Home / Transcripts / Pinnacle West Capital Corporation (PNW) · February 25, 2026

Pinnacle West Capital Corporation (PNW) Earnings Call Transcript & Summary

February 25, 2026

New York Stock Exchange US Utilities Electric Utilities earnings 47 min

What were the key takeaways from Pinnacle West Capital Corporation's February 25, 2026 earnings call?

In the fourth quarter of 2025, Pinnacle West Capital Corporation (PNW) reported earnings of $0.13 per share, a significant improvement from a loss of $0.06 in the same quarter last year. For the full year, earnings were $5.05 per share, slightly below the previous year's $5.24, primarily due to weather-related impacts. The company reiterated its 2026 earnings guidance of $4.55 to $4.75 per share, maintaining a weather-normalized sales growth forecast of 4% to 6%.

What topics did Pinnacle West Capital Corporation cover?

What were Pinnacle West Capital Corporation's February 25, 2026 results?

Pinnacle West's strong operational performance and customer growth position it well for future growth, despite some regulatory challenges. Investors should monitor the progress of the rate case and the company's ability to capitalize on growth opportunities in the semiconductor sector, which could serve as significant catalysts for stock performance.

Earnings Call Speaker Segments

Amanda Ho executive
#1

I appreciate that, Matthew. I want to express my gratitude to all of you for joining this conference call and webcast as we go over our Q4 and full year 2025 earnings, recent developments, and operating performance. With us today are our Chairman, President, and CEO, Ted Geisler, and our CFO, Andrew Cooper. Jacob Tetlow, COO, and Jose Esparza, SVP of Public Policy, are also joining us. Before we begin, I need to go over a few items with you. The slides we'll be referencing can be found on our investor relations website, together with our earnings release and related information. Today's remarks and our slides include forward-looking statements that are based on current expectations. Actual results could differ materially from expectations. Our annual 2025 Form 10-K was filed this morning. Please consult that document for forward-looking statements, cautionary language, as well as the risk factors and MD&A sections, which identify risks and uncertainties that could cause actual results to differ materially from those contained in our disclosures. A replay of this call will be posted shortly on our website and will remain available for the next 30 days; you can also access it by telephone through March 4th, 2026. I'll now hand the call over to Ted.

Ted Geisler executive
#2

Thank you, Amanda. I appreciate everyone being here with us today. During 2025, the team delivered impressive performance and achieved meaningful advancement against the goals in our strategy. We met unprecedented demand while achieving top-quartile reliability, gave customers a top-quartile experience, and exercised discipline in how we handled our grid expansion plans. Even though 2025 brought genuine headway, we still have work to do, and our dedication to carrying out the strategy has not wavered. As we move into 2026, that same approach will guide us, with especially close attention to advancing our rate case, delivering on grid expansion plans, maintaining affordability for customers, and closing commercial deals with new large customers. On the operations side, I'd like to acknowledge how exceptionally our team has executed on safety. Nothing matters more to us than safety, and our team's unwavering commitment to delivering service that is safe and dependable—especially through the third hottest summer ever recorded—makes me very proud. During 2025, APS reached a new system peak of 8,648 megawatts on August 7th, which is over 400 megawatts above the previous year. Our generating fleet delivered outstanding performance. Palo Verde ran at a 100% summertime capacity factor. Palo Verde is still the biggest producing nuclear plant anywhere in the United States. It recently earned a 2025 INPO Excellence Award for reaching the highest standards of safety, reliability, and operational performance. Such consistency highlights how strong our team's operational excellence really is. Customer experience continues to be a major priority; during 2025, we achieved substantial headway toward satisfaction that leads the industry. As one example, we built and rolled out an AI-powered high bill analyzer that helps customers gain a better understanding of their billing and energy usage while efficiently finding ways to reduce what they owe for energy. These enhancements are landing well. We finished the year in the top quartile nationally among peers for residential overall customer satisfaction and in the second quartile for business customers, according to Escalent. We additionally placed in the first quartile nationally in J.D. Power's U.S. Utility Digital Experience Study. Meanwhile, our customer base keeps growing more diverse, which mirrors Arizona's changing economy. Expansion among commercial and industrial customers, spanning chip manufacturing and data centers, keeps fueling robust economic activity throughout the state. These large load customers keep speeding up their ramp schedules, which our long-term sales growth of 5%-7% through 2030 demonstrates. The U.S. Department of Commerce and Taiwan announced agreements recently that are expected to drive at least $250 billion in additional semiconductor investment within the United States; in Arizona, TSMC keeps growing its footprint, with its 2nd fab reaching full production in 2027, a 3rd fab already under construction, a 4th fab and advanced packaging facility in early development, and 900 additional acres acquired recently for future expansion and growth. We're eager to collaborate with TSMC and the wider chip manufacturing sector as we build out grid infrastructure to keep pace with their rapid growth. Meanwhile, residential growth stays robust throughout our service territory. For a second year in a row, we added over 34,000 new meters—the most in 20 years. We are set to handle the rise in demand. The solid way we're carrying things out is producing results. We wrapped up more than 400 MW of APS-owned resources sooner than planned, which includes the new gas units at Sundance, the Agave Battery Storage Facility, and Ironwood Solar. The Red Hawk gas expansion is still slated to wrap up in 2028, and work continues on preparations to back additional gas capacity reaching as much as 2 GW starting in 2030. At the same time, we're keeping a close eye on how the Transwestern Desert Southwest Pipeline expansion is coming along, and it was recently enlarged from 42 inches to 48 inches because regional demand is so strong; these investments matter greatly for propelling Arizona's economic and population growth while keeping the grid dependable for our customers. Shifting to regulatory items, our rate case is still on schedule. Testimony from Staff and interveners should come next month, and hearings are set to kick off in May. We appreciate the continued teamwork with the commission and stakeholders, and we keep working alongside them to bolster Arizona's growth, cut down regulatory lag, and make sure costs are allocated properly, so that growth pays for growth. To wrap up, 2025 was a robust year of execution by our team. We're addressing mounting demand, putting money to work for our customers, and setting the company up for long-term value creation. Our goals for the coming year stay clear: carrying out our mission to provide safe, reliable, and affordable service to our customers, putting capital into baseload generation and transmission to serve growth, and securing a constructive regulatory outcome that safeguards customer affordability while shrinking regulatory lag. With that, I'll hand things over to Andrew to go over our financial results and outlook ahead.

