Good morning, and thanks for joining Northland Power's call covering the fourth quarter and full-year 2025 results. I'll note that this session is being recorded today, Thursday, February 26, 2026, at 10:00 AM Eastern. With us are Christine Healy, our President and CEO, Jeff Hart, our Chief Financial Officer, and Adam Beaumont, Senior Vice President of Capital Markets. Ahead of starting, Northland's management asked that I remind everyone that every figure discussed on today's call is stated in Canadian dollars, and to warn that some information we present, along with answers to questions, may include forward-looking statements containing assumptions and carrying various risks. Actual outcomes could differ materially from what management expects or forecasts. I'd encourage you to review the forward-looking statements section in yesterday's news release announcing Northland Power's results, and to let its contents guide any investment decisions or recommendations. That release can be found at www.northlandpower.com. I'll now hand things over to Ms. Christine Healy. Please go ahead.
Good morning, everyone, and thank you for being with us. I'd like to start by covering our strategic priorities and giving you an update on the two big construction projects we have underway. After that, Jeff will walk through the fourth quarter and full year financial results, along with our 2026 guidance. Once our prepared remarks are done, we'll open the line for your questions. During 2025, we moved forward on our operational, financial, and organizational priorities. We grew and strengthened the leadership team by bringing in new executive members. We rolled out a new global strategy that lays out our growth priorities, a five-year funding plan, and the way we'll create long-term value for shareholders. We pushed our construction projects ahead, hitting key milestones at our two offshore wind projects, Hai Long in Taiwan and Baltic Power in Poland. After Oneida wrapped up successfully last year, we're now moving forward with our second battery storage project in Alberta, Canada, which is called Jurassic BESS. Getting these projects executed is our main focus through 2026, and combined they will add 2.2 gigawatts of capacity by 2027. We met our financial commitments, hitting our adjusted EBITDA guidance and beating on free cash flow per share. Our fourth quarter performance was helped by 96% operating availability and record high generation from our German offshore wind assets.
Before we get to strategy, I'd like to pause and stress that everything we achieve rests on how we treat our people. Health and safety, as I've said in the past, sit at the heart of Northland's values. During 2025 we strengthened that commitment by introducing our 12 Golden Safety Rules. Those rules cannot be compromised, and they make sure our standards are understood, respected, and applied the same way in every work setting. Having a safe workplace comes first—it's what makes our work possible. From there, we're pushing forward with a strategy centered on growing in a disciplined way and creating value over the long term. Electricity markets are at a turning point. Demand for power stayed flat for decades, and now we're moving into a stretch where it keeps climbing—something some refer to as a power supercycle. Electrification, industrial growth, population growth, urbanization, and growing AI demand are all driving it. As power generators, we intend to seize that momentum, and our strategy calls for doubling gross operating capacity to 7 gigawatts by 2030. That's about more than size—it's about staying focused and identifying the right high-quality projects that bring genuine value to our business. Hitting specific free cash flow targets by 2030 is more to us than just a goal.
This is the standard we apply to each capital allocation choice we make. To reinforce our 2030 objectives, we are concentrating on three pillars: deliver, strengthen, and grow. Under the deliver pillar of our strategy, the emphasis is on operational performance and on successfully moving 2.2 gigawatts of projects now under construction into operation. A history of executing and delivering large-scale projects is among the things that distinguishes Northland. The strengthen pillar concerns creating a foundation for scale, which includes our goal of $50 million in annual cost savings by 2028. In support of that, we have already moved to a regionally focused operating model divided into the Americas and International business units, built to create scalable platforms in our core markets and to capture operational leverage by clustering assets within those core markets. This structure simplifies how we operate, strengthens local accountability, and preserves global standards. At the same time, we have consolidated all of our development activities into a single global organization. That guarantees every project, whatever the technology or geography, competes for capital on a consistent basis, and only the most value-accretive projects move forward. Lastly, beneath the grow pillar, we keep high-grading our pipeline, advancing new capacity to supplement our current construction.
