Good day, everyone, and welcome to the Royal Vopak Q3 2026 Results Update. <<operator_script>> Please note that this call is being recorded. It's my pleasure to introduce <<inaudible>>, Investor Relations Manager at Vopak. You may now begin the meeting.
Good morning, everyone, and thanks for joining our Q3 2026 analyst call. Dick Richelle, our CEO, and Michiel Gilsing, our CFO, will walk you through the latest results. We'll be referring to the Q3 2026 analyst presentation, which is on the screen for you to follow and can be downloaded from our website. Once the presentation is done, we'll open things up for Q&A. A replay of the webcast will also be posted on our website. Before we begin, I'd like to point you to the disclaimer content on forward-looking statements, which you're familiar with. Please keep in mind that during the presentation we may make forward-looking statements, and those carry certain risks and uncertainties. That disclaimer therefore applies to the whole call, including any answers given in the Q&A session. With that, I'll hand the call over to Dick.
Thanks so much, Mace, and a good morning to everyone who's joined the call today. Let's turn to our results. We put up an excellent showing across the first 9 months of the year, with a well-diversified portfolio, solid customer demand and meaningful contributions from our growth projects all pushing cash generation to a record level. You can see that in our occupancy rate of 91%. Proportional EBITDA rose 5% year-on-year. That figure is on an adjusted basis, accounting for negative currency translation, the impact of divestments and the specific one-off booked in Q2 of 2025. Operating free cash flow climbed to EUR 671 million, helped by record cash generation in the third quarter. We're also continuing to make solid headway on our growth strategy. In the Netherlands, we successfully commissioned the fourth tank at our Gate terminal. That new capacity is underpinned by long-term take-or-pay contracts and is producing returns in line with targeted investment multiples. In Canada, construction of Phase 1 of REEF is still on track for commissioning in the first quarter of 2027. We're also moving ahead with building the Optimization 1 project for additional throughput capacity, which we expect to have in service during the second half of 2027.
On top of that, we are moving the Optimization 2 project forward to add more capacity, with a potential FID targeted before the close of 2026. Over in India, AVTL brought storage capacity for ammonia into service at our <<inaudible>> site and took final investment decisions aimed at expanding capacity further. Turning to outlook: solid operational results and the gains delivered by our growth projects keep building momentum. Because of that, we are lifting our outlook for the whole year on proportional EBITDA and proportional operating free cash flow. As ever, this is still contingent on market conditions and currency movements as they unfold. Next, on returns to shareholders: we launched an interim dividend, with the initial payment of EUR 0.72 per share paid out this September, and we finished 75% of the EUR 100 million buyback tranche, itself one piece of a multiyear program worth as much as EUR 500 million. Let's dig into how our results break down, particularly across the various terminal types we run. Performance has been solid overall throughout the portfolio, with results higher versus a year earlier. Robust activity at major oil hubs such as Rotterdam powered our strong oil results, together with better results from our oil distribution business in South Africa. Newly commissioned capacity in the U.S. lifted the Chemicals segment, which also gained from stronger autonomous performance.
On balance, gas and industrial terminals backed by long-term contracts turned in steady results and have posted greater throughput so far this year. Taken together, that produced proportional EBITDA of EUR 906 million — a 5% rise on an adjusted basis versus the same period a year earlier. With the results covered, I want to give some context on the Middle East conflict, especially what we are observing in our network. That conflict has set off a historic supply-side shock spanning energy and manufacturing markets, pushing product shortages and price volatility. Because we run our business globally, these disruptions do not stay within the region. They reach across the wider terminal network we operate. So to get the full picture, we need to examine both direct and indirect effects throughout our network. Looking closely at our direct exposure in the region, we own and operate 4 storage terminals in the Middle East, with strategic positions in Saudi Arabia and the United Arab Emirates. These terminals produce roughly 5% of our proportional EBITDA and account for about 4% of our capital employed. Our Saudi Arabian terminals are tied to industrial clusters, whereas our Fujairah terminal in the Emirates, situated outside the Strait of Hormuz, serves as an oil hub.
