Good morning, everyone. I'm Livia, and I'll be serving as your conference operator for today's call. Right now, I'd like to extend a welcome to all of you joining TransAlta Corporation's Third Quarter 2025 Conference Call. Every line has been muted so that background noise won't interfere. Once the speaker finishes their remarks, we'll open things up for a question-and-answer session. Should you wish to pose a question at that point, all you need to do is press Star 1 1 on your telephone keypad. And if you'd like to retry a question, just press Star 1 1 once more. Thank you. Ms. Paris, the conference is yours to begin.
Thanks, Livia. Hello, everyone. I'm Stephanie Paris, Vice President of Investor Relations and Corporate Strategy at TransAlta. It's good to have you on TransAlta's Third Quarter 2025 conference call. Joining me are John Kousinioris, President and Chief Executive Officer; Joel Hunter, EVP Finance and Chief Financial Officer; Blain Van Melle, EVP Commercial and Customer Relations; and Nancy Brennan, EVP Legal and External Affairs. This call is being webcast, and if you're listening by phone, I'd encourage you to pull up the supporting slides posted on our website. A replay will be available later today, and the transcript will go up on our website shortly after that. Everything shared on this conference call falls under the forward-looking information statement qualification on Slide 2, which is described in more detail in our MD&A and incorporated in full for today's call. Unless we say otherwise, all amounts referenced are in CAD. The non-IFRS terminology we use, including adjusted EBITDA and free cash flow, is reconciled in the MD&A for your reference. On today's call, John and Joel will walk through an overview of TransAlta's quarterly results. Following those remarks, we'll open the line for questions.
Having said that, I'll now hand things over to John.
Thank you, Stephanie. Good morning, everyone, and thank you for joining our Third Quarter Conference Call for 2025. As part of our commitment towards reconciliation, I want to begin by acknowledging that our company operates on the traditional territories of Indigenous peoples across Canada, Australia, and the United States. We recognize the rich and diverse histories, cultures, and contributions of the First Nations, Inuit, Métis, Aboriginal, and Native American communities, and it is with gratitude and respect that we thank the peoples who have lived on these lands for reminding us of the ongoing histories that precede us. TransAlta delivered solid performance during the third quarter, demonstrating our fleet's resilience during challenging market conditions. Our Alberta portfolio hedging strategy and active asset optimization continued to generate realized prices well above spot prices while availability remained high across the fleet. During the quarter, we delivered adjusted EBITDA of CAD 238 million, free cash flow of CAD 105 million, or CAD 0.35 per share, and average fleet availability of 92.7%. Based on our results to date and expectations for the fourth quarter, we remain confident in achieving our 2025 guidance range. We are tracking to the lower end of the adjusted EBITDA range and the midpoint of free cash flow, which Joel will speak to later in the call.
As everyone is aware, advancing our legacy thermal opportunities remains a top priority for the company, and we kept at that work throughout the quarter. Our data center project in Alberta is going to help power a new industry within that province, while in Washington our Centralia project is set to support reliability for decades ahead. Commercial negotiations on both of these projects kept moving forward during the quarter, and although our confidence in advancing these key priorities is unchanged, we have chosen to move the date of our Investor Day to the first quarter of 2026, after the data center and Centralia announcements are made. At that point we will give you detailed updates on both projects and how they affect our company, along with the opportunities we see across each of our core markets. Turning back to the quarter, we signed agreements extending our committed credit facilities, which total CAD 2.1 billion, with our syndicate of lenders. Our syndicated facility of CAD 1.9 billion now matures on June 30, 2029, and our bilateral credit facilities of CAD 240 million received a one-year extension, to June 30, 2027. During the quarter, we closed the sale of a 100% interest in the 48 MW Poplar Hill facility, as the terms of the Heartland Generation acquisition require.
After the quarter, on October 2, we also completed the sale of a 50% stake in the 97 MW Rainbow Lake facility. As set out in the transaction terms, the proceeds from these divestitures are directed to Energy Capital Partners. This represents the successful wrap-up of the last remaining regulatory conditions tied to the Heartland acquisition. In August, the AESO unveiled its final design for the Restructured Energy Market, or REM, and I'll address that in a moment. The government of Alberta also put forward proposed amendments to the TIER regulations. Those proposed changes include treating on-site emissions reduction investments as a compliance pathway within the TIER system. That could affect the emission credit market. Still, since the bulk of our credits get applied internally against our gas fleet's emissions obligations, we don't expect this change, should it be implemented, to be material to our business. Lastly, we keep engaging directly and collaboratively with the government of Alberta and the AESO regarding the Alberta data center strategy and how they plan to approach Large Load Integration. Turning more specifically to what we're doing to realize the value of our legacy generation sites, at our Centralia site we are actively in commercial negotiations with our customer and expect to be able to execute a definitive agreement before year-end.
