In the first quarter of 2026, TC Energy Corporation reported a strong performance with comparable EBITDA of over $3 billion, reflecting a 14% year-over-year increase. The company reaffirmed its 2026 comparable EBITDA guidance of $11.6 billion to $11.8 billion, indicating solid growth potential driven by strategic investments and favorable market conditions. Notably, management highlighted the successful launch of the $1.5 billion Appalachia supply project, which is expected to enhance capacity and support future growth in a high-demand corridor.

What topics did TC Energy Corporation cover?

What were TC Energy Corporation's May 1, 2026 results?

Overall, TC Energy's strong Q1 performance and strategic investments position the company well for continued growth. The reaffirmation of guidance and successful project announcements are positive catalysts for the stock. However, investors should monitor potential risks related to human capital and supply chain constraints as the company scales its operations.

Earnings Call Speaker Segments

Operator operator
#1

Appreciate everyone joining us. I'm the conference operator, and I'd like to welcome you to TC Energy's First Quarter 2026 Results Conference Call. <<operator_script>> At this point, I'll hand things over to Gavin Wylie, Vice President, Investor Relations. Go ahead, please.

Gavin Wylie executive
#2

Thanks, everyone, and welcome to the conference call for TC Energy's first quarter of 2026. With me today are Francois Poirier, our President and Chief Executive Officer, and Sean O'Donnell, our Executive Vice President and Chief Financial Officer, as well as other members of the senior leadership team. <<inaudible>> will start us off today with comments on our financial results and operational highlights. You can find a copy of the slide presentation on our website under the investor election. After the remarks, we'll take questions from the investment community. Please limit yourself to 2 questions. If you're a member of the media, please reach out to our media team. Today's remarks will contain forward-looking statements that carry important risks and uncertainties. For more information, please see the reports TC Energy files with Canadian securities regulators and with the U.S. Securities and Exchange Commission. Finally, we'll refer to certain non-GAAP measures that may not be comparable to similar measures presented by other entities. You'll find a reconciliation in the appendix of this presentation. With that, I'll now turn the call over to Francois.

François Poirier executive
#3

Thank you, Gavin, and good morning, everyone. We came into 2026 carrying strong momentum, delivering on a set of strategic priorities that is clear and consistent. Above all else, our safety results were the best we have seen in 6 years. We produced more than $3 billion in comparable EBITDA, a rise of 14% year-over-year, which shows strong and stable results despite continued volatility in markets and geopolitics. We secured settlement agreements with customers across our Canadian mainline, ANR, and great Lakes assets, with outcomes that came in largely as expected, giving further support to our comparable EBITDA outlook. I am pleased today to announce a strategic investment in our Columbia Gas system. The Appalachia supply project, at USD 1.5 billion, expands our reach into a corridor with high demand and builds a scalable platform for growth going forward. Customer demand keeps validating our strategy, with consecutive open seasons in Ohio and on our Crossroads system drawing a strong response, which supports incremental growth visibility. In Canada, we hit an important milestone through new commercial agreements for Coastal GasLink Phase II under a disciplined risk allocation framework, and execution of the Bruce Power MCR program stays firmly on track. These results strengthen our confidence in delivering our 2026 comparable EBITDA outlook, keeping capital spending disciplined and preserving balance sheet strength as we keep delivering solid growth that is low-risk and repeatable.

François Poirier executive
#4

The U.S. Heartland ranks among the most strategically vital areas in our portfolio, and it's a place where our competitive edge is unmistakable. We operate more natural gas pipeline and storage across this region than any other company, with over 27,000 miles of pipeline infrastructure, giving us unmatched access to low-cost supply and key demand markets. Today, roughly 3/4 of our U.S. deliveries come from the heartland, and natural gas demand there is projected to rise an additional 40% through 2035, powered by diversified demand from power generation, including data centers, LDCs and LNG exports. Our ANR system forms the core of our Heartland footprint and showcases how strong our incumbent position is in the U.S. Midwest. Across our Heartland and Northwoods projects, we've announced nearly USD 3 billion of investment on ANR over the last 6 years, adding more than 1.1 Bcf per day of incremental capacity by leveraging existing rights of way and infrastructure. On our Columbia Gas system, natural gas demand throughout the footprint has grown by approximately 50%, and we anticipate an additional 4 Bcf a day of incremental demand by 2035. We expect that momentum to keep unlocking further accretive growth opportunities, reinforced even more by the strategic investments being made today in our Appalachia supply project.

François Poirier executive
#5

With this project, we push even deeper into a market that carries high value and strong growth. A long-term 20-year take-or-pay contract with an investment-grade utility stands behind the USD 1.5 billion expansion on our Columbia Gas system, and we expect it to produce solid risk-adjusted returns along with a 7.3x build multiple. Capacity of 0.8 Bcf per day will be added by the project to serve new power generation development, with an anticipated in-service date of 2030. Importantly, though, future expansions could take total capacity as high as 2 Bcf a day, which gives us line of sight to capital-efficient growth projects tied to overall economic development, demand from data centers, and broader electrification as it keeps scaling. This strategic investment strengthens the Columbia Gas system while putting us in position for several potential follow-on accretive opportunities. Customer demand across our footprint is being driven by accelerating power-related load growth, and the results of our 2 most recent open seasons show it. During our fourth quarter earnings call, we noted that the Columbus, Ohio open season came in roughly 3x oversubscribed. That strong response mirrors Ohio's projected natural gas demand growth of more than 30% over the next decade — the largest increase nationally outside of LNG exporting states.

