NorthWestern Energy Group, Inc. (NWE) Earnings Call Transcript & Summary
April 30, 2026
What were the key takeaways from NorthWestern Energy Group, Inc.'s April 30, 2026 earnings call?
In the first quarter of 2026, NorthWestern Energy Group, Inc. (NWE:US) reported GAAP earnings of $1.03 per share and a non-GAAP EPS of $1.31, reflecting a 7.4% increase year-over-year. The company reaffirmed its 2026 earnings guidance range of $3.68 to $3.83 per share, maintaining its long-term EPS growth target of 4% to 6%. Key developments included the approval of the merger with Black Hills and the signing of new development agreements for data centers, which could enhance future revenue streams.
What topics did NorthWestern Energy Group, Inc. cover?
- Merger Progress: NorthWestern received shareholder approval for its merger with Black Hills, with 'approximately 86% of our shareholders voted, and of those that did, 99.7% voted in support of the merger.' This merger is expected to enhance scale and operational efficiency, potentially increasing EPS growth from 4%-6% to 5%-7%.
- Data Center Development Agreements: The company signed a new development agreement with Quantica Infrastructure, bringing the total to three agreements. This is part of a strategy to capitalize on growing demand for data centers, with management stating, 'we're happy to announce we've signed another development agreement.'
- Weather Impact on Earnings: The warmest winter in over 100 years negatively impacted volumetric loads, resulting in a $0.17 unfavorable variance. Management noted that 'the recovery of these costs was certainly impacted by low market power prices.'
- Operating Costs and Colstrip Ownership: Increased operating costs were attributed to the incremental ownership of Colstrip, which added $0.12 per share in costs. Management expects annual operating costs of approximately $48 million related to this ownership.
- Regulatory Developments: The passage of Senate Bill 36 in South Dakota provides legal protections for utility operations against wildfire-related damages. Management expressed excitement about having 'some of the best wildfire protection in the United States at the state level.'
What were NorthWestern Energy Group, Inc.'s April 30, 2026 results?
- GAAP EPS: $1.03 (vs $1.00 est, +3% YoY)
- Non-GAAP EPS: $1.31 (vs $1.22 in Q1 2025, +7.4% YoY)
- 2026 Earnings Guidance: $3.68 to $3.83 (maintained guidance)
- Dividend Declared: $0.67 (payable June 30, 2026)
- Operating Costs Increase: $0.12 (due to Colstrip ownership)
- Annual Operating Costs from Colstrip: $48 million (expected annual costs)
Overall, NorthWestern Energy's strong quarterly performance and strategic merger position it well for future growth. However, the impact of weather on demand and rising operating costs present risks. Investors should monitor the progress of the merger and the development of data centers as key catalysts for growth.
Earnings Call Speaker Segments
Thanks, Audra. Good afternoon, everyone, and I appreciate you tuning in to the webcast where NorthWestern Energy Group is discussing its financial results for the quarter that wrapped up on March 31st, 2026. I'm Travis Meyer, serving as Director of Corporate Development and Investor Relations Officer here at NorthWestern. With us on today's call are Brian Bird, our President and Chief Executive Officer, along with Crystal Lail, our Chief Financial Officer. They are going to take you through the numbers we posted and give a broader update on the really strong strides we made during this quarter. We've already put out NorthWestern's results, and you can find that release on our site, northwesternenergy.com. Our 10-Q also went out before the market opened this morning. I want to remind everyone that the company's press release, this presentation, what the presenters say, and any answers to your questions could include forward-looking statements. Because of that, please refer to the disclosures in our SEC filings and the safe harbor language found on the second slide of this presentation. I'd also point out that this presentation contains non-GAAP financial measures as well as information about the pending merger transaction. Be sure to review those non-GAAP disclosures, along with the definitions and reconciliations, plus the merger-related disclosures, all of which appear in the appendix of today's presentation materials. This webcast is being recorded. A replay will be posted not long after we finish and will stay available for 1 year. To get to that replay, just go to the Financial Results section on the website. Now that I've covered those items, I'll turn the presentation over to Brian Bird for his opening remarks.
