represent something more—not exactly one time, but they don't reflect how operations are truly performing. I think looking at that slide four and factoring in the asset sale gains is genuinely useful.

Brian Gray executive
#8

Kathryn, let me build on what you asked. When it comes to how well the operations did, our revenue rose 13%, and volumes climbed by double digits across every one of our product lines. That produced a double-digit gain in gross profit too, for all those lines. Demand is still robust. Pricing is something we feel great about — once you account for product mix, on the aggregate side it was an 8% lift. That pleases us a lot. As for the KPIs inside the operations, those self-help efforts we've discussed at length, there are quite a few different measures showing that, once again, the underlying business and how the operations performed were very solid this quarter.

Kathryn Thompson analyst
#9

All right, thank you. I have a follow-up question regarding that. What you're suggesting is that the core operation is performing quite strongly, especially within the product line, while there are certain challenges related to contracting services. Could you perhaps elaborate on what's fueling a few of those fundamental improvements you're observing? Is it tied to geography, or does it come down to the mix of products? Any extra detail about the gains achieved during the quarter would be helpful. Thanks.

Brian Gray executive
#10

As was shown in the earnings release, the central segment definitely delivered an excellent quarter, with EBITDA up 21% compared to the same period last year. Several factors within the central region are behind that. We've put forth a focused push, which we've discussed in terms of our EDGE initiatives, to boost third-party sales. One element of the shift in our product mix this quarter came from the 630,000 tons of natural fines that were sold. Those were sold in packages alongside certain higher valued, higher margin materials. We've succeeded greatly in growing third-party sales across the central region, up 34% for the quarter. Arguably the most significant drivers in the central region are the North Dakota DOT budget along with the fully integrated teams at Strata and Knife River collaborating to pursue and secure that work. As I said during my prepared remarks, it's very exciting to anticipate what we believe will be a record year for Strata, and honestly, roughly 15% above what we had even modeled. That's performing very well. That acquisition is delivering as anticipated and honestly even better; the same goes for Texcrete. Texcrete is enjoying an excellent year. Weather affected them during the quarter; they supply and deliver considerably more residential, lower specification concrete. That has somewhat influenced our product mix on pricing. Regarding integration, we managed to secure early synergies tied to our purchasing power. We're still working to integrate those teams, and we expect Texcrete will keep performing strongly. The final item I'll bring up is that we have multiple data centers in the central region. We're providing materials to support construction near a data center up in Fargo. There are many different end markets doing well, not only in the central region but across all of our regions, which would be behind those double-digit volume gains throughout all of our product lines. A lot of positive developments are happening there, Kathryn. I appreciate the question.

Kathryn Thompson analyst
#11

Appreciate the update once more — I'll rejoin the line.

Brent Thielman analyst
#12

Hi there, thanks, and good morning.

Brian Gray executive
#13

Morning to you, Brent.

Brent Thielman analyst
#14

Brian, my apologies — my line cut out near the end of what you said in closing. If you covered this already, sorry about that. Looking at how the first half has gone, Q2 included, do you still believe the top end of the 2026 guidance range is reachable? And along with that, could you reset us on the seasonality that's baked into that guidance? You've done a fair amount of acquiring. I'm not certain whether that has altered what you normally expect.

Brian Gray executive
#15

Yes, Brent. Those outside pressures I described during my prepared remarks come to roughly $24 million. Much of that won't be recovered by us during this year. It would shift into the following year, or it would simply be something that takes us back closer to the middle of our guidance — those three outside items I referenced. Energy accounts for a $6 million negative effect on us during the quarter. We anticipate recovering $3 million-$4 million of it during Q3 as we collect on our escalation clauses under those public contracts. Only part of it comes back to us; roughly $10 million of projects were delayed. $2 million or $3 million lower in Texas, $3 million in Hawaii, a few million dollars up in Alaska because of a late start. I'd note that in Texas our crews had been set to pave 200,000 tons during the quarter on those two heavily affected projects, and they ended up doing under 15,000 tons. Those same crews are already set to keep paving on those jobs through the remainder of this year, and that work is genuinely going to spill into the following year, since we already had a full paving calendar in Texas; it will in fact be spilling into the following year. The construction season up in Alaska, as you're aware, doesn't last long. Those delayed projects would likewise be pushed into the following year. Then there's P-209 at Pearl Harbor in Hawaii, which we hope can begin late this year. I'd say most of that benefit — again, the EBITDA lost during the quarter — is going to be pushed into either late Q4 or early the following year. Brent, I believe that covers the delayed projects. On the timing and the type of work, we put that under the market dynamics currently at play. Specifically the timing of incentives — the gap between this quarter and the same quarter a year ago is that we had $8 million less in project gains. Performance generates those project gains, along with value engineering, change orders, and quality bonuses. Since last year we had so many bigger, new road construction projects with multiple scopes, we could capitalize on certain value engineering change orders, which accounts for a difference of $8 million. Incentives will come our way. On that asphalt paving business, where margins are thinner and risk is reduced, we're going to receive paving bonuses. During the most recent quarter, we performed considerably more of that kind of work — 44% more in Q2 than during the same period a year earlier — and the incentives tied to it arrive on a different schedule. Those incentives come to us with a one to two-month delay after the work is performed, or sometimes the smoothest bonuses aren't received until the job wraps up. The timing, along with the type of work, will produce roughly an $8 million effect for the quarter, and a portion of that will come back to us later in the year. Nathan, the final part of the question is yours to answer.

