Prosafe SE (PRS) Earnings Call Transcript & Summary
June 1, 2026
What were the key takeaways from Prosafe SE's June 1, 2026 earnings call?
In Q1 2026, Prosafe SE reported a significant revenue increase of nearly 50% year-over-year, driven by higher-margin contracts, resulting in EBITDA tripling compared to the same quarter last year. The company reiterated its guidance for EBITDA in the range of $45 million to $55 million for the fiscal year, signaling strong operational performance and a positive market outlook. Despite a net loss of $1 million, a substantial improvement from a $15 million loss in Q1 2025, management expressed confidence in future demand, particularly in Brazil, which remains a key market for the company.
What topics did Prosafe SE cover?
- Revenue Growth: Prosafe's revenue surged nearly 50% year-over-year, attributed to higher-margin contracts related to the Safe Boreas and Safe Caledonia. CEO Reese McNeel stated, 'I think you see a very strong quarter, driven largely by the utilization of having all the rigs working.'
- EBITDA Tripling: EBITDA tripled year-over-year, reflecting improved operational efficiency and contract performance. CFO Halvdan Kielland noted, 'This is largely due to a result of higher-margin contracts related to the Safe Boreas and the auctions for Safe Caledonia.'
- Market Outlook: Management highlighted a positive market outlook, particularly in Brazil, with increased demand for accommodation vessels. McNeel mentioned, 'I think we may even see more demand in Brazil than some of the projections that we put out here.'
- Backlog Position: The backlog remains robust, with management focused on extending and building it further. McNeel stated, 'Backlog remains very high... we got to go back many years to see this backlog position for Prosafe.'
- Operational Safety: The company reported no lost time incidents (LTIs) during the quarter, emphasizing a commitment to safety in operations. McNeel remarked, 'No LTIs, no significant injuries or incidences to report in the quarter despite a lot of activity operationally.'
What were Prosafe SE's June 1, 2026 results?
- Revenue: $45 million (up almost 50% YoY from Q1 '25)
- EBITDA: $55 million (tripled YoY)
- Net Loss: $1 million (vs $15 million loss YoY)
- Liquidity: $87 million (well above $20 million debt covenant)
- Backlog: null (remains very high)
- Debt: $305 million (including $5 million exit fee)
Prosafe's strong operational performance and positive market outlook position it favorably for future growth, particularly in Brazil. Investors should monitor the company's recontracting efforts and market developments, as these will be critical to sustaining momentum and addressing analyst concerns.
Earnings Call Speaker Segments
Good day, everyone, and welcome to the Q1 presentation for Prosafe. My name is Reese McNeel, and I serve as CEO; joining me today is Halvdan, our CFO, and once more, welcome to the presentation. We will walk through the presentation. Should any questions arise, kindly email them to us, and we will address them during a Q&A session at the conclusion of this presentation. I want to begin this quarter's presentation by discussing a little of what we accomplished during this quarter. The way the team has delivered this quarter has impressed me greatly. First, touching briefly on operations: it was a quarter in which every rig was operating. Caledonia extended through, secured all of her options and demobilized successfully, and we also had Boreas fully on hire during the quarter, and we saw two units perform the SPS. I will speak a little about all of this later, but from an operations standpoint, I think it was a very successful quarter for us. I think also financially — Halvdan will talk a bit more about that — but I think you see a very strong quarter driven largely by the utilization, of course, of having all the rigs working, and I think we'll touch a little bit on liquidity, but I think also very positive liquidity liquidity development, although, inevitably some due to working cap.
Looking forward, what probably excites me the most is honestly the market outlook. I'll devote the bulk of my time today to discussing that market a little. There are some genuinely encouraging developments there, and I believe we're also reaffirming on this call our guidance for the year of $45 to $55 million of EBITDA. To say a few words about what was perhaps among the most strategically significant activities that began in this Q1 and that we wrapped up in April, that was really the SPSs. We completed the SPS for Notos in 55 days and for Zephyrus in 42 days, and I think we actually delivered these SPSs consistent with our estimates. This matters a great deal to us — it's a substantial amount of spend. We're talking about $50 million combined across two vessels over a period, and I'm very excited and very pleased to see the team deliver on this both safely and consistent with the estimates that we communicated to the market. Really, congratulations to everyone on the Prosafe side who was involved in these two very important projects.
