Moreld ASA (MORLD) Earnings Call Transcript
May 7, 2026
Earnings Call Speaker Segments
Good morning, and welcome to the first quarter 2026 presentation for Moreld. I'm Geir Austigard, CEO of the Moreld Group. Joining me today are Trond Rosnes, our CFO, and also—importantly—Kevin Murphy, who leads Ocean Installer as CEO and will take us a bit deeper into what that business is all about. Let's get straight into it. For those of you who are new as listeners or viewers, I'd like to say a few words about what Moreld is. Moreld comprises three main segments. The largest segment by EBITDA contribution is Ocean Installer, a subsea installation business that operates internationally. Moreld Apply handles projects, maintenance, and modifications. For those of you who know it well, we've added projects to their scope, since that will be the most important area for Apply going forward. It's primarily a Norwegian continental shelf company. Global Maritime is a highly international business focused on marine offshore engineering. Let's take a brief look at what Moreld has done across the past few years. As you can see, growth has been significant. What this slide shows is EBITDA growth. I'd say it's fair to describe Moreld as able to deliver a minimum of roughly NOK 600 million in EBITDA, and perhaps as much as about NOK 1.2 billion in a very strong year.
Those operations are almost completely tied to oil and gas, with only a small portion outside those sectors. Let's spend a moment on oil and gas. Given where things stand today, with the conflict in the Middle East and other events, energy and energy security are going to matter a great deal going forward, in our view. We're engaging with customers in areas where our role is to ensure, I'd say ensure, energy supply. We're making a contribution there. Especially in the North Sea, we see ourselves targeting satellite field developments. A tremendous number of satellite field hookups are coming in the years ahead. That's a space where Moreld is very well-positioned. Three months back, at our quarterly presentation, I stated that the first quarter would bring a negative result. That is what happened. Still, we will keep our guidance for this year, or our future guidance, at NOK 700 million-NOK 900 million. It's easy to see that we expect some very strong quarters over the remainder of the year. Beyond that, we also see a very strong bidding pipeline extending well past this year, and that's a good and important feature for the future of the Moreld Group.
Let's dig a bit deeper into the specifics. Revenue came in at NOK 1.4 billion, which reflects a temporary drop in activity, and EBITDA was negative at NOK 93 million. The main reason for that is the two enabling vessels for Ocean Installer have been without work. They began working at the close of quarter one, and both of those vessels carry a very strong backlog, with almost no available days remaining for the rest of the year. So we can say the outlook is very good. Interest-bearing debt remains low, and Trond will go into more detail on that. Another thing I consider very important is that the backlog is growing. It's mostly project-based, so visibility is shorter. The good news, though, is that it comes with higher margin potential. Our activities, as I mentioned, will rebound, along with margins, from this quarter. I can say that now because we have key awards. We have international expansion, and together that gives a very strong outlook. The EMOD/EPRO that we won with Equinor at the start of the year will soon see quite extensive bidding, and we definitely believe there is meaningful volume upside on those contracts that will come out.
We have landed a sizable SURF contract from Eni in the Mediterranean Sea. Global Maritime has picked up quite a few projects, and we're also expanding internationally. Brazil is clearly a key market for us down the road. That itself isn't major news. The fact that Ocean Installer has now opened an office there is genuinely news, and we believe that will serve us very well going forward and drive future growth. We're also examining other opportunities for international expansion that we'll need to revisit at a later date. I'd also like to note that our quarterly dividend has gone up. The Board has approved an increase from NOK 0.42 to NOK 0.50 per share each quarter. A few remarks on Ocean Installer — I'll keep this brief since Kevin will cover it in more detail. In my view, the work on the Eni subsea tieback award is a highly significant event for us. Kevin will say more about that, so I'll leave Ocean Installer aside for now and share a bit more on Moreld Apply. Moreld Apply performed pretty much in line with expectations, with revenue just under NOK 1 billion — NOK 9 short of it — and NOK 50 million in the first quarter.