Because of the disruptions from the conflict, we're seeing lower activity and customer utilization at our Middle East terminals. Now, on indirect exposure, performance varied across our network: strong results at certain terminals were partly offset by weaker activity in other places. In India and Pakistan, for instance, rental capacity and activity levels dropped as prices caused demand destruction in price-sensitive domestic sectors, and that was compounded by shipping disruptions and export delays from key gulf suppliers. But we also saw positive effects substituting for the lost product volume from the Middle East — a rebalancing of trade goods has been emerging. Our key terminals, our hub terminals, play an important role in facilitating that, which leads to higher activity. On top of that, concerns about security of supply are driving greater storage demand at some locations, and that has supported spot sales. To wrap up, this conflict has once again shown that diversifying our portfolio — by geography and by product — is 1 of our key strengths. As we navigate a volatile global landscape, we've demonstrated that we can meet our customers' evolving needs when it comes to energy security, affordability and sustainability. Now, looking more closely at these dynamics, it's clear the investments we've made in the past years are proving highly relevant to addressing the main themes in energy markets.
When it comes to Gate in <<inaudible>>, we help keep Europe's supply secure by offering vital LNG import capacity. Over in Canada, the reef terminal we operate links production from Western Canada straight to Asia, shrinking shipping times to merely 10 days rather than the 25 days it takes from the U.S. Gulf Coast, which brings substantial cost benefits. In India, meanwhile, ATL is facilitating the shift between fuels by constructing the infrastructure needed to import products like LPG and ammonia. At the same time, our battery energy storage systems investments made recently are moving into the execution phase, supplying the physical buffer capacity that grid stability demands. In summary, the infrastructure we own and run, along with the investments we have made over the past years, will stay highly relevant amid the rapidly changing landscape of energy and manufacturing markets. And through our diversified portfolio of strategically located terminals, we facilitate the secure, affordable and sustainable flow of products, satisfying our customers' changing needs. As I mentioned, the Gate terminal in Rotterdam plays a critical role in delivering energy security to Europe. That terminal lets our customers import liquefied natural gas through sea-going vessels destined for various countries, then distributed as gas via pipelines, ships and even trucks. This is effectively lowering the historical dependence on single-source pipeline imports and domestic production, which improves security of supply.
Back in 2023, we made an FID alongside our partner, <<inaudible>>, for an additional bank with 180,000 cubic meters of capacity. Vopak's proportional investment came to approximately EUR 175 million. Following a 3-year construction period, the fourth tank was brought into service efficiently on the 1st of October this year — safely, on schedule and within budget. Now that the fourth tank is operational, the terminal can supply about 2/3 of the Netherlands' national gas consumption, which mainly serves electricity generation and residential heating. This new capacity, as with the remainder of the terminal, is backed by a long-term take-or-pay contract and will generate returns consistent with targeted investment multiples. Out of our EUR 4 billion proportional total growth CapEx program for investing in gas, industrial and energy transition infrastructure through 2030, we have committed EUR 2.4 billion in total so far, with roughly EUR 450 million of that committed during the first 9 months of 2026. At present we hold EUR 1.5 billion in assets under construction, and about EUR 790 million of that is scheduled to be commissioned by year-end 2027. The bulk of this will come from commissioning REEF Phase 1 and Optimization 1 in West Canada.
After these assets go live, they'll be backed by longer take-or-pay agreements and will produce returns consistent with our targeted investment multiples. Going forward, we're still strongly placed to hit our long-term goals. We've demonstrated solid business performance over recent years, and that carried through into the first 9 months of 2026. Market indicators for storage demand are still solid, which supports delivering our growth projects as well as the resilient performance of our existing business. You can see this in our long-term OCT ambition of between 13% and 17% on a rolling 12-month basis, and we keep delivering on it. Beyond that, we remain well on track to invest EUR 4 billion in growth CapEx through 2030. With that said, I'll turn things over to Michiel, who will walk you through more detail on the Q3 2026 results.
