Home / Transcripts / ReNew Energy Global Plc (RNW) · November 10, 2025

ReNew Energy Global Plc (RNW) Earnings Call Transcript

November 10, 2025

NASDAQ US Utilities Independent Power and Renewable Electricity Producers earnings 42 min

Earnings Call Speaker Segments

Anunay Shahi executive
#1

Thank you, and thank you once more. Good morning to all of you, and we appreciate your presence on this call today. A press release has been issued by us covering the results for the second quarter of fiscal 2026, as well as for the six-month period that closed on September 30, 2025. Both that press release and the earnings presentation can be found in the investor relations area of ReNew's site, www.renew.com. Joining me once again today are Sumant Sinha, who serves as our Founder, Chairman, and CEO; Kailash Vaswani, our CFO; and Vaishali Nigam Sinha, who is a Co-founder of ReNew and also serves as Chairperson of Sustainability. Following the prepared remarks — which we anticipate will run approximately 30 minutes — the call will be opened up for your questions. As always, we ask you to keep in mind that our safe harbor statements appear in our press release, our presentation materials, and the materials posted on our website. Those statements matter greatly and form an essential part of everything we say here. Certain risks and uncertainties exist that might lead our actual results to diverge materially from what those forward-looking statements express or suggest. For a fuller picture, we urge you to look over the press release we submit in our Form 6K, along with the presentation found on our website. Our press release, presentation materials, and annual report likewise include specific non-IFRS measures, which we reconcile against the most comparable IFRS measures; those reconciliations can be accessed on our website within the press release, the presentation materials, and our annual report. Having said all of that, I am now pleased to pass things over to Sumant Sinha, our CEO.

Sumant Sinha executive
#2

Hi there, and thanks, Anunay. Greetings, everyone, whether it's morning or evening where you are. It's a pleasure to have all of you join us for this call covering Q2 and the opening six months of fiscal 2026. Global macroeconomic conditions and trade-related turbulence are still very much with us, but India's situation looks comparatively stable. India's long-term credit rating has been upgraded by S&P, and with inflation staying subdued, the Reserve Bank of India has room to cut rates further. Many also expect an Indo-US trade agreement to be finalized and made public shortly. Shifting to energy, climatic patterns in India this year have been quite unusual. Monsoons lasted longer than normal, which dampened growth in power demand and pushed solar PLFs below last year's levels. On the policy side, in a move we welcome, the Government of India acted decisively and cut the goods and services tax on the majority of renewable energy items, taking it from 12% down to 5%; that ought to make clean energy even more affordable, and it was already India's cheapest source of electricity. As a business, we keep producing profitable growth, executing projects, and showing discipline with capital by earning returns well above our cost of capital. Now to the quarter's highlights: starting in October of last year, we've commissioned more than 2.1 GW of renewable capacity, which works out to 22% portfolio growth once asset sales during that stretch are factored in. Our committed portfolio keeps growing, and across the last four quarters we've signed PPAs covering 3.8 GW of installed renewable capacity, for projects that ought to yield returns at the upper end of our target IRR range, or possibly beyond it. So we restate our FY 2026 MW guidance and remain on schedule to finish building 1.6 to 2.4 GW during fiscal 2026. Onto the financial side, our strong results continue, with adjusted EBITDA reaching INR 53.5 billion — a 24% increase year over year for the first half of the fiscal year that ended March 31, 2026; we've also notably bettered leverage metrics on operational projects, and we restate our fiscal year 2026 adjusted EBITDA guidance of INR 87 billion-93 billion. Our manufacturing arm, with 6.4 GW of module capacity and 2.5 GW of cell capacity in operation, has fully stabilized, turning out more than 2 GW of modules and over 900 MW of cells in H1 FY 2026. Manufacturing also chipped in a substantial INR 3.3 billion to adjusted EBITDA this quarter, bringing it to INR 8.6 billion across the first six months of fiscal year 2026. Because of that, we're raising our FY 2026 adjusted EBITDA guidance for manufacturing to INR 10 billion-12 billion. Our dedication to ESG remains just as strong. A recent example is the score of 83 out of 100 we obtained in the S&P Global Corporate Sustainability Assessment — no Indian IPP has ever earned higher. For the third time, we also made the Fortune Global Change the World List 2025. We've released our first climate risk and biodiversity risk reports, which follow the TCFD and TNFD frameworks, reflecting our ongoing commitment to openness and governance. Now, if you turn to page nine, execution sits at the very top of our priorities and sets us apart. Across roughly the last 12 months, we brought more than 2.1 GW of capacity into service, and we're updating our guidance to finish building 1.6 to 2.4 GW during fiscal year 2026. So far this year, we've commissioned in excess of 1.2 GW, divided into about 750 MW of solar and close to 500 MW of wind. Beyond that, more than 500 MW of solar has already been put up, which will help us hit our construction goals. Although bidding activity has slowed somewhat, we view this as a cyclical phase, since the majority of IPP players have already managed to develop pipelines to be executed over the coming four or five years. Moving to page 10, our solar manufacturing plants are running at maximum capacity right now, turning out more than 12 MW of modules and 5 MW of cells each day. During the first half of this year, we made nearly 2 GW of modules while maintaining strong utilization and efficiency. At present we hold third-party orders for roughly 650 MW to be sold this fiscal, and we've already delivered close to 1.5 GW this year; in September 2025, we additionally finalized the $100 million investment coming from British International Investments, which will mainly fund expansion of the cell facility. We're happy to report that our new 4 GW TOPCon cell facility is progressing on schedule, with land acquisition, engineering, and machinery orders all done, and civil works moving along well. Our manufacturing business now contributes meaningfully to the consolidated P&L, generating an adjusted EBITDA of INR 3.3 billion this quarter at a margin above 30%. Compared with the prior quarter, the EBITDA contribution this quarter has eased because captive sales made up a larger share. On top of that, margins came in somewhat higher thanks to certain cost savings and early procurements, which could normalize as the year goes on; at this point, let me pass things to Kailash, who will discuss the financial highlights in more detail.

