Home / Transcripts / ReNew Energy Global Plc (RNW) · February 16, 2026

ReNew Energy Global Plc (RNW) Earnings Call Transcript

February 16, 2026

NASDAQ US Utilities Independent Power and Renewable Electricity Producers earnings 38 min

Earnings Call Speaker Segments

Anunay Shahi executive
#1

Thanks so much. Good morning to all of you, and we appreciate your participation on this call; earlier today we issued a press release covering the results for the third quarter of our fiscal year 2026, which closed on December 31, 2025. You can find both that press release and the earnings presentation in the investor relations area of our site, www.renew.com. Joining me on this call are Sumant Sinha, who serves as our Founder, Chairman, and CEO; Kailash Vaswani, our CFO; and Vaishali Nigam Sinha, our Co-founder and Chairperson, Sustainability. Once we finish our prepared remarks — we anticipate these will run roughly 30 minutes — we'll take your questions. As a reminder, our safe harbor statements appear in our press release, in the presentation materials, and in the materials posted on our website. Those statements matter and form an essential part of everything we say here. Various risks and uncertainties might lead our actual results to diverge materially from what such forward-looking statements express or imply. Therefore, we urge you to look over the press release and the presentation on our website so you get a fuller picture. Our press release, presentation materials, and annual report also include specific non-IFRS measures, which we reconcile against the closest comparable IFRS measures, and those reconciliations can likewise be found on our website within the press release, the presentation materials, and our annual report. Having said all that, I'm glad to now turn things over to Sumant.