Thanks, Travis. Turning to what stood out for us this quarter: on a GAAP basis, diluted EPS came in at $1.03, while non-GAAP diluted EPS was $1.31. Our 2026 earnings guidance range of $3.68 to $3.83 is being reaffirmed, and we're also reaffirming the long-term targets for rate base EPS growth of 4% to 6%. On the merger front, I'm certain everyone on this call has seen that shareholder approval came through for our pending combination with Black Hills, with all proposals approved as well. Beyond that, constructive settlements are now in place with each of our key interveners in Montana, Nebraska, and South Dakota tied to the merger dockets. Looking at regulation and legislation, constructive wildfire legislation has passed in South Dakota, and we recently filed a Large New Load tariff proposal with the MPSC. As for data centers, we're pleased to share that another development agreement has been signed, this one with Quantica Infrastructure, bringing us to 3 development agreements in total related to data centers. Finally, on the dividend, a dividend of $0.67 per share was declared, payable June 30th, 2026, with the record date of June 15; with that, I'll hand things to Crystal for the first quarter financial review.
Thanks, Brian. During my remarks, I’ll go over the results for our first quarter, the outlook for 2026 earnings, and what we have planned for capital, and after that I’ll hand things back to Brian so he can share some of the exciting updates he referred to when the call began. Let me start on Slide 7. Our GAAP earnings came in at $1.03, and that figure reflects the effects of a first quarter that was unusually warm from a historical standpoint, costs tied to the merger, and costs connected to the additional ownership stake in Colstrip. When adjusted, we posted $1.31, which is a 7.4% improvement over what we recorded in the first quarter of 2025. Slide 8 offers some additional detail about the main factors behind the quarter. Those include better margin, though that came net of the weather I just referenced, which was offset by greater operating costs along with depreciation and interest expense. On those operating costs, the total includes $0.12 of an increase compared with the prior quarter stemming from our additional ownership share of Colstrip, plus $0.04 attributable to labor and benefits. We have discussed on numerous occasions why owning more of Colstrip makes sense and why that facility matters for serving our Montana customers, and we anticipate annual operating costs of roughly $48 million tied to that added ownership. That works out, on a quarterly basis, to generally around $12 million each quarter, and you can see that we offset roughly $8 million of those costs during Q1. Recovery of those costs was clearly affected by weak market power prices, which were pushed below our expectations by broader conditions. Now on Slide 9, where I’ll give you more detail on margin. First quarter margins show the benefit of new rates in Montana. You may remember how the timing worked with our rate filing last year and the absence of interim rate recovery during the first quarter, and you can see that increase reflected here. Also shown are the sales tied to the Puget Colstrip interest, along with ongoing growth in transmission revenues within the Bulk Electric System. Weather worked against us, since Montana saw its warmest winter in more than 100 years. Turning to Slide 10, that warm weather cost us an unfavorable $0.17 relative to what normal volumetric loads would have produced. As I said, conditions in Montana were very mild, and that carried over from our fourth quarter results too. The quarter also included $0.05 of merger costs and $0.05 of Colstrip operating expenses that went unrecovered, as I just described. With those adjustments, we again arrive at adjusted earnings of $1.31 for the first quarter of 2026, compared with $1.22 in the prior quarter. Now to Slide 11. Brian mentioned that we are reaffirming guidance for 2026. As we look toward when our next rate reviews will occur, you would typically expect us to announce that timing here in Q1. Brian’s going to walk you through more specifics on the settlement agreement tied to the merger, and that agreement does contain certain stay-out provisions for Nebraska as well as South Dakota. When it comes to Montana, we haven’t yet settled on when our next rate review will happen, since the 2024k is still being reconsidered. On top of that — and this matters a great deal to our longer-term earnings profile — the things Brian mentioned regarding development agreements with Quantica, plus the large load care filing, are what support where we aim to be on earnings growth, in that 4% to 6% range, and they underpin our capacity to reaffirm guidance for 2026 and past that. Slide 12 offers additional specifics about our capital plan. It’s the same as what we shared on our fourth quarter call: $3.2 billion covering 2026 through 2030, and let me remind you this comes from necessary investments made to serve our customers’ needs. It excludes any incremental investments that could arise from further regional transmission opportunities — something we’re quite enthusiastic about — or from serving any of those large loads. What it does contain, though, is the adjustment we made at Q4, namely the added generating capacity in South Dakota tied to the SPP Expedited Resource Adequacy Study. We’re carrying out our base capital plan with no new common equity issuance, and we have no equity needs in 2026. As we told you on our Q4 call, added capital in 2027 connected to the generation capacity in South Dakota will mean some equity needs in 2027 and afterward. With that, I’ll hand things back to Brian for the remainder of the update.