François Poirier executive
#6

Demand from power generation, industrial growth, and the need for a reliable grid is fueling this growth — that includes a substantial step-up in load from over 40 new data centers, which puts Ohio among the top 5 U.S. markets for data centers. Our Crossroads open season drew an equally robust reaction, with bids coming in above 2.5x the offered capacity. The key point isn't merely the size of the demand we see; it's that we're positioned well to seize it. Deliberately, we're reinforcing links throughout our systems, connecting assets that can reach premium low-cost supply — Columbia Gas, for instance — to systems that serve high-quality, long-duration demand, such as A&R. Corridor expansion chances on established systems such as Crossroads let us react fast to what customers need, put capital to work efficiently, and cut execution risk in a meaningful way. Now to Bruce Power. The MCR program keeps delivering safely, reliably, and with economics that continue to improve. Successive MCR costs have declined as we apply lessons learned and deploy new tools, such as robotics, for removal and installation work. That strong execution gives long-term visibility into the cash flows from the asset. By 2030, distributions will start to exceed capital spend meaningfully. And by 2032, Bruce is expected to produce roughly $1 billion in annual free cash flow, rising to roughly $2 billion after the MCR program wraps up in 2035.

François Poirier executive
#7

Solid execution gives us added confidence that the team can generate substantial free cash flow growth from Bruce Power, which opens up more optionality to support growth throughout our whole portfolio, along with the possible expansion of Bruce C. With that said, I'll hand things over to Sean, who will take you through the numbers.

Sean O'Donnell executive
#8

Thanks, Francois. Good morning, everyone. Now let's look at how we did in the first quarter. TC achieved 14% growth in comparable EBITDA compared with a year earlier, which represents a very strong beginning to 2026 across all 4 of our business units. Our natural gas pipeline operations in both Canada and the U.S. kept delivering outstanding results, and during the quarter they set 7 new all-time records for deliveries. These results highlight how strong our footprint is and the value our highly contracted Corridor assets bring to customers. Over in Power and Energy Solutions, Bruce Power came in at 88% availability for the quarter, which matches our plan and reflects the planned outage on Unit 8. For the full year '26, we still anticipate Bruce's availability landing in the low 90% range, the same as 2025. Our Alberta cogeneration fleet likewise turned in outstanding performance, reaching 99.5% availability. On the right-hand side of the page, we summarize quarterly EBITDA performance. I'd point out that this quarter was a record one, marking the first time we produced more than $3 billion of comparable EBITDA from continuing operations within a single quarter. Growth was driven by our Mexico and U.S. natural gas businesses, which brought over $8 billion of new assets into service in 2025.

Sean O'Donnell executive
#9

Canadian Natural Gas Pipelines gained from increased flow-through depreciation and NGTL incentive earnings, and Power and Energy Solutions recorded larger contributions from Bruce Power. Those outcomes show solid execution throughout every one of our business lines and strengthen the momentum supporting the portfolio's financial outlook for this year. Turning forward, we are reaffirming our comparable EBITDA outlook for both 2026 and 2028, which mirrors steady customer demand for access to our assets through our distinctive long-term, low-risk take-or-pay and rate-regulated commercial structures. For 2026, our comparable EBITDA outlook stays at $11.6 billion to $11.8 billion, representing an increase of roughly 7% actual to midpoint versus exceptional performance in 2025, and an 8% actual to midpoint annualized increase versus 2024. Looking out to 2028, we keep targeting comparable EBITDA of $12.6 billion to $13.1 billion, implying a 6% actual to midpoint 3-year annualized growth rate that is entirely underpinned by sanctioned projects progressing toward their in-service date. Moving to the right-hand side of the page, we summarized several further factors that could affect our EBITDA outlook over time. Although our EBITDA is highly contracted, we have ongoing revenue enhancement initiatives plus cost and capital optimization programs across the organization that are in flight, and each one has the potential to drive incremental upside.

Sean O'Donnell executive
#10

We have introduced a project execution dashboard that gives an unusual degree of visibility into the major projects fueling EBITDA growth across the coming years. Taken together, those projects represent most of our capital deployment and the EBITDA expansion we expect. As you will see, we have a clear view of both our in-service date and our build multiples. That mirrors 2025, when we brought more than $8 billion of projects into service on time and 15% under budget. The team is carrying that momentum forward into 2026, with our projects tracking to schedule and at or below budget. This slide contains considerable detail, but you will notice that most investment activity is concentrated in the U.S., where commercial and regulatory tailwinds are helping support a weighted average build multiple of 6.2x. Even with the portfolio positioned attractively today, project execution remains a strong focus, because it is so critical to our continued growth. Disciplined execution directly reflects the rigor built into our low-risk project selection process and the strength of our cross-functional project delivery capabilities. It is that consistency in our team's execution excellence, year after year, that underpins our ability to deliver the financial outlook we provide and also reinforces the confidence we hold in both our near-term forecast and our longer-term growth trajectory.

Sean O'Donnell executive
#11

To close out this slide, I want to emphasize that the visibility we're providing on our upcoming set of projects keeps confirming how high-quality, repeatable, and low-risk our backlog really is. That backlog, together with how well our team executes, is what supports our EBITDA guidance and our ongoing proposition of delivering shareholder value. Now I'd like to move to our investment outlook and walk through the updated capital allocation dashboard. This chart shows even more clearly how deep, how diverse, and how steadily growing our project portfolio is through the end of the decade. With the Appalachia supply project announced today, roughly $2.2 billion of investment capital moved from pending approval to sanctioned. In the last quarter, we also added more than $2 billion of new, high-conviction, substantially derisked projects into that pending approval bucket, and that keeps supporting announcements of projects in the near term. Beyond what's shown on this slide, we have around $15 billion of further projects in origination that are competing for capital allocation during this decade. To give you a sense of where part of that $15 billion backlog stands and how confident we are in moving them to sanction capital over the coming year or 2: Francois noted that we recently ran 2 open seasons in the U.S. that were substantially oversubscribed, and we're extremely excited about them.

