Home / Transcripts / Pinnacle West Capital Corporation (PNW) · November 3, 2025

Pinnacle West Capital Corporation (PNW) Earnings Call Transcript & Summary

November 3, 2025

New York Stock Exchange US Utilities Electric Utilities earnings 37 min

What were the key takeaways from Pinnacle West Capital Corporation's November 3, 2025 earnings call?

In the third quarter of 2025, Pinnacle West Capital Corporation reported earnings of $3.39 per share, a slight increase of $0.02 year-over-year, driven by higher transmission revenues and robust sales growth across customer classes. The company raised its 2025 EPS guidance from a range of $4.40 to $4.60 to $4.90 to $5.10, reflecting strong demand and operational performance. Management highlighted a weather-normalized sales growth of 5.4% and residential sales growth of 4.3%, indicating a positive outlook for the fiscal year and beyond.

What topics did Pinnacle West Capital Corporation cover?

What were Pinnacle West Capital Corporation's November 3, 2025 results?

Pinnacle West's solid performance in Q3 2025 and raised guidance indicate a positive outlook for the company, driven by strong sales growth and strategic investments in infrastructure. However, regulatory challenges and the need for careful management of capital expenditures remain key risks. Investors should monitor the progress of the rate case and the execution of the company's long-term growth strategy.

Earnings Call Speaker Segments

Amanda Ho executive
#1

Thanks, Matthew. I want to express appreciation to each of you for joining this conference call and webcast, where we'll go over our third quarter earnings along with recent developments and operating performance. Joining us today are our Chairman, President and CEO, Ted Geisler, and our CFO, Andrew Cooper. Also with us are Jacob Tetlow, COO, and Jose Esparza, SVP of Public Policy. To start, there are a few slide-related items I should mention. The slides we'll be referencing can be found on our Investor Relations website, together with our earnings release and associated information. Statements made today and the content of our slides include forward-looking statements that rest on current expectations, and actual results could differ materially from those expectations. Our third quarter 2025 Form 10-Q was filed this morning. For forward-looking statements, cautionary language, and the risk factors and MD&A sections that identify risks and uncertainties which might cause actual results to differ materially from what our disclosures contain, please consult that document. A replay of this call will be posted on our website shortly and will remain there for the next 30 days. It will also be accessible by telephone through November 10, 2025. I'll now hand the call over to Ted.