Kailash Vaswani executive
#3

Thanks, Sumant. If you go to page 12, you'll see that we keep delivering profitable growth consistently. Compared with the same point a year ago, we've built more than 2.1 GW of projects, which works out to a 22% rise in operating capacity once you adjust for the 600 MW we sold over the trailing 12 months. So far this year, we've commissioned more than 1.2 GW of renewable energy capacity. Our revenue rose by more than 50% in H1 of this fiscal versus last year, driven by higher MW and a substantial contribution from third-party sales within our manufacturing business. Now, on page 12 and the EBITDA walk, we experienced subdued PLFs this quarter because irradiation was lower during a prolonged monsoon period, and that produced a net negative impact of INR 1.7 billion for the quarter relative to last year. The new projects commissioned during the last 12 months added INR 2.5 billion to our adjusted EBITDA, and the manufacturing business contributed INR 3.3 billion. During the past year, we sold 600 MW of solar assets plus a transmission project, and their contribution was likewise missing from adjusted EBITDA this quarter. Moving to leverage, headline leverage keeps falling substantially and steadily, down from 8.6% in September 2024 to 7% in September 2025. Leverage at the operating asset level also remains under the 6x threshold we've established. On a trailing 12-month basis, leverage stood at roughly 5.5x, leaving out our under-construction portfolio and the contribution from our JV partners. Please keep in mind that our trailing 12-month EBITDA doesn't reflect the run rate EBITDA for these assets, since many of them have been operating for under one year. We keep exploring every option that can bring down our leverage ratio at the consolidated levels, including asset recycling, cost optimization, and cutting corporate debt. During the quarter, there was also favorable macro news, as S&P upgraded India's long-term ratings to BBB from BBB-, the first such upgrade in nearly 18 years. The Government of India also reduced GST rates. On top of that, there are further expectations of rate cuts from RBI, which ought to flow through to our future borrowing costs as well. I'll now pass it to Vaishali for her comments on ESG.

