Glad you could join us for MPLX's earnings webcast covering the second quarter of 2026. You'll find the deck that goes along with this presentation posted on our site, mplx.com, beneath the Investors section. Here with me today are Maryann Mannen, who serves as President and Chief Executive Officer; Kris Hagedorn, our Chief Financial Officer; plus additional executives from our leadership group. Please take a moment to review the safe harbor language shown on Slide 2. Today's remarks will include forward-looking statements. What actually happens could turn out differently. The things that might lead to a different outcome appear in that disclosure, and they also show up in the documents we submit to the SEC. Having said all that, let me hand things over to Maryann.

Maryann Mannen executive
#2

Appreciate it, Brian. Morning everyone, and thanks for being on the call with us. The results we posted for the second quarter show we're steadily delivering on our strategic priorities. MPLX generated $1.8 billion in adjusted EBITDA during the second quarter, which is up 5% compared with the same period a year ago, and that more than offsets the sale of the Rockies assets late in 2025. That performance made possible a distribution of more than $1.1 billion back to our unitholders. 2026 is likewise a year focused on execution; we keep moving forward high-return projects throughout our integrated natural gas and NGL value chains. Because of how these projects are sequenced as they come online, we have confidence that EBITDA will rise meaningfully in the back half of 2026 and into next year. Out in the Delaware Basin, the Secretariat I processing plant started service in April, and we finished the quarter with 86% utilization across our Delaware Basin processing system, which shows both solid demand from producers and the operational excellence of our teams. Then in August, the Harmon Creek III processing plant kicks off operations, consistent with our approach of bringing on processing capacity on a just-in-time basis. That lifts our overall processing capacity to 8.1 billion cubic feet per day and our deethanization capacity above 800,000 barrels per day; together with the related gathering and compression expansions, this plant strengthens our ability to serve producers in liquids-rich areas and underpins long-term throughput growth. While we grow MPLX's core value chains, we're equally focused on getting the most out of assets we already have and on running operations better; up in the Northeast, 96% Marcellus processing utilization during the quarter drove record volumes throughout our system, and robust production activity in the Utica underpinned 73% processing utilization. Over in the Permian, sour gas treating volumes came in above 150 million cubic feet per day for a second straight quarter as we keep fine-tuning operations at our Titan treating facility. With throughputs climbing across our gathering and processing assets and more projects coming into service during the back half of the year, MPLX stays positioned to deliver adjusted EBITDA growth in the mid-single digits. The fundamentals for natural gas and NGLs are still strong. That creates attractive opportunities to serve rising worldwide demand for U.S. energy. When it comes to deploying capital, we stay disciplined. There has to be a strong strategic fit, durable demand and compelling returns. MPLX is putting over 90% of its organic growth capital toward opportunities that address growing natural gas and NGL infrastructure needs, drawing on our advantaged value chains. MPLX is raising its 2026 capital spending outlook by $500 million, to $2.9 billion. That increase mainly reflects faster execution of our ongoing Gulf Coast fractionation project, pulling forward capital we had previously expected to deploy in early '27. In July, the Blackcomb natural gas pipeline started commissioning activities. The JV partners keep advancing the pipeline as planned, with Blackcomb expected to reach full commercial service in the fourth quarter. Within our NGL value chain, the expansion of our BANGL Pipeline to 300,000 barrels per day is likewise expected online in the fourth quarter, supplying critical takeaway capacity as in-basin NGL volumes grow. In the Delaware Basin within the Permian, where producer interest remains robust, our people are focused on finishing the build-out of our sour gas treating capacity so it exceeds 400 million cubic feet per day. This strategic growth platform's expansion is still slated to begin service at the close of the fourth quarter, and we expect volumes to rise rapidly, which underpins our run rate expectations for 2027; as several investments move from construction into operation during this year, we remain on track to achieve mid-single-digit adjusted EBITDA growth in 2026. Although the increase from '25 to '26 on a year-over-year basis is weighted more toward the back half, it also sets up MPLX for robust adjusted EBITDA growth in 2027. Given geopolitical uncertainty, the strategic value of U.S. energy infrastructure is unmistakable. Demand for secure, reliable energy keeps expanding both at home and abroad. On top of that, international customers increasingly look to the United States as their supplier of choice. MPLX is positioned well to meet our customers' needs in this expanding market. Work on our Gulf Coast fractionation and export facilities keeps moving forward according to schedule. We anticipate the initial 150,000 barrel per day fractionator, the 400,000 barrel per day JV LPG export terminal and the related purity pipeline will be in service in 2028, with the second 150,000 barrel per day fractionation following in 2029. Our assurance regarding the volumes and utilization of our assets strengthens our expectation for durable cash flows that will underpin MPLX's ongoing growth. This puts MPLX in a position to keep reinvesting in the business while also supporting the annual distribution increases to unitholders. Now I'll hand the call over to Chris to cover our operational and financial results for the quarter.

