Good afternoon, and thanks for tuning in to the webcast where NorthWestern Energy Group is discussing its financial results covering the full year that closed on December 31, 2025. My name is Travis Meyer, as Jordan mentioned. At NorthWestern, I serve as Director of Corporate Development and Investor Relations Officer. With us today are Brian Bird, our President and Chief Executive Officer, and Crystal Lail, our Chief Financial Officer. They're going to take you through the numbers and give a broader update on how things went during this quarter. Our results are out now, and you can find that release on our site, northwesternenergy.com; additionally, our 10-K was published before market open this morning. Keep in mind that forward-looking statements could appear in the company's press release, in this presentation, in what presenters say, and in answers to your questions. Because of that, please refer to the disclosures in our SEC filings along with the safe harbor provisions shown on slide 2 of these materials. Be aware as well that non-GAAP financial measures appear in this presentation, plus information about the pending merger transaction. The appendix of the presentation materials contains the non-GAAP disclosures, definitions and reconciliations, as well as the merger-related disclosures; a recording is being made of this webcast. Once the event ends, an archived replay will be posted soon and will stay accessible for 1 year. To get to that replay, head to the Financial Results section on our website; now that those items are covered, I'll turn things over to Brian Bird, who will begin with his remarks.
Thanks, Travis. When it comes to 2025, the very first thing I'd like to address is how we performed at carrying out our strategic initiatives. To begin with, we made public our agreement with Black Hills Corporation for an all-stock Merger of Equals. We waited patiently and in the end completed our purchase of the Avista and Puget Colstrip interests effective 1/1/26; not long ago we put forward a $300 million, or 131-megawatt, South Dakota natural gas project for SPP's expedited resource adequacy study, and that project is now part of our ongoing capital plan; and we picked up the Energy West and Cut Bank Gas natural gas distribution assets. When it comes to legislation and regulation, the outcomes we had in 2025 were very, very good. On the legislative side, Montana Senate Bill 301 was signed into law, which gives greater confidence for transmission investment in Montana. And Montana House Bill 490 was signed into law, clarifying and limiting risks tied to wildfire, which protects our customers, communities and investors. So once again, a very good legislative outcome in '25. Turning to regulation, and speaking of wildfire, we also — under that legislation, we have to get our wildfire plan approved, and from the Montana Commission in 2025 we did secure that approval. And then also on the regulatory side, we finished our Montana Electric and Natural Gas general rate reviews. And then looking ahead, thinking about opportunities for data center growth. Over the course of the year, we signed our third letter of intent with Quantica for a 500-plus megawatt data center. And with Sabey we moved from a letter of intent to a development agreement; so that's 2025. More recently, when it comes to financial results, and Crystal will cover that shortly, but for the full year, we reported GAAP diluted EPS of $2.94 along with non-GAAP diluted EPS of $3.58. Our quarterly dividend is going up by 1.5% to $0.67 per share; we're initiating our 2026 earnings guidance range of $3.68 to $3.83. And our 5-year capital plan is being updated to $3.21 billion, a 17% increase over the plan we had before. Speaking of the merger with Black Hills, which we expect to close in the second half of 2026, we filed joint requests for merger approval in the states, Montana, Nebraska and South Dakota, but we also filed with FERC. And we recently filed our Form S-4 and joint proxy as well. As for the Montana IRP, we initiated — or submitted, I should say, our draft 2026 Integrated Resource Plan roughly a month ago; and from a Montana data center perspective, as of yesterday, we advanced our reference at Atlas Power from an LOI perspective to a development agreement. And I'll speak to all of these topics a bit more after Crystal's presentation. With that, Crystal?