Nathan Ring executive
#16

Yes. Hello, Brent. It's nice to hear from you. To be certain, if you happened to lose the connection earlier, I'll restate a few items, and after that I'll address the remaining portion of your question regarding how the cadence shapes up for the balance of the year. Our revenue guidance was lifted partly because of acquisitions and because the quarter's revenue was strong, while the adjusted EBITDA margin range stays where it was, much like what we provided earlier in the year, and Brian walked through many of those elements. Our guidance now points more toward the middle of the range we shared earlier in the year. As you think about how to model that for your forward-looking work, our pattern is quite close, in fact, to what happened in the prior year regarding the timing of when EBITDA gets recognized. We currently expect roughly 55% of our adjusted EBITDA to come in Q3, with the rest, naturally, arriving in Q4. One final point, purely from an administrative angle: these guidance ranges assume normal weather. We enjoyed a fairly strong Q4 last year. That also assumes energy costs keep moving as they are, absent a significant shift to the upside in things like diesel, and that operating conditions stay more or less unchanged. Naturally, no effect from any future acquisitions. Brent, I hope that assists you on the modeling front too.

Brent Thielman analyst
#17

All right. That's helpful, thanks. As a quick follow-up about contracting services, when we look at the second half, ought we to expect margins nearer to the level from a year back? Or does some drag remain? I believe you mentioned certain acquired business that still needs to be worked through, with carries that have lower margins. That drag is still present and could keep that from happening.

Brian Gray executive
#18

Yes. Brent, that's correct. Some drag exists from legacy projects we took on via recent acquisitions, and those will affect margins during this year's H2; we also intend to recover a portion of those diesel costs I discussed, which we took on in the Q2. That should assist in offsetting it during this year's H2. As I said, we have plenty of asphalt paving, and such asphalt paving usually comes with performance and quality bonuses paid near the completion of those projects, which should assist in offsetting it. Yes, I think you can reference our margins from last year's H2, and we ought to match those margins, in this year's H2 within our contracting services.

Brent Thielman analyst
#19

Alright, folks. We truly value that. Thanks.

Trey Grooms analyst
#20

Morning, everyone. Just briefly touching on how energy is affecting things — I appreciate the specifics you provided. Could you break down what that means particularly for the aggregates segment, and how you're managing it? Also, I recall there was a goal set for this year involving 200 basis points of margin growth in aggregates. With the pressures coming from energy and so on, does that still stand?

Brian Gray executive
#21

Thanks for asking, Trey. Indeed, higher energy expenses — mainly fuel — affected our aggregates during the quarter. Honestly, it hit margins harder, as Nathan pointed out; we managed well by applying a fuel surcharge to customers that offset the bulk of those costs. But when we do that, we only break even — no profit there. Plus, we shipped significantly more material this year compared to last, with delivery volume rising by 41%, if I recall correctly. Since our delivery margins are calculated on an all-in basis, same as our pricing, and delivery margins tend to be thinner than what we get from aggregates at the plant, those at-cost fuel surcharges cut into our quarterly margins. Looking ahead, we're confident aggregates margins will improve. Whether we reach that 200 figure, I'm not sure. A more realistic estimate today might be around 100 basis points, given our forecasts for ongoing fuel effects, the surcharge amid more deliveries, and other challenges. As I've said, pricing looks promising to us. I'm pleased with the KPIs, especially with variable operating costs in aggregates declining by 1% despite these year-to-date pressures. The KPIs, our PIT Crews, and dynamic pricing are definitely assisting us in handling those challenges.