Taking a quick look at our position as a company within our fleet, this is roughly where we stand in the fleet overview and how things are lined up right now. We did lock in a contract for Caledonia in 2027. That LOI was announced late last year, and I think converting that LOI was a very important step for us. Notos, obviously, we secured the contract through 2030 last year. As for Boreas, she has now begun her firm contract period of 15 months, she has a firm contract now through mid-July, or to July next year, early July next year, with options to take her to the end. Our real focus over the coming months is very much on Eurus and Zephyrus and extending those two units, or re-contracting those two units, in what is a much, much more improved environment. I think on — I will mention though on Caledonia, I do think there's a positive market development, touched on that, but I think in the UK, which is her core market, I do think we see a positive, some positive opportunities there. We are very focused on trying to get Cali work, in beyond '27.
I believe she could be available in '26, though for '26 it would need to be a rather exceptional opportunity. But especially when we look forward to what we're seeing in '28 and beyond, I'd say there are high probabilities of filling something in during the next months. Turning to the market a bit, just to reiterate and summarize for everyone where we stand in the cycle: again, Prosafe is very much late — it's very much a maintenance-cycle-driven business, later in the cycle. We do perform some hookup work. The work in Australia is hookup in nature, but most of our work comes from maintenance of FPSOs and installed installations, and FPSOs in particular. I think we're somewhat buffeted by the short-term ups and downs of the oil market, since we focus really on maintaining long-term installations. What has happened in the market over the last quarter, the last few months? From our perspective, again, we view the market as those units that we see competing against us in tenders at various points in time.
I'll go into more detail on the market in the slides that follow, but what this slide is telling us, I think, is that conditions have held fairly stable, and the market in Brazil—or South America as a whole, meaning Brazil plus Guyana—is still far and away the biggest one, accounting for 15 units, which works out to roughly 50% of the worldwide fleet in total. When you break it down, Brazil genuinely serves as the baseload for this whole accommodation segment, which is fairly niche. People often ask me how I view this market. There are 31 rigs, and they aren't identical. A portion of them are high-end units, and that is precisely where Prosafe sits. We hold some of the finest, most capable rigs available, with the top uptime and the strongest safety results. Within those 31, you'll also find some lower-end or lower-spec units that aren't DP3—perhaps DP2—and while they can serve as accommodation rigs, they don't really match our high-end rigs on utilization or capability. Looking across this—and I'll get into it further on the next slide specifically—when you examine that full breakdown of rigs, you find hardly any inactivity.
Contracts are in place, people are working, and utilization across this wider fleet of 91 vessels is still at 90% — you know, 90% for the high-end units, and it still remains 80%-plus for all the units across the spectrum. The market in this space remains very tight. Brazil, as I mentioned, is the largest driver to this market — half, you know, virtually half of all accommodation units available in the world are working in Brazil. What is driving, again, the need for accommodation in Brazil is very — it's a combination of the FPSO installed base and the climate and the conditions in Brazil. You see a lot of corrosion. You need — we see clients actively using accommodation vessels, UMSs, to support the repair and maintenance of these FPSOs, and we see an increasing number of FPSOs in this market. One thing that has got me a little bit excited, again, the last few quarters or last few months has been what we see as an increasing trend in Brazil, I would say, of using accommodation earlier than in the past. Historically, we saw people using accommodation, particularly Petrobras, 2 or 3 years after a unit was installed, kind of a main — a maintenance campaign, 6 months here, 6 months there.
We're seeing them use accommodation support more and more—not just Petrobras, but other companies too. Take the Bacalhau project for Equinor: they're increasingly relying on that kind of support even during the hookup phase. If this trend keeps up, I believe we could see demand in Brazil exceed some of the projections we've shared here. We've also noticed that ANP, Brazil's regulator, has become stricter about the rules, warning operators they'll be shut down if they don't complete all the corrective maintenance that's mandated. That, I think, has actually driven some extra demand—particularly from some of the smaller players, maybe not the Petrobrases of the world, but some of the more independent ones. I'm quite optimistic about demand. I think we'll keep seeing growing, strong demand from Brazil. Let me spend a little more time on this slide, because as many of you know—many of you who follow us and follow this space—there's a great deal of tendering activity right now. There was a recent tender out of Brazil, a very public one, that tender.