Thanks, Dick — and hello from me as well, and good morning everyone. To start with, we delivered a very strong performance across the first 9 months of 26%. We posted a healthy occupancy rate, lifted our EBITDA, and made further gains in how much operating free cash flow we generate. These results underscore the strength of our well-diversified portfolio, especially when uncertainty and volatility are on the rise. At the same time, we keep putting money into attractive, accretive growth projects while also giving value back to our shareholders. Now let's dig a bit deeper into how the portfolio performed. Proportional EBITDA rose to EUR 906 million, up from EUR 902 million in the first 9 months of 2025. If you strip out negative currency translation effects, the divestment impact, and the prior year one-off settlement tied to a commercial resolution, proportional EBITDA was up 5% year-on-year. Operating free cash flow grew to EUR 671 million, a rise of 6% year-on-year, once negative currency translation effects and the divestment impact are excluded. Our operating cash return on a 12-month rolling basis climbed to 15.8%, which reflects the structural, ongoing trend of better cash generation. Demand for our services stayed strong, and you can see that in an occupancy rate of 91% year-to-date. Let's move on to the overview of how our business units performed.
Leaving aside adverse FX impacts of EUR 9 million and a EUR 6 million hit from divestments, proportional EBITDA rose 2% versus a year earlier. That said, as I mentioned, Q2 2025 contained a sizable positive one-time item worth EUR 22 million. Strip that out and year-on-year EBITDA growth comes to roughly 5%. Much of that increase reflects a EUR 26 million boost from our growth projects, especially in the U.S., the Netherlands and South Africa. Results from the existing network were solid, mainly on the back of firm oil markets, which helped, among others, our Euro <<inaudible>> hub terminal in the Netherlands and the oil distribution terminals in South Africa. Partly working against this was soft performance in the Asia and Middle business unit, caused by the continuing Middle East conflict. Our ongoing priority is producing predictable, growing cash flows that create value for shareholders. During Q3, operating free cash flow reached a record EUR 227 million. Across the first 9 months of 2026, our EBITDA cash conversion improved further and now stands at about 74%. Lower operating CapEx and IFRS 16 leases relative to the first 9 months of 2025 drove that gain.
Higher EBITDA along with stronger cash conversion pushed operating free cash flow up by 4.3%. Once taxes and financing costs are taken out of that operating free cash flow figure, we get to proportional free cash flow, and that rose 6.8% compared with a year earlier. Taking the EUR 486 million of free cash flow produced during the first 9 months of this year together with the market cap at the close of Q3, our cash flow yield is presently around 12%. That yield underpins the robust shareholder distributions we are making while growth investments are elevated. Our improved cash generation has represented a structural trend over recent years. Year-to-date, operating free cash flow per share came in at EUR 5.88. For the first 9 months of 2021, the figure was EUR 3.49, which reflects a rise of 68%. We achieved this through strong operational performance, the contribution of growth projects and the termination of the portfolio. Our share buyback programs have accelerated this further. Since the start of 2024, Vopak has repurchased 12.1 million shares at an average price of around EUR 39 per share. That has cut our share count by approximately 10%, including the expected cancellation of the shares bought back during 2026.
Now let's turn to the balance sheet. Proportional leverage — which captures the economic portion of joint venture debt — rose to 2.95x, driven by a step-up in our growth investments. When you strip out assets under construction, since those aren't yet adding to EBITDA, proportional leverage comes in at 2.15x, a level that has held steady over recent years. Roughly half of the 0.8% of leverage tied to assets under construction comes from REEF, which is due to be commissioned in Q1 2027. Our target for proportional leverage hasn't changed: it sits between 2.5x and 3x. To support the development of growth opportunities that lift our operating cash return, Volpak's proportional leverage could shift temporarily to a range of 3x to 3.5x while construction is underway, a period that may run 2 to 3 years. All of this fits within our disciplined capital allocation framework. Putting capital into growth unities is a central element of our capital allocation policy. By 2030, we aim to invest EUR 4 billion on a proportional basis to expand our base in gas and industrial terminals and speed up progress toward energy transition infrastructure. So far, we have already committed roughly EUR 2.4 billion to growth investments since '22, and about $855 million of that has been commissioned and is generating returns consistent with the targeted investment multiples.
