Good morning, everyone. The date today is Wednesday, July 29, 2026. You're listening to the Toromont Industries Limited conference call covering our second quarter 2026 results, and we're glad to have you with us. <<operator_script>> I'd like to let you know that this call is being recorded. Mr. John Doolittle, our Executive Vice President and Chief Financial Officer, is your host for today. Sir, the floor is yours.
Thanks very much, Angeline. Morning, everybody. Appreciate you being here today as we go through Toromont's second-quarter 2026 results. Joining me on this morning's call is Mike McMillan, our President and Chief Executive Officer. Mike and I will be walking through the presentation, which you can find on our website. First off, I'd point listeners to Slide 2, where you'll see our advisory on forward-looking statements and specified financial metrics. Once we've finished our prepared remarks, we'll be glad to take your questions. So let's begin — please turn to Slide 3, and Mike, over to you.
Thank you, John, and good morning to everyone. We appreciate you being with us today. Our results for the second quarter and the first half leave us pleased. Both revenue and earnings rose, which shows the business is executing solidly across the board. Within the Equipment Group, we saw growth in sales of new and used equipment, enclosures, rentals and product support. Higher revenue and better gross profit margins lifted the Equipment Group's operating income by 47% in the second quarter, though higher expense levels partly offset that gain. AVL kept expanding production. In the quarter, we raised our ownership stake in AVL to 80% and bought land in Canada to support manufacturing growth in the future. At CIMCO, results came in slightly lower for the quarter. Operating income fell, mainly because package revenue was lower due to project timing, gross profit margins were lower, and expense levels were higher along with investments aimed at future growth. Now let's move to Slide 4 for a few other financial highlights. Our investment in noncash working capital was comparable year-over-year. The net effect came from higher inventory levels, higher accounts receivable balances and lower accounts payable balances, all due to the timing of equipment deliveries. We finished the first half of the year with ample liquidity, including $1.2 billion in cash and another $449 million available under our existing credit facilities.
Our ratio of net debt to total capitalization came in at negative 13%. All told, the balance sheet is in a strong position to sustain operations and steer through shifting economic and business circumstances. Naturally, we will keep exercising operational and financial discipline as we serve customer requirements and assess upcoming investment possibilities. Over the business cycle, Toromont aims for an 18% return on equity. For the second quarter, ROE stood at 17% all in, a touch under our target, yet it rose from 16.9% at year-end 2025 and was comparatively lower than the 17.6% reported at the end of June 2025. That year-over-year gap mirrors greater shareholders' equity, which more than compensated for higher comparative earnings. We should also point out that ROE took a hit of roughly 1.5% from the expenses as disclosed tied to the accelerated purchase of certain AVL shares during the quarter. That move lifted our ownership to 80%, a choice grounded in long-term expected returns. Return on capital employed reached 24.8%, a bit above the prior year, mirroring our higher net earnings. Lastly, as we announced yesterday, the Board of Directors gave the green light to a regular quarterly dividend of $0.56 per share, payable on October 2, 2026. John, back to you for more detailed commentary on the results.
Appreciate it, Mike. Moving to Slide 5, I'd like to offer a handful of extra remarks regarding the consolidated results. Looking at things on a consolidated basis, revenue rose 16% during the second quarter and was up 15% across the first half of the year. The Equipment Group accounted for most of that growth, through higher power system revenue—our enclosure business included—plus increased revenue from mining equipment, rental and product support. CIMCO's start to the year has been a bit slower, with package revenue down due to construction timing, though that was offset by stronger product support activity. SG&A expenses were higher for both the quarter and the year-to-date period versus the comparable period a year ago, with the main drivers being the inclusion and growth of AVL, DSU mark-to-market adjustments, and other increases tied to investments in growing the business—compensation costs, travel and training being some examples. Operating income climbed 41% in the quarter and 42% through the first half, driven by the higher revenue and better gross profit margins, partly offset by the elevated expense levels. Measured as a percentage of revenue, operating income came in at 13.6% year-to-date, up from 11% a year ago. AVL continued to grow both its operational capacity and its execution during the quarter. Revenues reached $171 million, compared with $57 million in Q2 '25, and stood at $300 million year-to-date versus $79 million in the first half of '25.