Crystal, thank you. Turning to Page 14, there's positive news regarding the South Dakota wildfire bill. Senate Bill 36 made its way through the South Dakota legislature with strong backing from both parties and has been signed into law. The first thing I want to emphasize is that there is no strict liability. Utility operations can't be held strictly liable unless they caused wildfire-related damage. In fact, the legal protections for providers and damages, also shown on Page 14, are extremely similar to what our Montana legislation contains. If you actually go back and compare this page with our Montana page, they're very, very similar. So we're quite excited about the protection we have across our 2 electric states from a wildfire perspective — some of the best state-level wildfire protection anywhere in the United States. We intend to file our wildfire mitigation plan for approval by the South Dakota PUC during the second half of 2026, and we anticipate refreshing that plan every 2 years from then on. One last point on wildfire: looking back 3 years ago at what we've accomplished legislatively, operationally, and in terms of situational awareness, we feel far better about how we'll mitigate wildfire risk across our states, while also recognizing that a difficult fire season lies ahead of us, and we must keep that in mind as we keep monitoring our systems in those 2 states. As for the merger with Black Hills and how stakeholders benefit, certainly we've devoted a lot of time to discussing this with shareholders. Obviously, the greater scale and our capacity to move from a 4% to 6% EPS grower to a 5% to 7% one, and bringing these 2 companies together, doubles our rate base going forward. It expands investment opportunity and gives us more resources — not just financially, but in terms of personnel — putting the right level of resources behind these opportunities. A stronger balance sheet, with 2 strong companies combining to produce an even stronger balance sheet on the other end. And clearly enhanced business diversity through an expanded footprint and a much bigger company for both entities. That's certainly a benefit to shareholders, and this combination represents a highly attractive value creation opportunity. I think our shareholders have supported it — approximately 86% of them voted. Among those who did, 99.7% voted in favor of the merger. So obviously we're trying to do the right thing from a shareholder perspective, but this merger will benefit many stakeholders, and certainly customers. When it comes to customers, it's not simply about having 2 businesses deliver excellent service reliably and at low cost. Beyond that, going forward, whatever savings in costs those 2 businesses manage to realize will end up flowing back to customers through future rate reviews. So we're thrilled during this period when affordability sits right at the forefront for every one of our customers, to be doing what's necessary on our end to assist with that. The merger definitely counts as one of those efforts. As we proceed with each of the 3 states we're engaged with, our hope is that we can eventually secure those approvals. On that note, turning to Slide 16, which covers the time line, we mentioned earlier during this call that settlements have been reached in each of the 3 states where we filed applications seeking approval. A hearing has already taken place in Nebraska, and hearings are scheduled in Montana and South Dakota during the May and June timetable, respectively. So that's continued solid progress. Once again, securing settlements with key interveners matters greatly at this stage. Beyond the state level, we filed with FERC quite a while back, in December. Considering the 180-day approval time line, we're hoping to receive a response from FERC by the end of June. From FERC's standpoint, regarding the S-4 and joint proxy, the shareholder approvals came through not long ago, clearly. As for Hart-Scott-Rodino, we've met that requirement now that the waiting period has expired. So there are quite a few green checks across this page and this time line, which is wonderful. That said, we're still waiting not just on FERC, but on the 3 states to make their final decisions. And clearly, hearings must take place in 2 of those states. So plenty of green checks. We'd like to believe something could come together sooner rather than later, but our belief remains that an outcome will ultimately be reached. And clearly, once we obtain the approvals we require, we anticipate having them during the second half of 2026. On the topic of data center process and progress, I'd say we keep seeing a considerable amount of demand. In fact, our data center request queue has grown from 6 to 8 since the last time this page was shown to you. High-level assessments have actually declined. I think that happens as people work through the process and grasp what they essentially must do to submit a deposit and consider the costs tied to moving forward. One of those dropped off, leaving 4 in that high-level assessment. Hopefully, we can keep guiding folks toward a development agreement; and incidentally, speaking of that, you'll notice on Slide 17 that we've grayed out letters of intent. Once Quantica put pen to paper on that development