Right now, roughly EUR 1.5 billion of growth projects are in the construction phase, and about EUR 790 million of that total will be delivered across 2026 and 2027. On top of that, for 2028 and beyond, a further EUR 750 million in projects should begin operating and will add to the results. Delivery of these projects will follow the CapEx to EBITDA multiples we have communicated, and they underpin our longer-term ambition for operating cash returns of between 13% and 17%. That leads me into the outlook for the full year 2026. As Dick mentioned, market indicators for storage demand are still firm, which supports both the delivery of growth projects and the resilient performance of our existing business. That is why we feel confident raising our full year 2026 outlook, with proportional operating free cash flow now projected at around EUR 840 million and proportional EBITDA expected in the range of EUR 1.2 billion to EUR 1.22 billion. Putting it all together on this slide, we had a strong first 9 months of 2026, with solid cash generation and a portfolio that remains well positioned despite volatility in the market. We also keep investing in attractive growth opportunities while returning value to shareholders, most recently through the addition of an interim dividend payment.
So with that said, I'll now turn things back over to Dick.
Thanks. Michiel, appreciate it. So with that said, I’d like to have the operator open up the line now so we can take questions.
<<operator_script>> We'll take our first question from Philip Ngotho at Kepler Cheuvreux.
I've got 2, if I may. First, regarding the EBITDA bridge from Q3 to Q4 — and also some early thinking on 2027, perhaps beginning with Q3 to Q4. If you could help us understand a little whether we should expect any other movements, et cetera, and of course gate now coming in and contributing fully this quarter, whether there are other things we ought to be mindful of when looking at the Q4 FDA estimate, because it feels a little bit — if I look now at what you're expecting in terms of uplift from gate, the higher end of the guidance range should actually be achievable. But I'm just wondering if you could share your thoughts there on what we should keep in mind. And the same going into 2027 — what items should we be mindful of when thinking about an expectation for 2027. And my follow-up question on <<inaudible>> also in the Middle East and the total impact as well. But I'm just wondering whether, to the extent possible, we could see any pressure there for 2027 if there are contract renewals. I don't know what the average duration is on the contracts that you currently have in place.
We have, of course, observed some effect on throughput, but what kind of effect might there be on possible new pricing levels.
Okay, Philippe, let me begin. So to start with, regarding that EBITDA bridge between Q3 and Q4 — yes, the Gate project will indeed add to the results. We effectively hold half of it, 50% <<inaudible>>, with investment of up to EUR 350 million. But that will contribute to results in Q4. What you should keep in mind — what you typically observe in our business — is that cost seasonality in the fourth quarter always pushes maintenance costs higher in Q4. We're also seeing somewhat rising energy costs. So on the cost side, I'd say we're a bit cautious, also in light of what we saw in prior Q4s relative to earlier years. And there remains some uncertainty about what will unfold in the Middle East. You already brought up contract renewals. Clearly, if you consider the 2 main locations we have in the Middle East <<inaudible>>, that facility is covered by very long-term contracts, so renewal risk there isn't significant. In Fujairah, though, the contract runs shorter, and the appetite to renew is lower than before the crisis, obviously.
That's something we're factoring in for the fourth quarter as well. It could also carry over into your second question and perhaps still stretch into next year. Of course, it's very difficult to pin down where the contract is heading, how severe it will be, and whether any solution will emerge. To some extent, we continue to see volumes recovering, particularly on the crude side, though not on the LPG side, the product side, or the chemical side — that's where we still observe, let's say, a fairly considerable supply shock originating from the Middle East. So ultimately that may affect the renewals for the Fujairah location, and it may still affect markets such as Pakistan and India going forward, but how big that impact will be is very hard to predict. Obviously, any impact will be significantly offset by the growth projects coming on stream. So you may expect that, and in Q2 next year, REEF is going to have a quite positive effect on our results, consistent with the investment multiples we have shared with the market. So that will be a positive contribution to our results. So definitely 27 should see a step-up in growth, with some uncertainty still surrounding the Middle East.