For the second quarter of 2026, results are reported after deducting purchase commitment expenses totaling $54.3 million, compared with $1.7 million in Q2 '25, and on a year-to-date basis those expenses came to $68.2 million versus $2.8 million for 2025. As a reminder, this figure includes costs tied to valuing the company's commitment to purchase the remaining outstanding shares of AVL, and it reflects the routine assessment of that commitment using actual and expected results. It also takes in expenses connected with dividends paid to noncontrolling interests. Net earnings stayed largely flat in the quarter versus a year earlier and rose 9%, or $18.4 million, across the first 6 months of the year. As a gauge of our base business, we'd point out that net earnings, once purchase commitment expenses are excluded, climbed 42% in both the quarter and the first half of the year versus 2025. Basic earnings per share came in at $1.53 for the quarter, essentially unchanged from the prior-year comparative, and rose to $2.66 year-to-date. Moving to the Equipment Group on Slide 6: revenue grew 18% in the quarter and 16% for the year, driven by stronger power systems sales and higher mining deliveries, together with greater rental and product support revenue. Equipment sales, covering both new and used equipment, were higher in the quarter and the first half of the year, by 27% and 23%, respectively.
Sales of new equipment rose 31% during the quarter and 25% for the full year, driven by greater mining deliveries and stronger power systems markets — which include revenue from the acquired business — while construction market levels were comparable to the prior year. Used equipment sales were up 2% in the quarter and 9% year-to-date across most markets. Turning to the quarter's market segments: total equipment revenue climbed 72% in mining, and Power Systems gained 43%. Construction came in slightly lower, down 1%, and material handling fell 32%. Rental revenue rose 11% for both the quarter and year-to-date. Although market conditions remain somewhat uncertain, revenue was higher than the prior year, broadly reflecting the larger fleet and better activity levels in most areas. For the quarter, revenue changes broke down as follows: heavy equipment rentals climbed 25%, light equipment rentals rose 8%, and power rentals increased 18%, partly offset by a decline in material handling, which was down 7%. The RPO fleet stood at $98.8 million versus $101.4 million a year ago, and rental revenue was up 19% for the quarter and down 3% for the year compared with similar periods last year. Product support revenue grew 8% in the quarter and 9% year-to-date, reflecting equipment utilization in our territory along with a higher technician workforce.
Broadly speaking, activity came in stronger across the majority of markets and regions. Turning to individual markets. Revenue movement for the quarter broke down like this: Construction declined 6%, mining rose 18%, Power Systems fell 1%, and material handling gained 4%. Gross profit margins were up 270 basis points during the quarter and up 330 basis points year-to-date versus a year ago. Margins on equipment rose, which mirrors the beneficial sales mix among our equipment offerings. Rental margins improved thanks to better utilization. Product support margins dipped somewhat, which mirrors the character of the work and the sales mix. Sales mix proved unfavorable in both periods, mirroring a smaller share of product support revenue relative to total revenue in each period. Selling and administrative expenses rose $20 million, or 13%, in the quarter and rose $48 million, or 17%, for the year. The higher expenses mirror ongoing investment in key strategic areas. Compensation costs ran higher in both periods, mirroring staffing levels and routine salary increases, larger profit sharing accruals on the stronger income and greater DSU mark-to-market expense on the higher share price. Other costs, including training, travel and occupancy, have risen given sales levels and planned investment in inflation. Measured against revenue, selling and administrative expenses climbed to 12.4% versus 12.3% a year earlier.
