Good morning, everyone, and welcome to the Q3 2025 presentation from Moreld. I'm Geir Austigard, the company's CEO, and joining me later on stage is Trond Rosnes, our CFO. The third quarter of 2025 was a strong one for Moreld. It came in as we had expected. Our financial results followed the plan. Above all, we reached key milestones for the company. We keep positioning the business for bigger projects within the subsea segment, which matters greatly going forward. First, a few words about Moreld in broader terms. The company is made up of three main segments, each centered on engineering and, more specifically, on maintenance, modification, subsea installation, and high-level marine consultancy. Moreld runs an asset-light business model, meaning we have chosen not to own construction yards ourselves. We do not own the vessels either. Instead, we purchase manufacturing services and charter key vessels under long-term contracts, always paired with options that safeguard our future capacity to serve large projects and meet obligations to customers and to shareholders. Now, on to a few highlights for the quarter. Revenue in quarter three came to NOK 2.1 billion.
And for the year to date, that adds up to NOK 7.6 billion. Activity in the quarter came in as expected, with projects mainly carried out in the North Sea. During this quarter, we've been relocating our assets, or our main vessels, from West Africa up to the North Sea. At the EBITDA level, Adjusted EBITDA stands at NOK 178 million, taking year-to-date EBITDA to NOK 969 million. That leaves us NOK 31 million short of the lower band of our full-year guidance. The margin came in at 8.6%, which reflects a bigger mix of maintenance and modification work. In particular, there's been some larger pass-through within that EBITDA on goods for the MMO business. We're now ahead on EBITDA compared with last year, when it stood at NOK 947 million at this point. As I mentioned, we're now at NOK 969 million, and we're very pleased about that. Looking also at net interest-bearing debt of NOK 314 million, that's where we've sat for a couple of quarters, with interest-bearing debt EBITDA at 0.3, which pleases us a lot. I'm aware that many of you will ask about the backlog, and the backlog has been coming down.
The positive side is that a lower backlog was anticipated, since we're heavily engaged in bidding work across both of our activities — the maintenance modification with Moreld Apply and the subsea installation projects at Ocean Installer. I'll return to what that outlook looks like later in the presentation. Once more, I'd like to emphasize that this matches expectations. There are three highlights from the quarter I've picked out to go through in a bit more detail. To start with, one week ago we landed a highly significant contract award. That was the BaltA Next award. Since it arrived after quarter three, this award isn't reflected in the figures. Ocean Installer won a sizable contract with Vår Energi covering engineering as well as product deliveries. This matters. It isn't subsea installation. What it involves is product deliveries for the BaltA Next development, meaning a subsea installation portion will follow at a later stage. The award rests on the strategic partner agreement that we hold with Vår Energi. The subsea installation portion of this contract has not been booked by us as yet. It will follow a final investment decision that Vår Energi is going to make in next year.
That leaves Ocean Installer's order backlog over 60% ahead of our entry into 2026, and that is really pressing. During this quarter we rolled out a share program for the staff. Everyone here knows about it already, so it isn't much of a surprise. What I do want to flag is that 25% of all staff enrolled in it. They had just two or three weeks to make up their minds, yet we needed to move quickly on this. Beyond that, 50% of Ocean Installer's employees joined the program. I raise this because no one has a clearer view of where the company is headed than the staff. Their very heavy participation in the shares shows they truly, truly have faith in the company. I wanted to pass that along. It makes me very proud that interest in the share program has been so strong right across the group. We purchased 3.3 million shares. That is more of a technical matter in Q3, and they will serve this purpose. Turning to the dividend, the board decided yesterday to distribute NOK 0.42 per share, as previously announced.
We're guiding that it'll also be paid out in February 2026, or in the following payout. That means we're paying roughly a 10% annualized yield on dividends. Let's dive a bit deeper into the details on the various companies within the group. Ocean Installer accounts for roughly two-thirds of the EBITDA contribution to Moreld. It's been a fantastic year for Ocean Installer, where they've delivered well beyond what we expected, on both revenue and EBITDA. Because of project phasing, we knew the first half would be substantially stronger than the second half of the year for Ocean Installer. That's down to project phasing. Since we've now wrapped up two of the main projects in quarter one and quarter two, we're about to move into a new large project phase, though that won't start until quarter two next year onwards. We'll see reduced activity this quarter and the following quarter for Ocean Installer, but after that it picks up, and we have a solid order backlog moving forward past that point, from quarter two next year onwards. I'd also like to let you know that one of the vessels, a key vessel, the North Sea Giant, is scheduled for our planned and necessary or required dry dock in the early part of next year.