Andrew Cooper executive
#3

Thanks, Ted. And I want to thank all of you once more for being with us today. This morning, we put out our financial results for Q4 and for the full year 2025. I'll take you through how we performed during the period, point out the main drivers, and then go over our 2026 financial guidance, which we first shared on our third quarter call. Beginning with Q4, we brought in $0.13 per share, versus a $0.06 loss in Q4 of 2024. That Q4 outcome shows the ongoing strength of our service territory, our solid operational execution, and steady cost management. Main drivers included favorable O&M compared with last year, along with ongoing robust sales growth. Milder-than-usual weather, increased financing costs, and pension and OPEB expenses partially canceled out those gains. Our full-year earnings reached $5.05 per share, landing in the upper 1/2 of the guidance range we had updated. That figure is down from $5.24 per share in 2024, but the year-over-year decrease was largely attributable to weather, amounting to a $0.71 drag. An exceptionally hot summer that carried into autumn boosted the prior year, whereas 2025 brought conditions that were generally nearer to normal. Additional pressures came from financing costs, greater pension and OPEB expense, depreciation, amortization, and O&M. The key point is that the robust growth happening beneath the surface of our operations mostly canceled out those negative pressures. In Q4 specifically, sales rose 6.8% on a weather-normalized basis, and that lifted our weather-normalized sales growth for the entire year to 5%. Within that number, residential was up 2% while commercial and industrial climbed 7.5% over the year, which shows the economy across the territory we serve keeps expanding. Beyond that, adding customers is a trend that has proven durable across many years. For 2025, our total customer count grew 2.4%, landing at the top end of the range we had guided to, because both new companies and new households continue to make Arizona their home. This steady and varied growth in customers and load provides a solid base for our long-term outlook. Looking forward, we're reaffirming all elements of our 2026 outlook that we shared during the third quarter 2025 call, and that includes the yearly earnings target of $4.55 to $4.75 per share. For 2026, our guidance on weather-normalized sales growth remains at 4% to 6%, and we anticipate Extra High Load Factor CNI customers will account for 3% to 5% of that expansion. Through 2030, our sales growth guidance over the longer term is likewise unchanged at 5% to 7%, which reflects the strong growth we're seeing across our service territory. We continue to be intensely focused on cost efficiencies and on achieving a declining O&M per megawatt hour. During 2025, we delivered a 3.3% reduction compared with the prior year, and we anticipate cutting O&M per megawatt hour even more in 2026. Managing costs remains a top priority. By applying our lean principles and culture, we'll continue pursuing operational excellence and efficiency. In addition, we're restating our plans for capital and financing. Reliability, grid resiliency, and satisfying our customers' expanding needs stay the central focus of our capital program. In line with that approach, our rate-based growth guidance for 2028 remains the same, at 7% — 9%. On the financing side, we keep carrying out a disciplined, balanced strategy that matches our balance sheet targets. As for how we fund capital spending, we depend on a balanced mix of debt and equity. The key point is that our equity requirements for 2026 have mostly had the risk taken out of them, since close to $500 million has already been priced. On top of that, we've worked hard to broaden our liquidity so that we're in the best position to seize financing opportunities as they arise over the course of the year, given that our capital investment program keeps getting bigger. Along those lines, we just completed the extension of our core credit facilities out to 2031, which increases our revolving borrowing capacity by $550 million. Our 2025 results were solid, driven by strong execution and durable growth. Looking ahead to 2026, we feel good about what's coming, and we believe we can execute both our financial and operational plans with discipline. We're ready to push forward on our rate case and keep working with all stakeholders, which lets us maintain service that's safe, dependable, and affordable for the people we serve. That's everything we had ready to say. With that, I'll turn things over to the operator so we can take your questions.