Carl Hagedorn executive
#3

Thanks, Maryann. On Slide 8, you'll see the highlights for the second quarter covering operations and finances in our Crude Oil and Products Logistics segment. Adjusted EBITDA for the segment came in $23 million higher than the second quarter of 2025. What drove that? Mostly stronger rates throughout the business units, plus more butane blending, though those gains were partly offset by reduced crude pipeline throughputs stemming from planned turnaround work at MPC and the usual seasonal pattern of scheduled maintenance and project spending, which pushed operating expenses upward. Over the last few years, MPLX has been making deliberate investments in butane blending systems across the terminal and pipeline network. Thanks to those investments, MPLX could blend more butane volumes and capitalize on robust commodity prices during the quarter, which delivered more than $20 million in added benefit relative to the prior year. Pipeline volumes rose 4% year-over-year, largely because of Marathon's planned refining turnaround activities in the Mid-Con region. Turning to Slide 9. Adjusted EBITDA for the segment was up $62 million versus the second quarter of 2025. That gain came mostly from higher volumes, including growth from equity affiliates and acquisitions, though it was partly offset by the 2025 divestiture of our Rockies assets. If you set aside the Rockies divestiture, segment adjusted EBITDA rose $99 million year-over-year. Gathering volumes climbed 15% year-over-year, driven mainly by production growth in the Utica, Permian and Marcellus basins. Processing volumes were 5% higher year-over-year, primarily on increased production in the Marcellus and Permian basins. Marcellus processing utilization reached 96% for the quarter, which shows why we need incremental capacity as Harmon Creek III starts operations in August. Total fractionation volumes grew 8% year-over-year, mostly from higher production in the Marcellus. With Secretariat 1 starting up in April, volumes on the BANGL NGL pipeline rose to more than 200,000 barrels per day in the second quarter, which illustrates the strategic value of our integrated wellhead-to-water strategy. Sour gas treating volumes in the second quarter topped 150 million cubic feet per day as we keep optimizing operations at our Titan treating facility and work to expand its capacity so it can handle over 400 million cubic feet per day by the end of the fourth quarter. We're moving ahead with construction of a natural gas pipeline connection that will let sweet gas from our Titan facility feed into the Secretariat I processing plant. That underscores the value of the Delaware Basin system we acquired recently. Along with a rising rig count in the U.S., MPLX is strategically positioned to support more drilling activity by producer customers; in the Permian Basin, current producer customers recently leased undeveloped acreage in Lea and Eddy Counties in New Mexico. About 40% of that acreage has volumes dedicated to our sour gas treating system, which highlights the geographic advantage of the Titan complex within the Delaware Basin, excuse me. On top of that, the state of Ohio recently awarded leases for undeveloped acreage in Belmont County. About 50% of this acreage is committed to MPLX as well, and we expect that more output within the Utica's wet gas window is going to drive better usage of our gathering and processing infrastructure there, requiring only modest capital spending. On top of that, rising Utica volumes have backed the investments and expansions MPLX has recently made in its pipeline and Ohio River terminals, which exist to meet growing demand across the region. That leaves MPLX in a position to keep putting money back into the business while also sustaining yearly distribution growth for unitholders. At this point, I'll turn things over to Maryann for a few closing remarks.

Maryann Mannen executive
#4

Appreciate that, Kris. Steady, durable expansion is coming out of our base operations, and the approach we've been carrying out for a number of years now has put MPLX in position to keep producing solid outcomes. By deploying capital in a disciplined way and optimizing our integrated value chains, we've lifted adjusted EBITDA and distributable cash flow while sustaining an attractive return profile; our long-term strategy is being carried out consistently and with discipline. <> A sturdy financial base. Thanks to this execution record, we've been able to raise our quarterly distribution by 12.5% in each of the past 2 years. We expect to lift our distribution by that same rate once more in 2026 and in 2027. Continued distribution growth is what we foresee, backed by durable cash flows, a strong balance sheet and visible growth. As we deliver on our strategic organic growth priorities, we'll keep assessing inorganic opportunities whenever they come up, so we can further extend our strategic value chains and expand cash flows. Supported by optimization of our value chains and throughput ramp across new assets placed into service such as Secretariat I, Harmon Creek III and our sour gas treating operations, MPLX stays on track to produce sequential growth across the year, building to mid-single-digit adjusted EBITDA growth in 2026; I'll now hand the call over to Brian.

