Home / Transcripts / Toromont Industries Ltd. (TIH) · April 29, 2026

Toromont Industries Ltd. (TIH) Earnings Call Transcript

April 29, 2026

Toronto Stock Exchange CA Industrials Trading Companies and Distributors earnings 45 min

Earnings Call Speaker Segments

Operator operator
#1

Good morning, everyone. It's Wednesday, April 29th, 2026. We're glad to have you with us for the Toromont Industries Limited conference call covering Q1 2026 results. Please note that this call is being recorded, and every line has been muted so that background noise doesn't interfere. Your host today will be Mr. John Doolittle, Executive Vice President and Chief Financial Officer. Sir, the floor is yours.

John Doolittle executive
#2

All right, thanks, Angeline. <<foreign_lang>> everyone, and thanks for being with us today as we go over Toromont's results for Q1 of 2026. Joining me on this morning's call is Mike McMillan, our President and Chief Executive Officer. We're coming to you from beautiful Montreal today. Mike and I will be walking through the presentation, which you can find on our website. First off, I'd like to point listeners to slide 2, where you'll see our advisory about forward-looking information and statements. Once we've finished our prepared remarks, we'll be glad to take your questions. So let's begin and turn to slide 3. Mike, the floor is yours.

Mike McMillan executive
#3

Thank you, John. Good morning, everyone, and we appreciate you being with us. Despite persistent uncertainty in worldwide trade markets, our team delivered a strong quarter. Revenue and earnings both rose, which shows solid execution across the majority of our business areas. The Equipment Group saw healthy gains in new equipment sales and used equipment sales, plus solid activity in rentals and product support. Production continued to rise at our AVL enclosure business, which supports data center needs mainly in the Eastern U.S. region. Given operating performance and how we see market demand, we keep looking at opportunities to invest in growing our power and energy business. As of today, our ownership percentage of AVL has been raised to 80% by moving up the purchase of half of the shares we did not currently own. It is important to note that a passive investor held these shares, and they do not impact the ownership or status of Vince DiCristofaro, President of AVL. The purchase price was CAD 71 million, paid in cash, and it will result in an expense of approximately CAD 45 million to be recorded in Q2 of 2026. The Equipment Group's operating income was 52% higher in Q1, as higher revenue and improved gross profit margins were partly offset by higher expense levels.

Mike McMillan executive
#4

CIMCO reported an increase in package revenue. Profitability came in lower, driven mainly by project timing and deferred product support activity. A strong quarter backlog helped support the growth in package revenue. Operating income fell, largely because of lower gross profit margins and elevated expense levels, partly offset by higher revenue. AVL's operational capacity and execution kept expanding during the quarter. Revenue totaled CAD 129 million, compared with CAD 22.1 million in Q1 of 2025. The business contributed CAD 0.19 per share to basic EPS, versus breakeven in Q1 2025. Q1 of 2026 results are net of roughly CAD 13.9 million in purchase commitment expenses, including a dividend paid to minority shareholders tied to earnings and the distributable cash position for fiscal 2025. Investment in non-cash working capital fell 4% year-over-year. That reflects the net effect of lower inventory levels, higher accounts receivable balances, and lower accounts payable balances stemming from equipment delivery timing. Accounts receivable rose, mainly reflecting the 13% revenue increase in the quarter, offset by solid collection activity. DSO improved by 3 days, down to 40 days. Our team keeps doing a good job managing receivables aging and customer credit metrics. Inventory levels came down primarily because of deliveries executed against a solid order backlog from year-end inventory management initiatives, slightly offset by higher work in process levels at CIMCO, reflecting the timing of project construction and product support schedules.

Mike McMillan executive
#5

We closed Q1 with plenty of liquidity — CAD 1.2 billion in cash plus another CAD 452 million accessible through existing credit facilities. Net debt to total capitalization came in at -12%. All in all, our balance sheet is in a strong position to keep operations running and to handle shifting economic and business conditions. Naturally, we're still exercising operational and financial discipline as we meet customer needs and weigh future investment opportunities. Toromont aims for an 18% return on equity across the business cycle. ROE for Q1 stood at 17.3%, a bit under our target, though it improved from 16.9% at year-end 2025 and was lower than the 18.5% reported at the end of March 2025. That year-over-year gap mirrors higher shareholders' equity, which more than offset the rise in comparative earnings. Return on capital employed reached 24.4%, up slightly year-over-year, reflecting our higher net earnings. Lastly, as we announced yesterday, the board of directors approved a regular quarterly dividend of CAD 0.56 per share, payable on July 2, 2026 to shareholders of record at the close of business on June 5, 2026. John, back over to you for more detailed commentary on the results.