Take the two late-stage battery storage projects we acquired in Poland not long ago as one illustration. Together with Baltic Power, that deal shows how we cluster high-value assets within a core European market. We stay technology-agnostic in our approach, concentrating on our core markets, where the fundamentals are strongest. An ongoing and growing requirement for energy security is what shapes our European plans. At the North Sea Summit in January, which I attended recently, nine European governments restated their commitment to grow offshore wind in the North Sea via a coordinated regional approach — encompassing as much as 100 gigawatts of projects by 2050, alongside an interim target of 20 gigawatts for the 2030s. What came out of that North Sea Summit reflects a theme we observe consistently throughout Europe: a commitment to renewables build-out for decades ahead — offshore, onshore, and battery storage. For developers such as Northland, this delivers meaningful long-term demand visibility. Stronger policy alignment and infrastructure coordination ought to help cut development friction, speed up permitting timelines, bolster supply chain improvements, and in the end lift capital efficiency. Europe keeps demonstrating conviction that offshore wind will be essential to satisfying the region's energy demand and driving the clean energy transition, reinforcing energy security, enhancing affordability, and underpinning industrial competitiveness.
In Canada, the push toward electrification along with industrial expansion is speeding up the demand for additional supply. For us, Canada remains a market that keeps growing, and power demand growth is being projected in every single province. Across a number of our technologies—gas-fired generation and battery storage among them—we see opportunities. To seize this opportunity, we've established our five-year growth and funding plan on the right foundation, backed by an investment-grade balance sheet. Our project return thresholds have been raised to a minimum of 12%, which shows we'll put money only into the opportunities that create the most value. Our focus is on moving forward with the opportunities where our global expertise can be applied to local execution. Now I'll move to more specific details regarding construction progress. At Hai Long, several major milestones have been achieved, among them the installation of all 73 foundations, all four export cables, and both offshore substations. As of today, 37 turbines have been successfully installed. 20 of those turbines are now actively producing power. Over the winter, the project team has been working hard to optimize our schedule, and a crew has been kept on standby so that commissioning can continue when the weather allows. As we've discussed on previous calls, offshore Taiwan we operate within a weather window, and full in-water activities will resume in earnest later in April, when that weather window reopens.
The project remains on schedule to reach commercial operation in 2027. At Baltic Power, our offshore wind project in Poland, we hit two important milestones during this quarter: all monopile foundations were finished, and the grid interconnection work was completed by the local utility. In addition, we finished installing both offshore substations, two of the four export cables, and 30 of the project's 76 wind turbines. The project stays on track for commercial operation in the second half of 2026. We're also making progress with our battery storage portfolio. At Jurassic BESS in Alberta, the foundations are in place, and the battery packs have reached Canada. That project remains on schedule for commercial operation in 2026. Going forward, our priorities are clear: we will deliver our construction projects, optimize the value of our operating portfolio, and advance and high-grade our development pipeline. Our recent acquisition of two late-stage battery storage projects in Poland adds scale to our European platform. We keep advancing both projects — their battery supply agreements are signed — and right now we are finalizing other procurement activities ahead of financing and the start of construction, which is expected later this year. Drawing on our expertise and experience from the Oneida project in Ontario, we still see opportunities to grow our battery storage portfolio, and we are actively evaluating several projects.
Back in November, we wrapped up the mandated performance test tied to a 23-megawatt capacity increase at the Thorold site — our natural gas-fired plant in Ontario — and formally locked in a contract extension of five years running through 2035. Taken together, these illustrate the momentum building throughout Northland. By staying disciplined about how we deploy capital, execute projects, and run our operations with excellence, we generate energy for the markets we serve along with value for shareholders. At this point I'll hand things to Jeff, who will take us through the financial results.
Thank you, and good morning to all of you. As Christine mentioned, we hit our 2025 adjusted EBITDA guidance and came in above our free cash flow guidance. Strong winds at our offshore assets during Q4, together with reduced curtailment caused by grid outages, gave us production that was higher than budgeted and a 21% overage versus the same quarter a year earlier. Our high operating availability of 96% let us capture that benefit. The quarter also gained from contributions from the Oneida Energy Storage Facility, which began operations in May of last year, and from greater market demand for dispatchable power at our natural gas facilities, driven by cold weather and outages at third-party facilities in Ontario. Adjusted EBITDA for the quarter came to $390 million, up 25% from the fourth quarter of 2024. That increase was mainly attributable to higher production from offshore wind, contributions from Oneida, and greater market demand at our natural gas facilities. Net income for the quarter was $290 million, versus $150 million in 2024. Free cash flow per share in the fourth quarter was 46 cents, compared with 31 cents in 2024. Turning to the full year, adjusted EBITDA came to $1.25 billion, in line with 2024, since lower offshore wind resource during the first half of this year offset contributions from Oneida and strong performance at our Americas onshore wind assets.