Operating income rose 47% in the quarter and was up 49% for the year, driven by greater revenue and better gross profit margins, partly offset by higher expenses. Bookings for the quarter grew 196%, primarily due to larger power systems orders, including AVL, which contains a $1 billion order announced earlier for delivery mostly in 2027. Mining markets are lumpy or cyclical given the character of the business, and they improved 11% on solid orders. Construction orders stayed relatively flat compared with Q2 2025, which reflects normal demand dynamics. Material handling orders fell 51% against a strong prior-year comparable. Backlog stood at $2.5 million at June 2026, quite solid, reflecting healthy new order intake across the quarter. Roughly 60% of that backlog should be delivered during the next 12 months, though naturally it is subject to timing differences depending on vendor supply, customer activity and delivery schedules. Now let's move to CIMCO on Slide 7. Revenue declined 1% in the quarter, yet it rose 1% for the first half of the year, mainly reflecting project timing. Package revenue dropped 5% in the quarter, with weaker revenue in the recreational market, partially offset by growth in the industrial market.
Recreational activity fell 50%, with revenue declining in both Canada and the U.S. Revenue from the industrial market rose 32%, driven by greater activity in Canada and the U.S. alike. Package revenue for the first half of the year was essentially flat and mirrored comparable trends in the quarter. Product support revenue grew 6% in the quarter and 1% year to date, as stronger market activity in Canada was offset by weaker U.S. revenue in both periods. Activity levels keep improving thanks to solid customer demand and a larger technician base. Gross profit margins contracted 90 basis points in the quarter and 120 basis points in the year compared with the same periods a year ago. Package margins came in lower because of the nature and timing of projects in process. Product support margins were mostly in line with last year's levels. Better execution and efficiency remain a priority, and a favorable sales mix—with product support making up a larger share of total revenue—lifted margins. Selling and administrative expenses rose $2 million, or 10%, in the quarter and $4 million, or 12%, over the first 6 months of the year. Compensation costs were higher, reflecting staffing levels, annual salary increases and the mark-to-market on DSUs, largely offset by reduced profit sharing accruals tied to lower earnings.
Additional costs like travel and training went up to back our activity and headcount levels. Selling and administrative expenses as a share of revenue came in better at 16.9% during the second quarter compared with 15.2% in Q2 2025. For the quarter, operating income fell $3 million, or 20%, and for the year it dropped $7 million, or 26%, mostly driven by reduced revenue, lower gross margins and elevated expense levels that support growth. On a year-to-date basis, operating income as a percentage of revenue fell 290 basis points to 8.2% against the comparable period a year ago. Bookings were essentially flat this quarter and rose 11%, an increase of $16 million, for the year. Industrial orders climbed 12% for the year, and recreational orders gained 11% as well. Broadly, activity continues alongside solid strategic capital investments. Backlog came in at $375 million, up 7% from last year, with stronger backlog in the recreational market, which rose 14%, while industrial market backlog stayed roughly flat. Roughly 75% of that backlog should be realized within the next 12 months. That said, this once again depends on construction schedules. With that, let's go to Slide 8 and hand it back to Mike to walk through some key takeaways as we look to close out the year.
Mike, over to you.
Thanks again, John. As we look toward the back half of 2026, our attention stays fixed on carrying out our strategic priorities. These start with an unwavering dedication to operations that are safe, reliable and efficient — consistently delivering high levels of customer service and keeping disciplined financial and operational rigor to support sustainable growth over the long term. With that as our backdrop, we keep watching key external factors that might affect the business. Global trade negotiations are shifting, and developments between the U.S. and Canada in particular stay dynamic, which calls for proactive mitigation plans that we keep refining as things change. Foreign exchange volatility, especially swings in the Canadian dollar, is being actively managed through our hedging program, which helps soften earnings impacts, though we recognize that broader economic conditions may still produce headwinds. Beyond that, we are tracking overall macroeconomic trends closely. Our backlog of $2.9 billion keeps growing nicely, and the equipment supply chain is well positioned to meet customer requirements. Investment in our technician workforce remains a key strategic priority. By strengthening this critical capability, we are enhancing our aftermarket services, improving responsiveness and delivering greater long-term value to our customers across our product and service offerings. From an operational as well as a financial standpoint, we benefit from a focused operating model, an experienced leadership team, a disciplined culture and strong liquidity.