John Doolittle executive
#6

Thanks, Mike. Now let's go to slide five, where I'll add a few remarks about the consolidated figures. Looking at things on a consolidated basis, Q1 revenue rose 13%, and the Equipment Group was up 14%, driven by greater revenue across every revenue stream as a result of solid execution against order backlog in our enclosure business, which is growing, plus a 3% rise at CIMCO and higher package revenue, partly offset by lower product support activity. SG&A expenses rose 21% for the quarter versus the same period a year ago. The main drivers were the inclusion of AVL and DSU mark-to-market adjustments, along with other increases tied to investments in growing the business, such as compensation, travel, and training. The provision for expected credit losses was up versus the comparable period last year, reflecting certain exposures. Mark-to-market adjustments on DSUs rose because of a higher share price. For the year, expenses came in at 14.2% of revenue versus 13.2% a year earlier. Operating income grew 44% in the quarter, as higher revenue and gross profit margins were partly offset by higher expenses. Measured as a percentage of revenue, operating income was 11.6% year-to-date versus 9.1% last year. Having passed AVL's first full year of operations, a dividend was paid to shareholders reflecting earnings and the cash position in 2025.

John Doolittle executive
#7

When it comes to IFRS rules, the dividend that was paid out to minority shareholders — a total of CAD 12 million — gets recorded as an expense. Net earnings rose 25%, which works out to CAD 18.3 million, in the quarter versus the same period a year earlier. Basic earnings per share came in at CAD 1.14 for the quarter. Bookings for Q1 were up 44% against Q1 2025. The gain in Equipment Group bookings mostly came from stronger power systems orders, and that includes AVL and mining. At CIMCO, bookings climbed 34%, driven by higher orders across both markets and regions, which reflects activity that keeps up. Booking activity has a way of being lumpy, so it produces quarter-over-quarter variability that mirrors market-related factors as well as the buying patterns of customers. Our backlog stands strong at CAD 1.7 billion, a 30% rise year-over-year, with gains in both the Equipment Group, which was up 40%, and CIMCO, which rose 4% against 2025 — a reflection of solid demand for our products, including at the business we acquired. Moving to the Equipment Group on slide 6. Revenue for the quarter grew 14% on the back of solid equipment deliveries, led by substantial growth in power systems, plus better rental and product support revenue thanks to healthy customer activity levels. Revenue in the construction market was 2% higher, while mining fell 32% because of how lumpy that business is. Equipment sales — covering both new and used equipment — rose 18% in the quarter across the majority of our market segments and regions.

John Doolittle executive
#8

Sales of new equipment rose 18% during the quarter. Gains in construction, power systems, and material handling were offset by a decline in mining, which stemmed from the timing of delivery schedules. Used equipment sales climbed 21% in the quarter, as stronger activity in construction and mining was slightly offset by weaker material handling activity. Rental revenue grew 11% in the quarter, broadly reflecting a larger fleet and better activity across every market and region. Revenue rose in most areas for the quarter as follows: heavy equipment rentals climbed 38%, light equipment rentals rose 8%, power rentals jumped 52%, and material handling was largely flat. The RPO fleet stood at CAD 89.1 million versus CAD 101 million a year ago, and rental revenue declined accordingly. Product support revenue grew 10% in the quarter, with gains in both parts and service. Activity was stronger across all markets and regions, reflecting end-user demand and activity levels. Turning to specific markets for the quarter, revenue changed as follows: construction rose 4%, mining rose 17%, power systems rose 10%, and material handling rose 8%. Gross profit margins expanded 400 basis points in the quarter. Equipment margins rose 370 basis points, reflecting a favorable sales mix within our equipment offerings.

John Doolittle executive
#9

Improved utilization lifted rental margins by 60 basis points. Solid execution drove a 10 basis point gain in product support margins. Sales mix worked against us, falling 40 basis points for the year, which mirrors product support revenue making up a smaller share of total revenue. Selling and administrative expenses rose CAD 27.9 million, or 22%, during the quarter. Once again, the main drivers were AVL, mark-to-market adjustments on DSUs, and investments aimed at growing the business. Selling and administrative expenses came in at 13.7% of revenue, compared with 12.8% a year earlier. Operating income climbed 52% in the quarter, driven by higher revenue and by gross profit margins that grew and improved, partly offset by the elevated expenses. Bookings rose 45% this quarter. Power systems orders drove most of that gain, enclosures included, posting strong order activity with a 231% increase on healthy demand for our products, helped along by expanding capacity. Mining markets, lumpy by nature, rose 96%. Construction markets softened, with bookings slipping 1%, which mirrors normal demand dynamics. Backlog stood at CAD 1.4 billion as of March 31st, still at healthy levels and reflecting solid new order intake across the quarter. We expect roughly 90% of that backlog to be delivered within the next 12 months, subject of course to timing differences tied to vendor supply, customer activity, and delivery schedules.