Executive executive
#5

Appreciate that, Maryann. We're going to begin taking your questions now, and out of consideration for everyone on the line, please keep it to 1 question plus 1 follow-up. Should there be time, we'll be quick to take more questions. At this point, we'll turn the call over to your questions.

John Mackay analyst
#6

I want to talk about the way growth is distributed over the course of this year. I appreciate the specifics on the back-half project ramp, and also the comments regarding mid-single-digit EBITDA growth for the full year. What I'm picking up is that your prior guidance for this year was a bit higher than the '25 growth rate. So I'd like to know if you could take us through some of the pluses and minuses for the entire year, and how we should think about bridging to our exit rate as we move into Q4 of this year.

Maryann Mannen executive
#7

<<inaudible>> BANGL at 250, and by year-end that figure reaches 300. During Q3, Harmon Creek III — the project I mentioned before — began operations right as August got underway. So throughout Q3 and continuing into Q4, we'll be bringing it up to full capacity. Bay Runner is another one: that involves supplying 2.6 Bcf of natural gas to LNG facilities located in Brownsville. Then when Q4 arrives, Blackcomb comes into play. I raised that point in my remarks, and you've already talked about it. Then there's the Titan facility ramp-up — that's sour gas from the Delaware Basin — coming back in Q3 and again in Q4, when we get past 400 of processing capacity. So year over year, just to say it again, John, that's what gives us confidence that growth in '26 will be higher than in '25. And honestly, when we think about the sequence, Q3 ought to be better than Q2, and Q4 ought to be better than Q3 too. So we're definitely not trying to say anything different from what we've said before. If somehow we did, I apologize for it, but we still see that growth the way we've laid it out. Allow me to check whether that covers what you were asking, John.

John Mackay analyst
#8

Thanks for taking us through all of that. For my follow-up, I want to dig into the fresh information regarding when the frac is scheduled and the acceleration of CapEx. You both touched on this somewhat, but could you perhaps take us through what the updated timeline looks like for those fracs, plus how we ought to view their start-up in relation to the export dock, and what has shifted versus what was said before?

Maryann Mannen executive
#9

Sure, absolutely. The project is still within its budget — that's the key point. What we're really doing is moving spend that we had already kicked off, or had planned, sorry, for 2027, and shifting it into the latter portion of 2026. That raises our confidence further that we'll finish on schedule, and naturally it opens up the possibility of finishing early, though at a minimum it strengthens our belief that the frac and the dock will be done on time. Our expectation is that the frac and the dock begin operations simultaneously, though one thing is certain — we wouldn't bring the frac into service before the dock. So we feel quite good about when this project will land, and we're certain that every one of our assets, as we've consistently said, is full, which makes us happy. Shawn visited the site only a few weeks back; so I figured I'd let Shawn share a bit of perspective on how things are moving along there from a construction standpoint.

Shawn Lyon executive
#10

John, it's Shawn here. Like Maryann mentioned, I was actually able to be on-site only a few weeks back. While I was standing in that spot, watching the 60,000-barrel spheres go up along with the 600,000 refrigerated tanks for the terminal under construction, it truly drove home precisely what Maryann stated — our assurance that we will be operational in early 2028. Beyond that, let me add one more thing: the safety standards being demonstrated by the whole team and the contractors at the location are plainly evident, and I feel a great deal of pride in the team for keeping that as the top priority.

Maryann Mannen executive
#11

That covers what you asked...

Manav Gupta analyst
#12

I want a bit more detail on the ramp and the completion over at Titan, plus how the broader Permian gas picture is progressing now that these new pipelines are coming online. Should Waha stay in positive territory, you might see additional NGLs flowing out of the Permian, and additional gas too. And if you could, in that way, point to your exposure to the whole Permian gas situation, particularly the Titan project.

Maryann Mannen executive
#13

Sure, and I appreciate the question; so I'll begin, and then I'll hand it over to Greg so he can provide a bit more color on the real progress and specifics regarding Titan, and after that Dave can share some additional insights on how we're viewing egress from the Permian. Hopefully you've picked up that we keep running the Delaware Basin Delaware Basin sour gas processing system effectively, a second quarter in a row in which we topped 150 a day, and we're still optimizing around that, clearly pursuing cost reductions. This was always meant to serve as a significant platform for growth for us, and we keep seeing that. And as you're aware, you may have picked up, we had several producer customers showing interest in the platform, and that clearly creates opportunities for us to boost utilization. So we're pleased with how it's performing now. In the back half of the year, as I said earlier, we'll see those volumes escalate. And let me hand it over to Greg, and he can offer you some added color on how that's running.