Sumant Sinha executive
#2

Absolutely. Hello, Anunay, and thanks. Good morning to everyone, and good evening to those in different time zones. It's a pleasure to have all of you join our earnings call covering the third quarter along with the first nine months of fiscal 2026. Fiscal 2026 has begun with positive macroeconomic developments. As all of you are likely aware, India and the U.S. reached a trade agreement just a few days back. Beyond easing the broader uncertainty and overhang, this should reopen the U.S. market to Indian exporters and deliver an overall benefit to the economy. The rupee has also gained from this, recovering some of its value against the dollar. On top of that, the financing landscape continues to be favorable, with interest rates trending downward. Thanks to all of this, India's growth projections remain above 7% for fiscal 2026, and the government of India is forecasting approximately the same growth rate for fiscal 2027. Turning to our sector, electricity demand has shown some recovery, with growth rebounding sharply in December 2026 and slightly stronger figures in January 2026 as well. Power demand should return to normal levels in fiscal 2027. On today's call, I'll go through the quarter's updates and also touch briefly on our strategic direction as a company. Now to our highlights. Since December of last year, our operating capacity has grown from 10.7 GW to 11.8 GW. Since we also sold 900 MW during this window, after adjusting for that, our portfolio grew 19%, or 2 GW, across the last 12 months; we remain focused on optimizing our portfolio to lower execution risk and CapEx and to achieve more predictable cash flows. So for our complex projects, we've chosen to swap out a portion of our wind projects in favor of additional battery energy storage systems, or BESS, along with solar capacity. As a result, we've cut the wind capacity within our committed portfolio from 2.5 GW down to roughly 850 MW, bringing us now to 19.2 GW, which includes approximately 1.5 GW of batteries. This shift allows us to bring down CapEx, cut execution risk, and forecast our future cash flows more accurately, given reduced volatility in weather patterns. Now for our financial highlights. Our adjusted EBITDA rose 31% to INR 74.8 billion for the nine months ending December 31, 2026, alongside a more than sixfold rise in our profit after tax. We also raised $600 million via a bond offering and refinanced our earlier bond, which was due in July 2026. Demand for the offering exceeded $2 billion, and we managed to bring the interest rate down from the previous 7.95% to 6.5%. That translates to roughly $9 million saved in annual interest expense; this was also the first bond issued through GIFT City. We kept our capital recycling engine running as well, selling another 300 MW of solar assets this quarter. For the first nine months, adjusted EBITDA got a contribution of INR 10.8 billion from our manufacturing business. That's why the bottom end of the guidance range has been raised for both adjusted EBITDA and megawatts for the year. Adjusted EBITDA of INR 90 billion-INR 93 billion is what we now anticipate delivering, with somewhere between INR 11 billion-INR 13 billion of that coming from our manufacturing business. The range for our project guidance has likewise been tightened, and between 1.8 GW and 2.4 GW is what we expect to construct in the fiscal year ending March 31, 2026. Finally, and most importantly, ESG sits at the core of all our activities. It's my pleasure to share that on our ESG commitments we keep exceeding expectations. An A grade rating has come to us from LSEG along with a score of 90.41 out of 100, which effectively puts us in the top quartile globally; an A grade rating has also come to us from CDP Climate Change and Water Assessments for effective water management at our plants. Beyond that, water positive certification has been achieved for two of our sites. If you turn to pages eight and nine, I wanted to point out that this year is a significant milestone for us, since we mark 15 years of our operations. Three mature businesses now make up our company: a utility scale IPP business, a C&I business, as well as our manufacturing business. If you turn to page 10, it's important to note the crucial strides ReNew has continued to take against the backdrop of a transaction; roughly 1.9 gigawatts has been commissioned by us, our manufacturing capacity has been ramped up, and $100 million was also raised from BII, British International Investment, to finance the cell expansion of our manufacturing business. Among the market leaders in the segment is our C&I business, and roughly 30% expansion has occurred in our portfolio over the past year through contracts with marquee customers. Leverage also keeps trending downwards meaningfully, and approximately 5.5 x levels are already where we sit for our operating portfolio, which is debt to EBITDA. Moving to page 11, some time is what I wanted to spend highlighting our key strengths. While the size and scale of our portfolio, both in utility scale and C&I, is known to everyone, in-house O&M and EPC capabilities have been developed by us over the years. Connectivity has also been secured by us for our entire portfolio, including for our letter of awards, with 5 GW-6 GW of spare connectivity on hand. Timely connectivity continues to be a key metric in the sector that we operate in, which makes this an important differentiator. Moving to page 12. It's important to note that approximately 17% per year is how we have been consistently growing our EBITDA since our listing. Without issuing any new equity and relying on capital recycling, which has been more attractive for us, we have managed to do this. On page 14, some new elements that will be pivotal for both growth, predictability, and profitability are what I would like to add. By adding more BESS and solar to what we own and cutting back how much we depend on wind, we've lowered the risk in how we carry out projects and made future cash flows easier to forecast. Since a 25-year PPA already stands behind these tariffs, this lets us execute more quickly and brings in revenue that's more dependable. A combination of cash generated internally plus recycling of capital will keep funding our capital requirements, which lets us lift our returns. And finally — this matters most — our attention will now shift more toward a strong, disciplined balance sheet, and we'll actively pursue bringing leverage down even more. Even though we're turning in profitable results at this point, concentrating on leverage and on optimizing costs ought to push our returns and cash flows higher still. If you look at page 15, we've laid out certain run rate figures tied to the present configuration, both gross and net of asset sales. Our aim was to show that through disposing of roughly 1.6 GW across a span of time, we can get to a portfolio of 19.2 GW efficiently without needing to bring in outside capital, and also bring ex-headline leverage, with under construction projects included, down from where it sits now at 6.7x to below 5.5x.