That base gives us a solid way to handle the uncertainty we're facing in the near term while still pushing forward on the growth priorities in our strategy. When it comes to building shareholder value over the long run, we stay anchored in managing costs with discipline, investing strategically and with care, and executing operationally in a consistent way. Our team has our thanks for their ongoing commitment, and we're grateful to our stakeholders for their trust and support. That wraps up the remarks we prepared. At this point we'd be glad to take your questions. Angeline, please go ahead and line up the first question.
<<operator_script>> Our opening question is from Yuri Lynk at Canaccord Genuity.
Could you give us a little more detail on that $1 billion in AVL orders — are they made up of lots of customers and lots of projects, or is it more concentrated? And how did it all come together to book a number that big?
Yes. Thank you for that question, Yuri. I think I might offer a bit of color here, and John can add something too. Yes, this is definitely a significant order. I would simply note that we haven’t disclosed details related to the customer. But I would say it involves multiple locations, largely along the U.S. Eastern Seaboard—that’s the positioning there. And so I think part of the positioning is that, as we’ve ramped up in Charlotte and continue to track really nicely to plan and hit our quality and delivery time scales, it has created the opportunity for us—between both of our facilities, the Hamilton facility and the Charlotte facility—to secure that kind of commitment from a customer perspective. And again, what I’d emphasize is that as we booked and secured that order, it is largely to be executed and delivered in 2027 with both facilities.
Yes, and the one point I would make in addition, Mike, is that we keep backing the CAT network through what we deliver. So the bulk of that activity is in the U.S., in support of the CAT network.
All right. But is there a way to tell us whether that's a single customer or several?
Right, so what we're really talking about is several purchase orders sitting inside one bigger purchase order.
All right. Regarding that land acquisition you mentioned taking place during the quarter — is it included within CapEx? And could you break out that figure for us?
Yeah, regarding the land acquisition this quarter — we're growing the AVL operation. We bought property to the north of Hamilton. In terms of that land purchase, it's roughly $20 million, and that sits within the CapEx figure. Since it's land, Yuri, we'll still have to carry out a build-out over the period ahead. So don't count on any production from that facility until around mid-2027.
And what's the approximate figure for the investment still ahead?
At the moment we're focused on the build-out and what that will end up costing. But perhaps consider roughly $75 million all in.
And does that figure also take in the $20 million set aside for the land?
That's right.
Yeah. All right. And the final point on this — would that bring in revenue capacity roughly comparable to Hamilton?
Yes. So as I mentioned, we've purchased that land. A facility has to be constructed on it, and that work will carry us into 2027. Then, once we're fully ramped, my expectation is that we'll be adding somewhere around 40% to 50% in additional capacity for the overall business — but that won't arrive until sometime out of 2027.
Our following question is from Krista Friesen at CIBC.
Perhaps I could ask for a bit of clarification on that final point. Regarding the 40% to 50% capacity figure, is that measured against the capacity in Canada, or does it also take into account what's in Charlotte?
It was intended to serve both purposes, Krista. The point was to indicate that it would contribute 40% to 50% in additional capacity for the business as a whole. Just bear in mind the timing I referred to there.
Yeah, that's clear. So perhaps moving over to the more conventional equipment segment. Could you update us a little on how the construction outlook appears for the remainder of the year? And also, are you beginning to see more of these nation building projects come through, and when do you anticipate an impact from that?
Yes, that's a really good question, and thanks for asking it, Krista. There are a couple of points I'd make. We're seeing somewhat improved activity. I think that shows up in construction, and it shows up in our rental business as well, with stronger utilization on the bigger fleet, and that covers both heavy and light. One area where I'd sound a note of caution is the residential-related business, which still appears largely stalled — for instance, when you consider infrastructure feeding into high density or residential, activity there remains limited. That said, we're seeing decent levels of activity in road construction, repaving, and construction markets. As for the larger projects you mentioned, they're at a very early stage. So I think a number of the major projects that have been announced federally need road access and various other things before development can begin, particularly when you consider resource access in other areas. So there is some engineering work, and some initial work is underway there. But our view is that this will carry on through into '28, when we hope to see a stronger tailwind as we head into the new year.