There's a project called Eirin tie-back. This week you may have seen in the papers or in the media that Equinor brought the Eirin field on stream on a record fast track. The Moreld Group carried out that project in its entirety when it comes to subsea installation and topsides modification. The subsea installation was handled by Ocean Installer, while Moreld Apply took care of the topsides modifications. Very successful. It stands as the fastest tieback Equinor has ever executed. That's in their own words, and we view this as a fantastic opportunity going forward, then a little bit back to the energy securing. This is one example of doing satellite field hookups, tiebacks that Equinor has indicated seven to per year for the next 10 years. On that exact type of work, we see a very interesting future. I mentioned at the start that we are looking at becoming, with Apply, an MMO project-focused company. We have certainly done a few things to get there this quarter. We have adjusted our staffing, reduced staff. We have changed the way we work to make us future ready to take more project on board. We have now transformed Apply into a project type of entity rather than what it used to be, a more V&M type of entity where you were sitting waiting for orders.
We're now leaning further forward and actively pursuing orders and delivering high-quality project work. I'll return to that in more detail next quarter; I can already say the management team is in place. Separately — and this has no connection to that transition — the CEO of Moreld Apply, Karsten Gudmundset, stated quite some time ago that he wished to retire at the end of 2026, and we are also searching the market for his successor. Global Maritime. This picture shows a TetraSpar that has, of course, been generating electricity off Karmøy in western Norway. Global Maritime has secured a project to dismantle it and bring it ashore. It will cease operating, and I think that's a solid indication of Global Maritime's capabilities and of its future involvement in floating offshore wind as well. The company has a strong backlog — the strongest we've ever had. In Global Maritime too, we expect considerably stronger results going forward. I'll wrap up my part with the backlog. Our contracted backlog now stands at a decent level, and I want you to keep in mind that as we increasingly become an MMO project-oriented company, the backlogs of NOK 10 billion or NOK 15 billion we had on long-term maintenance and modification contracts will no longer be the case.
Our backlog is going to be smaller, though margins will remain very healthy, and we believe this positions us extremely well going forward. With that, I'll hand things over to you, Trond.
Thanks, Geir. I'll carry on by updating you on the financials for Q1 2026. As Geir noted as well, revenue came in at NOK 1.4 billion, while adjusted EBITDA was NOK -93 million for the quarter, in line with what we communicated in February. Those results mainly reflect a temporary drop in offshore activity and vessel utilization at Ocean Installer. A significant uptick in activity and margins is expected starting in the second quarter, with both key enabling vessels back in offshore operations, and high project activity is anticipated in the coming quarters. The leverage ratio, as you can see, has risen to 0.6x. Looking at nominal net interest-bearing debt, it stands at NOK 335 million at quarter-end, so a fairly flat development versus Q4. Over the last year, the 12-month rolling EBITDA has declined as a consequence of this negative quarter as well. We do, however, expect the leverage ratio to come down by year-end and to stay below 1x throughout 2026. In the first quarter, Ocean Installer reported revenues of NOK 270 million and EBITDA of NOK -137 million. As I said earlier, the negative result reflects a temporary stretch of low offshore activity in this quarter, which is historically the weakest quarter in the industry segment where Ocean Installer operates.
During most of Q1, the North Sea Giant — one of the company's two key enabling assets — was in dry docking and also undergoing some maintenance. A soft spot market likewise played a part in low vessel utilization, even as preparatory and onshore work stayed at a high level within the company. Even with limited offshore execution, activity levels stayed elevated, with substantial engineering, procurement, fabrication, and project preparation spanning a broad portfolio, which positions multiple parallel offshore campaigns for efficient execution as activity ramps up over the coming quarter. The outlook for the rest of 2026 is strong. With both vessels back in operation and offshore execution underway, activity levels should rise materially going forward. Moving to Moreld Apply, revenues came in at NOK 934 million for the quarter, reflecting a lower overall activity level than in previous quarters. EBITDA for the quarter reached NOK 50 million, with margins improving versus Q4 last year and climbing above 5% this quarter. Results were shaped by timing effects tied to cost elements and project progress, while better execution toward the end of this quarter underpinned the positive margin development we have seen. Operationally, the quarter was marked by continued execution of several large and technically demanding projects spanning both onshore and offshore scopes.