Sumant Sinha executive
#3

Should additional asset recycling or farm downs become possible, our intention is to apply those proceeds toward reducing leverage and corporate debt still more. On page 17, business updates: our operating megawatts keep being delivered, and the operating portfolio now stands at 11.8 GW — a 19% gain once the 900 MW of assets from the last 12 months are adjusted for. Including BESS, the total portfolio has reached 19.2 GW. Across the past nine months, we commissioned wind projects exceeding 600 MW along with more than 900 MW of solar. On page 18, performance in our manufacturing business remains ahead of expectations, posting adjusted EBITDA of INR 10.8 billion during the first nine months of this fiscal year. An external order book of 900 MW is held by that business. Construction of our 4 GW cell facility is moving along nicely, and first cells should actually arrive from it in the next fiscal year. Our module facilities turn out more than 12 MW daily, with 3 GW produced year-to-date, while the cell facility turns out more than 5.5 MW daily, with 1.4 GW produced year-to-date. Sold so far this year: 2.6+ GW of modules, roughly 1.5 GW of that externally, and the remainder directed into our own operations. On page 19. Within the country, our C&I segment ranks among the biggest C&I portfolios and has performed exceptionally well. Partnerships have been built strong with global tech giants including Amazon, Microsoft, and Google, and our customer base has grown nationwide. These tech giants account for 50% of the portfolio overall. The business is positioned well, too, to capture emerging opportunities like energy management services and supplying renewable energy to data centers. Kailash will now cover the financial highlights. Kailash, the floor is yours.

Kailash Vaswani executive
#4

Thanks, Sumant. If you'll look at page 21, we're still achieving steady, profitable expansion. Compared with the same point a year ago, we've built more than 1.9 GW of projects, which works out to a 19% rise in operating capacity once you account for the 900 MW we divested over the trailing 12 months. So far this year, we've commissioned 1.6 GW of renewable capacity. Revenue for the first nine months of this fiscal rose 48% versus last year, driven by more megawatts plus a substantial boost from the manufacturing business. Adjusted EBITDA for this fiscal's third quarter is likewise higher, mainly because of gains on asset sales, the scaling up of our manufacturing operations, and greater operating megawatts. Now on page 22, headline leverage keeps coming down steadily. It has fallen from 8.2x in December 2024 to 7x debt EBITDA right now, and to 6.7x when you strip out the contribution from our JV partners, which is equity. Measured on a trailing 12-month basis, leverage for our operating portfolio stood at roughly 5.6x. Keep in mind that our trailing 12-month EBITDA doesn't reflect the run rate EBITDA of these assets, since a lot of them have been operating for under a year. We're still exploring every avenue to bring our leverage ratio down at the consolidated levels, including asset recycling, cost optimization, and lowering our corporate debt. Moving to page 23, which lays out the specifics of our financing and asset recycling. We recently issued a $600 million bond carrying a 6.5% coupon, replacing the previous bond that was at 7.95%. This marks the first bond out of India's GIFT City, so it's a marquee transaction. The issuance drew strong investor demand of, you know, more than $2 billion and has also let us save $9 million in interest costs each year, on top of withholding tax savings. On top of that, we closed the sale of a solar 300 MW asset, bringing our total asset sales this year to 600 MW, and through that we've raised $275 million in total via capital recycling this year, which includes the $100 million from BII tied to our manufacturing business. I'll now pass it to Vaishali for her comments on ESG.

Vaishali Nigam Sinha executive
#5

Appreciate that, Kailash. If we move over to slide 25, we can examine what's new with ReNew's sustainability programs and goals. By 2026, the worldwide ESG situation calls for required measures and proof of tangible results, and it's a point of pride that we're setting the pace across renewable energy and other industries. Let's begin with the ESG scores we received lately. Regarding the LSEG ESG rating. Are you there?

Kailash Vaswani executive
#6

Yes, I can hear you, Vaishali.