Fayyaz Zuberi analyst
#4

Hello, and good morning, everyone. Fay here, sitting in for Nicolas today. We appreciate the update and your willingness to take our questions. I was hoping to dig into the capacity growth a little, if that's alright. Could you bring us up to speed on where things stand with the IRP planning, and what the timeline looks like for this year? Broadly speaking, how should we frame the opportunities for incremental transmission and gas generation? I suppose I'm asking relative to the details you shared on slide 21?

Ted Geisler executive
#5

Yes. Hey there, Fayyaz. Glad you could join us. Around the middle of the year, we anticipate submitting a refreshed 15-year integrated resource plan. What that gives you is a picture of where our thinking currently stands regarding the load and demand forecast, along with the resource plan designed to satisfy it. Naturally, within the action plan window and the near term, it gets somewhat more granular when it comes to technology, resources, and locations. Once you move past that roughly five-year near-term horizon, things become more directional. The important thing is that it will keep demonstrating the strong, robust growth expected over the long haul, plus how much generation and transmission will be required to meet that growth. Naturally, our capital plan at present extends only through 2028. Much of the growth tied to supporting TSMC's build-out, along with data center ramping, falls outside that window, and the resource plan ought to show how much generation is still required just to serve what we've already committed to. On top of that, we remain in negotiations to serve additional data center demand coming from our subscription queue, which we discussed last quarter. That piece isn't reflected in the capital plan. Should we manage to land an agreement for incremental load covering a portion of that queue, those are resources that would have to be constructed on top of everything we've already described. Beyond that, any additional expansion for TSMC would likewise require consideration and would prompt still more generation or transmission expansion past what's been laid out in the three-year window of the current capital forecast.

Fayyaz Zuberi analyst
#6

Excellent. That is very easy to follow. I appreciate it. Perhaps one brief question regarding the update on the credit metric and the holdco debt as a percentage of total debt. Could you talk through the pace needed to get to that target in the mid-teens, and where the metric stood at the end of 2025?

Andrew Cooper executive
#7

Of course, Fayyaz. Andrew, yes, we are dedicated to maintaining our holdco debt at a sensible level and at that mid-teens level. I think if you worked it out as of year-end, it came in at 17%, so that is roughly inside the band we are aiming for. When you look at the 2026 financing plan, the holdco debt amounts are meant to be fairly small and remain inside that range.

Fayyaz Zuberi analyst
#8

Wonderful. I appreciate the briefing. That's all from me. Thank you.

Analyst analyst
#9

Hello there, everyone, and good morning. This is Alex sitting in for Shar. We appreciate you fielding our questions.

Andrew Cooper executive
#10

Hello, Alex.

Analyst analyst
#11

Morning. About that future sales growth — the 5% to 7% yearly across the coming 5 years — could you remind us how firm that figure really is in the long run? And what assumptions sit behind your forecasts? Is it essentially only the minimum take agreements contained in your large load contracts? If you thought about it that way, you know, and customers ended up ramping quicker and drawing more power as time went on, would that create an upside opportunity relative to the 5% to 7% forecast? Thanks.

Ted Geisler executive
#12

Yes, Alex, the way to view it is that the load forecast rests on existing demand, where we have certainty that it's being developed or is already in service inside the service territory and that we expect to grow, plus projects already in development or under construction. So there's upside to the degree that anything incremental gets added from either our uncommitted queue, additional TSMC expansion, or other projects not yet announced. The growth forecast we've laid out is really grounded in projects where we hold a high level of confidence and certainty about developing, and we monitor that quite closely.