At that point, we’ll be in a position to lay out our detailed development plans for the site. We’re also continuing to move forward with our Alberta data center strategy and the related commercial negotiations. Not long ago, we signed a demand transmission service contract with the AESO covering 230 MW, which accounts for the entire allocation granted to the company under phase one of the AESO’s data center Large Load Integration program. In September, Parkland County gave unanimous approval to rezone more than 3,000 acres of TransAlta-owned land around our Keephills and Sundance facilities to support future data center development. We appreciate that community support, which marks an important milestone in advancing the opportunity for new investment, job creation, and economic growth in the region. We’re continuing to work closely with our counterparties on their data center project and are making steady progress toward finalizing a memorandum of understanding. We’re also continuing to engage directly with the provincial government and the AESO on phase two of the Large Load Integration program. We’re excited about the data center opportunity in Alberta and the meaningful investment it can bring to the province. In August, the AESO announced its final design for the Alberta Restructured Energy Market, or REM.
This structure aligns with what we anticipated, brings more certainty to the market, and bolsters system reliability—something our varied and dispatchable generating fleet in Alberta is particularly suited to deliver. Of note, the REM will assist in making sure suitable price signals reach generators, which enables investment in reliable generation and keeps Alberta competitive with other jurisdictions. Under the REM, the provincial price cap rises to CAD 1,500 per megawatt hour and in time to CAD 2,000 per megawatt hour, along with added Administrative Scarcity Pricing when system conditions are tight. The REM additionally establishes a new Ramping Product to strengthen system reliability—our dispatchable fleet is well positioned to provide it—and it shields incumbent generators from any negative effects of adopting Locational Marginal Pricing by allocating Financial Transmission Rights. Implementation of the REM is anticipated for 2027 or 2028, and we will stay actively involved in the AESO consultation process, which now centers on implementation. In our view, the market changes the REM brings, together with expected load growth from the fully allocated 1.2 gigawatts of data center system access that the AESO has granted, will cause Alberta's imbalance between power supply and demand to improve and bring about a recovery in the province's merchant power price, to the benefit of our diversified legacy fleet.
Forward pricing is starting to capture the shifting balance of supply and demand in the province — a shift driven by electrification, data center load, and population growth, together with fewer incremental new supply additions reaching commercial operation, all of which makes the generating fleet we already own more and more valuable. Today there seems to have been a reaction to a mention that Project Greenlight's data center in-service date has slipped to 2030. As we understand it, that date is very much an outside one, and Kineticor and its customer are still working toward bringing the project into service in 2027 or 2028. Our view, grounded in the information available to us, is unchanged: forward prices have not yet completely incorporated the effect of the REM or of the 1.2 gigawatts of data center load set to come online. The load growth we now anticipate, building gradually, will offset the present oversupply of generation in the province and create long-term growth opportunities. TransAlta's dispatchable thermal and hydro fleet has capacity available today to deliver reliability and meet the load growth we expect. Before handing the call to Joel, I want to say a few words about my upcoming retirement. As announced today, I will retire from TransAlta and from its board effective April 30, 2026.
Serving as the head of TransAlta has been a privilege, and so has collaborating with a team that is both so dedicated and so capable. Alongside our board, we've transformed the company and laid a solid groundwork for what lies ahead — lifting returns for shareholders, posting robust financial outcomes, steering through shifts in regulation, broadening our operations, and readying our fleet to serve the future requirements of customers. I give Joel my full backing as TransAlta's incoming President and CEO. He is a leader with a proven record and the ideal individual to carry TransAlta's strategy forward. Over the months ahead, I'm eager to collaborate with him, the management team, and the board to help make the transition a success. With that, I'll turn the call over to Joel.
Thanks, John, and good morning, everyone. First, I want to congratulate John on his upcoming retirement and express my appreciation for his leadership, guidance, and strategic vision for TransAlta, along with his active support of my leadership. I look forward to working together to ensure a smooth transition and continued execution of our strategic priorities. We will announce the CFO successor in the coming months. Turning now to our third quarter results, I'll start with an overview of the period where our fleet demonstrated resilience in softer market conditions. During the quarter, we generated CAD 238 million of adjusted EBITDA, which was CAD 77 million lower than the third quarter of 2024 due to lower Alberta and Mid-C power prices, subdued market volatility impacting energy marketing and trading results, and lower contract revenue from our Centralia facility. Turning to our segmented results relative to the same period of 2024. Hydro segment adjusted EBITDA decreased to CAD 73 million, compared to CAD 89 million last year due to lower spot power prices in Alberta, as well as lower Ancillary Services revenue, which was impacted by lower availability from higher planned maintenance outages. Through optimization, we were able to reallocate these services to our gas fleet, maintaining our market share of the associated ancillary revenues.