Thanks, Brian. In what I'm going to say now, I'll go over the results for our fourth quarter and for the year to date. I'll also go over, just as Brian referred to, what we expect for 2026 and our revised plan for capital and financing. Having heard Brian just now, 2025 has been an extremely, extremely hectic year with many achievements, and our team has put in tremendous effort to also come through with our 2025 results, posting 5.3% growth over 2024 on a non-GAAP basis. We posted GAAP earnings of $2.94, which took in impacts from costs tied to the merger, the regulatory outcome rate case in Montana, and an especially warm fourth quarter. Those adjustments will be described in somewhat more detail — additional detail here on a slide later on. Once those items are adjusted for, as I said, we posted $3.58, and that reflects the work done despite a fair number of headwinds over the year to come through on what we promised our shareholders. Turning to Slide 8; on an adjusted basis for Q4, we posted $1.17. Our better margin shows new rates, a great deal of regulatory execution involved in reaching those figures, which were partly offset by mild weather, as I hinted at for the fourth quarter, very warm in our case, and the effect of market prices within our Montana PCCAM mechanism. That margin gain was offset by a one-time charge in the Montana rate review, greater operating costs — and operating costs definitely take in merger-related costs too — and then increases in depreciation and interest expense too. Turning to Slide 9 to discuss a few of the adjustments for the quarter. Weather for the quarter hurt us by $0.03. Yet if you set that against an especially mild 2024, when measured against normal, weather amounted to a $0.13 impact on us in Q4. The quarter was also affected by $0.03 of merger costs, the onetime charge for the Montana rate review outcome tied to the Yellowstone County Generating Station and the disallowance of certain costs connected to that came to $0.38, and $0.03 tied to the PCCAM, reflecting the final order there, reflecting the end of the sharing amount there, offset by a $0.12 tax benefit. You'll note that produced the $1.17 of adjusted earnings versus $1.13 in the fourth quarter of 2024. On a year-to-date basis, turning to Slide 10, our performance comes from, again, that better margin coming from regulatory execution, offset by PCCAM detriments within that of $0.09 on a full year basis. From an O&M standpoint, certainly greater given new maintenance at the Yellowstone County Generating facilities and maintenance at our other electric generation, the amount we're spending, importantly, on wildfire mitigation and also insurance that has risen in labor and benefits; we also took on greater depreciation expense of $0.27 and interest expense of $0.23. There's one point on this slide I want to call out: taxes for the period just reported contain a $0.12 benefit, whereas 2024 had a $0.39 benefit. That leads nicely into Slide 11, where I hope to make clearer several of the things that shifted in our earnings on a 2025 full year basis. Once again, weather went against us to the tune of $0.05 relative to normal, and that represented $0.18 of harm to us when we consider how it affected 2025 results. The back half of 2025 was extremely mild. Many of you probably don't remember, but through the first quarter we actually began the year with weather that helped us; so that swing mattered a great deal to us and also affects, as we will discuss later, cash along with the consequences for financing plans. Beyond that, costs tied to the merger came to $0.15, and the Montana rate review disallowance I mentioned earlier was $0.38. Notably, we have considered seeking reconsideration of that disallowance, though we lack a clear time line for when any effect from it might appear. Should it come, it would definitely be a 2026 item. I also mentioned tax benefits, and there is considerable noise in our tax figure when comparing last year with this year. Discrete items produced a $0.12 benefit in 2025. That is measured against 2024, when, as you may remember, we recorded $0.28 in the earlier period. Following the slide, all of this brings us to $3.58 in adjusted earnings for 2025, which, as I said before, amounted to a 5.3% rise over 2024. My observation here is that despite the sizable headwinds — we have discussed the pressure on our financials from the PCCAM mechanism, and again, I will take a positive from the Montana rate review outcome, since it shows the sharing portion of that will be suspended going forward; that matters — that still cost us roughly $0.09 in 2025 overall, which we have adjusted out in the fourth quarter here. On top of that, property taxes ran higher. We gather a substantial sum of property taxes via our rates. Those went up, and between rate cases we recover only a portion of them; those were fairly significant headwinds for us across the year. So despite the mild weather I described and the continued pressure on our financials, we are pleased to have delivered $3.58 for 2025. Slide 12. Turning to guidance, we are initiating earnings guidance of $3.68 to $3.83 per share, which equals 5% growth at the midpoint from our 2025 results and stays anchored to our 2024 base. A major piece of that takes us to Slide 13 and the update to our capital plan. Brian noted the addition of the 131-megawatt generating facility in South Dakota. Additionally, we have made an update so that our incremental Colstrip ownership is now included. We take a lot of pride in getting those transactions closed with an effective date of January 1, 2026, and in being resource adequate so that we are able to serve our customers. Those two items produce a 17% rise in our total capital plan compared with what we had previously reflected. You will remember how dedicated we are to a capital plan that funds itself and to issuing equity only when doing so is accretive on a continuing basis. What I would say to you is that the base capital plan sitting behind the $3.2 billion shown here remains self-funded. Given the incremental South Dakota generation investment reflected here, we do anticipate needing equity past 2026 in order to finance that investment, and when you consider it, we would expect to handle that incremental capital on a 50 to 50 debt-to-equity basis, which lines up with our broader commitment to keeping high credit quality and with our ongoing plan. Turning to Slide 14 to discuss financing for 2026. As I said, the incremental South Dakota generation investment would fall beyond 2026. We expect to issue debt in order to refinance maturities that already exist and to fund the capital plan we already have. We ended 2025 with a lower FFO to debt. That came about because of what I noted earlier: the mix of missing margins from extremely mild weather that hurt our cash flows, plus being substantially undercollected on supply costs on the Montana side. Those two factors truly caused us to finish the year at a level below what we would prefer, yet we stay committed to rising above our downside thresholds and remaining there. With that, I will hand it back to Brian.
