Thank you, Mark, and good morning to all of you, and thanks for being with us on PetroTal's Q3 2026 webcast, where we'll go through the financial and operational results that came out today. I'm Manolo Zúñiga, President and CEO of PetroTal. With me today is Camilo McAllister, our Chief Financial Officer. If you clicked the link in this morning's press release, you should be able to see our slide presentation on your screen. Before I start, I should note that disclaimers appear toward the end of the main presentation on our website, and I'd encourage you to read them after our prepared comments. Turning to slide 2, I'd like to pause before we get into the quarter's numbers and restate the case for PetroTal as an attractive investment. Start with the asset: PetroTal ranks as Peru's biggest oil producer. We have 110 million barrels of remaining 2P reserves — worth $1.2 billion in NPV10 — versus 34 million barrels produced so far. We are still in the early stages of developing this field. Our record tells the story. From the beginning, we've put $675 million into Peru, delivered over $1 billion in EBITDA, and returned more than $150 million to shareholders. Looking at what's coming up, we're glad to have kicked off our development drilling again in September, since the goal is to get back to the output we had before—over 20,000 barrels per day. As those new wells start producing, we anticipate considerable output gains during the coming six months. Another positive note is that output across the first nine months of this year ran 3% above plan, at 13,076 barrels per day. The right side of the slide gives you a snapshot of where we stand today on production, finances, and the capital markets. Each quarter we're now adding a corporate responsibility update as well, which shows how we're committed to operating safely and to making things better in the communities where we work — a key piece of how we try to build value that lasts. We're proud that since we started, we've committed almost $39 million to our innovative 2.5% social trust fund, which gives local communities the power to tackle social disparities in our host district. Turning to the third slide, as I said, production so far this year is running 3% above our budget. At 13,100 barrels a day, it averaged 11,800 barrels a day in the third quarter, which is 6% lower than the second quarter of this year and 36% lower than the third quarter of 2025. That's a reflection of the organic drop in our output base while we paused development drilling, along with the requirement for extra water handling capacity, and we're aiming to turn that around soon. During the quarter, we finished a pulling campaign at Bretaña, swapping out production tubing and electro-submersible pumps across 5 wells. That effort boosted how durably our wells produce, which helped partially offset output decreases. We also stimulated a pair of water injection wells, and in September we injected 187,000 barrels a day of water, marking a 6% rise month-on-month. That's supported the oil recovery we're getting from our current output; in September we drilled the new development well, the 25H, the first in our effort to bring production back above 20,000 barrels a day by the close of the first quarter of 2027. This page shows the Stena rig at the site, which we've signed for a minimum of 8 oil wells. Finally, following the end of the quarter, we were glad to receive a technical evaluation agreement covering area 107-T. That provides us with exclusive, low-cost access to assess 2 structures where legacy wells have tested oil, along the same trend as other major fields in the Marañón Basin, including Bretaña. We’re eager to update the market after well 25H is finished, and our attention stays on bringing PetroTal back to production growth that can be sustained in 2027. On that note, I’ll pass the call to Camilo so he can walk us through the financial results.
Thanks, Manolo. If you look at slide 4, we've set out how PetroTal performed financially in the third quarter, with comparisons against both the previous quarter and the same period a year ago. For PetroTal, the average Brent price during the quarter came in at $86.45 per barrel, while our production volumes declined 6% quarter-on-quarter. Operating expenses for the third quarter were basically unchanged year-on-year at $13.7 million, though as you can see they rose on a per-unit basis because production volumes declined. Consequently, net operating income came to $44.9 million, an 18% decrease relative to the second quarter. Adjusted EBITDA for the third quarter was $33.7 million, down 23% versus the second quarter; across the first 9 months of the year, adjusted EBITDA reached $112.3 million, already inside the $110 to $120 million full-year guidance range we provided back in May. We posted a net loss of $5.5 million for the quarter, and that really mirrors the effect of a total commodity price derivative loss of $14.9 million. It's worth noting this comprises unrealized fair value hedging losses of $10.6 million and realized losses of $4.8 million, partly offset by a $0.5 million gain on outstanding embedded derivatives. As you may remember, that's our oil in the pipeline. I want to stress that these unrealized derivative losses have no effect on our operating cash flows, liquidity, or any other cash metric. Capital expenditures during the third quarter amounted to $11.8 million, up 48% quarter-on-quarter, which mirrors our return to development drilling, as expected. Cash at quarter end totaled $151.4 million, including roughly $36 million of restricted cash. Following the quarter's close, we were glad to repay the $36.6 million balance on our BanBif/COFIDE syndicated loan facility using our own existing resources; doing so has let us eliminate about $3.9 million in future interest costs.
Going back to slide 5, this final slide summarizes our full-year 2026 guidance, and you've seen it before. I won't spend much time on each line, particularly since it's November now and some metrics—Brent oil price among them—are clearly stronger than what was expected when that guidance was set. Still, we're pleased with our operational and financial performance so far this year. That reflects the hard work of the entire PetroTal team and the support of all our stakeholders, and we're grateful for it. Returning to drilling is a huge step toward restarting growth, and I look forward to sharing well 25H's results with you as soon as they're available. With that, I'll turn the call back to the operator. Let us know if you have questions; in Bretaña, when well 25H was announced, we said drilling it should take about 2 months, and at that pace we should be able to drill 6 wells per year in Bretaña. As we refine the drilling campaign—keep in mind it's been 2 years since the last well was drilled—we might do better than that, though typically 6 wells per year in Bretaña. As prior releases noted, we hold 22 total 2P wells; in Los Angeles, as mentioned here, we succeeded in lowering royalties. The government strongly supports additional investment in Peru's Amazon jungle, but even so there's a schedule we must satisfy, which is to drill 2 wells within the next 2 years; we're working toward a final investment decision on resuming drilling in Los Angeles. As I've said before, 2 of the 4 oil-producing wells in Los Angeles went down into deeper formations showing pay, yet they were never tested. The plan is to drill a well that produces from the Cushabatay Formation and also tests the lower Noé and Copacabana, which could then add reserves and production and give PetroTal a profitable second oil field. Block 131 fits into this broader campaign as well, and we have 2 years, and hopefully we can secure the FID next year.