Revenue from environmental and tax attributes sold to third parties likewise came in below the prior year. Adjusted EBITDA for the wind and solar segment reached CAD 45 million, matching the third quarter of 2024. Within gas, adjusted EBITDA fell to CAD 110 million from CAD 141 million in 2024, driven largely by weaker realized power prices in Alberta and increased carbon pricing, partly offset by the Heartland assets, which lifted contracted production, plus additional Ancillary Services revenue stemming from production optimization across the gas and hydro segments. The energy transition segment posted adjusted EBITDA of CAD 28 million, down CAD 6 million year over year on softer market prices, partly offset by reduced purchase power costs and a greater volume of favorable hedge positions settled. Energy marketing adjusted EBITDA declined by CAD 25 million to CAD 17 million, mainly reflecting relatively muted market volatility throughout North America and in natural gas and power markets, as well as fewer realized settled trades in the quarter versus last year. Corporate adjusted EBITDA matched last year at CAD 35 million. As a reminder, ERP costs are excluded from our adjusted EBITDA, since the integration does not reflect ongoing operations or the performance of our operating assets.
On the whole, free cash flow came in at CAD 105 million for the third quarter, and that was CAD 26 million below what we saw in the same period a year earlier. Adjusted EBITDA was lower and net interest expense was higher, though those effects were partly offset by a reduction in current income tax expense and smaller distributions paid to non-controlling interests. Moving to the Alberta portfolio, the third quarter spot price came in at an average of CAD 51 per megawatt hour, below the CAD 55 per megawatt hour average recorded in 2024. That year-over-year decrease stemmed mainly from additional generation as new gas and renewable supply came online in the province, along with benign weather. During the quarter, we put hedging strategies to work to strengthen portfolio margins and soften the effect of weaker merchant power prices. We captured the benefit of roughly 2,500 gigawatt hours of hedges at an average price of CAD 66 per megawatt hour, which is a 29% premium to the average spot price. Beyond that, our hydro fleet achieved an average realized merchant price of CAD 76 per megawatt hour, a 49% premium to the average spot price, and the gas fleet achieved an average merchant price of CAD 79 per megawatt hour, a 55% premium to the average spot price.
For our merchant wind fleet, which isn’t usable as firm power for hedging, the average price realized was CAD 28 per megawatt hour. We also managed to deliver extra ancillary volumes throughout the Alberta fleet. During the quarter, hydro ancillary service pricing gave us an average realized price of CAD 47 per megawatt hour, which was 8% below the average spot price. Because Ancillary Services were optimized toward the gas segment from hydro during planned outages, the gas segment’s average ancillary service price came in at CAD 41 per megawatt hour. Even though weather in the quarter was relatively benign, pushing spot power prices lower, we added margin by using purchase power to cover part of our higher-priced hedges when prices sat below our variable production cost, so the overall realized price per megawatt hour produced was CAD 103, versus CAD 90 per megawatt hour in last year’s same period. For the rest of the year, roughly 1,900 gigawatt hours of our Alberta generation is hedged at an average price of CAD 72 per megawatt hour, which is well above the current forward curve of CAD 57 per megawatt hour. Looking ahead, we expect to keep optimizing the fleet and to cut production during low-priced, high-supply hours by meeting our financial hedges and customer requirements through open market purchases.
Turning to next year, the team has raised our hedge position to roughly 7,800 gigawatt hours, at an average price of CAD 66 per megawatt hour, and that is still well above where forward pricing sits today. Given our year-to-date results and what we expect for the balance of the year, we remain confident in the 2025 outlook. At present we are tracking toward the lower end of our adjusted EBITDA range, mainly because the Alberta spot power price is tracking to the bottom of the outlook range of CAD 40-CAD 60 per megawatt hour. Right now, we expect the full-year spot price to average CAD 46 per megawatt hour. On sensitivity to the Alberta spot power price, CAD 1 per megawatt hour is expected to have a CAD 2 million impact on our adjusted EBITDA for the balance of the year. Other factors affecting adjusted EBITDA include lower wind resource and subdued market volatility. Free cash flow is tracking to the midpoint of the outlook range, since the adjusted EBITDA impacts just mentioned are partially offset by lower expected current taxes and lower expected distributions to non-controlling interests. As we did in the past year, we'll give a fulsome 2026 outlook update on our fourth quarter 2025 conference call in February.
John, the call is yours again.
Thank you, Joel. For 2025, our priorities remain as follows. First, we aim to deliver adjusted EBITDA and free cash flow inside the guidance ranges we set for 2025. Second, we intend to strengthen both our leading and lagging safety performance indicators while also attaining robust fleet availability. Third, we want to capture the most value we can from our legacy thermal energy campuses — by seizing the opportunity that comes with landing a data center customer at Alberta Thermal, and by moving our coal-to-gas conversion at Centralia forward. Fourth, we will actively pursue any strategic M&A opportunities that come up. Fifth, we will keep our financial strength and flexibility intact. And finally, we will carry out the upgrade to our ERP System successfully. In my view, TransAlta presents a compelling investment opportunity. As a safe, reliable operator, we generate strong cash flows supported by a diversified portfolio of hydro, wind, solar, and gas assets spread across three countries, and enhanced by our leading capabilities in asset optimization and energy marketing. Substantial and expanding value exists within our legacy thermal sites, and our team is working actively to repurpose them so they can help satisfy the rising demand for reliable generation in the jurisdictions where we operate. We also continue to lead in clean electricity, concentrating on concrete reductions in greenhouse gas emissions, and we stay on track to reach our ambitious 2026 CO2 emissions reduction target.