agreement, LOIs essentially ceased to exist for us — those got elevated into the development agreement stage. And going forward, when people sit in the high-level assessment, our preference would be to shift them straight into a development agreement, so that's what we're hoping for. Out of the 3 sitting in the development agreement phase, our aim is to transition every one of them into an ESA, or an Energy Service Agreement. Rather than promise any particular timeline for ESAs, here's how I'd frame it: each of those 3 counterparties — those developers — wants an ESA wrapped up before 2026 comes to a close. For our part, we're pulling out all the stops to make sure we're prepared on the 2026 side, though it's worth noting they've got their own obligations to handle too. So the aspiration is getting a few of these development agreements converted to ESA before this year ends, but specific items absolutely have to be completed, and we'll collaborate with them — everyone involved wants that outcome by year-end. Turning to Slide 18, on the regulatory side regarding large load customers, the standout development this quarter is that we filed our Large New Load tariff with the MPSC during March 2026. Naturally, there are plenty of inquiries concerning data centers and safeguarding customers.
Looking at our Large New Load tariff, the goal there is clear: it's meant to shield both customers and the company, while also laying out the rules for how we'll proceed should we be able to serve large load. So that marked a big step forward during the quarter. Beyond that, things are pretty much unchanged in Montana and South Dakota. Once we secure the large load tariff in Montana, we're set to move ahead — though in South Dakota, we can already serve large load as of today. On that note, as I said before, we are seeing some demand. It was a disappointment that we couldn't land any sales tax relief when it comes to data centers in South Dakota, yet interest there remains quite strong regardless; so we'll keep working with people to see whether we can reach any agreements there before long. As for the 3 parties involved, I'm sure plenty of you saw that Sabey ran into trouble securing the land needed for its data center. They're still working through that, and we're being patient with them along the way. Atlas is continuing along the path required to move from a development agreement to an ESA. Then with Quantica, naturally, the recent headline is our development agreement covering their load, which scales from 25 megawatts up to 1.1 gig, with a target start of early 2029. As typically happens in these deals, and especially at this stage, no customer has been identified yet, and one certainly will be once we actually sign an ESA with that customer. Turning to Colstrip on Slide 19. I want to walk through this slide so there's no misunderstanding about what we intend with our 2 incremental Colstrip pieces. I believe everyone knows we bought the Avista share of Colstrip to reach resource adequacy at that level, 222 megawatts. After that, we acquired the 370 megawatts from Puget, which moved our stake from 30% alongside Avista up to 55%. That gives us the deciding say over Colstrip and what happens to it going forward, instead of leaving that power with parties who may not think about Colstrip over the long haul. For the state, that's hugely important. You probably know as well that the Puget portion currently resides within a FERC-regulated entity, and it will remain there until we hear back regarding our Large New Load tariff. If the Large New Load tariff does go into effect, our preference would be to move that asset into the Montana state regulated business. But while the Large New Load tariff is still pending, that asset continues to be subject to FERC regulation. A lot of you are probably already familiar with what NorthWestern offers as a standalone company: a 4% dividend yield, along with 4% to 6% EPS growth, backed by a $3.21 billion capital program that's divided roughly equally among our transmission, distribution, and supply operations — and it's still doable, low-risk, essential capital for the customers we serve. Still, that spending could produce, and that growth rate could produce, a total return of 8% to 10%. There are additional opportunities we think might let us expand faster than 6%, but we need to actually execute on them. And every one of those opportunities I'll mention today sits outside our current plan. Nothing involving a data center appears in what we've laid out right now, and on the capital spending side, there's nothing off to the left either — no FERC regional transmission. Aside from the South Dakota capacity we've already discussed, no additional generation is included. What I just described would come on top of that. None of it sits in our current plans. That said, if we actually pulled it off, total returns could exceed 10%. One more point, returning to the merger discussion: we think this plan can be carried out even more effectively, performing better alongside our colleagues at Black Hills. So clearly the merger remains significant, allowing us to push that value proposition even further. That brings our presentation to a close, and at this time we'll open things up for any questions you may have.