John Doolittle executive
#10

Now let’s move to CIMCO, on slide 7. Quarterly revenue rose 3%. Package revenue climbed 10% during the quarter, with activity improving in both the recreational and industrial markets, which reflects solid execution on equipment delivery and progress against customer schedules. Recreational activity was up 27% in the quarter, as higher revenue in the U.S. was offset by somewhat lower revenue in Canada. Industrial market revenue fell 4% in the quarter, with stronger activity in Canada and slightly weaker activity in the U.S. Product support revenue declined 3% in the quarter because of lower activity in the U.S., which more than offset stronger activity levels in Canada. Activity levels reflect customer demand as well as the timing of purchase decisions and work performance. Gross profit margins dropped 180 basis points in the quarter compared with the same period last year. Package margins fell 230 basis points because of the nature and timing of the projects in process. Product support margins rose 60 basis points because of the nature of activity. An unfavorable sales mix, with a smaller proportion of product support to total revenue, reduced margins by 10 basis points. Selling and administrative expenses rose CAD 2 million, or 14%, in the quarter. Higher compensation costs, higher costs reflecting staff levels, and annual salary increases were largely offset by lower profit-sharing approvals on the lower earnings.

John Doolittle executive
#11

Additional costs like travel, training, and occupancy came in higher to support activity and staffing levels. The provision for credit losses rose because recoveries were lower this period than in the same period a year ago. Selling and administrative expenses, measured as a share of revenue, climbed to 19.8% in the quarter from 17.8% in Q1 of last year. Operating income fell CAD 3 million, or 36%, for the quarter, driven by the lower profit, reduced gross profit margins, and elevated expense levels, partly offset by higher revenue. Operating income as a percentage of revenue declined to 6.2% for the quarter relative to the comparable period a year earlier. Bookings rose 34%, or CAD 16 million, in the quarter across both markets and regions. Industrial orders climbed 51%, and recreational orders gained 24%. Activity remains generally positive, with solid strategic capital investment levels. Order bookings can reflect the timing of end-user schedules as well as the timing of buying decisions. Backlog stands at CAD 360 million, up 4% from last year, with industrial market backlog higher by 7%, while recreational market backlog was relatively flat. Roughly 75% of the backlog is expected to be realized over the next 12 months.

John Doolittle executive
#12

Once more, that depends on how the construction schedules play out. That said, let's go on to slide 8. I'll hand things back to Mike, who will point out a few important takeaways as we head into the coming quarters. Mike?

Mike McMillan executive
#13

Thanks once more, John. Looking toward Q2 of 2026, executing our strategic priorities stays front and center for us. First among these is an unwavering commitment to safe, reliable, and efficient operations, consistently delivering high levels of customer service and keeping disciplined financial and operational rigor in place to support sustainable long-term growth. With that as our backdrop, we keep watching key external factors that might affect the business. Global trade negotiations are evolving. Developments between the U.S. and Canada in particular remain dynamic, which calls for proactive mitigation plans that we will keep adjusting as the situation evolves. Foreign exchange volatility, especially fluctuations in the Canadian dollar, is being actively managed through our hedging program, which helps mitigate earnings impacts, while we recognize that broader economic conditions may still create headwinds. Beyond that, we are closely monitoring overall macroeconomic trends. Our backlog of CAD 1.7 billion continues to grow nicely. The equipment supply chain is well-positioned to support customer requirements. Investment in our technician workforce remains a key strategic priority. By strengthening this critical capability, we are enhancing our aftermarket services, improving responsiveness, and delivering greater long-term value to our customers across our product and service offerings. From both an operational and financial standpoint, we benefit from a focused operating model, experienced leadership team, a disciplined culture, and strong liquidity.

Mike McMillan executive
#14

With that base in place, we can handle short-term uncertainty well and still keep moving forward on the growth priorities in our strategy. Looking further out, the way we build shareholder value stays anchored in tight cost control, well-considered strategic investment, and steady execution on operations. We appreciate our team's ongoing commitment and the confidence and backing of our stakeholders. That brings our prepared remarks to a close. We'd now be glad to take your questions. Angeline, please go ahead and bring us the first caller. Thank you.

Operator operator
#15

Thanks. Ladies and gentlemen, we're going to start the question-and-answer portion now. If you have a question, kindly press the star key and then the number one on your touchtone phone. A prompt will sound to confirm that your hand has been raised. If you'd prefer to withdraw from the polling process, kindly press the star key followed by the number two. When on a speakerphone, please pick up the handset prior to pressing any keys. Please hold a moment for your first question. Your first question is from Steve Hansen with Raymond James. Please go ahead.