We stayed on track with deliveries that are critical to the schedule, and those required close attention from management because of supplier-related delays and technical clarifications. During the quarter, the Eirin tie-back project moved toward finalization, and the remaining offshore work and completion activities were closely managed to support handover and a successful startup at the end of last week, actually. As Geir also mentioned, the company has put a transition program in place in response to shifts in the project portfolio and the market outlook. Management's attention stayed on preserving critical competence and delivery capabilities while adapting capacity and the organizational setup to expected future activity levels. Global Maritime posted a negative result for the quarter, reflecting lower activity levels and revenue compared with both recent quarters and the same period last year. Revenue for the quarter came in at NOK 175 million, and EBITDA was NOK -8 million, compared with a positive result in Q1 last year. Performance was affected by delayed project startups, reduced utilization of both internal and subcontractor resources across several business streams, and lower client activities in part of the portfolio. The geopolitical situation in the Middle East also had a negative impact on Global Maritime in Q1. That was partly offset by more stable results outside the affected markets.
Geir also pointed to another key item from the quarter: the TetraSpar demonstrator decommissioning contract award, which represents a significant and strategically important marine operation project for Global Maritime over the months ahead. Moving to the balance sheet and a few remarks on net working capital. As we've discussed in earlier presentations, we run a capital-efficient model in which working capital, on a normalized basis, is negative. The primary reason working capital is negative is front-loaded milestone payments on larger projects, along with non-recourse factoring solutions. Working capital varies considerably from one quarter end to the next because of the timing of invoicing and customer prepayments. On prepayments, we had NOK 93 million of prepayments at quarter end, versus NOK 70 million at the end of Q4 last year. All in all, our working capital showed a positive development this quarter. Moving to the debt side, our gross interest-bearing debt includes $130 million of senior secured notes that we issued in February last year. It also includes lease liabilities, which are accounted for under IFRS 16. That is mainly these two key enabling assets, the two CSVs, but also some office leases that we carry on the balance sheet as a liability.
At the close of the quarter, our cash balance had fallen to NOK 933 million, compared with just under NOK 1.1 billion in Q4 of last year. Net interest-bearing debt, as I mentioned, stands at NOK 335 million, which puts the leverage ratio at roughly 0.6x. Turning to the cash flow bridge from Q4 last year through the end of Q1 this year, as noted, we entered Q4 with a cash balance of just under NOK 1.1 billion. Reported negative cash EBITDA came in at NOK 98 million, and that figure includes NOK 5 million of one-offs on top of the negative NOK 93. Net working capital moved positively by NOK 98, which ties to some overhang in accounts receivable that went unpaid in Q4 but was collected in Q1 this year. CapEx was minor at NOK 14 million, tied to the ERP upgrade in Apply. We made an interest payment covering six months on the senior secured notes, and we also paid out a dividend of NOK 75 million in February. Cash therefore stood at NOK 933 million at quarter-end, with roughly NOK 200 million of untapped credit facilities in addition. Before I wrap up my portion, on the topic of dividends — and we've discussed our balance sheet, a robust balance sheet along with cash flow generation — that makes for a good transition into dividends.