On a full-year basis, free cash flow per share fell to $1.46, down from $1.53 in 2024. The decline compared with the prior year stemmed largely from larger scheduled repayments of debt, weaker offshore wind resources, and the absence of certain one-time items that did not repeat, partly offset by contributions from new assets and reduced current taxes. For the full year, Northland posted a net loss of $108 million, versus net income of $371 million for the full year of 2024. That swing is mainly attributable to a non-cash impairment on Nordsee One taken in the third quarter of 2025. We keep moving our major construction projects forward. As of December 31st, Hai Long and Baltic Power together have under $4 billion of capital expenditures still to be spent. Broadly, both construction projects remain on track for commercial operations, and overall costs are in line with original expectations. As we reported last quarter, turbine commissioning at Hai Long has been slower than anticipated, and it could affect pre-completion revenues and equity injections to the tune of $150 to $200 million Northland share. The pre-completion revenue shortfall described above can be covered from several sources, including corporate liquidity. That said, we and our project partners are actively examining optimizations at the project level to supply funding, and we will give an update on this by midyear.
Now looking at our 2026 financial guidance: for 2026, we anticipate adjusted EBITDA landing between $1.45 and $1.65 billion, which is roughly a 25% rise over the $1.25 billion we delivered in 2025. The main forces behind that growth are contributions from Hai Long and Baltic Power, along with full-year contributions from Oneida and the start of operations at the Jurassic BESS project in Alberta. Partly offsetting these gains will be reduced contributions from Nordsee One, as a result of a scheduled step-down in the feed-in tariff mechanism. Our expectation for 2026 free cash flow is a range of $1.05 to $1.25 per share, versus the $1.46 per share in 2025. That year-over-year decline stems from several one-time items totaling 22 cents that benefited 2025, including a German tax refund, deferral of Spanish debt repayments, and other items. The decrease also reflects ongoing foreign exchange hedging costs, higher debt service for the natural gas assets, and the end of capitalized interest on our hybrid debt as we begin operations at Baltic Power. Partly offsetting that decrease is the additional contribution from Baltic Power, which represents approximately 20 cents per share. For 2026, we are assuming development expenditures of approximately $50 million, focused on selective opportunities in our core markets of Europe and Canada.
Moving on to the balance sheet: available liquidity stands at over $900 million, and with our investment-grade credit rating, we're in a strong position to carry out a disciplined capital allocation plan. With that, I'll turn things back over to Christine.
Thanks, Jeff. Our attention is on executing the plan we laid out in the fall and moving forward the new projects that will create value and double our capacity by 2030, and we look forward to sharing our progress with you. That wraps up our prepared remarks, operator, so could you please open the line for questions?
Thank you. If you’d like to ask a question, dial *11 on your phone and then wait until your name is called. If you want to cancel your question, just dial *11 once more. Please hold while we put together the Q&A list. Baltej Sidhu from National Bank of Canada has our first question. Your line is open.
Thanks, and morning to all of you. Your 2026 guidance sits comfortably ahead of consensus, and if we just look back at the weak wind resource we saw in the first half of last year and take into account the added diversification coming from projects such as Hai Long and Baltic, could you give us some insight into what downside protection is built into your outlook and how you thought about risk in your assumptions across the P50 production forecast?
I can handle that one, and good morning, and then Christine can chime in afterward. I think, look, we've stayed consistent in the way we outlook on the wind resource. It aligns with long-term averages. We've kept forecasting on that basis from our currently operated facilities. I think you can see this year is, Q1 and Q4, as we've always discussed, are always the heavy wind periods. We did experience lower wind in 2025 during the first half, and particularly kind of through Q1, and we recaptured a good chunk of that in Q4 with record piece. I think, look, I think where we view this is the long-term average and the P50 is the right spot to be. We'll have some variability and volatility in that, but we continue to not deviate from that, and I think we're comfortable with where we sit on that. Then the other piece when you look at it on guidance is obviously there's a big piece on execution on the construction projects and the EBITDA contribution between Hai Long and Baltic. I think for us is, as you can see, and where we've been in Hai Long, we did have the weather window here.