Okay, thank you, Crystal. Turning to slide 16, we address the combination with Black Hills and how it benefits every stakeholder group. Clearly, this strategic tie-up offers a very appealing chance to create value for both firms. This slide addresses that from the standpoint of shareholders, and also customers, so I'll begin with shareholders. It boosts our scale, our position, and our growth. Consider taking 2 businesses from growth of 4% to 6% in EPS up to 5% to 7%, with each company's rate base doubling to roughly $11 billion. Both firms possess meaningful growth prospects and the capacity to leverage this merger to genuinely seize them; and as noted a bit further down the page, being bigger lets us widen our investment opportunities. I should also note that it lowers risk, since as a larger organization with hazards such as wildfire risk and other dangers present in our operations, we are certainly able to absorb those. It also reinforces the balance sheet along with the credit metrics. You just heard Crystal address that moments ago. Of course, being a combined organization gives us the financial wherewithal to invest more heavily in what we do, and as a larger player we can deliver that efficiently for the people we serve. And then there's the benefit of a broader mix of operations. When it comes to ownership, or to how much say any one jurisdiction has, no single one will exceed a third. The largest, I think, sits at about 31% for one jurisdiction. On top of that, we have a really strong balance between electricity and natural gas, and that's what takes these 2 outstanding businesses — each already a combination utility — and makes them even more formidable as a pair. Then at the middle of this page, and this truly is the middle of everything we do, certainly at NorthWestern, and I'll speak for our colleagues at Black Hills, we focus on our customers and the considerable long-term value for them that comes from uniting these 2 teams, which are highly complementary, and we both deliver outstanding customer service and are excellent operators; and I'll tell you the savings produced by combining these 2 companies ultimately flow to customers in future rate review proceedings. So clearly, at a moment when people are concerned about affordability, both of our companies are considering that as we weigh this merger going forward. On the timeline front, as I mentioned before, we filed joint applications seeking approval in three states — Montana, Nebraska, and South Dakota. Those submissions went in during Q4, and we expect the hearings for those states to take place in the second quarter of '26. In addition, we submitted a filing with FERC in Q4 of '25. Our S-4 joint proxy statement went in on January 30, and the shareholder votes for both companies are scheduled for April 2. Beyond that, integration planning efforts are already underway, and we do anticipate receiving approvals and completing the closing in the back half of 2026. Going forward, any discussion of large-load customers naturally leads us into conversations regarding data centers. Turning to Page 18, over on the right-hand side, the sizable-load prospects in Montana are laid out. The first one to mention is Sabey — you've surely seen reports that they've run into issues tied to property for their project. They've got 2 locations they're actively looking at. Right now, they've just gotten a positive vote to move forward, though they're still sorting through the land-related questions and trying to resolve them. Both Butte and Anaconda are places where they hold land that's in the running. So we continue to work alongside them as they navigate those difficulties. A development agreement exists, and our target is to finalize an ESA by the close of Q2 2026. On top of that, we made a recent announcement about Atlas. Atlas Power — we've gone from an LOI to a development agreement. And they have been progressing far, far faster. Those are good signs. I would think that from an offtaker's or a customer's standpoint, they're preparing to move ahead. That's positive news for us with that development agreement. I would simply say the advantage of development agreements is that these 2 entities are now putting skin in the game. Consider upwards of $500,000 of investment, so to speak, for all the studies that are required that we need to finish this utility. So skin in the game, so to speak, for those 2 entities as we proceed. I anticipate that for those two, at minimum one ESA will get done by the close of Q2 2026. Quantica is moving ahead nicely as well. With any luck, a development agreement with them will come together before too long. Regarding the two states shown on the left where we offer electric service, the key point on Montana is that our eventual aim is to serve these large-load customers under state jurisdiction. So after we get an ESA signed with one of those parties, our plan is to file with the MPSC, and we'd include a large-load tariff in that filing that safeguards customers. Our hope is to get that done during