That’s a dry dock lasting five weeks. Naturally, that creates certain constraints both before and after the dry dock period begins, since we can’t rely on having the boat available on the very day it starts. We need buffer room on each side of those five weeks in dry dock. I want you to be mindful of that. I’m quite pleased with the backlog we’ve locked in up to now. We’re certainly seeing what looks like a record-high bidding pipeline, in the North Sea as well as internationally. I’ll return to that point shortly. Let me add a few more remarks about the BaltA Next project. Our strategic partnership involving Vår Energi and Ocean Installer and Vår Energi is a robust one. Within that partnership, we can bring projects to maturity very fast. I think if you consider the future outlook from Nick, Vår Energi’s CEO, including satellite hookups and the major activity for the company, then that alone—given that we hold a strategic partnership—provides strong security for us, or security, but a strong project outlook going forward.
Allow me to say a bit more regarding how the vessels we have at Ocean Installer are being utilized. Obviously, they are crucial to how we perform going forward. As you can see on this slide, we hold long-term charters for those vessels. Both vessels have been extended — one in February and one in October. The October extension was done ahead of when it was required. For Vision, we now have a firm period running until the start or end of 2027, and for Giant through the first quarter of 2027. Take a look at the options. That is exactly what we were seeking now. We needed visibility of a full 27 of firm charters, but we equally needed to see 28 and 29 with priced options. I think you grasp the reason. The projects we are bidding are so large and run for such a long time that we must have this in hand for us to qualify for them. When I say we are building a strong situation for the company's future, those opportunities are what I mean. We have not yet won everything there. Obviously, we do believe there is a very high likelihood for the installation work on the BaltA Next project.
We have a number of even larger projects where we're in really close discussions and submitting bids internationally. So I'm confident that what we see in the backlog for Ocean Installer will look quite different over the coming one or two quarters. Okay, let's turn to Moreld Apply. Moreld Apply is still roughly one-third of the group's EBITDA. As you know, the core business is maintenance and modification. Those contracts typically run three to six years, plus options. As everyone is aware, we're now bidding on major contracts for extending the agreements we currently hold. Those existing agreements run until the end of this year. The key agreements — maintenance, modification. We are certainly in the running for renewed and continued maintenance and modification contracts. We have strong signals that we will, and I expect we'll have at least the same contract level going forward as we do today. Of course, everyone will ask, when will this happen? Because last quarter I said we'd probably know by the end of the year. That is now slipping a bit. We can't control that. It's entirely up to two companies we're bidding to.
I do anticipate seeing awards in the next few months. I can't give you anything more precise than that. As you can appreciate, I don't have that knowledge, but awards are not far off. Let me remind you, however, that the awards related to the maintenance modifications are not for the FLX contract. The FLX contract will continue running for several more years ahead. It will proceed irrespective of how this bidding turns out. I'm fairly confident that, looking at the backlog ahead, we'll witness a very significant rise in maintenance modification contracts. Turning to Global Maritime, highly regarded marine specialists, we find that we are winning bids across several areas, particularly in the Middle East. I won't go into contract details here, but we have landed some solid contracts for the company. The outlook for next year looks very good. We've had, I'd say, a bumpy ride with the company over the last two or three quarters. We're now seeing a more stable level of activity ahead for the company. Its contribution is, of course, only 5% or 6% for the group, but it's still worth flagging to you.
Alright, I promised to return with additional specifics regarding the backlog. As I mentioned previously, we currently have a backlog worth NOK 5.7 billion. This slide illustrates how it is distributed. As you can see, the bulk of the backlog relates to 2026. Past that point, it drops off considerably. The primary explanations are that the maintenance modification backlog isn't included there, since it concludes this year. That's the area where we're now anticipating a substantial increase. The subsea contracts will likewise make a strong contribution to this picture. Keep in mind, we did note that the BaltA Next project — a contract worth between NOK 1 billion and NOK 2 billion — is a sizable one. It doesn't appear on this list, because this is the list as it stood at quarter-end. Also absent from the list is the subsea installation for the BaltA project, which we haven't booked. That will be another large contract that likewise isn't reflected there. Then, a more — or perhaps I should say, personal guesstimate on my part: I'm fairly confident that when I'm standing here at the close of quarter one next year, this backlog will have more than doubled.
Okay, Trond, let's move on to the financials.