Trey Grooms analyst
#22

Understood. All right, I appreciate you sharing that. This quarter came with a great deal of noise, particularly in contracting services. I just want to confirm — and obviously many things are in motion — but are you finding it necessary to become more aggressive in order to secure projects? Has the environment around bidding grown more competitive? Or is it simply that a bunch of these developments are coinciding, which has generated these headwinds that mostly appear transitory?

Brian Gray executive
#23

No, excellent question, Trey. I'm glad you raised it. Each market and each product line differs. Indeed, competitive forces are contributing to that reduced margin, particularly within contracting services; we've discussed Oregon frequently before. Sadly, no extra paving work came out of Oregon's bid lettings that we won. In Oregon, asphalt paving bid lettings totaled literally under $5 million. Because of that, contractors in that area who are extremely mobile went to neighboring states. That might be Northern California, Idaho, Montana. Yes, bidding dynamics are occurring in the bid room that would place some pressure on our contracting services margins. Other markets exist with quite robust DOT budgets, and those are assisting in offsetting it. I would characterize the bidding dynamics as competitive. We made the deliberate choice, which we've mentioned in prior quarters, to become more aggressive since we recognize there's an advantage from the pull-through of those higher margin materials. You can observe that our gross profit rose by double digits across all our upstream materials; that was partly driven by that deliberate choice to bid asphalt paving at a more competitive margin in order to go out and win that work. In my view, it was the correct call, and we'll keep watching it and remain very transparent with all of you regarding it.

Trey Grooms analyst
#24

Ah, got it. Thanks, Brian. That clears things up — appreciate you walking us through it. Wishing you the best. Thank you.

Brian Gray executive
#25

Yep.

Timna Tanners analyst
#26

Yes, hello, good morning. I appreciate the thorough information. I actually wanted to focus on some of the factors behind that range you mentioned for Texas. My understanding is that you could recover the costs in Q3 — or did that get delayed too? Regarding the wildfires, I'm aware Spokane has suffered severe damage, and I've been hearing quite a bit about Oregon. I'm hoping everyone on your teams is safe, and I'm curious whether those situations have affected you at all.

Brian Gray executive
#27

Not at all, Timna, I'm glad you brought that up. With those terrible fires that struck Spokane over the past few days, we do have facilities located there. I spoke with our VP and general manager, and luckily everyone on our team came through unharmed. Still, nothing disrupted output at the prestress plant, which operates indoors. Obviously, wildfires along with smoke and high temperatures may affect paving work and outdoor operations. For July, I'd characterize that as immaterial, and we've managed to handle it quite effectively. As for your opening question — what was it again, Timna? My apologies.

Timna Tanners analyst
#28

Oh, I believe the same thing. I was merely attempting to grasp it. You mentioned that to recover, Hawaii and Alaska could need to extend into 2027, and I was simply curious whether, just to make things clear regarding any of the other effects, such as Texas especially, you can make up for volumes lost before the year ends.

Brian Gray executive
#29

Yeah. No, I'd state that in Texas, our crews had been set to pave on those 2 big impact projects for 7 or 8 additional months, beginning in that Q2. We intended to be extremely occupied. That volume we lost in the Q2 because of schedule changes and weather delays, the bulk of that work on those 2 specific jobs is going to be moved into 2027; we still intend to be extremely occupied in Texas, enjoying a very strong year in Texas. Partly that's since we had such solid backlog down there that we truly have been scheduled. We have some capacity remaining to accept extra work there. I'd simply say that the bulk of that missed opportunity, particularly in Texas, when it comes to contracting services on those 2 impact projects, the bulk of that is going to be moved into 2027.

Timna Tanners analyst
#30

All right, excellent. Appreciate the context.

Rohit Seth analyst
#31

Hi, thanks for letting me ask. Regarding the West, where revenue fell roughly 9%, the explanation given is reduced public sector activity in Oregon and across the West, plus your backlog declined around 16%. Back in February, you indicated the 2026 outlook for Oregon would be approximately the same as the prior year, and that the backlog had bounced back. I'm just wondering what has shifted, and what you expect as we move into the second half.