the first half of 2026. Turning to South Dakota, we're seeing quite a lot of interest from data centers there. What makes that attractive is that any new large-load customers would need additional capacity. We've got infrastructure riders in place that can assist with recovering generation costs, and beyond that, the South Dakota PUC already has a process set up for large-load customers using a deviated rate tariff. One more point on South Dakota: while the legislature is in session, we're watching for the state's sales tax overhaul. Data centers view that as a make-or-break condition before they commit to expanding there, so keep an eye on it over the next few weeks. Turning to data centers, that's Slide 19. The middle section lists letters of intent next to development agreements. Previously we had 2 letters of intent and 1 development agreement; now it's 1 letter of intent and 2 development agreements, so genuine progress has been made. We aim to move every one of them into the ESA column on the right before long — at some point in 2026. Over on the far left, I'd also mention data center requests along with high-level assessments. You might notice the queue count there has dipped slightly. What I believe occurs is that many developers are involved, and once they reach a particular stage, if they're unable to proceed quickly enough, or can't secure an offtaker or a customer, that number can shrink — which doesn't really catch me off guard. From a high-level assessment standpoint, we think certain ones in that group can definitely shift into the middle category of letters of intent and development agreements. So that's encouraging for us. We are observing some sales tax activity in South Dakota, and I anticipate both of those queue counts will rise in 2026. Turning to Colstrip, I'm glad to share, as I mentioned previously, that we have closed those 2 portions of Colstrip.
Beyond the 222 megawatts we already own, we brought in the Avista 222. That did two things: it let us reach resource adequacy in Montana, and it raised our ownership stake from 15% up to 30%. Still, we recognized that holding 30% didn't give us anything close to full control — in fact, we lacked control over the facility as a whole. The additional Puget stake accomplished two things for us. It took us from 30% to 55%, which hands us the ability to steer the strategic direction of the entire facility, and it also positioned us to now serve large-load customers. Both of those stakes are now closed, they're performing well for us, and we're glad to have them in the fleet. And I'll tell you, I rest a lot easier once the cold weather arrives in Montana and South Dakota. One quick point on Avista and Puget. I believe you're all quite aware that we picked up both of those units for 0, which is a wonderful outcome for our customers, particularly when it comes to affordability and reliability. That said, we still have to cover our operating costs. In Montana, for the Avista portion, we submitted a temporary PCCAM tariff waiver to the MPSC in August, and that should deliver near-term cost recovery that's anticipated to mostly offset roughly $18 million in added annual operating costs. Incidentally, that waiver was granted on a temporary basis in January 2026. So with luck, we'll find out more about that waiver in '26, and hopefully secure full recovery for the entire year of those operating costs at some point down the road. On the Puget side, we signed a contract in October 2025 to sell that electricity through late 2027 — think about when data centers could come online in the state. Revenue from that contract should mostly offset the roughly $30 million in added annual operating costs that come with the transfer. I think everyone here knows we filed with FERC for cost-based rates in October 2025, and we anticipate approval of that filing in the first quarter of 2026. Finally, on the NorthWestern value proposition slide, you may have spotted 2 changes there. The first, which Crystal mentioned, is the 17% bump in investment on the right-hand side, up to $3.21 billion. The second is the dividend yield noted at the top of the page. You may remember it used to be stated as 4% to 5%. I'd contend that today, we're saying approximately 4%. Keep that in mind as you consider our base plan on the left and our incremental opportunities in the center — starting from the base plan, adding that dividend yield to our 4% to 6% EPS growth, you get an 8% to 10% total return, simply doing what I'd argue utilities typically do through electric and gas distribution, transmission, and supply investment. This is the kind of bread-and-butter utility investment. So despite that, when we consider a total return of 8% to 10%—and clearly, we can take advantage of any growth in data centers, any regional transmission, any additional generating capacity—that return could definitely exceed 10%. With that said, from a concluding standpoint, I believe we've looked at this conclusion slide for a number of years. I'll now hand things over for the Q&A portion.