Looking at the results through the first 9 months, those are the same measures we're putting in place. The Middle East conflict has hurt the locations I just named, but we're also seeing some positive things. South Africa is one example, and we're also seeing fairly strong business in the Netherlands and, to some degree, in the U.S. On the whole, we can't fully offset the conflict, but we've added measures on the cost side and on operating CapEx, specifically to protect our cash flows. That's also why we've raised the cash flow step more than perhaps the EBITDA side, since some elements inside free cash flow aren't in EBITDA, particularly on operating CapEx. So that may be a somewhat lengthy answer to your question, but hopefully it gives you some guidance.
Our next question comes from Quirijn Mulder, who is on the line from ING.
To start, I’d like to ask about the CapEx programs and the plans for the projects. When I compare the second-quarter text with the third quarter, I notice just 1 change in the table. It’s the AVTL matter, where you moved things—let’s say—from the third quarter into the fourth quarter of 2026. To me, that looks more like fine-tuning. That is the only thing in the table that changed. Yet when we read the text, particularly regarding AVTL, there is some progression on a cryogenic product. And perhaps other changes are still to come. So should we expect an update to full-year numbers as new projects come up or reach FID? Is that in the planning? I’d also like to know how things are progressing in Australia, both on the LNG terminal and on the Botany storage. Maybe you can elaborate on that.
I want to say a special thank you, because I know this is the final time you'll be joining the Vopak results call after so many, many years. So thank you very much for everything you've contributed and for the constructive feedback you've given the company over the past years. Maybe then, on to your questions — your 2 questions — perhaps ABTL, what you see in the table is the expected in-service date for the project in Mumbai, <<inaudible>>. And what we're announcing is additional expansions at that same location. So it's a bit — we'll try, probably at the full year results, to make sure you have the right specification for those projects. But for now, it's an attractive board in Mumbai. We're currently investing in liquid and cryogenics, and we've additionally added more capacity at that same location, which is listed under the announcement we made today, like further investments made next to Kochi in India. I think that's 1 element. And again, we'll probably clarify that in the next quarter once we have good visibility on all the time lines. Second, your question on Australia, both LNG as well as the Sydney expansion LNG, we're making very good progress on the permit side, meaning that the whole public process of permit application for the LNG terminal has passed.
We are currently awaiting the issuance of our permit, and at this point it appears fairly encouraging and favorable, except for the impact of the upcoming elections in the state of Victoria; there will likely be a minor delay owing to the elections happening at the end of this month. Still, on the whole, from a permitting standpoint, the public engagement we have witnessed so far — and as I mentioned, that engagement has concluded — appears fairly encouraging with regard to securing the permit in a manner consistent with what benefits project delivery, and then to Sydney and the possible fuels expansion. That is a project we are advancing at the current terminal, and it appears encouraging and is expected, provided everything moves in the right direction — meaning the customers and tractor quotes that are arriving, and expected to arrive. We hope to reach a final estimate decision on that during the coming quarters.
Now the next question comes from Jeremy Kincaid at Van Lanschot Kempen.
To start, I have a couple of quick questions. I see there was — or there is — a strike at Trigon, over at the Rippers facility. I was just wondering whether you could say if you believe that is going to have any effect on your operations or on earnings in the fourth quarter? And I also came across a couple of articles regarding SPEC in Colombia, which may have been down for a brief stretch. I'm not certain whether it's running again, but I was hoping you might comment on whether you think that will have an impact on the fourth quarter. Then, the second, bigger question. Obviously, you're doing some — a fair number of developments in the <<inaudible>> space in the Netherlands. I was just wondering if you could frame how large that opportunity is going forward. How big do you think — or how much money might you invest in that category of assets over the years ahead?