From where we sit, that tender was for a lower-spec unit. It was a tender that had been issued, and it was available to DP2 vessels — available to any hull form or shape at all. Clearly, from my point of view, it's very encouraging to see Petrobras issue such a long-term, solid tender. I'd also say it's very encouraging to watch how the rate has developed there. For what we regard as a somewhat lower-spec unit, that's of course still a very robust rate. Over the coming year — or really through the end of 2027 — there are in fact six units that will need re-contracting with Petrobras. Our view is that they will be re-contracted. When you factor in this most recent tender, five units alone still require re-contracting by Petrobras, and on top of that, one of the bigger independent FPSO players has come out with a 2-year tender, and we're also seeing a few of the independents out with smaller requirements. I think this is unfolding much the way we've been describing: Petrobras is active in the market, some independents are active in the market as these contracts roll forward, and we're very well positioned here, with the Eurus and the Zephyrus coming off during that same period as those other five.
I'd say that re-contracting those two is a really key focus area for us, with, of course, a strong emphasis on Brazil, where we have a very solid presence. That said, I'll note we're open-minded about whatever other work emerges out there at the right price, of course, but our primary focus is re-contracting these into what we view as a very positive Brazilian market. I've already touched a little on the UK and on Caledonia. I think that one's a little bit special, but I do think opportunities will be there, and we do see continued activity as well in other markets. There's recent work awarded in Turkey, recent work awarded in Angola, and I think more work is coming as well in West Africa. From where I sit, I see the market staying very tight, with a lot of tendering activity coming up over the coming, I would say, 3 to 6 months, and with a couple of rigs here, we are very well positioned, I think, to capture that increased market potential. Jumping back a little bit to operations, I think, again, a very positive quarter, safe operations, which is super important to me, no in- no no LTIs, no significant injuries or incidents to report in the quarter, despite a lot of activity operationally with the Caledonia coming off contract, going to warm layup in in Scapa Flow in the UK, and these two SPSs.
Once more, huge credit goes to the team for delivering strong results during the quarter just ended. Turning briefly to our backlog — as I said, it's a major priority for us over the next few months. In my view, backlog is still very high. To find Prosafe at this kind of backlog level, you'd have to look back many years, but my main focus, and the team's focus too, across the coming few months, is very much on extending that backlog and building it out further, and I think the market backdrop we have is a very positive one. With that, I'll pass it over briefly to Halvdan for a few words on the financials.
Thanks, Reese, and good morning. In Q1 2026, revenue rose nearly 50% versus the same period a year earlier, Q1 '25. EBITDA, meanwhile, has tripled. That's mostly because of contracts with better margins tied to the Safe Boreas and the options for Safe Caledonia. Naturally, some off-hire days for Safe Notos and Safe Zephyrus linked to the SPSs in March also weighed on it negatively. We anticipate the same in April, since both of those were finished during that month. Turning to the income statement, there's very little that comes as a surprise here. A net loss of $1 million, against a net loss of $50 million a year earlier. The company remains on track to hit the annual SG&A figure of $19 million. On interest, the company keeps choosing to pay PIK interest on the senior facility; the full figure shown here doesn't really mirror the cash outflow, which we'll come to on the following slide. Where cash is concerned, the key items worth flagging are, naturally, capex and the net working capital movements. On capex, two vessels have been going through SPSs across March and April, and those costs have carried over into the following month.
During Q4 2025, net working capital saw a sizable outflow, and a good portion of that was tied specifically to kicking off Safe Boreas's contract in Australia. As we noted on the previous call, we anticipated the bulk of it would come back in Q1, which is roughly what you're seeing now, and naturally the positive number also benefits from how accounts payable lined up against the capex outflow. When the quarter closed, the company held roughly $87 million on balance — a very comfortable position above the $20 million debt covenant — and as we start drawing on this to pay down the SPSs, we expect to remain well above that covenant. This highlights how strong our balance sheet is compared with where we've stood historically. NIBD to EBITDA came down to 4x. Of course, we do expect a modest move in the other direction as we pay down these SPSs. From the company's standpoint, deleveraging remains a priority, together with reaching and sustaining a robust capital structure going forward. On the capital structure front, total debt at quarter end stood at $305 million, including the $5 million exit fee, which carries no interest.