Steve Hansen analyst
#16

Oh, yes. Morning, everyone. Appreciate you making the time. Could you address, a bit more directly, what the margin profile looked like at AVL this quarter and how you see it trending from here, especially given that capacity is ramping up while you also have some very strong bookings out there? I'm just trying to zero in on how that business actually did during the quarter.

John Doolittle executive
#17

Sure, Steve — the business did really well. Charlotte ramped up more quickly than we had anticipated. Hamilton, as we mentioned, is operating at full capacity, and margins at Charlotte are improving relative to where they stood in Q4 of last year. We'd anticipate that Charlotte will keep raising output, with margins flattening out there. It was a strong quarter for AVL.

Steve Hansen analyst
#18

Let me try asking that in a different way — would it be fair to say that the ramp-up caused a degree of margin dilution during the quarter? Margins appear to have fallen from one quarter to the next, and I'm simply trying to figure out the source of that pressure.

John Doolittle executive
#19

My sense is that there hasn’t been a quarter-over-quarter decline.

Mike McMillan executive
#20

Right, and there were some startup costs and other items in the prior year. Still, Steve, the teams handled execution quite well.

Steve Hansen analyst
#21

Alright. Perhaps this is simply a suggestion — it feels as though we spend something like 1 hour to 2 hours on each occasion working out how this business is performing. Getting some direct clarity on that within the MD&A would, I think, be helpful. It would be useful. As a separate point, and I suppose still related, could you tell us what portion of the backlog is now specific to AVL? This time I didn't see that in the disclosures.

Mike McMillan executive
#22

So Steve, if you check our disclosures, what we've separated out is power systems specifically, correct? Looking at the trended information, I believe we've stated that roughly 56% of the backlog ties to the Power Systems Group. A sizable share of that, naturally, if you review historical trends for power systems, is going to show some lumpiness. That should give you a sense of the magnitude when you're making comparisons there.

John Doolittle executive
#23

Right, Steve, just to remind you: we've provided the revenue figures, the contribution to the bottom line, and the charges related to dividends and purchase commitments. So hopefully you can work backward to the margins from those.

Steve Hansen analyst
#24

Alright. Yeah. Well, we can continue that discussion offline. Maybe just one last thing — mining orders appeared to rise during the period, which is an encouraging sign. Is there anything particular behind that, whether it's existing fleet owners or new projects that could be reaching fruition? Any detail on what's driving that uptick would be helpful.

Mike McMillan executive
#25

Well, Steve, I'd say it's genuinely a bit of a mixture. We frequently describe mining as—well, not exactly cyclical, but uneven, correct? Whenever we consider mining, the orders tend to arrive less often yet come in bigger batches as we observe the backlog building up in that area. Naturally, there are longer lead times given the type of equipment involved. What I'd say is that it's somewhat of a combination. Certainly, several projects we're examining over the longer term were announced federally and so on, which give us a hint of some new greenfield developments, though those remain some distance away. I'd characterize it as simply a broad mixture. We're looking at quite a few fleet additions, and replacements factor into that count as well.

Steve Hansen analyst
#26

All right, that’s quite useful. Thanks.

Mike McMillan executive
#27

I appreciate it.

Operator operator
#28

Thanks. Our next question is from Devin Dodge at BMO Capital Markets. Go ahead, please.

Devin Dodge analyst
#29

Yes, thank you, and good morning. Were you expecting that?

John Doolittle executive
#30

Good morning there, Devin.

Devin Dodge analyst
#31

Morning, and thanks for the question. On the Section 232 tariffs, are you anticipating a significant impact, or possibly none at all, on your business as a whole? I'm especially curious about your view on AVL, given the shipments coming out of Hamilton.

John Doolittle executive
#32

Sure, Steve — taking into account all the information we currently have, we are not anticipating that the 232 tariffs will significantly affect AVL shipments coming out of Hamilton.

Devin Dodge analyst
#33

All right, understood. Your outlook commentary noted that you're looking at opportunities to put money into growing businesses tied to data centers. I was hoping you could give us a little more detail on what options you're exploring. What I'm trying to figure out is whether those options lean more toward organic expansions — things like, you know, extra AVL capacity or broadening what you offer there — or whether they lean more toward M&A and bringing in a whole new line of business.

Mike McMillan executive
#34

Well, Devin, to kick things off on that point, I'd say it's likely closer to the first option. If you step back and consider the investments we've made up to now, we're still focused on raising output in Charlotte. I mean, within the operations we already have, improving efficiency and that kind of thing. There are several ways investment can look, but mostly it would be inorganic in nature, and also building out some capability through our Power and Energy Group to bolster the supply chain. For instance, it might just be warehousing and helping to support the production capacity at each of the two facilities we currently have, and then looking at growth opportunities, but that would lean more organic rather than toward an M&A approach.