Andrew Cooper executive
#13

Andrew, I’ll build on what was just said: the timing pattern for that committed pipeline reflected in our sales force sales forecast extends into the 2030s. We’ve provided the 5%-7% through 2030, yet the complete build-out of the capacity already in place has a runway past that point. Also, it’s worth remembering that the ramp and the timing between now and 2030 come from our experience with these customers across the last several years, and they reflect a fairly informed view of how that ramp will look over the next several years.

Analyst analyst
#14

Understood, that helps a lot. Thanks. Regarding the EPS and the rate base CAGR you've provided — as we look toward 2027 and past that point, how should we consider the gap between those two? Is roughly 200 basis points the correct number, or might they come together eventually, given how many opportunities you're finding? Thanks.

Andrew Cooper executive
#15

Yes, Alex, certainly, once we move through the rate case, I believe we'll examine both the capital plan itself and what shapes the financing plan, and consequently, how our EPS trajectory appears. If you consider the rate base CAGR, it currently extends through 2028, and we updated that during the Q3 call. You're only starting to witness the effect of certain projects within our long lead execution window, so to speak. You heard Ted mention Red Hawk on the call. That's a solid illustration. Many of the transmission projects in our strategic transmission plan also demonstrate that. As we keep evaluating how to offer greater transparency over a longer period regarding the capital plan, and what that implies for the rate base CAGR, that will subsequently flow through the rate case and our expectations about a formula rate that grants us quicker recovery, letting us give you additional detail on what that means for financing and finally for the path of our EPS. In the end, our objective stays the same: to build a more linear trajectory there, arising from the formula rate.

Analyst analyst
#16

Excellent. That's all from me. Thanks very much.

Julien Dumoulin-Smith analyst
#17

Hello, and good morning, everyone. Well executed. I appreciate you making the time.

Ted Geisler executive
#18

Morning to you.

Julien Dumoulin-Smith analyst
#19

There are a few items I'd like to... Hello there, and good morning to you, Ted. I was hoping we could briefly discuss what the recent UNS matter might mean, particularly now that the decision on the formula rate has come down. Do you have any views or responses from your side regarding what we should take away, and are there perhaps 2 or 3 key points you would call out as a read for APS? Once more, I recognize this is sensitive, it's just a remark here, and I want to confirm that we're, that all of us share the same understanding on these reads, if you're able to weigh in. On both the-

Ted Geisler executive
#20

Yeah, of course.

Julien Dumoulin-Smith analyst
#21

Sure thing, Julien — that's a reasonable thing to ask.

Ted Geisler executive
#22

From what we took away, the overall message came across as fairly positive. That said, the circumstances around the UNS gas matter and APS aren't the same in important ways. Let me walk through a handful of items about how we're looking at this. To begin with, they were granted roughly 86% of the revenue requirement they originally requested, and that translates into a rate increase above 14%. That's a solid outcome. They also received a formula rate paired with a post-test year plan. Because of all the solid effort put in during last year's workshops, the commission properly saw that no pilot was needed, so the formula rate is locked in permanently. Their ROE is close to what they currently have. That being said, we don't accept the idea that the formula rate should lead to any reduction in ROE whatsoever, and we'll keep pressing that point. Their ROE remains reasonably strong and in line with what they had previously, and they have the formula rate on top of that. You do have to keep certain distinctions in mind. This is a gas utility serving a region where growth is nowhere near what we're experiencing. Their most recent rate case filing was 16 years ago, so it's somewhat hard to claim that regulatory lag is holding back their capacity to finance growth the way it does for us. Their risk profile is clearly not the same, and the formula rate schedule differed somewhat from the one we're putting forward, or from what we'd anticipate negotiating with the commission. What was put on the table suited UNS. They accepted it, and perhaps that's appropriate for their territory. Again, my sense is the overall message is largely positive. It establishes the state's first formula rate and signals where the state is headed, which is a good thing. There are certain distinctions between our service areas, and we'll keep making the case for those.

Julien Dumoulin-Smith analyst
#23

Yes, of course. I appreciate that, and thanks. If I may continue here, you have an intriguing 20 GW of load that isn't committed, alongside 4.5GW that is committed, compared with the 25 system peak. That's truly an amazing context. Having said that, could you share some thoughts and square that somewhat with the IRP? I'm aware it's due mid-year. I understand we're attempting to get a bit ahead of it, but I'm just trying to break down, particularly the 4.5GW committed, versus what's already included in the forecast or perhaps past the core forecast, yet what would be added in that IRP? Again, it all sort of circles back to an eventual roll forward of your plan, and also what genuinely adds to the plan compared with the current years you've disclosed. I'm just trying to pinpoint it.

Ted Geisler executive
#24

Yes.

Julien Dumoulin-Smith analyst
#25

This sounds like a significant development.