Manolo, let me take this one.
Please.
The purpose of our hedging program is essentially to make sure the company has its minimum liquidity available when oil prices are stressed or in downturn scenarios. As you may remember, our policy sets minimum liquidity at $60 million, and right now we have hedged roughly 1.7 million barrels covering October 2026 through December 2027. Hedging is always done solely against our base production; we don't immediately hedge incremental production as wells come online — we wait some time before that output gets added to the base and becomes eligible for hedging. The fact that we paid the facility does not prevent us from continuing to evaluate hedging opportunities. Those opportunities exist to protect cash flow, not for speculative purposes.
Camilo, how about you take that one also?
You may remember the erosion control project from when we introduced it last year — we said then that it would run roughly $65 to $75 million, and we had picked a consortium to carry it out. That project was halted in March of this year, and through March we had executed around $34 million of the program. Taking the top of the range we disclosed, we still have approximately $42 million left to go. That work will be carried out during 2027; we are still in the final stages of choosing the construction company that will install the pilings for the groins. Every other piece of critical equipment has already been secured and is available to us. As soon as the project is ready to be announced as restarting and completed, we will make that announcement.
I want to give a quick update on the ONP. A few weeks back, Petroperú — the state-owned oil company that holds the pipeline, known as the ONP — signed a joint venture agreement with Cheiron Energy, an Egyptian oil company, aimed at developing Block 192, which has been shut in for 9 years now. Prior to being shut in, that block was producing close to 10,000 barrels of oil. From my conversations with the government, my understanding is that the plan is for Cheiron to begin oil production by April 2028. Why that matters is that Block 192 relies on the ONP. As soon as oil flows into the pipeline again, that ought to be a strong signal that oil will be moving. So some of the oil sitting trapped in the pipeline, which carries a derivative versus oil we previously sold to Petroperú, will at last be settled. It's hard to pin down exact timing, and whether we re-enter the pipeline will also hinge on how well Cheiron performs in producing Block 192. As I've consistently said, I think the company ought to return to the ONP in order to diversify its markets. We're potentially looking at April 2028. Camilo, over to you.
We repaid it earlier than planned since, as you may recall, that loan was tied directly to the erosion control project, and it was essentially restricted cash usable only as the project progressed; we halted work on the project, as I noted earlier, in March of 2026 while we bring in a replacement contractor. Those funds weren't available to us—they sat in restricted cash and, naturally, were generating an expense for the company, so keeping that facility made no sense. With oil prices and the current environment as they are, we had sufficient liquidity to eliminate that facility; now, are we looking to put a new one in place? We're finalizing next year's budget, and we always evaluate those financing opportunities in light of our development program and investments, so that remains a possibility.
Our guidance was for 2 months, and we ought to hit total depth very soon, and the well should be producing in roughly the same period we guided, 2 months. As a reminder to our investors, we've been quite consistent. After the wells clean out, we give the first week of rates, and then the first 30 days. That provides investors with a sense of how the well is performing. We intend to do precisely the same thing. Naturally, if it falls on a weekend, it might be 8 days or 9 days, but we give 2 pictures of how the well performs, and we intend to do the same with every one of the wells. Camilo, would you like to answer that one as well?
Yes. Capital returns, as you're well aware, is a topic we look at each quarter. We examine it against our growth opportunities, against the cash flow we generate, against our balance sheet, and since we're wrapping up the budget for next year, it's clearly part of the conversation, and it's something we're assessing. I can't give any guidance until our budget is finalized, and we'll be offering guidance on that budget, hopefully, before year-end.
The
question
is...
Apologies, Manolo, I'll take that one. Essentially, our capex guidance hasn't been changed, though you're correct to note that some of it will slip into next year because of how the erosion control project is being executed. So our investment pace in Q4 is going to be elevated, but $85 million would be a stretch, and part of that amount will need to shift over as a result of erosion control.
We need to expand what we can handle on the water side. Since I founded this company, I've consistently said that our original 3P case envisioned 20 wells in total, and at 10,000 barrels per well, we'd have to handle 200,000 barrels of fluid each day. At present, we're handling roughly 210,000 barrels of fluid. Our 2P case now contains 46 wells altogether, which means we'll need to manage somewhere between 460,000 and 500,000 barrels of fluid daily. That matters. In our corporate presentation, you'll notice we've raised the notion of moving from the 210 we handle today up to 340 or 350 by the close of 2028, and after that we may have to make the additional leap to 500,000. That matters. I believe we'll leave it at that. As I've told some investors, within our currently certified reserves, the 2P case presumes a larger amount of water treatment, and my feeling is that won't be necessary, particularly should the contract terms be extended, which the government is indicating it intends to do, and that would be wonderful for everybody. As usual, I want to express my thanks to all of our investors. I'm aware that my team members are listening to this webcast as well. My thanks go out to them. I'm eager to give our 2027 guidance very soon, so investors can understand how we will actually drill every well we intend to drill and boost the plant capacity, allowing us to produce 20,000 barrels per day over the coming years. Thank you very much.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete PetroTal Corp. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to PetroTal Corp. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.