Devin Dodge analyst
#35

All right, I appreciate that. I'll hand things over now.

John Doolittle executive
#36

Appreciate it, Devin.

Operator operator
#37

Thanks. Our next question is from Patrick Sullivan at TD Cowen. You have the floor.

Patrick Sullivan analyst
#38

Morning, and thanks for taking my questions. So the first thing—rental revenue and product support revenue are both up, and as you said, I think that's across every market and region. Mining has been pretty solid for a while now, as far as we can tell. What I was hoping is that you could really unpack what you're seeing in the construction and infrastructure areas.

Mike McMillan executive
#39

No, that's an excellent question, Patrick. As you can see, we had some decent year-over-year growth in new, used rental and product support, just as you mentioned. What we're observing — and you can also take a look at the backlog — is some modest growth in that area. I'd say the team did a really nice job in construction this quarter, especially when you reflect on the quarter, the weather profile and so forth. When you think of the seasonality in our business, Q1 is generally a bit of a slower quarter for us. It was pretty cold, a lot of moisture, and that does tend to slow some of the construction activity. We saw a nice pickup at the end of the quarter, and I think we're continuing to monitor it carefully. Activity levels in construction are still moderated a little bit given the uncertainty in the market. We're not seeing as much activity in infrastructure as we've seen historically, but I think there are a number of tabled projects and a number of tailwinds or indications that we're gonna see some activity over the next couple of years.

Mike McMillan executive
#40

So our team is really concentrating on getting the business positioned to grow in that space, and on making sure we can answer what customers need when they kick off projects — and as they react to some of the government moves that are in progress when it comes to investment and backing infrastructure development.

Patrick Sullivan analyst
#41

Alright, that's really useful. So I suppose the next item would be — I think you talked not long ago about a few of the capital investment priorities outside of AVL for the year, I believe something like the Ontario Distribution Center, some capacity expansion in Quebec, and maybe a camp up in northern Newfoundland. So I guess, could you bring us up to date on where those stand, and whether there's anything else I'm leaving out in the plans for the year?

John Doolittle executive
#42

Yes, Patrick, you’ve identified a number of those. The distribution center is performing well. Bradford is now completely operational. We’ve broken ground on the new Toronto branch and head office, and that work is progressing nicely. As I believe I noted during the previous call, we anticipated investing CAD 400 million to CAD 450 million in the business through CapEx over the year, which exceeds last year’s level. Real estate may account for somewhat more as a result of some of these initiatives, but they are moving along well.

Mike McMillan executive
#43

Yes, and I’d like to build on that as well, Patrick. I believe we’ve said before that we are also constructing a new branch in the eastern section of the GTA, near Brooklin, and that location is again intended to support growth in that market as a new site. We’ve also spoken historically a bit about how, after Bradford, we examined Quebec City, and we are beginning an expansion for remanufacturing to serve the eastern seaboard along with the northern Labrador and Quebec region. Those represent two additional investments for which John has allocated some capital.

John Doolittle executive
#44

To put it another way, you could say: open up the wallet.

Patrick Sullivan analyst
#45

All right, thank you very much. I'll hand it back to you now.

Operator operator
#46

Thanks. Our following question is from Sabahat Khan at RBC Capital Markets. You may proceed.

Sabahat Khan analyst
#47

Thank you. Good morning. Let me try to pull together some of the remarks about AVL. When you first bought this business, it was running at roughly CAD 30 million to CAD 50 million at a single facility. This quarter, revenue looks to be around CAD 130 million. Putting together everything that's been said about the outlook and the facility's ramp-up, can you give us any view of what the combined quarterly run rate, or some other broad metric and share, might be for that platform by year-end as we think about modeling the business?

John Doolittle executive
#48

Sabahat, like I mentioned, in Hamilton we’re at roughly 100% capacity, give or take a couple of units. During Q4, we shipped a handful of units from Charlotte, but output truly ramped up in Q1. Coming out of Q4, Charlotte is likely a bit under 50% capacity per quarter. By year-end—possibly sooner—we’d expect Charlotte’s capacity to double. That’s roughly the path we’re on.

Sabahat Khan analyst
#49

Thank you, that's very helpful. Regarding what you said earlier about the 232 tariffs, should we take it that any pricing — whether it comes from your OEM on the equipment side, and I believe you mentioned there's really nothing on the AVL side — should we take it that anything on the equipment side is mostly in the quarter and likely not a material consideration for us going forward? Or is the evolution-

John Doolittle executive
#50

Correct.

Sabahat Khan analyst
#51

With respect to Section 232, including on the OEM side, is there something worth considering?