Vaishali Nigam Sinha executive
#4

Appreciate that, Kailash. If we move over to page 15, we can examine how ReNew's Sustainability Initiatives and targets have progressed. As climate effects grow more severe, the worldwide situation is rapidly moving toward compulsory rules; within India, fresh reports draw attention to severe heat problems, while occurrences like the floods of August 2025 across Uttarakhand and Punjab, plus dangerous AQI readings in Delhi, show how urgently action and resilience are needed. Here at ReNew, our dedication to leading with purpose and resilience does not waver. Staying committed to purpose-driven sustainability keeps producing results, most recently shown through our remarkable showing in the well-regarded S&P Global CSA Assessment, a leading highlight for this quarter. Our score came in at 83, the best we have ever recorded, which is a 14% gain compared with a year earlier and more than twice what we scored when we first appeared in fiscal year 2022. That positions ReNew as the top-rated energy company based in India and puts us within the leading 10% of energy companies worldwide; this achievement speaks to how deep and broad our climate strategy is, along with human rights and our ongoing dedication to transparency and ethical governance. When it comes to awards and recognitions, as noted before, the Fortune Change the World List 2025 — ReNew has appeared on that esteemed list for a third time. This represents our second straight recognition tied to a community water initiative in Rajasthan. Regarding Forbes Sustainability Leaders, ReNew's Chairman and CEO, Sumant Sinha, earned a place among the top 50 climate leaders worldwide, which strengthens ReNew's position at the forefront of the sustainability movement. On the reporting side, we brought out our first climate risk report, consistent with IFRS S2 and TCFD, setting out the main climate-related risks and opportunities. We likewise issued our initial nature risk report, consistent with TNFD, pinpointing nature-related risks and opportunities that matter greatly to our resilience over the long term; now, if we go to page 16 to review how our ESG targets have advanced, our commitment to the sustainability roadmap is complete, and we have achieved significant strides across our sustainability goals overall. We have lowered our scope one and two emissions by 18.2% against the baseline, and through our pilot study, two of our sites have turned water positive. Social responsibility stays central to what we do. Our firm conviction is that a just energy transition has to empower people at the grassroots, and we keep upskilling and training women along with coal mine workers in green technology. Diversity sits at the core of our sustainability strategy overall, and diversity among our full-time employees is now roughly 16.2%. Our S&P Global CSA score of 83 keeps demonstrating our sustainability leadership. At present we are waiting on results from additional ESG ratings and will share progress on every rating at our next meeting. Looking ahead, our commitment stands to deliver sustainable growth and generate positive change throughout the world. I'll hand things back to Kailash now.

Kailash Vaswani executive
#5

Thanks, Vaishali. Now for our outlook on the fiscal year that closes on March 31, 2026 — we're restating the guidance we gave before. Assuming weather cooperates for the rest of the year, we anticipate landing at the upper portion of our adjusted EBITDA range of INR 87 billion to INR 93 billion. We also anticipate building 1.6 to 2.4 GW of projects over this period, along with generating cash flow to equity of INR 14 billion to INR 17 billion. In the opening six months of this fiscal year, wind PLFs came in slightly ahead of last year thanks to the monsoon running long, but solar PLFs dropped considerably, which pushed our overall PLF below where it stood a year ago. Our consolidated adjusted EBITDA as a whole has likewise gotten a lift from how our manufacturing business performed, and there we've raised the band for its EBITDA contribution by INR 2 billion, which moves the guidance to INR 10 billion to INR 12 billion for the rest of the year. With that said, we're ready to take your questions.

Justin Clare analyst
#6

Hello, and thank you for making room for us. I'd like to begin by focusing on the headway you keep achieving when it comes to contracting. As I recall, 3.8 GW worth of PPAs were executed during the past 12 months. Would you mind sharing your thoughts on the current contracting landscape, along with what you anticipate in terms of further PPA signings across the coming few quarters? Do you have any view on when the full 25-GW pipeline you've already secured might get contracted?

Kailash Vaswani executive
#7

Sumant, do you want to handle that one?

