Good day, everyone, and welcome to the Q3FY26 earnings conference call for Lloyd’s Metals and Energy Ltd., hosted by Anand Rati Share and Stock Brokers Limited. I’d like to remind everyone that all participants’ lines will be in listen-only mode, and you’ll have a chance to ask questions once the presentation wraps up. If you require assistance at any point during this call, please signal an operator by pressing star then zero on your touchtone phone. Kindly note that this conference is being recorded. I’ll now hand the call over to Mr. Parthiv Johnsa from Anandrati Share and Stock Brokers Limited. Thank you, and over to you.
Thanks, Ikra. Good evening, everyone, and thanks for being with us today. Here at Anandrati, we're glad to host the Q3 and 9 month FY26 earnings conference call for Lloyd's Metal and Energy Limited. Joining us today from management are Mr. Rajesh Gupta Sir, our Managing Director, Mr. Riaz Sheikh, our CFO, and Mr. Chintan Mehta, our CIO. So, without any further delay, I'd like to invite Mr. Rajesh Gupta sir to get the proceedings of the call started, and after that we'll move on to the question and answer session. Thank you. And sir, the floor is yours.
Good evening, everyone, and a warm welcome to all of the participants. Thank you, Parthiv, and thank you, Anand Rathi, for hosting this call. We genuinely appreciate the interest and the time from all of our investors, analysts, and stakeholders. Let me begin with the headline figures before moving to the operative narrative, where we have reached the highest 11,000 crore rupees. We have surpassed that mark in consolidated revenue, which is a very, very significant milestone for us. And as you may have seen in the presentation, the EBITDA and the PAT match — I would like to point out that this current top line and current bottom line were our top line around two to three years back. And we hope to achieve the same in the future as well. I will make a small deviation from my usual remarks today on the fellow side and start with copper. Copper, as we know, is a new goal for the new age economy. Structurally, the world is entering a phase in which copper demand will stay strong for decades while supply will remain constrained. And this is where we believe our entry timing is right. The copper project in the DRC, Democratic Republic of Congo, in the Katanga area will mark a very important milestone in our history.
Back when we grew our operations in Gachiroli, people saw that region as tough and even impossible, and we ourselves had fallen short on execution. Since then, we've learned a great deal. Both the market and the local communities have appreciated the work we've done to develop the economy and, through that, our business. And we broadly believe that, over time, the same story will play out for Congo Katanga as well as other parts of the world. On that note, I'd also like to take a moment to recognize the head of the Congo team, Mr. Surya Narayan, who serves as the leader and director of the Congo team. Efforts like these call for not only capital but deep operational leadership, which we already have in Mr. Surya as well as other core colleagues drawn from other parts of the operations. Now let me return to the Ferris operations. Execution is continuing at a breathtaking pace. Several projects are moving forward at the same time and, most importantly, on schedule. The second pellet plant has now been commissioned, with commissioning expected in QT Q2FY27, along with the 1.2 million ton wire rod mill by Q4FY27. While running our Parrot plant, we see an opportunity to unlock talent and latent capacities, and to optimize in similar fashion for parent plant number two.
We're going to raise capacity at both of those plants by 10 million tons — up to 10 million tonnes, versus 8 million tons previously. Through these projects, our value-added mix gets better and margin stability improves. One of the most critical pillars of our cost leadership continues to be logistics. Our first pipeline, 85 kilometers, is operating smoothly, and that has prompted us to plan a second study pipeline running from Hedri to Chandrapur. The key change here is bringing in a stockyard at Chandrapur so that beneficiated material, or material moved via the pipeline route as well, can be handled there. That gives us the advantage of direct access to railways close to Chandrapur, and obviously a saving of 850 rupees on the sale material plus roughly another 250 rupees — so around 1250 rupees — for the material that will feed the pellet plant in Chandraborg. With this, we are eliminating the inefficiency of the mine, which has no rail head. You'll find the details of this plan in the presentation. Turning to operational performance, iron ore dispatches have grown meaningfully, supported by the slurry pipeline, which is performing very well. Very strong operational discipline and strong execution. At the pellet plants, we reached optimal utilization within 3, 4 months of commissioning, and we are now looking at debottlenecking them.
The DRI plants are both commissioned, and the power plants are running at optimized levels, contributing steadily despite a very difficult DRI environment. When it comes to demand, we've seen strong interest in both iron ore and pellets, domestically and internationally. The product has been very, very well received. We expect market buoyancy to persist, backed by infrastructure, steel demand, and of course the country's economic growth. Let me take a few moments to discuss the MoU with Tata Steel. We've signed a non-binding MoU with Tata for multiple collaborations to strengthen the ecosystem in the Kanchivoli area on the eastern coast, the eastern belt of India. And of course, we've also signed a shareholder agreement for the BRPL pellet plant together with the conversion agreement, which gives us steady cash flow at BRPL. To summarize, we remain very buoyant on our ferrous operations. Iron ore volumes should grow in line with the EC in Q4 as well as FY27, value addition plans continue, and FY27 will mark our formal entry into steel making. And last but not least, copper will serve as a strong growth engine over the medium term.