Excellent capital plan that's been extended. First thing I want to ask — earlier on, you mentioned a large-load tariff would be submitted during 4Q, to protect costs associated with new data center demand. Could you give us an update on when that happens and what it covers? What has shifted relative to <<inaudible>>, and when should stakeholders anticipate a tariff being filed at ESA?
Yeah, though you're leaving out a small piece, I'll still address it. We did say a large-load tariff would be filed, but let me point out that this was contingent on executing an ESA. The idea is for both to move together — submitting a tariff alongside a particular contract. Within that discussion, a GS2 tariff already exists on our books right now. Our view is that customers could be served under it. That said, you'd want to reinforce it and definitely stay ahead of the claim that data centers fail to pay their fair share, and so on. Our plan is to submit it after an ESA is signed, allowing us to detail the specific mechanics before the Montana Commission — showing what it looks like and why they truly do pay their fair share and probably add broadly to system benefits. So after we get a signed ESA, our intention is to file that large load tariff alongside it.
Right. The one point I would tack on is what I mentioned during the presentation — the expectation is that we get this done before the second quarter wraps up. That timing lines up with when I anticipate an ESA happening. On top of that, the tariff is set and ready; from the ESA side, we're just waiting.
All right, that works. With any luck, you can hear me a lot better at this point. To add one more question regarding the merger, attention has centered on the big flow because of expense — pardon me, the expense tied to data centers as the cause. People with a stake either require or desire information, and not merely about how the process works. Could you update us on how the effort to inform stakeholders, showing there's no harm and that it stays affordable, has gone so far? That's all from me.
My guess is you mean from the standpoint of the public process. In my view, in — data centers have drawn considerable notice, as you know well, across the nation. And I'd say that in Montana, within the Butte community, clearly, the bulk of the conversation exists because Sabey has advanced the furthest in those talks there. And I believe Butte-Silver Bow permitted plenty of discussion, and in the end the community cast votes of 9 to 3 and 4 to 1 in favor of letting Sabey proceed; so I think — I'd contend that data centers are becoming louder in speaking about the upside. We utilities have definitely backed that push. And I think what must be shown — every one of us must show it — is that from a tariff angle, that's our approach, and let the MPSC give the go-ahead to a tariff, one we'd present to them, that will safeguard ratepayers. And I think once ratepayers get that, they will feel far, far better regarding it. Naturally, they're seeing what's going on elsewhere in the nation and how ratepayers have been hurt by data centers, and it's simple to leap to assumptions. And so I think the back-and-forth on this subject has been reasonably solid. Without a doubt, I and other people have been out discussing it. But I'm not claiming it will be simple for data centers either. Still, I think up to now, we're doing well with Sabey and Atlas and Quantica, which I know is out there discussing this too. So I feel fairly positive about our position.
I'd like to start by addressing the load fund, if that's alright; it feels as though we've spent quite a few quarters in the past waiting on an ESA; and Brian, during your prepared remarks you brought up some friction around the landing considerations, with Sabey possibly taking longer than anticipated. Do you think this problem is starting to spread to other prospective loads, like Atlas and others? Broadly speaking, what do you believe is required right now to get these development agreements across the finish line?