Thanks, Geir. Morning, everyone. To repeat what Geir said as well, the quarter’s result is coming in as expected. Revenue came to NOK 2.6 billion, and Adjusted EBITDA was NOK 178 million in the quarter. Revenue is a bit lower than in earlier quarters, when subsea offshore activity was stronger. EBITDA margins fell to 8.6%, largely because of a smaller gross margin contribution with a larger share of pass-through, mostly Apply, and also because of reduced profit recognition and closeout on bigger projects in Ocean Installer. So far this year, revenue has hit NOK 7.6 billion, with Adjusted EBITDA at NOK 969 million. As we’ve said in earlier presentations too, note that the EBITDA figure we show excludes IFRS 16 adjustments, which means we’ve put all cash vessel lease cost into this cash proxy EBITDA. The leverage ratio stayed at 0.3x, as Geir also said, and net interest-bearing debt came down by roughly NOK 50 million during the quarter. Ocean Installer had a quarter that went according to plan, mainly helped by offshore campaigns in the North Sea. Revenue in the quarter was NOK 741 million, while EBITDA came to NOK 116 million.
For the year so far, Ocean Installer has brought in NOK 3.6 billion in revenue, along with NOK 736 million of EBITDA. The drop compared with Q3 of last year comes down to unusually heavy offshore work during that same quarter a year earlier. As you may recall, that was fueled by wrapping up the Marine 12 project for E&I — the fast-track job from last year — plus important milestones on other projects. In this quarter, Ocean Installer has finished the offshore portions of a number of projects successfully. Five vessels were used during the quarter. Equinor's Oskar Compression modular replacement was completed successfully in August. Equinor's Eirene tieback to Gina Krog was also finished, with two vessels deployed in the quarter for spool installation, tie-in, and pre-commissioning. Order intake for Ocean Installer in the quarter came to NOK 117 million, which left an order backlog of NOK 2.6 billion at quarter end. Ocean Installer's tender pipeline at the close of Q3 is still strong, as Geir also noted, with many tender processes set to be decided in the months ahead. To reiterate, after the quarter ended, Ocean Installer was awarded what we classify as a large contract from Vår Energi, related to the BaltA Next project.
So this scope covers the early phase engineering and product supply work that comes before the client's final investment decision. Should a final investment decision be made on BaltA Next, that project would then be reclassified as a major project, which means its value exceeds NOK 2 billion. Now turning to Moreld Apply. Apply brought in revenue of NOK 1.1 billion during the quarter. That's 21% up against the same quarter a year earlier, continuing the year-over-year growth in activity. Offshore activity stayed at a high level, fueled by busy stretches across a number of M&M and EPCI contracts. I think it's fair to say Moreld Apply also saw an overall decline in frame agreement volume within the M&M market — more the baseline M&M frame agreement volume. The EBITDA margin fell to 4.9% this quarter from 6% in Q3 last year. Across the first three quarters of 2025, the EBITDA margin came in at 6.2%, versus 7.7% during the same three quarters a year ago. The quarter's EBITDA margin decline was mainly the result of a still-high share of pass-through revenue, as I mentioned earlier. On top of that, a smaller gross margin contribution from projects stemming from project mix, plus somewhat higher risk provisions on certain of our projects.
The order backlog fell from NOK 3.5 billion down to NOK 2.7 billion. And, as Geir said, we're bidding on a number of sizable maintenance and modifications framework agreements, with awards anticipated over the coming couple of months. Clearly, renewals and new long-term frame agreement wins carry substantial potential order intake, which would add to the backlog for 2026 and beyond. Global Maritime posted a quarter of higher activity and better margins, backed by solid performance in several areas. Revenue came in at NOK 216 million, a 15% decline from Q3 last year, while EBITDA was NOK 12.5 million against NOK 25 million a year earlier. That margin drop reflects the absence of a Highwind Scotland component exchange project we carried out last year, which unusually lifted profitability in the prior year for Global Maritime. Global Maritime's contracted backlog rose modestly even with high execution levels, and two key frame agreement renewals should be finalized shortly. Further wins are expected. On the working capital side, as we've discussed in earlier quarters too, we run a capital efficient model in which working capital is negative at a normalized level. We've given the range within which we estimate the normal level will fluctuate.
Closing out Q3 2025, working capital stood negative at NOK 290 million. As we've discussed previously, the primary factor behind that negative working capital is the front-loaded milestone payments on bigger projects, and additionally the non-recourse factoring arrangement we have in place for Apply. At Q3's close, prepayments on the balance sheet totaled NOK 90 million, lower than the NOK 128 million recorded in Q2. Gross interest-bearing debt takes in the $130 million of senior secured notes issued earlier this year. It likewise takes in lease liabilities under IFRS 16. Those are essentially the vessel leases plus the two key CSVs held on long-term charters, though certain office lease liabilities are also part of this figure. Cash at quarter-end was NOK 985 million. A breakdown of net cash flow comes on my next slide. Net interest-bearing debt, excluding IFRS 16 liabilities, was NOK 314 million, as noted earlier, giving a leverage ratio of 0.3 times — unchanged from the prior quarter. Entering the quarter, cash stood at NOK 945 million.