That's great. Now for the final question on the CIMCO business. It sounds like a few timing problems came up during the quarter. How are you viewing the rest of the year, and the timing of orders as they come in?
Yeah. I’d also point you back to the backlog, Krista. Our backlog is in a solid position, and we made a few remarks about that. We frequently describe CIMCO as somewhat uneven, since it is a lumpy business. For instance, we have some sizable projects that need a bit longer before revenue can be recognized. So for the rest of this year, I’d say we feel at ease because of the backlog and the way that backlog is being fulfilled, as we noted in disclosure. The first half has been somewhat slower, largely because of when certain projects fall. Product support has perhaps been one of the encouraging indicators there. Results are a little stronger in that area, though I think they are fairly in line with what we saw last year.
Cherilyn Radbourne from TD Cowen has the next question.
I'm not looking to make this into the AVL call, so I'll keep my AVL question to just one. I'm just curious—as you put more capital into this business, how much visibility are you beginning to build for AVL past 2027? And what contractual protections do you have in these POs?
Yes. That's a fair question, Cherilyn. What I'd say is that we're seeing solid demand from our customers. The purchase order we mentioned runs for quite a long time—all the way to the end of '27. So we expect a reasonable amount of demand across the coming several years, though we're cautious in the sense that we have to earn that business and lock in POs to replace what we deliver here over the next 18 months. On the protections in there, I'd say again that there are various customers—hyperscalers, colocators and regional players. And as John said, we're collaborating closely with the Caterpillar network. So I'd say we try to be fairly careful about some of those terms within those agreements. Our emphasis is really on quality and execution across our product line as well, because these are—what we've seen so far is really standby or backup power generation, which tends to involve lower hours, but we need to ensure we're consistently executing on quality and on delivery of that product line. So I'd say on exposure, we have standard warranty periods and so on, which the customer has accepted, and we also have a capability to assist with service if needed.
Yes. And one more thing I want to point out, Cherilyn, is that we're taking a very careful approach with our growth strategy when it comes to acquiring property in strong locations — such as the new site we recently picked up north of Hamilton, as well as the one in Charlotte. And down the road, should things ever level off, we'll have some excellent assets available to us there.
All right, sounds good. And you had some solid growth in product support this quarter, which was good to see. Construction appeared strong, and mining rose noticeably compared with a year earlier. Could you share a bit more detail on what you're seeing in those areas, including around rebuild activity?
Yes. Appreciate you raising that. I mean, the growth we've been seeing in product support makes us pretty pleased — in the Equipment Group alone, we're up 8% to 9% measured quarter over year-to-date. There are a few factors we've discussed for the past couple of years. Some of it, clearly, ties to activity levels, with customers telling us construction is beginning to call for additional support as activity picks up somewhat. On mining, we've covered that topic a fair amount before, and we've placed some fleets into service across the last 2, 3, 4 years. As those fleets accumulate the hour requirement, we begin to observe a somewhat stronger need for product support, and that's starting to show up. And on your rebuilds point, that's an area we're focused on. Given the economic uncertainty out there and some of the shifting dynamics in the marketplace, we've been working diligently alongside our customers to offer that as an option, together with other choices — along with used and RPO and so on. But on the rebuild side, demand has looked fairly decent.
Mining is a lumpy area, though if you consider the construction network, it may be somewhat more steady, correct?
Yes. And another point I raised regarding the rebuild, Mike, is that we've broken ground on the Quebec City facility, and the build-out there is progressing really well. So that development has us excited.
Our following question is from Devin Dodge at BMO Capital Markets.
I wanted to ask about AVL again — could you explain why you chose Hamilton for the new facility rather than a location somewhere in the U.S., especially since I believe most of the product is delivered south of the border?