John Doolittle executive
#52

No — like I mentioned, we’ve reviewed the 232 and our view is that it won’t have a material impact. That said, none of us can predict what will happen day-to-day with tariffs. As we discussed last year, we’re doing everything we can to make sure we’re prepared for that. Specifically on the 232, we don’t see a material impact from it.

Sabahat Khan analyst
#53

Thanks. One last quick thing — I think you touched on this earlier regarding M&A, that comment about seeking additional opportunities in power: is that really just, you know, a matter of doubling down on AVL, or are there other possible avenues for gaining exposure to the power space, or for investing in that space in some way beyond the silos you already occupy?

Mike McMillan executive
#54

Sure, so a few points on that, Sabahat. For instance, we’re aware that data center buildout in Canada, let’s say, trails the U.S. by one or two years. And when we consider the power and energy segment — which includes AVL plus our current operations doing backup power and prime power generation — we keep scanning for chances on the power and energy front in Canada too. We’re engaging with customers, putting together a schedule and timeline and something of a pipeline, so to speak, to gauge what the potential might be and then how we’d invest to meet some of that if we can earn our way into those opportunities. I’d call it a mix of things. We keep assessing how to productively add capacity within our current footprint, while also watching for opportunities as some of these other projects take shape, including in the Canadian market. We’ll be pursuing both.

Sabahat Khan analyst
#55

Thanks — I really appreciate that.

Mike McMillan executive
#56

Appreciate it.

Operator operator
#57

Thanks. Our following question is from Yuri Lynk at Canaccord Genuity. You have the floor.

Yuri Lynk analyst
#58

Hello, and good morning to you all, gentlemen.

John Doolittle executive
#59

Good morning, everyone.

Mike McMillan executive
#60

Yuri, hello there.

Yuri Lynk analyst
#61

Hey. Maybe John should handle this one. Regarding the AVL dividend to non-controlling interests — is that a one-and-done payment in Q1, or does anything remain to be paid over the rest of the year?

John Doolittle executive
#62

Okay, there are a few things to address there, Yuri. The dividend we paid during Q1 was a reflection of how the business performed financially, setting amortization aside — so, the cash performance of the business in 2025 — and it also reflected what a growing business needs in terms of cash. Both of those factors were considered by us. A dividend of CAD 30 million was paid, 12 of which went to minority shareholders, and that is the expense you saw in the quarter. Looking ahead, we own 60% of the business. We now own 80%, so any dividend we pay will be roughly half of what it was going to minority shareholders as a percentage. That will be reviewed by us on a quarterly basis. It will be reviewed by the board of AVL on a quarterly basis. As you know, interim dividends may or may not end up being paid by us, depending on the performance and cash needs of the business.

Yuri Lynk analyst
#63

All right. So moving ahead — that CAD 12 million covered the whole of 2025, correct? Thinking back on it.

John Doolittle executive
#64

You've got it right. Exactly right.

Yuri Lynk analyst
#65

So you're suggesting that, moving ahead, dividend payments could be determined by results from, for example, the quarter that came before?

John Doolittle executive
#66

Okay, so we will examine how the business is performing and what its cash requirements are. AVL's board — that's Mike, Vince, and myself — will decide what serves all shareholders best regarding those dividends. Once again, it will take into account the business's performance, how it continues to perform, and its cash needs. Some interim dividends could happen. We might hold off until the year is over. We will simply have to see how things develop.

Yuri Lynk analyst
#67

Alright, so for Q2 there’s going to be a CAD 45 million purchase expense. Will that show up as its own separate line item on the P&L?

John Doolittle executive
#68

That's going to show up as its own line on the P&L — the purchase commitment expense — and it equals the gap between the liability we recorded at the time we first acquired the business. As you'll remember, we acquired 60%, and we're on the hook to acquire the remaining 40. We've moved up the purchase of that 20%. We paid CAD 71 million for it, and we carried CAD 26 million of liability on the balance sheet. That gives you the CAD 45 million we'll expense in Q2.

Yuri Lynk analyst
#69

So does that bring your taxable income down, or not?

John Doolittle executive
#70

I’m not going to do that.

Yuri Lynk analyst
#71

Final question. I just want to be certain I’ve got a clear picture of AVL’s revenue capacity. I mean, looking at Q4, let’s call it CAD 100 million in revenue from AVL, was Charlotte a major contributor to that figure, or a contributor at all? I’m only trying to establish a clean starting point and then, you know.

John Doolittle executive
#72

Charlotte made only a minimal contribution during the fourth quarter.

Yuri Lynk analyst
#73

Alright.

John Doolittle executive
#74

Charlotte became operational during Q1. By the close of Q1, you know, they were operating at just under 50% of their capacity. As I mentioned, Hamilton is running at 100%, and we anticipate doubling that Charlotte capacity over the course of 2026.