To begin, I’ll cover what we’ve delivered up to this point. Including the dividend paid in February at NOK 0.42 per share, dividends totaling NOK 300 million have been distributed across the last four quarters — equivalent to an annualized yield of roughly 10%. That speaks to how strong our cash generation is, and equally to how committed we are to returning capital to shareholders. I also want to restate something I mentioned during the Q4 presentation. During 2025, our free cash to equity conversion came in at 65%, approximately 70%. Essentially, that is the cash to equity we can produce from our cash EBITDA. This applies once working capital is normalized and non-recurring items are excluded. Looking ahead, we anticipate that cash to equity conversion landing within a 65%-70% range. If you apply that range to our EBITDA guidance of NOK 0.7 million-NOK 0.9 million, you get a sense of what free cash to equity should look like in 2026. On that basis, with support from a strong balance sheet and ongoing solid cash flow, we are raising the quarterly dividend to NOK 50 per share, with payment around May 20th.
That wraps up my portion. So with that, I'll turn things over to Kevin. That'll provide a thorough look into Ocean Installer.
Thanks, Trond, and I appreciate the chance to walk you through Ocean Installer. As for Ocean Installer, we turn 15 this year. The business started in 2011. We've come through two downturns and also experienced a couple of upturns. At this point we've established a strong base, a foundation that can scale, and today we're bidding against others on some of the biggest offshore subsea projects anywhere in the world. Over on the left side of the slide, you'll see where our market focus lies. In fact, we have worked and hold a track record across every one of these segments. The segment with the box drawn around it, SURF together with moorings, is truly where our main emphasis sits, our core business, and from it we generate most of our revenues. SURF basically means installing umbilicals, risers and flow lines, plus certain structures, all that is needed to build out from the seabed up to the surface on subsea projects. Mooring refers to the chains and anchors that large FPSO projects require. We've gained substantial experience here, especially over recent years, in Norway as well as internationally. We have worked across all the major subsea basins worldwide. On the right side of the slide, you'll find the key customers we serve.
Mostly in the North Sea, those are Equinor and Vår Energi — our steady customers who keep handing us big projects again and again. On the international side, we're doing work for companies such as Eni and Total, and those are likely the clients we see with the biggest portfolio ahead of them that matters for Ocean Installer, and they're also bringing us into various parts of the world where they'd want to see more competition. We built this company up piece by piece. We began with somewhat smaller projects. Once we delivered well there, we got invited onto bigger projects, and we built and built and built that way. With our asset strategy, which I'll return to later, we have a scalable business where we can bring in additional spot tonnage whenever we need it, when our two enabling assets are filled up, and we can also, when necessary, release assets. On geography, we began in Norway — we still keep our main office and headquarters in Stavanger, on Norway's west coast. We have sizable operational offices in Oslo and in Aberdeen. We also run a sales office in Dubai, and most recently, in Q1 of this year, we opened our Brazil office. We've hired our first staff in Brazil.
We are actively pursuing contracts, and I have strong confidence that we'll land some work in Brazil during 2026. You can see the dark-colored countries. Those represent the nations where we've operated. As you can tell, we've been across the globe in every major basin. Most of the repeat business coming our way is located in the North Sea. In the Mediterranean, there's considerable activity, and we'll be running two projects there this year. We're also seeing substantial work in West Africa, and Brazil, naturally, has long ranked among the biggest subsea basins. Up to now we haven't participated there, but we're noticing a growing number of work scopes that fit both our capabilities and our assets. Particularly among the independents, we see an appetite for introducing fresh competition to that market. Just to walk through some of the financials, here we're showing the past five years for Ocean Installer. As you can see, there's been a significant rise in both revenue and profitability for the company. If the graph extended further to the left, you'd notice yet another step up. This really got going back in 2018 and 2019, when we secured our first major greenfield project for Equinor — the Johan Castberg project.