At this point I'll turn things over to Riyazi and Nareviji, and they'll walk you through the detailed figures.
Thanks, Rajeshi. Good evening, everyone. I want to open with a line that really speaks to us at Lloyd's Metals. Satya Nadella has said that growth isn't merely a matter of size — it comes down to mindset, learning and execution. That way of thinking fits closely with what our business is showing right now: scaling in a responsible way, making structural improvements, and delivering with discipline. With that as background, I'll walk you through the stand-alone financials and operating results for quarter three and for the nine months that ended in FY26, concentrating on the numbers, margins and CapEx. On a stand-alone basis, this quarter and this nine-month stretch have both been very strong for us. As a matter of fact, quarter 3 and the 9 months of FY26 represent our best results to date when it comes to revenue, profitability and margins. For quarter 3 FY26 stand alone, total income reached roughly 3875 crores, a rise of 129% year on year. EBITDA came to 1317 crore, which is an increase of 137% year on year. PAT was 889 crores, up 128% year on year. On a standalone basis for the 9 months of FY26, total income amounted to 8859 crores, up 59% year on year, while EBITDA reached 2994 crores, growing 74% year on year. PAT came in at 2129 crore, up 71% year on year.
On the margins side, they've stayed quite healthy and stable. The EBITDA margin for quarter three came in at approximately 34%. For the nine months, the EBITDA margin was around 33.8%, which is nearly 280 basis points greater year over year. This gain isn't a one-time thing — it's structural, and it stems from a larger proportion of value-added products, particularly pellets. There's also the advantage of the slurry pipeline, which has begun contributing to the P and L. On top of that, we're seeing improved utilization across mining, pellet, and DRI offerings. Moving to operational highlights, on the operations front, iron ore production reached 5.49 million tonnes during quarter three and 12.87 million tonnes across the nine months. FY26 dispatches were broadly in line, at 4.1 million tonnes in quarter three and 10.1 million tonnes over the nine months. EBITDA came to 1825 per tonne in quarter three and 1951 per tonne for the nine months. FY26 pellets have been a major positive this year. Pellet output was 1.14 million tonnes in quarter three and 1.95 million tonnes in the nine months. FY26 — what's encouraging is that this run rate was hit within only three to four months of commissioning. Realization during quarter three was approximately 10,289 per tonne, while EBITDA per ton was about 4,535.
Captive iron-ore slurry-based evacuation is providing support, along with solid demand. In quarter three, domestic DRI demand volumes came to roughly 0.12 million tonnes, and for the nine-month period they reached 0.29 million tonnes. The DRI expansion was commissioned in quarter three, and operations are now stabilizing. Value Added Mix: value-added products now make up a meaningful portion of our revenue mix. In the nine months of FY26, value-added products represented approximately 35% of standalone revenues. That shift in mix is key to steadier margins, lower volatility and better overall return metrics. Now, turning to the CAPEX update on a standalone basis, let me give you a quick rundown of capex. Standalone capex for 91 FY26 came in at about 4236 crores. Most of that went toward Pellet Plant 2 DRI expansion, the 1.2 million ton steel plant at Chandrapur, and the first module of the beneficiation plant. Importantly, CAPEX execution remains on track and stays within approved budgets. Moving on to the balance sheet and cash flow: even with the high level of CapEx, our balance sheet stays comfortable. Robust EBITDA generation has underpinned funding led by internal accruals and kept leverage in check. Working capital remains well managed, aided by quicker dispatch cycles and healthy demand conditions. Looking ahead, the Outlook: looking forward, iron ore volume should stay strong in quarter four FY26, and we aim to exit FY26 with 20 plus million tonnes.
Ore pellet operations will keep running at optimal utilization levels. As operations steady out, DRI's contribution is set to rise further. On the whole, we anticipate margins staying robust, backed by a value-added mix and continued logistics efficiencies. In summary, standalone performance for Quarter 3 and 9.1 FY26 has been very strong. Margins are holding up well on a structural basis. CAPEX execution stays disciplined. With that, I'll pass it over to Naridi Ji for the Triveni performance.