Sumant Sinha executive
#8

Yeah. Okay. Hi, Justin. Yeah. So, over the past 12 months, we've achieved some decent movement on our PPA signings, and as you're aware, we hold roughly 6 GW of LOAs, and we'd be hoping that a significant portion of those would turn into PPAs. Providing you with precise visibility on that is tough, since the timing of PPA signings depends on when they happen, driven by what we hear back from the DISCOMs. What we'd expect is that across the coming six months or thereabouts, a fair-sized portion — though it's really difficult for me to guess precisely how much — of that six would be signed. Offering a concrete signal about when the whole lot could be converted is extremely difficult. My sense is that patience is required, and we need to keep engaging with the DISCOMs. A large share of that capacity involves the more structured products, and converting those does require time for discounts, essentially, because substantial diligence and work is needed. Another point is that much of the capacity relates to execution stretching out to 2029, 2030, and beyond. In those cases, we need to collaborate very closely with the discounts to understand what the requirements look like, and to determine whether we can prepone any of that capacity. There's plenty of conversation and dialogue happening with the discounts via the REIAs, the bidding agencies, aimed at converting this capacity. Giving you a highly specific timeline for when everything will be converted is difficult at this stage.

Justin Clare analyst
#9

All right, I understand, and that helps. Now, considering what you've got lined up, could you give us an update on where things stand with transmission for those projects, particularly looking ahead to 2029 and 2030, and also shed some light on what risks remain when it comes to locking down the transmission your assets need?

Sumant Sinha executive
#10

Yes. The bulk of transmission is already secured, since as soon as a bid is won and the letter of award is received, you're permitted to go reserve connectivity. That means connectivity has in fact been reserved for all 25 GW. On top of that, you can also reserve connectivity by acquiring land, which isn't tied to any particular project, so a good amount of connectivity was reserved on that basis too, again not tied to any particular project. Now, like I mentioned, what's taking place is that a number of the DISCOMs are approaching us and saying, "Look, if these projects are going to be built around transmission that arrives in 2029 or 2030, that could be too distant for us. Could you deliver the projects somewhat sooner?" We're examining where we have room to shift the transmission connectivity we already hold, which sits further out, and in some manner try to swap it for some of the land-based connectivity we possess, which might arrive earlier. That's the effort underway to determine which of those PPAs we'd like to actually move up by using the land-based connectivity at our disposal. That actually gives us considerable flexibility, in the sense that it lets us turn some of those LOAs into PPAs sooner. Naturally, land-based connectivity right now is an extremely scarce asset, and it's extremely valuable, so we intend to deploy it with great care.

Justin Clare analyst
#11

All right. Thanks for that. I have one additional question regarding the manufacturing segment, specifically solar manufacturing. Looking at it on an even-margin basis, it appears to have declined to 33% during fiscal Q2, down from 40% in Q1. I believe during your prepared remarks, you referenced a potentially greater proportion of captive sales, but I was hoping to gain more clarity on what caused that decrease. Perhaps you could elaborate a bit more on this. It would also be helpful if you could share your outlook for how even margins are likely to move during the back half. Thank you.

Sumant Sinha executive
#12

Yes; so in fact, one point I think that, hello, Justin. Yes. Hello, Justin. Thank you. You see, Justin, captive sales don't truly affect the reported EBITDA margins, since when our figures are reported, we report only third-party manufacturing sales. Naturally, if Q2— Quarter One was unusual, we had stronger realizations, and because of that, margins came in higher. Naturally, Quarter Two is a comparatively slower month where sales are concerned. Since we were generating output, we were simultaneously selling it; that's the reason there was an effect on realizations, which led margins to come in lower. Also, second, during Quarter One, we had completed certain strategic procurement in advance, prior to prices rising for wafers and all, along with some other key equipment used to make cells and modules. I believe we witnessed that unfold during Quarter One. Quarter Two, naturally, involved the updated pricing we received on our procurement side.

Justin Clare analyst
#13

Alright, thanks. I'll hand it over.

Sumant Sinha executive
#14

Thanks.

Nikhil Nigania analyst
#15

Hello, and thanks for taking my question. To start, picking up where we left off regarding the solar manufacturing piece, it would be helpful if you could provide some timelines regarding when the cell expansion is expected to be commissioned, and also whether there are any intentions to move into ingot wafer, considering the guidance the government has provided.

Sumant Sinha executive
#16

Nikhil, on cell expansion.

Nikhil Nigania analyst
#17

Go ahead.

Sumant Sinha executive
#18

Right now, we've moved quite far along when it comes to buying land and putting in orders for some of the essential equipment. Our expectation is that pre-commissioning will begin to become visible around this same point next year. As I see it, full commissioning would probably take place by the close of fiscal 2027. Regarding our wafer plans, the notification came out fairly recently, so we will clearly assess what advantages that expansion could offer and then make our decision on whether to move into wafer ingots.