We stay disciplined when it comes to growth, concentrating on returning value to shareholders while we diversify our portfolio inside our core jurisdictions and make our cash flows steadier and more contracted—and our company rests on a solid financial footing. There's flexibility in our balance sheet, and we hold ample liquidity to chase and complete several growth opportunities, plus the capacity to give capital back to shareholders as well. Last, and most importantly, we have our people. Our people are our greatest asset, and I want to thank every employee and contractor for their dedication in positioning the company for success through the rest of 2025 and beyond. Thank you. I'll now hand the call to Stephanie.
Thanks, John. Livia, could you go ahead and open up the line for analyst questions?
Just a quick reminder — if you'd like to ask a question, press Star 11 on your phone and hold until your name is called. Should you wish to pull your question, just hit Star 11 once more. Please hang tight while we put together the Q&A roster. Our first question is from Robert Hope at Scotiabank, and your line is open now.
Good morning, all, and congratulations to John and Joel on the announcements.
Appreciate that, Robert.
Appreciate that, Rob.
Great, thanks. Now, regarding the data center side of things, it looks like talks with potential customers for the Alberta facilities are taking longer than we had expected. Could you give us a bit more detail on what's behind that, and also tell us whether your confidence in landing a project has gone up or down since the Q2 call?
Robert, we still feel good about our capacity to move forward with the data center opportunity we have here in the province. Look, it's a major initiative both for our prospective customers and for our company. It takes time to make sure that all of the details that we need to work with, and frankly, there are multiple parties involved in bringing it forward. It just takes time to do all of that. Phase two of the AESO process and the government of Alberta process in terms of Large Load Integration is also critically important. That's taking a little bit of time to sort out because, at least from our own perspective, it isn't just about the initial 230 MW that we've got. It's about how we're thinking about phasing. A real data center opportunity for the province and for our company. All of this takes time, but we're tracking. We remain the confidence that we had last quarter and in other earlier times of the year to move it forward. It is very much a key priority for our company.
Thanks for that. Are you currently talking with additional data center clients in Alberta about shorter-term arrangements? You brought up Greenlight. You sound confident it might enter service in 2027 or 2028. What's behind that confidence, and might you also be delivering power to them during that window?
Every conversation we're having and all the effort we're putting in really center on one single opportunity. At least from TransAlta's standpoint, we've gone with an exclusive approach toward those prospective customers. That's how we're viewing it. We also expect that once we can announce our MOU and start moving forward, we'll begin to see load arriving at our sites gradually—and likely somewhat sooner than what Kineticor currently anticipates it would have coming in. Hopefully that gives you a bit of color.
Yes, thanks.
Thanks. We’ll take our next question from Mark Jarvi at CIBC, and your line is open now.
Thanks, Aron, and congratulations to Joel and John. I don’t want to get ahead of things too much, but after the MOU is actually signed, what happens next? What kind of timeline do you foresee for reaching a binding agreement? And since reaching the MOU has taken somewhat longer, does that mean the period between the MOU and the final agreement will be shorter?
Mark, good morning. Look, we'd want to move pretty fast, I think, and we've already started getting our team ready and getting things set up internally so we can reach definitive documentation fairly quickly and push that forward. I can't give you a specific timeline for when that would happen, but certainly I'd be pushing our team to try to get it done as soon as possible. I think one of the key elements of the MOU is having enough specificity in it, and an understanding of the arrangements between us and our customers, to permit that to make the definitive documentation a bit easier to proceed. I think it's going to happen in a — I think it'll actually be quicker than certainly it's taken to get the MOU done is what I would say.
Alright. You keep saying counterparties in the plural. Could you explain a bit more about what that actually means? Is that on the funding side, for the customer? Is it some kind of joint venture on the data center? Anything you can share on that, and on the fact that it's multiple customers? How has that affected the timeline for reaching an MOU?
Yes, we're engaged with more than one customer. We're collaborating to bring that opportunity to fruition. Honestly, that's been true for the entire span of our engagement. Given our current stage in the process and the way we're working through it, there isn't much more I can share with you, Mark. I wish I could, but I can't.
All right. During the previous call, you said you saw those coal-to-gas conversion units that aren’t fully utilized as something like added generation capacity when you consider phase two, and that you were attempting to hold those discussions with the AESO and the government. What progress has been made on that front, and is that idea gaining any traction?