Back then, that stood as Equinor's biggest subsea contract anywhere globally. Soon afterward came the Balder Future project for Vår Energi, their biggest project so far. It was a brownfield contract, yet it largely carried many traits you'd associate with a greenfield, since we took the FPSO sitting at one site, towed it in, cleared the entire seabed, and reinstalled that FPSO at a new site together with the full subsea architecture, much of which we delivered under an EPCI arrangement. I have a separate slide covering that later. Our top-line revenue held steady through 2023, and then you can see the step up into 2024. That really came after the breakthrough contracts in Norway, where we showed international clients we could secure those contracts and deliver them successfully. That let us get pre-qualified internationally and then land those contracts. Across 2024 and 2025, you truly see the impact of that. It comes from better utilization of our assets across the year, so not only the North Sea summer season but also the international market in Q1 and Q4.
Naturally, having bigger projects brings economies of scale. Through cooperation with our supply chain, we can bring costs down. And then especially across 2024 and 2025, utilization of both assets was really strong, since we had steady work from Q1 all the way through Q4. That is genuinely the position we want to be in. This year, Q1 has been quiet for us, and it didn't help that one vessel wasn't available because of dry dock. Given the global expansion we've undertaken, we really need to secure work during Q1 and Q4 on an international basis and pair that with the strong activity level we're seeing in the North Sea. EBITDA has gotten better over this stretch, especially during the first years. We were still carrying some legacy contracts left over from the previous downturn. By the time we reach 2024 and 2025, you can see that the Ocean Installer platform we've assembled can generate meaningful earnings sustainably. Perhaps the greatest strength of our business model is its scalability: when we spot additional opportunity and the assets we've committed to long-term charters are fully utilized, we're able to bring in spot tonnage.
I've picked three out of close to 100 projects that we've completed over the past 15 years. The one on the left is the biggest so far — well over $500 million, and that figure is Ocean Installer's share. It was a fully integrated SPS and SURF job, an EPCI with Baker Hughes in a consortium. Only a handful of companies worldwide are capable of delivering projects of this scale in an integrated way. It was Vår Energi's biggest contract ever, ran very successfully, was delivered safely, and because of that we won the alliance through which we're now carrying out more work scopes for Vår Energi. That project lasted, I believe, seven years in total. In the middle you see a rather different type of project. This one was signed and then we were offshore within six months. The whole project took under 12 years. Here we took 11 vessels from the spot market, so we used neither of the key enabling assets we had. We could competitively go out, win projects, secure vessels, tailor that with our engineered solution and give Eni down in Congo a competitive offer, executed in Q4 and Q1 — exactly the kind of project we're after going forward.
And finally, the Girassol Life Extension project, located in Angola. To date, that stands as the biggest project we have carried out in Angola. We expect to encounter additional life extension projects of this kind, especially across West Africa. In this instance, we leveraged our enabling assets located in Angola. In addition, we teamed up with Oceaneering through a consortium arrangement covering the in-country work and a substantial portion of the diving work we performed there. We also had 90 people on the top side, coordinating all of the top side operations. An extremely complex project, delivered successfully ahead of schedule, with a happy customer. Once again, delivered in Angola with zero LTIs. The work scope was very hectic as well. Returning to our asset strategy. We have maintained an asset strategy here for the past seven years now. We secured the two vessels visible on the left-hand side, Normand Vision and North Sea Giant. Those are key enabling assets, particularly because of their large deck and large crane characteristics. Each has a vertical lay tower in the middle, which is in short supply and does not trade on the spot market. These are assets that you need to control. Typically, these are the assets where one of their characteristics opens up the projects for us.
We keep those assets under our control until, yeah, basically the close of the decade, and for the Normand Vision, past that as well. The Normand Vision has been on charter with us since delivery in 2014, and we played a major role in designing that vessel. It was built specifically for Ocean Installer and the kind of work we carry out. Every year, our aim is to keep those assets busy and achieve the highest utilization possible on them. After they're filled up, we add extra tonnage through seasonal charters or project charters. Historically, in any given year, we've had 8 to 12 assets on charter over the course of that year. The two enabling assets are, of course, 365, but beyond those we can take anything from a seasonal charter down to a couple of weeks to fit project requirements. This strategy has been ours in both slower periods and busier ones, and we've managed to secure or retain the assets we need. Looking ahead, we also see that there is plenty of new equipment in what I'd call this smaller asset market — a great deal of new tonnage entering it. We're seeing as many as 30 new builds that have been announced, which will be coming into the market.