Ted Geisler executive
#26

Yes, thanks for asking, Julien. What I'd say is that the IRP is going to take into account demand from customers that is known and committed; using a longer-range forecast, it will show what we anticipate that 4.5 GW of committed load turning into across the 15-year period, along with what I'd describe as organic load growth occurring on top of that 4.5 GW of committed high load factor demand. Our most current views regarding TSMC and the associated chip manufacturing timeline, covering both when things happen and possible expansion, will also be part of it. What won't be part of it is anything from the uncommitted queue that's currently being negotiated or hasn't been contracted yet. All of that will continue to be counted as incremental demand on top of what the IRP shows. To put it briefly, the IRP is going to provide our clearest picture of how that 4.5 GW of high load factor demand plays out across the 15-year period, along with our outlook for organic load growth, including residential and so on. Whatever we sign from the uncommitted queue — and we're actively pursuing that — will come in addition to that, even beyond what the IRP reflects.

Julien Dumoulin-Smith analyst
#27

Right. Absolutely. So, to wrap that up, I mean, what's the split between what's committed and what isn't? My guess is that TSMC makes up most of the committed piece, but could you give a bit more detail on that, and perhaps also say a word about where things stand when it comes to converting more of the uncommitted into the committed bucket? For instance, is there any chance that something shifts from one bucket to the other before that IRP, even?

Ted Geisler executive
#28

I'd say a healthy share of that committed amount is still high load factor customers—data centers or similar—that we signed up over the last 2 years and that are now actively building out or ramping. TSMC is definitely a significant part of that; the 4.5 GW doesn't account for any possible expansion of TSMC, and we'll keep working with them on their plans for any acceleration or expansion. That would come on top of the 4.5 GW. As we mentioned last quarter, we did move an opportunity into the uncommitted queue for evaluation through our subscription model. Those talks are still going on. If that gets finalized before the IRP, it might be included, though there's also a chance it would be additive to the IRP; for any successful negotiations of that subscription model, our goal would be to file an agreement with our commission this year.

Julien Dumoulin-Smith analyst
#29

Yeah. Right, those are helpful points to keep in mind, thank you. OK, that's where I'll stop. Thanks once more. Best wishes. OK. Talk to you before long.

Paul Patterson analyst
#30

Hey, hello there.

Ted Geisler executive
#31

Hello, Paul.

Paul Patterson analyst
#32

I realize, of course, that testimony from staff and interveners is scheduled shortly, yet I keep wondering — with everything currently being discussed over in Arizona, and taking into account that we now have the ARM from the formula matter at UNS — whether anyone has considered the possibility of resolving this case through a settlement? As I mentioned, staff and interveners are still to come, but I'd simply like to hear whatever thinking exists on this. Has any consideration or conversation along those lines taken place?

Ted Geisler executive
#33

Yes, Paul, thanks for raising that. What I'd tell you is that right now, our attention is on moving the case forward in the customary way. Settlements are something we never close the door on, and in fact this company has built a lengthy history of reaching them successfully within this jurisdiction. There are a couple of distinctive elements in this particular case. First, we need to make certain we're in agreement regarding how the formula rate will actually be put into practice, and second, it matters greatly that the rate design modifications for the new high load factor tariff get settled, and both of those aims would benefit from going through the customary hearing approach. In our most recent rate case, we proved we could secure a favorable result by way of the hearing process. In our view, that represents a workable route toward securing a favorable result once more. As things stand, our attention is on the customary format. The door on settlement never closes, though relying on one in this case isn't something I'd advise.

Paul Patterson analyst
#34

All right, that makes sense. Then last thing — there was a nuclear conference yesterday, or a hearing, whatever you'd call it, over at the commission, and honestly I couldn't catch much of it, but it seemed like there's quite a bit of enthusiasm around, you know, when it comes to utilities, regarding this particular resource. I was just curious whether you all have any views on it, you know, whether there's anything short term we could see there, or just any perspective at all?

Ted Geisler executive
#35

Yeah, Paul, I'd say we're lucky that the wider community, the policymakers, and the community leaders continue to be strongly in favor of nuclear. Clearly, that matters a great deal to us, since we run the biggest producing nuclear plant in the nation right now. There's also considerable curiosity about whether Arizona might have a chance at new nuclear down the road. We've told stakeholders and our customers plainly that although we stay constructively supportive of new nuclear for the nation and possibly Arizona later on, you wouldn't anticipate that arriving soon, yet it's something we intend to watch closely and collaborate on with stakeholders to determine how those possibilities might take shape across the medium and long term for our state. That's largely what yesterday's workshop addressed, and we truly value the commission spending time to learn about and explore what those possibilities might be. It's terrific dialogue, but we've made it plain that, you know, a great deal of capital is needed. You need supportive policy, and crucially, you need the supply chain and the trades to have enough capacity to actually construct these projects. We're deeply engaged in the industry, we're deeply engaged in the state, backing what new nuclear might become later, but we see that as more of a medium and long-term possibility.