Glad you brought that up. On phase two, we've had talks. Joel, Nancy, and I have devoted quite a lot of time to it, and Blain has participated too as we move ahead. I'll offer some perspective on where our company stands, and our impression is that the government has received it favorably. To give you a rough idea: first, we don't see co-location as required. In our view it would be preferable — there's no necessity to site the data center alongside the generation as we go forward. That's point one. We firmly think that underutilized generation, such as our coal-to-gas units, would function much like added supply and could serve the demand from data centers arriving in the jurisdiction. That works as a bridge until new generation gets built during the 2030s to cover that need. The reason is that reliability, sustainability, and cost aren't the whole story. Speed counts, and those are exactly the units required. That's especially true considering the difficulties in the supply chain. Practically speaking, I'd say securing a turbine, for instance, or transformers takes many years.
I think they play a pretty important part in moving us from where we stand right now toward where we see the market heading. That's what we've been pushing for. I do believe the government gets that position, and frankly, I think there's some merit to it.
To build on that point, John — regarding what you called a possible bridge, I want to clarify. Do you mean that a portion of the megawatts that are underutilized could be seen as available for a period of 3 to 5 years, roughly a couple of years plus more, until additional megawatts arrive? Or could it instead count as "permanent supply" from the standpoint of the phase two process?
Right, I’m not sure we’re really viewing that as permanent supply, at least not necessarily. Take a unit running at a 20% capacity factor, for instance — there’s a lot of horsepower still left in that unit to operate and serve incremental data center needs over a period of time. When we look at Keephills Two, Keephills Three, the Sheerness facilities we have, Sundance, and our ability to potentially bring something new to the market in the fullness of time into the 2030s, we absolutely see a bridging role during phase two to get that there.
Got it. All right, thank you all.
Appreciate it.
Thanks. The next question is from Benjamin Pham at BMO Capital Markets, and your line is open now.
Hello, and thank you — good morning. I'd like to follow up regarding the postponement of your investor day. The rationale behind it is something I can appreciate. What I'm curious about is this: when the investor day was originally scheduled, looking back, was securing the MOUs on both of those projects your priority? My recollection is somewhat hazy, but I believe it had more to do with refreshing your long-term strategic capital allocation process. Has that shifted as time has gone on?
No, Ben, that date was chosen with this expectation in mind. We would have preferred somewhat greater certainty, or the capacity to give a bit more clarity on the data center strategy we have underway, certain other initiatives we are pursuing, and Centralia as well. Landing those items has required a little more time from us. We could have held the investor day, but as we see it, it would not have been the investor day we wanted in order for all of our investors and the investment community broadly to grasp how these projects affect the company and to possess every building block needed to fully understand the company's go-forward strategy. It is really that simple. We had selected a date. We believed at the time that prospectively it would be something we could comfortably meet. We are still working through everything and our confidence level remains. We simply want to ensure we hold a good investor day, one that will be helpful to our investors. That is what we have decided to do.
All right, understood. Regarding what you said about the interconnection queue and the updates — I mean, the in-service dates you brought up are usually on the cautious side and they do shift. Given that things are moving somewhat slower at a few of your developments, does that justify perhaps having your projects consider some external dates?
Yeah. No, I think we feel fairly at ease with our current position, since what we're considering — keep in mind, this will be an opportunity tied to the grid — and then we'll essentially be addressing the generation requirements that the entity holds. So we're quite comfortable regarding our capacity, from a power standpoint, to satisfy the needs of the supply we provide for our customers. I think we're in a solid position there. From where we sit, the schedule will be dictated more by how long it actually takes to construct the data centers and get that infrastructure established. There's a substation, I believe, that we need to install, but that's something we're fairly confident about, both in terms of supply chain and from a schedule standpoint, to complete. We're not — I can tell you that as of today, TransAlta isn't worried about the sort of timing considerations surrounding our data center opportunity.
Alright. And if I could just get one statistic here, that 3,000 acres — I mean, in theory, that's an enormous quantity of megawatts you could add on top of that land.
That's right, I agree with you. We view this as a major opportunity. We're thankful for how Parkland County has engaged with us — they also recognize the chance for the county to have a genuine data center hub just west of Edmonton. Everything we're doing, as I said earlier on this call, is not solely for the 230. It's because we picture the larger campus we're hoping to build out over time.
All right, thanks — and congratulations to you both, John and Joel.
Appreciate it, Ben.
Appreciate it, Ben.
Thank you. We now take a question from Maurice Choy, who is on the line from RBC Capital Markets — your line is open.
Thank you. Good morning, everyone. You brought up planning alongside your customers for phases past 230 megawatts. You also mentioned that AESO's phase two is critically important. If you look ahead from now until sometime in Q1, when your investor day takes place, I suppose putting it the other way around, what would be the leading reason that might push your timeline off course and make it even later?
Sure. Look, speculating is hard. What I can really say is — and honestly, all we can tell our investors is — that we keep working, I'd say relentlessly, to get our facility set up and to secure the permitting around the opportunity in front of us. From a TransAlta standpoint, and from a timing standpoint, we don't see — how should I phrase this? — problems that might come up in getting there. We're collaborating with our customers, since they in turn face knock-on effects they have to handle so they can land all of that and better grasp what the future pathways look like. We have confidence in phase two. We believe the government and the AESO are committed to growing a data center industry here in Alberta. It's a priority. Our team is now engaging with very senior people in the government, and nothing I've heard would indicate otherwise. To be honest, there isn't really a derailer I would see in us moving through.