Greg Floerke executive
#14

Appreciate that, Maryann. Manav, I’ll add some context on the Titan 2 expansion and the projects tied to it, and how everything fits together. Like Mary Anne said, we keep running at a volume that’s close to what we can handle. So our attention is on making things more reliable, clearly on safety as well, plus the costs of operating and how efficiently we run the system. When it comes to Titan 2, tied to Titan 2 and the real increase in amine treating capacity, we’re additionally putting in roughly 100 miles of pipeline and several compression station expansions so we have the hydraulic capacity needed to fill the plant. And we’re also constructing a pipeline that runs from Titan down to our Secretariat plant so we can deliver sweet gas, as Maryann said before. That means we have a few different connections, among them the line to Secretariat into our existing legacy systems. So we really are bringing the systems together. And a major advantage from this will be using sweet gas to help fill our processing plants, which in turn helps fill our BANGL NGL system. Those projects remain on schedule and on budget for fourth quarter delivery, including the new Titan expansion.

David Heppner executive
#15

Manav, Dave here. Let me address the final question you raised, which is whether we think the Permian needs additional takeaway capacity when it comes to natural gas. The brief response is yes — that's our belief. It's common knowledge that demand for U.S. natural gas remains quite robust, driven not just by LNG but equally by the requirements of data centers. In the Permian specifically, looking at just June and July, growth of more than 1 Bcf per day has pushed gas volumes there to almost 25 Bcf per day. By 2030, projections show that rising to 35 Bcf per day. That outlook tells us constraints on incremental takeaway capacity are expected down the road. As you're aware, we've taken an active role across many long-haul pipelines running out of the Permian — Whistler, Matterhorn, Blackcomb, and Eiger — delivering in excess of 11 Bcf per day of takeaway capacity. Even accounting for that, plus Blackcomb and Eiger entering service — Eiger in the fourth quarter of this year, Blackcomb in the second half of 2028 — our view is that more takeaway capacity will still be required. So going forward, I expect you'll keep seeing us assess, take part in, and commit capital toward additional industry solutions that deliver that long-haul takeaway capacity from the Permian to the U.S. Gulf Coast. Hopefully, there's more to come.

Maryann Mannen executive
#16

I hope that addresses your question, Manav.

Manav Gupta analyst
#17

Sure thing. Could you give us a brief status report on Bay Runner Pipeline as well as the Bay Runner Twin pipeline — just wondering whether anything new has come up regarding those 2 projects.

Maryann Mannen executive
#18

Manav, we missed the beginning of what you said. Would you mind posing your question once more? The latter portion came through, but could you say it again?

Manav Gupta analyst
#19

On the Bay Runner pipeline, along with the Bay Runner Twin pipeline — is there anything new to share about those 2 projects?

Maryann Mannen executive
#20

Of course.

David Heppner executive
#21

Yeah, Manav, Dave here once more. As we made public not long ago, both of those projects are actually backing our NextDecade LNG facility, since they keep announcing their initial 3 trains plus the ones that follow. Together with our partners, we've been carrying out our own projects to deliver capital right when it's needed, so that when those trains start up, the gas can be supplied to them. That covers Bay Runner and, more recently, the announced Bay Runner 2, which comes from converting Rio Bravo. And like we do across every project — this is somewhat what Shawn mentioned before — we're constantly seeking the most efficient paths for capital and for schedule. That switch from Rio Bravo over to Bay Runner Twin lets us operate in the very same location and simply be more effective and more efficient, and we'll start it up right on time, exactly as we did with Bay Runner, to serve NextDecade LNG's growing capacity.

Jeremy Tonet analyst
#22

This is Francina, filling in for Jeremy. I wanted to explore a little further the inorganic opportunity set you touched on at the end of the prepared remarks. Could you describe what opportunities are currently in front of you? And regarding the strategy itself, would you call it more bolt-ons, or a refreshed approach for MPLX through M&A?