Sure — thanks, Devin. Perhaps I can begin there. I'd say we keep taking a close look at both of those markets. I think it really depends on the local jurisdiction, and you also have to factor in labor market supply, real estate availability, the supply chain, logistics, and what surrounds the facility. So that's a major consideration. You may remember that when we talked about the Hamilton facility, it consists of several buildings, whereas Charlotte is a fit-for-purpose building — one large facility. Our new facility, located just north of Hamilton in the Burlington area, will be comparable to Charlotte. So we were considering it from that angle too, ending up with a facility that's fit for purpose and built for highly efficient operational flow. And I think the other piece is that while we're seeing the strongest demand in the U.S. and expect that to continue over time — over time, we also expect demand in Canada, though at a more reasonable level compared with the U.S. So it's good to have access. And since it's in Hamilton, we also have port access and other advantages, which is an added benefit, right?
Yes, that’s clear. And one more quick question about AVL: are you still accepting orders for delivery in 2027?
That's right, we are. Correct.
Absolutely.
All right, let me shift topics for a moment. Toromont, I believe, is now in the closing months of a 3-year business plan. What would you say were the greatest achievements under Connect26? And looking ahead, where do you think the main areas of focus will land in the next business plan?
Yes, Devin — that's a great question in my view. As you may remember, we entered the 3-year plan, the one currently running, right as we were exiting COVID, and the urge to connect was powerful. That connect theme centered on reaching customers, re-engaging with customers, linking up with employees given the pandemic's upheaval, and connecting digitally, among other things. Broadly speaking, our aim was truly to get the business positioned for growth as we came out of that uncertainty. And once more, the trade dynamics and everything else that came into play were not something we foresaw. Still, from that standpoint, the team has done a really solid job of placing us well across the businesses so we're set as activity levels begin to pick up and we gain a bit more stability south of the border. Then there's the discipline piece in the business, I'd add. From a cost management angle, our teams have performed nicely. We keep bringing on technicians. The digital area is also a massive investment focus. Caterpillar is directing substantial resources there. We've assembled our team and made it stronger in those areas.
And I view that as something that will keep picking up considerable momentum and will be among the recurring themes in our plans from here on, given the analytics, the technology built into the equipment, and the way we leverage all of that capability to set our service offering apart and assist our customers in reducing what they spend to run their operations. That's a lengthy response to your question, but I'd say much of it concerns getting the business positioned for durable growth over the long term, correct? And that was the aim.
Steve Hansen of Raymond James has the next question.
The first one concerns AVL and really just how fast things ramped in Charlotte, or possibly throughout the network today. That ramp happened pretty quickly during the period. At what point do you roughly anticipate beginning to make use of, I suppose, the capacity you have right now at other sites, taken together as of today?
Yes, Steve, and we’re genuinely happy with how the Charlotte ramp has gone. We’d expect Charlotte to reach full capacity as we exit Q3, but the team there has done an excellent job increasing output. Safety has been the top priority, which has been great, and quality has been very strong too. So the team down there is doing a truly remarkable job. And yes, it ramped up quite well during the second quarter, as you noted, and it will keep ramping through the third quarter, and by the fourth quarter we’ll be at or near capacity there.
Appreciate that. And regarding margins, it looks like some disclosure around AVL was removed during the period. Could you walk us through how margins are trending versus earlier periods, or provide some context on what EBIT contribution may have been in that period? I'm just trying to understand what that contribution looks like compared with the period.
Yeah, Steve, the margin narrative has essentially remained unchanged. It’s a really strong margin profile, and you can sort of get there through the revenue growth as well as the bottom-line effect on AVL once you strip out the purchase expenses.
Alright, that's useful. And then just one final quick item: it really does look as though the equipment market, notwithstanding a couple of weak patches in Eastern Canada, is gradually firming up — or steadily firming up — with inventories seemingly declining throughout the channel. I mean, how do you feel about the margin profile, and kind of within the core equipment business, compared with even last year? Are you beginning to observe any spots of improvement out there?