We think sticking with our approach of leveraging the spot market to secure assets for carrying out more work scopes will be beneficial. Let me briefly recap the Ocean Installer story and where things stand today. The macro picture and competitive landscape are getting better, and have been improving for the past couple of years. Activity levels are higher. The pipeline of new tenders looks very strong. On the supply side, capacity is fairly tight. Only a handful of companies globally are bidding on some of these big projects. Frequently we see tenders with merely one or two competitors, and entry barriers are relatively high, with essentially no new entrants arriving. In fact, during the 15 years Ocean Installer has operated, the count of competitors in the market has fallen quite dramatically. We further observe consolidation, or plans for it, among the Tier 1 players, and we think that will create more opportunities for an agile, nimble player such as Ocean Installer. We aren't attempting to replicate the business model of the big competitors.
Our business model is our own. In-house project management and engineering are what we aim to excel at, and we'll rely on partnerships to unlock many of the other services we need. Our international footprint keeps growing, and we're now regularly securing projects throughout Africa, the Mediterranean, and internationally. Looking ahead, we anticipate that more than 50% of our revenue will come from the international market. For us, it matters that our core home market, the North Sea, now has a favorable trend toward marginal tie-backs — that really was the core business of how Ocean Installer began. With these small tie-backs, we use flexible pipe structures and spools to unlock new reserves near existing infrastructure, which suits our business model very well. Our two assets were built specifically for projects of that kind, and we believe we can be highly competitive going forward with this new wave of marginal tie-backs. Naturally, with Ocean Installer now part of the Moreld Group, we also see a solid opportunity to provide a top side and subsea solution that no competitor currently offers. The expansion into Brazil, as I mentioned, means entering the largest subsea market.
We feel really good about what lies ahead in Brazil. We're essentially trailing the clients who've requested that we establish a presence there. It looks to us like this could become another building block within our Ocean Installer narrative. Should we secure the contracts I anticipate winning during this year, my sense is we'll remain active in that market well into the future. Regarding how we grow Ocean Installer, that strikes me as among the most thrilling aspects of this platform we've constructed — the ability to expand on top of it. Partnerships are how we open up scopes. Whether it's rigid pipe, a diving element, or some other local content we lack, we've got a track record of pursuing and executing partnership agreements and then securing scopes alongside those partners. We've had success with companies such as Baker Hughes and with Oceaneering. There's also an alliance we're part of with OneSubsea and Saipem. Our record on this is solid — combining our know-how with the know-how of other firms and landing scopes for the clients. Our continued emphasis will be on this asset-light operating model, genuinely marketing our core strengths, and locating partnerships that unlock projects. Ours is a capital-light, flexible arrangement, and we think it's both scalable and capable of tracking the cyclical character of the subsea sector.
Having said that, we feel really good about what lies ahead. We're glad to take whatever questions you may have. Yeah.
Thanks a lot, Kevin. It was really helpful to get a presentation on what actually sits within Ocean Installer. Let me finish up with a few words about the outlook. As I mentioned at the beginning, energy markets right now are genuinely seeking every kind of energy. We believe the setup we have with Ocean Installer and Apply means we're truly positioned to capture a solid share of that market as we move ahead. Sure, there's market uncertainty and geopolitical tensions, as all of you know. Yet we're quite confident that, given the capabilities within the group, we can move fast. We're small enough to pivot quickly, yet large enough to handle big projects. We see that as a very, very strong business model going forward. Naturally, the outlook is strong for the Norwegian Continental Shelf. Beyond that, I'm very pleased that we can now see an international pipeline being built again. With what Kevin just presented, this is a very strong opportunity we have at Moreld going forward. Regarding the guidance and the dividend Trond touched on, I should point out that the dividend posted is NOK 0.5 per share.