Sean O'Donnell executive
#12

In Canada, likewise, we've rolled out the first of what we expect will be a series of new offerings on NGTL, and at the same time we're continuing to push forward parallel talks with customers on a new framework for growth investment. Let me close out this slide with some remarks on how we're approaching capital allocation as we move ahead. Through the coming couple of years, we'll keep working to optimize and pull forward capital in order to support as much as $6 billion in annual net capital deployment. When we look toward the latter portion of the decade and take into account the project backlog we've discussed, it's that high-value opportunity set, largely in Carter, that will determine how much we invest on a net basis. We stay committed to preserving balance sheet strength and our 4.75x leverage target, and we'll keep executing projects with excellence. These guiderails are essential to how we screen for risk and allocate capital, which underpins our capacity to go above the $6 billion annual level, especially as we approach the end of the Bruce MCR program after 2030, as Francois mentioned earlier. That scenario now sits within our planning window. It positions us very well for ongoing EBITDA growth toward 2030 and beyond.

Sean O'Donnell executive
#13

Having covered that, I'll now hand things over to Francois.

François Poirier executive
#14

Thanks, Sean. There’s an exciting year in front of us, and our strategic priorities are still clear and solidly established. Through safety and operational excellence, we’ll keep maximizing the value of our assets, while making use of commercial and technological innovation. Growth with low risk and high returns will be our priority. Further announcements should be coming during this year. And third, we’ll preserve our financial strength and agility in support of long-term value creation. Operator, we’re ready now to take questions.

Operator operator
#15

<<operator_script>> Our initial question is from Bernie Satish at Belsargo. Our initial question is from Aaron MacNeil at TD Cowen.

Aaron MacNeil analyst
#16

Thanks for picking up on the idea that the Appalachia supply project arguably carries some pre-spend for future growth. Could you give us a sense of what the economics of a fully loaded project at that 2 Bcf might look like from a build multiple standpoint? And then what has to happen to reach 2 Bcf per day, and when do you think that could happen by?

Tina Faraca executive
#17

Tina Faraca here, and I'll start by answering that question. We're genuinely thrilled to announce our Appalachia supply project this morning, and for a lot of reasons beyond the headline figures we discussed. Our capital allocation choices are made with a view toward many years out, and the scenarios for putting this line in service give us a robust long-term growth path. Given the type of these facilities — pipeline extension plus compressor modifications — we have a chance to build on future opportunities in the region. The corridor this project runs through is a high-growth power corridor in our view. Across that part of our footprint, we expect gas demand to rise by roughly 4 Bcf through 2035. That makes it essential that we consider the future while we shape the scope of this project. Looking at the potential to boost this project's capacity to as much as 2 Bcf, minor facility modifications would get us there. So when you think about how that could play out, this will be a highly economic expansion for us down the road.

Aaron MacNeil analyst
#18

Got it. Let me shift over to Canada for a moment. On the slide deck, you've opened an open season on NGTL. Could you share some additional detail on that, and on how a project of that kind would stack up when competing for capital against the other opportunities throughout the portfolio?

Tina Faraca executive
#19

Absolutely. So we did hold an open season on NGTL. Demand has been rising throughout the system — that includes additional load growth in the Greater Edmonton area, and that's what prompted the recent open season. Beyond that, we've seen a lift in overall interest across NGTL, and we're responding to it through those open seasons. Our aim is to bring that customer demand together as efficiently as possible so we can serve the market. When we evaluate these investments, we do it through the lens of making sure they generate a competitive risk-adjusted return alongside the rest of the portfolio. So you'll remember our NGTL settlement, which extends through 2029 — it provides an investment framework, using incentive shared mechanisms, that supports competitive returns on invested capital for our multiyear growth plan. And as we look forward to the next expansion past the multiyear growth plan, we're in discussions with our customers about a potential new investment framework that would keep letting us compete for capital in the market.

Operator operator
#20

Jeremy Tonet from JPMorgan has the next question.

Jeremy Tonet analyst
#21

I’d like to begin again with Appalachian supply and the project there. I’m just wondering: when you identify the 2 Bcf of capital-efficient expansions, does 2 Bcf represent a specific capacity threshold for the system in your view? Or is it visibility into customer interest? And when you describe this as a platform for future growth, are you referring only to getting to 2? Or are there additional opportunities too?

Tina Faraca executive
#22

Yeah, we recorded that 2 Bcf on the basis of a highly economical expansion using only compression or small-scale modifications. With the pipeline or extensions, it could go past that level. Still, it's a fantastic high-growth corridor — not only are we able to support growth along it, but we can push it further ahead or reach out for more opportunities.

Jeremy Tonet analyst
#23

Understood — that's useful. Then I'd like to pivot to ANR for a moment. Regarding the settlement, I'm curious whether you might offer any perspective on how it stacks up against what your guidance assumed — could there be upside from it? Or anything else, I suppose, throughout your system as you look ahead, given that additional settlements might land going forward?