Cash EBITDA as reported came in at NOK 174 million. Net working capital moved in our favor by NOK 35 million. CapEx was NOK 19 million, mostly tied to the ERP upgrade at Apply — moving from IFS on-prem to IFS Cloud — plus some IT improvement initiatives. Interest on the bond for six months has been paid, which accounts for the NOK 66 million. The dividend went out in August, totaling NOK 74-75 million. That leaves us with a total cash balance at quarter-end of NOK 985 million, up NOK 40 million from Q2. Total available liquidity is then close to NOK 1.2 billion once you add the NOK 200 million of untapped credit facilities. Before wrapping up my portion of the presentation, I'll briefly cover our capital allocation strategy and how we engage with our shareholder base. Our capital allocation approach is disciplined and built to generate long-term shareholder value. We put priority on returning capital to shareholders via a consistent and sustainable dividend policy. Predictability matters most. Investors know what to expect. We keep a prudent balance sheet so we have financial flexibility and resilience through cycles.
That provides us with room to put money to work when chances come up. On M&A, we stay disciplined, looking solely at possibilities that sit inside the strategic space we've defined and that plainly create value. Acquisitions have long featured in how we've grown, though we go about them carefully. We seek out complementary deals that reinforce the core business and that we can finance either from retained earnings or through a mix that includes debt. Should bigger strategic opportunities emerge that genuinely add value, we're willing to fund them with equity, yet shareholder value always comes first. Put briefly, balance defines how we allocate capital — rewarding shareholders now while readying the company for growth that lasts into tomorrow. As we keep building the company, our attention is on growing a shareholder base that backs our long-term strategy. What we want is a sound blend of shareholders — investors who grasp our business, buy into our vision, and prize long-term shareholder returns. Our target is institutional and professional investors with experience in the subsea and MMO sectors, people who value the dynamics and opportunities in our space. Such an approach supports stability in our share register and puts us alongside partners who favour measured growth over short-term gains.
In the end, having a balanced shareholder base makes our company stronger. It provides the right support for carrying out our strategy and delivering consistent value over time. With that, I’ll turn things back to Geir, who will wrap up and close out our presentation.
Thank you, Trond. Let's begin with the forward guidance. For this year first of all, we're keeping the company's guidance unchanged, at NOK 1.0 billion to NOK 1.2 billion on EBITDA. We're already very near the lower end of that band, and at this point we don't want to make any adjustment to the guidance. Our view is that this is the range where the company will land. As I mentioned, our tender pipeline is strong. That gives investors the strategic outlook Trond referred to. We expect to be able to share considerably more detail and perspective on that over the coming months. We're aware that this matters a great deal to investors. We're also aware that it matters a great deal to the company. I can assure you we haven't seen that kind of — well, maintenance and modification is a business we understand, these are contracts we understand, and there won't be major shifts there, even though Equinor is putting substantial effort right now into its 2035 strategy and so on. We know that maintenance and modification work on those facilities will have to carry on. We're well placed to keep doing that work, since we are asset light.
Changes can happen fast on our side, and we’re able to support those installations really effectively. What I find even more compelling is the bidding work Ocean Installer has underway. We’re taking the company into a higher tier of projects that now represent the opportunities. Unfortunately, I’m not able to share specifics about which customers or which projects those are. All I can say is that the bidding is at a very advanced stage, and we’re extremely forward-leaning about the company’s future, building a strong outlook for our shareholders and an even better-positioned Ocean Installer going forward. That’s the reason we describe Moreld as positioned for resilience. We now have a broader range of contract types that Ocean Installer can reach. We have a strong footprint on the Norwegian Continental Shelf. Pairing that with the international opportunities available to us, I’m quite confident — and I know for certain — that what we’re doing now and the preparations we’re making on future contracts will bring Moreld a really, really strong future. That concludes our presentation, and we now open the floor for questions.
Any questions from the audience? I can do that. Yeah.
Hi there, this is Erik Aspen Fosså.
I’ll take that question. During the previous presentation, we also noted that our plan is to maintain the dividend at a steady level for Q3 and Q4. That means NOK 0.42 per share. As we move into next year and once 2025 is behind us, we’ll need to revisit what the dividend level should be going forward. There isn’t much more we can say about that right now. For the next two quarters—this one and the following one—the intention is to keep that same dividend level.