Vaishali Nigam Sinha executive
#7

Sure. Regarding the LSEG ESG rating, we got an outstanding 90.1 out of 100, along with an A grade, which puts us in the top quartile worldwide; among 346 companies in our sector, we rank second, which shows a solid 7% improvement year over year and obvious leadership in the industry; we also did well in the CDP Climate Change and Water assessments. In the Climate Change Assessment we earned an A rating, which places us on the esteemed Global Corporate A List, and we kept an A- rating for water security. All together, CDP ranks us within the top 4% globally. Water stewardship stands as a central pillar of ReNew's environmental strategy, integrated throughout our operations; we got a water positivity pilot off the ground successfully, certifying two sites as water positive. Our solar site located in Ashok Nagar, Madhya Pradesh, received certification as water positive, which makes it India's first water positive solar plant. Such accomplishments highlight our dedication to establishing new sustainability benchmarks for the sector. Now if we go to Slide 26, let's go through our progress on the core pillars of our ESG initiatives and targets. Within the environment pillar, we met our carbon neutral target by finishing verification for the fifth year in a row for fiscal year 2024, 2025; we stay aligned with our annual SPT targets, reaching an 18.2% decrease in Scope 1 and 2 emissions against the baseline in fiscal year 2025. As the nation moves toward sustainable economic and inclusive development, our CSR initiatives have likewise changed to reinforce new India's priorities. So far, our initiatives have made a positive difference in more than 1.7 million lives. One key highlight is Project Surya, which trains 1,000 solar power workers as solar technicians, with 720 women trained and more than 200 already placed in the sector, greatly advancing gender equality and skilled employment. When it comes to governance, we are achieving solid progress on our goal to rank among the top five global energy and utilities company by 2030, according to leading ESG rating agencies. This shows up in an S&P Global CSA score of 84, an LSEG score of 90.4, and top-tier CDP ratings of A for climate change and A- for water. These outcomes demonstrate our ongoing dedication to responsible and sustainable practices. I'll now hand things over to Kailash. Over to you, Kailash.

Kailash Vaswani executive
#8

Thanks, Vaishali. Now for our outlook on the fiscal year that wraps up on March 31, 2026: we've raised the bottom end of our EBITDA guidance range by 3%, and we now anticipate adjusted EBITDA coming in somewhere between INR 90 billion and INR 93 billion. Our expectation for projects built during the year is now 1.8 GW to 2.4 GW, higher than the 1.6 GW we previously had at the low end, and we expect to produce cash flow to equity of INR 14 billion to INR 17 billion. On top of that, we're lifting our guidance for the adjusted EBITDA contribution from the manufacturing business to a range of INR 11 billion to INR 13 billion. With all that covered, we're ready to take your questions.

Maheep Mandloi analyst
#9

Hello there, and I appreciate you fielding this. I have a single inquiry regarding that updated approach. Sumant, you mentioned an increase in projects focused solely on solar and BESS moving ahead. Might you expand on that in greater depth? What exactly prompted this choice, including both the advantages and drawbacks? Also, regarding solar, your company has been producing the modules on its own. Is there any intention to pursue a similar path when it comes to BESS? Thank you.

Sumant Sinha executive
#10

Yes. Thank you, Maheep. So essentially, the reason we're cutting back on wind in the portfolio is that when we placed bids for a number of these projects, BESS prices at that point were much higher than they stand today, and the same goes for solar. So broadly speaking, as BESS costs have fallen a great deal, our capacity to firm up power via solar plus BESS has in fact gotten better. And so, to arrive at the right solutions that customers want, we essentially need less wind from the standpoint of an overall new configuration. That's one reason the wind share has been reduced. The second point is that, as you're aware, we've been through experience in wind where PLF has regrettably come in below what we expected across the last 7 years, across the last 5 years. And, you know, we can't say precisely when that pattern will turn around. It could turn around next year, it could take somewhat longer, but at bottom, wind's variability is far greater than solar's; and, execution too in general, since much of the solar execution sits in Rajasthan, where land is easier to obtain, while much of the wind execution sits in sort of Deccan, central India, where a lot of it is agricultural land, which is typically harder to obtain. And so therefore, delivering a comparable amount of capacity is simpler in solar than in wind. And so for both of those reasons, in fact all three reasons, which relate to the change in BESS price, the change around the wind variability issue and the issue of solar being easier to execute, we have therefore, you know, sought to lower the wind share in our portfolio going forward; and so within the close to about 7 GW of new IPP capacity that we have, we've reconfigured those projects wherever the terms of the bid of the various bids permit, and we are therefore now aiming for a greater amount of solar plus BESS. There is, of course, still close to 1 GW of wind, but that's down substantially from 2.5 GW we had before. Those are the reasons. As for manufacturing BESS, it isn't something we've actively examined, seriously, at this stage. The reasons are in fact twofold. One is, or I'd even say threefold. One is that, there's no restriction right now on imports of batteries from China or cells from China. And you know that you can bring them in at a much cheaper level than you can produce domestically. And so that was one reason. Reason number two involved the tech side of things. When it comes to batteries, technology advances much more quickly, which means you need significantly more know-how just to grasp which cell technologies are the right ones, and so forth. Much of the cell production in this country — or honestly in any country — is essentially powered by the EV sector. That's a market we clearly wouldn't be pursuing for what we make in BESS. Otherwise, a large share of it would need to be directed toward that segment, and that's an area we don't have as strong an understanding of, you know. Which explains why, up to now, we haven't explored cell manufacturing, or manufacturing of battery cells, up to this point.