Jeremy, thank you. Perhaps regarding Trigon and SPEC — Trigon in particular. Yes, as you say, we are aware a strike is currently taking place. So along with our partner — this is a joint venture we share with AltaGas — we are working toward resolving the situation. Clearly, the appeal and significance of the LPG exports already under way via the Port of Prince Rupert and through RIPET matter a great deal. So we are simply trying to reach a resolution on that. There is no sign at present that it will affect Q3 — sorry, Q4 — for an extended period. Then perhaps on SPEC: SPEC is operating at nearly full capacity. That also relates to the drought in Colombia having an effect. So gas imports are therefore truly essential and significant. We have observed, in some of the performance — the operational performance of the FSRUs located there, and the alignment with what must be received and delivered into the gas — there have been a few — we have seen a few hiccups during the recent period, and we will work with the FSRU providers and the pipeline operator to ensure that this gets smoothed out.
However, we don’t anticipate that being a fundamental challenge in Colombia. So I think that gets to the specifics of Trican and Colombia. And perhaps, Michiel, you could comment on the batteries?
Yes, absolutely. So where the batteries are concerned, we've put in or pledged roughly EUR 400 million. That covers 2 big battery systems plus the purchase of green energy storage. When you consider our broader accelerate goal, it comes to EUR 1.4 billion, and about half of that is now committed. There's still space for, shall we say, carrying out further expansions on the battery front. So that's what you might expect — the excise at this point is extremely difficult to forecast, and the chance of other new infrastructure on the energy transition side does exist. But frankly, looking at how things have developed over the last years, it moves far more slowly than anticipated. So anything tied to ammonia and hydrogen or CO2 storage is tougher to get off the ground. So it's likely nearer the end of the decade now, given where things stand. That means there could be a chance for us to move somewhat quicker on the battery side, though no decision has been made yet. So — right now we certainly won't give more guidance on that; for the time being, it's simply too early. We're working on a few other projects to see if we can get them off the ground, and hopefully reach FID at the start of next year, which would mean an additional investment.
Still, as I mentioned, it's too early to provide a precise figure, though we certainly have the ambition to put more money into this area.
We'll go ahead and take the following question from Kristof Samoy, who is on the line from KBC Securities.
To start, nice work on the numbers. On the question side, perhaps REEF first. This is really a matter of semantics. You either mention or describe investments, or possible ones, in reef as optimization to phase. Is that the Phase II you brought up earlier, where you said, all right, we'd like to move or pull forward investments so we don't get a ramp down and ramp up of the construction crew working on the phase that will be commissioned in Q1 of '27? Then perhaps a follow-up on BES. Might you indicate how large the covered investments are that you're prepared to make and take FID on? I realize you aim for — you try to lock in tolling agreements, long-term offtake and so on. But how much capacity would you want secured through a tolling agreement if you take FID? And then regarding ongoing business development in Australia. I was curious whether you could offer your thoughts on the news we saw about the Golden Beach project in Victoria, the storage project, and how it might affect your path to FID — whether you'd have to scale down, and whether it's positive or negative?
Now, regarding Fujairah — could you possibly give us some indication of how the conflict affected throughput levels, both before it and prior to that, and where things stand at present? That way we could get a sense of the potential recovery if the situation in the Middle East evolves.
Kristof, thank you for those questions. Perhaps we can start with the first one on Reef. And I understand what you're asking about Symantec, since we refer to it as Optimization 1 and 2. First of all, the reason we call it optimization is that it's really much more of an addition to what I'd describe as the main and first base investment at Price Rupert on this particular side. And why do I call that the main and the base? Because that's where the massive truck or rail car loading rack has been constructed, but most importantly, the jetty. So anything added on top of that, we call an optimization of the first phase. And that is Optimization 1, which we've already taken the investment decision on and announced earlier in '25, and those were decommissioned after the first phase in the second half of 2027. And then the other one we're referring to today, which is your question, OT2, Optimization 2 — that's a further optimization within, I'd say, the scope of the current REEF setup. So it's more butane and propane export capacity tank and rail unloading capacity, but it doesn't require further investments in the jetty because the jetty is already there. So that's why we call it REEF Phase 1 — sorry, Reef, OPTI 1 and Optimization 2.
I hope that clears things up. As for optimization, we haven't tackled that yet either, but we're hoping to be in a position to do so during the rest of this year. I hope that's clear enough. Then perhaps on BES...
Maybe, just on the wording optimization piece, does that also mean it’ll be very limited relative to the amounts you disclosed and taking—or when announcing FID for Phase 1? Or is that not the case with that?