I’ll just add a brief follow-up on that. Do you see any regulation or policy—whether federal or provincial—that is absolutely essential to provide clarity so this MOU and definitive agreement can move forward?
Having some clarity on where phase two will ultimately land would be useful from where we sit, since that would let us plan around it—and I believe we can deliver inside that. Getting that resolved matters. The other piece, and we have discussed this previously, is that the Clean Electricity Regulations are still something of a hurdle for us. We are putting in significant effort to preserve as much optionality as possible so we can operate within those rules in their present form. That way we can capture the potential we see in the data center work. When our team considers these matters, honestly it is the CER that occupies our long-term thinking as something requiring active management. Phase two is really about clarity, which we expect will be established. I hope that gives you a sense, Maurice.
That's right. And that might be precisely where I'll wrap up when it comes to federal policy. Clearly, the Canadian federal budget was released earlier this week. It doesn't seem as though we received a great deal of clarity regarding either the CER or the industrial carbon tax as we head toward 2030 or past 2030. I'm aware that the Alberta government has held the carbon tax at CAD 25 per ton. What could you tell us about what you expect for both the CER and the industrial carbon tax through 2030 and after that?
Look, if I answer that, I'd just be guessing. What I can say is that our internal modeling involves running quite a few scenarios when we evaluate our fleet. Those range from the carbon price holding at CAD 95 all the way to it staying on the trajectory expected through 2030. What I can say is that we're still engaged with the federal government on the CER. I believe it was last week that our team was in Ottawa having conversations about it. Later today, in fact, I'll be discussing it again. For us, this is a continuing process of dialogue.
Just a quick follow-up on that. Regarding the risk from federal policy shifts, who actually bears it? Does that fall to your data center customer, or would it sit with you? Is that piece still being negotiated?
That's a matter we're actively resolving together with the customers. I'm not in a position to share particular specifics on it. What we aim to accomplish, I think, when we map out the opportunity before us, is to make sure it's robust and, frankly, insulated from a degree of regulatory uncertainty, to be honest, Maurice. That's genuinely what we're attempting to do. Partly, when you hear the company speak about being more contracted and about how we're diversifying, part of that is driven by a wish to insulate the company from any regulatory shifts or repercussions that occur. That's genuinely the approach our team is taking when it comes to the data center file. Frankly, I'd say it's a similar approach in Centralia. Blain and his team are working on that. Same situation there. It's a real focus for us.
Excellent. Congratulations to John and Joel, both of you, and I hope to meet up with them when they visit.
Excellent. Many thanks, Maurice.
Thanks. The next question is from John Mould at CIBC, and your line is open now.
Hello, and good morning to everyone. At the risk of diving a bit too deep into the details, I'm just trying to read the tea leaves a little further regarding those AESO in-service dates. So the Keephills load ISDs, as AESO reports them, are 100 MW by January 2027, and then an additional 115 MW at mid-year. How should investors think about the timelines for your projects as given in AESO's data? Do those timelines represent when the load could genuinely be online, or are they more a schedule for when those projects would be ready to hook up to the grid from AESO's point of view? Just help us get a handle on that piece.
Right. So those dates are really anchored to when we believe we’d start to start, if you follow me. They’re connected to the point at which the grid interconnection would happen and when the load would begin ramping up. They aren’t linked, John, if you catch my meaning — they’re tied. We do expect load to be phased in gradually over time. What we’re looking at doing — I brought up the substation earlier — would be a full facility capable of accommodating the generation ramping up completely over time. Keep in mind, AESO requires the load, I believe, to be in place — I think that’s December 1, 2028, correct? That’s what we currently expect.
All right, I'd like to get some clarity on what you said regarding phase two. Is there anything about phase two that you or your customer still need spelled out—even if it's only preliminary information about bring-your-own-power or allocations—so that an agreement can be finalized and you can have line of sight on some of that? And then the aspirational piece—though maybe aspirational isn't the right word—the potential multi-stage development you mentioned in your news release: what timeline are you hoping for in terms of giving the market more clarity on the key aspects of phase two?
Regarding that final item, it seems quite evident to us that both the AESO and the government recognize that receiving certainty sooner rather than later would be beneficial. I'm unable to provide a specific date for when we might obtain it, but I do know they are attempting to proceed at a suitable pace so they can give us that degree of clarity. I would say the most important thing, at least from my own standpoint concerning phase two, is simply gaining a clearer understanding of what bringing incremental power entails and what role our legacy facilities, where we do have capacity, can play in that context. From a planning standpoint for us going forward, that is probably the top priority. We are working to build optionality so that we can handle it regardless of which way it goes. That is something we keep working on. Certainly, we would be in a position to offer greater clarity on it to our investor there.