Maheep Mandloi analyst
#11

Understood. That clarity is helpful. Then, regarding the latest on the take-private situation or what course of action lies ahead—in one of the slides, you mentioned the path forward. Is that the strategy going ahead, or should we anticipate additional developments concerning the path forward or further discussions about privatization? Thanks.

Sumant Sinha executive
#12

Well, Maheep, that's really not a matter we're in a position to say anything about, clearly, since it's quite a particular subject; and if a situation ever arises where some statement becomes necessary, the company will issue a suitable disclosure when that moment comes.

Maheep Mandloi analyst
#13

Okay. I'll go back and thank you. Thanks.

Nikhil Nigania analyst
#14

Hello, and thanks for taking my question — it's good to see the emphasis placed on bringing leverage down and growing solar plus base rather than wind. To start, I wanted to ask about the broader industry challenges, specifically delays on transmission projects and curtailment — neither of which is within our control, yet both are weighing on the industry. On those two fronts, are we noticing any improvement in direction, or do they remain an obstacle for us?

Sumant Sinha executive
#15

Yes, Nikhil, I appreciate that question. So as you're aware, clearly these matters have now drawn considerable attention since they affect the entire sector. That's why there's been extensive dialogue among the ministries — specifically MNRE and MOP — regarding the approach to this problem. There's also significantly more emphasis on finding ways to enhance transmission implementation. The government is undertaking numerous measures, and I could perhaps share details with you on a separate occasion, or you might also discover what's taking place. The same applies to curtailment; basically, when it comes to curtailment, a joint committee has been formed involving the secretaries from MNRE and MOP to examine how to address this matter and to essentially consider this loss, which clearly falls on us, yet ought to be shouldered by a wider group of stakeholders; so that's currently being discussed. I'm not certain precisely which path it will ultimately take or where it will conclude, or even the timeframe required to reach the proper resolution; however, there is definitely an acknowledgment that this constitutes a loss, a systemic one, and there's no justification for only the developers bearing the brunt to absorb this loss on our books. So that principle has been accepted. What the appropriate method is for handling it is something the government is deliberating. And regarding transmission too, they're pursuing many different initiatives to determine how transmission build-out can be improved.

Nikhil Nigania analyst
#16

Understood. To continue on that point about curtailment: would it be reasonable to think that in situations where a GNA exists rather than a TGNA, we receive compensation from the DISCOM when curtailment occurs?

Sumant Sinha executive
#17

Yeah, that's right. So take us, for instance — you know, out of the entire loss we took because of this combined issue, roughly 30% or 35% is being paid back to us, since we had GNA, a permanent GNA. So with a permanent GNA, essentially what happens is you get paid according to your schedule instead of according to the power you actually supply. And when it's a TGNA, naturally, you've got to absorb that loss yourself, which is exactly what the government is now trying to work out — how to spread that loss a bit more across all the stakeholders. But when it's GNA, we do get compensated.

Nikhil Nigania analyst
#18

Understood, thanks. I’ll ask one final thing about manufacturing, which is a solid cash generator for us; regarding the cell side of cell manufacturing, are margins getting squeezed at all, or are they still staying firm?