Brian Gray executive
#32

Yes. To be clear, Oregon wasn't the sole driver behind how the West performed. Let me address those states one at a time; we've discussed Hawaii, where the P-209 project got pushed back, which we estimate cost us roughly $3 million. In Hawaii, the rainy conditions that arrived toward the end of Q1 and persisted through Q2 clearly hurt our cement and ready-mix sales. Hawaii definitely underperformed relative to what we had anticipated for the quarter. The same applies to Alaska, where roads aren't opened to dump trucks and ready-mix trucks until June 15th; that cost us several million dollars during the quarter. Comparing our West results for this quarter against the prior year, there was clearly an effect. The situation in Oregon, how it's spilling over into Northern California, along with competitive pressures and those market dynamics, all played a role in the quarter. We had been saying Oregon had stabilized and that we anticipated its operational results would be roughly comparable to the previous year. That held true through the H1. In Q1 we were a bit above, and we came in somewhat below what we had projected. I'd characterize the first six months as largely matching our expectations, which was to be similar to last year. As for the second part, which ties into the guidance, we were quite unhappy with both the volume and the nature of the work that came out for bid, and the extremely small amount of new work. We had hoped to see pickup and stronger gains in that DOT and other public agency work, but that failed to materialize in Q2. So whereas we expected to be broadly in line for the full year, I now think we'll come in slightly below that. That said, there are some encouraging indicators in Oregon worth paying attention to. When we keep watching aggregate sales, particularly in the Portland, Oregon market, that serves as a solid gauge for what lies ahead for the state. Typically those trends run about a year ahead of what eventually shows up in Southern Oregon and over in Central Oregon. We keep seeing healthy sales, with volumes rising 20% to 30% in that Portland, Oregon market. That's a favorable signal. One final point about prestress in Oregon, which falls under our Oregon operations: they secured a really sizable, really solid contract involving a semiconductor facility located in Idaho, and we anticipate that construction will get underway and that we'll see some gains and an effect on our EBITDA later this year and mostly as we move into the start of next year. There are some positive developments happening there. That's basically the situation out West.

Rohit Seth analyst
#33

Alright. Regarding the pricing trends across mixes, there was a fairly large spread between what was reported and what was mix adjusted. I understand that's impacting aggregates, perhaps somewhat, your concrete as acquisitions get layered in, and asphalt ASP declined a little. Perhaps you could discuss how you expect pricing trends to move across the coming couple of quarters, how that mix adjusted figure sort of unwinds and moves toward the reported end color. That would be helpful. Thanks.

Brian Gray executive
#34

I'll have Nathan take that one.

Nathan Ring executive
#35

Good morning. You're right to flag that — a few of these swings warrant some additional detail. I'll begin with aggregates, because that's where the headline figure lives: if memory serves, our average selling price landed at 3.2%. Inside that number — and I mentioned this in my prepared remarks, and Brian raised it a moment ago too — we shipped a big slug of natural fines, 630,000 tons. That came about through a commercial strategy initiative, but it definitely drags on average selling price. So on the product mix adjusted side, what we did was pause and ask, "How is each product actually performing individually? Are the price increases we discussed earlier in the year showing up?" And the answer is yes, they are. When you look at it product mix adjusted — essentially like for like, meaning what would this look like had I sold the same mix last year as I did into this year, with the pricing increases applied — we're up 8%. For the remainder of the year, the guidance we're providing is on an as reported basis. As we keep optimizing our pricing, with revenues coming in from surcharges and delivery, we anticipate our average selling price for aggregates will be up mid-single digits on an as reported basis. Now to ready-mix — you pointed out you'd noticed the pricing there. A significant chunk of that traces back to geographic mix, something we've discussed a bit previously. Brian brought up Texcrete and its residential lower spec material. That carries a different price point. It's still solid margin work for us, but the pricing profile differs. As Texcrete and Texas grow proportionally relative to the rest of the company, that average selling price will shift again — though that doesn't mean we aren't securing the price increases we're after in those specific markets. Looking ahead, we're not necessarily providing guidance on ready-mix or hot mix, since plenty of contingency exists around what happens with cement prices and asphalt prices. What we've observed thus far is encouraging, and once again, on the aggregates side, we're seeing strong pricing dynamics ahead of us.

Rohit Seth analyst
#36

All right, how about asphalt?

Brian Gray executive
#37

Regarding asphalt, as Nathan pointed out, input costs play a big role there—particularly energy expenses tied to natural gas and liquid asphalt. For the quarter, we're satisfied with the margin between price and cost. Heading into next year, though, there could be some pressure. During the first half of this year, a good portion of our mix relied on secured asphalt bought at lower prices, and that's going to shift. Those costs and prices should start mirroring the rise in inputs, especially liquid asphalt.

Rohit Seth analyst
#38

Alright. Thanks very much.

Ivan Yi analyst
#39

Hi, everyone. Morning. Appreciate you making the time. Let's begin with aggregates. How much organic volume growth in aggregates did you see during Q2, and what do you anticipate for organic volumes across full-year 2026 versus your guidance calling for total aggregates volumes to rise in the high single digits? Thanks.