All right, thank you for that. Perhaps just a final question about your hedging approach and mid-term pricing. I'm curious what level of interest you're seeing from C&I customers when it comes to signing mid- to long-term agreements, given that power pricing conditions could normalize quite substantially over the coming few years. On your end, how are you weighing that possible uptick in appetite against your own goals for serving large loads?
Yeah. Look, I might begin, and then I'll have Blain jump in, since his team is the one that sort of oversees all of that work. I'd say — and Blain, feel free to correct me — but I'd say things have been fairly steady. I'd say the C&I demand that we have — and I think we're actually the biggest C&I player now in the province of Alberta — the C&I book that we hold, from a renewal standpoint, an incremental business, it kind of carries on as business as usual. We keep seeing our customers roll over. I think the average tenor, Blain, is roughly in that three-year kind of range. We've seen some of the recontracting prices come down a little bit, I would say, Blain. Blain will be able to give more color as they rolled off, because some of them were done when we had higher power prices, and it kind of takes time for that to roll off. We are seeing that. Those prices are still constructive from our perspective. When you're looking at kind of 2028 or late 2027, 2028, which is when we would expect to see kind of the forward curve in the merchant market tighten up.
Honestly, Blain, at this moment I don't believe that's shifting the needle much for the 1-year, 2-year, or even 3-year renewals. I mean, I'm not sure what your views on it are.
John, you've got that exactly right. Even with the lower prices we're seeing at the moment, the C&I business really hasn't stumbled. Recontracting is still very robust. We keep pulling in some solid premiums over the financial market. As we go forward from here and as some of that load begins to materialize — something already reflected in the forward price — I'd expect contracting levels to ramp up a bit as customers start needing to plan for those power needs in later 2027, 2028, and 2029. Yeah.
All right, I really appreciate the background you provided. I'll stop my questions here. My congratulations go out to Joel and to John on the announcements.
John, thank you very much.
Appreciate it, John.
Much appreciated. The following question is coming to us from Julien Dumoulin-Smith, who is on the line with Jefferies — Julien, your line is now open.
Hey, good morning, everyone. John, it’s truly been a joy working with you through the years. Joel, congratulations. Getting to know you better lately has been great, and those are big, exciting shoes to fill here given the data center opportunity. Turning back to the opportunity in front of us, and speaking of that, I’d like to grasp a bit more regarding the Greenlight situation and what AESO posted here. Since all of you express clear confidence that there remains a capability to have that project in service by 2027 or 2028, what was the aim of this AESO update that got posted? I just want to understand exactly what happened if there doesn’t appear to necessarily be a timeline push from your viewpoint, just to make that clear, because obviously the market out there is quite perturbed about this timeline issue.
Yes. So, we’re aware this surfaced — when exactly? — yesterday, when the revised date was, I believe, figured out from individuals. I mean, fundamentally I’d say that’s really a matter for Kineticor rather than TransAlta. What I can say is, we’ve held conversations with Kineticor, and we definitely have a perspective on the situation from a government standpoint. According to those conversations, they are continuing to target 2027 to 2028 — and not only them, but their customer as well, from what we understand. I’m aware they have a bit of a — in the location where, and this isn’t a secret, especially — in the location where they intend to essentially establish everything. They are working to ensure there are no transmission-related restrictions. I believe one item they’re considering under a worst-case scenario is: if some debottlenecking is required, what would that involve? I don’t think that’s their intended path, and certainly not while the load would be ramping up. Everything we’ve heard through our engagements is that we are still tracking — and they are still tracking, more importantly, never mind us — toward that 2027, 2028.
With any luck, that provides a bit of context for you.
Understood. There's been some attention given to possible debottlenecking—to put it more simply—yet that doesn't appear to amount to much, even though the statement is technically there on the website. Based on what you grasp about how transmission works in practice, it comes across as a relatively small matter.
As far as I understand it, that 2030 date—I'm not really sure how to characterize it. It's nearly a worst-case type of situation regarding where they stand. It's kind of an outer-bound date. Look, the concept behind phase one is that you'd have completed this by the close of 2028. It's quite evident that they've held some talks to ensure they've preserved complete optionality regarding their opportunity. Frankly, we'd be doing the very same thing. I believe I can say, from our company's viewpoint, that we keep operating and see things continuing as business as usual.
Great. All right, thanks for clearing that up — I appreciate it. Just a quick follow-up on Centralia. I realize this has been something of a lingering question, but you mention the end of the year. Specifically, what should we expect by then regarding how big that opportunity is? As things stand today, what are you watching for in terms of what it should look like — customer scope of conversion, and so on?
Based on the effort our teams have put in and how things are moving along, we'd anticipate having this done before the year is out. Our customer, I have to say, has been tremendous to collaborate with—a wonderful partner as we think through the chance we have to deliver reliability services to them. What we'd be looking at is a definitive agreement. That agreement would take the form of an omnibus arrangement covering the work required to switch the facility from coal to natural gas. Revenue streams and revenue tenor would be laid out in it. No further agreements are contemplated under it. This one would be the agreement. We've already completed a fair amount of engineering and costing work, and I do expect we'll be in a position to share with the market roughly what the scope of work at Centralia would involve so we can get done what's needed there—which includes not only converting coal to gas but also some modest life extension, since we've harvested the facility somewhat, plus certain controls work we still need to carry out.