We keep amortizing the Eurus sellers' credit down, and at the same time the senior facility went up during the quarter because we continued using the PIK option. Turning to summary and outlook: the company remains focused on re-contracting opportunities so we can reach the mark-to-market EBITDA shown here. As Reese mentioned, two vessels are up for re-contracting in 2027 in Brazil, and that should let us narrow the gap from the 4.2 you see here to closer to the 2.2 potential. To wrap up, as we always do, we point out that we trade at a meaningful discount to current broker valuations and replacement costs. Our rigs are best-in-class, high-spec units that were costly to build back in the day, even before accounting for inflation since then. We do believe demand for these units will stay strong going forward, and so we expect to improve, hopefully, both our mark-to-market EBITDA potential and our trading values relative to both broker values and replacement costs. Now, I'll hand it back to Reese for closing statements on outlook and guidance.
Thanks a lot, Halvdan. Like I said at the start of this call, we are reaffirming our guidance for the year at $45 to $55 million EBITDA. We keep seeing, I believe, a better EBITDA contribution coming from Safe Notos. From September she moves onto her new contract at a day rate that's significantly higher, and I think that gives us a bit of a lift as we look at the second half of the year, plus Safe Boreas, of course, on hire through the rest of the full year of '26. So again, reaffirming our guidance. On the balance sheet and liquidity, as Halvdan noted, I think we sit in a comfortable spot, especially when we consider where we've come from. I think we've accomplished quite a bit over the last couple of quarters, keeping these SPSs in check. I think we've been able to improve the working capital situation significantly, and clearly, the re-contracting of Caledonia has also been very positive for us in terms of securing that additional backlog. I think our strategic focus over the coming few months is very much on capturing the current state of the market and rolling over the Eurus and the Zephyrus onto improved contracts as we go forward in the market.
Okay, so a few questions have come in, and we'll do our best to answer them here. One of them was actually about the most recent Petrobras tender, and it was pretty direct—did we take part in that tender? The answer is no, we did not. Neither we nor Floatel took part in this tender. My position is basically that this tender was heavily oriented toward the lower-spec units that are available in Brazil—just to name a couple, the Venus or the Olympia, or a few of these other vessels. Our view was that this one wasn't necessarily for us, and that more contracting opportunities will come, as I mentioned, with six units to be re-contracted. That's number one. Our view was that it was better for us to stay a bit calm here and see how this market develops, rather than taking what looked like a lower-spec contracting opportunity right from the start. I think the next question was tied to the newbuilds. Briefly on the newbuilds—yep, they're still there. I think we're still very keen to do something with these two newbuilds.
We still very much hold the view that before there's a clear chance to deliver these vessels, the market has to keep getting better. Above all, our attention is firmly on re-contracting the tonnage we already have, and should the market carry on developing the way it is now, I believe opportunities for these newbuilds will arise down the road. Let me just quickly look at a couple more questions that have come in. One asks whether we'd think about moving one of our vessels out of the Petrobras fleet. My response to that is, as I've said before, the market keeps improving worldwide. Should an opportunity come up with someone in Brazil outside Petrobras, or indeed outside Brazil, at the right price and the right terms, then naturally we would look at it. These vessels are Brazil compliant and they've operated with Petrobras over a long period, which is all well and good, but ultimately, in a tight market, our focus is very much on locking in the rates and rate structure that make the most sense for us and for the company.
What's our view on how day rates are trending internationally, excluding Petrobras and the North Sea? Well, once more, rates look pretty strong to us. Recently, I believe we witnessed a rate of $200,000 outside Brazil — $200,000 per day — though that was on a shorter-term deal, more like a 6-month-plus contract, so to speak. Even so, we do believe day rates are holding firm internationally as well as in the North Sea. That, again, simply reflects the fact that supply is fairly tight, and we've actually had recent instances where clients wanted a rig yet no rigs could be found at all. That, I think, is what keeps rate levels elevated. As for where things stand at Nova Vega — yes, what's the timeline for getting those units out of the yard? Much the same. We remain very eager to do something with these two vessels and to get them working. How long that takes, or how much flexibility we have with COSCO — there's a continuing conversation with COSCO on the matter, and I think we'll carry on that dialogue with them and see whether we can find a way to unlock this.
My view is that they'll make it to market in time, and once more, among the custom-built accommodation units still available out there, they're one of the last 2 — yet we really need rates to improve or shift toward a more favorable structure so these vessels can get out into how the market currently stands. Let me check whether any further questions have come in here. I believe those were all the questions I had received. On that note, I'd like to thank everybody for joining, and we'll speak with you again next quarter. Thank you very much.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Prosafe SE transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Prosafe SE earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.