There's no set very limit. So in terms of capacity, I'd say reef is clearly the biggest investment, again, because of all the land work that had to be done and still has to be done, plus the marine infrastructure. OPTI 1 is a comparatively small investment — because really it's an optimization of existing infrastructure. OPTI 2, the way it's being progressed at this moment in time, would until additional store capacity. So it sits somewhere between the other 2, REEF and OPTI 1, if that makes sense, in terms of investment dollars. But again, we're not yet at the point to take an investment decision — that's just to give you an indication. I hope that's helpful.
Correct, that’s right.
On BES, perhaps, your question concerned the downside versus exposure to merchant risk there. Roughly 3 of the available capacity in a battery is what we aim to cover through longer-term pole agreements. As for the rest, we've chosen to wait until we're nearer the in-service date for the batteries and then determine how the contractual situation for the remaining capacity will be covered. That might mean taking some merchant market risk, or placing the available capacity in the market, but under different contract durations — that's the lens through which we view the investment. It's also how we reached the investment decision on those 2 batteries announced in Q2. So that gives you an indication. Then perhaps on Fujairah, your question concerned activity levels there. It's hard to give exact figures. But as an indication, I think first, and promos, it's important to recognize that the situation remains very volatile. So the initial effect was in terms of occupancy still high, but activity level quite low. What you see now is quite low, basically meaning product that was in the tanks was taken out as much as possible, but not a lot of new product was coming in.
And I'm referring to Q2 of this year. What we've observed in Q3 is a compounded effect of several factors. Yes, some renewal contract discussions have already had their first effect. A portion of those has been renewed successfully. Another portion remains subject to renewal — and perhaps isn't expected to be renewed just yet, since people can afford to take a bit of a wait-and-see approach. But I think what you're seeing in Q3, and what we expect to persist, is a different type of product flow moving through, because a lot of shuttle servicing is now taking place via the Strait of Hormuz. That calls for ship-to-ship transfers in Fujairah, and it calls for quite a bit of activity at the terminal, which is keeping the crew quite occupied right now. And there are a few other flows — I'd almost call them land-based — that are also very important and are taking shape in Fujairah. So I think it's a bit of a mix in terms of how that activity level will develop going forward as well. That's very hard to predict, given that the situation remains uncertain and volatile, but at least it gives you a bit of an indication that it's not completely 0, and we're still looking for quite some opportunity in that area and have confidence with the location of Fujairah in the medium to longer term given its strategic positioning.
Then your final question was about Golden Beach, and I need a bit of help from you there in Victoria — what the project involves, and what exactly your question is getting at.
So, about 2 weeks ago, there was some new slope upping that we see the permits from Victoria state for the golden beach project, which would allow gas storage in gas fields that are almost depleted.
Alright. That's the one. Okay. Yes, I believe that's a somewhat different kind of situation, since it even applies to storing gas in depleted gas fields. I think the main point here is that not enough gas is expected to be present in and around Victoria by the close of this decade. And so, at a minimum, maritime flows, or marine flows, LNG input flows, are expected to cover the shortfall that the State of Victoria will face -- so having underground gas storage, whether on land or even offshore, is not necessarily going to alter the demand for liquid gas imports that in any case need to occur in the state of Victoria. So that's the foundation on which we are developing the project. And as I mentioned earlier in response to 1 of the earlier questions, that is also how we keep advancing the project with good confidence.
Alright, clear. Just one final follow-up question, if I can, regarding AVTL — could you remind me of the timeline under engine legislation for when EBITDA must reach a freehold of 25% for your secondary offering?
Right, that falls inside 3 years from when it first listed. The first listing happened in '25, so that puts it around the middle of '28.
Our following question now comes from Thijs Berkelder, who is on the line from ABN AMRO ODDo BHF.