Yes. I believe you've witnessed — I'll offer a bit of a mea culpa on my own part here. I think when it comes to ESAs, at times we ourselves were the obstacle preventing these ESAs from being completed, and from where we stand, we're prepared to proceed. Then, unfortunately in Sabey's case, they hit this land issue. And clearly, they are working their way through it. So I think the utilities aren't the only ones responsible for getting these things finished; often, developers must also secure customers. And sometimes, before they can sign ESAs, they need to have that step completed. Of course, it's far simpler for hyperscalers, who don't have to go find customers. So I do believe Sabey is putting in tremendous effort to reach an ESA. Atlas is clearly progressing toward a development agreement. Reaching an ESA is the following step. So what I've observed is that nationally, this process has been taking somewhat longer. And without a doubt, it has affected us somewhat here. But I'm also quite confident about where we stand with these 3 providers today, or these potential data centers. I feel really good about where we'll eventually end up.
Got it — that makes sense. Let me turn to how growth looks from here. After the South Dakota facility, you maintained the 4% to 6% rate base CAGR, and my rough read is that this involves somewhere around $300 million of CapEx, speaking directionally; and as you pointed out in your remarks, it could be funded up to 50% through equity; so what I want to ask is: which offsetting elements tied to that share dilution make you confident about standing behind the 4% to 6% EPS CAGR?
For sure. What's great here — and we've talked about this, the question being what incremental opportunities exist for total return, those incremental opportunities sitting on the right side. With the incremental generation out of South Dakota, cash comes back to us while construction is underway. Through a phase-in rate plan rider, we're able to recoup costs — AFUDC is excellent in that regard. It benefits earnings, though it doesn't do the same for cash; and like we've talked about, financing those items over an extended period is a challenge. So when the chance comes up to satisfy resource adequacy needs at SVP by having that generation on our side and putting up that facility, that's precisely the type of step-up in CapEx we want to add into our plan; we're thrilled about it; that's definitely the sort of thing that lets us feel secure keeping our earnings range where it is or perhaps moving it higher, all while funding it on reasonable terms. So that's where we've been pretty clear; that's the type of incremental CapEx we are looking for. That's incremental to our base plan. So we'll fund that in a 50 to 50 kind of approach. The phase-in rate plan is going to let us bring in cash while we're building, and then once that asset is up and running, we should clearly see earnings growth coming from it.
I simply wanted to clarify a bit about the ESA strategy in general. Also, my earlier understanding was that the system is long, so for the first couple of deals you might not require a dedicated framework to cover depreciation, interest, and whatever else would be tied to new build. But this ESA will shape how you propose an overall tariff covering all of that in this upcoming first half year? Is that basically the general strategy? I apologize for making you go back and repeat yourself.
Yes. I think as an illustration of how we intend to make sure customers are protected. And I think we're — the conversations we're having with data centers, they want customers protected, the folks we're certainly talking to; and so moving forward together with them with an ESA and a tariff, that is the plan, and that's in the plan by the first half of '26.
And Nick, let me build on what you just said. The thing is, each data center is unique to its location. For some of them, as you mentioned, we're dealing with a lengthy generation process, plus what sort of transmission requirements exist, and what is — perhaps a few of them require minimal CapEx. On top of all that, we already have a tariff in place. As you recall, we discussed this 12 months back. Our view was that we could serve customers under it. That remains true right now. As you're aware, the way the country talks about data centers has shifted somewhat, and there's plenty of what I'd describe as false information regarding how they can certainly contribute to covering the grid's costs and actually help offset expenses for some of your other ratepayers. I believe in every jurisdiction, you'll find commissions eager to grasp that more clearly; we received comments from the Montana Commission, and we definitely aim to be open with them and present that information so you wind up with a favorable framework for doing this. So even though every single one is different, putting forward something that shows the benefit a data center brings, the benefit a large-load facility brings to the grid, and that they truly are contributing their fair share — while we'd be at ease serving them under the tariff that exists — I believe there's considerable worth in ensuring your regulators grasp that as well. And naturally, that keeps public opinion on the matter favorable.
Yeah. And another point on that, Crystal — your question got me thinking. Regarding this matter of safeguarding customers, I believe there's some misunderstanding about the reason the Puget portion ended up inside a FERC-regulated entity. What we're aiming for here is genuinely to safeguard customers. As for what was required with the Puget piece, we had to have it so we could gain control of the facility. Yet when you look at it from an energy standpoint, we definitely didn't require it before the 2027 timetable. So rather than placing $30 million of costs onto our current customers, we came up with a way to handle that and safeguard customers while it sits in a FERC-regulated entity; and our hope is, as I said before, that eventually we can shift it into a state-regulated entity once we have large-load customers we're able to serve through it. And that's what we're ultimately attempting to accomplish. It would be great to have everything under state-regulated treatment, but we do want to serve large-load customers in whatever manner serves our customers best at present.