Thanks, Rajeshi and Riyadhji. Good evening, everyone. Trived Growth has always been about disciplined execution, consistency, and getting the fundamentals right day in and day out. Let me walk you through how Triveni performed in Q3 and across the nine months ending FY26. Financially, this has been a strong and improving stretch for Triviani. In Q3FY26, total income came in at roughly 2,200 crore, with EBITDA of about 550 crore, which works out to an EBITDA margin of nearly 25%; for the nine months, revenue was around 5,480 crores, EBITDA approximately 1080 crores, and margin about 20%. That margin improvement reflects better operating leverage, higher equipment utilization, and a continued focus on cost discipline across various projects. On the operational side, our coal mining operations keep performing exceptionally well. At PB west, we earned the highest distinction of a five star rating from the Ministry of Coal, ranking number one among more than 380 open cast mines in the country. December brought a record monthly coal production of 17.7 lakh tonnes, and the in pit crushing and conveying system commissioned earlier has already handled close to 15 lakh tonnes, significantly boosting efficiency. PB Northwest, another coal block, has also begun production and dispatches, and we expect this project to scale meaningfully over the next.
Odisha continues to be a major engine of growth for us. Capacity has been expanded at a number of mines, and we expect volumes from Odisha overall to rise close to 40% year on year. In FY27, faster statutory clearances, better infrastructure and focused execution at site are driving this ramp-up. In Garchiroli, which many of you know well, the environmental clearance has been raised to 55 million tonnes from 10 million tons, including BHQ. Beyond scale, we keep advancing sustainability-led efforts like electrification of mining equipment and LNG hybrid deployment, which help us optimize costs while cutting our carbon footprint. At jiomassur India Private Limited, we began MDO and exploration activities from January 26. This is a gold mine. This asset gives us long-term visibility, with a targeted EBITDA contribution of around 60 crores in FY27. And we see potential upside as exploration moves ahead internationally. We are rationalizing lower-margin operations in Indonesia and redeploying our equipment toward higher-return opportunities. Overall, our revenue focus stays very clear: scale responsibly, execute efficiently, and protect margins through productivity and cost optimization. The FY27 pipeline looks very strong, and we are confident of sustaining both growth and profitability.
So with that, I’ll turn things over to Mr. Pathi, who can open the floor for questions and answers. Thank you.
Thanks a lot. We're moving into the Q&A portion now. If you'd like to ask something, just hit STAR and one on your touch-tone phone. Should you want to drop out of the queue, press STAR and two — and we ask that participants use handsets when posing a question. Ladies and gentlemen, we'll take a brief pause while the queue fills up. Our first question comes from Amit Dixit at GS Financial. Go right ahead.
Yes, hello, and good evening, everyone. Thank you for the chance to speak, and congratulations on a very strong set of results. I have a couple of questions from my end. The first concerns the MOU we have signed with Tata Steel. I just wanted to get a clearer picture of the different aspects of this MOU. You did cover it in your prepared remarks, and Tata Steel also held a call where they explained a few things, but I am still wondering: in mining, when we are so strong in this region, why do we need another party? I mean, it could be Tata Steel. Of course, they are experts, no doubt about that. But what expertise are we actually seeking from Tata Steel, and is there anything that extends beyond mining, say into steel, where we might receive some kind of consultation from them? And if there is, is there any possibility of a long-term iron ore supply agreement with them? I just wanted to explore these points.
Thanks, Amit. The MoU we signed with Tata consists of two components. First, there's the BRPL SHA along with the BRPL ownership and conversion contract, and that has been executed. Second, there's future exploration of opportunities. We're currently examining two areas. The first is the eastern part of the country, where, for instance, Tata might hold some assets and we could serve as a contractor — perhaps as an MDO contractor — or where a pipeline might be needed to a particular area and we have expertise there, though that data hasn't been developed yet. Alternatively, we may own some land in Paradee that we could try to put to better use. Quite a few opportunities have been examined across the eastern belt, in the Gachiroli area. We're checking whether we can build jointly, or whether opportunities arise through the government's tendering system that would let us obtain ore at comparatively better pricing and better commercials. This wouldn't come from the existing mine — it would be for future expansions. We remain open to partnerships at all times, since that's how you develop quickly. And Tata is one of the finest companies in the country — not one of the finest; I'd call them the finest company in the country.
It’s definitely an honor to be partnered with them.
Alright. Alright, fine. The second question is basically about the copper. So I mean, the presentation does show that a few mines are tied to it as well. To start with, Congo isn't really the greatest location to operate in. And then, you know, mining. I'm aware of multiple companies that have gone under for a range of reasons. So what exactly is it that we're seeing in Congo, and are those mines already running, or at what exploration stage do they sit? You've given some figures, but those figures appear to relate more to the processing side. I just wanted to get a slightly better grasp of the backward integration piece. And if you could also state the copper grade you're anticipating there.
Our focus is on the Katanga region of the Democratic Republic of Congo. Taken on its own, this region—and the DRC as a whole—currently ranks as the world's second-biggest copper producer, behind Chile at number one. The major copper players, Glencore among them, all have their copper operations in this area. Between 60 and 80 companies, both small and large, are active there. The infrastructure and the systems are already in place to handle a great many things. Political stability in the country is considerably better, especially in this southern part of the region. It's a country and an area that runs very much on economic foundations. Not politically concerning—not zero political concern. There would, of course, be some worries, but it is very, very well sustained. As for the mining leases we hold, there are 16 or 18 of them. I'm forgetting the exact number at the moment.