Paul Patterson analyst
#36

Awesome. Thanks so much, guys.

Ted Geisler executive
#37

Thanks, Paul.

Steve D'Ambrisi analyst
#38

Tim, Andrew, hey — appreciate you taking the question. This will be quick, and it's about slide 20, specifically the sales growth. The opening bullet pretty much captures it: growth has topped the guidance range for 9 straight quarters, and 4Q clearly seems to be picking up speed. There may be an element of art versus science when it comes to weather normalization during a quarter with mild weather. Could you discuss what this sales growth trajectory looks like relative to the 4%-6% sales growth for 2026 that you provided, and also against the long-term guidance?

Andrew Cooper executive
#39

Certainly, Steve — this is Andrew. We keep observing sales growth that is highly diversified and highly consistent. Residential for the year landed at essentially the very top of anything we've ever projected, since the 4%-6% we projected for last year, and project for this year, mostly reflects the scaling up of our Extra High Load Factor customers. Seeing residential growth at that level, powered by customer growth of almost 2.5%, is still solid. Our expectation for 2026 is something like a return to typical dynamics, in which the scaling up of Extra High Load Factor customers makes up the biggest portion of the sales mix. One of the tailwinds, I believe, that we've observed — and will simply need to keep watching in 2026 — is distributed generation, which created fairly modest offsets to residential sales last year. That, I think, is what pushed it upward and sort of kept that tailwind going into Q4 of last year; we'll simply need to keep watching how those declines in applications we're seeing for new rooftop installations might eventually translate into ... support for the residential sales growth figures we have. Near term, 2026 is powered by the known customers in that queue that we see scaling and see coming online, among them, as the fabs of TSMC keep progressing. Then across the longer term, out to 2030, that step-up is genuinely tied to, once again, those known customers and where we anticipate them to be in their ramps. Having spent a long time working with the data centers, I believe our forecasting has achieved a solid balance of grasping where these customers stand, what the purpose of their facilities is, and how that shapes those ramp rates from one year to the next. At bottom, the runway we have with these customers, together with the semiconductor space and then the residential growth, leaves us fairly confident in those figures out to the end of the decade.

Steve D'Ambrisi analyst
#40

All right, that helps. I'm not sure whether you folks have some kind of sensitivity or a handy rule of thumb regarding, say, the magnitude... I realize your guidance takes resi customer growth back down toward the typical average, but if it ends up, you know, returning to the high end and beats expectations by 50 basis points or 100 basis points, what would that translate into for something like an EPS sensitivity?

Andrew Cooper executive
#41

Well, when it comes to gross margin, our usual framing is that each 1% of residential growth amounts to a bit more than $25 million, while 1% tied to Extra High Load Factor would land closer to somewhere between $5 million and $10 million; that's roughly how the two differ. Naturally, all of this provides operating leverage as we keep working to lower our costs throughout the system. That's the rule of thumb we use when thinking about it — residential hours tend to be concentrated more around the peak, and the XHLF, naturally, achieves 90%+ load factors during both peak and off-peak hours.

Steve D'Ambrisi analyst
#42

All right, that's quite useful. Many thanks, everyone. I appreciate it.

Ryan Levine analyst
#43

Hello there, good morning.

Andrew Cooper executive
#44

Good morning.

Ryan Levine analyst
#45

Good morning. Could you give us any color on how quickly those large load commitments in the uncommitted bucket might be ready — the ones you're looking at? I mean, do you expect a lot of these big customers to come together around the same period? How do you handle the cadence of possible movement out of the uncommitted bucket and into the committed one?

Ted Geisler executive
#46

Ryan, our approach is that once we locate infrastructure and projects that we can present to that uncommitted queue at a size worth sparking their interest — roughly a gigawatt or more, let's say — we'll put that in front of the uncommitted queue, see or assess interest according to where that infrastructure sits and when it would be available, and then ultimately collaborate with counterparties on the best match for that infrastructure opportunity and negotiate an agreement. Our first offer under the subscription model came in the latter part of last year, and because of that, right now we are actively in discussions with the counterparties who are interested, intending to try to finalize an agreement and file it with the commission this year. Alongside that, we're developing a pipeline of generation and transmission infrastructure projects that would generate incremental capacity, which could then be brought back and offered to that uncommitted queue. Going forward, we'd expect that to happen on, you know, a somewhat repeatable basis. As I said earlier, I think when Julien was asking the question, all of that for uncommitted demand would be incremental to the current plan. We hold off until we have a secured contract with a definitive project before adding it to the plan, from both a capital and rate base standpoint, and the load growth tied to those uncommitted projects would likewise be incremental to the plan. We're actively working on that now, but, importantly, we want to make sure we identify the infrastructure capacity first and do this prudently. Secondly, it'll be important in parallel to work with our commission on modernizing the rates to ensure the growth pays for growth.