Let me add that our policy is to keep a certain amount of cash in our accounts, but any surplus cash will be distributed. That's laid out in the company's guidelines. I want that to be very clear. We'll also be evaluating that situation as we go forward. If there is, how should I put it, an abundance of cash sitting in our accounts, then of course we'll look at what needs to be done regarding distributions. Regardless, it should follow our philosophy.
Right, just to restate what I mentioned in connection with the capital allocation policy as well: the aim is to deliver a dividend on a consistent basis over time. We see that as an important element of it.
Okay, let’s go ahead and take questions from the web portal. We’ve got a few questions sitting in the backlog. You disclosed an order backlog for 2026 of NOK 3.8 billion. That works out to roughly 40% of revenue for this year. How does that stack up against the outlook for 2025 at this same point last year?
To respond to that, I should first explain how these specialty maintenance modification contracts are structured. Typically, our key clients for maintenance modification hold agreements that last, let's say, 6 years. The way it works is that once we secure a project or a maintenance modification agreement, in the year of winning it, we record annual revenue multiplied by 6 as backlog, since that reflects the contract's length. If the figure were NOK 1 billion, we'd put NOK 6 billion into backlog. Starting in the year we win it and moving forward, we'll subtract NOK 1 billion annually until it reaches zero at contract end. That's precisely our situation right now. The largest contract we've had dates from 2016, so it's been in place for 10 years. It has steadily grown up to this point. As of now, the VEM contract is declining to nearly zero. After that, it will rise again once we renew it. That's the approach. Our customers determine the number of years for the duration, which means the backlog too. Those are the mechanics involved.
Then we expect it to jump back up again once those contracts come up for renewal in a few months.
When it comes to what's ahead for Ocean Installer, you brought up several multi-billion-dollar project opportunities. Could you give us some detail on what kind of projects those are, and where they're located — those projects?
Yeah, I think that's a fair question. As for the kinds of projects, they're SURF activities — subsea work involving the installation of new equipment on production equipment, from the wellhead all the way up to the vessels. That could include umbilicals, flexible flow lines, and activities related to those. That's essentially what it involves. You also asked about location. That starts getting into a more confidential area. What I can tell you is that the larger ones — the really big ones — are outside the North Sea.
All right. When we turn to the upcoming quarter, Ocean Installer’s revenue and profit vary quite a bit from one quarter to the next. So what should we be expecting for Q4? Is it going to keep declining, or will it head back up?
During this quarter, Ocean Installer is still carrying out jobs for us, and how long that work will last is somewhat unclear. This isn't the SURF activity. It's more, yeah, I'd describe it as smaller projects that involve various variations. It's difficult for us to state precisely where revenue will land. We won't get into specifics right now, but good activities are still underway as we speak. That is what then shapes the result. The best answer I can give you is that we are keeping the guidance at NOK 1 billion-NOK 1.2 billion. The question is where within that range we finish. That we'll have to wait and see.
One last question. Turning to 2026, is there anything you can share right now about the revenue and profit levels you're expecting at this point?
It's too soon to discuss that. I don't want to get into the specifics of 2026 during today's meeting. Perhaps Trond would like to add something.
One thing I can add is that we’ll need to revisit that point in the next presentation. That’ll take place in mid-February next year. Yeah.
One thing I want to mention, since I realize this is a really important question — naturally, I'd have asked the same thing in your position. Activity is coming in lower because one of the vessels is at dock, and that fact alone explains it. It will be unavailable for 5 weeks plus a stretch of time before this year is out, and beyond that as well, since lining up a project to land precisely when dock services wrap up isn't easy. For Ocean Installer, the first quarter will certainly be a weaker one than what we've seen previously. Some solid projects are getting underway following the first quarter. That's all I'm able to share on this for now.
To build on that point, looking at the order backlog as it stands right now, for Ocean Installer we've got roughly — or a bit more than — 60% of revenue for 2026 already covered. When it comes to Apply, the backlog, as Geir mentioned, is somewhat artificially low because of all those frame agreements currently out for tendering. Typically, for Apply, as we head into the year through the budget process, we'd usually be at 80% revenue coverage, correct? This year is a bit unusual, and it connects to, well, those major contract awards that we're expecting in the next couple of months.
Alright. Thanks, Trond and Geir. That brings the Q&A portion to a close.
All right, that's great. Many thanks for being here.
Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Moreld ASA transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Moreld ASA earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.