18,
We have 18 leases covering more than 100 square kilometers — actually, correction, it's 16 leases spanning over 800 square kilometers. Exploration work is underway. Copper has already been encountered at promising depths. Grades of 1.5 to 2% copper are present, and 0.8% is there as well. Oxide material is also on hand, and that 10 to 12,000 tonnes figure represents the direct output of the facility we're discussing — the cathode plant, meaning the leaching and cathode plant. The ore could come from our own mines, if we've already begun stockpiling, and also from purchased mines. Ultimately, this would be an integrated operation of roughly 30,000 tons per annum, which might require 2 or 3 years to reach. We expect that financially, in the coming year, 27 will add 10,000 tons of operations, achieved with a reasonably integrated ore mix.
Thank you. If I could just fit in one more question — I wanted to ask about where things stand with the BHQ plant.
Regarding the BHQ plant, the land situation—land procurement—is under control, and the Indian engineering work is finished. The ordering has been completed. We placed orders for the equipment with the finest companies globally so that any exigencies are handled. Since this technology is new to India, we aren't, you know, taking any chances where the technology aspect is concerned. We have worked with the Chinese and now with F.L. smith as well. And we are hopeful of getting a commission around December 27th.
Alright, thank you very much.
And at that point, and yes.
All right, sir. That's excellent. Thank you very much, and best of luck.
Thanks. Ladies and gentlemen, so that management can take questions from everyone on the conference, please keep your questions to two per participant. Our next question comes from Jashindeep Singh Chaddha at Nomura. Please go ahead.
Hello. Hi. Thanks for the chance, and congratulations, sir, on a great set of numbers. My first batch of questions concerns iron ore. First, on your guidance: for 26 guidance is close to 20 to 22 million ton. If I assume you will be doing 3 million ton of pellets also, that is close to 4 and a half, 5 million ton of iron ore, 10 million tons of iron ore you have still done, which means close to 6 to 8 million tons of volumes you are forecasting for 4th quarter of FY26. Lloyd has not done for, you know, anytime you know, such volumes in one quarter. Just wanted to understand what the confidence, you know, behind giving such guidance is and what challenges the company can face in meeting those guidance. My first question is this, sir.
For this year — and specifically for January — volume is running at roughly 2.4 million tons. That's 2.5 million tonnes, which pushes us past 26 million tons in total, and we will definitely hit the 20, 21 million tonne target for the year. One thing we have to acknowledge is this: at this moment, we have to. Marketing isn't where the problem lies. Mining isn't where the problem lies either. The area we're concentrated on fixing right now is the logistics side. At present, on an annualized basis, we're moving about 4.5 billion tons of ore through the pipeline. And by April we'll be capable of doing 9 million tons — the second plant would be in place by June, the second sleep, and the pipeline would be set to accept the second plant's input. So 9 million tons would flow out of that. And at the moment we're producing — transporting by truck — roughly 70, 60% beyond the total requirement. It's a tough job. We're highly confident of reaching 21. That's why we've given confident guidance of 2222 million tons for the year. We think the quarterly guidances and directions are lesser.
For a company like ours, quarterly guidance matters less, and what really defines us is the longer arc — growth over a decade, or at minimum over 3 years. That is what we are. That is what I am concentrating on. Operational efficiencies get examined at every level, and you can see that reflected in the rise in the, in the revenue and in the margin as well — 280 basis points comes from what Riya mentioned plus a cost control system too. So all of it has been taken into account when we put the guidance together.
Okay, thank you very much for that detailed response. My next question also concerns — and I’m not sure, sir, only you would know — we’ve observed that domestic benchmark iron ore prices declined during this quarter. In that context, I just wanted to get a sense of how much the realization for Lloyds has been affected, and how much margin compression, EBITDA compression, we might see in the fourth quarter, and specifically relating to iron ore. I just wanted to understand what the CAPEX is for the slurry pipeline and — could you also, for the purposes of our analysis, could you also tell us how it compares with BTS?
Relative to the.
Company?
All right, the benchmark has dropped, and along with it the benchmark basis has fallen from 62% to 61%. So if you look right now at a benchmark price of $103, it amounts to 1 on $108, which is roughly 3, $4 above the same amount in the same period a year ago. So I'd say the benchmark hasn't really come down — it's gone up.
On the domestic side — I was referring to domestic iron ore.
Domestic iron ore. I'm not sure how you figure it has fallen. Over the past two months, some competitors have raised their prices. The auctions that came out in both of those months have been very strong. The steel benchmark is very strong. So right now I don't see any indication at all that the steel industry or the iron ore industry in India is soft at the moment. Maybe a month back, or a month and a half back, things were different. But that's just part of the cyclical nature of the business.