Like we mentioned at Investor Day and during the quarter, we had a situation — last quarter, just about 2 turbines were running when that weather window opened. It didn't seem wise to count on being able to get out there given weather conditions, and right now we're at roughly 20, which I'd say beats what we anticipated once the weather window closed. We're still managing things, and as you can tell from the assumption regarding our equity injection or possible equity injection, we're looking at matters project by project. I think we're taking a careful approach with our cash resources to ensure we have funding mechanisms in place. Then when it comes to Baltic Power, I'd say execution has been good, but we — I'd never call it comfortable. The main takeaway I want to leave you with is execution on these construction projects, and that's the most important thing we need to stay on top of this year. The wind will blow on the operating assets, and we'll leave it at a P50.
Sure, I can give a little more context there — and thanks for asking, Baltej. One thing that maybe isn’t coming through as much in the numbers is that this winter has been a really difficult weather window at Hai Long, and getting offshore has been tough. I think taking a conservative approach there was the right call. The weather window should open again in April, and we’re ready to move on that. There’s still plenty left to do on the project, so I think it makes sense to be prudent about what we expect through the remainder of the year. At Baltic Power, we’ve actually seen very good in-water performance over the last few weeks. Not everyone is probably following weather trends in the Baltic Sea, but it has also been extremely cold, and that does affect the operational tempo. I think we’ve been prudent this year in how we think about what could happen with the projects, and our guidance reflects that.
Thanks, that's great context. To build on a couple of the points you both mentioned: at Hai Long, slightly over 50% of the turbines you originally anticipated would be energized now are, and since the Capital Markets Day there's been quite a bit of advancement, as you noted in your prepared remarks. Can you share any specifics about how the recovery plan is moving forward from here, and what input or line of sight are you getting from Siemens when it comes to execution and the complete route to finishing?
It's clearly something we think about a lot, and we're putting a lot of attention on it — both at the project level and also here at Northland. I stay in touch with Siemens regularly, so there's an ongoing conversation that's kind of zippered up across both organizations. My sense is that Siemens is strongly committed to completing the work and to completing it as efficiently and effectively as they can. At this point it's really about preparation, since the weather window is closed right now, which actually gives us some time to confirm the planning is right and that we have the people, the expertise, and the vessels ready to go once the weather window reopens. That's a very high priority for us, and I'd say the dialogue with Siemens carries on on a fairly regular basis.
Great. Turning now to the Polish BESS — since those projects are already under contract, which major milestones or execution risks have to be addressed in order to bring them through to FID?
A few things are happening at the moment, Baltej, and we've got local teams on the ground in Poland. The projects have us really pleased. As I said in my comments, we've locked in the supply for the batteries. At the same time, we need to make sure all the local permits are in place, that the local authorities understand we have a solid relationship there, that they know what we're doing, and that there's a clear understanding of it. I'd call it a normal regulatory process, which the team is working through. The intent would be for that to come forward internally for our final investment decision midyear,
And so, moving on from there—
We need to carry out that project and, to sound like a Newfoundlander, get 'er done.
Like Christine mentioned, we have obviously locked in the battery supply, and the major item beyond permitting and those elements that take us to midyear is clearly the funding arrangement and project financing levers, which we're working through, and I believe we'll have made progress, and at present there are no roadblocks. We would anticipate being through that by roughly midyear, as Christine discussed. Those are the avenues we're pursuing.
Great, thanks. I’ll rejoin the queue. Appreciate it.
Appreciate it. We now have a question from Mark Jarvi with CIBC. Your line is open.
Thanks. Morning, everyone. I just wanted to follow up on a few items regarding Hai Long. One would be whether you can keep commissioning and energizing turbines ahead of the weather window opening — can you get beyond the 20 that are presently selling into the grid now?
So essentially, Mark, what happens at present is that we run the look-ahead forecast, and whenever a window of a couple of days exists in which folks can be sent out there safely to carry out the work, we go ahead and do it. A team is on standby at all times, and we build the plan around the weather forecast. That gets updated every day. The main update is definitely weekly, but on top of that we adjust it daily as well. If an opportunity arises to get out there, the teams head out.
Understood. So, Jeff, you said that reaching 20 at this stage is somewhat ahead of what was expected, but you still have the foregone PCRs at $150 to $200 million. What needs to occur for you to achieve that $150 to $200 now? Or are you currently running below that level?