Ryan Levine analyst
#47

Excellent. So then, when it comes to paying for a portion of the transmission build-out, is the company considering the DOE Energy Dominance Financing, similar to what we have observed from a few of your competitors elsewhere in the nation, and what is your thinking regarding where the transmission funding will come from?

Andrew Cooper executive
#48

Yes, Ryan, this is Andrew. As you know, for the CapEx plan we will examine every possible financing source; specifically, you know, our interest lies in exploring capital sources that fall beyond, you know, the conventional ones. I believe it begins with our customers and making sure that, within this growth conception's growth space, they are deploying capital given how large certain balance sheets are and how urgently they wish to come online. You know, considering customer financing, definitely considering whatever financing alternatives exist, we will, you know, keep assessing grants and other possibilities that emerge from the federal government too as things progress. You know, at the most basic level right now, the financing plan in front of you is, you know, our base plan, you know, as of today, which essentially lets us depend on conventional funding sources. Of course, when we examine certain big projects and take a more time-based view, considering, you know, completing a lot of large things simultaneously, we will consider every sort of, you know, alternative for moving it off balance sheet while construction is underway. I think it truly begins with making sure we are in sync with our customers and, via the subscription model, to the degree that we can obtain capital from our customers upfront to lower their price over time, that also benefits us from a balance sheet standpoint.

Ryan Levine analyst
#49

Thanks.

Anthony Crowdell analyst
#50

Morning, Andrew. I bet you don't miss New York City after all that snow we just had. I've got a couple of quick things to ask. First, what was your FFO-to-debt figure when the year closed, and are you going to stay within 14%-16% for the whole forecast period? One more thing after that.

Andrew Cooper executive
#51

Yes. As you’re aware, the key restriction actually comes from Moody’s, since the level at which they would downgrade us is 14%, so that’s where our attention stays. We were above 14%; their formal figures won’t arrive until Q1, but using the method as we interpret it, we’re in the high 14s under Moody’s framework. That feels reassuring. What we aim for, aspirationally, is to keep a cushion of 100 basis points at all times. When you consider the regulatory lag we’ll keep facing in 2026, that really shows why the conversation we’re having in this rate case matters so much. With FFO to debt, the longer you’re removed from any rate relief, the more it begins to face some strain. Although we know rating agencies aren’t focused on the near term, and we’ve kept fairly steady communication with them regarding the gains we’re observing and the possibility of recovering costs, especially via the formula, if you compare our earnings path in 2026 with 2025, all of that is tied to regulatory lag, and that ought to show up in the top line, from the standpoint of the FFO to debt numerator too. In the end, our objective, I believe, is to expand that numerator, and that, I think, will do a great deal to reinforce the credit metrics and let us produce that 14%-16% over the long run with enough cushion inside that band.

Anthony Crowdell analyst
#52

Okay. So, Ted, I think this connects back to that question you raised earlier regarding transparency. My understanding is that you're expecting earnings once the formula rate plan takes effect. You mentioned something about possibly greater linearity, or a more linear pattern, when it comes to earnings. What I'm wondering is whether your hope is that, with the formula rate plan, once it's approved and put into place, we'd see earnings follow a smoother path, or an extended path, or perhaps both of those things?

Ted Geisler executive
#53

Yeah, Anthony, I believe we completely understand that a disclosure done in a more conventional manner could align the earnings rate base with the capital plan through that point at 5 years; our preference is to offer visibility over a longer horizon and, inside that, a trajectory that's more consistently linear. Because of how things currently work where we operate — rate cases arriving in lumpy fashion — it has simply been difficult to accomplish that while keeping the forecast precise. Once this case has been worked through, we'll seize the chance to step back and think about the strongest disclosures we can put together and issue. In that respect, our intention is to line up better with what our peers do. After the case wraps up, a fresh set of forecasts and disclosures will be prepared by us. Being able to deliver that over a longer horizon, and to get more linearity because the formula will operate in a more regular way, would be our objective.

Anthony Crowdell analyst
#54

Great. Thanks for taking my questions.

Ted Geisler executive
#55

Thanks, Anthony.