Whitney Mutalemwa here, filling in for Shar. Great results this quarter. You mentioned that big loads need to complete their own tasks before reaching the ESA phase. With what just happened with the Sabey land, does that make the case stronger for tighter requirements around site control and permits before NorthWestern actually counts a project in a planning baseline? Then I have one more question.
In this situation, I'd say that at the outset, when we set out to file the large load tariff, our plan was to enter into an ESA with one of these large load customers and together go and discuss the large load tariff. One goal of ours is ensuring we keep collaborating with these parties on — I believe it will take some time to finally reach a resolution on the large load tariff. Meanwhile, we can keep working with these 3 developers on everything they must do and everything we must do to eventually get us into an ESA position.
Honestly, that sounds quite favorable. And moving along to consider the big load figures. What we heard today came in much more robust at the overall level, with demand linked to the 3 large load customers now growing to 1,500 by 2030, compared with the earlier 1.1 gigawatt estimate. Could you walk through what is really behind that bump from the previous view? My understanding is that Quantica accounts for most of it, but is this improved clarity on the counterparts already in place, or simply a wider shift in the way you are assessing the pipeline?
Yeah. What mainly changed here related specifically to Quantica. I believe you may recall earlier, I think we had them somewhere around 500, and clearly, 1.1 gig from them now. So I think the shift is mostly tied to Quantica.
Turning now to the large load topic. You've obviously shown solid advancement by securing your third development agreement during this quarter. Before the ESAs, I'd be interested to learn what the most current resource planning assumptions look like for every one of these projects. Also, could you share your thoughts on how NorthWestern can take part in generation opportunities? In the past, Brian, you brought up build-own transfer as a possibility, but it would help if you could lay out where things stand right now and sort of explain the playbook for what utility involvement looks like currently.
Aidan, that's an excellent question, and I could easily spend around 30 minutes on it. So I'll do my best to keep it short; we absolutely want to participate. One point I've raised before is my worries regarding Montana's procurement regulations when it comes to IRPs, RFPs and pre-approval — that's a lengthy process. And our data center partners definitely want to move at a quicker pace than that allows. So one approach we're exploring with them involves asking whether they can take part in some manner via a build on transfer arrangement. And they clearly prefer — I believe you've heard data centers express this — to be served by the utility through a portfolio rather than through stand-alone behind the meter resources; that's ultimately our goal too, but our procurement regulations and their wish to move faster will make it difficult. So I believe we'll need to collaborate and essentially figure out a path forward. Naturally, the Puget interests exist, so to speak, for large load tariffs; that's definitely beneficial. Our current portfolio exists primarily to serve our current customers, though the Puget 370 portion can certainly assist; and our long-term IRP does include certain scenarios tied to data center build-out, but it would need to fall in the back half of some of these opportunities. And so we'll collaborate with every one of these developers on their resource planning and eventually align wherever we're able to participate jointly, though likely with a smaller stake than some utilities whose procurement regulations permit them to supply all of these resources. So once more, we certainly want to participate as much as possible when it comes to generation, and we intend to do as much as we can given the timing available to us. But keep in mind, there will also be an enormous number of transmission opportunities tied to this as well. So we're enthusiastic about our capacity to invest alongside our development partners from a data center standpoint.
Then there's one final thing I'd like to ask about. I want to switch over to the regulation side. Do you have any opinions about the Montana Commissioner races that are coming up, and could the outcome affect what you do in that state?