Nikhil Nigania analyst
#19

Got it. My second question concerns the manufacturing side. We've picked up that pricing has eased somewhat for non-DCR modules, while DCR is still holding up well as we move into this quarter too. Would you say that's accurate on both counts?

Sumant Sinha executive
#20

Yes. Nikhil, once more, this is pretty much what we'd anticipated, I'd say — whenever additional capacity starts up, that kind of pattern generally shows up. Seasonality plays a role too, since construction activity was in a slow period; we noticed a bit of a decline in sales. Clearly, pricing might have come down somewhat as well. We'll wait and watch how the remaining months of the year unfold. Once again, with capacity ramping, those extraordinary margins we had been enjoying would have normalized eventually regardless. Regarding DCR, I'd also note that although at present there's nothing alarming right away, additional capacity is beginning to arrive on the cell side too. Once again, margins would settle at more typical levels as time passes.

Nikhil Nigania analyst
#21

Great, that's really useful regarding the manufacturing side. So my next question was about the renewable assets. When I look at that committed pipeline of 7 GW that's going to be built out, roughly 2 GW of it is solar, and I believe the timeline there is clearer. The remaining 5 GW appears to consist of the more complex projects — FDRE, RTC — where the stated timeline is two years from PPA, contingent on transmission. I'd appreciate some additional detail on when you anticipate that remaining capacity to come online, meaning the committed pipeline in the complex FDRE and RTC portion, since that's a sizable figure.

Sumant Sinha executive
#22

Regarding what's in the committed pipeline, a portion of those transition projects still haven't been awarded yet. We don't yet have a precise picture of what the schedules for them would look like. Once again, based on how we understand things right now, the majority of it should be finished by FY 2029, while a certain portion might slip past that point.

Nikhil Nigania analyst
#23

Got it. So, if I were to distribute that 7 GW across the period up to FY 2029, is it possible that capacity addition might decline in FY 2027 or FY 2028?

Sumant Sinha executive
#24

No, Nikhil, we keep expanding what's in the pipeline. Beyond that, you'll see interstate-style projects within the state, and we'd have the chance to assess those and take part in certain auctions or pursue CNI. As an organization, I'd say we've stayed on that path of adding capacity. Since connectivity isn't available, I can't see any justification for that to shift.

Nikhil Nigania analyst
#25

Understood. To put it plainly, could you say whether the situation has improved regarding finishing transmission projects or securing right of way in that area, or does it remain comparable to the position 12 months ago?

Sumant Sinha executive
#26

It's difficult to say, since each project—each transmission project—has its own distinct characteristics, and it either finishes on schedule or it finishes behind schedule. As for what's actually happening on the ground, in Rajasthan, which had been comparatively simpler when it came to execution, certain ROW problems have started to arise there as well.

Nikhil Nigania analyst
#27

Understood, that's useful. So my final question concerns what lies ahead or the bidding that's currently underway. We're noticing quite a few tenders for battery energy storage. From our vantage point, the bids look pretty aggressive, but I'd like to hear what you think — does ReNew see it the same way, and is that the reason ReNew hasn't been particularly active in that area?

Sumant Sinha executive
#28

That's absolutely correct. Our actions are reflective of what our belief is.

Nikhil Nigania analyst
#29

Perfect. Thank you; those were my questions. Thanks for answering them.

Sumant Sinha executive
#30

Thank you, Nikhil.

Puneet Gulati analyst
#31

All right. I appreciate it very much. First off, could you share a little on whether curtailment was something you also ran into over the most recent quarter, and how large was it?

Nikhil Nigania analyst
#32

Sumant, do you want to handle that one?

Sumant Sinha executive
#33

Right, of course. No, we did see some curtailment across certain projects in Rajasthan, Puneet. That amounted to roughly INR 100 crore in terms of the actual routine figure during the first half. These relate to projects where we have revenue. Yes, revenue, correct. These relate to projects where GNA is in place, the substation is ready, and we need to connect. At times the backend lines aren't prepared to provide us the full GNA. I believe this will persist to some degree until some of those backend lines are completed, which likely will occur over the next couple of months. At least in those areas, that curtailment will decrease.