Chris Ellinghaus analyst
#56

Morning, everyone. This is a follow-up. Regarding disclosure, I had the same thought—how formula rates would alter things. Let me clarify: is it enough for formula rates to simply take effect, or do you additionally require clearer visibility into, for instance, what sits in the committed queue, plus a stronger read on where TSMC's subsequent expansions are headed, so that you'd have sufficient information to make that kind of extension?

Ted Geisler executive
#57

Yes, Chris, our perspective is that this is nearly all a matter of timing and steadiness when it comes to cost recovery. Our committed demand is something we see fairly well, and it's strong. However, because regulatory lag is significant in this jurisdiction, our capacity to reliably convert top-line growth and bottom-line growth on a linear basis is hindered by how lumpy the rate case process is. Moving to a formula rate produces rate changes that are smoother and more incremental for customers, and it additionally gives us a somewhat more predictable and steady recovery approach for getting those costs back. That's truly the most significant shift.

Chris Ellinghaus analyst
#58

All right, got it. Andrew, when we consider specifically the RES DSM piece within O&M, what's the right way to frame that moving forward versus where things stand for 2026?

Andrew Cooper executive
#59

Yes. Chris, the key point to remember is these are regulatory programs whose costs we recoup via rates; they appear in our gross margin figure, and then they appear on the O&M side, offsetting almost one-for-one. Near the close of last year, the commission decided to end certain of those regulatory programs, so the total size of the DSM program shrank. That shrinkage has been visible in gross margin and in O&M alike. You know, although there's a strong broader narrative about how we manage O&M costs as a company, if you examine our waterfall between 2025 and 2026, a sizable share of that O&M benefit is directly linked to a matching reduction in revenue on the gross margin side, those RES DSM PSA chemicals line items. As for the programs currently in place, our feeling is, you know, quite positive, you know, the commission reached that decision, and so in the interim those programs have been reduced.

Chris Ellinghaus analyst
#60

So-

Andrew Cooper executive
#61

Yeah.

Chris Ellinghaus analyst
#62

I get that an offset exists, but here's what I'm attempting to pin down: considering the cost pressures, especially in residential, and really across every category, would you say their appetite for those programs — I suppose this is the best way to phrase it — has been permanently cut back? Or might some of those programs come back, in light of the cost of living pressures consumers are facing?

Ted Geisler executive
#63

Yes, Chris, Ted here. The way I'd frame it is that I believe the commission and staff took a genuinely thoughtful approach when they reviewed every program, asking, "Which ones deliver the greatest positive impact for the customers who need them most? Let's direct the funding toward those, while retiring the ones that are somewhat legacy in nature, that are less effective and perhaps no longer merit the investment." Many of those programs had existed for a long time. They accomplished plenty of good, yet they also began hitting a saturation point. Essentially, the programs still standing are those that serve the customers who need them most and deliver the greatest impact. My sense is this commission is committed to continually reviewing those programs, making sure the dollars are used wisely and that impact is maximized relative to the investment made. Affordability is another major focus for the commission. They understand the need to let utilities recover costs stemming from inflation, stemming from the investments required to secure a reliable grid given growth, while at the same time seeking every possible opportunity to bring costs down for customers. Right-sizing the DSM plan produced meaningful savings for all our customers. To repeat what Andrew said, we need to do our part too, which is why we're now approaching three years of flat to declining O&M — declining O&M per kilowatt hour. We stay focused on modernizing the rates in this rate case so that Extra High Load Factor customers pay their fair share of growth, which nets out as a benefit to residential customers; we remain competitive on rates, with our residential rates sitting below the national average, and we'll do everything we can to keep them affordable.

Chris Ellinghaus analyst
#64

That helps. Thanks, Ted.

Ted Geisler executive
#65

Thanks, Chris.

Chris Ellinghaus analyst
#66

And finally, regarding those extra TSMC expansions, at this stage how much visibility do you actually have on them? When do you think you'll get, you know, a clearer picture of what that's going to mean in your case?

Ted Geisler executive
#67

Obviously TSMC is a hugely significant customer, and they have a major build-out under way. We're talking with them right now about the schedule for the fabs they have announced and committed to, and also about whatever further expansion they might pursue. Once they're prepared to firm up those plans, we'll be prepared to explain what that translates to when it comes to utility infrastructure.

Chris Ellinghaus analyst
#68

Okay, great. Thanks. Appreciate the details.

Ted Geisler executive
#69

Thanks, Chris.

Operator operator
#70

Appreciate it. That wraps up the question-and-answer portion. Folks, that brings today's gathering to a close. Feel free to hang up now, and enjoy the rest of your day. Thanks for joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pinnacle West Capital Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Pinnacle West Capital Corporation earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.