Ted Geisler executive
#2

Thanks, Amanda, and I appreciate everyone being here today. During Q3, our operational and financial results were robust, which highlights the discipline and focus that characterize our strategy. Today, I'll explain how we intend to keep satisfying growing customer demand and how we made it through a summer season that was quite dynamic. I'll also point to our long-range planning work and the strategic investments that set us up for sustainable growth; after that, Andrew will describe how higher sales and transmission revenue caused us to update our 2025 earnings guidance, as well as our expectations for the financial future. Crucially, our long-range planning and resource procurement delivered results, since we served customers dependably across several record peak days during this quarter. I take pride in our whole team for rising to the occasion during the summer season to back our customers and communities with reliability that leads the industry, which is a signature of our company. Our crews dealt with storms, flooding and extreme heat, but we were ready to make sure customers received attention through fast response and operational excellence. In addition, Palo Verde Generating Station ran at 100% capacity factor all summer long, providing a solid performance for our customers and the whole Desert Southwest region. Our peak demand record mirrors the strong economic growth underneath in our service territory, with weather-normalized sales growth of 5.4% and residential sales growth of 4.3% during the third quarter by itself. Population growth in Arizona stays robust, driven by major employers that are expanding their operations and creating demand for skilled labor. The state's capacity to draw and keep high-quality talent is genuinely a key differentiator and a strong indicator of the long-term economic vitality we're helping to support. SEMICON West, known as North America's largest Microelectronic Exhibition and Conference, took place outside California for the first time in over 50 years, with Phoenix chosen as the host city. Economic momentum in our region keeps speeding up. Site Selection Magazine recently ranked Maricopa County as the top county in the nation for economic development in 2025, pointing to its success in drawing high-growth industries such as semiconductors, data centers and logistics. Taiwan Semiconductor restated its commitment to Arizona, speeding up production of 2-nanometer wafers and advanced technologies. They additionally revealed plans to obtain a second location in Phoenix to back their vision for a stand-alone giga-fab cluster. Meanwhile, Amkor Technology started construction on a $7 billion advanced semiconductor packaging and testing facility, which represents an added investment of $5 billion beyond their original plans. The first phase should be finished by mid-2027, with production starting in early 2028. To underpin this growth, we're carrying out our plan for long-term investments in both transmission and baseload generation, which matter for securing a reliable grid over the long term; in Q2, we announced our role as the anchor shipper on the Desert Southwest expansion project. And only days ago, we announced plans to develop a new generation site near Gila Bend just southwest of Phoenix, which could add up to 2,000 megawatts of reliable and affordable natural gas generation for our customers. The Desert Sun Power Plant is a project split into 2 phases, built to meet the needs of current customers as well as growing demand from extra-large energy consumers such as manufacturers and data centers. By late 2030, Phase 1 should start providing service to committed customers. Phase 2 should back new demand coming from our queue of high load factor customers. What matters here is that we're now negotiating with customers to lock in Phase 2 capacity through our subscription model — a commercial construct meant to guarantee that growth pays for growth while keeping service affordable for everyone. Putting money into generation by itself won't be sufficient to meet rising customer demand. We're also investing heavily in transmission, with several projects already underway and additional ones being developed. These efforts should improve reliability, resiliency and the integration of new resources. On top of that, they broaden our access to regional markets and generation from out of state. Transmission investment benefits from constructive and timely recovery via our FERC formula rate and opens the door to extra wheeling revenues that help keep our retail customers' bills affordable. Now, on our pending rate case. We're still actively working with intervenors to answer data requests and stay on schedule for a hearing in Q2 of next year. With 2025 drawing to a close, our priorities haven't changed: carrying out our mission to provide reliable and affordable service to our customers, putting capital into baseload generation and transmission to serve growth, and securing a constructive regulatory outcome that safeguards customer affordability while cutting regulatory lag. I appreciate your time today. I'll now hand things over to Andrew.