Yes. Steve, what I'd add is that supply is ample in this market, correct? We keep observing modest gains in activity. That said, generally, there's plenty of equipment available. So that inevitably introduces a bit of firmness and margin pressure to some extent. What I mean is, the team is working — as you're aware, we discuss the value proposition, and we note it isn't solely about the equipment margin piece. It also covers product support and availability, plus assisting our customers with that whole value prop and a lower cost of ownership. Still, I think looking ahead, the one area I'd point to that remains quite tight is clearly the large engine market, driven in part by data center demand, and mining stays reasonably robust. So that's a tight market with longer lead times. Yet if you consider the GCI and BCP product lines within CCE, supply is ample and, we believe, will stay that way.
One final thing: at any stage, do you plan to separate AVL out as its own segment?
That's not something we do, Steve.
Our following question is from Jonathan Goldman of Scotiabank.
Just a quick housekeeping question for you, John. On construction product support, did you say it was up 6% or down 6%? And on product support margins, did you say they were similar year-on-year?
Yeah, Jonathan — it actually rose 6%. Within product support, construction specifically for the quarter climbed 6%. Mining came in slightly above that.
All right, that's great. So my follow-up is probably a wider one about data centers. Do you expect there will be a chance for you to take part in prime or backup power through <<inaudible>>?
Absolutely, that's a really good question. What I believe you're getting at there are the limitations on the power grid and the shortage of energy as they keep constructing data centers. And I think we'd consider — I'd say there's a somewhat limited chance for resets. The best bridging approach, so to speak, toward the grid would involve bigger solar turbines and similar equipment. However, there's a certain amount of interest in prime power that relies mostly on gas generators, correct? So that's something we will examine. That said, I'd say up to now, our focus has been on the standby and backup power segment, and it's mostly diesel.
Okay, that makes sense. And Mike, you brought up technician headcount, but can you update us on how much it has grown so far this year and also what you're thinking about maybe '27?
Yes. Jonathan, this is something we're focused on. Once again, I'd say we've been ramping up our recruiting efforts. Part of that ties to how we see the business developing and our desire to reinforce the product support side of operations. So I'd say the market is always tight. Hiring is always a challenge, but we've managed it quite well, and we'll keep seeing growth in actual headcount. And I'd say this applies across the business as well. So we've spoken a bit about CIMCO, but on the rental side with the dealership, we keep looking and keep drawing new talent and bringing people on to make sure we're compensating for natural retirements, while also continuing to build that capability over time. So we don't see that declining.
Sabahat Khan from RBC Capital Markets has the next question.
To follow up on what we discussed earlier about margins, I believe you mentioned that margins in that business remain solid. As revenue ramps up, it feels like a lot is coming through in '27. Would it be fair to assume that margins could be in line with what you generated over the course of this year and last? Or is there perhaps a significant directional tilt up or down? I just want to make sure we're in the right ZIP code.
As for a major directional shift either upward or downward, Saba, I’m not seeing one. It’s still early days, admittedly, though that remains our best assessment right now.
Yeah. One thing to keep in mind, I suppose, when we think about it, is the mix as well, correct? As we observed during the quarter, rental product support growth was a bit better, which is encouraging as AVL keeps adding to production. They're performing very well, I mean. But we'll — as John described the new facility and as we watch that play out through '27 and '28, just remember when you're modeling how you blend that margin through, the equipment segment, I think, will be well supplied, as we discussed earlier. So...
My apologies. Perhaps I should dig in a bit more — I may not have — I was thinking maybe more specifically about the AVL, I suppose, simply because it's becoming a larger portion of the revenue mix. Given the ramp there, might that shift margins in either direction?
No. As I mentioned, I don't expect much change from AL at the current production site. What you'll see once the new facility is operational is that, just as happened with Charlotte, some costs will come before revenues. So there could be a little compression in that area. Still, on the whole, I wouldn't anticipate a significant shift either upward or downward, Saba.
And then, I suppose that might just be implied in there as well — with margins, I guess, staying fairly steady as we move ahead, are you seeing solid pricing power in that business, given what demand looks like in the AVL business?