There are several factors baked into this, so if you'll indulge me, I'll walk through the pre-completion revenue picture broadly and then the matching funding needs, since I think quite a few things are at play there. It's not just about generating revenue — it's also cash collection and how that lines up with where we are in construction. You're absolutely right. And of course, you raised the question about the weather window over the coming month or so. Look, we don't really plan on getting a large volume of work done, because the weather will do what it does, but we did complete 20, or 18 out of the 2 to 20, and that figure will move around somewhat as we work through the turbine issues, so that was a solid outcome. Where we're aiming over the longer term to get to the level we need, we require materially that by the next weather window in early October, effectively every turbine is spinning at that point. That's where, as we've consistently said, Q1 and Q4 are pretty much the heavy weather periods, and that's where you see a meaningful amount of generation. I say generation because that clearly falls more toward the latter part of the year, and given cash collection timeframes — let's say 60 days or so, whatever it comes to — the cash receipt would land more in the new year, even though we would have generated.
What makes that significant is that, clearly, once the weather window for construction closes, we'll be heavily focused on execution of the project itself again. Obviously, given how back-end weighted the PCR generation is — with execution more, I'd say, front-end loaded, or running through Q2 and Q3 — we do have some funding needs, since that revenue arrives later and gets collected more toward the new year. With this change in shape, we're still looking at potentially having to fund what could be an equity injection in that $150 to $200 range that we've discussed. As I mentioned, we're exploring various avenues to perhaps fund that inside the project alongside partners, and examining different options there, and I'd anticipate an update by midyear on that, Mark.
All right, let me just make sure I have that straight — PCR is really more about cash flows you simply haven't caught up on yet, since payment trails EBITDA by a bit of a lag, right.
Absolutely. Two points here. First, the EBITDA is weighted more toward the back end. Second, with that back-end-weighted EBITDA, every business has a lag between when revenue is generated and when cash is collected, along with payment terms, so we need to work through that. Since it's back-end weighted and collection comes afterward in the normal course, we have execution ahead of us before Q4, which means there are some construction components we do have to fund. So we're exploring different avenues for that funding: is there something we can do at the project level so that maybe we don't have to inject equity corporately around midyear? That's one of the major pieces we're working through. Think of it this way: back-ended earnings in generation, and then you've got a timeframe on collection.
Understood. So, Christine, you mentioned the North Sea Summit and the investment pact that emerged from it. Beyond Poland, are there additional regions in Europe—specifically around the North Sea—where you're placing growing emphasis? And when it comes to partnerships, is anything beginning to gain momentum?
Appreciate that, Mark. Let me be clear on Poland: it sits in the Baltic rather than the North Sea, and both regions strike us as interesting. Poland remains a place of strong interest for us. Our partnership with Orlen is something we're genuinely pleased about. We're also happy with the Baltic Power project, so our appetite for doing more in Poland stays high. As for the North Sea, we've had a presence there for a good while — in many respects I'd call it home for Northland, given the work we've carried on for over 10 years in Germany and the Netherlands. We have one project in development in the UK. We're in extensive conversation with other companies and with governments regarding opportunities, and for Northland we see a setting rich in opportunity — though the task now is to stay disciplined and select only the strongest opportunities on which we want to put our people. I'd say we are fairly selective, yet some solid opportunities lie ahead of us there.
Over the past couple of months, has the range of opportunities gotten better or shifted, and what about the quality of those opportunities?
Looking at what's unfolded with the auctions held lately, the economics for projects look improved, and because of that, the environment for us is better. Personally, I really do view it as a solid sign of capital discipline throughout the sector — we have to ensure that the projects we take on going forward produce the rates of return that will bring success for investors, and success for the host markets too.
Got it — appreciate you spending some time with us this morning.
Thanks. We move to our next question, from Nelson Ng at RBC Capital Markets. Your line is open.
Thanks a lot, and good morning to everyone. My first question is about the Polish battery storage project. When it comes to that 17-year capacity contract, approximately what share of your overall expected revenue does it account for?
No, and I believe we'll share more specifics down the road regarding the economics here, and when we reach final investment decision or financial close—whichever phrasing you prefer. What I'd say is that it's going to involve a combination of merchant and capacity, and look, I won't get into a particular percentage right now, but capacity won't be disproportionate. There will be a much more even split among merchant exposure, ancillary services, and possible capacity payments, which are indexed to inflation.
Nelson, in case that helps you, this follows a model much like the one we see used in Oneida. The percentages will come out a bit differently, since they vary from one jurisdiction to another, but the basic structure resembles Oneida's.