Andrew Cooper executive
#3

Thanks, Ted, and I appreciate all of you being here today. Earlier this morning, we put out our financial results for the third quarter of 2025. I'll go through what drove our performance, give some context around the updated guidance for 2025, and share how we see 2026 and the years ahead. For the quarter, we posted earnings of $3.39 per share, which is a slight bump of $0.02 compared with a year ago. That came mainly from greater transmission revenues and increased sales, thanks to strong sales growth across our customer classes. Partly offsetting those gains were lower weather-driven sales versus last year's Q3, greater interest expense, decreased pension and OPEB benefits, and more shares outstanding. Given strong sales growth, weather that was above normal, added transmission revenues, and contributions from El Dorado, we're lifting our 2025 EPS guidance from a range of $4.40 to $4.60 per share to $4.90 to $5.10 per share. Because we can derisk future operating expenses, our updated guidance reflects a higher forecasted O&M for the year, now a range of $1.025 billion to $1.045 billion. Sales growth remains strong across every customer class. For the quarter, we saw 5.4% weather-normalized sales growth, which included 6.6% C&I growth, helped by large load customers continuing to ramp up, and 4.3% residential growth. Residential sales growth year-to-date is 2%, above what we expected, driven by ongoing customer growth reaching the top end of our range. So we're narrowing our customer growth guidance range to the high end of 2% to 2.5% for the year. Looking toward 2026, we expect earnings per share of $4.55 to $4.75 per share. The anticipated year-over-year decline relative to our revised 2025 earnings guidance stems from the projection of normal weather along with higher financing and D&A costs as we move through the rate case process; we still expect robust customer and sales growth, increased transmission revenues, disciplined O&M management, and some positive contributions from our El Dorado subsidiary. Customer growth for next year is projected at 1.5% to 2.5%, backed by Arizona's continued population and business expansion. A year ago, we set a post-recession record with almost 35,000 new meter sets. We're on pace to equal that number once again in 2025, and our 2026 forecast for customer additions stayed strong. On overall sales growth, we expect weather-normalized sales to keep growing at 4% to 6% in 2026. And with strong residential sales growth trends plus continued ramping and acceleration plans from our extra high load factor customers, including those in advanced manufacturing, we have growing confidence in our forecasted long-term sales growth range, so we're raising it from 4% to 6% up to 5% to 7% and extending it through 2030. Our capital and financing strategy stays focused on enabling growth while keeping affordability and financial discipline. Our capital plan has been revised through 2028, now encompassing key strategic investments in both transmission and generation. These support reliability as well as the needs of our service territory, which is expanding quickly. As Ted pointed out, we're eager to build out these new resources so our customers benefit. Through 2028, this spending should produce rate base growth between 7% and 9% — up from the earlier forecast of 6% to 8% through 2027. To back this plan, our financing approach for '26 through '28 has been refreshed, keeping a balanced combination of debt and equity that matches our balance sheet objectives. Roughly 85% of the equity we need for 2026 is already priced, with another $1 billion to $1.2 billion of Pinnacle West equity projected through 2028. Regarding O&M, our 2026 outlook shows our dedication to cost efficiency; we anticipate a modest decline compared with last year even as customers keep being added, and over the long run we stay focused on bringing O&M per megawatt hour down. Lastly, we're reaffirming long-term EPS growth guidance of 5% to 7%, anchored to the midpoint of our original 2024 guidance range; we know regulatory lag will remain a factor during 2026. Even so, our confidence in the long-term financial strategy is unchanged. Unique advantages exist in our service territory, such as robust growth among every customer class and a diversified economic base featuring advanced manufacturing, data centers and ongoing population gains. By collaborating closely with the Arizona Corporation Commission and stakeholders, we're dedicated to tackling regulatory lag, speeding up recovery timing and preserving affordability while we keep serving new and existing customers. That brings our prepared remarks to a close. I'll hand the call back to the operator now for questions.

Julien Dumoulin-Smith analyst
#4

Great work, I have to say that once more. Now, let me — if I may get us started here, clearly, the gas build is the main topic for you folks right now, solid progress. What's your thinking about eventually providing visibility on 2029 and 2030, particularly given what you've observed up to this point? Could you discuss, to whatever degree you can, how that trajectory might look if you extended it forward in that setting? And perhaps elaborate a bit more on the order in which this pipeline gets constructed on time and placed into service to match what appears to be a rather compressed schedule overall for developing this generation.

Ted Geisler executive
#5

Sure, Julien, thank you so much; and I'll begin and then Andrew can address the capital plan. The pipeline should be placed into service during 2029. We're keeping very close tabs on that project and continue to feel confident about the milestones along the way; and so, as you're aware, that represented the initial critical step. The next step, then, involves beginning to announce some of the generation capacity projects we've been developing, with Desert Sun being the first significant announcement and project that we would anticipate. And so, as we've mentioned, we view this in essentially 2 phases. The initial phase will be required to serve committed customers. That falls within the 4.5 gigawatts we've already committed to and are constructing to serve. And we'd anticipate having that phase placed into service in 2030; so still a solid buffer beyond when the pipeline enters service, but a schedule we feel at ease about achieving. Crucially, we've secured all the key equipment, land interconnection is established; so I believe we're well positioned to deliver on that time line. And then regarding the second phase of that project, we've pinpointed the opportunity to serve our subscription customers with it; we've presented an opportunity to subscription customers for 1.2 gigawatts and we're actively engaged with those counterparties regarding their preferred timing and ramp rate so they can capitalize on that second phase. And that's among the advantages of the subscription model — we can guarantee that the delivery time line of that second phase aligns with the counterparties' ramp rate, and we ensure reliability is safeguarded by keeping those 2 synchronized. Both will, naturally, take service from the new pipeline, but we're at ease with the timing and how that corresponds with the pipeline's entry into service. And we'll keep tracking pipeline progress throughout. And be ready to make adjustments if necessary. But we're at ease with the time line we've set out. Andrew, would you like to address the capital plan?