All right, thank you. Perhaps we could revisit the financing strategy you touched on earlier — you brought up that 13% FFO to debt figure. Does all of the additional CapEx from here on out mean equity becomes necessary? Also, could you expand on how things shift for your financing if those ESAs come through and you're able to float on the system?
Certainly. We've stated many times that our base capital plan gets sized according to the cash flow we have available and in order to meet our credit quality metrics. As I noted, 2025 is the year in question. The main factors involve dropping under the 14% FFO due to insufficient cash, which stems from unusually mild weather along with the margins we had anticipated, plus a significant undercollection in the Montana supply tracker — roughly $80 million, I believe. So we anticipate recovering that during 2026. Even so, our capital plan is always built to keep the balance sheet strong and preserve credit quality. So, regarding your question about what additional capital means: as I referenced with Aberdeen Generating Station, we get cash back while it's being built. If you consider the ramp-up phase for any data center and the extra capital needed there, you'd see a funding approach much like that, with cash coming in during construction. That sort of thing is accretive, and for accretive growth like that we would definitely consider issuing equity. That's why we've drawn a line consistently: we'll stay very disciplined with our base capital plan, and that involves a regulatory lag of 18 to 24 months from when it goes in the ground until recovery. For that category, we require steady cash flows to back it; for items that generate growth, like any large load would, those are the ones where we'd aim to keep equity issuances going when it makes sense. But once more, nothing during '26 — just want to be sure that was clear...
Nothing in '27?
Nothing in '26.
The initial thing I want to ask about — regarding that South Dakota facility, are you — do you currently hold a spot in line for a turbine? And when would that facility's commercial operation date fall?
Let me begin with the commercial operation date. What we're looking at is — to start, a plant is under construction right now. I believe the 131 megawatts is what you're referring to. That $300 million investment, we're already putting money in during '26 for turbines; therefore I'd estimate roughly 1/3 of that investment gets made in 2026 so our turbines are installed, and the plant should reach completion in 2030.
All right; so are you in line, or do you already have — assuming those turbines are scheduled to be operational by 2030?
Well, we are purchasing turbines.
Alright. My follow-up concerns the scenario where EPA reverses the endangerment finding — would that alter what we might spend on environmental upgrades at Colstrip? Also, could you bring us up to date on the status of those environmental upgrades?
Yeah. Clearly, we'll take whatever steps are necessary, basically, to keep Colstrip running so long as it makes economic sense. And of course, should we be compelled to undertake something we regard as unnecessary, we'd likely put money into a gas plant if something must be done sooner instead of later. Our hope all along with this Colstrip investment has been that we can hold that plant open and running across the depreciable life we anticipated under the 2040 timetable. And once more — ideally, that technology, whether nuclear, maybe long duration, storage, or whatever it turns out to be, would let us swap Colstrip out for something cleaner; yet if we're pushed to act sooner, whether through spending on environmental controls, so to speak, or eventually constructing a gas plant, we'll do that as well. We have to serve our customers using Colstrip or whatever takes its place. So that question is tough to answer right now, Paul, until we ultimately see what unfolds. Still, I'd say what we anticipate from the administration is definitely beneficial to our long-term Colstrip plans at this moment.
Let me also make sure our 5-year capital plan is clear. We did include CapEx tied to Colstrip, but Paul, I'd describe that as maintenance CapEx. That figure doesn't contain any material environmental CapEx. So if things shift down the road, of course, we'll discuss it when that happens. We'd spoken before about the mass ruling and what effect it could have on Colstrip, but no figures connected to that ever appeared in our capital plan.
Also, is there — I mean, do we have any news regarding if the EPA will end up voting on or implementing those rules? Or should we, for now, simply presume that on that front, nothing is progressing?