Tina Faraca executive
#24

For ANR, reaching that settlement in principle is a favorable outcome. Getting all of our customers to agree unanimously on every major issue is something we're glad about. As shown in the interim rate filing, we settled on an increase above the prefiled rates. That settlement result lines up with what we had estimated. Our usual habit is to take a fairly conservative view, though that certainly doesn't mean it isn't what we anticipate when it comes to how things will turn out with our customers. So once again, this is still a settlement in principle, and it falls inside our forecasts.

Operator operator
#25

Barclays' Theresa Chen has our next question.

Theresa Chen analyst
#26

Coming back to NGPL, since there’s obviously a need for additional residue egress capacity from that region, could you go into more detail about the new investment framework that’s being discussed? And in what ways did the framework that came out of the Canadian Mainline settlement—the impressions it established—shape the conversations you had with shippers regarding NGPL?

François Poirier executive
#27

Teresa, this is Francois — I'll handle this one. The mainline deal, and those terms have now become public. It was genuinely a win-win, because we could commit to adding about 300 million cubic feet per day of capacity across a 4-year period, with a $200 million capital commitment, which clearly is a very efficient use of capital in exchange for keeping the incentive programs that were established in the last settlement. This is effectively an extension of that original settlement. A win-win in the sense that shippers can see capacity expansion, and our Canadian projects are able to compete for capital in our internal processes. So that was the signal, and in addition, over the very recent few months, a significant increase in demand for service on our NGPL system pushed us to enter into a dialogue with our customers on a new investment framework. So we're doing 2 things in parallel. Through the open seasons, we are gauging interest in capacity in 3 or 4 parts of the province at the same time as we're discussing a new investment framework. It's early days in terms of that conversation.

François Poirier executive
#28

That said, when you weigh the risk against the return, the proposal we've laid out strikes us as beneficial to both sides, and it would hold its own when competing for capital under our capital allocation framework.

Theresa Chen analyst
#29

Turning to the U.S.: after that Crossroads pipeline open season came in successfully and was heavily oversubscribed, what stands between us and FID at this point? And zooming out for a moment — the Midwest is turning into more and more of a center of gravity for data center construction, and it's also seeing an acceleration in power demand growth across the board. Could you say more about how big you see the opportunity being for your assets in that region, and how you'd characterize our competitive position relative to others?

Tina Faraca executive
#30

Teresa, it's Tina here. I'll begin with Crossroads, then perhaps widen out to the larger conversation about Midwest growth. As you've heard, our open season went very well — interest came in at 2.5x what we had advocated for. So our attention now turns to thoughtfully cultivating that demand in a way that delivers capital-efficient expansion for our customers and secures the biggest project we can, as efficiently as we can. We're therefore working with every customer who took part in that open season to sharpen commitments and scope, and as I noted, there is certainly potential to upsize given current discussions, and we'll keep targeting sanctioning that project in 2026 within our 5 to 7x build multiple range. On the Midwest, we're seeing incredible opportunities throughout that corridor, particularly in the power demand sector — roughly 5-plus Bcf per day of incremental gas demand across the Midwest corridor over the next 10 years. And competitively speaking, our incumbency there is a really critical opportunity for us, with our Columbia, ANR, Crossroads, Northern Border and great Lakes system giving us a highly advantaged footprint in that region.

Tina Faraca executive
#31

We hold the number one operator position in a number of those states. In that Midwest corridor, we have more than 200 connections to electric and gas utilities, specifically on A&R. That puts us in a really strong position to capture that new demand. On top of that, we offer supply optionality, which is growing increasingly important to our customers. We can reach Appalachia, Gulf Coast, Mid-Continent, Bakken and WCSB supply, bringing that diversity to our customers. And lastly, our storage access in that region is unmatched, with over 532 Bcf of storage opportunities for our customers. So overall, we're genuinely excited about our chance to compete for that growth in that corridor.

Operator operator
#32

Rob Hope from Scotia Bank has the next question.

Robert Hope analyst
#33

Could you talk about how the pipeline for project development is coming along? You approved approximately $2 billion in projects during this quarter, and despite that, the project development pipeline seems to have grown to more than $21 billion. So could you perhaps help us get a sense of how the book-to-bill ratio is shaping up for you?

François Poirier executive
#34

Yes, Rob, Francois here — I'll handle that question. Like we've mentioned before, the development cycle for pipeline projects spans a number of years. You need roughly a full year to get a project developed, and then typically a couple of years to secure permits before construction actually begins. That gives us fairly strong visibility into what lies ahead, right down to the individual projects, within a margin of about 50 basis points either way, and we have a very clear picture of the kind of returns to expect. So when it comes to the EBITDA build multiple, I can tell you that every project in that pipeline — all $21 billion of it in aggregate — sits comfortably inside that 5 to 7x EBITDA build multiple and the 12% after-tax levered IRR range, which is in line with what we've delivered over the past couple of years. You're right that the backlog keeps growing, and the reason is that even for projects we've been advancing for many months, sometimes years, our utility customers return to us and tell us they'd like to enlarge a project as the electricity supply gains credibility and looks increasingly firm, which is drawing in more load — whether from electrification at a large scale or from additional data centers seeking the certainty a project provides.

François Poirier executive
#35

So yes, that momentum really is carrying forward. And it makes sense that our backlog has increased even compared with where it stood a quarter back — and that level was already fairly robust.

Robert Hope analyst
#36

Thanks for that. Perhaps a somewhat wider question with a longer horizon. Canada is working on an electricity and nuclear strategy—what would you want to see in that strategy to support future investment in Bruce? And when might we expect those discussions to begin?