This would be—I'm not sure—Blain and Esima are handling this one too, a comprehensive arrangement, I'd say, Blain. I don't know whether you'd like to add anything.
Yeah, John, I believe that's correct. As you mentioned, our hope is that within the upcoming six weeks before Christmas, we'll be able to share an announcement about something.
There's something we need to announce. Yeah.
What we'd need is a genuinely definitive agreement laying out every piece of work required across the coming 12 months as we get closer to returning that facility to service on natural gas.
You've got it right.
Great, everyone. Thanks for making the time. Once again, congratulations to you both. Wishing you all the best.
Thank you, Julien.
Appreciate it, Julien.
Thanks. The next question is from Patrick Kenny at National Bank Financial, and your line is open now.
Thanks. Morning, all. Yeah, congratulations, John and Joel. Maybe just going back to the rezoning at Sundance and Keephills, given how close the two sites are. I was wondering whether you could talk about how you're thinking of integrating those two assets for a larger-scale customer — in terms of sharing generation, transmission, even fiber and water licenses — and maybe how that would compare with your Sheerness site, or perhaps give a competitive advantage over some other phase two proponents.
Alright, thank you Patrick, and good morning. So 3,000 acres — that's a substantial tract of land, as you're well aware. Our mine up there is pretty extensive, and it actually straddles the highway on both sides. Keephills sits on the south side of that east-west highway, while the Sundance facility is on the northern side. What we did was take a fairly comprehensive approach when it came to rezoning, so that we'd have the ability to flex up in terms of scale. Our initial thinking is that the site, location-wise, would be close to our Keephills facility — in fact, just recalling from memory, it's situated directly south of Keephills. That's where we'd be aiming to build out — the data center plus the substation to support it. Down the road, as we consider optionality and opportunity around Sundance, there's a chance for us to pursue that too. At the moment, though, the focus is more on Keephills. We already have the water access we require. We already have the existing infrastructure we require. And the fiber is nearby.
Honestly, we aren't encountering any real obstacles at this point, though completing the rezoning was essential. As I said before, the process went really well. We put a lot of effort in on our end, and the people in Parkland County were very receptive, which we appreciate, since they somewhat understand the vision of what this could offer.
All right. So with so many things going on at once, Joel, I’m sure you’ll lay out a funding plan at investor day. If the Centralia conversion economics turn out as expected, maybe you could speak to how the returns here might stack up — say, Centralia against backing phase two load growth in Alberta, or even against M&A opportunities you may be looking at down in the U.S.?
Yes, Pat, I’d say that with Centralia, it’s much like any legacy asset where you’re able to extend the operating life through capital spending that comes in at a fraction of the cost of building something new — that would give us attractive risk-adjusted returns. This is an area where we’ll share more specifics with you and the investor community at our investor day coming up, once definitive agreements are signed, so we can describe what it would look like from a cost standpoint, as John mentioned, and what the build multiple would be. Again, in line with our strategy, this would be really attractive risk-adjusted returns for us, supported by a long-term contract. That’s how we want to position ourselves going forward to make our portfolio more contracted. In the same way, any opportunities we see in phase two would also be supported by long-term contracts, with, hopefully, a very attractive risk-adjusted rate of return.
On the M&A front, Joel, I'd say what we've witnessed is somewhat of a—not compression, exactly; I can't come up with the precise term—but more of a realignment, really. Perhaps you could speak a little about the renewable and gas opportunities we're considering, since we haven't discussed that much during this call, though we are actively reviewing a number of acquisition opportunities.
Yeah, John, that’s a fair point. Pat, we’re looking at plenty of opportunities, both on the renewable side and the thermal side. What I’d say is that we’re really seeing a convergence in multiples, so to speak: with thermal generation, it depends on location, it depends on the contract profile, and so on, but those multiples are moving upward toward roughly the lower end of what we see for renewables. That fits with our strategy — we stay technology agnostic, we stay focused on our three geographies for M&A opportunities — but right now the market out there is very robust. For us, the key is just to stay really disciplined in how we allocate capital going forward.
Yeah, I'd describe it as really centered on returns, I'd say. Yeah.
All right, that's excellent. I appreciate the context. Yeah, I'm eager to hear additional specifics once the new year arrives. Thank you.
Thanks, Pat.
Thanks. Right now, the queue has no more questions. At this point, I'd like to hand the call back to Stephanie so she can offer any closing remarks.
Thanks to all of you. That brings today's call to a close. Should you have additional questions, please reach out to the TransAlta investor relations team.
That brings us to the end of today's conference call. Thanks for joining us, and you're free to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete TransAlta Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to TransAlta Corporation earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.