And third, on the slurry pipeline — you know, the skeptics, and.
My apologies for cutting in, Mr. Singh. Would you mind getting back in line for additional questions?
That's only a piece of what I asked you.
Regarding the slurry pipeline — as you may be aware, we had planned an additional 5 million tons of slurry pipeline linking our mines to the Chandrapur plant, to Google's plant in Chandrapur. What we're doing now is increasing that capacity. We'll now be taking it to a 16 million ton slurry pipeline, so that we cover the full 26 million tons of dispatches via slurry pipelines. So it will be — one is the existing one, which stands at 10 million tons. This is the second slurry pipeline, which will be a 16 million ton slurry pipeline, and it will take us further to the market as well as to our plant. And the total cost for this — we also actually have a second phase on it, the slurry pipeline that will connect to more of the markets as well as the ports. So the total cost envisaged is around 8,000 crore rupees on this particular project. But we will be doing it phase-wise. So the first phase, up to Chandrapur, will be around 2000 crore rupees.
Thank you very much, sir. I’ll hand things back to Keith.
Thanks. Everyone, we ask that each participant keep it to 2 questions. We now have a question from Pratik Singh at IIFL Capital. Your line is open.
Hi there. Thanks for the chance to ask, and congratulations on a solid set of numbers. My first question is mainly about the BHQ project. Since most of our volumes going forward will come from BHQ, how confident are we that BHQ's cost of production will stay similar to what we have now? Given that we'll need to mine more material, there will also be beneficiation cost. I understand we save a little on royalty. But do you see any risk of operating cost overruns at BHQ down the road?
Regarding BHQ — with the government’s current proposals and policies, plus what it may propose going forward, would those royalty savings cancel out the expense of processing the ore? The BHQ2 ore. And please take into account that ore grading 62, 64 would rise to 66, 67%. That commands quite a strong premium. As a result, the relationship between what the ore costs and what it sells for — or how usable it is — improves considerably. Beneficiation of BHQ, or beneficiating generally, has been embraced by the government as a highly significant element of national steel policy. We therefore anticipate substantial royalty-related backing on that front. Does that address your question?
Yeah, so let me get into a little more detail here, sir. On royalty—if our current regulations are, say, 6000, and royalty all in is, say, 20, that's 1200-odd in royalty. And even if royalty on BHQ is, say, 0, so 1200 rupees per ton of saving, plus, let's say, some premium because of
The royalty isn't zero. It'll start around 1,200 rupees and drop to roughly 200 rupees. Processing the ore takes power, and power is the largest cost. We're focused on making our power greener. Power, and other operations too. That's exactly what I meant. We're applying the best technology so the systems are extremely robust. And with uptime, plant efficiency ends up being the best.
Alright.
Also, if I sold all the ore, the premium on this product output would be about 1,400 rupees per ton. You need to factor that in as well.
Got it, sir. Got it. And the next question relates mainly to the Surrey pipeline. 85 kilometers.
My apologies for cutting in, Mr. Singh. Since there are quite a few people waiting, could you please come back on for a follow-up question?
Yeah, absolutely.
Thanks. Our next question comes from Vikas Singh at ICICI Securities. Go ahead.
I appreciate the chance to ask. First, about our copper mine—you mentioned it was an operating mine. I just wanted to get a sense of whether the existing promoters had run into any trouble when it came to producing and ramping up that mine, and whether that's why we were able to pick up a stake there. Second, on management bandwidth: we're doing a lot of things at once. So I'd like to understand the management bandwidth when it comes to running and overseeing the on-time completion of all these projects. How should we think about that?
First, regarding the current promoter: they are more heavily engaged in commercial ventures and general trading within the country. This mine came to them as an opportunistic asset. They also built the copper plant. The copper plant is set up but not operating — they lacked the bandwidth to run it. That is precisely where we step in. Mr. Prabhakaran and the former Tribeni had been examining DRC for a long time. That is how this investment opportunity reached us. There have been no issues. To repeat what I said, there are 70, 80 plants out there, Glencore and Ivano among them, and the finest company globally operating copper mines and copper operations in that region. So that is not a concern we anticipate in any very serious way when it comes to operational bandwidth. We have scaled up. Let me first give you a bit of context on the issue. We grew from roughly 500 crores to 10,000 crore rupees, or perhaps 13,000 crore rupees this year, across four years. We have demonstrated to the market, demonstrated to ourselves, demonstrated to our team — and our team has demonstrated to us — that we can handle growth in a sustainable, sensible, economical and businesslike fashion.
And we keep doing that — that's point one. Point two: with respect to Congo specifically, one of the promoter directors would be there on a full-time basis, alongside a highly, highly professional team that has been engaged in mining operations. And we've had experts on the copper side as well, and on the copper manufacturing side too — also on the technical side of the leaching process and the cathode process, which isn't very, isn't a super-technical or super-new invention, and that can be handled by the team we've made sure is already on the job at the site right as we speak. I think that — we're confident about sustaining this growth in a very sensible manner.