On the AVL side, I'd say once more that this is a segment we intend to handle with real care. Our priority is squarely on pushing cost efficiencies and similar improvements, since, as you'd expect, while this segment has been developing there was a stretch when engine and enclosure production capacity was tight, among other things. Still, in my view a substantial amount of capital is flowing into that market. And I think you'll naturally begin seeing additional competitors appear, and potentially some strain on certain pricing. So our aim is to be the leading supplier — the most dependable, with high quality — and likewise concentrated on auto-like manufacturing capabilities so we can generate efficiency on the production side of the business and thereby help offset whatever pressure shows up at the top end or on margin, correct?
Alright, and perhaps just a final quick question — I suppose it's about the idea of limited supply in the current climate. How are you seeing your supply chain for the AVL business? I think it may be less complicated than the engine supply chain, but with that large backlog, have you managed to secure supply so you can deliver against it?
Yeah, I'd say on the supply side we feel fairly at ease, right? When you really think about it. Of course, engine supply is a major factor, as you pointed out, and we're continuing to watch how engine availability shapes production and so on. But we've been working quite hard to make sure our suppliers — whether that's fuel tanks or panels or whatever else — and we've also added, within our Power and Energy group, we've also added a capability to help assemble switching and camboards and similar items, which we had in the Power and Energy Group. So that capability has been strengthened, and it also helps us offset some of that supply chain requirement. So overall, I'd say we're comfortable with the direction it's going, and given what we see in the backlog and so forth, comfortable with that positioning.
Our following question is from Cherilyn Radbourne at TD Cowen.
I have just a couple more quick follow-ups. If we put AVL to one side for a moment, could you describe what trends you are observing across the wider Power Systems business?
Yes, that’s a fair question, Cherilyn. What we’re observing, as you’re aware, is a bit uneven. Take the broader market—there’s been some conversation about the marine segment, for instance. And as certain defense-related opportunities become available, that might generate some projects further out. Those are definitely longer-term in nature. On the power side, we keep identifying opportunities involving bridging strategies—bridge to grid and similar areas where constraints exist, driven in part by data centers, but also by other industrials seeking to peak shave and pursue similar measures. So it’s a fairly diversified group, as you know. And I’d characterize our view as cautiously optimistic regarding what we’re seeing on energy requirements over the longer term, along with additional opportunities in distributed power and so on.
Thanks. It also looked to me like CIMCO's package revenue moved more toward the industrial side rather than recreational during the quarter, at least. I wasn't sure whether that reflected a trend or was simply the usual lumpiness in the business.
Yeah. That’s just ordinary unevenness, Cherilyn. It rises and falls, as you’re aware, from one quarter to the next. And like Mike mentioned, we had a few bigger projects in there, and based on which segment it falls into, you’ll notice that unevenness.
Steve Hansen from Raymond James has the next question.
Just a quick question. I'm curious about a rule of thumb here — is there some way to estimate how many megawatts of power that $1 billion order would cover? I'm just trying once more to frame the announcements we're seeing out there against your order flow and get a sense of what we should be thinking about in terms of what it covers.
Yeah, Steve, that one's tough, because every site has power needs that differ quite a bit, right? Broadly speaking, what we tend to say is this: take a big block such as the 16 — each unit there can produce roughly 2.5 megawatts, right? So a few of the bigger facilities are able to draw more than 100 megawatts. But it's really hard to pin down. I'd put it this way — I wouldn't convert that into a metric of that kind, simply because facilities vary and so do their power requirements.
That brings us to the end of the Q&A. I'll hand the conference call over to Mr. John Doolittle now. Sir, the floor is yours.
All right. Wonderful. Thanks, Angeline. I appreciate all of you being here with us today. And thank you for those excellent questions. That brings our call to a close, so please stay safe out there. Have a wonderful day. Thanks so much.
Thank you. That brings us to the end of today's conference call, everyone. We appreciate your participation. You're welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Toromont Industries Ltd. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Toromont Industries Ltd. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.