Yeah. My sense is that we've anticipated getting some word about this at any moment. And I suppose until we really find out what those rules contain, I'll more or less wait before deciding how to answer that.
And then as a final point, is there anything new regarding the rest of the Colstrip stake, the part where those involved probably will have to sell off what they hold?
Paul, we just picked up those 2 assets for Puget and Avista, that 592 MW. We couldn't be happier about them. We would definitely like to get a handle on the commission's view of it and, in the end, how matters are shaping up with data centers. Getting ourselves to 55% ownership is something we're very pleased about, and that's all I'll say.
OK. But theoretically speaking, if the other owners had to leave, how would those expenses end up being covered?
Do you mean environmental costs that would need to be imposed?
So basically, suppose those other partners have to leave the planned ownership due to state legislation — then what happens regarding the portion of operating expenses they're responsible for? Would they — I mean, are they still liable for it? Or what's the mechanism there?
Yeah. My sense is that's a difficult position for them. My guess is each of them is seeking a way out, except Talen has no need to exit. Still, I'm certain they're having those conversations with people.
Quickly, I'd like to touch on the state regulatory side of the merger. There appears to have been some slippage in South Dakota, so I wondered whether that's something to worry about. Then with Montana's review, it seems certain intervenors are arguing the filing is deficient — possibly due to a missing benefits study, possibly for other reasons. So are you at ease with Montana's current schedule? Or could a delay hit Montana too?
Absolutely, I'll handle that one. Starting with South Dakota and its timeline: the statute there gives 6 months, and I'd admit that's somewhat of a fast clock for completing every step of the process and procedure and getting them comfortable; alongside staff, we're working to reset the procedural schedule with a bit of an extension. That doesn't worry me; the questions being asked are the right ones and the process being followed is the right one. They simply require somewhat more time than they would have had before both Nebraska and Montana. So together with them we're working on resetting the procedural. My belief remains that ultimately they will probably finish well ahead of the Montana order, even under the revised procedural schedule. So no worry there. You've likewise observed movement in Montana, and what I'd call somewhat typical considering the character of the interveners there and who those parties are. So the motions there have gotten our responses. Interveners are also present <<inaudible>>; and on the whole, once more, precisely what we'd anticipate for how the docket advances. There are comments regarding — perhaps commitments we might offer, what they'd want to see in order to understand things better. We definitely understand that across each jurisdiction we serve, not merely those we're currently in, your utility forms a major piece of your local commitment, and we want to ensure we work through that the proper way. So I wouldn't characterize anything as a worry in how those dockets are moving. The worries voiced are, in my view, standard for each of those intervenors, and the intervenor testimony, in my view, charts a course toward the kinds of things they want to ensure get weighed in an eventual outcome.
Then, to build on what we discussed about Montana, my understanding is that you're currently working through that IRP proceeding too. In what way does that — if it does at all — play into the examination, perhaps not the examination itself, but how the timing lines up for the deal's examination against the IRP's examination. My impression is that the final draft is expected in roughly 2 months, though I'd welcome a correction if I've got that wrong.
No. The IRP has been issued, and we'll get to look at it. I do not — I don't expect any linkage whatsoever between the IRP and the merger process.
Okay, so as Crystal mentioned earlier during this call, we actually had a truly excellent 2025. Naturally, we did encounter certain challenges regarding the rate review and how that turned out; however, I recall that — I believe we should consider the revenue requirement tied to it, since that definitely keeps helping us make the investments we must, so we can keep delivering solid service to our customers. Yet when you consider how we were able to announce the merger and all the effort we're putting in alongside our colleagues at Black Hills to bring that over the finish line, consider what we can now do with Colstrip being resource adequate in Montana and, in an era when folks are deeply worried about reliability and affordability, to feel far more confident about how we serve our customers. And also, looking further ahead, how do we keep making the investments we have while also earning the right returns for our shareholders. I believe 2025 positioned us extremely well for that going forward. And with that, I simply want to express gratitude to all of you for supporting the company and for your interest in what we're doing here at NorthWestern. And we absolutely want to thank everybody at NorthWestern for all the hard work throughout 2025 too. So with that, I'll say thank you.
That concludes today's meeting. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NorthWestern Energy Group, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to NorthWestern Energy Group, Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.