Understood, sir. The second question, then, relates to Triveni. And the top-line growth was.
Apologies for cutting in, since the queue is really long. Could you please come back on for a follow-up? Thanks. Our next question comes from Vedant Sarda of Nirmal Bank Securities Private Limited. Go ahead, please.
Thanks for the chance to ask, and congratulations on those strong results. My question is this: we keep hearing that the government is taking a range of steps to make sure iron ore is available — for instance, they need to bring prices for our iron ore and iron products level with international markets so that we can compete and export iron goods. So could you comment on the pricing outlook ahead and how we should think about it?
If you take a look at iron ore in India, growth stands at roughly 5,6%. Steel growth comes in at about 8,9%. Even today, on a 5-year CAGR basis, it's 5,6% for iron ore and roughly 9,10% for iron ore. So supply has kept shrinking continuously — the extra supply — and as a result, exports, whether of low grade iron ore or of pellets, have come down. So the overall gap between supply and demand is very, very favorable when it comes to iron ore supply. That's number one. Number two, looking ahead across the coming five years, roughly one third of the capacity that is premium free will head into auction over that same five-year stretch. And. And that will add to the. Not to lesser supply, but definitely to a higher cost mechanism for the industry. So we feel pretty confident about our commercial side of selling iron ore. And over time our value added business will be quite substantial. And we can therefore be well equalized across both iron ore and value added products such as pellets or steel as well going forward.
Appreciate that explanation, sir. Thanks a lot.
Thank you. Ladies and gentlemen. So that management can take questions from every participant on this conference, we ask that each of you keep to a single question. Should you wish to ask something further, please rejoin the queue. Our next question comes from Harsh Shah of Seven Rivers Holding, on the line. Please go ahead.
Hello there. Yes, good afternoon, sir. We truly appreciate the outstanding work delivered across the past 3 years. My first question concerns the MoU with Tata Steel. Since it may ultimately become a fairly wide-ranging agreement, will that in any way impact or alter our intentions regarding the integrated steel plant — the one tied to our 16,000 crore capex plan?
We're looking at our future steel plant in Gachiroli internally. It has nothing to do with Tata. Tata MOU. Any Tata MOU. Any joint setup with Tata would be for a different plant than that one.
All right, so just a quick accounting question. As of right now, what number of warrants would be outstanding today — what's the current figure for outstanding warrants? As of today.
We ought to receive roughly 900 crore rupees from that. I'll give you a lot the figure, but the amount is about 900 crore rupees of spending, which should be coming up in March. That is something between — between the 15th or 18th March. That's the last. So we should be getting.
All right. And regarding the copper side, for the 10,000 metric ton capacity that we have, what should we expect as the average realization and the EBITDA margin on that?
Okay, this is copper cathode. So right now copper is priced at roughly $11,000 — $11,500, $12,000. And typically there's a premium attached to Congo on account of the transport cost. So that's about the range. And the margins we're expecting come in at approximately 30, 30, 32%. So that produces the 570 crore rupees we're referring to for next year.
Right. And because we hold a 50% interest in this, it ties back to that. So either the MDO Partner is involved here, or the mining will be handled by another party.
Hello.
The mining would be handled by Triveni — by a subsidiary of the training operation in that area. Yes.
Alright, certainly. Thanks — and many thanks.
Thanks. Our following question comes from Hardik Ghori at Aban’s investment managers. The line is yours — go ahead.
Hi sir, and thanks for the chance to speak — congratulations on those strong results. First, about the growth outlook for our MDO business in FY27. And second, what was the IPS benefit for Q3?
Regarding IPS benefits, we've been drawing on those since the very first day of parent land production. And this year, that has come to roughly 130 crore rupees. For Trimani, the outlook is about a 40% rise in iron ore non-loyalty metal, and around 60%. A 70% increase in loyal metal, driven by the BHQ increase. 15% at NTPC. That covers both Pakharbadi mines at approximately 60 crore rupees. EBITDA. They came forward directly with the EBITDA figure anticipated for the gold mine. Not. Not
Goldberg: 0.3 million tons.
Output would be 0.3 million tons, and profitability would follow from that. We would see some volume reduction in Indonesia and at the barrack operations. Overall, top line growth would be roughly 15% to 20%, with bottom line growth of about 35%. Right.
Understood, sir. And what we expect the debt trajectory to be at the console level.
My apologies for cutting in. Kindly get back in line if you have further questions.
Okay, thank you.
Thanks. Our next question comes from Vinit Thakur at Plus 91AMC. You have the floor.
Hello, good evening, sir. Thanks for giving me the chance to ask. Sir, I’d like to find out what debt console figure should be expected for the year, and what our peak debt would be.