Regarding what we do in that state, here's how I'd frame it. Whoever ends up winning the commission seat doesn't factor into our approach there. Naturally, we'll collaborate with whoever prevails, and we clearly want to partner with the commission to do what's best for our Montana customers. If what you're asking is about how those races are shaping up, I'm happy to address that, though I'm not sure I fully grasp what you're getting at.
So I suppose, regarding the timing of when you file, how do you view that with the election bringing some momentum into this autumn, and what are your thoughts there?
Right, Aidan. There are, I believe, always many factors that shape when we submit our filings. And we've made it quite plain — and clearly, since we're a state where commissioners are elected, and in fact all 3 of ours are — that no matter when elected commissioners arrive or depart, we will still have to recoup what we spend. We're putting substantial money into serving our customers in Montana. So those filings are going to come at a fairly regular pace. And even with an election happening, 2 seats are up this year, one where someone is finishing their term and another where a commissioner is seeking another term. In either case, we'll keep up our pattern of having to recoup our costs under historic rate making, and I made reference to the '23 test period, '24, no measurable filing, and 2026 at the end of April, I believe, and we still lack the final result. So we'll have to operate inside that historic rate-making framework and keep filing. So even though elections come and go, that doesn't really alter our wider approach to recovery.
Crystal, would you say that was the biggest swing from typical conditions you've ever experienced?
It's amusing you brought that up, Chris. We were ready for exactly that. My recollection is that during 2019's first quarter, we saw a deviation that was a bit bigger, and in that instance it was a chillier weather pattern; as a result, that winter brought unbelievably frigid conditions. So we went back to review it; therefore it's not our most material weather effect, though in terms of average warmth overall, I'd say, across Q4 as well as Q1, my suggestion would be that this was likely the most notable we've encountered.
Brian, you mentioned that you'd give us an update on how the races are shaping up; so what's the latest?
Sure, I'd put it this way: there's a commission seat on the ballot in both South Dakota and Nebraska. As for primaries, things are fairly calm there, from what I can tell in Montana — I'm aware that on the commission, Dr. Bukacek has 2 Republicans challenging her in that primary, plus what I believe is an uncontested Democrat. It's still early innings regarding what we can say about that. The Panoche seat is open, with a couple of Democrats in the running for it and, I believe, an uncontested Democrat. And once more, no matter what, Chris, clearly whoever wins, we're at ease working alongside them, and we'll keep watching. But as things stand right now, I think the primary, as you know, is approaching on the June schedule, and the window for others to enter those Montana races, I believe, has closed. So stay tuned.
So considering how quickly Montana tends to move, when I look at that chart you showed about what to expect for merger approvals, other states do seem to follow a more typical schedule when it comes to rulings. Montana, though, is especially sluggish. And since the hearings begin in the middle of next month, if you just consider a rate case, as an illustration, it might be many, many months after the hearing wraps up before orders come through. So is there any basis for your having some confidence that approvals in Montana will arrive by year-end?
Thank you, Chris. That's a fair question. Clearly, we're pointing to the latter half of 2026. I would say I'm confident — first off, we don't know how this turns out, and we hope to secure certainly the right number of votes to reach a good result. The rationale for why I believe that result ought to come about fairly fast is 2 reasons. First, the key interveners, so to speak, the big customer group, and clearly, the Montana Consumer Council. And clearly, you noticed a handful of other interveners have come to agreement and settled here. So basically, we've arrived at a situation where folks feel at ease with the merger, enough to settle alongside us. That's reason number one. So I believe we've removed a great deal of the issues, so to speak, from consideration. And we have 2 interveners that genuinely remain, with whom we need a hearing and a contested issue. So I think the reality that we've made substantial headway through these settlements ought to assist with the pace. The second point I'd make is there's a $10 million benefit that will go to customers soon after the merger; and I think if that benefit... I would anticipate that the commission would desire that benefit to reach customers as fast as it possibly can. So I would think, factoring those matters in, I'd like to believe this would go quicker rather than slower.
You mentioned a desire to bring an ESA along to the commission regarding the large load filing — is there insufficient precedent from other states? Particularly in Southern states and certain parts of the Midwest, some quite effective mechanisms have been established for bringing new resources on board. So isn't that sufficient — taking some of that presidential evidence before the commission — compared with needing to bring a specific customer?