Andrew Cooper executive
#6

Absolutely. So, Julien, when it comes to Desert Sun specifically — part of that capital sits in the current plan, on the generation side and a little bit on transmission too. Long lead equipment, land, those types of items are included. And of course, with the in-service date Ted mentioned for Phase 1, you'd expect that CapEx to ramp as we approach the end of the decade. And on the wider capital plan, as we move through the rate case, get a handle on how the formula rate behaves, and keep building out the subscription model alongside our customers, that gives us a chance to offer greater visibility, since we really want that growth to be paid for by growth. But the plan we've laid out through '28 does capture the early stages of those very large, longer lead time investments on both generation and transmission. You can spot it in the 2028 new run rate for transmission investments, plus the extra detail we gave on our ability to begin examining that additional $6 billion backlog of FERC-regulated transmission assets and start developing them side by side with a project like Desert Sun. So that's the plan. We feel good about it through '28; and as we can provide further information on the time line out to the end of the decade — and we've tried to begin doing so with the construction work in progress disclosure we've given over the past few quarters.

Julien Dumoulin-Smith analyst
#7

Understood. That's great. You basically set up what comes next. What's the status of the subscription side of things? You mentioned that 1.2 gigawatt opportunity. How far along are you in terms of filling that bucket, or that opportunity?

Ted Geisler executive
#8

Right, discussions are ongoing. This was Tranche 1 of our subscription, and we understand that the timing of Tranche 1 lines up with building out Phase 2 of Desert Sun, along with the new pipeline coming into service. So right now we're coordinating with counterparties to align that with when they want their in-service date. But talks are active, and we're still optimistic about being able to roll out the subscription model to keep serving a portion of the 20-gigawatt queue that's ready to start service in our territory, while also structuring it in a manner that supports financing and safeguards customer affordability. So I believe the market has responded well to the core components of the model. We're working closely with counterparties, and it will be a solid approach for serving that queue both at present and into the future.

Julien Dumoulin-Smith analyst
#9

Yeah, that makes sense. Just a small point regarding '26 — there's that $0.55 increase tied to transmission. Is that a level we can count on staying at? It's quite a sizable increase, after all.

Andrew Cooper executive
#10

Right, Julien. As we move ahead, we'll be giving guidance on that, naturally. Still, I'd say it does reflect where things are heading; we've stayed strongly dedicated to putting money into our transmission business regulated by FERC, and that represents part of the capital I mentioned earlier; so this stems from the necessity of reaching resources located farther out and supporting our expansion. And with how FERC is structured, the formula rate, plus how much capital we've committed there, this simply follows naturally from the plan we've laid out and is now turning into a yearly earnings opportunity.

Fei She analyst
#11

This is Fei, sitting in for Nick today. So, real quick, if I may, just one point of clarification regarding equity dilution. Given that 85% of the equity requirement for 2026 is already handled — that's the $550 million you noted was priced in the slide — what is the actual additional equity needed for '26 through '28, particularly considering the $1 billion to $1.2 billion of total equity earmarked for the 3-year guidance period? And then, how should we view the timing of issuance across '26 and '27? Also, how ought we to consider any equity mitigation, given the robust sales growth environment you just described in the update?

Andrew Cooper executive
#12

Thanks, Fei. So yes, regarding equity, as you mentioned, we've largely removed the risk from the '26 need through all the equity priced via the block issuance completed in 2024 as well as our ATM usage across the last 2 years; so it would seem we're sitting in a solid spot. Looking at the incremental requirement across the 3 years — that '26 to '28 stretch — that is precisely what the $1 billion to $1.2 billion figure captures. And certainly, these projects come in lumpy fashion; so the rhythm of issuance necessity largely tracks that; that's precisely where an ATM has served us effectively up to now, letting us align our drawdowns and issuance with the CapEx as we move through certain of these bigger projects. But your final question regarding mitigation is truly the crucial one. When you consider that range alongside our capacity to fulfill our long-term aspirations for a balanced capital structure and to keep equity dilution as low as possible within such a balanced capital structure, it truly circles back to all the efforts underway both on cutting regulatory lag via the rate case process, to boost retained earnings and our capacity to finance that capital through internally generated funds; and then on turning to our large load customers in the subscription conversation to ensure that, insofar as we can obtain cash upfront to support those investments, it lowers the necessity for us to approach the market for equity. So although that range represents today's forecasted requirement, we will keep working through the rate case process and the large load engagement to attempt to mitigate it to the greatest extent feasible.