By 31st December? If I were to put the consolidated net debt at roughly 7,100 crores for this year, it ought not to exceed that. And FY28 is when I'd call the peak. Once we hit that peak debt, on a consolidated basis we should be sitting at about 10,500 to 10,600 crore rupees. So what we keep aiming for is one-to-one debt to EBITDA, and that's what we're working toward.
Thank you, sir.
Thanks. Our following question comes from Shubham Harne at Parta Investment Advisors, who's on the line. Go ahead, please.
Hello sir, and thanks for the chance to speak. I believe the question was about EBITDA per ton for Talents, which has gone down quarter on quarter. In the last quarter it stood at 5,000 per ton, while this quarter it's a bit lower, roughly 4,000 or thereabouts. So is there any reason for that on the DRI side?
This is among the toughest sectors out there. As another question brought up before regarding the downturn, the secondary steel market is taking the biggest hit. And when it comes to pellet prices, if that's what you're asking, they have risen.
That's not right at all.
When it comes to pellets, the pricing is based on EBITDA.
When you look at pellet prices, they have risen. So that puts pressure on spawn and pricing—that's what the numbers are showing. Right. EBITDA on DLI pricing. Basically, it was a cycle, and that cycle has now passed its peak.
In quarter two, pellet prices were roughly 11,000. We had an average realization, and in quarter three it dropped to 10,000. That's the reason margins have come down.
The price is lower since we've put more export into the mix.
Alright.
Volume's been on the rise. We've needed to bring on additional export volume. EBITDA remains really robust — and considerably more robust than the entire rest of the industry combined.
Understood, thanks very much.
Thanks. We'll take the next question from Tanmay Chaudhary at Ventura Securities. Your line is open.
Hello sir, and thanks for the chance to speak. With Lloyd’s continuing CAPEX plan pipeline in mind, could you outline the expected funding mix and cash outflows across the next two years, along with the scheduled debt repayments and the RTSP payment, and also address the fact that TMPL has not declared any dividend?
As for the debt schedule and everything else, we can provide that to you on a separate basis. I won't be able to do it right now. But yes, the capex outlay comes to roughly 14,000 crores, counting both this year and next year, and we would be at about 6. We're looking to raise around 6,000 crore rupees from debt, with the remainder coming from internal approval. So that's where things stand.
Alright, and so just one final question on PPT — we noted the realization of valid increases stemming from the geographical location. Could you shed a bit of light on that?
Could you say that again, please?
In the PPT, I'm seeing that we mention pallet realization going up due to geographic location. So could you shed some light on that?
On the geographic side — I mean, I can't really tie this directly to the PPD question, but in terms of where we sit geographically, our location lets us market effectively. We've been quite strong at marketing into the south, and into the Chandrapur area itself as well. That's why our pellet realization comes in at about 4505, and EBITDA is roughly 45005000 crore rupees per ton — a reflection of how market friendly things are, along with our costly costing and logistics cost. So I think that's where it stands. Does that answer your question, or is there something specific you were after?
No, sir — what I’m getting at is the realization.
What's actually happening is that it comes down to trade versus market, and that's the situation we find ourselves in.
The location is an advantage. Having that location is an advantage. That is the reason we outperform the competition. That is. That is the sole factor.
Alright, thanks.
Thanks. On to the next one. Appreciate it. Our following question comes from Unifi Mutual Fund's Karthik Srinivas, who's on the line. Go right ahead.
Appreciate the chance to ask. I have just one question, really at the policy level. With many mines set to come up for auction through 2030, and a sizable gap between demand and supply for iron ore and steel, could the government step in and place a ceiling on auction premiums? And is there a risk we face if the government does intervene, puts that cap on auction premiums, or alters some policies? That's on the policy side.
We think the government still has faith in the free market, and the premiums are set by the largest iron ore consumers, who are among the biggest, some of the biggest corporations in the country. So no policy change or policy announcement has come to our attention that would suggest a cap is being placed on those premiums.
Alright.
Thanks. We have a follow-up question now from Jashindeep Singh Chaddha at Nomura. Go ahead, please.
Thanks again for the chance to ask. My question concerned Trivini. I just wanted to get a clearer picture — given that quite striking result, with EBITDA having doubled from one quarter to the next — of how that EBITDA breaks down. Specifically, is the bulk of the gain coming from higher volumes out of Lloyds, or are there other significant hedges that have also driven the EBITDA improvement? And I'd like to understand how we ought to model EBITDA growth from here through FY28, if you could help us with that.
During Q3, EBITDA went up, mostly because of the situation through Q2 involving rain and various local conditions. The EBITDA stood at that level. Output came in below plan. EBITDA came in below plan. Once Q3 arrived and the rain had stopped, we returned to the strike rate we originally had, and EBITDA was back to normal, matching what we had planned. As for next year, what we're aiming at — Q4 again, Lloyds will be running at full production. This year as well, we're in Q4. We're opening one new mining lease, and next year we're picking up three, four new contracts plus extended capacity. So volumes are going to be higher. And because of that, we don't see any challenge when it comes to EBITDA.