Understood. So Jeff, I have a question for you. Regarding those three European offshore wind projects of yours, you refinance the debt or lower the credit spread fairly fast as you get close to completing construction. My assumption is that talks with lenders are already underway for Baltic Power and Hai Long — or could you just say whether discussions have begun about either refinancing or the credit spread, now that construction risk is coming down? I'm aware you mentioned exploring other alternatives for injecting capital into Hai Long, but could you give a little more detail on how the whole process is going?
Absolutely, 100%. You're correct, and usually as we get close to COD, you might ask: when is the right moment — exactly at COD or slightly afterward? That's on our minds, and it's among the deliverables for the team to examine how we can drive optimizations. First, with Hai Long, I believe there are simply some market factors at play. We see that possibly happening earlier than COD through certain potential mechanisms, but we'll examine that, and I'll give an update at midyear. Baltic Power — yes, we're considering various options and avenues as we near COD, though we'll maintain some flexibility there. It will depend on the market, and you're right, it will typically align as we reach COD, but we might see windows before or slightly after that depending on market conditions. It's definitely something we're looking at.
Understood — just one final question remains. Regarding the Polish battery project at €200 million, I believe that comes to roughly $320 million in Canadian dollars. If I calculate Jurassic BESS against the Polish project, Jurassic looks to be around $750,000 per megawatt hour, while the Polish project sits near $270,000 per megawatt hour — meaning the cost is over 60% lower. Clearly scale plays a role, and geography likely matters too when it comes to labor, but could you discuss why there's such a large cost gap between the Polish project and the Alberta project?
Thanks, Nelson. I think that's an excellent question, since it really highlights what occurs when a technology is still early in its development curve. With grid-scale battery storage—like those BESS projects—we've witnessed a genuine shift in battery pricing, and that's among the major factors affecting these projects' overall costs. You're correct that the price of the batteries is likely the largest variable component; it keeps declining, and we've observed that drop over time. There's another element, though, that I'd be remiss not to point out: the permitting approach. The permitting process we see applied in Poland moves faster than what we encounter in most Canadian jurisdictions. When planning our projects, we factor that in according to what the permitting process will look like from one jurisdiction to the next. As you may have heard me say more times than I should, how long it takes to secure permits truly matters. In projects, time is money.
Perfect. Appreciate that, Christine. That's where I'll stop.
Thanks. The next question is from Sean Steuart at TD Cowen, and your line is open.
Thank you. Morning, all. My first one is for Jeff. On that 2026 free cash flow per share bridge, Baltic and others are shown adding 20 cents year over year. So what makes up the rest of that figure? I realize Baltic is set for COD in the second half, but could you give any detail on precisely when Baltic starts contributing within that number?
No, nothing major stands out in that area, I’d say. The team will follow up with you on the specifics, simply because there isn’t anything I’d call especially noteworthy—but I’ll have the team get back to you about it.
Baltic makes up most of it.
Sure.
All right, that's reasonable. Appreciate it. So I have a follow-up regarding the emphasis on earlier-stage development. Christine, you mentioned some optimism about expanding in the Baltic region. When it comes to the development capital you'll be deploying in 2026 for earlier-stage opportunities, could you help us understand — whether it's Canadian gas or renewables, or other projects in Europe — where you have a clearer line of sight on moving some earlier-stage opportunities forward?
Absolutely, and thanks for raising that, Sean — the timing is good, since this is a topic we've essentially been discussing on nearly a weekly basis from the beginning of the year as we evaluate the various opportunities. When it comes to chase and assessing fresh opportunities, I'd say you've put your finger on exactly what we're seeing: there are strong opportunities in offshore wind in Europe, and strong opportunities in gas in Canada. On top of that, we have a number of projects sitting in the queue that we examine — how much capital do we put toward maturing them, and over what timeframe do we bring them to maturity? I'd also add, Sean, that as we mentioned at Investor Day, we hold some value enhancement projects within the portfolio — that's our term for them — and those must compete for capital against these external new opportunities. We have our current opportunities in the funnel that we likewise want to mature. All of it feeds into the mix. That's precisely the rationale behind having a centralized development organization. At present, I'd characterize the development dollars this way: the largest portions are directed at locating the right next offshore wind project in Europe, and at locating or selecting the strongest next gas opportunity in Canada.
Appreciate it, Christine. That’s everything from me at the moment. Thank you.