Fei She analyst
#13

Understood, that's really useful. Then, if I may, regarding the slide you showed on transmission capital investment. I value how clear you were about the $2.6 billion in cumulative transmission CapEx through '28, plus the $6 billion plus through 2034. Would you speak to what you're assuming for yearly transmission CapEx after 2028? Also, how are we meant to read that $6 billion plus, particularly regarding what drives and adds to the upside?

Andrew Cooper executive
#14

Sure; the details of the plan beyond 2028 haven't been presented, since those are truly the projects contained in the 10-year strategic transmission plan we submit to the commission every other year. A large number of projects sit within it, 500 or 600 miles of high-voltage lines being built to serve various needs; and there's a degree of fungibility regarding whether you build this line or that line. So a great deal of that effort is underway now. My overall framing would be that 5 years ago we were below $200 million annually in run rate CapEx on transmission, purely for the local area projects, the ones at 69-kV plus. That figure is climbing to the $300 million to $400 million range for just the blocking and tackling CapEx on the transmission side; and therefore the amounts above that, which you can see nearly reaching the possibility of $850-plus million becoming a run rate. A baseline of $300 million to $400 million is included there. The amount beyond that then reflects the start of putting money into the strategic transmission projects. Still, it's a very long runway, and the figure will shift year-to-year. Yet I believe when you consider 2028, that captures the opportunity continuing steadily via a mix of core transmission and the added piece from strategic transmission.

Fei She analyst
#15

Understood, that's really useful. If I may, I'd like one more brief point of clarification. Regarding the upgraded guidance for strong sales growth — I suppose what I'm seeing is a notably high figure of 5% to 7% all the way through 2030, whereas the 7% to 9% rate base growth runs only through 2028. Could you speak to how confident you are about potentially carrying that 7% to 9% rate base growth out further into the future? And what do you think the main drivers behind that would be?

Andrew Cooper executive
#16

Sure. So on the rate base side, we've set things out through 2028. A key reason it moved higher is that you start to see certain long lead projects entering service in '28. The clearest illustration is Redhawk, which is the expansion of our natural gas facility at that location. Once you reach 2029 and 2030 and past that, additional larger projects arrive, serving — as you put it — the greater sales growth we're observing, particularly among the large load type customers. So as we keep progressing and build out the CapEx plan concerning Desert Sun, concerning those strategic — that $6 billion strategic transmission we just discussed, we'll keep revisiting that rate base growth rate. Our confidence is that this runway is very long. The exact level is something we'll be able to keep working through; that CWIP disclosure I brought up earlier is likewise a solid way to consider some of the projects we already know are in the pipeline that carry us into '29 and '30, and a solid way to extrapolate if you run some of those calculations.

Shar Pourreza analyst
#17

This is actually Alex, filling in for Shar. So regarding the growth rate outlook, you're still aiming for that 5% to 7% of the '24 midpoint. Just given today's new '26 guidance, could you help frame what you might use as your new base? And once the rate case is concluded, will you roll the plan forward right away?

Andrew Cooper executive
#18

Sure. Yes; so really, the rate case pushes us to examine all of that; and when you consider base years, we truly attempt to set the bar as high as possible for ourselves to ensure we're consistently meeting or exceeding expectations and doing so the right way. And so we want to reach the point where that 5%, 7% becomes evergreen. Currently, we're in a situation where earnings are lumpy. We go and have a rate case and receive a rate increase, and then regulatory lag occurs through a lengthy rate case process. The formula rate is really an important element here to be able to convert that earnings growth rate from being kind of a long term look at '24 and then look at '28 to something that can be more evergreen; and so I think, as we work through the rate case process and the structure of the formula rate, we'll be much better positioned to talk about what all that looks like. And ultimately, that's the goal — to be able to deliver year in, year out, produce more modest increases year-over-year for customers as well. That's a really important part of it. And ultimately, that creates the better stability for us around our earnings growth.