Yes. Two things, Chris. First and foremost, the great part about being in the utility business is that we observe what our peers are doing, and we believe we've adopted the finest elements from all the large load tariffs we've encountered out there. What I'd say is that the proposal you're seeing lands right in the middle of the fairway — it's consistent with what other companies in the industry have put forward, and it's structured in a way that protects customers. The other point worth making is that we'd actually gotten to the stage where, in my view, an ESA would have been completed quite a while back. Sabey, as you're aware, ran into some land problems that we didn't know about until very recently. So when it comes to the large load tariff's timing and that ESA, our expectation was that the two would land at roughly the same point; and it made sense to fold it into the large load tariff. Chris, there's been plenty of speculation regarding our strategy for data centers and how we intend to safeguard customers. In our view, submitting this Large New Load tariff proposal was the right move for all involved. You're correct that it's quite comparable to the safeguards other utilities are pursuing on behalf of their customers. That gives us a clear chance to observe the approaches others are taking.
And Chris, one more thing I'd mention regarding the filing we made: for anyone who hasn't gone through the devilish specifics of those documents, this is actually a favorable position, since you're able to point to all those other states that already figured out how to prevent cost shifting and secure sensible protection for stranded assets. That's precisely what our framework accomplishes, and it explicitly uses as a benchmark every one of those other tariff filings that reached that outcome. So I believe this gets us to a place where your question rests on a really solid foundation — the commission has the ability to evaluate it even without a particular customer contract in front of them. With luck, one of those will come together before long, yet they're able to weigh it, and that tariff framework delivers sufficient safeguards for customers within the state while still permitting the tremendous advantages you'd observe from necessary system investment that large load customers cover the cost of.
Perhaps I could put that question a different way. Clearly, all of you observe what others are up to; yet the kind of talk that has circulated, definitely over the past year quite a lot, appears to imply that possibly a number of the commissioners in Montana hadn't really been tracking how these other jurisdictions were proceeding, nor the safeguards that are offered, nor the benefits that customers receive. So, in your view, are they paying attention?
Yeah, I'm not able to speak on behalf of the commissioners. What I expect is that they, along with the staff, are monitoring developments in other states. I would definitely hope that's the case. I simply want them to grasp what our aim is, and, as Crystal mentioned too, our aim is to deliver comparable safeguards to those already implemented and embraced across various states. And I believe testimony has been given to supply illustrations of that.
Certainly. And as you pointed out, the settlement in Montana tied to the merger brings advantages — not merely safeguards, but also gains for customers that stem from these arrangements, which you'd imagine they would be eager to deliver to customers more quickly. In any case.
Right. Chris, I would say across all 3 states — clearly it's credit in Montana, yet even the halt in South Dakota and Nebraska delivers safeguards to customers throughout all 3 of those states.
Nice work on the solid quarter. To begin, regarding Quantica, how long would it take them to get to 1,100 megawatts?
Great question, Paul. Looking at how the ramp would go, I'd say roughly 2 years, beginning in '29 and lasting about 2 years.
Yes. I think our materials is around 2031, they be a full ramp.
So then, considering your 4% to 6%, and given that the present 4% to 6% doesn't factor in any data centers, would Sabey and Atlas still leave you inside that 4% to 6%? Or do you figure Sabey and Atlas might actually lift you beyond roughly that 4% to 6% EPS growth?
Paul, my response to that would be that every one of these agreements will depend on what each customer requires and the level of investment needed, which will be shaped by where that customer sits and where they wish to be; so as we've said all along, first, we're unable to put a precise figure on it before reaching a deal with them and then being able to make clear how earnings are affected. Yet with everything else held constant, it definitely moves us higher within that range.
So then is it fair to think that the Avista share of Colstrip would probably be the generation source supplying Sabey and Atlas?
No, that's not something we should assume. The Avista share is — you might remember, and Paul, this came up between us quite a bit at this company, we clearly lacked the proper reserve margin in our operations; we aren't resource adequate. The Avista piece brought us to resource adequate for serving the needs of our current customers. The Puget piece, keep in mind, as I mentioned earlier on this call, that gave us an ownership position at Colstrip that made us more at ease that we held control, certainly, over Colstrip's future. But that $370 million isn't needed for customers right now, and we also didn't want to saddle our customers with $330 million in operating costs for assets they don't require today; however, that $370 million can be used to serve large customers.