Brian Gray executive
#40

Sure; roughly 75% of our volume growth originated from legacy operations. I'd say that reflects a great deal of the asphalt paving work we performed along with the advantage we capture through vertical integration. Roughly 25% originated from acquisitions. Some of that involves selling aggregate out of those newly acquired businesses, though in Texcrete's situation as well, we managed to move their aggregate supply in-house, when previously they'd been procuring it from outside sources. That, too, gave our aggregate sales a lift. So roughly 25% from recent acquisitions and 75% from the legacy business, mainly because of the additional asphalt paving.

Ivan Yi analyst
#41

Great, thanks. You went into a lot of depth regarding gross margin and the Q2 headwinds. Could you speak to how we should think about the path for overall gross margins across Q3 and Q4? I realize quarterly guidance isn't something you provide, but any insight into how that takes shape over the back half would help. Thank you.

Brian Gray executive
#42

Our margin expansion across every product line left us encouraged. On a year-to-date basis, margins have grown in aggregates, ready-mix, and asphalt. There were headwinds, which we've already covered, that weighed on aggregates throughout the year. A number of those will persist. Energy costs, along with certain market dynamics we referenced — particularly in Oregon, which is affecting several neighboring states — will keep exerting downward pressure on margins. I'll hand it to Nathan to address the second half of this year specifically and what our expectations are.

Nathan Ring executive
#43

Looking at things by product line, some of those elements have already come up. On a combined basis, we're expecting margins to widen across the entire year; during the back half, if you look at what we achieved in H1, that signals — as Brian noted — roughly 100 basis points for the whole year. That's an improvement. On contracting services, we addressed that too: margins roughly in line with the prior year, with a slight bump up. The remaining two product lines you might be referring to haven't been covered yet, though we have discussed the factors affecting them. We're quite pleased with how H1 went. As we mentioned, those two lines — ready-mix and asphalt hot mix — could see margin pressure, caused by energy costs running higher. There's also some lower margin work Brian referenced, plus increased depreciation tied to acquisitions we made recently. Weather in Q4 was more favorable this year. As my guidance remarks indicated, we expect typical weather conditions for H2 this year. Those factors might squeeze margins on those two product lines. As we've said, on the whole, for aggregates, ready-mix, hot mix — those material product lines — we do anticipate gross profit rising compared to a year earlier.

Ivan Yi analyst
#44

Thanks a lot.

Garrett Greenblatt analyst
#45

Hello, and I appreciate you fitting in my question today. When we examine the EBITDA guidance you provided and remove the raised DD&A expectation, the implication is that the EBIT outlook has fallen by roughly $20 million compared with what was previously given. Could you walk us through what makes up that difference? My guess is that it ties to those projects slipping into 2027, the softness in Oregon, and also power expenses. I'm attempting to determine how much of this could be recovered when we get to 2027. Thank you.

Nathan Ring executive
#46

Yes, I believe one portion of it is connected, as we mentioned; our DD&A came in higher; we flagged in the guidance that it's now up mid-teens, whereas previously it had been mid-single digits. One element of that is genuinely tied to the fact that we've revised our forecast in light of our recent acquisitions, and also our revenue, which you picked up on. In fact, when we look at the full year with respect to DD&A, the ratio of DD&A to revenue is roughly unchanged compared with a year ago. Does that address your question regarding the DD&A increase?

Garrett Greenblatt analyst
#47

What I'm really getting at is this — if we now remove that elevated DD&A assumption from the EBITDA guidance we've kept unchanged, then the implied EBIT guide comes out lower. I'd just like to know what's behind that on the operating side.

Nathan Ring executive
#48

Yes, I believe a portion of it ties to what I mentioned a moment ago. There are a few of our product lines where we do expect a bit of margin compression for the reasons I went through; that's likely one contributor. And naturally, the kind of work we're performing could affect margins somewhat when it comes to those upstream product line materials.

Garrett Greenblatt analyst
#49

Understood. When it comes to those older projects from the acquisitions that carry thinner margins, at what point should we expect them to be completely finished?

Brian Gray executive
#50

Sure, I'd say mostly during Q3. That's the period when the bulk of our revenue gets recognized. There's some older work involved, particularly in Utah. Mostly, that would happen in Q3.

Garrett Greenblatt analyst
#51

Understood — thanks a lot.

Brian Gray executive
#52

It's great to have all of you with us today. We're grateful for your questions, and we can't wait to talk with each of you once more in the next quarter. Thanks so much.

Operator operator
#53

This concludes today's call. Thank you for attending. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Knife River Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Knife River Corporation earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.