Yuri Lynk analyst
#75

All right. All right. That figure is something I can reach. All right. I'll hand things over at this point. Thank you, John.

John Doolittle executive
#76

Understood, Yuri.

Mike McMillan executive
#77

Much appreciated, Yuri.

Operator operator
#78

Thanks. Our following question is from Jonathan Goldman at Scotiabank. You have the floor.

Jonathan Goldman analyst
#79

This is somewhat a different angle. Could you discuss how competition is playing out in the industry? Perhaps whether you have observed any reaction from rivals. I would like to know if any of your competitors have added capacity too. Mike, I believe on a few earlier calls you mentioned that margins could potentially decline over time and something about a technology adoption curve. Are you seeing that at this point? What is your best estimate for when margins in this business might start to taper?

Mike McMillan executive
#80

Yes. Appreciate the question, Jonathan. I think you lost your train of thought a bit at the start there, but I believe I caught the gist of what you were asking. You know, in this space, as you're aware, we tend to take a cautious view in certain areas of the business. With all the money flowing into the data center sector, it's drawing plenty of interest, and it makes sense to expect that others are entering the enclosure and packaging business. That's the reason behind those remarks we made. At some point further out, we expect supply will improve and things will normalize more. And on the cost front, we'll be putting in a lot of effort to optimize our operations and keep costs in check. Material costs have been rising over the past 2 years, when you consider aluminum panels and steel fuel tanks and the trade dynamics. A number of factors like that, I think, will feed into the margin equation. Given the historical trends with technology like this, you typically see at some point a normalization, or a supply-demand dynamic that's more balanced.

Mike McMillan executive
#81

That is what we'd expect. Still, at this point it's quite hard to give you a number, a timeframe, or any quantification of that.

Jonathan Goldman analyst
#82

Can you give any sense of just how tight capacity is across the industry — even a directional comment would help — when it comes to the enclosure business?

Mike McMillan executive
#83

Honestly, that's a really tough thing to pin down. Demand does appear to be pretty robust, and it's genuinely hard to call. From where we sit, our focus is on collaborating with our main customers, making sure we meet our delivery commitments, and giving them the quality products they require along with dependable distribution, supply, and timelines and so on. I'd simply say that at this stage it remains one of the bottlenecks in the supply chain, though it's hard to go further than that when it comes to overall market demand and so forth. Right.

Jonathan Goldman analyst
#84

All right, understood. One more, I suppose, regarding CIMCO. Has there been any advancement or news on the possibility of that technology being specified for data centers?

Mike McMillan executive
#85

Sure, a few points come to mind on that. I'd say that picture keeps shifting too. We've said many times that you have to engage on the data center cooling side early in the cycle, particularly with some of the players involved. The hyperscalers, for instance, have specified a range of partners to deliver cooling, in my view. CIMCO has an opening there with the technologies we bring, though it would probably lean more toward the second tier and other such players, correct? And in Canada, when we look at the opportunities north of the border, there's definitely a chance there as well. Again, it's shifting when it comes to what's needed on energy and on cooling, and especially as — when I speak about technology, I mean the thermal side of the chips and all of that. There are several elements we keep assessing and keep hunting for chances to show what CIMCO can do. At this point, I'd say the biggest opening is likely more within the Canadian market.

Jonathan Goldman analyst
#86

Yeah. All right, thank you. Perhaps I could fit just one more question in. I think there's been plenty of discussion during this call regarding AVL capacity. It appears that you'll reach, you know, nameplate capacity at both facilities by year's end. Could capacity be expanded further at those two sites — perhaps by boosting throughput through productivity initiatives, by adding another warehouse or facility, or by installing a second line?

John Doolittle executive
#87

I mean, Jono, we genuinely like what that business is showing us. The progress we're making in Charlotte is something we're happy with. We're always examining organic opportunities to boost production in both Hamilton and Charlotte. You know, we're watching demand very closely. You know, thinking about whether or not adding capacity at some point makes sense. Right now we don't have any news on that. Certainly the performance of the business has us pleased.

Jonathan Goldman analyst
#88

All right, I appreciate the context. I’ll rejoin the queue.

Mike McMillan executive
#89

I appreciate that.

Operator operator
#90

Thanks. Our next question is from Steve Hansen at Raymond James. Go ahead, please.

Steve Hansen analyst
#91

Oh, yeah, thanks, guys. Could you remind us how the price for that incremental 20% you just bought gets determined? It just seems to me that CAD 71 million for the 20% stake looks like a fairly reasonable price. I’m just trying to think about how that factors into the residual 20% still out there. Thanks.