Puneet Gulati analyst
#34

All right, that works. When you look at it purely as absolute power capacity, what figure would represent the curtailment?

Sumant Sinha executive
#35

Let's take a tariff averaging somewhere around INR 3.50 to 4 rupees.

Puneet Gulati analyst
#36

Understood.

Sumant Sinha executive
#37

Whatever number of units ends up being the result, that's most likely what it will be.

Puneet Gulati analyst
#38

Yeah, yeah, that's great. Thanks very much, sir. Then, regarding connectivity, your goal for this year sits at 1.6 GW-2.1 GW. For every one of those projects, up to 2.1 GW, is the connectivity in place, or are we still counting heavily on getting connectivity commissioned on schedule?

Sumant Sinha executive
#39

The bulk of it, I'd say, is in place. Naturally, one problem is active right now — the Great Indian Bustard matter, on which the Supreme Court is issuing its opinion. In these projects, that's the sole external factor we're dealing with, I believe. With luck, it gets settled, and so it won't become a limiting element. Even so, should a delay occur, it would amount to one month or two months at most. From the standpoint of how much it hits the financials, it won't be significant.

Puneet Gulati analyst
#40

All right. And finally, with regard to the RTC and peak power projects you've brought online, could you share how things have been progressing — specifically, what amount of capacity are you selling externally at this point, and what has battery performance looked like?

Sumant Sinha executive
#41

On that particular item, Puneet, I don't believe I can provide or pass along precise figures to you. So Anunay or Kailash, should either of you have the data, then please feel free to jump in.

Anunay Shahi executive
#42

Puneet, regarding peak power, everything's now fully commissioned. All 400 MW of RE capacity, along with 150 MW hours of batteries, is complete. Things have gone quite well for me; when it comes to RTC, the batteries are finished, plus roughly 1,100 — close to 1,100 MW of RE capacity, which breaks down to about 700 MW of wind and 400 MW of solar. There's really nothing to complain about, and no concerns as such with either of these projects when it comes to operating performance.

Puneet Gulati analyst
#43

All right, that's useful. Thanks a lot, and good luck.

Maheep Mandloi analyst
#44

Hi, thanks for taking my questions here. Just one question on the manufacturing side — I believe Kailash mentioned normalized margins, or something along those lines, for the future. Could you discuss what the expectations are for normalized margins going forward on cellular modules?

Kailash Vaswani executive
#45

Maheep, at this moment it's difficult to give a definite answer. In our forecasting work, we don't assume margins around 35% to 40%. Ours tend to be more sensible; how things play out with demand and supply will determine that. We'll see. Providing you with a precise figure would be tough for me.

Maheep Mandloi analyst
#46

Do you have any sense of when we reach that point — perhaps a year or two after the approved roster of cell makers would have an impact, or when we arrive there?

Kailash Vaswani executive
#47

On the ALMM side for sales, there's also quite a bit of capacity being added. A portion of that is arriving right now, ahead of ALMM taking effect, which happens in April of next year. So to that degree, you'd get some extra supply as well, which is currently present in the DCR market; then once more, when the window for ALMM on cells opens, you'll see margins jump up for a short while. I believe in whichever part of the market you look at, there's scarcity. We're observing an initial stretch of, let's say, 12 to 15 months, 18 months, during which we're earning margins above what we had expected.

Maheep Mandloi analyst
#48

Understood. Understood. I'd really like to ask one thing about the privatization piece here. I noticed the most recent news out of New York's press release not long ago. Is there anything new since then regarding the offer, or any bids coming in from other investors? Thank you.

Kailash Vaswani executive
#49

Absolutely not. Any competing offer would have required a public announcement. As of right now, the only bid that has come before the special committee is the one from the consortium.

Maheep Mandloi analyst
#50

Do you have any view on the schedule, or did the consortium set a schedule of, I believe, T plus 1 year? Would that be a reasonable sort of schedule for the closing there?

Sumant Sinha executive
#51

So, that's the information they've disclosed in their filings. With any luck, we'll handle it efficiently, at least as far as the processes the company itself can control are concerned.

Maheep Mandloi analyst
#52

Okay, sounds good.