François Poirier executive
#37

I'll begin at a very high level, then ask Greg to fill in some detail. In Canada, we are the sole investor-owned owner and operator of nuclear facilities. Bruce Power is best-in-class — those reactors hold an InPo1 rating, meaning top-decile operating efficiency along with safety performance. You may have seen that we've signed cooperation agreements with Alberta and Saskatchewan. So we absolutely have ambitions across the coming many decades — because developing these projects takes quite a bit of time — to invest in and allocate capital to nuclear throughout the country. That, of course, will come after prosecuting Bruce, any value at Bruce. So I'll hand that over to Greg.

Greg Grant executive
#38

Absolutely, and thank you for that question, Rob. Personally, I find it rather flattering that Bruce is included among the strong management teams being invited into certain discussions regarding a federal strategy, and beyond that, with what has recently been announced in Saskatchewan and Alberta — plus the credibility and experience Bruce has established over the past two decades as a large-scale operator, having delivered some of the crucial work on the MCR program safely, on time or under budget, and ahead of schedule — this really positions them as the team people reach out to when we consider the next nuclear build in Canada. Echoing Francois' point, I want to restate that our near-term priority is clearly the safe completion of what remains of the MCR program, along with advancing Bruce expansion as Canada's next nuclear facility. Given the current footprint, the infrastructure, the highly skilled workforce already in place, the solid local backing, and an integrated Canadian supply chain, we simply believe this makes Bruce the logical next project we would want to see move forward. That said, the longer-term possibilities and optionality throughout Canada, with Bruce participating at the table, matter a great deal.

Operator operator
#39

Praneeth Satish from Wells Fargo has our next question.

Praneeth Satish analyst
#40

Apologies for the earlier technical issues. So at this point you've got $6 billion in late-stage projects awaiting approval. I was just hoping you could speak in conceptual terms about what sits in that bucket. I believe on the last quarter's call, you mentioned that Crossroads and Colombia gas aren't in there. It sounds like that remains the situation. But the Bruce Power MCRs are included — so if Crossroads and Columbia Gas aren't in that bucket, does that mean that simply totaling up the MCRs, does that mean you have another couple of billion of undisclosed U.S. gas projects that are close to <<inaudible>>

Tina Faraca executive
#41

Praneeth, it's Tina here. That's right — our backlog keeps expanding. You've got it right: those projects weren't part of the pending capital. We're moving them forward this year, driven by what we're hearing from customers and rising demand throughout our footprint. Looking ahead to the close of this year, growth in our power generation sector persists, and that lets us pull more and more of these advanced projects into that queue. So opportunities keep turning up, especially along the Midwest corridor of our system, where power generation growth is still outpacing what we expected — and the key point is that our footprint is what lets us capture those opportunities.

Praneeth Satish analyst
#42

Understood. And I suppose, with all these projects in view, when you look ahead to longer-term capital planning—especially 2029 and 2030, when much of the CapEx for the projects you're sanctioning is going to land—leverage ought to be lower, and you're hitting that free cash flow inflection at Bruce. So against that backdrop, perhaps we could go back over how much flexibility you have to increase CapEx, maybe pull forward some of the Bruce free cash flow. By our math, it looks like you could raise it by a couple of billion, but I'm just trying to get a sense of the range of outcomes.

François Poirier executive
#43

I'll cover capital allocation, and then Sean will discuss funding and the effects on leverage. We want to remind everyone that the top priority is preserving excellence in project execution. That's nonnegotiable as we consider pushing net capital spending past $6 billion. We've convinced ourselves and our Board that we're capable of doing so, backed by what I'd describe as a pretty thorough and rigorous level of planning and preparation. Clearly, keeping the balance sheet strong matters a great deal. As we approach the latter part of the decade, we'll let the set of opportunities inside those guardrails determine how large our capital program is, instead of a $6 billion net capital cap that we impose on ourselves — we believe we're at a generational moment where returns are very attractive — we're putting money to work at very appealing returns and build multiples, and we want to be sure we seize that for our shareholders' benefit. Sean, over to you.

Sean O'Donnell executive
#44

Yes. I think the sole item I'd tack onto that — and thanks for giving Bruce a mention, right? — is that it now sits inside our planning window. So as you watch this program unfold, we'll have work spanning a decade to produce that cash flow profile starting in 2030. Thinking about what Bruce can help GasCo accomplish in 2030 and beyond is a ton of fun, and it fundamentally changes the game in terms of how we approach capital allocation within the guide rails Francois just described. So for 2030 and beyond, our degrees of freedom and optionality — subject to team discipline and capability and high return projects — is just a lot of fun.

Operator operator
#45

The following question is from Robert Catellier at CIBC.

Robert Catellier analyst
#46

There are a couple of points I want to address regarding NGL. First, given the updated CGL framework, could you just explain how that reduces TC Energy's exposure on construction and costs, and what that implies for some of the returns you could see if the CGL Phase II project reaches FID later this decade?

Tina Faraca executive
#47

Rob, it's Tina, and I'll handle that one. We've signed a new commercial agreement framework with LNG Canada and its partners. Under this arrangement, LNG Canada will take the lead on executing the project. Our team, serving as execution manager, is going to supply technical advisory services. We are in the process of actively putting that fresh execution model into operation. Practically speaking, this means that when it comes to project execution, LNG Canada will handle a portion of the cost and schedule activities, and that reduces our capital commitments along with our overall liability for construction cost and schedule risk. So this aligns with our strategic goals of keeping project execution and capital allocation risk inside our tolerance.