Then, assuming the Puget component takes care of those clients, what other kinds of expenditure might you anticipate being tied to Sabey and Atlas, should they become operational?
Right. Here, you're really talking about it from the standpoint of generation. Clearly, transmission investment is going to be required, along with other investment, to back that up. And as Crystal mentioned, once we have an ESA in place, we'll be in a position to say a bit more on that.
Paul, one more thing I'd mention is that with our large load filing under that framework, the underlying assumption is that every customer pays the embedded rate currently in the large load tariff, plus a surcharge covering any incremental investments, whether in transmission or generation. Another way to frame it: they'd start out paying whatever rate is established in each base rate case, and that becomes the floor for both what they pay and what they contribute to the systems. Past that point, we could apply a surcharge tailored to each individual customer's needs, and that leads into the question you're heading toward about how to think through this and model the opportunity — namely, that once we sign a specific ESA, we'll know what incremental investment that situation requires.
So then, if the Quantica demand were to grow past what the Puget portion of Colstrip can provide, how would you realistically handle serving it?
Yeah. In the timeframe they're discussing, I believe — as we mentioned in our current IRP — we addressed being able to serve as a base load; our base plan didn't involve serving data centers, though we did have scenarios that included data centers. But essentially, for us to take part on the back end of that, we'll probably need to capture the latter half of 2031 with some generation. Still, from our conversations with them, they'll need to supply their own generation, especially for 2029 and 2030, and I'd assume based on their requirements, that entire load — certainly a substantial share of 2031 too. We'd love to be involved, but it will be on the back end. And we want to ensure that with whatever they construct, we'd have the chance for a build-on transfer in anything they build.
Great. So my final question relates to something I believe your big customers brought up — they said they'd like to see you go after tighter integration between your system and Black Hills once the merger closes. Could you perhaps give us a sense of what kinds of integration efforts you think would be worthwhile in order to serve customers of both systems better?
Yes. When I think about what's needed on the generation side to serve our customers, my view is that the generation located nearest to those customers will probably keep getting built inside our service territory. The greatest opportunity right away would involve examining Path 80 through the lens of transmission interconnection. I've mentioned that before as one of those paths; however, as we keep evaluating North Plains Connector along with other chances for regional transmission, having the ability to be combined with Black Hills definitely, in my view, opens up stronger possibilities for us to take part in every regional opportunity we're considering.
Also, what's the KV rating on that line, and approximately how many miles would that involve when it comes to building it?
Regarding the North Plains Connector, we're discussing either a 10% stake or a 300-megawatt share. As for the dollar figure tied to that project, I can't say what's been made public at this point; for us it was a fairly substantial investment. That's something we're assessing. We're also assessing, naturally, whether to keep putting money into the Colstrip transmission line along with the related upgrades. Paul, we're examining our Montana, Idaho chance when it comes to putting capital there, plus Path 80, clearly, so we can link Black Hills with our own system. There's a slide about that regional transmission that we've shown before. When it comes to the money involved there, we're still fairly early in the development process; and before we reach specific milestones, we'll likely avoid disclosing any dollar figures. Those investments, in our view, would be.
Thanks for the kind words earlier about the strong quarter. Let me add this. Consider where we stand now with the merger, the shareholder vote, and the 3 settlements. I simply wanted to express gratitude to my team. My thanks go out to the Black Hills team as well — terrific coordination allowed that to come together, along with the schedule we're on. Excellent effort from everyone at NorthWestern, not just in moving the merger forward, but in delivering everything else we're — all the additional items we're discussing on this call, while continuing to serve our customers the way we do every single day. So I'm genuinely, genuinely proud of our people and the excellent quarter we've put up. So thank you so much.
That brings us to the end of today's call. We appreciate everyone for joining in. You're free to hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NorthWestern Energy Group, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to NorthWestern Energy Group, Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.