Analyst analyst
#19

Understood. Okay, that's useful. Now, shifting topics—could you give a bit more color on the megawatt pipeline tied to the hyperscaler segment, and how you're viewing first-generation capacity requirements?

Ted Geisler executive
#20

Yes, absolutely, Alex. We keep observing a very strong demand pipeline. As shown in the slides, we have 4.5 gigawatts of additional demand already committed; part of that will be served by Desert Sun, along with upcoming generation and transmission projects within our guidance period and beyond that will still need development. Beyond that, we aim to make headway in committing to and serving a portion of the 20 gigawatts of uncommitted load in our present queue; Desert Sun will start enabling us to serve some of that too. Naturally, we expect to provide far more than merely that initial 1.2-gigawatt tranche. The plan is to contract that first tranche, then keep pinpointing chances to expand generation and transmission capacity as we reach a stage in predevelopment where we're confident about timing and available capacity levels, at which point we'll approach the market and offer another tranche of service to that uncommitted queue. That's the approach we expect to implement moving forward. Ultimately, we expect to keep offering capacity steadily to chip away at those 20 gigawatts, and we view the 1.2 gigs recently offered as merely the initial move along that path.

Travis Miller analyst
#21

Let me just verify something about the '26 guidance. Nothing is baked in from the rate case, right? And assuming that's right, could you share any thoughts or direction regarding what a dollar increase might look like, so to speak, during the later portion of the year? Any perspective on that?

Ted Geisler executive
#22

That's right, Travis; no assumptions regarding a rate case outcome went into the 2026 guidance. Like we've mentioned, we expect the case to wrap up in the final quarter of the year; and since that quarter is quite small for us regardless, plus the timing, it simply didn't appear wise for us to build in any assumptions right now; but of course, when the case wraps up, that will let us take a step back and reassess how constructive the result is and what it means for guidance looking ahead. So we'd aim to do that at that point, along with the specifics of how the formula rate would function regarding both timing and level going forward; so expect more updates after the case wraps up on all of those elements.

Travis Miller analyst
#23

All right, that's clear. Moving on to a different topic, regarding those 4.5 gigawatts of customers who've made commitments, could you provide more detail on who they are? And is any portion of that going to your system-wide base, involving residential or small commercial? How would you — in what way would you divide up those 4.5 gigawatts?

Ted Geisler executive
#24

Sure. Those 4.5 gigawatts represent a good equilibrium and mixture spanning additional industrial expansion, for instance chip production, with TSMC and Amkor serving as illustrations of that plus their supplier network, and naturally, data centers either currently being built or already operating, though we anticipate them gradually coming online during this timeframe. And crucially, we keep witnessing consistent and strong growth in residential and small business segments. So I would describe that as a key characteristic of our expansion narrative — a highly varied narrative, not overly reliant on any single industry or customer group. Maricopa County was just named the leading County for economic development in 2025, and it stands as the third fastest in the U.S., while Phoenix was ranked #1 among the top 15 growth markets for manufacturing. And every bit of that stands apart from a data center narrative. It simply demonstrates the genuine fundamental growth. We're also happy to observe that affordability remains a defining feature of our service area, with an advantageous cost of living. Inflation in Phoenix is rising at roughly 1.4% compared to the national average of 2.9%. Therefore, I believe numerous factors explain why we're experiencing varied growth, and that 4.5 gigawatts encompasses every sector, which instills confidence in the growth rate, yet also indicates we have substantial infrastructure to roll out to keep pace with the different sectors requesting it.

Travis Miller analyst
#25

All right. Yeah, that makes sense; and then — so the bulk of that 4.5 gigawatts, would it be headed into rate base? Or is a portion of it the subscription approach you mentioned, which could sit outside rate base?