John Doolittle executive
#92

Right. Steve Hansen, that CAD 71 million figure is just something we negotiated. When we acquired the business, we settled on a purchase price. We agreed to buy out those shareholders — the 40% — across five years. A price was fixed at that time, the business has performed, and it came out of a negotiated settlement with the shareholder. None of that affects Vince DiCristofaro, the shareholder who remains.

Steve Hansen analyst
#93

I'm just trying to get a handle on this — is it based on, say, a multiple of EBITDA, or some kind of multiple of trailing earnings? How exactly do you land on that negotiation, or what is the negotiation grounded in?

John Doolittle executive
#94

So the buyout was structured around an EBITDA multiple — that's what it was founded on from the start. And then the other piece of it was the settlement we negotiated.

Steve Hansen analyst
#95

Alright, that's great. Thanks a lot.

Operator operator
#96

I appreciate that.

John Doolittle executive
#97

Is there anything more you’d like to add?

Operator operator
#98

My apologies — please continue.

John Doolittle executive
#99

I was about to ask whether there are any further questions.

Operator operator
#100

Yuri Lynk from Canaccord Genuity has his hand up once more, so we'll go to him.

John Doolittle executive
#101

All right.

Operator operator
#102

Yuri, you have the floor.

Yuri Lynk analyst
#103

The chance that exists in the enclosure business.

John Doolittle executive
#104

Hey, Yuri. Apologies — your audio dropped out. We didn't catch almost any of that question. Sorry about that.

Yuri Lynk analyst
#105

Oh. All right. Are you able to hear me at this point?

John Doolittle executive
#106

Sure.

Yuri Lynk analyst
#107

All right, I was just curious whether the enclosure business opens up any kind of aftermarket opportunity.

Mike McMillan executive
#108

Well, a few points on that, Yuri. Generally speaking, these are standby power units, so near term they don't accumulate many hours. On the enclosure and packaging side, there are moving parts — doors, preventative maintenance, that kind of thing. Longer term, there's certainly an opportunity, and the real question becomes whether operators take care of some of that preventative maintenance on their own. Often, the local Caterpillar dealer handles preventative maintenance on the engines or the power plants. We're also looking at that from a service and aftermarket standpoint — specifically preventative maintenance involving the packaging and the enclosure components. I think it'll be a while before that need emerges.

Yuri Lynk analyst
#109

Alright, thank you, everyone.

Mike McMillan executive
#110

Thank you. Many thanks, Yuri. That's right.

Operator operator
#111

Thanks. There's another question here. Krista Friesen from CIBC is on the line. Go ahead, please.

Krista Friesen analyst
#112

Hello, and thank you for taking my question. I was just hoping you could address how long it typically takes from when a customer places an order at AVL to when delivery occurs, and how that timeframe has changed over the past year?

Mike McMillan executive
#113

Thanks, Krista. I think — I mean, several things play into that. What I'd say is that it depends a lot on where the customer is located, what their build schedule looks like, and when they actually need that power plant delivered. As you know, once they've locked in a build schedule — at a given site, say — we examine the logistics, and then the order might come in. It does shift somewhat. Certain of those schedules also move around, based on what's happening with construction activity and how the scheduling there works out. What I'd say is, you know, we're looking out — if you look at our numbers, we're looking out a minimum of 12 months. Some of them at times could slip a bit past that. Generally, another piece of the puzzle there is our customer's access to the power plant, so, you know, making sure engines are available on our end, and then the scheduling of that. We're able to respond quite fast. As John mentioned, we're at a pretty solid level of capacity — productive capacity — today. You know, what I'd say is, when you think about it, we'd be looking out, you know, 12 months to 24 months, depending on the schedule and what the customer requires.

Krista Friesen analyst
#114

Great, thanks. I’ll get back into the queue.

Operator operator
#115

Thank you. As a reminder, if you'd like to pose a question, just press star one. At this point, we have no further questions. I'll hand things over to Mr. Doolittle for closing comments, if any. Please go ahead.

John Doolittle executive
#116

Alright. Angeline, thanks for hosting, and thanks to all of you for taking part. As we wrap up the call, I want to remind everyone listening that the AGM takes place today at 10:00 A.M. Eastern. This is an in-person gathering at the company's offices in Pointe-Claire, Quebec — the address is 5001 Trans Canada Highway, Pointe-Claire. If you can't be there in person, a recording of the meeting will be made available via a link on our website. That brings our call to a close. Many thanks for joining us. Stay safe and have a wonderful day.

Mike McMillan executive
#117

I appreciate that.

Operator operator
#118

Thank you. That brings us to the end of today’s conference call, everyone. We appreciate your participation. You can disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Toromont Industries Ltd. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Toromont Industries Ltd. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.