Got it. So, just to wrap up on that point — this looks like the standard run rate for EBITDA. And as contracts and volume both rise, there should be growth from here onward. Is that the right way to understand it, sir?
Yeah.
Alright, thank you very much, sir. Thanks.
Thanks. Our following question comes from Rushav Dhruv at Uttam Investments, who is on the line. Go right ahead.
Yeah. Hello. Can you hear me okay?
Yes.
Yeah, so my question is about iron ore sales volume. We did roughly 4.1 million tons this quarter, right? So why does this PPD show 5.39 million tons as well? What accounts for that gap?
The internal transfers are part of that as well. That's just the way it was. Those are the dispatches coming from the mines.
Alright, alright. So it’s a captive operation, correct.
On sales, we posted 4.1 million, and that
It's 4.1. All right, thanks.
Thanks. Our following question comes from Pratik Singh at IIFL Capital. The line is yours.
Hello, and thanks again for the chance to speak. I just wanted to get a sense of something: when we showcased that transaction with Trivedi back in December 24, we gave a sense of EBITDA of around 3500 crores in FY27 coming from Trivedi. Is that something we still stand by and are on track for right now, or has that number shifted somewhat, either up or down?
For FY27, EBITDA revenue ought to come in at roughly 3000 crores.
Got it, got it. Thank you. That’s everything from me.
Thanks. Our next question comes from Divya Agrawal with Fincom Family office, who's on the line. Please go ahead.
Yes. Hello sir, and thank you for taking my question. I'd like to ask about the Triveni MDO business. So on the Q2 call, the target mentioned was roughly 2000 to 2200 crores for FY26. But when you look at 9 months, total EBITDA comes to about 1100 crore. So are you still holding to that earlier guidance, or would you prefer to lower it?
We’re sticking with the guidance. Yes.
You follow that guidance, sir.
Yes, we are following the guidance.
Alright, and regarding the revenue guidance too. I just wanted to ask, for FY26 and 27, what would the revenue guidance be for Thriveni,
I’ll start with FY2.
For the full fiscal year 2026 and the full fiscal year 2027, those figures are 6 and 27.
Fiscal year 2026 and fiscal year 2027.
Understood. Yes, sir.
Yeah, so for FY26 we're looking at revenue guidance of around 7,500 plus crores, and for FY27, revenue guidance of 10,000 plus.
More than 10,000 doors.
Right.
And finally, sir, what would that figure actually be?
My apologies for cutting in, Mr. Agarwal. Kindly get back in line for additional questions.
Sure, thank you.
Thanks. We’ll take the next question from the line of Partif Johnsa from Anandrati Share and Stockbrokers limited. Please go ahead.
Hello there. Thanks for the chance to speak, and I appreciate your having us host this call. My quick question returns to Trivini MDO from a few quarters ago. You provided guidance of roughly up to 28 and 29. I think sir gave an EBITDA guidance of about 30% in 27. After that, could you offer guidance for 28 and 29? Since I believe it was around 32 odd percent, give or take. Given that you plan to handle 40% higher volumes than iron ore, Non Lloyd’s, and for the other minerals too, would it be possible to share some guidance?
On 28 and 29, look, this is a contracting business. We review contracts all the time. Giving more guidance than what we've already provided would be really tough. Even the guidance Mr. Naridi just shared could end up with some upside surprises, since certain contracts may come through. Hopefully going forward.
Yes, of course. Sure. All right. Could you say that figure again — the 40% rise in iron ore and all of it? Honestly, I think I missed a few of those for next year.
The external iron ore figure, sorry—the external iron ore number—is roughly a 40% rise in FY27. For external coal, that is, the NTPC contract, it's about 15 growth. If I'm mistaken, please correct me.
Yeah.
Barrite operations would see a drop of roughly 65%. In Indonesia, the reduction would come to about 25%. On top of that, there's the gold and copper from the Kananga and Taranka area. With all of that, we arrive at the number Mr. Daraini just provided.
Excellent. That sounds great, sir. Thank you, sir.
Thank you. Ladies and gentlemen. Because of the time limit, that brings our questions to a close. At this point I'd like to pass the conference to Mr. Partif Johnsa, who will offer closing remarks. Over to you.
We appreciate everyone being on today’s conference call. Our team at Anandrati wants to express gratitude to management for providing this chance. That brings today’s conference call to an end. Thanks to all of you, and have a good day.
Thank you.
Thanks.
Thanks.
Speaking for Anand Rati Shares and Stock Brokers Limited, that brings this conference to a close. Thanks for being with us. You can disconnect your lines at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Lloyds Metals and Energy Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Lloyds Metals and Energy Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.