Thanks. We’ll take our next question from Benjamin Pham at BMO. Your line is open.
Hi, thanks. I just wanted to ask about your guidance of a 6% CAGR in free cash flow per share through the end of the decade — the range you put out there. How should you, or we, frame where that calculation starts? Because using $1.45 as a base is a bit wonky, and using $1.15 is also a bit wonky. How do you frame that now?
Appreciate the question. I think if you step back, we clearly beat our free cash flow guidance for 2025. When you take that step back, there were obviously a number of one-time items in there — to the tune of, I'd say, 20 to 25 cents, whether that was the German tax benefit we had plus a few other items. I think that's something that factors in, and it's also on my mind as well: how do we keep getting better at making sure we call out one-time items and can kind of clarify this for folks? I think that's a critical piece for us, because when you take all those one-time items, they come to roughly 20 cents a share, and that makes a substantive difference to the ongoing run rate of the business.
All right. Take the $1.45 reduction — call it 25 cents, for argument's sake — and use that as your baseline. That gets you to the 6% figure you pointed out earlier.
I don't have those figures right in front of me, correct? I think you take a look and you go, all right, so what occurred during the back-end quarter? Obviously, wind was stronger, and that pushed us past guidance. When you look at the full year, that 20 to 25 cents was among the major contributors that drove us to the buck 46. The CAGR isn't in front of me at the moment, but what we've got to be sure about is that these one-time items, or sort of non-recurring items, need to be factored in. You have to strip that out, right?
I see. Perhaps I could go back to what was said earlier regarding the supercycle and how volume demand has been fairly strong across every one of your major markets. Do you feel that you need to look at other places in order to be positioned better, or in a different way, so as to gain from this supercycle as it continues?
Appreciate the question. We went into this quite thoroughly while getting our plan ready for the next five years. For us, Canada and Europe are settings full of opportunity. Both are really big markets. I believe there's plenty of room for our company to fill in and to deliver on what we've committed to over that five-year horizon in those markets. Our focus is strongly on going deeper where we already are rather than expanding into new locations.
Understood — thanks.
Thanks. We’ll take the next question from Heidi Heuch at BNP Paribas. Your line is now open.
Hello, and good morning. Thanks for taking my questions. I'd like to begin with something from your annual report, where it mentioned that the floating portion of the Scotwind offshore wind project had been deprioritized. Could you discuss what drove that decision, and what it might mean for the kinds of projects or technologies you're more likely to pursue within the growth pipeline? Thank you.
Thanks very much for that question, Heidi — I appreciate it. Since we see such a large number of fixed-bottom opportunities in offshore wind, we genuinely had to ask whether we need to shift to floating at this point. As we examined the opportunity set, I think the conclusion we reached is that we don't need to. At present, we believe solid existing technologies exist for offshore wind. I think what sets us apart is our capacity to deliver that, and to deliver those projects effectively. Perhaps going back to the earlier question about deepening in geographies — it's also about going deeper in the areas we already know well. We're highly skilled at that, so we'll continue doing it, and we see an environment rich in opportunity for us at the moment. Yes, you're absolutely right that floating is being deprioritized, and our focus is more on fixed-bottom offshore wind.
Thanks a lot. So could you bring us up to date on what the chances are of contracting the rest of Nordsee One? We noticed the encouraging news about 1/3 being contracted, but are conversations still going on regarding the remaining share? Thank you.
Thanks, Heidi. We're watching that closely. With the 1/3 contracted, we're pleased because it gives us steady cash flow from the asset over the next five, six years, so that's quite helpful. Then, as you likely know, the spot price has actually been fairly strong lately, and when we see that strong spot price, how much of it are we willing to contract away for the sake of stability? At the moment, the 1/3, 2/3 split works fine for us. We keep monitoring the market and seeking different opportunities. That in fact gives us optionality, which I truly value in the portfolio, particularly considering the new, heavily contracted generation coming in. It gives us a little more room so we're not exposed to a large amount of variability with that, and we can absorb it within the portfolio approach.
Thank you. At this point, we have no additional questions coming in. Christine Healy, I'll hand things over to you for any closing comments.
I'll keep this short and simply offer my thanks to all of you for being with us today, along with my appreciation for the support you keep giving us.
That brings us to the end of today's conference call. Thanks for joining us, and you're free to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Northland Power Inc. transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Northland Power Inc. earnings transcripts and 131,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.