François Poirier executive
#48

Regarding your returns question, Robert — as you're aware, we account for CGL under the equity method, and our stake in the equity is 35%. Because of the project financing that's expected to be in place once shovels are in the ground, the capital table includes only our equity cash calls, so we evaluate that project on a levered return basis. On that levered basis, it's a very attractive returning project for TC, even though it's a small one in the grand scheme of things.

Robert Catellier analyst
#49

All right, got it. Moving on to the U.S. — clearly, we hold a fairly solid share of that market. Shipments rose substantially compared with a year earlier. Still, when you consider the upcoming round of U.S. LNG projects, which elements will decide if we keep expanding rather than simply holding our share there? And how much unused capacity do we have relative to what new construction will probably demand?

Tina Faraca executive
#50

Rob, as you probably know, over the past several years we've advanced a number of LNG export projects throughout our whole footprint. We've placed into service roughly CAD 16 billion of projects to deliver natural gas transportation capacity to LNG export terminals totaling more than 7 Bcf per day. So across the last several years, we've really built a very strong approach to serving this corridor -- in the U.S., we have 2 projects -- well, 1 project underway with our Gilles access extension projects, which will be going into service later this year. And in Canada, we have our Cedar Link project, which is in execution as well. So we're continuing to develop solutions for the LNG export model. And as we look ahead, we have great connectivity, not only to the U.S. Gulf Coast, but to the West Coast of Canada. So we're well positioned to capture additional opportunities through expansion of those facilities.

Operator operator
#51

Spiro Dounis from Citi has the next question.

Spiro Dounis analyst
#52

I wanted to revisit that $15 billion backlog and perhaps add a little to what Preet asked. Obviously, with that backlog sitting 25% above where it stood at the previous update, it appears to suggest things are speeding up. So in light of your plan to step up CapEx cadence later in the decade, I'm just wondering what portion of that $15 billion might translate into spending before 2030?

Tina Faraca executive
#53

Thanks. I’ll take that question. The $15 billion backlog is mainly in the U.S. business, for our pipeline facilities. When we look at a project’s life cycle, it usually takes, as Francois said, several years from origination to in-service. So generally the biggest spend on a project comes in the year you’re actually entering construction. That means the spending is often weighted toward the end of the cycle. And that’s roughly how we think about how that capital is spread. Most of our projects are now targeting in-service dates in the 29, 30, 31 range.

Spiro Dounis analyst
#54

Thanks, that's useful. Now a question about the Canadian pipeline side — you touched on it a little. It sounds like that region is moving nearer to competing for capital on a bigger scale. So I'm curious how much of the Canadian expansion sits within that $15 billion backlog. From what you said, it sounds like not much. Maybe another way to put it: what does the opportunity set look like there? How much more could be added if this framework begins to be scaled up further?

François Poirier executive
#55

Only a small portion of the NGTL expansion sits within that $15 billion backlog. As I mentioned before, Spiro, our discussions with customers regarding the new investment framework are still at an early stage, and including it in the backlog under our criteria would be premature. It might reach several billion dollars — since the MOU between Canada and Alberta was announced, we have observed a notable increase in interest for service. That served as the catalyst for us. Somewhat between our usual yearly demand assessments, we decided to present a service offering outside the normal cycle. So things have progressed rapidly, and it could prove fairly significant, contingent on a new investment framework.

Operator operator
#56

Our following question is from Maurice Choy at RBC Capital Markets.

Maurice Choy analyst
#57

I'd like to open with a broad question. Earlier you brought up the nonnegotiables—project execution, balance sheet strength, and competitive returns. From where you sit at the very top, and looking past the next 3 years, which parts of your business do you see as possibly becoming an emerging constraint on how durable your growth is?

François Poirier executive
#58

Maurice, Francois here — I'll handle that question. Demand isn't the issue, and neither is the return profile on the projects we're reviewing. What it really comes down to is human capital. As I mentioned, we completed a very rigorous, detailed organizational readiness assessment so we can execute on projects. We believe we've built processes and mechanisms that give us a good couple of years of visibility into where tightness may emerge with our people, with contractors, and in the supply chain for steel and compressors, et cetera. So that, I'd say, is the one constraint as you look toward the 2030s. The other would be the permitting and policy environment. We're seeing some tailwinds there, in both Canada and the United States, regarding governments' desire to speed up infrastructure spending for affordability as well as energy security purposes. Our base case at present is that those constraints won't materialize, but we must plan for every scenario. We must be disciplined. And our final safeguard will always be our capacity to deliver projects safely and efficiently, on time and on budget, with an impeccable safety record.

Maurice Choy analyst
#59

And maybe just to follow up quickly on that. Is supply chain somewhere you devote more of your attention? Or does it come down to the fact that you're pretty big, with a certain scale and bargaining power?

François Poirier executive
#60

Maurice, we really need to keep a close eye on the supply chain. In the United States it's somewhat tighter than in Canada. That's part of why Canada looks like an appealing chance for us to put more capital to work. There's somewhat more unused capacity up there. Still, we're adopting various approaches to handle supply chain risk. We're forming strategic alliances and long-term agreements with OEMs. We're also considering doing the same with construction firms, simply to ensure we have not just the project backlog but also confidence in our ability to execute. So we clearly recognize the need to be somewhat more strategic and to operate a little differently from how we did previously. But as I'd put it, it's a very high-quality problem.

Maurice Choy analyst
#61

Got it. And if I may wrap up with one brief follow-up on something Tina said earlier regarding the Appalachia supply project. The first phase carries a 7.3x build multiple, and you indicated that later phases ought to deliver improved returns and economics. Would it be fair to say that once all of these phases are complete, you will likely be averaging down into the 5 to 7 target range and perhaps even moving toward the lower end of it.