Sumant Sinha executive
#19

As you’re aware, up to now it has remained steady. We saw a short-lived slowdown after that, you know, during the monsoon period, when stock levels usually rise somewhat and work on projects gets slower. Still, profitability has improved once more to some degree in the, in this quarter we’re in; and demand appears to be fairly fine right now.

Nikhil Nigania analyst
#20

Got it. Thank you. Those are my questions. Thanks a lot for answering.

Puneet Gulati analyst
#21

Thanks a lot. To start, I'd like to ask about the shift in configuration toward more solar. Would it be reasonable to state that, even without adjusting for risk, the IRRs come out stronger than those achievable from wind?

Sumant Sinha executive
#22

At the bidding stage, I'd say no — but looking back at how solar has actually played out, CapEx declines have meant that people wound up earning better IRRs from solar, since capital expenditure fell, at times more sharply than anticipated. Right now, as you're aware, we're observing somewhat of a reversal, since bidders put in very aggressive figures in recent auctions, and prices have in fact risen, given developments in China and elsewhere. So it does depend somewhat on timing, yet broadly speaking, I'd say solar has generally delivered superior returns compared with wind, thanks to CapEx coming down over a fairly extended stretch.

Puneet Gulati analyst
#23

Understood. So when it comes to the projects you're running, would executing them using wind rather than solar bring you a bigger return?

Sumant Sinha executive
#24

You mean if solar plays a larger role than wind does?

Puneet Gulati analyst
#25

Yeah.

Sumant Sinha executive
#26

Of course, here's the thing — at every single moment, we aim to get the best possible returns out of the configuration, correct? So.

Puneet Gulati analyst
#27

Understood.

Sumant Sinha executive
#28

Like I mentioned, three factors explain why we're moving off wind. First, it's simply about optimizing how things are configured, since BESS now carries new capital costs available in the market; that lets us capture improved returns compared with the assumptions we made when we placed our bid. All right?

Puneet Gulati analyst
#29

Yeah.

Sumant Sinha executive
#30

That's essentially the situation. However, whenever you go about carrying out wind projects, you're dealing with greater risks — not only when it comes to capital cost, but also elsewhere. And we have observed budget overruns occurring with wind more often than what we've witnessed with solar, and that stems from the execution difficulties I brought up. Plus, secondly, even after the asset has been built and is operational, at times you'll notice that wind generation fails to deliver the way you'd anticipate, which means your returns wind up declining. So I'd say these are matters you can't always — or rather, you don't truly account for in your models — yet they still occur in actual practice. Okay?

Puneet Gulati analyst
#31

Correct.

Sumant Sinha executive
#32

This isn't something that occurs all the time, though generally speaking, it can occur. So on the whole, the consensus is that risk-adjusted returns from solar tend to be steadier compared with those from wind.

Puneet Gulati analyst
#33

Understood.

Anunay Shahi executive
#34

Of your overall capacity,

Puneet Gulati analyst
#35

Yeah, my apologies.

Anunay Shahi executive
#36

No, what I meant was this — take a look at page 15 in the presentation, and we've also got the revised configuration there on page 41. So the way things have played out is that, because BESS prices have come down and with this new setup, our CapEx for the build-out is basically falling by about INR 60 billion.

Puneet Gulati analyst
#37

Alright.

Anunay Shahi executive
#38

On the other side, though, EBITDA is dropping by only roughly 65 to 68, $6.5 billion-$6.8 billion. So in effect, for the under construction portfolio, our EBITDA is getting somewhat better, besides clearly gaining tighter command over execution and cash flows that are more predictable. Therefore, even when looking at returns, given how BESS prices have moved and solar prices have moved, it is more, it is better for our returns.

Puneet Gulati analyst
#39

Got it. Then, moving to your total output or capability, what portion would fall under TGNA, and what kind of curtailment might you have encountered during this quarter?