That matters. With that said, thanks for your attention—we're now opening the floor for questions.
Okay. Should we take questions from the audience first? No. Geir, could you expand a bit on the remainder of 2026? Is Q1 expected to be the trough for earnings? How do you view the coming quarters and the latter part of the year?
Of course, that's a really important question. Quarter one was definitely a low point — I can say that with 100% certainty. We're going to see more activity in the quarters ahead. And with that, of course, will come stronger earnings as well as EBITDA. With the guidance we're now putting in place, I think it's clear that we're going to close the gap left by the negative result in the first quarter, and then on top of that, we're going to add the guidance that we have. I think the guidance really is the best answer to that question.
Could you talk a bit about which projects are going to be the key ones in 2026?
Yeah. Those are projects from Ocean Installer, as Kevin mentioned. His pipeline is almost 100% full for the remainder of the year, and I'll let Kevin speak a bit about the projects we're seeing there. As for Apply, we're examining additional projects to win, but we're also carrying on with the work — most of Apply's activity this year will come from running out the old existing frame agreements, and that keeps activity at a fairly high level for the rest of the year for Apply. Kevin, you can take the Ocean Installer part.
Right. A few of the major projects we've got going this year involve Equinor. We're doing work on the Troll field — that's a Gas to Europe project. It spans multiple years. It's a full EPCI job, and we've been manufacturing quite a bit of equipment for it. We're right in the crux year now. All that equipment is being installed at present. We're offshore as we speak. Things are progressing well, and I think there's a strong focus from both Equinor and the EU on getting that Gas to Europe. Beyond that, Balder VI is underway for Vår Energi. That's the first of the alliance projects for us. We're offshore now. Again, it's EPCI. We're delivering flexibles and umbilicals. What we've started so far is running ahead of schedule, with strong focus from Vår Energi. This is a fast turnaround project for Vår Energi. I'd say it's cutting edge when it comes to the speed at which it's happening, and we're really pleased to be part of that one. We mentioned the Eni project that will take place in the Mediterranean — these are the kinds of projects we like to have during the winter season. We're starting that offshore in Q3, and it will run all the way into Q1.
We’ve also got another project in Egypt, and that one will run into the winter months of Q4. That’s the selection.
Thanks. Appreciate it. Now let's shift our focus to how the market looks ahead. What's your read on how the current rise in oil prices is playing out? And going forward, are you anticipating any pickup in CapEx from the E&Ps?
We definitely observe encouraging momentum in activity and in bidding, and I think that is about as close as we can get to answering that question. When we notice more projects available to bid on and a robust bidding pipeline, that is something we clearly see. Without question, the oil and gas companies, or operators, are searching very intently right now for projects that can be carried out relatively quickly. Satellite field hookups, for instance, are becoming larger and larger. In addition, bigger projects that have sat on the shelf for some time are now beginning to be examined and matured, though that is on a somewhat longer horizon. We are unquestionably witnessing a positive upturn in activities ahead for oil and gas.
Thank you. One last question for Trond about the dividend. Even with a negative result for the quarter, the dividend went up. How do you view the company's ability to sustain the dividend at its present level, and could there be further room to raise it?
If you look back at what I said regarding how well we convert EBITDA into cash, I mentioned that we delivered 70% free cash to equity in 2025, and now for 2026 we're aiming at roughly 65%-70%. We can essentially apply that same figure to the EBITDA itself. Doing so, there may be some potential down the road to raise it even above where it currently stands. At the level we're at now, we're comfortable taking it up to NOK 0.50 per share.
Thanks. That being the case, we can bring the Q&A session to a close.
Thanks.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Moreld ASA transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Moreld ASA earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,