Tina Faraca executive
#62

Thanks, Maurice. Yeah, since we can expand that new infrastructure quite efficiently up to 2 Bcf per day, you could see pretty quickly how we might bring that down toward the lower end of that 5 to 7x range.

Operator operator
#63

Sam Burwell from Jefferies has the next question.

Sam Burwell analyst
#64

I just wanted to get some clarity on the fact that the Appalachian supply project sat in the pending approval bucket for only one quarter. I'm simply wondering whether the PJM backstop procurement announcements have played any role whatsoever in speeding up sanctioning, or whether this was already more fully baked and that made no difference — though maybe development could serve as a tailwind for originating future projects, or just for converting the backlog?

Tina Faraca executive
#65

Yeah, I'll begin with the market drivers piece. That didn't factor into the decision to sanction the project, and neither did developing that opportunity set — sure, it could give us a tailwind, but it wasn't what drove customer demand in this case.

Sam Burwell analyst
#66

Alright, got it. And regarding that $200 million you mentioned for Canadian Mainline investment, could you give us some detail on precisely how that adds to egress capacity from Western Canada? Is it mainly aimed at Eastern Canada? Just wondering whether there's anything we can look at that might involve moving additional Canadian gas into the U.S. through your pipeline further downstream.

Tina Faraca executive
#67

Yeah, thanks, Sam. The capital we're considering for our mainline expansion mostly supports capacity running from Empress to Amerson. That lets us supply expansions downstream of Emerson along the Northern Ontario line and into the Eastern Triangle. So that's the area we're concentrating that capital on at the moment.

Operator operator
#68

Our next question is from Ben Pham at BMO.

Ben Pham analyst
#69

I wanted to ask about the separate categories within your backlog. There's the $23 billion secured, plus the $6 million and the $15 million. I realize you touched on this earlier in your remarks, but could you give a little more detail on what a project has to accomplish to land in that $6 billion bucket, and then also in the $15 billion plus of origination.

Sean O'Donnell executive
#70

Yes, Ben, this is Sean. I’ll handle that question, partly to reinforce what Francois said about the conditions a project must meet to compete for capital. Clearly, it needs to be a project with high returns and low risk, and that is mainly what you’re seeing in <<inaudible>> across everything on that slide. Then there’s internal human capital, plus supply chain control and visibility, correct? Those really are the guardrails we talk about. And as we move into 2030 and beyond, as Tina mentioned, the 4.75 holds true in every year, and in the period after 2030 it becomes even easier for that figure—or something better—to serve as our metric, given the cash flow profile. So that is really the triangulation, right? As for the distinction between pending and what sits in our advanced business development, with pending we may not have contractually committed the capital, but in our own thinking we have committed it—so the bar to enter the pending bucket is extremely high. So far we have not seen anything drop out of the pending bucket except by becoming a sanctioned project. There is also deal flow and a set of opportunities and conversations that are not even in advanced business development; for projects to reach that $15 billion figure we listed, we must have had <<inaudible>> discussions with customers in which we have a solid understanding of what the capital commitment would be, such that it translates into a toll that is competitive.

Sean O'Donnell executive
#71

We could be in the middle of competing for contracts right now. Of course, when you're dealing with that $15 billion figure, there's no guarantee it will actually come to pass. To land in the pending bucket, you'd need to have already won a bid while still sorting out certain specifics. That means there's yet another bucket—one at an even earlier stage—on top of the 15 that's already there. So that 15 carries a good deal of substance. Naturally, our Columbus, Ohio project and our Crossroads project sit within that $15 billion and aren't in pending yet, even though our open seasons have been very strong. Once an open season wraps up, plenty of work remains: you have to support all the contract details, confirm the credit provisions and the delivery points customers want, and revisit capital cost estimates now that you have a much clearer picture of actual demand. So there are quite a few tailwinds across all 3 of those categories, which leaves us quite confident in our capacity to keep growing well into the next decade.

Ben Pham analyst
#72

And it sounds like, when you consider this force even bucket prospect that you have, it sounds like a multiyear runway of constant replenishment rather than on the 15 billion.

Sean O'Donnell executive
#73

Absolutely. Like I mentioned, getting projects developed and permitted takes several years. We gain from extremely strong visibility stretching many years ahead. So that is definitely true.

Ben Pham analyst
#74

Okay, great. Perhaps just a quick follow-up from me on the NGTL new investment framework, to get some clarity on that. It doesn't mean you have to revisit the existing sentiment and open it up. Is it something that could sit outside that framework?

Tina Faraca executive
#75

That's right, Ben. That would fall outside the current settlement and would apply specifically to any new investments made after the multiyear growth program.

Operator operator
#76

The following question is from Goldman Sachs's John Mackay.

John Mackay analyst
#77

Perhaps I'll take a brief moment on the backlog, so we don't get too deep into Symetis regarding pending approval versus origination, and so forth. But let me ask about that $15 billion — is there a general time frame for it, Francois? You mentioned something like projects cycling in and cycling out. Could you attach a number of quarters or a number of years to that $15 billion?

Tina Faraca executive
#78

John, it’s Tina here. I may go into a bit more detail regarding the in-service timing, but these projects cover a range of in-service dates spanning 2028 all the way through 2031. So it depends on where we stand in the discussions with customers, and a commitment to earlier in-service dates around that earlier ’28, ’29, ’30 period would mean sanctioning within the next year or 2. We’re looking at when those need to be sanctioned so that we can begin the development activities and carry them into execution with our regulators. So it’s difficult to say, but we have a long runway of opportunities to sanction these projects across the next several quarters and several years.