Sumant Sinha executive
#40

This quarter? Look, TGNA isn't a set figure. If you're asking specifically about the previous quarter, well, a few of our projects actually shifted from GNA—I mean from TGNA over to GNA; so an exact figure isn't something I can provide, though it's likely within the few hundreds of megawatts at this point. Previously, I believe it was around 1 GW. At present, it's possibly reduced to 400 MW-500 MW, since roughly 500 MW shifted out of TGNA into GNA; but, as you know, whenever we develop new projects, it hinges on which substation you're tying into. Should that substation lack proper back-end connectivity to the other transmission lines feeding the national grid, then whatever project links to it will receive TGNA. Later, once those back-end transmission lines are constructed, that TGNA becomes GNA. So a project might remain on TGNA for one quarter or two quarters, and that's a portion of the new projects you're developing. So yes, that's essentially how it operates. At any moment, there might be 500 MG-700 MW sitting on TGNA.

Puneet Gulati analyst
#41

All right. Regarding TGNA capacity during the prior quarter, what amount of curtailment would we have experienced?

Sumant Sinha executive
#42

Anunay, are those figures available to you?

Anunay Shahi executive
#43

Right, right, right. So Puneet, as you know, at the beginning of the previous quarter, there was approximately — as Suman mentioned — near 1 GW of capacity sitting on TGNA, and from that, around 600-something MW shifted over to permanent GNA. So at present, we're probably at somewhere around 400 MW, or perhaps just a touch under that, and that's what remains on TGNA.

Sumant Sinha executive
#44

Incidentally, if a title appears on TGNA, that doesn't indicate it's being cut off entirely. It simply indicates that a certain level of curtailment exists. That level might be 10%, 20%, or some figure along those lines.

Puneet Gulati analyst
#45

Yes.

Sumant Sinha executive
#46

And that also depends on.

Puneet Gulati analyst
#47

Just trying to get a feel for it.

Sumant Sinha executive
#48

Right, right, correct — and beyond that, that varies too, as you know, depending on which day it is, plus demand and every one of those factors.

Puneet Gulati analyst
#49

Understood. I see. And finally, you mentioned your intended leverage ratio of 5.5 x for portfolios that are fully constructed. For your operational portfolio, you're already sitting at 5.6 x. To what extent do you still want to reduce that leverage? Is there genuinely a necessity to lower leverage? Once your portfolio has been constructed, you ought to be there automatically, or is there a broader need to bring down a large leverage?

Sumant Sinha executive
#50

Kailash, would you care?

Kailash Vaswani executive
#51

Yes, I'm able to do that.

Sumant Sinha executive
#52

There's a single point I want to make clear. Before you respond, Kailash — apologies, Puneet — one item I should clarify is this: when we refer to 5.5x, that figure is the headline leverage, while at present it sits nearer 6.5x, 6.6x. The goal would be to lower it to those levels eventually. But go ahead, Kailash.

Kailash Vaswani executive
#53

Right, Puneet, so that’s one point I wanted to make clear. Beyond that, when we look at what people have been telling us — and we share this view quite strongly — there’s a need for a larger share of accruals flowing toward equity holders rather than lenders. Given that, lowering leverage is clearly the simplest route to get there. On cost cutting, we’ve already pushed it about as far as we can. The real issue is the gross debt figure itself, since it eats into free cash flow to the firm. That’s exactly why we want to reduce it.

Puneet Gulati analyst
#54

Got it. So 6.7 x sliding to 5.5 x is the way to think about it. Is there a target date or a specific year you have in mind?

Kailash Vaswani executive
#55

No. What I'd say is that, based on all the number crunching we've carried out, I think somewhere in the 2028 to 2030 window, we'll be in a position to get there.

Puneet Gulati analyst
#56

All right, that covers everything I had. Thanks a lot, and best wishes.

Kailash Vaswani executive
#57

Thank you.

Operator operator
#58

That brings an end to both the question-and-answer portion and today's conference. We appreciate everyone joining in, and at this point you're free to hang up.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete ReNew Energy Global Plc transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to ReNew Energy Global Plc earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.