Maryann Mannen executive
#23

Yes, absolutely. When we consider inorganic opportunities, they have to align with our strategic intent. You've heard us discuss wellhead to water. Dave just gave you our perspective on Permian egress. Our wellhead-to-water strategy remains a very strong platform for growth and opportunities over the longer term, especially when you consider the demand pool. I brought up nat gas and NGL and, honestly, the need for reliable, secure energy and the U.S. pool. That's an area where we continue to lean in. Beyond that, it must clear our hurdles, must be capable of delivering our mid-teens returns, and also must ensure we can deliver mid-single-digit growth year-on-year. So we're evaluating those opportunities. And then our JV partners, and so on, as you've seen us take on Transaction BANGL would be a good example as we increased our ownership assets we know and that fit very deeply into our long-term strategy. So hopefully, that answers your question helpfully as we think about where we would be leaning in strategic fit, nat gas NGL, our wellhead-to-water growth strategy — those are the places where we would be executing.

Analyst analyst
#24

That's quite useful. Then, if we dig a little further into the capital allocation priorities, considering the fairly strong pipeline of projects scheduled to come online in '26 and '27, along with that 12.5% distribution increase still in place, how might those priorities shift over the longer term as we move past '26 and into '27?

Carl Hagedorn executive
#25

Thanks, Francina. What I'd say is that our capital allocation priorities haven't changed. When we consider how we deploy capital, the first and most important thing is keeping up — keeping up our assets and our current EBITDA level. After that, it goes toward distribution growth, correct? We've consistently communicated that 12.5% we expect in both '26 and '27. Then comes growth. That growth may take the shape of organic projects, including some of the major ones we just discussed, plus ongoing assessment of inorganic opportunities present in the basin. So I hope that answers your question. But truly, what I'd leave you with is that our capital allocation priorities haven't changed.

Burke Sansiviero analyst
#26

Do you still aim for a minimum of 1.3x coverage alongside the distribution growth plans for 2026 and '27? Also, could organic growth alone satisfy that? Or does getting there demand M&A?

Carl Hagedorn executive
#27

Yes. Thanks. What I'd say is absolutely, our 1.3 coverage ratio remains the target for '26 and '27 and honestly, past that. What I'd say is that when it comes to capital, we think our existing organic plan provides confidence — we're confident about sustaining that 1.3 coverage. We've discussed this a few times already during this call. It's the growth in the second half that will give us confidence in 1.26. And then honestly, as we enter 2027, we'll have the platform to grow even more. So hopefully, that answers you. Maryann, you may have something else.

Maryann Mannen executive
#28

Yeah, Burke, I'd say Chris handled that nicely. Perhaps just to restate it: when we consider 2027 right now, sitting here with everything involved, as Chris pointed out, if you look at the projects that are coming online — ones where we deployed capital during the third quarter and the fourth quarter — several of those keep ramping up into 2027 too. As we sit here today, we believe the growth for 2027 is essentially already secured, so to speak, across all those projects. That said, it doesn't mean we won't — that we'll quit searching. We'll keep assessing inorganic opportunities; however, the 1.3 coverage target stays our aim; for 2027, we aren't depending on inorganic M&A to reach it. We'll keep hunting for it, but we don't require it to hit 2027. Hopefully that clarifies things.

Burke Sansiviero analyst
#29

Historically, the company has said it favors the existing MPC and MPLX setup, and it has pushed back on the notion of MPC acquiring MPLX somewhere down the line. Yet thanks to the supportive refining environment, MPC's shares have gained considerably more than MPLX so far this year. That shift in relative performance has been fairly substantial. So I simply wanted to ask whether the way the 2 complexes have performed against each other has influenced your view of the affiliate connection, in terms of a roll-up, intercompany dealings, or affiliate backing.

Maryann Mannen executive
#30

Yes. No, thanks for raising that; and naturally, we're quite pleased to observe that MPC and MPLX both keep carrying out strategic priorities and optimizing and performing the way we've described — we anticipate our results. Regarding how MPC and MPLX relate to one another — we see no cause to alter that connection. At present, a great deal of value is being generated. When you consider MPLX's growth compared with a year earlier and our capacity to keep increasing that distribution for our unitholders, it delivers solid cash flow back to MPC. And in our view, that connection generates value for both the MPLX unitholder and the MPC shareholders. So that matters. Those 2 companies share a significant and strategic relationship. Thus we see no cause to alter it at present. I hope that's useful.

Executive executive
#31

All right. So, we appreciate you taking an interest in MPLX. If additional questions come up, or if you'd like anything from this morning's discussion explained further, feel free to reach out, and our team will be ready to take your calls. Thanks for being with us today.

Operator operator
#32

Thank you for your participation. Participants, you may disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete MPLX LP transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to MPLX LP earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.