John Mackay analyst
#79

Okay, this is my second question, and it’s a quick one. You and a few of your peers have been discussing substantial growth in Midwest gas demand. Could you take a moment to explain where you expect that gas supply to originate — and more specifically, are you having discussions with Appalachia producers who are seeking to effectively increase basin egress overall, lift Marcellus production above its prior levels, and shift, I suppose, effectively incremental output so left?

Tina Faraca executive
#80

Yes, thank you, John. What's really been fascinating in our conversations with customers is that having choices about where supply comes from in that region matters more and more. That explains why projects such as our Crossroads project are seeing subscriptions at more than 2.5x capacity — because customers want that flexibility. So in the Midwest, the supply opportunities we can reach connect us to Appalachia, the Gulf Coast region, Mid-Continent, Auken and the WCSB. That puts us in a strong position to deliver the optionality customers are asking for. A few of our projects into Wisconsin in recent years have drawn in additional WCSB supply. Certain producers have interest in that opportunity, though what really drives it is the demand side, which is looking to sanction projects in the near term.

John Mackay analyst
#81

I realize we're starting with you, Tom, so maybe just a brief clarification on that point. Regarding ASP specifically, does that add incremental Marcellus egress? Or is it simply, I suppose you could put it, enhancing connectivity to the Marcellus Utica supply that already exists?

Tina Faraca executive
#82

Considering how much supply that project demands, we happen to be the top transporter of Appalachia supply in this region. This project is going to permit extra egress from the basin.

Operator operator
#83

Our following question is from Zack Van Everen at TPH.

Zackery Everen analyst
#84

Perhaps circling back to the previous question somewhat. You said there's 4 Bcf of demand around your assets, but then you also referred to 5 Bcf of demand in the Midwest. Do you have an internal demand figure for the Northeast? It appears that some of your peers, along with producers, keep raising that number into what you might call the 5 to 8 Bcf range. I was just wondering whether you have an internal number for total demand.

Tina Faraca executive
#85

Yes. Zach, it's Tina here, and thanks for asking. The figures keep coming in above what we'd anticipated. Fresh projections will be released shortly, and reviewing them lately, we're noticing the power generation piece — that demand is genuinely climbing toward that 5 to 8x — 5 to 8 Bcf band across the Midwest corridor. Most of our assets sit in the Midwest, which is exactly where so much of that expansion is happening. So, as I said earlier, being the #1 operator in a number of Midwest states lets us push that connectivity forward and meet that rising demand.

Zackery Everen analyst
#86

Understood, that’s clear. You also brought up supply diversity. I’m wondering whether you still see demand coming from the Gulf Coast—perhaps down A&R or Columbia Gulf—or whether basically all of these projects are now in the Northeast and soaking up every bit of the added supply, so a longer-haul project might not be needed simply because there are sufficient projects in the Northeast.

Tina Faraca executive
#87

Right now, there are definitely a lot of projects out there. But, as I said earlier, having supply optionality has truly been a key part of what we talk about with our customers, along with our capacity to reach not just all the supply in Appalachia and the Mid-Continent, but also our link to the Gulf Coast in Haynesville, which is a significant differentiator for us too. So what we're seeing is customers turning to every supply basin we're connected to at the moment, so they can get supply optionality into the different regions where they're seeing demand growth.

Operator operator
#88

Our following question is from Keith Stanley at Wolfe Research.

Keith Stanley analyst
#89

Regarding Crossroads, I'd like to ask a follow-up. Your competitor's competing projects in that region were likewise oversubscribed during open season. So demand appears to be overwhelming. Looking ahead, would you describe yourselves as competing with them to lock in that demand in that area through binding agreements? Or do you view your project as largely distinct from theirs, with a different group of customers at the negotiating table?

Tina Faraca executive
#90

Appreciate the question. Keith, it's Tina here. I've said this previously — in that region our competitive standing is quite strong, and we're positioned well to contend for and capture our fair share of the opportunities there. Being connected to more than 200 electric and gas utility city gates along that corridor, I believe, gives us a considerable competitive advantage. That said, your location and where you're hooked up matter a great deal too. And that again comes back to how interconnected we are with every electric and gas utility in the region. The fact that our project, along with some of our peers' projects, is oversubscribed, I think, is simply translating into a growing opportunity set for apply diversity across the region. But importantly, a lot of our customers want some degree of redundancy and maybe even just some optionality. So I think this corridor has room for further expansion, but I'm quite confident we'll capture our fair share.

Keith Stanley analyst
#91

Regarding your second question about the gray bar projects that are awaiting finalization, how would you characterize them — fairly diversified throughout the asset base, or quite concentrated in that Heartland region you keep referencing with Colombia and ANR?

François Poirier executive
#92

Keith, I'd say that bucket of pending approvals is fairly diversified, wouldn't you?

Operator operator
#93

That wraps up the question and answer portion, everyone. Should anything else come up, you can reach Investor Relations at TC Energy. At this point I'll hand things over to Gavin Wylie, who has some closing remarks. Go ahead, please.

Gavin Wylie executive
#94

Well, thanks once more for joining us this morning. We appreciate the excellent questions that came our way and your interest in TC Energy. If your question didn't get answered, as the operator noted, please do get in touch with the Investor Relations team. We're always glad to assist. With that, we'll wrap up and look forward to our next update in late July. So thank you very much.

Operator operator
#95

That wraps up the conference call for today. You're welcome to disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete TC Energy Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to TC Energy Corporation earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.