Anunay Shahi executive
#53

Maheep, one quick point of clarification — my understanding is that the group had signaled a timeline of T plus seven to eight months. Per what Kailash mentioned, we believe it will hopefully arrive before then; this is probably on the more cautious side of that window.

Maheep Mandloi analyst
#54

Thanks for clarifying that — I appreciate it.

Nikhil Nigania analyst
#55

Hello again, and thanks for letting me ask another question. I only have a single follow-up to add. Regarding that roughly 6 GW, the amount for which the LOA has been granted while the PPA remains unsigned, several news stories have come out lately pointing to government intentions to scrap 42 GW of renewable tenders — specifically those where awards were made but no PPA has been executed. Do you have any view on this? Given that situation, is there a chance this 6 GW could disappear?

Sumant Sinha executive
#56

From my perspective on this, Nikhil, quite a few details ended up appearing in the press. In the end, Emanuela's statement represents the definitive position — namely, that efforts are underway, and the REIAs are being encouraged to complete signing of all the PPAs, with that work set to continue. Should any cancellations occur, they would only happen once substantial effort had already been invested, and they would be handled very selectively, on a case-by-case basis. A blanket decision of that sort is not something I can envision being made here. My sense is this will go on a while longer. Everyone will keep trying to get these PPAs executed. Only after perhaps another 6 months, 9 months, or 1 year will we find out what transpires if some PPAs, even after, say, 2 years have passed since being bid out, remain unsigned — and what steps the government would take then. At this moment, I believe it's still too early to say.

Nikhil Nigania analyst
#57

Understood. Appreciate the answer. Thank you so much.

Anunay Shahi executive
#58

Thanks. We have a few questions submitted online. The first one, Kailash, is for you if you'd like to handle it: what's the approach for refinancing the Diamond II bonds maturing in 2026, along with the INGPH, which is an issuance from the restricted group and comes due in 2027? Do we intend to refinance those once more through dollar bonds, or instead onshore using INR?

Kailash Vaswani executive
#59

When it comes to those two bonds, the response is that their maturities mostly fall in the latter half of the coming calendar year, and plans for refinancing them are underway. Whichever marketplace provides the cheapest cost of capital for refinancing is the one we'll watch, and we'd carry out the refinancing there. That said, on the whole, conditions in the financing markets are still quite strong and healthy. Capital remains accessible through the various pools we normally tap, encompassing not just the dollar bond market but the domestic financing market as well, where public sector undertakings, financial institutions, and private sector banks are all highly active and committed to funding renewable energy projects; whenever the refinancing comes due, we don't expect any significant difficulties.

Anunay Shahi executive
#60

Kailash, I believe this next question is also directed at you, and it concerns where things stand with the TIC private offer. As I understand it, the question being asked is: at what point do you anticipate the consortium will finalize its offer? Should we expect that in November? Then there's a follow-up — are conversations with them happening on a regular basis? And do you have any knowledge of whether they are engaging directly with certain of your long-term shareholders?

Kailash Vaswani executive
#61

All right. If there's any question I didn't get to, just tell me. Regarding how things move forward from this point, my sense is that the special committee has made clear it backs the final non-binding offer that came in, and it has requested that the consortium turn that into a binding offer. We expect the consortium's final binding offer to arrive at some point during November. After that, I believe there will be steps involving documentation. We will execute the transaction agreement, move ahead with the 13D filings, and then comes the E3 filing together with the scheme for SEC review. All of those steps will take place. Whenever those meetings are convened, I stay in contact with the special committee, together with the company's General Counsel. The special committee is in discussions with a number of the public shareholders, the large public shareholders, and where some public shareholders have said they would also like to talk with the consortium, I think that is being permitted as well, or rather being facilitated. Yeah, I believe I've covered a few of the questions. Was there anything I left out? Just let me know.

Anunay Shahi executive
#62

No, I think that was all.

Kailash Vaswani executive
#63

Okay.

Operator operator
#64

Since nobody has anything else to ask right now, that brings the Q&A portion to a close, along with today's ReNew second quarter fiscal year 2026 earnings report. We appreciate everyone for joining in. You're free to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete ReNew Energy Global Plc transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to ReNew Energy Global Plc earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.