Let's return to Q&A. Oil has performed very strongly this year, and that has also driven a rising share of your proportional EBITDA mix — well above 40%. With performance now more or less at its peak, are you strategically considering taking profit on some of those oil storage facilities? And perhaps tied to that, you've benefited especially in South Africa and Europort, as you mentioned. How should we think about expected performance for South Africa and Europort in '27 compared with '26, and the contract renegotiations there? A third question: we've seen interest rates climbing quickly around the world. Is that, at this moment, also causing investment decisions to be delayed with your JV partners or with the governments you're speaking with?
Thijs, it's always nice to know the analyst community has some competition in it. That said, I also want to thank you from my end for all the great work you've put in over the years. Working with you has been a real pleasure. And of course, I wish you a wonderful retirement, and I hope you'll carry good memories of Vopak with you. Now, to your questions, Thijs, about how oil has performed — yes, that's always the question, whether this is peak performance or whether it isn't. I remember, let's say, 4 years ago, when Dick and I joined the Board of Vopak, everyone was telling us to sell off the oil assets as fast as we could, because it all looked like doom and gloom. We saw things a little differently. You could say that now, perhaps, it's peak oil that remains to be seen, I would say. We certainly keep a close watch on our portfolio. Each year, we run a major strategic exercise to really determine where we believe we can still create value, where we believe things are neutral, and where we believe no value is being created, and we'll make decisions on that basis. What you also see in — well, in a lot of the forecasts is that oil has a far longer lifetime, first of all, than anyone had expected.
The most recent forecasts still put peak oil 7 years out, and that point has essentially been anticipated for the past 2 decades already. So I won't claim there's no risk whatsoever in oil, but clearly oil still has some lifetime left in it. What we observe at well-located facilities is that they effectively shift into lower carbon fuels, which is an opportunity for us too, to redevelop those sites down the road. That's where our thinking stands. It may not give you a direct answer on whether any sale is planned, but at the moment no plan exists. As I said, we'll keep reviewing our portfolio continuously. On your second question, South Africa and Europort, what performance should we expect for '27 versus '26? Well, South Africa continues to perform strongly. So we'd still anticipate a fairly strong showing in '27 as well. There's no reason to take a more negative view of it, basically. So that's one. And for Europort, effectively the same. Looking at the contracts we have in place. Looking at the renewal risks, obviously, anything may happen.
Yet as we see it right now, things ought to come out positive. Beyond that, a handful of projects are about to come online at the Europort, and those will add to our results. So there's no near-term alarm on that front. As for interest rates, sure, they're climbing. Right now a good chunk of our debt carries a fixed rate — 80% fixed, with 20% floating. All told, our interest cost remains fairly steady. Most likely we'll need to tap the market next year with a USPP issue, partly to refinance a portion of our existing funding and partly to support the growth program. Judging by today's picture — though we'll have to watch how the next few months unfold — interest costs are indeed going to be higher. That's a fair expectation, but not to a degree that has us postponing any investment decisions, nor do we see joint venture partners putting off investment decisions over the higher rates. So for now, we'll see what unfolds across the coming 6 to 12 months. Even so, up to this point everything is business as usual.
<<operator_script>> Our following question now comes from Quirijn Mulder, who is on the line from ING.
Yes, this is me again. I don’t actually have a question to ask, but I’d like to express my thanks for the kind remarks, and also to thank the management team. I’ve followed this name for 25 years, going all the way back to when the company still included Unipar, and I’ve always enjoyed covering Vopak over the years. So it was among the nicest companies to work with, given all those connections and so on. Many thanks, and good luck to everyone.
Thanks a lot, Quijin. And keep in mind that nearly everything worthwhile originates in Rotterdam, correct? That's excellent.
It's also great that you were there at the beginning of what we might call steadily rising dividends for Vopak, since next year, if we raise our dividend — and at that point we'll be a dividend aristocrat — you'll have been present both at the start and at the finish of that. So yes, it was a pleasant journey, I hope.
All right, that’s all. Operator, let’s hold for 10 seconds, and if nothing else comes in, we’ll end the call.
No, no — that's all the questions.
Thanks a lot. Thanks, everybody. Take care.
That wraps up today’s conference call. Thanks for joining us. You’re welcome to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Koninklijke Vopak N.V. transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Koninklijke Vopak N.V. earnings transcripts and 131,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.