Ted Geisler executive
#26

Let me make this clear — every bit of what we invest lands in the rate base. Even under the subscription approach, it still lands in the rate base. What we're doing is simply signing contracts with those customers. Picture it as a special rate agreement instead of something outside rate base, and that special rate agreement merely guarantees that growth funds growth, that the schedule of their ramp lines up with the schedule of the ramp of the infrastructure we'll build to serve them, and possibly that we get their assistance financing part of that infrastructure, allowing us to keep a healthy balance sheet while we expand these rate base investments, particularly for data centers. So everything lands in the rate base; the only real distinction under the subscription approach is how the dollars get recovered.

Stephen D'Ambrisi analyst
#27

I was simply looking for a bit more detail regarding the shift in sales growth year over year as a driver of EPS. From what I understand, in the '25 guidance you included $0.58; and in the '26 guidance, it appears you're including $0.39. I suppose I'd just take a step back and note that the size or composition doesn't appear all that different, since each year was 4% to 6% in total, with 3% to 5% coming from large C&I. So could you offer a bit more detail there? Is it the mix among the C&I classes? Or what is causing the gap in the EPS uplift amount that comes from sales growth?

Andrew Cooper executive
#28

Steve, this is Andrew. Absolutely. Yes, so you're correct, '26 has a somewhat smaller contribution there; and that's truly because we're discussing a fairly sizable set of customers whose ramp rate has puts and takes from one year to the next. And a number of those — since we've been an early data center market, we've managed to build more advanced forecasting on a customer-by-customer basis, regarding who's testing equipment, who's genuinely ramping. And so you do observe some fluctuation inside the customer class. So the residential small business figure is fairly steady; and as we've seen this quarter and in our guidance for this year, the anticipation of continued quite large new customer additions and an actual positive contribution from residential sales despite the fact that we've kept having energy efficiency and distributed generation pushing up against that. So it truly is the year-to-year variability among some of our large load customers. I think what we really want to emphasize is that this is a long-term set of customers with a trajectory we now feel confident about through <<inaudible>>, including lifting that sales growth guidance by 100 basis points across that period. And the fact that, that means the extra load factor contribution to it also steps up by 100 basis points. So over the long term, feeling really good. There is some intra-year variability; but once you combine that with continued customer growth, residential growth and then the continued conversion of our transmission investments into revenue through our FERC formula, we're feeling pretty confident about the ultimate outcome.

Stephen D'Ambrisi analyst
#29

That is genuinely useful. And I suppose that would be similar to the put and take, as opposed to what we had been thinking, which is simply sales growth against transmission. I'm aware Julien raised this, but could you expand on it a bit further? Obviously, through the remainder of the plan, transmission growth rises substantially going into '28? And does that $0.55 benefit therefore grow in a linear fashion alongside the higher transmission spending? Or is there some factor producing above-normal growth in recoveries...

Andrew Cooper executive
#30

Yes. No. Eventually, it ought to track the investment proportionally; we recover fairly fast, correct, as we place assets into service. What I believe will occur is that it becomes somewhat more lumpy, since in the near term, that $300 million to $400 million of run rate projects consists of smaller projects completed inside a single year, perhaps spanning 2 years at the most. And we're advancing into lines whose construction may take longer. A few of the items we're evaluating include whether you can energize them on a sectionalized basis, thereby cutting the regulatory lag — if we're constructing a 100-mile line, is it possible to do it in segments? That's the sort of approach we're considering to ensure we keep converting that opportunity into earnings. Another favorable aspect of the transmission opportunity is that it sits within the wider wholesale market. Consequently, the chance to offset part of the effect on our retail customer base through willing — others rolling over our system has also been a major element of our customer affordability story. So there are several benefits to pursuing it. We are undertaking some larger projects. Thus the scaling will eventually arrive over the long term. But within a year, some lumpiness may appear, simply because that increment beyond the core $300 million to $400 million involves longer lead time projects that may need a few years before entering service.

Operator operator
#31

Appreciate it. That wraps up the question-and-answer portion. Folks, we're now at the end of today's event. Feel free to drop off the call at this point, and enjoy the rest of your day. Thanks so much for joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pinnacle West Capital Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Pinnacle West Capital Corporation earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.